Architecture Internship-Portfolio

Page 1

ABOUT THE PRINCIPAL ARCHITECTS OF THE FIRM Ideology Believing that every problem has the capacity to inspire unique and creative solutions that motivate growth, the young duo of Badrinath Kaleru and Prerna Kaleru, founded Studio Ardete in the year 2010. Located in Chandigarh, India, the team at Studio Ardete aims to make each project they undertake, a study in logical and comprehensive designing. Their vision is to design spaces that would evolve into art, enriching the lives of people inhabiting them.

Not hesitating to take on even the most challenging of projects, they use modern construction and building methods to come up with designs that are at par with the most accomplished practices in the world. Ardete incorporates new techniques like parametric modelling and customised design elements, unique to each project they take on, striving to use materials available on site to make the projects sustainable. They work closely with the clients to understand their requirements and engage them in the design process, making them an intrinsic part of it.

Working on projects ranging from architecture to interiors, the architects at Ardete are always motivated to transform what is regular and conventional and flirt with the boundaries of art in architecture. Careful deliberation is employed at each step of process for building the project. In the urban and economic scenario today, that dictates most of the construction and architectural practices, Ardete attempts to erase the divide between practicality and innovation. Each project, regardless of the scale is considered complete in itself and attention is given to each and every detail.

Awards

Badrinath Kaleru & Prerna Kaleru, an Alumni of IIT Roorkee , founded Studio Ardete in 2010 as a proponent of “SPACE IS MORE” with the belief that built spaces need to celebrate the Human existence, the Life . Buildings need to connect to its users at an emotional domain. If it happens the physical aspects of space the form, materials and style disappear, The space bonds to its user like another human, its becomes alive.


PROFESSIONAL PRACTICE REPORT STUDIO ARDETE (INDIA) PVT. LTD., CHANDIGARH FEBRUARY 2021- JULY 2021

An Architect is directly responsible for what he or she builds. Direct involvement with the construction and ultimately responsible for the lives of the people. Such a huge responsibility can be dealt with the confidence only when one has the experience to do so. I was fortunate enough to gain such experience in my internship. The main reason being the experience in the profession teaches a lot rather than what we could be studying in academics. I was more inclined towards learning about the execution and implementation of designs on site and how to overcome challenges that come during actual construction. Studio Ardete, the firm where I was interning, provided me with such exposure. The Ideology of the firm: Believing that every problem has the capacity to inspire unique and creative solutions that motivate growth, the young duo off Badrinath Kaleru and Prerna Kaleru, founded Studio Ardete in the year 2010. Located in Chandigarh, India, the team at Studio Ardete aims to make each project they undertake, a study in logical and comprehensive designing. Their vision is to design spaces that would evolve into art, enriching the lives of people inhabiting them. One such ideology enriched ongoing project is a residential high-end luxury 5-Storey Double Duplex situated at E-58, Vasant Vihar, Delhi. Instead of experiencing the in-office culture, situated in Chandigarh, I was physically present at the site office in Delhi throughout the entire internship, working on all the Architectural, Services, Interiors of this Structure. I find this as an advantage since I was able to witness site complications and how designing and construction can ease it. Designing and Implementing Executing it on site are two different things, and working at the site office, helped me experience it. Since the project is built on such an immense scale and systems, including all services, it is taken care of and managed by a PMC Company. In this case, the Management company was held responsible to find the best suitable vendors and contractors for this project, even the Architectural Firm. So the hierarchy goes like this, all the client's demand is taken care by the Management Company, which has their trusted set of Vendors for certain construction related works, which in this case have equal say since the relationship they have with the client. Relationship plays an important role and the quality of the products and services rendered by these vendors and contractors are of high quality and incorporates experienced skill work. The site is being looked after by several contractors for their distinct services, like Window Systems, Interiors, Electrical, HVAC Systems, Plumbing, POP, Light Fixtures, Kitchen, Gas Connection, Lift System, Civil Services. I got the opportunity to interact with all the site supervisors of respective assistance on site.

As per site Measurements, Cross Checking of Work Done, Solutions for site Complication, while interacting with the skilled labor, nourished me to learn a lot from their involvement and expertise. I worked on the Revision of drawings of Electrical Layout, Plumbing, Interiors, Washroom Fixtures, Facade Specifications, Staircase, Selection of Materials, HVAC layout configuration to maximise height in each space. I got on-site techniques for particular Construction work, akin to Cladding, Stonework, Waterproofing, etc. Had experience with the overall design and functionality of all the services, completely coordinated together. I was committed to every system installed in the construction. Likewise, I was revealed to the procedures and discipline developed by the Management Company. They are held accountable for any rework happening on site, or any structural modifications or alterations if tend to occur. A conventional schedule of every work was also maintained, renewed, and rigorously ensued. There were site meetings, with the client individually and with the contractors on weekly basis. Punctuality is equally important. I came across multiple vendors contracting different construction products, ranging from Cladding Material to Marble Selection for Interiors. During the Internship, I had frequent site Checking of the electrical points, plumbing, and washroom fixtures position to be well-defined and also had to be certain if the necessary electrical and Plumbing point is correctly positioned as per the issued drawing. Most of the drawings were initially drafted and issued in the head office in Chandigarh, but my duty was to keep revising them and updating them as per requirement. This gave me insights into the working drawings and details required for construction to happen. The principal Architects of the firm usually traveled every Thursday for a meeting with the client. All the processes for presentation and Material selection were being followed. I even worked on interiors details such as Mosaic Designs, Tile Allocation, Provision of Ply work for Various Fixtures to be installed in the Ceiling. At the end of the Internship, I was looking after the approval by every contractor for the closure of the ceiling, floor wise. I was under the guidance of Mr. Soumen Adhikary, he is an architect and working as a project manager for this site and as a representative of the Architectural Firm. He has succeeded in installing passion inside me by the way he works and how he manages things so efficiently. Except working on the E-58 Site, I worked on other design projects as well including, the Interior Renovation Project of an Apartment, E-2/4 Vasant Vihar, Delhi One, a commercial project with Auditorium, Interior Rack Details for Kanpur Library, 3D Modelling of Siddharth Residence, Structural 3D of Rajendra Nagar. Thus, this internship did allow me to gain insight into fields related to Architecture, Construction, and Management and how design plays a vital role and can become the solution to several site dilemmas. I was wholly committed throughout, curious to know ways of how various systems work collectively and how everything can be established. The office work culture is surely way different than what we learn in Academics, and there is a necessity for every architect to hereby have a practical site knowledge of how to get the design executed as planned.


E-58, VASANT VIHAR My office/ site for my internship was this site, situated in the urban context of South Delhi, Vasant Vihar. This is an ongoing residential project started in 2019. The residential property is spread across 16,000 sq. ft, comprising of Two Duplexes, Terrace and a Basement as well. The structure of the Building is enveloped by concrete facade creating interesting perspectives and source for natural light and ventilation. There are slanting balconies on all four sides hence making fascinating extrusions in the structure. Using of contrast metallic materials which creates an impact of contrast and is alluring to the viewers eyes. The design has been. The design clearly portrays the ideology of the Firm of ‘space is more’ and using facade as an attractive element in each of their Architecture. This building is an high-end luxury project managed by a PMC Company having separate vendors and contractors for electrical, plumbing, HVAC, Wifi, Automation, Light Fixtures, Lift and Interiors.

LOWER DUPLEX | UPPER DUPLEX BASEMENT STILT FLOOR FOR PARKING GROUND FLOOR: LOUNGE AREA | DOUBLE HEIGHT FORMAL LOUNGE | KITCHEN DINING AREA DAY ROOM | WASHROOM POWDER LOO UTILITY FIRST FLOOR: GUEST ROOM | WASHROOM KID’S ROOM | WASHROOM | WC MASTER BEDROOM | WASHROOM | WALKING CLOSET


EXTERIOR VIEW


FACADE

WEEKLY TASK OF CREATING REPORTS AND DOCUMENTATION OF E-58

SITE PHOTOS AND PROCESS

FACADE

6th June July, 26th 2021 10th July,, 2021

E-58, VASANT VIHAR Basement Contractor Electrical

Drawing Selection/ Material

Work Progress Conduit Wiring DB/Panel

Plumbing

Soil/Waste Piping Water Supply Pipe Fixing Fixture Fitting Testing

HVAC

Ducting Piping Indoor Unit Grill Fixing Outdoor Unit Testing

Services

Lighting/ AutomationOrder Pening

Conduit Wiring Curtain Fixing DB Fixing Testing

Audio/ Video

Conduit Wiring AV Rack fixing Testing

Data/ Wifi/ Security

Conduit Wiring DB/Rack Fixing Testing

Ceiling

Hanging Arrangement Light/Fan Framing Partition above framing Gypsum/POP ceiling Trap Door Cutouts Light/Grill Paint

Flooring

Marble Granite Tiles

Door/ Window

DW Base stone External DW&Shutter DW Internal frame Internal Shutter

Wall

POP Paint Framework Stone Fixing Fabric Fixing Wood Fixing Decorative Panel Fixing Mosaic Panel

Furniture

Fixed Furniture Loose Furniture

Fixture fitting

Light Fixtures Decorative Lights Plumbing Fixture

Switch/ Socket Kitchen

Fixing Testing Counter Cabinets Hood Accessories

Lift

Wall Floor

Ceiling

Stilt

Ground

First

Second

Third

Terrace

10% 50% 90% 100%10% 50% 90% 100%10% 50% 90% 100%10% 50% 90% 100%10% 50% 90% 100%10% 50% 90% 100%10% 50% 90% 100%

Front Facade Frame Cladding For CORIAN

Front Facade Frame Cladding For CORIAN

On the East Facade External Wall M S Framing | External Stone Cladding

On the East Facade External Wall M S Framing | External Stone Cladding


LOWER DUPLEX

| LOWER FLOOR

Living Lounge

Lift Lobby

Dining Area

Kitchen

Kitchen

Powder Room

Day Bedroom

Day’s Room Washroom


LOWER DUPLEX

Guest Bedroom

| UPPER FLOOR

Facade Views from Corridor

Kid’s Bedroom

Guest Bedroom Washroom Masterbedroom

Masterbedroom

Washroom

Washroom


UPPER DUPLEX

Kitchen

| LOWER FLOOR

Living Lounge

Dining Area

Day Washroom

Day Washroom

Powder Toilet

Day’s Room

Powder Toilet


UPPER DUPLEX

Guest Bedroom

| UPPER FLOOR

Corridor

Kid’s Bedroom Masterbedroom

Lift Lobby

Terrace Lift Lobby

Masterbedroom

Washroom

Walking Closet


Basement

Terrace


Basement

Facade Cladding Framework for Corian


Ceiling Layout Status

Guest Bedroom | Upper Duplex

Guest Bedroom | Upper Duplex

Day Room | Upper Duplex

Double Height Lounge Area | Upper Duplex


LOWER DUPLEX - ARCHITECTURAL PLANS 62' [18.90]

62' [18.90] 11'-121" [3.39]

3'-6"

C.B C.B

BEAM 8" DN.

M.BEDROOM 21'-412"x18'-0"

1'-834"

SLAB 10" THK.

5'-0" WIDE BALCONY

BEAM 8" DN. 5'-421"

DRESS 421" 4'-9" 412" 1'-6"

76

69

UP

97'-4" [29.66]

117' [35.66]

10'-9"

LIFT/STAIR LOBBY 16'-0"x17'-0" LVL. +19'-3"

SLAB 10" THK.

SLAB 6" THK.

ELEC.(LOW SIDE) 5'-0"x1'-0"

SLAB 10" THK.

LIFT-2 (6P) 5'-0"x5'-0"

LIFT-1 (10P) 6'-3"x6'-0"

BEAM 1'-0" DN.

HVAC SHAFT 3'-3"x 6'-412"

LIFT-1 (10P) 6'-3"x6'-0"

PEDESTAL LAMP

BALCONY

TOTAL PLOT AREA:- = 62'-0"x117'-0" = 7254.00 SQ.FT (806.00 SQ.YD / 673.91 SQ.MT) PERMISSIBLE COVERED AREA @ 75% = 5440.50 SQ.FT (505.43 SQ.MT) ACHIEVED COVERED AREA = 4196.45 SQ.FT (389.86 SQ.MT) i.e 57.85%

1'-9"

421" 2'-6"

2'-0"

1'-9"

3'-121"

8'-9" TOILET

15'-0"x6'-0"

4'-6"

PL. DUCT 1'-0"x2'-6"

2'-121"

15'-0"

BEAM 8" DN.

BEDROOM-3 21'-9"x11'-712"

1'-3"

LCD ON POLE

DOUBLE HEIGHT BALCONY BELOW

16'-921" [5.12]

6'-921"

SLAB 6" THK.

FINAL LAYOUT PLAN, GROUND FLOOR

1'-9"

4'-6"

SLAB 10" THK.

C.B

BEAM 8" DN.

DOUBLE HEIGHT CUTOUT IN SLAB 16'-0"x18'-0"

BEAM 8" DN.

BEAM 1'-0" DN.

SETBACK LINE

1'-9" 1'-9"

VESTIBULE 6'-9"x6'-0"

412"

2'-3"

BALCONY

PEDESTAL LAMP

SHOWER

721"

DRESS

1'-3"

3'-0"

BEAM 1'-0" DN.

BEAM 1'-0" DN.

BEAM 1'-0" DN.

67

BEAM 1'-0" DN.

DOUBLE HEIGHT CUTOUT PUJA ROOM BELOW

DOUBLE HEIGHT FORMAL LOUNGE 16'-0"x18'-0"

16'-921" [5.12]

60

BEAM 1'-0" DN.

BEAM 8" DN.

BEAM 1'-0" DN.

CONSOLE

UPTURN BEAM 6" UP.

SLAB 7" THK.

PL. DUCT 1'-6"x1'-6"

DN

PL. DUCT 1'-0"x2'-6"

5'-0" WIDE DOUBLE HEIGHT BALCONY

1'-6"

3'-0"

HVAC SHAFT 3'-3"x 6'-412"

3'-0"

TOILET 10'-3"x7'-0"

SHOWER

BEAM 1'-0" DN.

SLAB 6" THK. SLAB 6" THK.

3'-0" 3"

Width - 4'-0" Tread - 1'-0" Riser - 0'-6"

ELEC.(LOW SIDE) 5'-0"x1'-0"

BEAM 8" DN.

4'-0"

97'-4" [29.66]

UP

LIFT/STAIR LOBBY 16'-0"x17'-0" LVL. +9'-3"

LIFT-2 (6P) 5'-0"x5'-0"

SLAB 10" THK.

BENCH

49

Width - 4'-0" Tread - 1'-0" Riser - 0'-6"

BEAM 1'-0" DN.

1'-1021"

DOUBLE HEIGHT CUTOUT IN SLAB 16'-0"x32'-112"

3'-0"

90'-221" [27.50]

BEAM 8" DN.

WALL MURAL

BEAM 1'-0" DN.

DN 48

DOUBLE HEIGHT (19'-3") PUJA ROOM 7'-9"x14'-10"

FOYER

C.B

DRESSING WALK-IN CLOSET 7'-9"x6'-9" 8'-3"x6'-9"+ SLAB 10" THK. 5'-9"x7'-412"

DOUBLE HEIGHT TERRACE BELOW

BEAM 1'-0" DN.

56

SLAB 10" THK.

SLAB 10" THK.

PL. DUCT 1'-6"x1'-6"

CONSOLE

KIDS ROOM 16'-412"x12'-712"

LEDGE WALL UPTO CEILING HT.

HALF BATH 16'-412"x7'-0"

42

19

1

UP

2'-0" 3'-8"

SHOWER

DN

8 6

3'-0"

DOUBLE HEIGHT LIVING AREA 16'-0"x32'-112"

Width - 4'-0" Tread - 1'-0" Riser - 0'-6"

421" 1'-3"

TOILET 10'-3"x6'-9"

PEDESTAL LAMP

5'-0" WIDE PASSAGE

3'-6"

2'-1"

1'-0" 3'-0"

3'-11"

3'-9"

VESTIBULE 6'-112"x6'-9"

TERRACE

SLAB 6" THK.

ACCESSORIES

DRESS

C.B

DAY ROOM 16'-412"x12'-712"

SLAB 10" THK.

UP

N. "D

UPTURN BEAM 6" UP.

5'-0" WIDE BALCONY

1

BEAM 8" DN.

ACCESSORIES

19

6

6'-921"

C.B

2'-9"

2'-0" 6'-9" 4'-9"

TOILET 9'-1"x13'-7"

3'-10"

19'-8" [6.00]

5' 9"

6'-10"

3'-5"

2'-3"

C.B

11'-8"

C.B

FULL HT. CABINET

INBUILT FRIDGE

47'-421"

BEAM 18" DN.

FULL HT. CABINET

421"

BEAM

SLAB 10" THK.

2'-3"

2'-3"

SLAB 10" THK.

90'-221" [27.50]

DISH WASHER

. 18" DN

WALK-IN CLOSET (HE) 7'-3"x13'-11"

9"

4'-021"

DRESSING 17'-6"x6'-4"

BENCH

117' [35.66]

5'-021"

BEAM 8" DN.

8

10'-3" WIDE DOUBLE HEIGHT TERRACE

2'-0"

2'-0"

Width - 4'-0" Tread - 1'-0" Riser - 0'-6"

18

5'-6"

SLAB 10" THK.

SUNKEN

1'-8" 421"

2'-421"

DINING AREA 13'-7"x18'-412 "

SPACE FOR UTENSIL WASHING ON FLOOR

AM BE

4'-8"

C.B

WALK-IN CLOSET (SHE) 10'-0"x17'-7 12"

SERVANT ROOM (3P) 10'-0"x13'-0"

BEAM 8" DN.

11'-7"

C.B 2'-3"

BEAM 18" DN.

BALCONY BELOW

PL. DUCT 2'-0"x2'-0"

NICHE

3'-5"

C.B

2'-3"

C.B

C.B

SLAB 10" THK.

UTILITY 6'-0"x12'-6"

5'-0" WIDE BALCONY

BEAM 8" DN.

EL./HVAC DUCT 10'-0"x1'-712"

11'-3" [3.43]

WALK-IN CLOSET 6'-0"x10'-7"

TOILET 8'-0"x4'-6"

SHOWER W.B 3'-3"X4'-9" 3'-0"X4'-2"

CONSOLE

KITCHEN 12'-0"x21'-10" +7'-9"x8'-3"

SLAB 6" THK.

BEAM 8" DN.

W.C 3'-0"X4'-9"

9'-3"

UPTURN BEAM. 4" UP.

BEAM 8" DN.

K.STORE 6'-0"x6'-712"

BEAM 8" DN.

C.B

WALK-IN CROCKERY 6'-0"x7'-0"

33'-721"

2'

10'-0"

SERVANT ROOM (3P) 10'-0"x13'-0"

BEAM 8" DN.

BEAM 8" DN.

PL. DUCT 2'-0"x2'-0"

MAID ROOM 8'-0"x8'-4"

10' [3.05]

SHOWER W.B 3'-3"X4'-9" 3'-0"X4'-2"

19'-8" [6.00]

W.C 3'-0"X4'-9"

421"

PL. DUCT 3'-0"x0'-712"

5'-0" WIDE BALCONY

EL./HVAC DUCT 10'-0"x1'-712"

11'-121" [3.39]

PL. DUCT 3'-0"x0'-712"

BEAM 8" DN.

10' [3.05]

SLAB 6" THK.

50'-1021" [15.51]

421"

BEAM 8" DN.

50'-1021" [15.51]

BEAM 8" DN.

BALCONY

SLAB 6" THK.

SETBACK LINE

FINAL LAYOUT PLAN, FIRST FLOOR TOTAL PLOT AREA:- = 62'-0"x117'-0" = 7254.00 SQ.FT (806.00 SQ.YD / 673.91 SQ.MT) PERMISSIBLE COVERED AREA @ 75% = 5440.50 SQ.FT (505.43 SQ.MT) ACHIEVED COVERED AREA = 4196.45 SQ.FT (389.86 SQ.MT) i.e 57.85%


UPPER DUPLEX - ARCHITECTURAL PLANS 62' [18.90]

62' [18.90] [15.51]

50'-1021" [15.51]

421"

[3.39]

11'-121" [3.39] 3'-0"x0'-712"

TAPERED WALL

2'-9"

ACCESSORIES

DAY ROOM 16'-412"x12'-712"

89

LIFT/STAIR LOBBY 16'-0"x17'-0" LVL. +29'-3"

LIFT-3 (6P) 5'-0"x5'-0"

107

116

109

47'-421"

90'-221" [27.50]

LIFT-1 (10P) 6'-3"x6'-0"

HVAC SHAFT 3'-3"x 6'-412"

LIFT-3 (6P) 5'-0"x5'-0"

PL. DUCT 1'-0"x2'-6"

2'-3"

3'-0" 8'-3"

2'-0"

5'-0"

TOILET 15'-0"x6'-0"

4'-6"

3'-0"

6'-6"

4'-0"Ø LOOSE PUFFY TABLEØ1'-6"

C.B

TOTAL PLOT AREA:- = 62'-0"x117'-0" = 7254.00 SQ.FT (806.00 SQ.YD / 673.91 SQ.MT) PERMISSIBLE COVERED AREA @ 75% = 5440.50 SQ.FT (505.43 SQ.MT) ACHIEVED COVERED AREA = 3964.20 SQ.FT (368.28 SQ.MT) i.e 54.65%

DOUBLE HEIGHT BALCONY BELOW

16'-921" [5.12]

6'-921"

5'-0" WIDE DOUBLE HEIGHT BALCONY

C.B

C.B DRESS 421"

PL. DUCT 1'-0"x2'-6"

2'-121"

15'-0" 2'-6"

3'-1"

1'-3"

CB

DOUBLE HEIGHT DRAWING ROOM 20'-0"x18'-0"

LIFT-1 (10P) 6'-3"x6'-0"

SHOWER 2'-0"

412"

VESTIBULE 6'-9"x6'-0"

DOUBLE HEIGHT CUTOUT IN SLAB 20'-0"x18'-0"

FINAL LAYOUT PLAN, SECOND FLOOR

4'-9"

UP

ELEC.(LOW SIDE) 5'-0"x1'-0"

5'

SETBACK LINE

PL. DUCT 1'-6"x1'-6"

LIFT/STAIR LOBBY 16'-0"x17'-0" LVL. +39'-3" DOUBLE HEIGHT CUTOUT IN SLAB 7'-9"x14'-10"

12'-6"

100

Width - 4'-0" Tread - 1'-0" Riser - 0'-6"

DOUBLE HEIGHT TERRACE BELOW

ELEC.(LOW SIDE) 5'-0"x1'-0"

HVAC SHAFT 3'-3"x 6'-412"

1'-9"

DN

DRESS

FOYER

3'-0"

3'-0"

TOILET 10'-3"x7'-0"

SHOWER

3'-0"

ELECTRICAL POINT NEEDED ON FLOOR

ELECTRICAL POINT NEEDED ON FLOOR

UP

3"

97'-4" [29.66]

96

Width - 4'-0" Tread - 1'-0" Riser - 0'-6"

4'-0"

421" 2'-6"

87

117' [35.66]

DN 80

97'-4" [29.66]

WALL MURAL

47'-421"

90'-221" [27.50]

PL. DUCT 1'-6"x1'-6"

16'-921" [5.12]

117' [35.66]

HALF BATH 16'-412"x7'-0"

BENCH

421"

1'-0"

DOUBLE HEIGHT CUTOUT IN SLAB 16'-0"x32'-112"

DRESSING 7'-9"x6'-9"

3'-121"

5'-0"

WALK-IN CLOSET 8'-3"x6'-9"+ 5'-9"x7'-412"

DOUBLE HEIGHT TERRACE BELOW

CONSOLE

5' C.B

7'-0"

TOILET 10'-3"x6'-9" SHOWER

UP

C.B

3'-6"

KIDS ROOM 16'-412"x12'-712"

1

2'-9"

3'-0" 5'-9"

3'-9"

BENCH

VESTIBULE 6'-112"x6'-9"

19

6

3'-0"

1'-0"

1'-6"

6'-0"

DN

8

1'-121" 1'-6"

UP

5'-0" WIDE BALCONY

19

ACCESSORIES

DRESS

Width - 4'-0" Tread - 1'-0" Riser - 0'-6"

5'-0" WIDE BALCONY

DN 1

DOUBLE HEIGHT LIVING AREA 16'-0"x32'-112"

9"

6'-9" 4'-6"

C.B

M.BEDROOM 21'-412"x18'-0"

421"

6

3'-6"

1'-421"

3'-0"

6'-6"

Width - 4'-0" Tread - 1'-0" Riser - 0'-6" 8

6'-6"

2'-6"

3'-0"

2'-9"

FULL HT. CABINET

WALK-IN CLOSET (HE) 7'-3"x13'-11"

WALK-IN CLOSET (SHE) 10'-0"x16'-8 12"

7'-6"

INBUILT FRIDGE

11"

2'-0"

2'-421"

5'-0" WIDE PASSAGE

FULL HT. CABINET

TAPERED WALL

4'-021"

SERVANT ROOM (3P) 10'-0"x13'-0"

DRESSING 17'-6"x6'-4"

1'-6"

SPACE FOR UTENSIL WASHING ON FLOOR

1'-8" 421"

5'-021"

C.B

DINING AREA 21'-412"x12'-1"

6'-10"

C.B

11'-3" [3.43]

WALK-IN CLOSET 6'-0"x10'-7"

CROCKERY CABINET

TOILET 4'-1012"x6'-6"

DISH WASHER

UTILITY 6'-0"x10'-4"

NICHE

2'-9"

PL. DUCT 2'-0"x2'-0" EL./HVAC DUCT 10'-0"x1'-712"

SHOWER W.B 3'-3"X4'-9" 3'-0"X4'-2"

CONSOLE

KITCHEN 12'-0"x19'-9" +7'-9"x8'-3"

9'-3"

5'-0" WIDE BALCONY

C.B

WALK-IN CROCKERY 6'-4"x7'-0"

C.B

K.STORE 6'-0"x7'-0"

C.B

MAID ROOM 8'-0"x8'-4"

SERVANT ROOM (3P) 10'-0"x13'-0"

C.B

EL./HVAC DUCT 10'-0"x1'-712"

C.B

PL. DUCT 2'-0"x2'-0"

33'-721"

2'

3'-5"

SHOWER W.B 3'-3"X4'-9" 3'-0"X4'-2"

W.C 3'-0"X4'-9"

C.B

5'-0" WIDE BALCONY

10' [3.05]

W.C 3'-0"X4'-9"

9'-3"

19'-8" [6.00]

33'-721" 5'

10' [3.05]

PL. DUCT 3'-0"x0'-712"

2'

421"

13'-11" PL. DUCT

19'-8" [6.00]

11'-121"

C.B

50'-1021"

BEDROOM-3 21'-9"x11'-712"

BALCONY

SETBACK LINE

FINAL LAYOUT PLAN, THIRD FLOOR TOTAL PLOT AREA:- = 62'-0"x117'-0" = 7254.00 SQ.FT (806.00 SQ.YD / 673.91 SQ.MT) PERMISSIBLE COVERED AREA @ 75% = 5440.50 SQ.FT (505.43 SQ.MT) ACHIEVED COVERED AREA = 3964.20 SQ.FT (368.28 SQ.MT) i.e 54.65%


E-58 Vasant Vihar | Studio Ardete | Electrical Points Count 7/05/21

WORKED ON ELECTRICAL DRAWINGS, LIGHT FIXTURES

LOWER DUPLEX (GROUND FLOOR) DIRECTION: E S.S

SE E.SE

AIR

E

USB OUTLET (RAW POWER)

S.No.

DESCRIPTION LIGHT POINT ON FLOOR

BUILT-UP AREA SCHEDULE C.AREA ON G.FLOOR C.AREA ON F.FLOOR C.AREA ON S.FLOOR C.AREA ON T.FLOOR TOTAL COVERED AREA

2

LIGHT POINT AT HEIGHT 7'-6"

3

LIGHT POINT AT HEIGHT 3'-3"

4

BUZZER

+3'-6" +2'-3"

FAN REGULATOR

+3'-6"

KEY PAD (UNDER DISCUSSION)

C2 6A SWITCH SOCKET OUTLET (RAW POWER)

+3'-6"

USB OUTLET (RAW POWER)

+2'-3"

DATA OUTLET

6A SWITCH SOCKET

+3'-6" +4'-6"

TV OUTLET + DATA OUTLET

+4'-6"

2NOS. 6A SWITCH SOCKET OUTLET (RAW POWER)

AS/CABINET DETAIL

MASTER SWITCH

D1 6A SWITCH SOCKET

E

6A SWITCH SOCKET OUTLET (RAW POWER)

CONDUIT IN FLOOR

1

1

5

5

1

27

3

3

Lobby | Corridor | Balcony

Day Room

3

16A SWITCH SOCKET OUTLET (RAW POWER)

+1'-0"

INTERCOM OUTLET

+2'-6"

H

6A SWITCH SOCKET OUTLET (RAW POWER) (AROMA DIFFUSER) LIGHT POINT

H1 6A SWITCH SOCKET OUTLET (RAW POWER) (AROMA DIFFUSER) I J

LIGHT POINT (ON PARTITION) SHAVER'S SOCKET

+4'-0"

2NOS. 6A SWITCH/SOCKET

K L

6A SWITCH SOCKET OUTLET (RAW POWER) (WATER CLOSET)

Master Bedroom

FOR BED SIDE PLEASE REFER WALL ELEVATIONS

B

6A SWITCH SOCKET, FOR T.V, DATA SOCKET

TOTAL

2NOS. 6A SWITCH/SOCKET (MORE POINTS TO BE ADDED AS/ AUDIO SYSTEM FINALIZED)

B1 6A SWITCH SOCKET, T.V SOCKET, DATA SOCKET

LOCATION

+1'-0"

+4'-6"

INTERCOM OUTLET CLIENT/PROJECT:

RESIDENCE #58 AT VASANT VIHAR, DELHI

NOTE:-

1. This drawing is a COPYRIGHT & PROPERTY of STUDIO ARDETE PVT. LTD, and is NOT TO BE REPRODUCED, COPIED, HANDED OVER to third party or used for any other purpose other than for which its intended.

6)

7) 2. While every attempt has been made in the preparation of this drawing and to avoid mistakes the maker cannot guarantee against human error. The contractor 8) on job must check all dimensions and other details and be responsible for the same. 9)

2

2

7

1

1

1

6

6

13

1

2

16

3

25

8

1

6

1 3

1

11

1

12 0

29

5

Switch

12

12

BERKER | 16A

Socket

50

Double

Switch

6

4

Dummy

5

DATA

6

INTERCOM

7

USB

91

Box | Plate

Socket

23

23

BERKER | 6A

BERKER | 16A

Socket

Double

Switch

6

6

12

9

161

Dummy

DATA

INTERCOM

USB

Box | Plate

Socket

8

1

19 5

1

4

2

1

1

1

Dining Area

3

3

1

1

Lobby | Corridor | Balcony

1

1

3

3

2

12

1

6

1

9 8 0

Servant’s Room

15

19

1

10

10

2

1

6

3

67

UPPER DUPLEX (THIRD FLOOR) BERKER | 6A Switch

BERKER | 16A

Socket

3

4

Master Bedroom

4

Master Washroom Lobby | Corridor | Balcony

+1'-0"

Servant’s Room

GOOD FOR CONSTRUCTION Date of Issue:- 29/04/2019

LOWER DUPLEX_ELECTRICAL

REV-09 CHANGES IN LAYOUT AS PER VASTU CHANGES IN LAYOUT FROM CLIENT (12/09/2018) CHANGES IN LAYOUT FROM CLIENT (11/11/2018) CHANGES IN LAYOUT AS PER VASTU (05/01/2019) CHANGES IN LAYOUT AS PER F.A.R AREA (17/04/2019)

REVISION NO. & NOTES: 5)

1

8

2

1

CONDUIT IN FLOOR

+2'-3"

2

4

2

1

1

PTS. SERVANT ROOM

16A SWITCH SOCKET OUTLET (RAW POWER)

Box | Plate

1

2

Kid’s Washroom

C

1

1

2

+1'-0"

+1'-0" +3'-6"

1

2

2

Kid’s Bedroom

6A SWITCH/SOCKET (RAW POWER)

1

2

+3'-0" +1'-0"

6A SWITCH/SOCKET (RAW POWER)

4

1

1

Day Room

6A SWITCH/SOCKET (RAW POWER)

B

70

Socket

1

Powder Room

C3

+3'-6"

2

USB

1

Guest’s Washroom

B1

4

INTERCOM

1

+1'-0"

SWITCH PLATE

1

DATA

4

6A SWITCH/SOCKET (RAW POWER)

A

Switch

Dummy

1

C2

6/16A SWITCH/SOCKET (RAW POWER)

6

4

Guest’s Bedroom

F1

1

1

CONDUIT IN FLOOR

6/16A SWITCH/SOCKET (RAW POWER)

2

5

6A SWITCH/SOCKET (RAW POWER)

F

11

2

C1

AS/LIFT CONSULTANT

9

5

LOCATION

16A SWITCH/SOCKET (RAW POWER)

6

2

CONDUIT IN FLOOR

1X10W LED BULKHEAD LIGHT

14

1

Living Area | Double Height

AS/CABINET DETAIL

+3'-0"

2

1

Formal Lounge

6A SWITCH/SOCKET (RAW POWER), INTERCOM OUTLET

E

4

Day Washroom

INTERCOM OUTLET

Double

2 4

Switch

C

D 16A SWITCH/SOCKET (RAW POWER) D1 16A SWITCH/SOCKET (RAW POWER)

1

UPPER DUPLEX (SECOND FLOOR)

CONDUIT IN FLOOR

2NOS. 6A SWITCH/SOCKET (MORE POINTS TO BE ADDED AS/ AUDIO SYSTEM FINALIZED)

Socket

3

26

+3'-6"

(ON WOODEN PANELING)

11

BERKER | 16A

BERKER | 6A

LOWER DUPLEX

+2'-6"

(ON WOODEN PANELING)

BERKER | 6A

11

BALCONY

KEY PAD

1

1

Servant’s Room

PTS. DRAWING AREA, LOBBY & DINING AREA, LIFT, LIFT LOBBY,

A

1

Lobby | Corridor | Balcony

+2'-8"

6/16A SWITCH/SOCKET (TOWEL WARMER)

21

Master Washroom

USB

M

1

2

0

Kid’s Washroom

2 NOS. 6A SWITCH/SOCKET DATA OUTLET

1

1

3

15

+1'-0"

DATA OUTLET

1

Servant’s Room

Kid’s Bedroom

+1'-0" CONDUIT IN FLOOR

4 3

3

1

3

Day Washroom Dining Area

6

2

Guest’s Washroom

+1'-0"

F G

Socket

5

Switch

+3'-0"

E1 6A SWITCH SOCKET OUTLET (RAW POWER) E2 6A SWITCH SOCKET OUTLET (RAW POWER)

Switch

8

TV OUTLET + DATA OUTLET

CONDUIT IN FLOOR

Double

8

FROM CEILING

2NOS. 6A SWITCH SOCKET OUTLET (RAW POWER)

Socket

Living Area | Lobby

Guest’s Bedroom

FAN REGULATOR

D

Box | Plate

1

LOCATION

YET TO BE FINALIZED AS/AUTOMATION

AS PER LEGEND

USB OUTLET (RAW POWER) DATA OUTLET

USB

1

1"

C1 6A SWITCH SOCKET OUTLET (RAW POWER)

INTERCOM

LOWER DUPLEX (FIRST FLOOR)

+2'-3"

DATA OUTLET

DATA

1

ACHIEVED F.A.R = 16321.50 SQ.FT i.e 1:2.25 OF SITE AREA

CENTRE LINE

USB OUTLET (RAW POWER)

= 4196.55 SQ.FT = 4196.55 SQ.FT = 3964.20 SQ.FT = 3964.20 SQ.FT = 16321.50 SQ.FT

PERMISSIBLE F.A.R @ 1:2.25:7254 x 2.25 = 16321.50 SQ.FT

6A SWITCH SOCKET OUTLET (RAW POWER)

Dummy

Formal Lounge

Powder Room

DWG NOTES:

1

KEY PAD (UNDER DISCUSSION)

C

SYMBOL

+2'-3"

INTERCOM OUTLET

W N.N

WATER

B1 6A SWITCH SOCKET OUTLET (RAW POWER)

N

TAB/KEY PAD (UNDER DISCUSSION)

E

+2'-3"

INTERCOM OUTLET

NW

6A SWITCH SOCKET OUTLET (RAW POWER) USB OUTLET (RAW POWER)

E.N

B

W

+3'-6"

BERKER | 16A

W.N

+4'-0"

A2 ONE WAY SWITCH

Switch

W

A1 KEY PAD

8.0° N.NE

+3'-6"

NE

KEY PAD

BERKER | 6A

H

SPA CE

BEDROOMS &TOILETS

A

S

LEVELS

W

DESCRIPTION

RT

W.S

PTS.

LOCATION

EA

SW

ELECTRICAL LEGEND

S.SW

E FIR

SCALE:DATE:-

N.T.S 13/02/2020

DWG NOSTATUS-

GFC-FLP-004 FINAL GFC

DRAWN BY:-

SIMARPREET KAUR

CHECKED BY:-

NISHA SARAO

ARCHITECT:

STUDIO ARDETE PRIVATE LIMITED SCO - 43, First Floor, Swastik Vihar, MDC, Panchkula - 134109, Chandigarh (Tricity) TELE. : 0172-4020185 E-MAIL: office.studioardete@gmail.com

TOTAL |

UPPER DUPLEX

Double

Switch

Dummy

DATA

INTERCOM

USB

Box | Plate

Socket

2

-

1

1

4

1

1

1

4

-

1

1

4

1

-

8

2

2

7

1

1

1

6

6

2

13

1

1

2

-

1

-

8

1

1

2

16

-

-

1

-

6

2

3

1

3

25

-

1

-

11

2

12 0

11

29

5

12

12

4

5

6

7

91

26

48

6

22

22

6

6

12

10

158

Date of Revised:- 19/08/2019 CONSULTANT:

TOTAL ALL FLOORS

BERKER | 6A

BERKER | 16A

Switch

Socket

Double

Switch

Socket

52

98

12

45

45

Dummy

DATA

INTERCOM

USB

Box | Plate

12

12

24

19

319


A B

DN DIRECTION:

W N.N

9"

6'

9"

1'

HM A F

1'

1'-6"

2'

2'-6"

1'-6"

A DN

A

1

UP

49

5'-121"

UP

1'

1'

E1

C.B

E 2'-321"

6"

4'-912"

E

3'-3"

2'-9"

F

13'-6"

1'

DA

6"

6"

A

C.B 4'-8"

6'-9"

DA

3'-9"

C1

5'

D

LVL. +9'-3"

B

A

1'

19

C1

C1

E

4'-4"

DRESS

4'

Width - 4'-0" Tread - 1'-0" Riser - 0'-6"

6

Width - 4'-0" Tread - 1'-0" Riser - 0'-6"

3'-9" EQ EQ

C 9'-621"

48

56

C2

3'

L

1'

1'

DN 42

4'-7"

6"

E2 3'-821"

8

8'-6"

B 1'-6"

ACCESSORIES

DRESS

4'-7"

H

9"

H1

B1

G K

F

2'

5'-3"

A1 I

1'-3" 2'-421" 1'-6"

EQ.

1'-3"

EQ.

SHOWER

ACCESSORIES

1'-3"

4' 9"

G D

D

1'

C.B

A

F

6"

5'-221" 8'-5" 10"

9'-2"

6"

A

1'

K

BENCH

9"

5'

4'-621"

1'-10"

6"

3'-3"

9"

C.B

C.B

5'-321" 2'-1021"

E

8' 4'-8"

3'-8"

UP

C1

4'-2"

J

D A

1

F

E2

2'-6"

BENCH

K

6'-6"

5"

D

D

4'-8"

EQ. EQ.

3'-9"

1'

1'-11"

I

A

9"

SHOWER

3'-3"

G

9"

19

I

G

4'-3"

C.B

E S.S

C.B

8"

= 4196.55 SQ.FT = 4196.55 SQ.FT = 3964.20 SQ.FT = 3964.20 SQ.FT = 16321.50 SQ.FT

PERMISSIBLE F.A.R @ 1:2.25:7254 x 2.25 = 16321.50 SQ.FT

5'-321"

6"

3'-421" 4'-7"

K

4'-3"

3'

CROCKERY CABINET

C.B

EQ.

EQ.

C.B

C.B

1'

C.B 4'-5"

E

B C

E1

C1

3'-1021"

WATER

8

2'-9"

N

1'-7"

A

4'-6"

E

C.AREA ON G.FLOOR C.AREA ON F.FLOOR C.AREA ON S.FLOOR C.AREA ON T.FLOOR TOTAL COVERED AREA

ACHIEVED F.A.R = 16321.50 SQ.FT i.e 1:2.25 OF SITE AREA

C 9'-6"

1'-521"

C3

4'-6"

NW

AIR

E.SE

E.N

6"

SE

W

W.N

C3

D C1

BUILT-UP AREA SCHEDULE

H

PEDESTAL LAMP

2'-221"

PEDESTAL LAMP

C

2'-2"

DN

13'-6"

2'-2"

2'-221"

C1

SETBACK LINE

60

67

76

69

Width - 4'-0" Tread - 1'-0" Riser - 0'-6"

UP

1'

STUDIO ARDETE | Electrical Conduits Check | 02/02/21 LOWER DUPLEX FINAL LAYOUT PLAN, GROUND FLOOR

North

There is one conduit running at ht 1’-0” but A should be at ht 3’-6”

C|B|A

Servant’s Room

South

C is missing. There has to be a provision for C at ht 2’-3”. B at ht 1’-0” and A at ht 3’-6” is present.

๏ ๏

CHECKED BY:-

NISHA SARAO

Behind the Crockery Cabinet

๏

Electrical Layouts in Both the Washrooms (i.e. Half Bath & Day Room) are correctly positioned. E Point of the lift blocks are missing. (To be checked when lift is installed)

LOCATION

WALL SIDE

Behind the Main Staircase

West

(MISSING)

D|A

West

E

UPPER PART

LOCATION

(MISSING)

WALL SIDE

Dressing Table

South

Bathroom | Right to W/C

West

Conduits to be provisioned at ht 2’-6”

H

Bathroom | Left of Washbasin

North

Conduits to be provisioned at ht 1’-0”

South

Conduits are present but not on the given vertical line( i.e. 8” from left edge). Currently it is at 3’ from the left edge. (Horizontally)

North

Conduit Line is present but the wall of the balcony is missing to which it has to go at ht 1’-0”.

B1

Left Side of the Bed

South

There is one conduit running at ht 1’-0” but B1 should be at ht 2’-3”

M

Bathroom

North

Conduits are missing, to be provisioned at ht 2’-6” for Towel Warmers

Bathroom | On the wall of the Duct

North

Conduits are missing, to be provisioned at ht 3’-6”

G

E2

๏ ๏

Bathroom | Left to W/C

West

There is one conduit running at ht 1’-0” but G (Intercom Outlet) should be at ht 2’-6”

Bathroom

WALL SIDE

REMARKS

Infront of Basement Staircase

East

Conduit Line has been shifted to the adjacent wall on the right

B (2)

Next to the Lift Shaft

North

Both Conduit Lines are to provided at ht 9”

F

Massage Room | Next to the Cupboard

North

Conduits to be provisioned at ht 2’-9”

Adjacent to the Sump

North

Conduits to be provisioned at ht 9”

POINTS (MISSING)

MASTER BEDROOM

๏

Bathroom | Left to W/C

Basement + Ground Floor

KID’S ROOM

A

West

Conduits are missing, to be provisioned at ht 1’-0”

Rest of the points are in correct position. Light Points at height 7’-6” are also present where marked. E Point of the lift blocks are missing. (To be checked when lift is installed)

B1 | B ๏ ๏

Satyam Rastogi | 2nd February, 2021

9"

E1

MASTER BEDROOM - WASHROOM K

LOCATION

H A

A2

I K G

2'-712"

1'

SHOWER

2'-5"

5"

3'-8"

F 1'

M B1

3'-521"

C2 8'-6"

2'-021"

C.B

Balcony

A

Conduit Line is present but the fitting is to be made on the cupboard at ht 3’-0”

G

GUEST ROOM D

E

REMARKS

GUEST ROOM

REMARKS A (Keypad) at ht 3’-6” is not present. Conduit Line is going for only D at ht 1’-0”

DA

Conduits for 2 Light Points at ht 7’-6” should be provided.

KID’S ROOM - WASHROOM

UPPER PART POINTS

CONSULTANT:

UPPER DUPLEX

E1

LOWER DUPLEX

Provision of light point at ht 3’-3” is required.

SCO - 43, First Floor, Swastik Vihar, MDC, Panchkula - 134109, Chandigarh (Tricity) TELE. : 0172-4020185 E-MAIL: office.studioardete@gmail.com

Electrical Layouts in Both the Washrooms (i.e. Half Bath & Day Room) are correctly positioned. E Point of the lift blocks are missing. (To be checked when lift is installed)

POINTS ๏

East

STUDIO ARDETE PRIVATE LIMITED

1'-6"

Servant’s Room

FINAL GFC

SIMARPREET KAUR

Rest of the points are in correct position. Electrical Conduits have to cross checked on Ground Floor and Basement, when the walls are finalised.

Satyam Rastogi | 2nd February, 2021

8"

C.B

D1 D

2'-2"

A

GFC-FLP-002

STATUS-

DRAWN BY:-

1'-4"

North

N.T.S

DATE:-

13/02/2020 DINING AREA

ht 1’-0” for the same. 9) CHANGES IN LAYOUT AS PER F.A.R AREA (17/04/2019) on job must check all dimensions and other details and beatresponsible

Dining Area | External Wall of Day Room

MidDWGLanding of the Internal Staircase NOARCHITECT:

SCALE:-

F1

D1 | A

Date of Issue:- 29/04/2019

Conduit Line is present but the wall is missing to which it has to go at ht 3’-0”.Date of Revised:- 19/08/2019

LOWER DUPLEX_ELECTRICAL

CLIENT/PROJECT:

Intercom Outlet is present at ht 3’-0” but 16A Socket at ht 1’-0” is missing. A (Keypad) provision is there as well.

LVL. +19'-3"

GOOD FOR CONSTRUCTION REMARKS

West

1'

West

Below Mid Landing of the Internal There is one conduit but& not in the same vertical REVISION NO. NOTES: REV-09 1. This drawing is a COPYRIGHT & PROPERTY of STUDIO ARDETE running NOTE:East PVT. LTD, and is NOT TO BE REPRODUCED, COPIED,line. HANDED OVER to third 5) CHANGES IN LAYOUT AS PER VASTU Staircase 6) CHANGES IN LAYOUT FROM CLIENT (12/09/2018) party or used for any other purpose other than for which its intended. RESIDENCE #58 AT 7) CHANGES IN LAYOUT FROM CLIENT (11/11/2018) 2. While every attempt has been made in the preparation of this drawing and to On the Externalavoid Wall of Day Room | There is one conduit running at ht 3’-3” but D should be VASANT VIHAR, DELHI mistakes the maker cannot guaranteeWest against human error. The contractor 8) CHANGES IN LAYOUT AS PER VASTU (05/01/2019) D Opposite the Internal Staircase

WALL SIDE

DRESS

Behind the Main Staircase

LOCATION

Living Lounge (Closed)

D2

1'-6"

D|A

Conduits are missing, to be provisioned at ht 1’-0” and 3’-6” respectively.

3'-10"

(MISSING)

DA

3'-1121"

POINTS

UPPER DUPLEX LOWER PART TOTAL PLOT AREA:- = 62'-0"x117'-0" = 7254.00 SQ.FT (806.00 SQ.YD / 673.91 SQ.MT) WALL @ 75% = 5440.50 SQ.FT (505.43 SQ.MT) POINTS PERMISSIBLE COVERED AREA LOCATION REMARKS (MISSING) SIDE ACHIEVED COVERED AREA = 4196.45 SQ.FT (389.86 SQ.MT) i.e 57.85%

3'-10"

LOWER PART

1'-3"

3'

B

1'-3"

6

1'-6"

S

C3

Width - 4'-0" Tread - 1'-0" Riser - 0'-6"

F1

W

FULL HT. CABINET

INBUILT FRIDGE

W.S

FULL HT. CABINET

W

D1 A B

D

E

6"

1'

D

C.B

DWG NOTES:

4'-2"

A

3'

H

SPAC

CB A

SW

D

RT

8.0°

1'-3"

UP

N.NE

D

6"

NE

7"

B

A B

DN

1021"

EA

S.SW

E FIR

B1 A

UP

B C


BEAM 8" DN.

C1

C1

C2

C2

DN

SLAB 6" THK.

UP

ODU

C6 C5

4'

BEAM 8" DN.

C3

BEAM 8" DN.

BEAM 8" DN.

C4

DN 9'

UP

6'-6"

BEAM 8" DN.

C6 C5

BEAM 18" DN.

4'

10'

C7

C8

DALI TRACK LIGHT

SW1

BEAM 18" DN.

C4

C3

SLAB 10" THK.

SW2

Width - 4'-0" Tread - 1'-0" Riser - 0'-6" 8

19

6

18" BEAM

DN.

SUNKEN

N.

"D

AM

18

1

C9

SLAB 10" THK.

UP

BE

C11

UPTURN BEAM 6" UP.

9" 1'

AA

V-1

18'

C7

BEAM 8" DN.

9'

C10 6'-6"

8'-421"

C8

C14

48

49

Width - 4'-0" Tread - 1'-0" Riser - 0'-6"

UP

C15 LVL. +9'-3" SLAB 6" THK.

SLAB 6" THK.

3'-7"

SW5

7'-3"

LIFT-2 (6P) LIFT-2 (6P) 5'-0"x5'-0" 5'-0"x5'-0"

C17

UPTURN BEAM 6" UP.

SLAB 7" THK.

8'-1121"

11'-11"

4'

19

8'

DN

8

SW7

BEAM 1'-0" DN.

Width - 4'-0" Tread - 1'-0" Riser - 0'-6"

SW6

LIFT-1 (10P) LIFT-1 (10P) 6'-3"x6'-0" 6'-3"x6'-0"

SW4

BEAM 1'-0" DN.

SW2

BEAM 8" DN.

BEAM 1'-0" DN.

5'

SW1

1

4' 6'-812"

3'

C9

SW3 DN

42

56

BEAM 1'-0" DN.

C13

6

SW3 BEAM 1'-0" DN.

10'

BEAM 1'-0" DN.

8'

UP

C19

C18

C20 BEAM 1'-0" DN.

BEAM 8" DN.

SLAB 6" THK.

C10

C11

SETBACK LINE

FINAL LAYOUT PLAN, GROUND FLOOR

AA

V-1

TOTAL PLOT AREA:- = 62'-0"x117'-0" = 7254.00 SQ.FT (806.00 SQ.YD / 673.91 SQ.MT) PERMISSIBLE COVERED AREA @ 75% = 5440.50 SQ.FT (505.43 SQ.MT) ACHIEVED COVERED AREA = 4196.45 SQ.FT (389.86 SQ.MT) i.e 57.85%

4'

8'-2"

C1

C2

4' DN UP

2'

C5 8'-312"

3'-6"

6"

87

1' 1'

80

C4

C3

DN

4'-4"

SW3

9"

SW3

C6

C7

1'-6"

96

C14

89

Width - 4'-0" Tread - 1'-0" Riser - 0'-6"

C8

UP SW1 SW2

C13

C15

Width - 4'-0" Tread - 1'-0" Riser - 0'-6"

DN

8 6

C9

19

1

UP

LVL. +29'-3"

C10

C11 1'

1'

LIFT-3 (6P) 5'-0"x5'-0"

C17

SW4

7"

SW6

1'

SW5

2'-312"

SW3

SW3 DN

LIFT-1 (10P) 6'-3"x6'-0"

SW7

C14

100

107

116

109

Width - 4'-0" Tread - 1'-0" Riser - 0'-6"

UP

C13

C15 LVL. +39'-3"

9'-1"

SW5 LIFT-3 (6P) 5'-0"x5'-0"

C17

SW6

LIFT-1 (10P) 6'-3"x6'-0"

SW4

SW7

2'

6'

11'-021"

3'

8'

WORKED ON SUPERIMPOSITION OF ALL SERVICES DRAWINGS COORDINATED TOGETHER

ODU

SLAB 10" THK.

9'-021"

C18

C18

C19

C19

C20

SETBACK LINE

C20 FINAL LAYOUT PLAN, THIRD FLOOR

TOTAL PLOT AREA:- = 62'-0"x117'-0" = 7254.00 SQ.FT (806.00 SQ.YD / 673.91 SQ.MT) PERMISSIBLE COVERED AREA @ 75% = 5440.50 SQ.FT (505.43 SQ.MT) ACHIEVED COVERED AREA = 3964.20 SQ.FT (368.28 SQ.MT) i.e 54.65%


WORKED ON ALL WASHROOMS


RENDERED VIEW

RENDERED WASHROOM VIEWS RENDERED VIEW


RENDERED VIEW

RENDERED VIEW

RENDERED VIEW

RENDERED WASHROOM VIEWS

RENDERED VIEW


1'-3"

4'-8"

6'-03 4"

6"

1'-0"

WORKING DRAWINGS OF WASHROOMS B.O.SLAB B.O.BEAM FALSE CEILING

3

LIGHT AS APP.

1'-6"

BINDS AS APP. 2'-0"

6"

eq

LAYOUT@1'-0" HT FROM FFL

3"

H

eq

HEALTH FAUCET AS APP.@ 1'-6"FROM FFL. POINT @ (K )AS/ ELECTRICAL LAYOUT@1'-0" HT FROM FFL

SHOWER/DIVERTER AS APP

WIRE FROM ELECTRICAL POINT TO HEATED SEAT TO BE ENCASED IN ALUMINIUM PROFILE AS/DETAIL-7

WF S-1

1'

HEATED W.C. AS/ APP.

9"

6A SWITCH SOCKET OUTLET (E2) (RAW POWER) AS/ ELECTRICAL LAYOUT@1'-0" HT FROM FFL

PAINTING

LVL+4'-021"

E2

K LVL±0"

4

8

FINISHED FLOOR LVL..

FINISHED FLOOR LVL..

9" 1'-6" 1'-3"

TOWEL WARMER

LVL±0"

LVL±0"

G

TOILET PAPER HOLDER AS APP @1'-6"FROM FFL.

LVL±0"

5

2'-9"

2" 1'-0"

2" 5"

I

1'-3"

6A SWITCH SOCKET OUTLET (RAW POWER) (AROMA DIFFUSER) (H)AS/ ELECTRICAL

WF S-1

GLASS/ BLACK MIRROR

INTERCOM OUTLET @ (G) AS/ ELECTRICAL LAYOUT @2'-6" HT FROM FFL

1'-0"

WF M-1

COUNTER HT. OF COUNTER AS/ WASH BASIN SELECTION

LVL±0"

SHAVER'S POINT SOCKET @ I, AS/ ELECTRICAL LAYOUT@3'-6" HT FROM FFL

3'-621"

WF S-1

CILL LVL@ 4'-0" FROM FFL.

3'

HANGING LIGHT AS/ APP.

2

WF S-3

LVL+2'-9"

1'-6"

4'-0"

MIRROR AS/ APP.

FLUTED GLASS UPTO 7'-0" HEIGHT

LVL+2'-421"

FALSE CEILING

BLINDS AS APP. LED LIGHT STRIP

WF S-2

WF S-2

1'-1121"

LIGHT

2

LIGHT AS APP. LIGHT AS APP. 7'-0" FROM FFL.

R1 '-0 "

1'-0"

C.L.OF MIRROR

FALSE CEILING

LINE OF LED LIGHT STRIP IN STONE FLUTING

2'-3"

B.O.SLAB

1'

B.O.SLAB

4'-8"

6'-03 4"

6"

6"

1'-0"

B.O.SLAB

B.O.SLAB

B.O.BEAM FALSE CEILING

B.O.BEAM LVL.

3

LIGHT AS APP.

2

FALSE CEILING

WF S-3

WF S-1

1'

LED LIGHT AS APP

6"

TOWEL WARMER

6/16A SWITCH/SOCKET (TOWEL WARMER)(M) AS/ ELECTRICAL LAYOUT@2'-6" HT FROM FFL

FALSE CEILING

KEYPAD @ A, AS/ ELECTRICAL LAYOUT@3'-6" HT FROM FFL

A

6A SWITCH SOCKET OUTLET (E2) (RAW POWER) AS/ ELECTRICAL LAYOUT@1'-0" HT FROM FFL

WASH BASIN ABOVE COUNTER AS APP.

M

7

2'-6"

PAINTING

LVL+4'-021"

E2 1'-0"

1'

3' 1'-6"

G

WF S-1

TOWEL WARMER

LVL±0"

LVL±0"

TOILET PAPER HOLDER AS APP @1'-6"FROM FFL.

LVL±0"

DF LM

FLUTED GLASS UPTO 7'-0" HEIGHT

LVL+2'-421"

CILL LVL@ 4'-0" FROM FFL. INTERCOM OUTLET @ (G) AS/ ELECTRICAL LAYOUT @2'-6" HT FROM FFL

WF S-1

LINE OF LED LIGHT STRIP IN STONE FLUTING

2'-3"

1'-6"

BINDS AS APP.

BLINDS AS APP.

9" 1'-6"

LOOKING MIRROR DOOR WITH WOODEN FRAME FINISHED FLOOR LVL..

11 1021"

6"

6"

3'-3"

FALSE CEILING

WASH BASIN AS APP.

MIRROR AS /DETAIL-9

M 1

OPEN SHELF AS APP WITH LIGHT PROVISION AT BOTTOM

MASTER-UPPER-ELEVATIONS PAI NTING AS APP.

2'-9"

S 1

2'-6"

S 3

OPEN SELF FOR STORAGE

10

WASH BASIN AS APP.

5

CILL LVL. 4" FROM FFL.

FINISHED FLOOR LVL

S 1

FINISHED FLOOR LVL

ELEVATION -A

ELEVATION -B

B.O.S LVL.

B.O.BEAM FALSE CEILING

FALSE CEILING

LED LIGHT AS APP

S 3

S 2

10'-0"

BLINDS AS APP. HEALTH FAUCET AS APP.@ 1'-6"FROM FFL.

7'-3"

KEYPAD @A AS/ ELECTRICAL LAYOUT @3'-6" HT FROM FFL

A

W.C.AS APP.

INTERCOM OUTLET @ G AS/ ELECTRICAL LAYOUT @2'-6" HT FROM FFL

G

POINT @ K AS/ ELECTRICAL LAYOUT@1'-0" HT FROM FFL

3'-5"

K

ELEVATION -B

6"

TOILET PAPER HOLDER AS APP @1'-6"FROM FFL.

1021" 5

E2

SWITCH SOCKET @ E2 AS/ ELECTRICAL LAYOUT @1'-0" HT FROM FFL

2

4'-821"

5'-3"

S 3

FINISHED FLOOR LVL

FINISHED FLOOR LVL.

ELEVATION -D

POWDER ROOM_LOWER DUPLEX CLIENT/PROJECT:

RESIDENCE #58 AT VASANT VIHAR, DELHI

NOTE:-

1. This drawing is a COPYRIGHT & PROPERTY of STUDIO ARDETE PVT. LTD, and is NOT TO BE REPRODUCED, COPIED, HANDED OVER to third party or used for any other purpose other than for which its intended.

REVISION NO. & NOTES: 5)

REV-00

SCALE:-

N.T.S

DATE:-

STATUS-

6)

7) 2. While every attempt has been made in the preparation of this drawing and to avoid mistakes the maker cannot guarantee against human error. The contractor 8) on job must check all dimensions and other details and be responsible for the same. 9)

DWG NO-

DRAWN BY:-

SATISH

CHECKED BY:-

NISHA

GFC-TD-002 FINAL GFC

ARCHITECT:

STUDIO ARDETE PRIVATE LIMITED SCO - 43, First Floor, Swastik Vihar, MDC, Panchkula - 134109, Chandigarh (Tricity) TELE. : 0172-4020185 E-MAIL: office.studioardete@gmail.com

CONSULTANT:


WATERPROOFING TEST | E-58 Vasant Vihar

Mosaic Wall Design

21/06/21

LOWER DUPLEX LOWER PART | Ground Floor Location

Date of Filling

Date of Emptying

Remarks

Day Bedroom Bathroom

20/3/21

1/4/21

Good to go.

Powder Room

30/3/21

7/4/21

Good to go.

Servant’s Room

23/3/21

3/4/21

Good to go.

Maid’s Room

10/4/21

22/4/21

Good to go.

Master Bedroom Bathroom

22/3/21

3/4/21

Good to go.

Kid’s Bathroom

22/3/21

3/4/21

Good to go.

Guest’s Bathroom

20/3/21

3/4/21

Good to go.

Servant’s Room

23/3/21

3/4/21

Good to go.

Date of Filling

Date of Emptying

Day Bedroom Bathroom

30/3/21

7/4/21

Good to go.

Powder Room

30/3/21

7/4/21

Good to go.

Servant’s Room

22/3/21

3/4/21

Good to go.

Maid’s Room

10/4/21

22/4/21

Good to go.

Master Bedroom Bathroom

31/3/21

7/4/21

Good to go.

Kid’s Bathroom

31/5/21

10/6/21

Good to go.

Guest’s Bathroom

19/3/21

3/4/21

Good to go.

Servant’s Room

21/3/21

3/4/21

Good to go.

Dark Brown

Light Brown

UPPER PART | 1st Floor

Cream

Grey-Base UPPER DUPLEX LOWER PART | 2nd Floor

Iterations (More Dense)

Location

Remarks

UPPER PART | 3rd Floor

Signature | Approval


STAIRCASE/LOBBY DESIGN


9"

SW7

6"

6'-921"

C20

5'

9"

36

26

19

1" 11'-112

10"

STONE SHADE AS APP. STONE SHADE AS APP. (BLACK) FIXED GLASS

D

B

C

LIFT/STAIR LOBBY 16'-0"x17'-0" 6"

5'

9"

1" 04/03/2020

DRAWN BY:-

SIMARPREET KAUR

CHECKED BY:-PRERNA

ARCHITECT:

19

HVAC SHAFT 3'-3"x 6'-412"

WALL MURAL

LIFT-2 (6P) 5'-0"x5'-0"

SW4

C.B

19'-8" [6.00]

SW5 SW6 LIFT-1 (10P) 6'-3"x6'-0"

SW7

PEDESTAL LAMP

C19

C20 BALCONY

5'-0" WIDE DOUBLE HEIGHT BALCONY

SETBACK LINE

1" 2'-102

2'-6"

3'-6"

1" 11'-112

D

1'

B

DA

C

6'

LIFT/STAIR LOBBY 16'-0"x17'-0" 6"

LIFT-1 (10P) 6'-3"x6'-0"

HVAC SHAFT

5'

9"

2'-6"

1" 2'-102

3'-6"

STONE SHADE AS APP. STONE SHADE AS APP.

S 3

STONE SHADE AS APP. (BLACK)

G 1

FIXED GLASS

1" 10'-82

1'-4"

LIFT-1 (10P) 6'-3"x6'-0"

HVAC SHAFT

LIFT-2 (6P) 5'-0"x5'-0"

Ground Floor and Above

BEAM 1'-0" DN.

Electrical Plan

STAIRCASE (Plans)

BEAM 1'-0" DN.

NOTE:-

REVISION NO. & NOTES:REV-00 1. This drawing is a COPYRIGHT & PROPERTY of STUDIO ARDETE PVT. LTD, and is NOT TO BE REPRODUCED, COPIED, HANDED OVER to third 5) 6) RESIDENCE #58 AT party or used for any other purpose other than for which its intended. 2. While every attempt has been made in the preparation of this drawing and 7)to VASANT VIHAR, DELHIavoid mistakesthe maker cannot guarantee against human .error The contractor8) on job must check all dimensions and other details and be responsible for the9)same.

SCO - 43, First Floor, Swastik Vihar, MDC, Panchkula - 134109, Chandigarh (Tricity) TELE. : 0172-4020185

BEAM 1'-0" DN.

S 1 S 2

ELEC.(LOW SIDE) 5'-0"x1'-0"

LIFT-2 (6P) 5'-0"x5'-0"

STUDIO ARDETE CONSULTANT: PRIVATE LIMITED

MATERIAL KEY ( LEGEND )

5'

A

1'-4"

TOTAL PLOT AREA:- = 62'-0"x117'-0" = 7254.00 SQ.FT (806.00 SQ.YD / 673.91 SQ.MT) PERMISSIBLE COVERED AREA @ 75% 5440.50 SQ.FT(505.43 SQ.MT) = ACHIEVED COVERED AREA4196.45 = SQ.FT(389.86 SQ.MT) i.e 57.85%

UP

1" 10'-82

ELEC.(LOW SIDE) 5'-0"x1'-0"

CLIENT/PROJECT:

LD-GBE-003

ELEC.(LOW SIDE) 5'-0"x1'-0"

C18

4'

26

10"

6'

LOWER DUPLEX STATUS-

LVL. +9'-3"

FOYER

DN 36

BEAM 1'-0" DN.

BEAM 1'-0" DN.

12" 5"

2"

2"

S 2 S 3

G 1

8'

29

4'-6"

A

STAIRCASE (DETAILS) DWG NO-

4' 4'-6" 5'

UP

STONE SHADE AS APP.

FLUTING IN ITALIAN MARBLE

N.T.S

C15

DOUBLE HEIGHT FORMAL LOUNGE 16'-0"x18'-0"

BEAM 1'-0" DN.

6"

29

1"X21"

DATE:-

UP

PEDESTAL LAMP

BEAM

4'

Width - 4'-0" Tread - 1'-0" Riser - 0'-6"

BEAM 1'-0" DN.

BRICK WALL

SCALE:-

LIFT-1 (10P) 6'-3"x6'-0"

HVAC SHAFT

LIFT-2 (6P) 5'-0"x5'-0"

DN

FIXED GLASS TO THE BEAM BOTTOM

REVISION NO. & NOTES:REV-00 1. This drawing is a COPYRIGHT & PROPERTY of STUDIO ARDETE PVT. LTD, and is NOT TO BE REPRODUCED, COPIED, HANDED OVER to third 5) 6) RESIDENCE #58 AT party or used for any other purpose other than for which its intended. 2. While every attempt has been made in the preparation of this drawing and 7)to VASANT VIHAR, DELHIavoid mistakesthe maker cannot guarantee against human .error The contractor8) on job must check all dimensions and other details and be responsible for the9)same.

49

LIFT/STAIR LOBBY 16'-0"x17'-0"

1'-1021"

1'-0" DN.

8'

MATERIAL KEY ( LEGEND )

NOTE:-

56

Width- 4'-0"

FINAL LAYOUT PLAN, GROUND FLOOR

S 1

FALSE CEILING DN.AS/HVAC DUCT LVL./ (+1'-6" LVL. FROM B.O.S)

SW3

48

Tread- 1'-0" C14 Riser - 0'-6"

7'-9"x14 '-10"

C17

BEAM 1'-0" DN.

4'

4'-6"

18MM PLY GLASSFIXED ON 12MM PLY & Aluminium Frame21"1 X 2" GLASS 18MM

HEIGHT (19'-3") C13DOUBLE PUJA ROOM

DN

42

1'-3"

4'-6"

4" HVAC GRILL

LEDGE WALL UPTO CEILING HT.

3'-0"

SW3

PL. DUCT 1'-0"x2'-6"

SETBACK LINE

Elevation-Lift Lobby

121"

1'-4"

LIFT-1 (10P) 6'-3"x6'-0"

HVAC SHAFT

LIFT-2 (6P) 5'-0"x5'-0"

TOTAL PLOT AREA:- = 62'-0"x117'-0" = 7254.00 SQ.FT (806.00 SQ.YD / 673.91 SQ.MT) PERMISSIBLE COVERED AREA @ 75% 5440.50 SQ.FT(505.43 SQ.MT) = ACHIEVED COVERED AREA4196.45 SQ.FT(389.86 SQ.MT) i.e = 57.85%

R.C.C. SLAB

3'-6"

PL. DUCT 1'-6"x1'-6"

CONSOLE

10'-3" WIDE DOUBLE HEIGHT TERRACE

ELEC.(LOW SIDE) 5'-0"x1'-0"

FINAL LAYOUT PLAN, GROUND FLOOR

1'-6"

3'-6"

ELEC.(LOW SIDE) 5'-0"x1'-0"

BALCONY

DETAIL A-Fluting

CLIENT/PROJECT:

2'-6"

3'-8"

3'-0"

TOILET C11 10'-3"x6'-9"

SHOWER

HALF BATH 16'-412"x7'-0"

BALCONY

C19 5'-0" WIDE DOUBLE HEIGHT BALCONY

1" 2'-102

117' [35.66] 90'-221" [27.50]

LIFT/STAIR LOBBY 16'-0"x17'-0"

LIFT-1 (10P) 6'-3"x6'-0"

C.B C.B

C.B

19'-8" [6.00]

SW5 SW6

2'

1" 6'-72

3'-9"

BENCH

VESTIBULE 6'-112"x6'-9"

CONSOLE

HVAC SHAFT 3'-3"x 6'-412"

3"

DETAIL B

DAY ROOM 1" 16'-412"x12'-7 2

UP

6'-921"

SW4

1'-3"

16'-921" [5.12]

Fluted Stone

19 1

DOUBLE HEIGHT LIVING AREA 1" 16'-0"x32'-1 2

16'-921" [5.12]

LIFT-2 (6P) 5'-0"x5'-0"

PEDESTAL LAMP

5'

8 6

3'-6" 9" 1'-1"

5'-0" WIDE BALCONY

1'-0"

ELEC.(LOW SIDE) 5'-0"x1'-0"

1'-1021"

C17

DOUBLE HEIGHT FORMAL LOUNGE 16'-0"x18'-0"

9"

BEAM 1'-0" DN.

1" 10'-82

1'-0"

2'-1"4

2'-0" 3'-8"

LVL. +9'-3"

6'

BEAM 1'-0" DN.

CONSOLE

LIFT/STAIR LOBBY 16'-0"x17'-0" FOYER

BEAM 1'-0" DN.

WALL MURAL

UP

C8

FULL HT. CABINET

C10

SW3

49

PEDESTAL LAMP

2'-6"

INBUILT FRIDGE

Width- 4'-0" Tread- 1'-0" Riser - 0'-6"

C9

DN 48

42

56

Width- 4'-0"

C15

C18

2'-10"

SW2

FULL HT. CABINET

11'-3" [3.43]C7

WALK-IN CLOSET 6'-0"x10'-7"

DINING AREA 1" 13'-7"x18'-4 2

SW1

1" 2

117' [35.66] 90'-221" [27.50]

SW3

Tread- 1'-0" C14 Riser - 0'-6"

7'-9"x14 '-10"

Detail A-Fluting

3'-6"

TOILET 8'-0"x4'-6"

UTILITY 6'-0"x12'-6"

2'

C2

SERVANT ROOM (3P) 10'-0"x13'-0"

WALK-IN CROCKERY 6'-0"x7'-0"

PL. DUCT 1'-6"x1'-6"

HEIGHT (19'-3") C13DOUBLE PUJA ROOM

PL. DUCT 1'-0"x2'-6"

1'-4"

1" 2'-02

C6

C.B

C5

KITCHEN 12'-0"x21'-10" +7'-9"x8'-3"

UP

HALF BATH 16'-412"x7'-0"

7'-9"

Metal Finish

10"

1

Width - 4'-0" Tread - 1'-0" Riser - 0'-6"

BEAM 1'-0" DN.

BEAM 1'-0" DN.

STAIRCASE WORKING DRAWING

Wallpaper

8

UP

1" 11'-112

BEAM 1'-0" DN.

LIFT 1

Width - 4'-0" Tread - 1'-0" Riser - 0'-6 1/4"

FIXED GLASS TO THE BEAM BOTTOM

LEDGE WALL UPTO CEILING HT.

3'-0"

BEAM 1'-0" DN.

8'

3'-6"

TOILET C11 10'-3"x6'-9"

SHOWER

CONSOLE

10'-3" WIDE DOUBLE HEIGHT TERRACE

S 3

3'-0"

3'-11"

3'-9"

BENCH

1" 2

DAY ROOM 1" 16'-412"x12'-7 2

C10 VESTIBULE 6'-112"x6'-9"

412"

PL. DUCT 1" 3'-0"x0'-7 2

C4

MAID ROOM 8'-0"x8'-4"

K.STORE 1" 6'-0"x6'-7 2

W.C SHOWER 3'-0"X4'-9" W.B 3'-3"X4'-9" 3'-0"X4'-2"

DN UP

PL. DUCT 2'-0"x2'-0"

C3

EL./HVAC DUCT 1 10'-0"x1'-7 2"

2'-1"4

19

UP

11'-121" [3.39]

C1 5'-0" WIDE BALCONY

5'

1

FULL HT. CABINET

1

DOUBLE HEIGHT LIVING AREA 1" 16'-0"x32'-1 2

62' [18.90] 50'-1021" [15.51]

67

3'-11"

INBUILT FRIDGE

8 6

60 5'

8

Ceiling Plan and Lighting Plan

2'

DN

2'-0" 3'-8"

SW2

FULL HT. CABINET

SW3

5'

8'-11"

C8

Width- 4'-0" Tread- 1'-0" Riser - 0'-6"

C9

2'

2'

17

97'-4" [29.66]

Stilt Floor Plan

4'

DN

11'-3" [3.43]C7

WALK-IN CLOSET 6'-0"x10'-7"

DINING AREA 1" 13'-7"x18'-4 2

UTILITY 6'-0"x12'-6"

SW1

8'

10

97'-4" [29.66]

6"

TOILET 8'-0"x4'-6"

4'

BALCONY

KITCHEN 12'-0"x21'-10" +7'-9"x8'-3"

C.B C.B

C.B

K.STORE 1" 6'-0"x6'-7 2

C2

SERVANT ROOM (3P) 10'-0"x13'-0"

WALK-IN CROCKERY 6'-0"x7'-0"

CROCKERY CABINET

1'-6"

C5

5'-0" WIDE BALCONY

10' [3.05]

1'-6"

C6

C.B

MAID ROOM 8'-0"x8'-4"

C.B

412"

PL. DUCT 1" 3'-0"x0'-7 2

C4

W.C SHOWER 3'-0"X4'-9" W.B 3'-3"X4'-9" 3'-0"X4'-2"

DN UP

PL. DUCT 2'-0"x2'-0"

EL./HVAC DUCT 1 10'-0"x1'-7 2"

CROCKERY CABINET

11'-121" [3.39]

C1 5'-0" WIDE BALCONY

C3

10' [3.05]

62' [18.90] 50'-1021" [15.51]

6"

LOWER DUPLEX

SCALE:DATE:-

N.T.S

DWG NO-

LD-GBE-003

STUDIO ARDETE CONSULTANT: PRIVATE LIMITED

ARCHITECT:

STATUS-

04/03/2020

DRAWN BY:-

SCO - 43, First Floor, Swastik Vihar, MDC, Panchkula - 134109, Chandigarh (Tricity) TELE. : 0172-4020185 E-MAIL: office.studioardete@gmail.com

SIMARPREET KAUR

CHECKED BY:-PRERNA

E-MAIL: office.studioardete@gmail.com

62' [18.90] 50'-1021" [15.51]

11'-121" [3.39]

412"

PL. DUCT 1" 3'-0"x0'-7 2

KITCHEN 12'-0"x21'-10" +7'-9"x8'-3"

TOILET 8'-0"x4'-6"

SW1 SW2

3'-3"

FULL HT. CABINET

INBUILT FRIDGE

19

S 3

G 1

S 1

S 3

C.B

LEDGE WALL UPTO CEILING HT.

1'-0"

2'-0" 3'-8"

3'-0"

HALF BATH 16'-412"x7'-0" PL. DUCT 1'-6"x1'-6"

CONSOLE

HEIGHT (19'-3") C13DOUBLE PUJA ROOM

DN

SW3

48

42

56

49

Tread- 1'-0" C14 Riser - 0'-6"

Width- 4'-0"

UP

C15 LIFT/STAIR LOBBY 16'-0"x17'-0" LVL. +9'-3"

FOYER ELEC.(LOW SIDE) 5'-0"x1'-0"

1'-1021"

S 1

SW3

7'-9"x14 '-10"

CONSOLE

1'-2" 2"

3'-6"

TOILET C11 10'-3"x6'-9"

SHOWER

DOUBLE HEIGHT LIVING AREA 1" 16'-0"x32'-1 2

10'-3" WIDE DOUBLE HEIGHT TERRACE

1'-6"

3'-0"

2'-1"

3'-9"

BENCH

3'-11"

C10 VESTIBULE 6'-112"x6'-9"

412"

DAY ROOM 1" 16'-412"x12'-7 2

UP

9"

FIXED GLASS

C9 1"

97'-4" [29.66]

3'-3"

Studs used to fix the Railing

1

WALL MURAL

Entrance

FULL HT. CABINET

8

117' [35.66] 90'-221" [27.50]

Glass Railing

7'-9"

LIFT

7'-8"

11'-3" [3.43]C7

C8

Width- 4'-0" Tread- 1'-0" Riser - 0'-6" 6

8'-3"

WALK-IN CLOSET 6'-0"x10'-7"

DINING AREA 1" 13'-7"x18'-4 2

UTILITY 6'-0"x12'-6"

LIFT

SERVANT ROOM (3P) 10'-0"x13'-0"

WALK-IN CROCKERY 6'-0"x7'-0"

C.B C.B

C5

19'-8" [6.00]

DN UP

C6

C.B

MAID ROOM 8'-0"x8'-4"

K.STORE 1" 6'-0"x6'-7 2

2" S 1

DETAIL B

C4

CROCKERY CABINET

5"

2"

EL./HVAC DUCT 1 10'-0"x1'-7 2"

C.B

C3

1'-6" 4" Grill

5'-0" WIDE BALCONY PL. DUCT 2'-0"x2'-0"

1'-9"

C2

W.C SHOWER 3'-0"X4'-9" W.B 3'-3"X4'-9" 3'-0"X4'-2"

5'-0" WIDE BALCONY

10' [3.05]

C1

LIFT-2 (6P) 5'-0"x5'-0"

C17

SW4

HVAC SHAFT 3'-3"x 6'-412"

SW5 SW6 LIFT-1 (10P) 6'-3"x6'-0"

SW7

PL. DUCT 1'-0"x2'-6"

Glass Railing

PEDESTAL LAMP PEDESTAL LAMP

FIXED GLASS

Entrance

S 3

7'-0"

C19

C18

S 3

S 1

G 1

F.F.L.

F.F.L.

5'-0" WIDE DOUBLE HEIGHT BALCONY

6'-921"

LIFT

LIFT

16'-921" [5.12]

7'-3"

C20

BALCONY

1'-3"

DOUBLE HEIGHT FORMAL LOUNGE 16'-0"x18'-0"

BALCONY

SETBACK LINE

FINAL LAYOUT PLAN, GROUND FLOOR

TOTAL PLOT AREA:- = 62'-0"x117'-0" = 7254.00 SQ.FT (806.00 SQ.YD / 673.91 SQ.MT) PERMISSIBLE COVERED AREA @ 75% 5440.50 SQ.FT(505.43 SQ.MT) = ACHIEVED COVERED AREA4196.45 SQ.FT(389.86 SQ.MT) i.e = 57.85%

Elevation C

1'-6"

Elevation D

1' 6"

DETAIL B 10'

S 2

8'-6"

LVL. ± 0'-0"

1'-0"

8'-3"

LVL. ± 0'-0"

1'-6"

S 2

4" Grill

6"

Ground

LVL. ± 0'-0"

12MM Groove

8'-9"

S 1

FIXED GLASS

LIFT

G 1

8'

A

4'-9"

Mock Up Detail

Stilt

3'-6" 8'-9"

8'

Elevation B

STAIRCASE (WALL ELEVATIONS)

Detail as per mock up

Elevation A REVISION NO. & NOTES:REV-00 1. This drawing is a COPYRIGHT & PROPERTY of STUDIO ARDETE PVT. LTD, and is NOT TO BE REPRODUCED, COPIED, HANDED OVER to third 5) 6) party or used for any other purpose other than for which its intended. RESIDENCE #58 AT 2. While every attempt has been made in the preparation of this drawing and 7)to VASANT VIHAR, DELHIavoid mistakesthe maker cannot guarantee against human .error The contractor8) on job must check all dimensions and other details and be responsible for the9)same.

F.F.L.

0"

6"

F.F.L.

NOTE:-

D

9"

7'-3"

S 2

12"

LVL. ± 0'-0"

3'-3"

CLIENT/PROJECT:

FALSE CEILING LvL.

6"

S 2

TRUE CEILING LvL.

0"

FALSE CEILING 6" LvL.

LVL. ± 0'-0"

LOWER DUPLEX SCALE:DATE:-

N.T.S

DWG NO-

LD-GBE-003

STATUS-

04/03/2020

DRAWN BY:-

SIMARPREET KAUR

CHECKED BY:-PRERNA

ARCHITECT:

STUDIO ARDETE CONSULTANT: PRIVATE LIMITED SCO - 43, First Floor, Swastik Vihar, MDC, Panchkula - 134109, Chandigarh (Tricity) TELE. : 0172-4020185 E-MAIL: office.studioardete@gmail.com


ANALYSING SPACES BETWEEN DUCTS AND FALSE CEILING LEVEL


UPPER DUPLEX-KITCHEN DESIGN WITH MATERIALS

LOWER DUPLEX-KITCHEN DESIGN WITH MATERIALS


E-2/4, VASANT VIHAR This Another Site Was A Renovation Super Fast Construction Project, Undertaken By Studio Ardete. The Interiors And All Designing Is The Charm Of The Place.

APARTMENT LOUNGE AREA KITCHEN DRAWING ROOM + DINING AREA POWDER LOO GUEST ROOM | WASHROOM KID’S ROOM | WASHROOM | WC MASTER BEDROOM | WASHROOM | WALKING CLOSET


ON GOING SITE PICTURES


COMPLETED ON 26TH JUNE, 2021 AND HANDED OVER TO THE CLIENT


SITE PHOTOS AND PROCESS

RAJENDRA NAGAR

6th July, 2021 26th June 2021

RAJENDRA NAGAR Basement Basement Drawing DrawingWork Work Progress Progress

This Another Site Was Also A Residential Bungalow Of 4 Floors, Into The Dense Typology, Situated In Rajendra Nagar. This Is An Ongoing Site, With Forth Floor Slab Currently Being Casted. In This Project, We Faced Municipal And Law Negligence, Due To Which We Had To Shift The Entire Building Behind By 3 Feet

Civil Civil

Stilt Stilt

First First

Second Second

Third Third

10% 10%50% 50%90% 90%100% 100% 10% 10%50% 50%90% 90%100% 100% 10% 10%50% 50%90% 90%100% 100% 10% 10%50% 50%90% 90%100% 100% 10% 10%50% 50%90% 90%100% 10

Excavation Excavation AntiTermite AntiTermite PCC PCC Foundation/Footing/Raft Foundation/Footing/Raft Retaining Retaining Wall Wall Guniting Guniting Casting Casting Columns Columns Casting Casting Roof Roof Slab Slab Brickwork Brickwork Plaster Plaster Waterproofing Waterproofing Terrace Terrace Terrace Terrace PCC PCC Foundation Foundation forfor Services Services

External External Cladding Cladding

Cladding Cladding

External External landscape' landscape'

Hardscape Hardscape

Boundary Boundary Wall Wall

Foundation Foundation

Softscape Softscape Brickwork/RCC Brickwork/RCC Boundary Boundary Gate Gate

Basement

Third Fourth Terrace Basement Stilt First Second Third 10% 50% 90% 100% 10% 50% 90% 100% 10% 50% 90% Work 100%Progress 10% 50% 90% 100% 10%50% 50%90% 90% 100% 10%50% 50%90% 90% 100% 10%50% 50%90% 90% 100% Drawing 10% 100% 10% 100% 10% 100% 10% 50% 90% 100% 10% 50% 90% 100%

Drawing Work Progress Civil

MS/SS MS/SS

Stilt

First

Excavation

Civil

AntiTermite

Weekly Reports Of This Site Was My Assigned Task. Made 3D Structural To Show The Shift Of The Building Along With Demolition External Cladding External landscape'

PCC

Foundation/Footing/Raft

Foundation/Footing/Raft

Retaining Wall

Retaining Wall

Guniting

Guniting

Casting Columns

Casting Columns

Casting Roof Slab

Casting Roof Slab

Brickwork

Brickwork

Plaster

Plaster

Waterproofing Terrace

Waterproofing Terrace

Terrace PCC

Terrace PCC

Foundation for Services

Foundation for Services

Cladding

External Cladding

Cladding

Hardscape

External landscape'

Hardscape

Boundary Wall

Foundation

Foundation

Softscape

Brickwork/RCC Boundary Gate

Excavation AntiTermite

PCC

Softscape Boundary Wall

Second

MS/SS

Brickwork/RCC Boundary Gate

MS/SS

• Stilt Floor Slab is being casted with respect to new lift positions. • New Columns are being casted.


DELHI ONE

SITE PHOTOS AND PROCESS Delhi One

This Site Is A Commercial Project, Located In Noida. It Consists Of Various Hospitable Spaces, Gathering Spaces And Huge Auditorium.

Site Photos Page 1

26th 2021 10thJune, July, 2021


Tower D G2 Fire Staircase

Tower C G2 Corridor


6007

FLOORING PATTERN FOR THE AUDITORIUM

5431

17529

11470

LOBBY 4256 X 4091 EL

FHC

6058

EX

A

EL

CHW

A EL

A

1184

EL

8

5788 EL

EX KID'S.TOILET

5723

CHW

LIFT-20 2150X2450 ELE

11460

DESIGN FOR AIR CURTAINS-EXPLORATIONS

1

HORIZONTAL | L-Angle Boxed by 12mm Ply To Base Plate

3

VERTICAL | L-Angle To Base Plate

4

HORIZONTAL | L-Angle To Base Plate

6

HORIZONTAL | Equipment attached with L-Angle, Entirely Boxed by 12mm To Base Plate


PRODUCT DESIGNING With The Help Of Prerna Ma’am, I Was Working On Few Models Using Wooden Mosaics Pieces As An Element.


TABLE RUNNER

VASES

POUCH

ANGULAR TRAY


PERFORATED LAMP

TRAY

WALL ART