Skip to main content

Hemlock Design - Bath Concept

Page 1

CLIENT HOLT Rhoda & Allan

PROJECT

Bsmt Bath Reno

PROJECT NO.

19-17

DRAWN BY

SR

ISSUE

10.30.2019

Project Concept


1'-9" 2'-5"

2'-4" 9"

SR

19-17

PROJECT NO.

DRAWN BY

PROJECT

6"

Bsmt Bath Reno

ISSUE

1'-0"

Oct 30, 2019

1'-6"

2'-5"

2'-6"

Layout

9 1/2"

2'-1 1/2"

4'-0"

4'-3 1/2"

HOLT, Rhoda & Allan

CLIENT

7'-6"

200-267 Brock Ave Toronto, ON M6K 2M3

6'-6"

4'-0"

1'-6 1/2"

A.01


EAST ELEVATION 2'-4"

2'-5"

2'-6"

SOUTH ELEVATION

19-17

HOLT, Rhoda & Allan

1'-9"

6'-8 1/2"

7'-10"

4'-11"

2'-5 1/2"

200-267 Brock Ave Toronto, ON M6K 2M3

1'-6"

SR

PROJECT NO.

DRAWN BY

2'-3" CLIENT

NORTH ELEVATION

Bsmt Bath Reno

3'-0"

PROJECT

4'-0"

Oct 30, 2019

WEST ELEVATION

ISSUE

2'-5 1/2"

6'-6"

Elevations

2'-9"

6'-8"

2'-11"

2'-6" 7'-6" 6"

1'-0"

7'-6"

A.02


Turn static files into dynamic content formats.

Create a flipbook
Hemlock Design - Bath Concept by Sara Roach - Issuu