East Van Multifamily Development

Page 1

Imraj & Amanjit Pasricha

x


TOC Background

Project timeline

Project objectives

Existing site: interior

Scope

Existing site: exterior

Proposed phasing


Background Amanjit & Imraj Pasricha

Hemlock Studio

4717 Lanark Street, Vancouver, BC V5N 3R9

Hemlock Studio has an agile way of working — our small studio is collaborative with alike design groups and specialists talent under one independent studio.

Young family purchased property and severed the lot for development. Proposed build project is a multi unit development, 2 single family homes and 2 laneway homes. The project is located in Cedar Cottage area, East Vancouver. Project is currently in pre-construction; layouts, architectural package is complete, building permits have been submitted and the design planning phase can begin. Projected finishing to be completed in Spring 2022.

Hemlock Studio is a design consultancy that specializes in spaces that question the line between indoor and outdoor living. Our focus is designing spaces that improve how people use and respect the natural surroundings.


Project objectives 1.

Develop a cohesive design theme throughout the main house and laneway home, then duplicate the symmetry to the 2nd lot and near replica single family home and laneway home.

2.

Achieve simple and attractive design to appeal to potential buyers.

3.

Streamline interior design process by providing clear options for approval. Be time efficient with project management and keep project budget at top of mind for material selections.


Scope We are committed to designing spaces that preserve the rules of nature, solve problems, save resources, and get better with age. Our place-based design practices cover a project from start to finish and consult on these specific pieces: Discovery, Site Survey & Analysis Schematic Design Details & Spatial Coordination Hand-off & Install


Proposed phasing Schematic Design (May-June 2021) a. b. c. d.

Mood board and concept development Schematic design presentation Mock-ups and illustrative modelling 3D models and renders

Design Development (May - Aug 2021) a. b. c. d. e. f. g.

Detailed plans Interior elevations (kitchens, baths, etc) Material groupings and tile packages Lighting and electrical plan Plumbing fixtures Custom millwork plans Landscape and planting plans

Spatial Coordination (July - Nov 2021) a. b. c.

Source various vendors and suppliers Prepare budget and cost plan based on selections Prepare for installation

Construction & Install (October 2021 - June 2022) a. b. c. d.

Coordinate trades people Source and procure furniture and finishes Handoff to selected installers or custom fabricators (ie. metal work, millwork, landscape installers, etc) Implement design plan


Project timeline Design Development & Detail Coordination

0 1

MAY - JUNE 2021

Environmental, Discovery & Schematic ● ● ● ●

Site analysis & data collection Mood board & design intent development Schematic design 3D renders & material groups

● ● ● ● ●

Detailed elevations Drawings for fabrication and install Material selections Proposed finishes finalised Source trades and suppliers

02 03

0 4

OCT 21 - JUNE 22

Project Management & Installation

MAY - NOV

● ● ●

Trades coordination Handoff to installer & trades for delivery & construction Design implementation


Existing Site: 4715 Lanark Street, Vancouver BC


Existing Site: 4715 Lanark Street, Vancouver BC


Existing Site: 4715 Lanark Street, Vancouver BC


Existing Site: 4715 Lanark Street, Vancouver BC