Skip to main content

Sarah Young : : Work Sample

Page 1

SARAH YOUNG

WORK S A MP L E


[ E ] : : ARCH.SYOUNG@GMAIL.COM [P] :: [ A ] : : BROOKLYN, NY 11216 *willing to relocate*

SARAH YOUNG

[ WORK EXPERIENCE ] : :

INTERMEDIATE ARCHITECT : : ADAMSON ASSOCIATES ARCHITECTS : : NEW YORK, NY October 2019 : : October 2020 Detailed Facade and Interior construction drawings for a 50 story commercial high rise in the Hudson Yards development. Led CD phase coordination with client and consultants for all ceiling conditions of 40 story residential high rise in San Francisco. Worked closely with design architects to ensure full concept incorporation in technical drawing development. PROJECT MANAGER : : KUSHNER STUDIOS : : NEW YORK, NY July 2016 : : August 2019 Directed and coordinated multiple commercial and residential typologies from Schematic Design to DOB permit sets, through Construction Administration. Optimized office standards to improve efficiency and workflow of project time lines. Advanced client relations and drafted contracts formulating project scope from design desires. Reviewed and redlined drawings for code compliance and construction viability. Conducted employee interviews, performance reviews, and instituted training programs for new hires. Regulated incoming work to efficiently distribute tasks among the team. GRADUATE TEACHING ASSISTANT : : PRATT INSTITUTE : : NEW YORK, NY September 2014 : : May 2016 : : Computer Media 1&2 with Christopher Kroner, Ben Martinson Responsible for assisting and providing feedback for the integrated use of computational software for representation, design development and presentation for multiple semesters. ARCHITECTURAL DRAFTER : : OLIVER COPE ARCHITECT : : NEW YORK, NY December 2014 : : October 2015 Developed a DD set into an accomplished CD set for a multi million dollar residential renovation on the Upper East Side. Clarified and compiled concepts into clear client presentations. Enacted new strategies for project organization. DESIGNER / MARKETING COORDINATOR : : TEXAS WILSON : : SAN ANTONIO, TX May 2012 : : September 2013 Composed interior space planning solutions for large scale civic and office buildings. Generated standards and launched a new intern program. Established a social media presence exhibiting in-house graphics and photographs.

[ EDUCATION ] : :

TEXAS STATE UNIVERSITY : : SAN MARCOS, TX August 2008 : : December 2012 B.S. Interior Design : : GPA 3.75 Honors College : : Deans List

PRATT INSTITUTE : : BROOKLYN, NY August 2013 : : May 2016 M.Arch : : GPA 3.88 Senior Member of Student Council

[ VOLUNTEER ] : :

The Architecture League of New York Prattside Build : : Pratt Institute

[ REFERENCES ] : :

[ SKILLS ] : :

Hany Michael : : hmichael@adamson-associates.com

[Associate, Adamson Associates Architects]

John Bedard : : Jbedard@Kushnerstudios.com [Junior Partner, Kushner Studios] Additional available upon request

Project Management : : Coordination Site Documentation Drawing Review Collaboration Code/Zoning Review DOB Paperwork Client Relations Timeline Development

Vectorworks Adobe : : Autodesk : : Photoshop Autocad Illustrator Revit Indesign Maya After Effects Mcneel : : Microsoft Office : : Rhinoceros 3D Word Grasshopper Excel Maxwell Render Powerpoint

[ HONORS & AWARDS] : : “IN-PROCESS” PRATT PORTFOLIO : : STUDIO WORK SELECTED, EXHIBITED & ARCHIVED Erich Schoenenberger Spring 2015 Fall 2015 Henry Smith-Miller Theoharis David Spring 2014 Fall 2014 Jason Vigneri-Beane Summer 2014 Jason Vigneri-Beane Fall 2013 Alex Barker OUTSTANDING CONTEMPORARY ISSUES DESIGN PROJECT : : TEXAS STATE UNIVERSITY Spring 2012 Asha Hegde : Critic


5 0 H UD S ON YA RD S 50 HUDSON YARDS, NYC : : ADAMSON ASSOCIATES : : CD, CA AT A STAGGERING 2.9 MILLION GROSS SQUARE FEET, 50 HUDSON YARDS IS SOON TO BE NYC’S 4TH LARGEST COMMERCIAL OFFICE TOWER, LOCATED AT THE NORTH-EASTERN CORNER OF THE RENOWNED HUDSON YARDS DEVELOPMENT. ANCHOR TENANTS ARE TO BE BLACK ROCK, AND TECH GIANT FACEBOOK. I JOINED THE ADAMSON (AOR) TEAM TO ASSIST WITH DEVELOPING THE CONSTRUCTION DRAWINGS, FOCUSING ON TIME-SENSITIVE AND CRITICAL RE-DESIGNS OF THE TOWER TOP, STORE-FRONT, AND INTERIOR DETAIL DEVELOPMENT. EACH PORTION WAS HEAVILY COORDINATED WITH THE DESIGN ARCHITECT, FOSTER + PARTNERS AND THE CLIENT, RELATED DEVELOPMENT.


RENDER : : TOWER TOP AT NIGHT

DETAIL : : TOWER TOP

DETAIL ELEVATION : : WEST LOBBY ESCALATOR

DETAIL RENDER : : WEST LOBBY ESCALATOR


BUILDING SECTION : : N/S TOWER 1

RENDER : : PLAZA

REFLECTED CEILING PLAN : : ELEVENTH FLOOR

TYPICAL FLOOR PLAN : : MOTHER UNIT TYPE 2S..P


‘ T H E CRE AM ERY ’ D E VE LOPMENT 655 4TH STREET, SAN FRANCISCO, CA : : ADAMSON ASSOCIATES : : DD, CD THE SOMA NEIGHBORHOOD OF SAN FRANCISCO, CALIFORNIA WILL SOON BE HOME TO THIS MIXEDUSE DEVELOPMENT FROM TISHMAN SPEYER WITH 900+ RESIDENTIAL UNITS. IT WILL ALSO CONTAIN HOTEL, OFFICE, RETAIL SPACES. AND A MYRIAD OF AMENITIES LOCATED THROUGHOUT THESE TWO 400 FOOT, 40 STORY TOWERS. EACH FLOOR CONTAINS A UNIQUE FOOTPRINT TO ACHIEVE THE DESIGN PROPOSED BY BIG ARCHITECTS, FOR THESE 2 TOWERS TO GIVE THE APPEARANCE OF 4 MASSES TWISTING TOGETHER, SPLITTING AT THE BASE AND OPENING THE SITE TO A PUBLIC PLAZA. I JOINED THE TEAM TO PULL THIS CONCEPT THROUGH DESIGN DEVELOPMENT TO CONSTRUCTION DOCUMENTATION. WORKING VERY CLOSELY WITH THE CLIENT, DESIGN ARCHITECT, AND CONSULTANTS, I LED THE COORDINATION TEAM, FOCUSING ON EFFICIENCY, FOR THE INTERNAL STACKING OF BUILDING SYSTEMS FOR THE UNITS, AND THE CEILING PLACEMENT AND DESIGN.


TOP QU A L ITY 10-29 44TH RD, LIC NY : : KUSHNER STUDIOS : : PM : : SD -- CA LOCATED IN THE INDUSTRIAL NEIGHBORHOOD OF LONG ISLAND CITY, QUEENS; THIS COMMERCIAL GUT RENOVATION OF AN EXISTING 2 STORY OFFICE BUILDING WITH A NEW-BUILD EXTENSION WAS AN ENTERPRISING PROJECT COMPLETED IN SUMMER OF 2020, AND FUNDED BY ASCENT DEVELOPMENT. I LED THE TEAM FROM INITIAL SITE SURVEYS, WELL INTO CONSTRUCTION; AND IT BLOSSOMED INTO AN ENERGETIC RESTAURANT ON THE FIRST FLOOR CONNECTING TO THE NEW CAFE EXTENSION, SPEAKEASY IN THE CELLAR, WITH A LARGE EXTERIOR BEER GARDEN SERVING OVER 200 PERSONS. THE SECOND FLOOR WAS DESIGNED TO BE OFFICES FOR ASCENT’S USE.


SECTION : : SOUTH STAIRWELL

FLOOR PLAN : : FIRST FLOOR

PHOTO : : ERECTING EXTENSION STRUCTURE

PHOTO : : EXTENSION SHELL COMPLETION


M EKE L BU RGS D OM INO 325 KENT AVENUE, BK : : KUSHNER STUDIOS : : PM : : SD - CA MEKELBURGS WAS A DESIGN-BUILD DEVELOPMENT WITH AN ARTISANAL GROCERY STORE AND BAR PROGRAM. COMPLETED IN SUMMER 2018, THIS NEW 5,000 SF EXPANSION ACTED AS THE ANCHOR TENANT IN THE NEW DOMINO DEVELOPMENT IN WILLIAMSBURG. AS PROJECT MANAGER, I WORKED DIRECTLY WITH THE CLIENTS TO INCORPORATE THEIR BRAND, AND ENSURED IT WAS CONSTRUCTED AS PER OUR DESIGN. OUR OFFICE COORDINATED EXTENSIVELY WITH THE BUILDING ARCHITECTS (SHOP / ISMAEL LEVYA) AND TWO TREES DEVELOPMENT TO INTEGRATE THE REQUIRED PROPOSED SYSTEMS INTO THE EXISTING BUILDING WITH MINOR CONFLICT.


FLOOR PLAN : : FIRST FLOOR

INTERIOR ELEVATION : : MAIN ENTRY

PHOTO : : DURING CONSTRUCTION

PHOTO : : COMPLETED BAR


INTERIOR ELEVATION : : GREENHOUSE TASTING ROOM SKETCH : : GREENHOUSE EXTENSION

PHOTO : : FOUNDATION IN PROCESS

PHOTO : : GREENHOUSE IN PROGRESS STRUCTURE

PHOTO : : GREENHOUSE COMPLETED


E VIL TWIN B REWIN G, C O 16-16 GEORGE ST, QUEENS NY : : KUSHNER STUDIOS : : PM : : SD - CA LOCATED OFF THE UP AND COMING ‘L’ HALSEY STOP IN RIDGEWOOD, QUEENS; THIS BREWERY AND TASTING ROOM HAS SEEN SUCCESS SINCE ITS OPENING IN SUMMER 2019. THIS PROJECT WAS SPLIT INTO TWO PHASES, AND AS PROJECT MANAGER OF THIS DESIGN-BUILD, I OVERSAW THE FULL DEVELOPMENT FROM INITIAL SKETCHES, TO CITY APPROVALS, THROUGH CONSTRUCTION. FIRST, WORKING VERY CLOSELY WITH THE CLIENT, WE FOCUSED ON CHANGING THE USE AND THE GUT RENOVATION OF THE TWO-STORY PRE-EXISTING BANQUET HALL INTO A FULLY FUNCTIONING MICROBREWERY. THEN SECOND, WE COORDINATED WITH THE PREFABRICATION COMPANY, TEXAS GREENHOUSE, TO SUCCESSFULLY DESIGN AND CONSTRUCT THE NEW BUILD TASTING ROOM EXTENSION IN THE EXISTING COURTYARD SPACE.


136 S UM MIT AV E N UE JERSEY CITY, NJ : : KUSHNER STUDIOS : : PM : : SD, DD, CD 136 SUMMIT AVENUE IS A 10 STORY, 99 UNIT RESIDENTIAL DEVELOPMENT, WITH RETAIL ON THE FIRST FLOOR, LOCATED IN THE BERGEN HILL NEIGHBORHOOD OF JERSEY CITY, NJ. KUSHNER STUDIOS WAS SELECTED BY MONTICELLO EQUITIES TO BE THE DESIGNER OF THIS 36 MILLION DOLLAR PROJECT. THE BUILDING’S UNIQUE CURVED FORM ALLUDES AND POINTS TO, A CONNECTION TO CITY HALL ON ONE END AND THE GROWTH OF ITS EPICENTER, JOURNAL SQUARE ON IT’S OTHER. I GUIDED THE TEAM THROUGH DESIGN AND PLANNING BOARD PRESENTATIONS, CONSULTANT COORDINATION, AND THE PRODUCTION OF CONSTRUCTION DOCUMENTS.


FLOOR PLAN : : FIRST FLOOR

AXONOMETRIC : : ZONING DIAGRAM

PHOTO : : EXCAVATION AND FOUNDATION WALL CONSTRUCTION


TEAM :: JENNY ARIZALA O MARK BERLINRUT

P

N

SARAH YOUNG

M

Q

13'-9"

UP

UP

UP

SLOPE

SLOPE

SLOP SLOPE

PE

E UP SLOP

UP PE SLO UP SLOPE

23'-0

PE

10'-4 UP "

SLO

6’- GLUL 0” O.CAM . TY JO P. ISTS

2x8

@ 2x8 GLULA @ 6’-0” M O.C. JOISTS TYP.

2x8 GLULAM JOISTS @ 6’-0” O.C. TYP.

UP

UP

SLOPE

"

29'-9 "

UP PE SLO E UP

UP SLOPE

SLOP

UP SLOPE UP SLOPE

SLOPE UP

9'-4"

SLOPE

23'-2

UP PE SLO

E UP SLOP SLOPE UP

16'-2" 7'-2" 4'-0"

5'-8"

STS

GLU ” O.CLAM . TYPJOI

.

6’-0

2x8

@

UP

UP

18'-1"

UP

14'-3"

SLOPE

UP

AM UL C. GL O. 2x8 6’-0” @

SLOPE

3'-8"

SLOPE UP

SLOPE UP

COLUMN 4.1-B.1 W12

W12

21'-1"

UP SLOPE

IST JO P. TY

COLUMN 2.4-B.1 W12

2.3

S E UP SLOP

A

26'-3"

IST JO . M ULA . TYP GL O.C 2x8 6’-0” @ S

ARCH 2 763.01

B

UP

UP

UP

25” GLULAM BEAM

PE

S UP

SLO

W.1

B.1

SLOPE

SLO

PE

PE

SLO

SLOPE UP

13'-9"

E UP

SLOP

IST JO P. TY

2x8 GLULAM JOISTS @ 6’-0” O.C. TYP.

7'-2"

UP

SLOPE

18” GLULAM BEAM

UP

SLOPE

AM UL C. GL O. 2x8 6’-0” @

E UP

13'-3"

SLOPE

E UP SLOP

SLOP

SLOPE UP

UP

PE

13'-4"

UP

SLOPE

SLOPE UP

S

UP

UP

SLOPE

SLOP

2.4

UP

SLO

25” GLULAM BEAM

STS JOI LAM TYP. GLU O.C. ” 2x8 @ 6’-0

E UP SLOP

EMERGENCY EXIT

COLUMN 1.1-A 25”x25” GLULAM TYP.

STRUCTURE PLAN : : FIRST FLOOR

FLOOR PLAN : : FIRST FLOOR

13'-7"

UP

E UP

E UP

PE

SLO

25” GLULAM BEAM

C.1 C

SLOP

UP

SLOPE

DIGITAL ASSISTANT

3

SLOPE

SLOPE UP

SLOPE UP

IST JO P. AM TY UL C. GL O. 8 0” 2x 6’@

SLOPE

UP

UP

PE

X HART MARLOW

RAINWATER STORAGE TANK

13'-9"

SLOPE

SLOPE

S

COLUMN 1-W.1 25”x25” GLULAM

25”x25” GLULAM

13'-2"

UP

UP

UP

W/C

E UP SLOP

UP

SLO

UP

BEAM

24'-4"

SAMEER KUMAR COLUMN 2-X

13'-2"

SLOPE

SLOPE UP

PE

SLO

PE

PE

18” GLULAM BEAM

UP

SLOPE

AHU-4

131

13'-2"

SLOPE UP

SLO

SLOPE

UP

W/C

FIRE HOSE

13'-5"

UP

UP

GLULAM

SLOP

E UP

PE

1.1

D

E UP

SLOP

UP

SLO

25” GLULAM BEAM

D.1

COLUMN E-4.1 W12 TYP.

E UP

COLUMN 3-Y 25”x25” GLULAM

2.1

E UP

SLOP

2.3

1

SLO

UP

2X16

SLOPE

IST JO P. AM TY UL C. GL O. 8 0” 2x 6’@

PE

UP

UP

BEAM

26'-10"

PE

SLO

UP

PE

GLULAM

SLOPE

25” GLULAM BEAM

SLO

SLO

2X16

UP

SLOPE

SARRAH KHAN

FACADE

E UP SLOP

Y

MECH CLOSET 3

E

18” GLULAM BEAM

SLOP

UP

E UP

" 17'-9

"

COLUMN 1-X.1 25”x25” GLULAM

UP

" 23'-8

7'-10

E UP SLOP

UTILITY CLOSET

133

PE

S

E UP

SLOPE

32'-5"

STRUC TURE

SLOPE UP

25” GLULAM BEAM

REFIGERATION

132

130

UP

SLOP

ROBERT KERNS 29'-4"

X.1

E UP

COLUMN 3-X.1 25”x25” GLULAM

SLOPE

COLUMN TREE 2.3-F 12” DIA. STEEL-REINFORCED LUMBER TYP.

25” GLULAM BEAM

META BRUNZEMA

FREEZER ROOM

FROZEN FOODS

SLOPE

25” GLULAM BEAM

COLUMN 1-V 25”x25” GLULAM

MECHANICAL 130

129

SLOP

" 23'-1

SLOPE UP

UP SLO

CHILLED BEVERAGE

E.1 E UP

SLOP

25” GLULAM BEAM SLOP

125

UP

" 13'-0

SLOPE

ERICH SCHOENENBERGER

EMERGENCY EXIT

SLOPE

25” GLULAM BEAM

SLOPE UP

SITE

PE

SLO E UP

UP

UP

DESIGN CRITIC

UP

SLOP UP

E UP

SLOPE

V.1

W

UP SLOPE

F 18” GLULAM BEAM

UP

SLOPE SLOPE

SLOP

IST JO P. AM TY UL C. GL O. 8 0” 2x 6’@

E UP SLOP

3.3

SLOPE

UP

2.2

SLOPE UP

25” GLULAM BEAM

CONSULTANTS ::

SLOPE UP

UP

SLOPE

. TY JOIST P. S

SLOPE UP

UP

GL 0” ULAM O.C

6’-

UP

PE

PE

COLUMN TREE 2.1-X 12” DIA. STEEL-REINFORCED LUMBER TYP.

UP

2x8

PE SLO

25” GLULAM BEAM

25” GLULAM BEAM

@

UP

COLUMN 3.3-X 25”x25” GLULAM

FISHMONGER

SLOPE

STS

.

25” GLULAM BEAM 25” GLULAM BEAM

UP

PE SLO

SLOPE

2x8 @ 6’-0GLULAM ” O.C JOI . TYP

25” GLULAM BEAM

M.1

25” GLULAM BEAM

SLO

SLO

127

F.1

3.4

UP

PE

UP

2x8 GLULAM JOISTS @ 6’-0” O.C. TYP.

2.1

SLO

"

PE

UP

SLOPE UP

UP

SLOPE

SLO ZONE 5 ELECTRIC BOX

SLOPE

UP

39'-7

FIRE HOSE

PE SLO

E UP

PE

UP

E UP

X

STORAGE 2

BUTCHER

WINERY

18” GLULAM BEAM

UP

PE SLO

SLOP

128 126

124

FIRE HOSE

UP

SLO

COLUMN 3.3-W.1 25”x25” GLULAM

CAFE

CAFETERIA

UP

SLOPE

JOISTS 2x8 GLULAM TYP. O.C. @ 6’-0”

TS

JOIS LAM GLU O.C. TYP. 2x8 @ 6’-0”

UP

105

SLO UP

UP

SLOPE

E UP

E UP

SLOP

E UP

UP

SLOP

SLOPE

MECH CLOSET NO. 1

UP

SLOPE

PE

FIRE HOSE

101 106

AHU-1

SLOPE

SLO

SLOP

2.5

SLOP

ZONE 2 ELECTRIC

CAFE FREEZER

G.1 G

UP

UP

PE

SLOPE UP

UP

UP

PE SLO

SLOPE UP

UP

E UP

"

4

CUSTOMER SERVICE

SLOPE UP

PE

SLOP

102

SLO

SLOP

SLOPE

SLOPE

UP

COLUMN 3.3-V 25”x25” GLULAM

FIRE SAFETY BOX VENT HOOD

18” GLULAM BEAM UP

SLOPE UP SLOPE

E UP

PE SLO 75'-2

ZONE 1 ELECTRIC

BAKERY

E UP

UP

UP

SLOPE UP

SLOPE UP

SLOPE UP

108

PE SLOPE

UP

47'-2"

PRIMARY CHECKOUT

UP

SLOPE

SLO

UP

SLOPE

UP

SLOPE

W.1

107

3.1

UP

SLOPE

SLOPE

W 103

EMERGENCY EXIT

CHIMNEY OPEN TO BELOW

V.1

FIREPLACE

SLOPE

E UP

SLOP

UP

SLOP

5

UP

109

SLOPE

UP

UP

SLOPE SLOPE UP

UP

HEATED BENCH

WOOD OVEN

SLO

SLOPE SLOPE UP

UP

E UP SLOP

"

UP SLOPE

SLOPE UP

E UP

SLO

SLOPE UP

EMERGENCY STAIR

H UP

PE SLOP

SLOPE PE

UP

SLOPE

SLOPE "

4.2

V

DAIRY COOLER

UP

COLUMN 4-T W12 TYP.

COLUMN 5-U 25”x25” GLULAM

34'-1

123

PE

ACCOUNTING OFFICE

DRY GOODS

SLO

12'-1"

SLOPE

UP

SLOP

20'-9 "

SLOPE UP

UP

128

104

H.1

UP SLO

SLOPE

E UP

PE

PE

UP SLOPE

SLO

18” GLULAM BEAM

SLOPE UP

SLOPE UP

UP

UP

FIRE HOSE

E UP SLOP

UP

UP

SLOPE

SLOPE

PE SLO

UP

COLUMN TREE 3-L 12” DIA. STEEL-REINFORCED LUMBER TYP.

SLOPE UP

UP

BOILER ROOM

110

I.1 I

UP

SLO

ZONE 3 ELECTRIC PANEL

BOILER

EMERGENCY EXIT

E UP

SLOP E UP UP

UP

SLOPE

UP PE

UP

SLOPE

SLO

UP

SLOPE

UP

" 13'-4

" 13'-4

E UP SLOPE

SLOPE

E UP SLOPE

UP

UP

3.2

E UP

SLOP

SLOP

PE

U

J

13'-9 "

SLOP

SLOP

E UP

PE

UP

SLOP

3.1

SLO

PE

SLOPE UP

E UP SLOP

UP

18” GLULAM BEAM

SLOPE UP SLO

18” GLULAM BEAM

T.1

UP

UP

EMPLOYEE BREAK ROOM

TELECOM CLOSET

J.1

"

PE

118

SLO

RECEIVING OFFICE

14'-7

E UP

SLOP

E UP

47'-9"

111

AHU-2

3.2

E UP

SLOPE

SLO

EMERGENCY EXIT

PE SLO

UP

UP

SLOPE

SLOPE

SLOP

127

ROLLING DOOR

UP

UP

SLOPE

PE

COLUMN 5-T 25”x25” GLULAM

UP

LOADING DOCK

E UP

PE

DELI COUNTER

SLOP

SLO

112

21'-7"

FIRE HOSE

ELECTRIC ROOM

18” GLULAM BEAM SLO

COLUMN 5-S.1 18”x18” GLULAM 122

25'-0"

S.1

EMPLOYEE W/C

FIRE HOSE

113

UP

T 126

UP

COLUMN 4.2-S 25”x25” GLULAM TYP.

EMPLOYEE W/C

W/C

K 14'-9"

18” GLULAM BEAM

PE

121

GAS ROOM

13'-4

SLO

125

W/C

WATER ROOM

ZONE 4 ELECTRIC PANEL

114

K.1 14'-0"

E UP SLOP

"

FIRE HOSE

120

115

COLUMN 5-R.1 18”x18” GLULAM TYP

MECH CLOSET 2

W/C

SLOPE

124 119

14'-4"

18” GLULAM BEAM

25” GLULAM BEAM E UP

SLOP

13'-4"

FIRE PUMP ROOM

L

13'-10"

18” GLULAM BEAM

"

13'-4

AHU-3

R.1

116

UP

WET STORAGE

SLOP

118

18” GLULAM BEAM

4.2

E UP

S

FIRE HOSE

DRY STORAGE

SLOPE

E UP

13'-3"

117

ELGIN, IL 60124

18” GLULAM BEAM

SLOP

13'-1"

UP

UP

4.1

SLOPE UP

SLOPE

Q.1

L.1

SLOPE UP

SLOPE UP

13'-7"

13'-1"

M.2

N.1 13'-5"

SUPER MARKET

GLULAM 1775 CAPITAL 18” ST BEAM

13'-5"

EMERGENCY STAIRS

SLOPE

P.1

R

EMERGENCY EXIT

SLOPE

PROJEC O.1 T ::

5'-4"

1'-2"

7'-6"

16'-1"

4.1

6'-8"

UP SLOPE

2.1

7'-8"

1

1.1

25” GLULAM BEAM

5

4

3 2

TEAM :: JENNY ARIZALA

JENNY ARIZALA MARK BERLINRUT

SARAH YOUNG

SARAH YOUNG O

P

L

L.1

6'-0"

6'-0"

6'-0"

13'-10"

6'-0"

4.1

6'-0"

K.1

14'-4"

K

6'-0"

6'-0"

4.2

6'-0"

14'-0"

6'-0"

6'-0"

29'-11"

2'-0"

6'-0"

2'-0"

"

2'-0" 2'-0"

2'-0" 2'-0"

6'-0"

"

I

6'-0"

2'-0"

1'-9"

6'-0"

6'-0" "

I.1

13'-9

6'-0"

6'-0"

1'-10"

6'-0"

3.1

6'-0"

2'-0"

6'-0"

6'-0"

6'-0"

6'-0"

13'-4

J

2'-0"

6'-0"

6'-0"

6'-0"

"

2'-0"

13'-4

2'-0"

3.2

6'-0"

6” S.OG. -3’-0”

6'-0"

3.2

2'-0"

2'-0"

6'-0"

LOGGIA TERRACE

T.1

47'-9" 6'-0" 6'-0"

12'-1"

" 6'-0"

6'-0"

6'-0" 6'-0"

2'-0"

6'-0"

23'-2

6'-0"

6'-0"

6'-0"

6'-0"

6'-0"

6'-0"

2'-0"

2'-0"

6'-0"

"

6'-0"

6'-0"

6'-0"

6'-0"

6'-0"

6'-0" 6'-0"

2'-0"

" 29'-9

2'-0"

6'-0"

6'-0"

16'-2"

8'-0"

6'-0"

7'-2"

6'-0"

2'-0"

6'-0"

F

6'-0" 6'-0"

2'-0"

2'-0"

6'-0"

6'-0" 1'-9"

13'-2"

2'-0"

23'-0

6'-0"

6'-0"

6'-0"

6'-0"

"

6'-0" 6'-0"

2.5

6'-0"

6'-0"

5'-8"

98'-1 1"

6'-0"

6'-0"

4'-0"

6'-0"

6'-0"

2.1

75'-2

8'-4"

4

6'-0"

ZONE 6 ELECTRIC BOX

F.1

1'-7"

3.4

6'-0"

W.1

13'-2"

47'-2"

6'-0"

PIZZA KITCHEN

6'-0"

6'-0"

"

205

G

2'-0" 1'-8"

8'-3"

6'-0"

V.1 W FIRE HOSE

G.1 13'-5"

OVEN-FIRED PIZZERIA

H

6'-0"

6'-0"

4.2 5

6'-0"

2'-0"

2'-0"

205

3.1 6” S.O.G.

6'-0"

2'-0"

FIRE HOSE

107'-4"

6” S.O.G. "

V

6'-0"

"

34'-1

H.1

2'-0"

40'-6

LOGGIA CHECKOUT 2

6'-0"

20'-9

2'-0" 6'-0"

6'-0"

207

6'-0"

2'-0"

2'-0"

U

2'-0"

206

"

6'-0"

1'-11"

S.1

2'-0"

T

LOGGIA CHECKOUT 1

2'-0"

205

FIRE HOSE

2'-0"

6” S.OG. -3’-0”

6'-0"

"

6'-0"

21'-7"

6'-0"

J.1

14'-7

13'-4"

13'-4

14'-9"

2'-0"

R.1

6'-0"

13'-4

2'-0"

S

DOWN

6'-0"

6'-0"

PRODUCE WALK

6'-0"

13'-3"

FIRE HOSE

207

6'-0"

6'-0"

13'-1"

6'-0"

13'-9"

6'-0"

6'-0"

25'-0"

Q.1

6'-0"

6'-0"

6'-0"

13'-5"

M.2

N.1

13'-7"

13'-1"

6'-0" EMERGENCY STAIRS

13'-5"

6'-0"

ELGIN, IL 60124

LOGGIA WALK DOWN

M

SUPER MARKET O.1 1775 CAPITAL ST

P.1

R 208

N

PROJEC T ::

Q

6'-0"

MARK BERLINRUT

6'-0" 6'-0"

2'-0"

6'-0"

10'-4

"

6'-0" 6'-0"

2'-0"

6'-0"

6'-0"

6'-0"

6'-0"

6'-0"

6'-0"

6'-0" 6'-0"

7'-8"

9'-4"

6'-0" 6'-0"

2'-0"

6'-0"

2.3 6'-0"

6'-0"

6” S.O.G. 2.4

6'-0"

7'-2"

6'-0"

6'-0"

6'-0"

2'-0"

6'-0"

1.1

6'-0"

6'-0"

2'-0"

14'-3"

6'-0"

6'-0"

2'-0"

2'-0"

2.3

6'-0"

2'-0" 26'-3"

ARCH 763.01

1'-10"

21'-1" 6'-0"

6'-0"

W.1

X

6'-0"

6'-0"

2'-0"

3'-8"

24'-4"

HART MARLOW

B

6'-0"

18'-1"

SAMEER KUMAR

26'-10"

2.1

B.1

2'-0"

6'-0"

DIGITAL ASSISTANT

6'-0"

Y

13'-9"

1

FACADE

6'-0"

6'-0"

6'-0"

6'-0"

32'-5"

SARRAH KHAN 29'-4"

C

6'-0"

13'-3"

STRUC TURE

C.1

6'-0"

" 7'-10

6'-0"

ROBERT KERNS

13'-4"

6'-0"

1'-10"

6'-0"

6'-0"

2'-0"

2'-0"

6'-0"

6'-0"

2'-0"

2'-0"

"

META BRUNZEMA

MECHANICAL

6'-0"

D

6'-0"

17'-9

SITE 62'-6"

X.1

1'-11"

13'-7"

ERICH SCHOENENBERGER

V.1

6'-0"

D.1

" 23'-8

6'-0"

6'-0"

W

6'-0"

13'-9"

OVERLOOK CAFE

2'-0"

6'-0"

2'-0"

CONSULTANTS :: DESIGN CRITIC

3.3 201

"

6'-0"

1'-9"

6'-0"

DEFIBRILLATOR

2'-0"

6'-0"

6'-0"

6'-0" 6'-0"

0"

39'-7

10'-2"

6'-0"

X

CAFE KITCHEN

E

6'-0"

" 23'-1

6'-0" 88'-1

W/C

204

13'-0

6'-0"

6'-0"

202

FIRE HOSE

E.1

"

2'-0"

13'-2"

2'-0"

2.2

M.1

6'-0"

2'-0"

1'-8"

6'-0"

6'-0"

6” S.O.G.

W/C

6'-0"

6'-0"

6'-0"

ZONE 5 ELECTRIC BOX

203

2 6'-0" 6'-0"

3

6'-0" 6'-0"

41'-2"

5'-4"

1'-2"

7'-6"

16'-1"

4.1

6'-0" 6'-0"

6'-8"

7'-8"

SITE PLAN

FLOOR PLAN : : MEZZANINE LEVEL

STRUCTURE PLAN : : MEZZANINE LEVEL

1.1

1

2.1 3 2

4

5

A


FRONTIER FARM & FIELD ELGIN, IL : : PRATT CRITIC : : ERICH SCHOENENBERGER THIS PROJECT WAS DESIGNED IN CONJUNCTION WITH TWO CLASSMATES. THE CONCEPT OF THIS GROCERY STORE RELATES TO THE SLOW FOOD MOVEMENT, SEEKING TO CONNECT CONSUMERS TO THEIR LOCAL FOOD SYSTEMS. THE SURROUNDING CLIMATE AND WIND MOVEMENT THROUGH THE SITE DROVE THE FORM, FORM, CREATING A EARTHEN BERM-LIKE MASSING. THE FACADE WAS MADE TO MIMIC THE NATURAL AGGREGATION OF WOOD, BLENDING WITH THE SURROUNDING SITE, WHILE FORMING A PROTECTIVE BUFFER FROM THE WIND.


SL IG H T L I N E LA N D ING BK NAVY YARD : : PRATT INSTITUTE CRITIC : : HENRY SMITH-MILLER THE BROOKLYN NAVY YARD IS HISTORICALLY A ‘STEALTHY’ PLACE, HOWEVER IT WILL NOT REMAIN UNDISCOVERED. HOW MIGHT A ‘LIVE, WORK, PLAY’ AGENDA CONTRIBUTE TO CURRENT VACANCIES? THIS PROPOSAL INVESTIGATES THE IDEA OF ILLUSIVE BUILDINGS, CONGEALING AND SHATTERING DEPENDANT UPON ANGLE OF VIEW. BY PROVIDING AN EXHIBITORY OUTLET CURRENTLY MISSING FROM THE SITE, THIS DEVELOPMENT WOULD PROVIDE THE SUPPORT TO FOSTER AND PROTECT THE EXISTING MANUFACTURING AND FABRICATING CULTURE IN LIEU OF A FALSE ‘NEW’ URBANISM. THE CURRENT RESIDENTS WOULD HAVE A PLACE FOR DISPLAY, COMMUNAL GATHERING, IN ADDITION TO SPACE TO CREATE.


255’- 0”

240’ - 0”

225’ - 0”

210’ - 0”

195’ - 0”

180’ - 0”

165’ - 0”

150’ - 0”

135’ - 0”

120’ - 0”

105’ - 0”

90’ - 0”

75’ - 0”

60’ - 0”

45’ - 0”

30’ - 0”

15’ - 0”

0’ - 0”

FLOOR PLANS : : BUILDING #3, PLAY TYPOLOGY, EXHIBITION SPACE,

BUILDING #3 :: PLAY TYPOLOGY, EXHIBITION SPACE FLOOR PLATE DIMENSIONS :: 16’-0” X 420’-0” 1/16” = 1’

RENDER : : AERIAL VIEW

DIAGRAMS : : LIVE, WORK, PLAY PROGRAM AND SITE DISBURSEMENT DIAGRAMS : : THE PARALLAX EFFECT - MASSING AND SHATTER


URBAN TREE-HOUSE NEW YORK, NY : : PRATT CRITIC : : JASON VIGNERI-BEANE NESTLED IN SOHO, THIS PROJECT WAS DESIGNED AS AN UNCONVENTIONAL SOLUTION FOR URBAN MIXED USE. THE RESIDENTIAL ZONE IS AN AGGREGATION OF PREFABRICATED MICRO-UNITS WITH AN INTERCEDING LARGE PUBLIC VERTICAL GARDEN PARK. EACH UNIT STACKS ON THE ONE BELOW THROUGH USE OF EXPOSED STEEL COLUMNS THAT EXTEND TO THE GROUND. AS TIME PROGRESSES, THESE COLUMNS BECOME AN ARENA FOR UNCONTROLLED NATIVE PLANT LIFE AND EMBRACES NATURE’S DESIRE FOR THE ULTIMATE RECLAMATION OF THE URBAN FABRIC.


A 02

DETAIL

ALUCO BOND ALUMINUM COMPOSITE MATERIAL CLADDING SYSTEM 2.5” EXTRUDED POLYSTYRENE RIGID INSULATION EXTRUDED ALUMINUM WINDOW SILICON SEALANT

EXPOSED BENT STEEL ‘T’ BEAM

GLAZING (LOW E GLASS) GAS FILLED (ARGON) CAVITY GLAZING (LOW IRON GLASS) SPACER BAR EXTRUDED ALUMINUM SILL PLATE

VAPOR BARRIER STEEL ‘C’ STUD 1/2” GYPSUM BOARD

POSTS FOR POD CONNECTION AND SUPPORT EXO STRUCTURE

CLERESTORY WINDOWS

A 03

DETAIL

A 02

DETAIL

INTERIOR BENT STEEL ‘T’ BEAMS

FLOATING FLOOR SLAB

EXTERIOR PLANTERS A 03

DETAIL

A 04

DETAIL

ALUCO BOND ALUMINUM COMPOSITE MATERIAL CLADDING SYSTEM EXPOSED BENT STEEL ‘T’ BEAM Z CLIP UNDER FLOOR STEEL PLATE 1/2” GYPSUM BOARD 2.5” EXTRUDED POLYSTYRENE RIGID INSULATION STEEL ‘C’ STUD VAPOR BARRIER

SECTION : : NORTH/SOUTH

RENDER : : PODS WITH PUBLIC SPACE AT NIGHT


THANKS FOR FLIPPING THROUGH! THROUGH! ENJOY THIS PHOTO I TOOK OF A SIDE DOME AT SAINT PETER’S BASILICA IN VATICAN CITY CONTACT : : ARCH.SYOUNG@GMAIL.COM


Turn static files into dynamic content formats.

Create a flipbook
Sarah Young : : Work Sample by Sarah Young - Issuu