SARAH YOUNG
ARCHITECTURE P O R T F O L I O
SARAH YOUNG DESIGN WORK :: 2OO9 - 2O19 [ E ] :: MIZSARAH55@GMAIL.COM
[ SKILLS ] : : PRO
Vectorworks NYC Code Review Microsoft OfďŹ ce Suite Project Management Site Documentation Rhinoceros 3D Adobe Photoshop Adobe Illustrator Adobe Indesign 3D Modeling Physical Modeling
GOOD
Revit Graphic Design Maya AutoCad Grasshopper Maxwell Render Mental Ray VRay Adobe After Effects RhinoCam
BASIC
ZPrint
[ WORK EXPERIENCE ] : : J U LY 2016 PROJECT MANAGER / INTERN COORDINATOR : : KUSHNER STUDIOS : : NEW YORK, NY JULY 2019 Directed and coordinated multiple commercial and residential typologies from Schematic Design to DOB permit sets, through
Construction Administration. Optimized and revitalized office standards to improve efficiency and workflow of project timelines. Advanced client relations and drafted contracts formulating project scope from design desires. Reviewed drawings for code compliance and construction viability. Conducted employee interviews, performance reviews, and instituted training programs for new hires. Regulated incoming work to efficiently distribute tasks among multiple teams.
J A N 2015 TEACHING ASSISTANT : : PRATT INSTITUTE : : NEW YORK, NY MAY 2016 Class : : Computer Media 1 & 2 : : Professors : : Christopher Kroner, Ben Martinson
Responsible for assisting and providing feedback for the integrated use of computational software for representation, design development and presentation for multiple semesters and groups of students.
DEC 2014 ARCHITECTURAL DRAFTER : : OLIVER COPE ARCHITECT : : NEW YORK, NY OCT 2015 Developed a DD set into an accomplished CD set for a multi million dollar residential renovation. Drafted updates from
site conditions and design revisions into a coordinated drawing sets. Clarified and compiled concepts into clear client presentations. Enacted and maintained new strategies for project organization.
MAY 2012 DESIGNER/MARKETING COORDINATOR : : TEXAS WILSON : : SAN ANTONIO, TX SEPT 2013 Composed space planning solutions for furniture at large scale civic and office buildings. Generated standards
and launched a new intern program. Established and maintained a social media presence to publish the selfgenerated graphics and photographs to attract new clients.
[ EDUCATION ] : : AUG 2013 PRATT INSTITUTE : : BROOKLYN, NY MAY 2016 Master of Architecture : : GPA 3.88 : : Senior Member of Student Council AUG 2008 TEXAS STATE UNIVERSITY : : SAN MARCOS, TX DEC 2012 B.S. Interior Design : : GPA 3.75 : : Honors College : : Deans List
[ HONORS & AWARDS] : : AUG 2013 IN PROCESS PRATT PORTFOLIO MAY 2016 Professor selected & archived studio work for publication in Graduate Architecture School portfolio
Fall 2015 Henry Smith-Miller Fall 2014 Jason Vigneri-Beane Fall 2013 Alex Barker
Spring 2015 Erich Schoenenberger Spring 2014 Theoharis David Summer 2014 Jason Vigneri-Beane
MAY 2014 BEST PORTFOLIO : : PRATT INSTITUTE (GAUD CLASS 2016) DEC 2012 GRADUATE IN HONORS COLLEGE : : TEXAS STATE UNIVERSITY
Accepted to the Honors College, pursued independent research presented in a thesis. APR 2012 OUTSTANDING CONTEMPORARY ISSUES DESIGN PROJECT : : TEXAS STATE UNIVERSITY
] K R O W L A N O I SS E F [ PRO
1616 GEORGE STREET, RIDGEWOOD NY 161 SIXTH AVENUE, MANHATTAN NY 325 KENT AVENUE, BROOKLYN NY 847 UNION STREET, BROOKLYN NY 10-29 44TH ROAD, LONG ISLAND CITY NY 139 WEST 13TH STREET, MANHATTAN NY 136 SUMMIT AVENUE, JERSEY CITY NJ 990 METROPOLITAN AVENUE, BROOKLYN NY
EVIL TWIN BREWING TORCH AND CROWN BREWING MEKELBURGS II (DOMINO) DDT BAR TOP QUALITY (BAR/RESTAURANT) RESIDENCE MULTI-UNIT RESIDENTIAL GRIMM ALES
623 SACKETT STREET, BROOKLYN NY
WILD EAST BREWING
535 GRAND AVENUE, BROOKLYN NY
ABENDBROT BREWING
381 TROUTMAN STREET, BROOKLYN NY 215 47TH STREET, BROOKLYN NY 41-11 39TH STREET, QUEENS NY 104 SHERMAN AVENUE, MANHATTAN NY 463 EAST 173RD STREET, BRONX NY 5-14 51ST AVENUE, LONG ISLAND CITY NY 311 EAST 60TH STREET, MANHATTAN NY 205 HUDSON STREET, MANHATTAN NY
KINGS COUNTY BREWERS COLLECTIVE FIVE BOROUGHS BREWING ALEWIFE BREWING DYCKMAN BREWING TORCH AND CROWN BREWING ALEWIFE (BAR) THE JEFFREY (BAR) MAMAN CAFE
235 EAST 53RD STREET, MANHATTAN NY
LITTLE TONG NOODLES
228 EAST 10TH STREET, MANHATTAN NY
RESTAURANT
464 AVENUE OF THE AMERICAS, MANHATTAN NY
KUBEH RESTAURANT
30 WEST 18TH STREET, MANHATTAN NY
SCAMPI RESTAURANT
20 CORNELIA STREET, MANHATTAN NY
RESTAURANT
1307 THIRD AVENUE, MANHATTAN NY
CANDLE CAFE
237 CENTRE STREET, MANHATTAN NY
MAMAN CAFE
333 14TH STREET, BROOKLYN NY
CONDO RESIDENCE
683 41ST STREET, BROOKLYN NY
PRIVATE RESIDENCE
301 WEST 80TH STREET, MANHATTAN NY
PRIVATE RESIDENCE
1 NEW MONTROSE AVENUE, BROOKLYN NY
SYNAGOGUE (NEW CONSTRUCTION)
NYC MAP OF PROJECTS - KUSHNER STUDIOS
THESE DRAWINGS & THE IDEAS THEY CONVEY ARE INSTRUMENTS OF SERVICE FOR KUSHNER STUDIOS ARCHITECTURE + DESIGN, P.C. & REMAIN THEIR PROPERTY.
381 TROUTMAN STREET, BROOKLYN NY DRAFTER : : AOR : : WINTER 2016
623 SACKETT STREET, BROOKLYN NY PROJECT MANAGER : : AOR : : EXPECTED FALL 2019
990 METROPOLITAN AVENUE, BROOKLYN NY PROJECT MANAGER : : AOR : : SUMMER 2018
704 BROADWAY, MANHATTAN NY PROJECT MANAGER : : DESIGN : : CONCEPTUAL
THESE DRAWINGS & THE IDEAS THEY CONVEY ARE INSTRUMENTS OF SERVICE FOR KUSHNER STUDIOS ARCHITECTURE + DESIGN, P.C. & REMAIN THEIR PROPERTY.
161 SIXTH AVENUE, MANHATTAN NY (CELLAR) PROJECT MANAGER : : DESIGN / AOR : : EXPECTED FALL 2019
161 SIXTH AVENUE, MANHATTAN NY (FIRST FL) PROJECT MANAGER : : DESIGN / AOR : : EXPECTED FALL 2019
41-11 39TH STREET, QUEENS NY PROJECT MANAGER : : DESIGN / AOR : : EXPECTED WINTER 2019
5-14 51ST AVENUE, QUEENS NY PROJECT MANAGER : : DESIGN : : CONCEPTUAL
215 47TH STREET, BROOKLYN NY DRAFTER : : DESIGN / AOR : : SUMMER 2017
THESE DRAWINGS & THE IDEAS THEY CONVEY ARE INSTRUMENTS OF SERVICE FOR KUSHNER STUDIOS ARCHITECTURE + DESIGN, P.C. & REMAIN THEIR PROPERTY.
1616 GEORGE STREET, QUEENS NY PROJECT MANAGER : : DESIGN / AOR : : EXPECTED SUMMER 2019
2 SOUTH STREET, MIDDLETOWN NY PROJECT MANAGER : : CONSULTANT : : EXPECTED WINTER 2019
EVIL TWIN BREWING, ‘16 - ’19 1616 GEORGE STREET, RIDGEWOOD, NY : : KUSHNER STUDIOS PROJECT MANAGER / EXPEDITER : : SD, DD, CD, CA AS PROJECT MANAGER OF THIS DESIGN BUILD, AT KUSHNER STUDIOS, I OVERSAW THE FULL DEVELOPMENT OF BOTH PHASES OF THIS BREWERY AND TASTING ROOM LOCATED JUST OFF THE ‘L’ HALSEY STOP IN RIDGEWOOD, QUEENS. FIRST, WORKING VERY CLOSELY WITH THE CLIENT, WE FOCUSED ON CHANGING THE USE AND BUILDING OUT THE PRE-EXISTING BANQUET HALL TO A FULLY FUNCTIONING MICRO-BREWERY. THE SECOND PHASE WAS HEAVILY COORDINATED WITH A PREFABRICATION COMPANY, TEXAS GREENHOUSE, TO SUCCESSFULLY CONSTRUCT THE NEW BUILD EXTENSION IN THE EXISTING COURTYARD SPACE.
EVIL TWIN : : FIRST FLOOR PLAN KUSHNER STUDIOS
EVIL TWIN :: FIRST FLOOR REFLECTED CEILING PLAN KUSHNER STUDIOS
EVIL TWIN :: SECOND FLOOR / EXTENSION ROOF PLAN KUSHNER STUDIOS
BREWERY : : (PHASE ONE) CONSTRUCTION PHOTOS KUSHNER STUDIOS
COCKTAIL BAR : : (PHASE ONE) CONSTRUCTION PHOTOS KUSHNER STUDIOS
EVIL TWIN :: FIRST FLOOR COCKTAIL BAR SEATING FINISH PLAN AND DETAILS KUSHNER STUDIOS
EXTENSION GREENHOUSE TASTING ROOM : : (PHASE TWO) INITIAL CONCEPT SKETCH AND CONSTRUCTION PHOTOS KUSHNER STUDIOS
EVIL TWIN :: GREENHOUSE NORTH ELEVATION AND SECTION KUSHNER STUDIOS
EXTENSION GREENHOUSE TASTING ROOM : : CONNECTION DETAILS KUSHNER STUDIOS
EVIL TWIN :: GREENHOUSE EAST SECTION KUSHNER STUDIOS
136 SUMMIT AVE, ‘16 - ‘20 JERSEY CITY, NEW JERSEY : : KUSHNER STUDIOS PROJECT MANAGER : : SD, DD, CD, 136 SUMMIT AVENUE IS A 10 STORY, 99 UNIT NEW BUILD RESIDENTIAL DEVELOPMENT LOCATED IN THE BERGEN HILL NEIGHBORHOOD OF JERSEY CITY, NJ. KUSHNER STUDIOS WAS SELECTED TO BE THE DESIGNER OF THIS 36 MILLION DOLLAR PROJECT, INITIALLY APPROVED BY PLANNING BOARD IN OCTOBER OF 2016. OUR TEAM WORKED CLOSELY WITH THE CLIENT, MONTICELLO EQUITIES, TO OBTAIN APPROVALS AND IS CURRENTLY UNDER CONSTRUCTION. THE BUILDING’S CURVED FORM ALLUDES TO, AND POINTS TO, A CONNECTION TO CITY HALL ON ONE END AND THE GROWTH OF ITS EPICENTER, THE JOURNAL SQUARE AREA ON IT’S OTHER. THE ENTRANCE ON SUMMIT AVENUE, IS A GREAT LOW SLOPING GESTURE THAT REFERENCES THE RATHER UNDER UTILIZED TRAFFIC ISLANDS FRONTING IT.
136 SUMMIT AVENUE : : ZONING DIAGRAM AND BUILDING INFORMATION KUSHNER STUDIOS
136 SUMMIT AVENUE : : ENTRY (1ST) FLOOR PLAN KUSHNER STUDIOS
136 SUMMIT AVENUE : : FAIRMOUNT AVENUE ELEVATION AND POST DEMO SITE PANORAMIC KUSHNER STUDIOS
136 SUMMIT AVENUE : : EIGHTH FLOOR PLAN KUSHNER STUDIOS
136 SUMMIT AVENUE : : (1) PARTIAL EXCAVATION PHOTO, (2) FOUNDATION WALL INSTALLATION (3) GROUND-BREAKING CEREMONY 01/18/18 KUSHNER STUDIOS
136 SUMMIT AVENUE : : FACADE DETAILS AND TYPICAL FLOOR PLANS KUSHNER STUDIOS
MEKELBURGS 2.0, ‘17 - ’18 325 KENT AVENUE, BROOKLYN NY : : KUSHNER STUDIOS PROJECT MANAGER / EXPEDITER : : SD, DD, CD, CA DANIEL AND ALICIA MEKELBURG BEGAN THEIR FIRST EXPERIEMENT OF AN ARTISINAL GROCERY STORE BLENDED WITH A BAR IN CLINTON HILL. WITHIN TWO YEARS OF OPENING, THEY LOOKED TO EXPAND OUTWARD. OUR OFFICE WORKED WITH OUR SISTER CONSTRUCTION COMPANY, IN HOUSE GROUP, TO PRODUCE BOTH LOCATIONS AS DESIGN BUILDS. THIS NEW EXPANSION ACTED AS THE ANCHOR TENANT IN THE NEW DOMINO DEVELOPMENT IN WILLIAMSBURG. I WORKED DIRECTLY WITH THE CLIENTS IN TRANSLATING THEIR EXISTING STYLE TO THE MUCH LARGER (5,000 SF) AND ENSURED IT WAS CONSTRUCTED AS PER DESIGN. OUR OFFICE COORDINATED HEAVILY WITH THE BUILDING ARCHITECTS (SHOP / ISMAEL LEVYA) AND TWO TREES DEVELOPMENT TO INTEGRATE THE REQUIRED EXTENSIVE PROPOSED SYSTEMS INTO THE EXISTING BUILDING WITH MINOR CONFLICT.
MEKELBURGS : : GROUND FLOOR SKETCH KUSHNER STUDIOS
MEKELBURGS : : GROUND FLOOR PLAN KUSHNER STUDIOS
MEKELBURGS :: GROUND FLOOR REFLECTED CEILING PLAN KUSHNER STUDIOS
MAIN ENTRY : : CONSTRUCTION PHOTOS KUSHNER STUDIOS
BAR : : CONSTRUCTION PHOTOS KUSHNER STUDIOS
MEKELBURGS : : INTERIOR ELEVATIONS KUSHNER STUDIOS
TOP QUALITY LIC, ‘16 - ’19 10-29 44TH ROAD, LIC QUEENS, NY : : KUSHNER STUDIOS PROJECT / DESIGN MANAGER / EXPEDITER : : SD, DD, CD, CA TOP QUALITY IS A COMMERCIAL GUT RENOVATION OF AN EXISTING 2 STORY OFFICE BUILDING INTO A NEW RESTAURANT ON THE FIRST FLOOR WITH A SPEAKEASY IN THE CELLAR, AND LARGE EXTERIOR BEER GARDEN SERVING OVER 200 PERSONS. A NEW CAFE EXTENSION WAS CONSTRUCTED ADJACENT TO THE EXISTING BUILDING. THE RENOVATED SECOND FLOOR WILL SERVE AS THE DEVELOPER’S, ASCENT DEVELOPMENT, NEW OFFICE. LOCATED IN THE UP-AND-COMING INDUSTRIAL NEIGHBORHOOD OF LONG ISLAND CITY, QUEENS, THIS RESTAURANT AND BAR WILL SERVE THE EXISTING COMMUNITY AS WELL AS THE INCOMING TENANTS.
TOP QUALITY : : DEMO PLANS KUSHNER STUDIOS
TOP QUALITY : : EARLY SCHEMATIC EGRESS SKETCHES KUSHNER STUDIOS
LOWER QUALITY : : CELLAR FLOOR PLAN KUSHNER STUDIOS
TOP QUALITY : : FIRST FLOOR PLAN KUSHNER STUDIOS
TOP QUALITY : : DETAIL FRONT STAIR SECTION AND MAIN ENTRY CONSTRUCTION PHOTOS KUSHNER STUDIOS
TOP QUALITY : : SECOND FLOOR AND ROOF PLAN WITH FACADE CONSTRUCTION PHOTOS KUSHNER STUDIOS
TOP QUALITY : : EXTENSION CONSTRUCTION PHOTOS AND WALL SECTION DETAIL KUSHNER STUDIOS
TOP QUALITY : : REAR BUILDING SECTION/ELEVATION KUSHNER STUDIOS
GATEWAYS TO CHINATOWN CHINATOWN, MANHATTAN, NY : : KUSHNER STUDIOS PROJECT MANAGER / DESIGN LEAD : : SD THE PROPOSAL FOR GATEWAYS TO CHINATOWN WAS LAUNCHED IN THE SPRING OF 2017 BY THE VAN ALEN INSTITUTE AS AN EFFORT TO CREATE A PLACE OF PRIDE, CULTURAL IDENTITY AND CONNECTION IN THE NEXUS OF CHINATOWN AND THE SOUTHERN ENTRANCE TO LITTLE ITALY AT MULBERRY AND MOTT STREET. I WORKED AS PROJECT MANAGER, VERY CLOSELY WITH THE PRINCIPAL OF THE FIRM AND LED A TEAM TO PUT TOGETHER OUR OFFICE’S UNIQUE DESIGN SOLUTION.
HOW CAN PAST BE FUTURE, AND HOW CAN PRESENT BE SIMULTANEOUSLY GLOBALLY APPLICABLE YET SITE SPECIFIC? CHINA TOWN - WHERE DOES IT BEGIN? WHERE ARE ITS BOUNDARIES?
WITH THESE QUESTIONS IN MIND, WE CONSIDERED THE PHILOSOPHICAL CONSTRUCTS OF THE YIN AND YANG, THE DUALITY OF HARMONIOUS OPPOSITES, WHY ENDEAVORING TO RESPOND TO THE PROGRAM JUXTAPOSING SUCH OPPOSITES AS A WAY OF PRESENTING THEIR CONFLICTING REALITIES SIMULTANEOUSLY AND INEXPLICABLY BOUND. TAKING ADVANTAGE OF THE NATURAL RISE IN THE SITE, THE EASTERN TIP OF THE TRIANGLE STARTS A SHORT, BUT IMPORTANT JOURNEY TO THE WEST. TWO PATHS DIVERGE, ONE LEADS UPWARDS TO A SOFT GRASSY MOUNT, ULTIMATELY RISING UP AND OUT OF THE TRIANGLE, CREATING AN OVERLOOK. THE OTHER, A HARDSCAPED DEPRESSION THAT LIGHTLY BURROWS INTO THE EARTH, TO CREATE SPACES OF SHADE AND SMALL GATHERINGS. THE STREET IS ENABLED TO ALLOW AS SHELTER AND EXPOSURE SIMULTANEOUSLY BECOMING,STAGE AND AUDIENCE. A MAP AND OFFERS BOOTH SITS UNDER THE GRASSED PASSAGE, WHERE THE CONCRETE IMPRESSION TERMINATES. A RETRACTABLE SCREEN IS EMBEDDED IN THE MAP, AND OFFERS OPPORTUNITIES TO HOLD SUMMER TIME FILMS. THESE TWO PATHS, RIFE WITH CONTRAST, ARE CONNECTED BY TWO SETS OF ‘EDGES’. THE REPLANTED TREES BECOME A NATURAL BARRIER AND PROVIDE SHADE FOR THE SOUTHERN EDGE. IN DIRECT OPPOSITION, THE NORTHERN ‘EDGE’ IS LINED WITH INDIVIDUAL TRANSLUCENT INFORMATION ‘PLANES’. THOUGHT OF AS A DIGITAL FOREST THEY FORM THE ’STRUCTURE’ FOR THESE TWO PATHS AND ARE ACCESSIBLE FROM BOTH LEVELS FOR TACTILE INTERACTIONS. WE IMAGINE THE VERY POSSIBLE ABILITY TO HAVE VISITORS CONTROL THE VISUAL ENVIRONMENT BY DISPLAYING VISUAL INFORMATION ON ADJACENT FACADES THAT ARE CONTROLLED AT THE LOCAL INFORMATION MONOLITHS. THE GATEWAY POSITS THAT WE LIVE IN A WORLD OF SIMULTANEOUS DIGITAL REALITIES COMPETING WITH VISCERAL REALITIES AND ATTEMPTS TO PUSH THE TWO APART THROUGH JUXTAPOSING THEIR EXTREMES IN ONE COMPOSITION
GATEWAYS TO CHINATOWN : : SITE PLAN KUSHNER STUDIOS
THE UPSTATE VILLAGE OF GARDINER, NEW YORK HOSTS THIS SITE WITH THE HUDSON VALLEY SPRAWLED TO THE EAST AND BACKED BY THE PRECIPITOUS CLIFFS OF THE SHAWANGUNK MOUNTAINS. A METAPHORICAL MEGA-TRANSECT WILL RUN THROUGH THE SITE ESTABLISHING THE ORIGINS OF THE VOCABULARY FOR THE PROJECT, WHICH IS DERIVED FROM TWO MAJOR FORMATIONS INSCRIBED ON THE SITE AND IN THE LANDSCAPE ITSELF. ONE IS AN INTERPRETATION OF THE GEOLOGICAL MORPHOLOGY OF THE ROCK FOUND AT THE SITE AND THE CLIFFS. THE SECOND MAJOR SYSTEM USED ON THE SITE SPRINGS FROM THE TRANSIENT NATURE OF THE MATURE GROWTH OF RED OAK TREES AND THEIR SEASONAL CANOPIES. KUSHNER STUDIOS IN ASSOCIATION WITH MADCO, HAS SPENT THE PAST 4 YEARS DEVELOPING A DESIGN FOR A 3D PRINTED POOL PAVILION. MADCO WAS ABLE TO OBTAIN A 12’ 3D PRINTER FROM ITALY AND AFTER MANY TRIPS UP TO THE SITE, WE WERE ABLE TO BUILD A STRUCTURE TO HOUSE THE OVERSIZED MACHINE. AS INTERN COORDINATOR, I MANAGED ALL WORK COMPLETED ON THIS PROJECT FROM 2016 - 2018. THIS WAS SUBMITTED AND WON THE 2017 ARCHITIZER POPULAR CHOICE ARCHITECTURE + 3D PRINTING AWARD.
765 N. MOUNTAIN ROAD GARDINER, NY : : KUSHNER STUDIOS AND MADCO PROJECT MANAGER / COORDINATOR : : SD
MOUNTAIN ROAD : : TEST PRINT PHOTOS KUSHNER STUDIOS MADCO
MOUNTAIN ROAD : : SCHEMATIC CONSTRUCTION DETAILS AND RENDERED SECTION KUSHNER STUDIOS MADCO
MOUNTAIN ROAD : : BUILD PHOTOS KUSHNER STUDIOS MADCO
MOUNTAIN ROAD : : AERIAL RENDER KUSHNER STUDIOS MADCO
] K R O W GN I S E [D
URBAN TREEHOUSE SOHO, NEW YORK : : CRITIC JASON VIGNERI-BEANE NESTLED IN SOHO (ON THE CORNER OF BROADWAY AND SPRING), THIS PROJECT SERVED AS AN UNCONVENTIONAL SOLUTION FOR URBAN MIXED USE. NEW YORK CITY HAS A CONSTANT BATTLE BETWEEN THE PUBLIC AND PRIVATE; SEEKING BALANCE, THE RESIDENTIAL ZONE IS AN AGGREGATION OF PREFABRICATED MICRO-UNITS WITH AN INTERCEDING LARGE PUBLIC VERTICAL GARDEN PARK. EACH UNIT STACKS ON THE ONE BELOW THROUGH USE OF STEEL COLUMNS THAT EXTEND TO THE GROUND. AS TIME PROGRESSES, THESE COLUMNS BECOME AN ARENA FOR UNCONTROLLED NATIVE PLANT LIFE, HIGHLIGHTING AND EMBRACING NATURE’S DESIRE AND ULTIMATE RECLAMATION OF THE URBAN FABRIC.
SOHO RESIDENCE : : 3RD FLOOR PLAN CUT
TWO BEDROOM - ADA ACCESSIBLE
TWO BEDROOM
ONE BEDROOM
LOFT / STUDIO
SOHO RESIDENCE : : UNIT PLANS AND SECTIONS
SOHO RESIDENCE : : BROADWAY STREET ELEVATION
SPRING STREET ELEVATION
INTER - POD STRUCTURE POSTS
EXO - SKELETON
CLERESTORY WINDOWS
INTERIOR BENT STEEL ‘T’ BEAMS
FLOATING FLOOR SLAB
EXTERIOR PLANTERS
SOHO RESIDENCE : : ONE BEDROOM ADA - EXPLODED AXO
A 02
DETAIL
A 03
DETAIL
SOHO RESIDENCE : : SPRING SECTION DETAIL CALLOUT
PROFILE TRIPLE LAYER ETFE INFLATED CUSHION
1/2” GYPSUM BOARD
STRUCTURAL STEEL ‘LATTICE’ FRAME
A 02
A 03
DETAIL
DETAIL
ALUCO BOND ALUMINUM COMPOSITE MATERIAL CLADDING SYSTEM
DETAIL
2.5” EXTRUDED POLYSTYRENE RIGID INSULATION
A 03
A 04
DETAIL
ALUCO BOND ALUMINUM COMPOSITE MATERIAL CLADDING SYSTEM ALUCO BOND ALUMINUM EXPOSED BENT STEEL ‘T’ COMPOSITE MATERIAL BEAM CLADDING SYSTEM Z CLIP EXPOSED BENT STEEL ‘T’ BEAM UNDER FLOOR STEEL Z CLIP PLATE
A 04
DETAIL
EXTRUDED ALUMINUM WINDOW SILICON SEALANT
UNDER FLOOR STEEL 1/2” GYPSUM BOARD PLATE EXPOSED BENT STEEL ‘T’ BEAM
2.5” EXTRUDED 1/2” GYPSUM BOARD POLYSTYRENE RIGID INSULATION 2.5” EXTRUDED STEEL ‘C’ STUD RIGID POLYSTYRENE INSULATION VAPOR BARRIER
GLAZING (LOW E GLASS)
STEEL ‘C’ STUD
GAS FILLED (ARGON) CAVITY
VAPOR BARRIER
GLAZING (LOW IRON GLASS) SPACER BAR
A 04
DETAIL
EXTRUDED ALUMINUM SILL PLATE
VAPOR BARRIER STEEL ‘C’ STUD 1/2” GYPSUM BOARD
A 04
DETAIL
2.5” EXTRUDED POLYSTYRENE RIGID INSULATION 2.5” EXTRUDED Z CLIP POLYSTYRENE RIGID INSULATION WATER PROOF FLASHING Z CLIP STEEL ‘T’ BEAM (INTUMESCENT COATED) WATER PROOF FLASHING VAPOR BARRIER STEEL ‘T’ BEAM 3” INSULATING AIR SPACE (INTUMESCENT COATED) INTERIOR FLOOR VAPOR BARRIER 3” INSULATING AIR SPACE INTERIOR FLOOR
SOHO RESIDENCE : : POD SECTION DETAILS
SOHO RESIDENCE : : ENCLOSED ROOF GARDEN
SLIGHT LINE LANDING BROOKLYN, NY : : CRITIC HENRY SMITH-MILLER THE BROOKLYN NAVY YARD IS HISTORICALLY A “STEALTHY” PLACE, HOWEVER WILL NOT REMAIN UNDISCOVERED; HOW MIGHT A “LIVE, WORK, PLAY” AGENDA CONTRIBUTE TO CURRENT VACANCIES? THIS MULTI-BUILDING PROPOSAL FOR THE BROOKLYN NAVY YARD, INVESTIGATES THE APPLICATION OF ILLUSIVE BUILDINGS. A MASTER PLAN THAT CONGEALS AND SHATTERS DEPENDANT UPON ANGLE OF VIEW. A DEVELOPMENT THAT PROVIDES SUPPORT TO FOSTER AND PROTECT THE EXISTING CULTURAL VACANCIES IN LIEU OF CREATING A “NEW” URBANISM. URBAN PLANNING THAT ALLOWS THE EXISTING MANUFACTURING COMMUNITY TO GROW ORGANICALLY THROUGH EXPLORING THE VOIDS OF THE ONGOING DEVELOPMENT, WHILE SEEKING TO PROVIDE CURRENT RESIDENTS A PLACE FOR EXHBITION AND COMMUNAL GATHERING CURRENTLY MISSING FROM THE SITE.
SLIGHT LINE LANDING : : SITE CONTEXT AND PROGRAM DEVELOPMENT
SLIGHT LINE LANDING : : SITE PLAN
BUILDING #3 SECTION :: PLAY TYPOLOGY, EXHIBITION SPACE FLOOR PLATE DIMENSIONS :: 16’-0” X 420’-0” 1/16” = 1’
SLIGHT LINE LANDING : : PLAY TYPOLOGY BUILDING PLANS
240’ - 0”
225’ - 0”
210’ - 0”
195’ - 0”
180’ - 0”
165’ - 0”
150’ - 0”
135’ - 0”
120’ - 0”
105’ - 0”
90’ - 0”
75’ - 0”
60’ - 0”
45’ - 0”
30’ - 0”
15’ - 0”
0’ - 0”
BUILDING #3 :: PLAY TYPOLOGY, EXHIBITION SPACE FLOOR PLATE DIMENSIONS :: 16’-0” X 420’-0” 1/16” = 1’
ILDING #3 SECTION :: PLAY TYPOLOGY, EXHIBITION SPACE OOR PLATE DIMENSIONS :: 16’-0” X 420’-0” 6” = 1’
SLIGHT LINE LANDING : : PLAY TYPOLOGY ELEVATION
SLIGHT LINE LANDING : : LIVE / WORK BUILDING TYPOLOGY FLOOR PLANS
SLIGHT LINE LANDING : : PLAY TYPOLOGY PHYSICAL MODEL
SLIGHT LINE LANDING : : MASTER PLAN PHYSICAL MODEL
SLIGHT LINE LANDING : : AERIAL VIEW
FRONTIER FARM & FIELD ELGIN, IL GROCERY : : CRITIC ERICH SCHOENENBERGER FRONTIER FARM & FIELD WAS BORN FROM THE CAP STUDIO AT PRATT INSTITUTE. IN THIS STUDIO, WE WORKED IN TEAMS OF THREE TO PROPEL A DESIGN THEORY FROM THE TYPICAL SCHEMATIC PHASE THROUGH TO A MORE ACTUALIZED DEVELOPED DESIGN, INCORPORATING AND DESIGNING MECHANICAL AND STRUCTURAL SYSTEMS. THE CONCEPT OF THIS GROCERY STORE EVOLVED FROM THE SLOW FOOD MOVEMENT. THE FORM WAS DRIVEN BY THE SURROUNDING CLIMATE AND WIND MOVEMENT THROUGHOUT THE SITE, CREATING A EARTHEN BERM-LIKE MASSING. THE FACADE WAS MADE TO MIMIC THE NATURAL AGGREGATION OF WOOD, BLENDING WITH THE SURROUNDING SITE, WHILE FORMING A PROTECTIVE BUFFER FROM WIND.
FARM & FIELD : : DEVELOPMENT STUDIES
FARM & FIELD : : SITE CLIMATE CONSIDERATIONS
WALKABLE GREEN ROOF OVER PARKING
CONSTRUCTED TOPOGRAPHY
WATER CHANNELS CONSTRUCTED WETLAND ADDED LOCAL FOLIAGE WATER RETENTION PONDS
PERMEABLE CIRCULATION AUTOMOBILE PEDESTRIAN
COMPOSITE SITE
FARM & FIELD : : SITE SECTION AND AXO
35’0”
15’0” 10’0” 0’0” -5’0”
SITE SECTION 1/16” = 1’
FARM & FIELD : : ELEVATIONS
FARM & FIELD : : BUILDING SECTIONS
O
P
N M
Q
L
SLOPE UP
UP
SLOPE
25'-0"
UP
UP
E UP
4.2
K
14'-0
"
SLO
SLOP E UP
PE UP
18” GLULAM BEAM
SL
"
K.1
14'-4"
SLOPE
PE UP
SLOPE UP
SLO
SLOPE UP
L.1 13'-10"
18” GLULAM BEAM
18” GLULAM BEAM
14
'-9
"
OPE
'-4
13
4.1
SLOP
PE SLO
S
18” GLULAM BEAM
18” GLULAM BEAM
"
13'-1
"
'-3
13
SLOPE UP
13'-7" 13'-1"
13'-5"
Q.1
13'-9"
13'-5"
P.1
R
M.2
N.1
O.1
UP
UP OPE SL
PE SLOPE UP
UP
UP E
E UP
OPE
OP
UP
UP
"
UP
SLOPE
OPE
SL
OPE SL
OP
E
UP
UP
SL
UP PE SLO "
'-9
"
UP
UP
UP
SLOPE
OPE
" '-0
"
PE
'-4
10
2x @ 8G 6’- LU 0” LA O M .C . T JO YP IST . S 2x8 GL @ 6’- ULAM JO 0” O. C. TY ISTS P.
SLO
SL UP SLOPE
UP SLOPE
SLOPE UP
29
UP PE SLO
SLOPE
" 7'-2 "
"
UP
SLOPE
OPE
SLO
PE
SL
OPE
UP
OPE
OPE
E UP SLOP
UP SLOPE
SLOPE UP
2x8 GLULA M JOISTS @ 6’-0” O.C. TYP.
UP SL OPE
UP PE SLO
UP
OPE
UP
SL
COLUMN 4.1-B.1 W12
W12
COLUMN 2.4-B.1 W12
2.3
26'-3"
IST JO M P. LA TY LU .C. 8G O 2x 6’-0” @
25” GLULAM BEAM
14'-3"
SLOPE
"
S PE
SLO
UP
25” GLULAM BEAM
S IST JO P. AM UL . TY .C GL 2x8 ’-0” O @6
25” GLULAM BEAM
COLUMN 1.1-A 25”x25” GLULAM TYP.
FARM & FIELD : : GROUND FLOOR STRUCTURE PLAN
B
'-1
21
13'-9"
UP
18
8"
3'-
"
'-1
E UP
SLO
UP
B.1
UP
PE
O
UP
UP
SLOPE
UP
SL
E
SLOP
W.1
PE
2 3
OP
SLOPE UP
X
2.1
PE
SL
SLOPE UP
COLUMN 3-Y 25”x25” GLULAM
SLO
UP
COLUMN 2-X 25”x25” GLULAM
BEAM
0"
26'-1
PE
PE SLO
Y
GLULAM
25” GLULAM BEAM
7'-2"
UP
SL
2X16
OPE
COLUMN 1-W.1 25”x25” GLULAM
18” GLULAM BEAM
UP
E UP
SL
BEAM "
24'-4
"
PE
SLOP
PE UP
SLO
SLO
SLO
S IST JO M YP. LA . T LU O.C 8G ” 2x 6’-0 @
GLULAM
13'-3
2.4
SLOPE UP
UP
2X16
UP
SL
UP
PE
SLO
UP
C
SL
UP
S IST JO . M YP LA . T LU O.C 8G ” 2x 6’-0 @
OPE
PE
C.1
SLOPE UP
UP
UP
SLO
SLO UP
1.1
UP "
O
PE
SL
13'-4
SL
0"
7'-1
18” GLULAM BEAM
UP
PE UP
2.3
SLO
2x8 GLULAM JOISTS @ 6’-0” O.C. TYP.
UP
PE UP
2x @ 8 GL 6’- UL 0” A O.C M . T JOIS YP. TS
UP
SLOPE UP
UP
OPE
SLO
SLOPE
"
SL UP
"
'-9
17
PE
UP
1
D
UP 13'-7
UP
OPE
E UP
O
E UP
OPE
SL
SL
SLOP SL
SLOP
SLOPE
SLOPE UP
UP
TS IS JO . M YP LA . T LU .C G O 8 0” 2x 6’@
E UP
PE
PE
D.1
COLUMN E-4.1 W12 TYP.
UP
OPE
13'-9"
SLOPE
UP
UP
PE
SLO
SLOPE
E UP
COLUMN TREE 2.3-F 12” DIA. STEEL-REINFORCED LUMBER TYP.
UP
SL
E UP
25” GLULAM BEAM
SLO
'-2"
UP
OPE
SLOP
"
'-8
23
SL
25” GLULAM BEAM
UP
13
UP
PE
O
SL
-4
"
SLOPE
SLOPE UP
18” GLULAM BEAM
SLOPE UP
UP
UP
SLOPE UP
SLOP
25” GLULAM BEAM
OPE
SL
13'-2
SLOPE UP
PE
SLOP
9'
E UP
"
'-1
SLO
E
UP
23
PE
32'-5"
29'-4"
X.1
"
SLOP
OPE
SL
SLO
UP
COLUMN 1-X.1 25”x25” GLULAM
SLOPE UP
E UP
SLOP
UP
SLOPE
E.1
"
'-0
13
UP
OPE
UP
UP
E
OP
SL
UP
PE
SLO
OPE
UP
E UP
SL
OPE
SLOP
25” GLULAM BEAM SL
COLUMN 3-X.1 25”x25” GLULAM
13'-2
"
E UP
OPE
25” GLULAM BEAM
SLOPE UP
COLUMN TREE 2.1-X 12” DIA. STEEL-REINFORCED LUMBER TYP.
25” GLULAM BEAM
25” GLULAM BEAM
COLUMN 1-V 25”x25” GLULAM
18” GLULAM BEAM UP
SL
UP
SLOPE UP
V.1
W
SL
2.2
F
UP
UP
SLOPE
SLOPE
TS IS JO . M YP LA . T LU .C G O 8 0” 2x 6’@
UP
SLOPE
UP
UP
OPE
SL
PE
PE
SLOPE UP
SLO
SLO
25” GLULAM BEAM
UP
25” GLULAM BEAM
2x @ 8 GL 6’- U 0” LA O.C M . T JOIS YP T S .
PE
O
SL
UP
25” GLULAM BEAM
25” GLULAM BEAM
PE
M.1
25” GLULAM BEAM
2x8 @ 6 GLUL ’-0” AM O.C JO . TY ISTS P.
O
OPE
UP
PE UP
UP
25” GLULAM BEAM
25” GLULAM BEAM
SL
PE
F.1
3.4
SLO
SL
COLUMN 3.3-X 25”x25” GLULAM
SLO
UP
SLOPE UP
UP
TS IS JO P. M TY LA . LU .C G O 8 0” 2x 6’@
"
UP
2x8 GLULAM JOISTS @ 6’-0” O.C. TYP.
2.1
O
UP
PE
SLO SLOPE
UP
PE
PE UP '-7
PE
UP
SLO
JO P. LAM GLU .C. TY 2x8 -0” O @ 6’
UP
SL
UP
SLOPE
STS LAM JOI 2x8 GLU . O.C. TYP @ 6’-0”
ISTS
39
18” GLULAM BEAM
PE UP
UP
4'-0
UP
23
SLOPE UP
PE
OPE
5'-8
PE UP
SLO
UP
UP
UP
3.3
UP
SLO
SLO
OPE
SLO
PE
SL
PE
E UP
UP
PE
SL
O
SL
SLO
G.1
SLOPE UP
SLOP
"
PE
SL
PE
SLO
COLUMN 3.3-W.1 25”x25” GLULAM OPE
PE UP
SLOPE
'-2
SLO
SL
SL
2.5 UP
X
UP
G SLO
SLOP
SLOPE UP
UP
OPE
SL
PE
SLO
SLOPE UP
"
UP
UP
'-5
OPE
PE
UP
"
COLUMN 3.3-V 25”x25” GLULAM OPE
UP
47'-2"
'-2
4
PE UP
18” GLULAM BEAM
SLO
SLO
UP
SLOPE UP
75
SLO
SLOPE UP
SLOPE UP
SLO
W.1
UP
PE
UP
PE
SLOPE
PE
PE
UP
O
PE
CHIMNEY OPEN TO BELOW SLO
W
SL
UP
SLO
SLO
16
PE
SLO
SLOPE
UP
SL
5
V.1
UP
SLOP
UP
13
V
OPE
SLOPE
SLOPE UP
'-2
SLOPE UP
UP
3.1
E UP
E UP
PE SLO
SLO
23
UP
SLO
SLOPE UP
PE UP
12'-1
SLOPE UP SLOP PE
UP
4.2
UP
SLOPE UP
"
SLOPE
PE UP
SLOPE
'-1
UP
SLO
34
H SLO
UP
COLUMN 5-U 25”x25” GLULAM
SLO PE
PE
COLUMN 4-T W12 TYP.
H.1 UP
PE
SLO
SLOPE
UP
SL
"
SLOPE UP
UP
UP
'-9
PE
OPE
20
SLOPE
SLO
UP
PE
SLOPE UP
18” GLULAM BEAM
SLO
COLUMN TREE 3-L 12” DIA. STEEL-REINFORCED LUMBER TYP.
SLOPE UP
PE UP
SLOPE UP
SLO
UP
SL
SLO
SLOP
SLOPE
UP
E
SL
SLOP
PE UP
UP PE
PE
SLOPE
" 13
'-4
UP
13 '-4 "
SLO
O SL
UP
SL
OPE
UP
SL
OP
I
SLOP
3.2
UP
I.1
'-9
E UP
SL
OPE
UP
47'-9"
OPE
SL
U
SL
UP
PE
UP
PE UP
UP
OPE SL
3.1
SLO
18” GLULAM BEAM
OPE
13
"
SLO
UP
SL
OPE
UP
SLOPE UP
PE
OPE
SL
PE
SLO SLO
SLOPE UP
UP
UP
E UP
UP
E UP
PE
O
SL
SLOP
UP
SLOP
3.2
UP
PE
E SLOP
UP
SLO
PE
PE
UP
18” GLULAM BEAM
O
UP
OPE
PE SLO
SL
SL
E UP
UP
18” GLULAM BEAM SLO
COLUMN 5-T 25”x25” GLULAM
J
UP
21'-7"
UP
UP
'-4
13
COLUMN 5-S.1 18”x18” GLULAM
T.1
"
O
S.1
J.1
'-7
SL
T
14
OPE
"
COLUMN 4.2-S 25”x25” GLULAM TYP.
18” GLULAM BEAM
SL
COLUMN 5-R.1 18”x18” GLULAM TYP
SL OPE
"
'-4
13
25” GLULAM BEAM
OPE SL
R.1
PE
SLO
1'-2"
5'-4"
7'-6"
"
16'-1
4.1
6'-8"
UP 7'-8"
1.1
1
2.1 3 2
4
5
A
EMERGENCY EXIT
EMERGENCY STAIRS
117
FIRE HOSE
DRY STORAGE
118
WET STORAGE AHU-3
124 116
FIRE PUMP ROOM
119
MECH CLOSET 2
W/C FIRE HOSE
120
115
125
W/C
WATER ROOM
121
EMPLOYEE W/C
W/C
ZONE 4 ELECTRIC PANEL
114
126
GAS ROOM
EMPLOYEE W/C
FIRE HOSE FIRE HOSE
122 113
ELECTRIC ROOM
112
DELI COUNTER
LOADING DOCK
127
EMPLOYEE BREAK ROOM
ROLLING DOOR
EMERGENCY EXIT
111
AHU-2
RECEIVING OFFICE
118
ZONE 3 ELECTRIC PANEL
TELECOM CLOSET
FIRE HOSE
128 BOILER
EMERGENCY EXIT
104
ACCOUNTING OFFICE
DRY GOODS
BOILER ROOM
110
123
HEATED BENCH
EMERGENCY STAIR
DAIRY COOLER
UP
109
WOOD OVEN
FIREPLACE
103
EMERGENCY EXIT
108
PRIMARY CHECKOUT
ZONE 1 ELECTRIC
BAKERY
FIRE SAFETY BOX VENT HOOD
102
CUSTOMER SERVICE
ZONE 2 ELECTRIC
107
CAFE FREEZER
FIRE HOSE
101 106
MECH CLOSET NO. 1
105
CAFE
CAFETERIA
128 AHU-1
126
STORAGE 2
BUTCHER FIRE HOSE
FIRE HOSE
124
WINERY
ZONE 5 ELECTRIC BOX
127 125
FISHMONGER
CHILLED BEVERAGE
EMERGENCY EXIT
130
129
FREEZER ROOM
FROZEN FOODS
REFIGERATION
132
UTILITY CLOSET
133
130
MECH CLOSET 3
W/C AHU-4
131
W/C
RAINWATER STORAGE TANK
FIRE HOSE
EMERGENCY EXIT
FARM & FIELD : : GROUND FLOOR PLAN
O
P
N M
Q
4.2
6'-0
"
6'-0"
6'-0"
6'-0"
6'-0"
K.1
14'-4"
14'-0
"
6'-0"
"
29'-11"
"
2'-0"
'-7
0"
0" 6'"
-0
2'-0
"
0"
6'-0
0"
2'-
6” S.OG. -3’-0”
"
6'-
2'-0"
"
6'-0
"
"
"
6'-0"
I
6'-0
2'-0
"
-0
6'
"
6'-0"
1'-9"
6'-0"
3.1
"
6'-0
1'-10"
6'-0"
" -0
6'-0"
6'-0"
'-4
3.2
'-9
"
"
"
6'-0"
13
6'-0"
3.2
I.1
13
6'-0
6” S.OG. -3’-0”
"
2'-0
2'-0
2'-0
6'
2'-0
13 '-4 "
"
" 1'-11
S.1
" 2'-0
6'
T
J
6'0" 2'-
21'-7"
"
'-4
"
0"
"
6'-0
"
-0
13
J.1
14 6'-
2'-0"
2'-0"
13
2'-0"
"
'-4
6'
"
2'-0"
2'-0"
6'-0"
'-4
13
R.1
14
'-9
2'-0"
S
"
6'-0"
6'-0"
6'-0 6'-0 "
'-3
13
K
6'-0"
25'-0"
"
13'-1
6'-0"
6'-0"
"
6'-0
L
L.1 13'-10"
4.1 6'-0"
13'-5"
6'-0"
6'-0"
6'-0"
6'-0"
6'-0"
13'-9"
13'-5"
13'-7"
6'-0"
13'-1"
Q.1
6'-0"
6'-0"
P.1
R
M.2
N.1
O.1
6'-0"
2'-0
" 6'-0"
47'-9"
T.1
-0
"
-0
2'-0
" '-9
0"
20
6'
-0
"
6'-
"
6'-0
6'
"
12'-1
"
"
2'-0
2'-0
6'-0
"
"
40
0"
'-6
6'-
"
6'-0
"
"
6'-0
2'-0
G.1
"
"
"
"
23
2'-0
-0
"
6'-0
G
-0
"
6'-0
"
0"
6'-
13 '-5
5
"
-0
6'
"
6'-0
6'-0
6'
6'
6'-0"
-0
"
6” S.O.G.
6'
4.2
'-2
"
6'-
0"
"
2'-0
"
6'-0"
3.1
6'-0
2'-0
"
6'-0
6” S.O.G. '-1
"
"
107'-4"
6'-0
34
H
-0
2'-0
-0
"
"
-0
6'
6'
"
"
"
H.1
"
"
2'-0
"
6'-0
V
6'
6' "
2'-0
U
"
"
6'-0 "
6'-0
"
2'-0
2'-0
16
'-2
"
8'-0"
"
"
6'-0
"
'-9 29
"
3.4
6'-0"
7'-2
F.1
1'-7"
6'-0
"
6'
"
"
"
"
13'-2
"
-0
6'-0"
"
2'-0
"
-0
F
"
98
'-1 1"
6'-0
"
6'-0
"
5'-8
8'-4"
"
"
2'-0
6'-0"
0"
6'-
1'-9" "
"
2'-0
"
6'
-0
'-0 23
" 6'-0
"
6'-0
"
" -0 "
6'-0"
6'-0
"
-0
2.2
"
-0
6'
6'-0
0"
"
6'-0
"
'-4
"
6'-0
10
"
"
2'-
6'-0
6'-0
6'-0"
6'-0
"
"
-0
6'
2'-0"
'-2"
"
2'-0"
13
0"
6'-0
"
6'-
"
"
0"
'-1
-0
"
6'
2'-
23
6'-0
0"
"
0"
6'-
'-1
6'-0
88
0"
2'-0"
"
2'-
39
6'-0
"
'-7
-0
"
6'
"
6'-0
"
13'-9"
6'-0
10'-2"
E
6'-0
1'-8"
"
'-0
13
"
M.1
0"
2'-
6'
6” S.O.G.
E.1
6'
"
13'-2
"
"
6'-0
"
6'-0
6'-0
"
6'-0
2'-0"
"
"
"
6'-0
-4
"
6'-0
1'-9"
7'-8"
9'
6'-0
X
"
-0
6' 6'-0
2.5
4
2'-0
"
6'-0"
2.1
'-2
6'-0"
0" 6'-
4'-0
75
6'-0"
"
6'
-0
"
"
-0
6'
6'
W.1
"
6'-0
2'-0
6'-0
"
6'-0
"
2'-0
"
1'-8 47'-2"
8'-3"
6'-0
V.1 W
"
'-8
"
6'-0
6'
-0
"
6'-0
D
0"
6'-0
2'-
"
1'-11
"
"
"
"
6'-0
6'-0
"
23
6'-0
D.1
0"
2'-
"
13'-7
"
6'-0
"
"
6'-0
-0
V.1
6'
"
"
2'-0
W
'-9
17
"
6'-0
6'-0"
2.3
C.1
"
7'-1
6” S.O.G.
C
0"
6'-
0"
6'-
6'-0
"
6'-0
"
6'-0"
13'-4
"
6'-0
0"
1'-10"
"
"
6'-0
62'-6"
6'-0
3.3
"
2'-0
6'-0
"
6'-0"
6'-0"
"
"
2'-0
"
2'-0
6'-0
6'-0"
1.1
13'-9"
1
6'-0"
X.1
6'-0
32'-5"
29'-4"
"
7'-2" "
6'-0"
13'-3
2.4
"
6'-0
6'-0"
B.1
2'-0"
6'-0"
B
0"
6'"
'-1
2'-0"
6'-
0"
6'-0"
18
8"
"
6'-
10
"
"
2'-0
X
"
6'-0
"
6'-0
2.1
"
6'-
"
2.3
2'-0
6'-0
6'-0"
1'-
"
'-1
21
"
6'-0
0"
W.1
0"
26'-1
Y
2'-0"
0"
6'-0"
14'-3"
3'-
24'-4
"
2'-0
26'-3"
2 0"
6'-
0"
6'-
3
6'-0" 6'-0"
1'-2"
"
41'-2
16
4.1
0"
6'-
0" 6'-
6'-8"
7'-8"
1.1
FARM & FIELD : : MEZZANINE STRUCTURE PLAN
5'-4"
7'-6"
'-1"
1
2.1 3 2
4
5
A
208
LOGGIA WALK EMERGENCY STAIRS
FIRE HOSE
207
205
PRODUCE WALK
LOGGIA CHECKOUT 1
FIRE HOSE
206
LOGGIA TERRACE
207
FIRE HOSE
205
LOGGIA CHECKOUT 2
OVEN-FIRED PIZZERIA
FIRE HOSE
205
PIZZA KITCHEN
ZONE 6 ELECTRIC BOX
ZONE 5 ELECTRIC BOX
203
W/C
202
W/C
204
CAFE KITCHEN
FIRE HOSE
DEFIBRILLATOR
201
OVERLOOK CAFE
FARM & FIELD : : MEZZANINE FLOOR PLAN
FARM & FIELD : : EXTERIOR RENDER
AXIS OF RELIGION
P01
ROME, ITALY : : CRITIC JASON VIGNERI-BEANE THIS PROJECT WAS AN INVESTIGATION INTO ROME’S UNIQUELY COMPLEX HISTORICAL RELATIONSHIP WITH THE BALANCE OF RELIGIOUS POWERS AND THEIR INTEGRATION WITH THE BUILT ENVIRONMENT. BEGINNING FROM THE ANCIENT FORUM AND EXTENDING TO THE MORE MODERN CATHOLIC CENTER OF SAINT PETERS. CAUGHT BETWEEN THESE TWO MASSES IS THE PIAZZA DEL CAMPIDOGLIO. THIS DRAWING EXEMPLIFIES THE PURPOSE BEHIND THE DESIGN TO CENTER ROME ON THE CATHOLIC EPICENTER.
1 1/2"
2"
1"
P01
11" 0 1/2"
11 1/4"
11 3/4"
1'-0 1/4"
1'-1"
1'-0 1/2"
1'-1 1/4"
1'-1 1/2"
1'-4"
NO HARDWARE CHAIR
1'-1 3/4"
2"
1'-7 3/4"
ELEVATION : : DIMENSIONED RIGHT VIEW
CRITIC : : BRUCE NICHOL, STEVE CHANG, BEN MARTINSON THIS IS AN INVESTIGATION IN HOW TO MAKE A PIECE OF FURNITURE WITHOUT HARDWARE OR GLUE WHILE STILL BEING ERGONOMIC. USING SIMPLE MATERIALS OF WOOD AND ROPE, THIS CHAIR CAN BE MANUFACTURED AND ASSEMBLED EASILY. THE SLATTED BOTTOM WORKS TO BIND AND WEIGH DOWN THE CHAIR WHILE THE TOP OF THE PIECES ARE BOUND TOGETHER WITH ROPE TO ACTIVATE TENSION AND REINFORCE
x5 x1
THE SLATTED BOTTOM; RESTRICTING MOTION BY WEDGING THE COMBS IN THE BASE.
PLAN : : TOP
#1 x2
#2 x2
AXONOMETRIC : : TENSION EXPRESSION
#3 x2
#4 x2
#5 x2
PHYSICAL MODEL : : WOOD
#6 x2
#7 x2
#8 x2
#9 x2
INSTRUCTION : : PIECES FOR ASSEMBLY
MILLED LANSCAPES
P01
GRASSHOPPER / CNC : : CRITIC BRIAN RINGLEY THIS PROJECT WAS AN INVESTIGATION OF THE RELATIONSHIP BETWEEN COMPUTATIONAL METHODS AND CONSTRUCTION. BEGINNING WITH THE CREATION OF A GRID BASE IN GRASSHOPPER, THEN MORPHING THE UNITS ONTO A SURFACE. THE UNITS ARE DISPATCHED DEPENDING UPON THE BIT TOOL WIDTHS ALLOWED BY THE CNC MACHINE. BALTIC BIRCH PLYWOOD WAS LAMINATED ONTO RUBBER AND WHITE ACRYLIC TO TEST THE ACTIVATION OF THE MATERIALS DEPENDANT UPON THE PLACEMENT OF EACH UNIT.
GRID CELL DEFINITION : : ARRAY
MILLED LANDSCAPES : : UNIT DEFINITIONS
UNIT TYPOLOGY 1 : : APERTURE
UNIT TYPOLOGY 2 : : EXTRUDE
MILLED LANDSCAPES : : UN-DISTORTED BLENDED GRID
.00 .01 APERTURE COLOR KEY
.02
.03
.04
.05
MILLED LANDSCAPES : : THRESHOLD COLOR DIAGRAM
.06
.07
.08
.09
01 ROUGHING
02 PARALLEL
03 PENCIL
04 POCKET
05 ENGRAVE (1/3)
06 ENGRAVE (2/3)
07 ENGRAVE (3/3)
1/2” FLAT BIT
1/2” BALL BIT
3/8” BALL BIT
1/4” FLAT BIT
1/8” FLAT BIT - PLASTIC
1/8” VORTEX DC - RUBBER
1/8” FLAT BIT
XL_20012_FLAT_.5_R
XL_20012_BALL_.5_F
L_20038_BALL_.375_F
L_20014_FLAT_.25_F
L_20018_FLAT_.125_F
VORTEX_1310_FLAT_.125
L_20018_FLAT_.125_F
MILLED LANDSCAPES : : TOOL-PATH DEPTH STEP ANALYSIS