New Brand Restaurant & Bar Renovation
La Puente, CA
Client: New Brand
Role: Business Development, Project Management, Site Visit, Site Measurement, Schematic Design, Design Development, Build Model in Revit (ADA), Enscape Rendering, FF&E, Lighting Design, RCP, Construction Administration, Presentation, Coordination with Stakeholders & GC
Reception
Bar
Restroom
Bar Area
Dining Area
Barnard College Roy and Diana Vagelos Science Center
Renovation
New York, NY
Client: Barnard College
Role: Interior Color Analysis, Enscape Rendering, Build Model in Revit (ADA), Construction Document Drawing, Office Plan, FF&E, Axon Analysis, Photoshop
9.1 C.8 C.9
UMASS Memorial HealthInpatient Pavilion Tower
Conversion
Worcester, MA
Client: UMass Memorial Health
Size: 88,000 square feet
Completion Date: 2024
Role: Sketches, Enscape Rendering, Build Model in Revit (ADA), Construction
Document Drawing (Floor Finish Plan, RCP, Wall Protection, Interior Elevation, Enlarged Plan, Details) FF&E, Coordination with MEP Engineers, Photoshop
UMass Memorial Health's new Inpatient Tower is an adaptive reuse project that serves as a campus extension for the UMass Memorial Medical Center located on the UMass Chan Campus in Worcester. This former skilled nursing facility will be transformed into a inpatient tower with a 72 bed occupancy and outpatient radiology functions that include Imaging and Ultrasound. This project's site is uniquely situated in a small wooded area, steps away from Lake Quinsigamond, and has been the source of design inspiration for the project team who has dubbed this project "hospital in the woods".
Sketches during brainstorming
S DT C C C C LC LC C CL LC CL CL LC LC C C L LC L C AA 2 AFF 9' 0" MC-1 AFF 9' 0" ACT-1 AFF 9' 0" ACT-1 AFF 9' 0" ACT-1 AFF 8' 0" ACT-1 AFF 8' 0" GYP BD AFF 9' 0" ACT-1 AFF 9' 0" ACT-1 AFF 9' 0" ACT-1 AFF 9' 0" ACT-1 AFF 9' 0" MC-1 AFF 9' 0" MC-1 AFF 8' 0" ACT-1 AFF 9' 0" GYP BD AFF 9' 0" GYP BD AFF 9' 0" ACT-1 AFF 9' 0" ACT-1 AFF 9' 6" GYP BD AFF 8' 0" GYP BD AFF 0" GYP BD AFF 9' 0" ACT-1 AFF 8' 0" GYP BD AFF 0" GYP BD AFF 9' 0" ACT-1 AFF 0" GYP BD AFF 8' 0" GYP BD AFF 8' 0" GYP BD AFF 9' 0" ACT-1 AFF 9' 0" ACT-1 AFF 8' 0" GYP BD AFF 8' 0" GYP BD AFF 9' 0" ACT-1 AFF 8' 0" GYP BD AFF 0" GYP BD AFF 8' 0" ACT-4 AFF 9' 0" ACT-1 AFF 9' 0" ACT-1 AFF 9' 0" ACT-1 AFF 0" ACT-1 AFF 0" ACT-1 346 SF STAFF BREAK 5-140 172 SF ELEV 4 5-000 E4 Redundant Room ELEV 5 5-000 E5 134 SF ELEV. VEST. 5-000L2 204 SF PATIENT ROOM 5-518 214 SF PATIENT ROOM 5-516 149 SF SOILED HOLDING 5-137 53 SF NORM ELEC 5-131 48 SF STAFF TOIL 5-163 69 SF EMERG ELEC 5-161 62 SF CORRIDOR 5-000C5 212 SF PATIENT ROOM 5-517 195 SF PATIENT ROOM 5-515 196 SF PATIENT ROOM 5-513 406 SF STAFF STATION 5-128 75 SF EQUIP. STORAGE 5-130 76 SF CLEAN SUPPLY 5-132 572 SF CORRIDOR 5-000C2 73 SF ELEV 3 5-000E3 93 SF ELEV 1 5-000E1 119 SF EMS 5-101 73 SF CONSULT 5-105 173 SF FAMILY LOUNGE 5-107 199 SF PATIENT ROOM 5-501 194 SF PATIENT ROOM 5-502 102 SF NOUR 5-111 198 SF AIIR PATIENT ROOM 5-503 204 SF PATIENT ROOM 5-505 212 SF PATIENT ROOM 5-507 219 SF PATIENT ROOM 5-509 43 SF PUB TOILET 5-117 101 SF OFFICE (CR, IP) 5-115 224 SF PATIENT ROOM 5-511 66 SF PAT BATH 5-511A 46 SF STAFF TOILET 5-121 213 SF PATIENT ROOM 5-512 173 SF STAIR 01 5-000S1 204 SF PATIENT ROOM 5-510 211 SF PATIENT ROOM 5-508 203 SF PATIENT ROOM 5-506 204 SF PATIENT ROOM 5-504 149 SF MEDS 5-126 952 SF CORRIDOR 5-000C3 45 SF PUB TOIL 5-103 33 SF ALCOVE 5-101A 41 SF EQUIP.ALCOVE 5-113 572 SF CORRIDOR 5-000C2 1 3 4 5 A B C C.5 D E G BB CC DD 10 11 12 13 14 4.2 6 7 8 9.1 J.6 F H J K J.8 96 SF EVS 5-139 H.5 F.7 170 SF STAIR 02 5-000S2 AFF 9' 0" ACT-1 AFF 9' 0" ACT-1 AFF 8' 0" ACT-1 AFF 8' 0" ACT-1 AFF 8' 0" ACT-1 AFF 8' 0" ACT-1 AFF 8' 0" ACT-1 AFF 0" ACT-1 AFF 0" ACT-1 AFF 0" ACT-1 AFF 8' 0" MC-1 AFF 8' 0" ACT-1 AFF 9' 0" GYP BD AFF 8' 0" ACT-1 AFF 8' 0" ACT-1 AFF 0" GYP BD AFF 8' 0" ACT-1 AFF 0" ACT-1 AFF 8' 0" GYP BD AFF 9' 0" ACT-1 AFF 9' 0" MC-1 AFF 9' 4" ACT-2 A51-01 4 A51-01 A51-01 AFF 8' 0" ACT-4 AFF 9' 0" ACT-1 AFF 9' 0" ACT-1 AFF 9' 0" ACT-1 AFF 0" ACT-1 TYP AFF 9' 0" ACT-1 AFF 8' 0" GYP BD AFF 8' 0" ACT-4 AFF 8' 0" ACT-1 AFF 8' 0" ACT-4 TYP TYP AFF 8' 0" ACT-4 AFF 8' 0" ACT-4 AFF 8' 0" ACT-4 AFF 9' 0" ACT-1 AFF 8' 6" MC-1 AFF 8' 3/4" MC-1 AFF 8' 7 3/4" MC-1 AFF 9' 0" ACT-1 CORRIDOR 5-000C4 A51-01 TYP AFF 0" ACT-4 2 A51-02 3 A51-02 A51-01 AFF 9' 0" MC-1 BUILT IN LIGHT REFER TO DETAIL 9.46RCP GENERAL NOTES 1. CEILINGS ARE TO BE TYPE XXX UNLESS NOTED OTHERWISE. 2. CEILING HEIGHT IS TO BE X'-XX" UNLESS NOTED OTHERWISE. 3. CEILING-MOUNTED LIGHT FIXTURES AND DEVICES ARE TO BE CENTERED IN CEILING TILES UNLESS NOTED OTHERWISE. 4. DIMENSIONS TO CEILIING-MOUNTED LIGHT FIXTURES AND DEVICES ARE TO FIXTURE/DEVICE CENTERLINE. 5. CONTRACTOR TO PROVIDE ACCESS PANELS IN INACCESSIBLE CEILINGS FOR SERVICE OR ADJUSTMENT TO ABOVE-CEILING EQUIPMENT. CONTRACTOR IS TO VERIFY LOCATION WITH ARCHITECT PRIOR TO CONSTRUCTION. 6. PAINT DECK AND STRUCTURE IN ALL AREAS OF EXPOSED STRUCTURE. CONTROL JOINT SUPPLY AIR GRILLE REFER TO MECHANICAL DRAWINGS RETURN AIR GRILLE REFER TO MECHANICAL DRAWINGS EXHAUST AIR GRILLE REFER TO MECHANICAL DRAWINGS C.J. RCP LEGEND RCP NOTES BY NUMBER LIGHTING FIXTURE RECESSED TROFFER LIGHTS 2'X2', 2'X4', AND 1'X4' LIGHTING FIXTURE SUSPENDED LINEAR 4' LIGHTING FIXTURE RECESSED DOWNLIGHT ROUND LIGHTING FIXTURE RECESSED DOWNLIGHT SQUARE LIGHTING FIXTURE SUSPENDED INDUSTRIAL STRIP 1/8" = 1'-0" 1 RCP - LEVEL 05 A B C SHEET NUMBER TITLE Job Number ISSUE CHART CONSULTANTS KEYPLAN PROJECT STRUCTURAL CIVIL MEP CONTRACTOR LANDSCAPING 1/4/2023 11:41:58 AM Autodesk Docs://UMASS Memorial s inpatient Bed Tower/ARCH-UMass Memorial Health-Inpatient Bed Tower.rvt A12-05 REFLECTED CEILING PLAN - LEVEL 05 152224.000 UMMH - New Inpatient Building © 2022 Perkins and Will 378 Plantation Street Worcester MA 01605 Simpson Gumpertz & Heger VHB 120 Front St #500, Worcester, MA 01608 480 Totten Pond Rd, Waltham, MA 02451 AEI 280 Summer Street, 4th Floor Boston, MA 02210 CODE RED CONSULTANTS 154 Turnpike Rd #200, Southborough, MA 01772 ACENTECH 33 Moulton Street Cambridge, MA 02138 Studio 2112 705 Centre St Unit 4, Boston, MA 02130 ACOUSTICS LIFE SAFETY VDA 100 Summer Street, Suite 1600 Boston, MA 02110 VERTICAL TRANSPORTSTION ROBBIE McCABE CONSULTING 27 Main Street Maynard, MA. 01754 HARDWARE STEEL REINFORCEMENT 12/22/2022 225 Franklin Street, Suite 1100 Boston, MA 02110 617.478.0300 617.478.0321 www.perkinswill.com <<< Indicates Sheet Keynote on Plan MARK ISSUE DATE DPH PART SUBMISSION 09/30/2022
C C C C LC LC LC CL LC CL CL LC LC C C C L LC LC RED BAG WASTE UP AA 16 2 9.2 9.3 9.4 1 3 5 A B C C.5 D E AA.1 G BB CC DD 10 11 12 13 14 14.4 15.6 17 4.2 6 7 8 15 18 9.1 J.6 9.5 F H J K 9 J.8 H.5 F.7 1/4" 12" VIF SHAFT 170 SF STAIR 02 3-000S2 178SFFAMILYLOUNGE 3-107 46SFPUBTOIL 3-103 CONSULT74SF 3-105 214 SF STAFF RECEPTION 3-100 SHAFT 74SFOFFICE(FM) 3-129 74SFOFFICE(MD) 3-131 102 SF NOUR 3-111 37 SF EQUIP. ALCOVE 3-113 73 SF ELEV 3 3-000E3 93 SF ELEV 1 3-000E1 173 SF STAIR 01 3-000S1 SHAFT 412 SF STAFF STATION 3-128 22 SF COPY/PRINT 3-137 SHAFT 54 SF PAT BATH 3-303A 73 SF EQUIP. STORAGE 3-130 74 SF CLEAN SUPPLY 3-132 53 SF CLEAN LINEN 3-124 148 SF MEDS 3-126 201 SF PATIENT ROOM 3-316 209 SF PATIENT ROOM 3-317 195 SF PATIENT ROOM 3-315 197 SF PATIENT ROOM 3-313 203 SF PATIENT ROOM 3-304 204 SF PATIENT ROOM 3-306 210 SF PATIENT ROOM 3-308 210 SF PATIENT ROOM 3-310 213 SF PATIENT ROOM 3-312 40 SF PAT BATH 3-318A 40 SF PAT BATH 3-316A 39 SF PAT BATH 3-317A 39 SF PAT BATH 3-315A 39 SF PAT BATH 3-313A 39 SF PAT BATH 3-304A 39 SF PAT BATH 3-306A 38 SF PAT BATH 3-308A 38 SF PAT BATH 3-310A 224 SF PATIENT ROOM 3-311 66 SF PAT BATH 3-311A 201 SF PATIENT ROOM 3-309 198 SF PATIENT ROOM 3-307 203 SF PATIENT ROOM 3-305 200 SF AIIR PATIENT ROOM 3-303 36 SF PAT BATH 3-305A 36 SF PAT BATH 3-307A 35 SF PAT BATH 3-309A 40 SF PAT BATH 3-312A 198SFPATIENTROOM3-302 37SFPATBATH 3-302A 37SFPATBATH 3-301A 204SFPATIENTROOM3-301 251 SF MULTI PURPOSE 3-122 45 SF STAFF TOILET 3-121 45 SF PUB TOILET 3-117 97 SF OFFICE NURSE SUPERVISOR 3-115 192 SF PATIENT ROOM 3-314 39 SF PAT BATH 3-314A 40 SF CART STO 3-119 74SFONCALL 3-127 54 SF NORM ELEC 3-131 69 SF EMERG ELEC 3-161 136 SF SOILED HOLDING 3-137 47 SF STAFF TOIL 3-163 169 SF IDF 3-165 99 SF EVS 3-139 172 SF ELEV 5 3-000E5 203 SF PATIENT ROOM 3-318 Redundant Room ELEV 4 3-000E4 CORRIDOR 3-000C3 CORRIDOR 3-000C2 144 SF ELEV. VEST. 3-000L2 CORRIDOR 3-000C1 CORRIDOR 3-000C6 CORRIDOR 3-000C5 CORRIDOR 3-000C4 10 SF EM. EQUIP. ALCOVE 3-109 13 SF ALCOVE 3-135 11 SF TANK STO 3-133 SHAFT SHAFT SHAFT P-TUBE 337 SF STAFF BREAK 3-140 STAIR 03 3-000S3 OPENTOBELOW CORRIDOR 3-000C4 9.46 CG-01 CG-01 CG-01 CG-01 CG-02 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-02 CG-01 CG-02 CG-02 CG-02 CG-02 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-02 CG-02 CG-01 CG-01 CG-01 CG-03 CG-03 CG-03 CG-03 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 CG-01 1. 2. REFER TO INTERIOR FINISH LEGEND IN A64 SERIES FOR FINISH INFORMATION. REFER TO A44-15A FOR WALL PROTECTION AND PAINT AT PATIENT ROOMS WALL PANEL PLAN GENERAL NOTES PANEL AND PAINT LEGEND SHEET WALL PROTECTION TO 2'-10" AFF SHEET WALL PROTECTION TO 4"-6" AFF SHEET WALL PROTECTION TO 7'-2" AFF SHEET WALL PROTECTION 7'-6" AFFUNDERSIDE OF SOFFIT SHEET WALL PROTECTION TO 7'-2" AFF SHEET WALL PROTECTION FULL HT SHEET WALL PROTECTION 20" BELOW FINISH CEILING TYPE DESCRIPTION PAINT ABOVE SYMBOL WP-1 WP-1 WP-1 WP-1 WP-1 WP-1 WP-2 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-3 1/8" = 1'-0" 1 LEVEL 03 - WALL FINISH DIAGRAM A B C SHEET NUMBER TITLE Job Number ISSUE CHART CONSULTANTS KEYPLAN PROJECT STRUCTURAL CIVIL MEP CONTRACTOR LANDSCAPING 12/21/2022 9:06:52 AM Autodesk Docs://UMASS Memorial s inpatient Bed Tower/ARCH-UMass Memorial Health-Inpatient Bed Tower.rvt A16-03 LEVEL 3 SHEET WALL PROTECTION 152224.000 UMMH - New Inpatient Building © 2022 Perkins and Will 378 Plantation Street Worcester MA 01605 Simpson Gumpertz & Heger VHB 120 Front St #500, Worcester, MA 01608 480 Totten Pond Rd, Waltham, MA 02451 AEI 280 Summer Street, 4th Floor Boston, MA 02210 CODE RED CONSULTANTS 154 Turnpike Rd #200, Southborough, MA 01772 ACENTECH 33 Moulton Street Cambridge, MA 02138 Studio 2112 705 Centre St Unit 4, Boston, MA 02130 ACOUSTICS LIFE SAFETY VDA 100 Summer Street, Suite 1600 Boston, MA 02110 VERTICAL TRANSPORTSTION ROBBIE McCABE CONSULTING 27 Main Street Maynard, MA. 01754 HARDWARE LOCAL APPROVALS 12/23/2022 225 Franklin Street, Suite 1100 Boston, MA 02110 617.478.0300 617.478.0321 www.perkinswill.com MARK ISSUE DATE DPH PART SUBMISSION 09/30/2022
A B C C.5 D E G F H F.7 PATIENT ROOM PATIENT ROOM PATIENT ROOM PATIENT ROOM PATIENT ROOM WP-1 WP-2 WP-1 WP-2 WP-1 WP-2 WP-2 WP-1 WP-1 WP-2 WP-1 B C C.5 D E G F F.7 PATIENT ROOM PATIENT ROOM PATIENT ROOM PATIENT ROOM PATIENT ROOM WP-1 WP-1 WP-2 WP-1 WP-2 WP-2 WP-1 WP-2 WP-1 1. 2. SEE ELECTRICAL FOR ELECTRICAL OUTLET, DATA OUTLET AND JUNCTION BOX SPECIFICATIONS. OUTLETS ARE SHOWN HERE FOR PLACEMENT COORDINATION ONLY. REFER TO A50 SERIES FOR MILLWORK INFORMATION 3. REFER TO FINISH PLANS FOR WALL BASE TYPES 4. REFER TO DRAWINGS A60-01 FOR WALL PROTECTION DETAILS INTERIOR ELEVATION GENERAL NOTES TOILET ACCESSORY TAG REFER TO A00-01 FOR LEGEND AND MOUNTING HEIGHTS. TA1 INTERIOR ELEVATION LEGEND CLEAN SUPPLY EQUIP. STORAGE ACCESS TO STAFF STATION PATIENT ROOM PATIENT ROOM PATIENT ROOM ACCESS TO STAIR STAFF BREAK/ LOCKERS 9.2 5 6 7 8 9.1 WP-1 WP-2 WP-1 WP-2 WP-2 WP-1 WP-1 WP-1 PATIENT ROOM PATIENT ROOM PATIENT ROOM ACCESS TO INPATIENT ELEVATOR NORMAL ELEC ROOM CORRIDOR 9.2 5 6 7 8 9.1 WP-1 WP-2 WP-1 WP-2 WP-2 WP-1 WP-1 WP-1 WP-1 AA AA.1 BB 4-107 4-401 4-402 4-111 WP-1 WP-1 WP-2 WP-2 WP-1 WP-1 2 3 4 4.2 2 3 4 4.2 1/4" = 1'-0" 1 AREA A - LEVE 04 UNIT CORRIDOR - WEST 1/4" = 1'-0" 2 AREA A - LEVE 04 UNIT CORRIDOR - EAST 1/4" = 1'-0" 3 AREA C - LEVE 04 UNIT CORRIDOR - NORTH 1/4" = 1'-0" 4 AREA C - LEVE 04 UNIT CORRIDOR - SOUTH 1/4" = 1'-0" 5 AREA B - LEVE 04 UNIT CORRIDOR - NW A B C SHEET NUMBER TITLE Job Number ISSUE CHART CONSULTANTS KEYPLAN PROJECT STRUCTURAL CIVIL MEP CONTRACTOR LANDSCAPING 12/5/2022 11:23:18 AM Autodesk Docs://UMASS Memorial s inpatient Bed Tower/ARCH-UMass Memorial Health-Inpatient Bed Tower.rvt A45-04A INTERIOR ELEVATIONS LEVEL 04 152224.000 UMMH - New Inpatient Building © 2022 Perkins and Will 378 Plantation Street Worcester MA 01605 Simpson Gumpertz & Heger VHB 120 Front St #500, Worcester, MA 01608 480 Totten Pond Rd, Waltham, MA 02451 AEI 280 Summer Street, 4th Floor Boston, MA 02210 CODE RED CONSULTANTS 154 Turnpike Rd #200, Southborough, MA 01772 ACENTECH 33 Moulton Street Cambridge, MA 02138 Studio 2112 705 Centre St Unit 4, Boston, MA 02130 ACOUSTICS LIFE SAFETY VDA 100 Summer Street, Suite 1600 Boston, MA 02110 VERTICAL TRANSPORTSTION ROBBIE McCABE CONSULTING 27 Main Street Maynard, MA. 01754 HARDWARE DEMOLITION PACKAGE 12/09/2022 225 Franklin Street, Suite 1100 Boston, MA 02110 617.478.0300 617.478.0321 www.perkinswill.com 1/4" = 1'-0" 6 LEVEL 04 STAFF RECEPTION 4-100 - SOUTH ELEVATION 1/4" = 1'-0" 7 LEVEL 04 CORRIDOR 4-000C2 - SE ELEVATION 1/4" = 1'-0" 8 LEVEL 04 CORRIDOR 4-000C1 - EAST ELEVATION 1/4" = 1'-0" 9 LEVEL 04 CORRIDOR 4-000C1 - NE ELEVATION 1/4" = 1'-0" 10 LEVEL 04 CORRIDOR 4-000L1 - NORTH ELEVATION MARK ISSUE DATE