DETAILING & WORKING DRAWING MODULE - IDS 60804. SARAH MOHAMED 0346977 BIA SEM 4 E-PORTFOLIO
MODULEDESCRIPTION
U L E D E D S C R I P T I O N
In this module, The integration of the design process and its documentation is the main focus . With the aid of digital photographs, sketch drawings, and field notes, we did research on buildings. Then, using the conventions of architectural representation in the proper media, we will make measured drawings. The module lays the foundation for us to understand the technical drawings, the value of services in buildings, the legal frameworks and rules of conduct that govern building construction, such as the UBBL, as well as the significance of an integrated approach to service delivery. The module covers the procedures from design approval to working drawing production.
M O
D
(TGC) I LEARNED DURING THIS COURSE
In this course I have learned to develop my skills and do research independently As well as identifying, extracting, synthesizing and using information effectively as well Be intellectually engaged
This course has helped me think critically and creatively Especially identifying and analyzing problems to reach effective solutions
Thinking and ProblemSolving skills
This course has helped me think critically and creatively Especially identifying and analyzing problems to reach effective solutions
M O D U
D
L E D E
S C R I P T I O N
ASSIGNMENT 03
WORKING DRAWINGS + SYSTEM INTEGRATION
REQUIREMENTS:
IN ORDER TO COMPLETE THIS PROJECT,WE MUST CREATE A NUMBER OF WORKING DRAWINGS THAT ARE INTEGRATED WITH THE COLLABORATIVE DESIGN MODULE. THE GOAL IS TO MAKE IT POSSIBLE FOR US TO DEVELOP PAPERS THAT INTEGRATE THE BUILDING SERVICES COMPONENTS BY COOPERATING ON THE DESIGN PROCESS AND IDENTIFYING SOLUTIONS TO DESIGN PROBLEMS WITH INTERIOR DESIGN PROPOSALS OF THE RIGHT BUILDING SCALE. PDF FORMAT OF CAD DRAWINGS IN A3 FORMAT SIZE, SERIES OF DRAWINGS (PLANS + SECTION), BQ OF SELECTED AREAS, BE SPOKE DETAIL, FF&E INTEGRATION DRAWINGS, BILLS OF QUANTITIES
ASSIGNMENT 3 INTEGRATION DRAWINGS NAME : SARAH MOHAMED BINNABHAN STUDENT ID: 0346977 TOUTER: MS.SIN AI SEMESTER : AUGUST - DECEMBER 2022 DETAILING & WORKING DRAWING MODULE - IDS 60804.
SCHEDULEOFACCOMODATION
2
AREAS NO.OFOCCUPANTS NO.OFROOMS AREAOFONEROOM(m2) TOTALAREAOFROOM(m2) SIXTHFLOOR 1.W/C 1 4 3.70 14.80 2.LABORATORY 2 1 2.66 2.66 3.STORAGE1 2 1 1.95 1.95 4.STORAGE2 4 1 3.40 3.40 5.STORAGE3 2 1 2.04 2.04 6.STORAGE4 2 1 2.10 2.10 7. PANTRY 4 1 6.70 6.70 8.OBJECTSALADBOOTHROOM 5 1 44.75 44.76 9.VERTICALGRDENROOM 6 1 30.62 30.62 10.GARDENCOWORKINGSPACE 5 1 31.21 31.21 11.LABORATORYAREA 4 1 56.42 56.42 12.BOTANICALWORKSTATION 4 1 15.90 15.90 13.GARDENINGWORKSHOP AREA 6 1 25.56 25.56 14.SINK 3 1 12.28 12.28 15.BRIDGE 3 1 8.43 8.43 TOTALAREA(M): 288.83
DRAWING.NO
PHASE1
WDSI_DWD_SM_SOA_01
WDSI_DWD_SM_SOP_6F_02
WDSI_DWD_SM_FLP_6F_03
WDSI_DWD_SM_RCP_6F_04
WDSI_DWD_SM_LLP_6F_05
WDSI_DWD_SM_FFP_6F_06
PHASE2
WDSI_DWD_SM_SEC_07
WDSI_DWD_SM_BSLP_08
WDSI_DWD_SM_BSSC_09
REVISIONTRACKING
WDSI_DWD_SM_BSBD_10 PHASE3
BILLOFQUANTITIES(BQ) SCHEDULEOFFINISHES(SOF) FIXTURE,FITTINGS&EQUIPMENTSSCHEDULE (FF&E) 01 01NO NO SECTION(SEC) BESPOKEDETAILPLAN BESPOKESECTIONA-A BESPOKEBLOW-UPDETAIL 01 03 04 01-NO NO NO NO SCHEDULEOFACCOMMODATION(SOA) SETTINGOUTPLAN(SOP) FURNITURELAYOUTPLAN(FLP) REFLECTEDCEILINGPLAN(RCP) LIGHTINGANDLOOPINGPLAN(LLP) FLOORFINISHESPLAN(FFP) 02 02 02 03 03 03 27.10.2022 27.10.2022 27.10.2022 03.11.2022 03.11.2022 03.11.2022--NO NO NO NO NO NO SHEETNAME REV DATE DESCRIPTION ISSUE 16NOV2022 20NOV2022 28NOV2022 28NOV2022 28NOV2022 28NOV2022 NO 0128NOV2022
WDSI_DWD_SM_BQ_11 WDSI_DWD_SM_SOF_12 WDSI_DWD_SM_FF&E_13
LEGEND SYMBOL DESCRIPTION DEMOLISH NEWINTERNALBRICKWALL EXISTINGBRICKWALL EXISTINGCONCRETEWALL WINDOWLEGEND CODE QTY W1 1500MM(W)X3200MM(H)GLAZINGWITHALUMINUMFRAME12MM TEMPEREDGLASS 31.72(LENGTH) DOORLEGEND CODE QTY D1 750MM(W)X2000MM(H)SINGLESWINGWITHPVCDOOR 4 D2 900MM(W)X2100(H)SINGLEALUMINUMSWINGDOORWITH LAMENTEDGLASS 5 D3 750MM(W)X2100MM(H)SINGLEALUMINUMSWINGDOORWITH LAMENTEDGLASS 4 D4 1800MM(W)X2100MM(H)DOUBLESWINGDOORC/WALUMINUM FRAME 1 D5 900MM(W)X2100MM(H)SINGLEALUMINUMSWINGDOORWITH FROSTEDTEMPEREDGLASS 1 D7 900MM(W)X2100MM(H)EMERGENCYDOORWITHGALVANIZEDSTEEL 2 VOID VOID VOID CORRIDOR LANDSCAPE PANTRY VOID VOID BRIDGE 1 2 3 4 5 6 7 8 4 DR HR M&E RISERS A/C ELV LV BREAKOUTSPACE STAIR3 VOID NOTE: CLIENT: ARCHITECT: INTERIORDESIGNCONSULTANT: QUANTITYSURVEYOR: PROJECTNAME: SCALE: DATE: CHECKEDBY: DRAWNBY: DRAWINGNO. REVNO. NO. DESCRIPTION DATE THISDRAWINGISCOPYRIGHTDRAWING.THEAUTHORIZED USERISTOCHECKALLDIMENSIONONTHESITE.ONLY FIGUREDDIMENSIONTOBEWORKEDON.DISCREPANCIES MUSTBEREPORTEDIMMEDIATELYTOPARTNERSHIPBEFORE PROCESSING. BANKHQ COMPANYARCHITECTS INTERIOR03GROUP QSQUANTITYSURVEYORSDN. BHD. JALANHAPPY,47500SUBANGJAYA LEVEL5,HANDTOWER,46150 PETALINGJAYA COMMONTOWER,50100KUALA LUMPUR QSBUILDING,47500SUBANGJAYA NEW GARDENING WORKSHOP AREA31.21M NEW BOTANICAL WORKSTATION 15.90M NEW GARDENCO WORKINGSPACE 31.21 NEW LAVATORY AREA 56,42M STAIR3 MEETING AREA MEETING6 AREA MEETING6 AREA GARDENCO WORKINGSPACE 31.21 PAMCOUNCIL MEETINGROOM AREAA A B C D E F G H I J BREAKOUTSPACE D D D D 07 07 03 04 D 03 1 2 3 4 D 01 01 D 03 D 03 D PAMCOUNCILMEETINGROOM MEETINGROOM6
D 01 D 01 D 01 D 01 D 07 D 07 D 07 W2 NP NP NP W2 61859 DR/HR A/C STAIR3 VOID VOID DEMOLISHDRY WALL DEMOLISHDRY WALL DEMOLISHDRY WALL DEMOLISH PANTRY FURNITURE DEMOLISHDRY WALL MT1 MT1 04 D MT1 C6 C6 MT1 W1 W1 W1 MT1 04 D LC1 LC1 LC1 LC1 EXIT 4.80M W/C 3.70M W/C 3.70M W/C 3.70M W/C 3.70M LAVATORY 3.70M LAVATORY 3.70M 04 D 04 D 04 D 50 50 SCALE1:150 SIXTHFLOORSETTINGOUTLAYOUTPLAN 01 FLP DRAWINGTITLE: SIXTHFLOORSETTINGOUTPLAN 1:150 27/OCTOBER/2022 MSSINAI SARAHMOHAMED WDSI_DWD_SM_SOP_6F_02 02 CONSTRUCTIONDRAWINGOFWILDHARVEST INPAMCENTERBANDSAR,MALAYSIA 03 D PANTRY
MEETING4,5
VOID VOID VOID CORRIDOR LANDSCAPE VOID VOID BRIDGE 8.43M 1 2 3 4 5 6 7 8 4 RISERS STORAGE1 1.95M STAIR3 VOID NOTE: CLIENT: ARCHITECT: INTERIORDESIGNCONSULTANT: QUANTITYSURVEYOR: PROJECTNAME: NO. DESCRIPTION DATE THISDRAWINGISCOPYRIGHTDRAWING.THEAUTHORIZED USERISTOCHECKALLDIMENSIONONTHESITE.ONLY FIGUREDDIMENSIONTOBEWORKEDON.DISCREPANCIES MUSTBEREPORTEDIMMEDIATELYTOPARTNERSHIPBEFORE PROCESSING. BANKHQ COMPANYARCHITECTS INTERIOR03GROUP QSQUANTITYSURVEYORSDN. BHD. JALANHAPPY,47500SUBANGJAYA LEVEL5,HANDTOWER,46150 PETALINGJAYA COMMONTOWER,50100KUALA LUMPUR QSBUILDING,47500SUBANGJAYA STAIR3 A B C D E F G H I J 1 2 3 4 COWORKINGMEETINGROOM 61859 A/C STAIR3 VOID OBJECT 44.76M BF2 GARDENCO WORKINGSPACE 31.21 LF1 GARDENING WORKSHOP AREA31.21M SINKAND WASHAREA 12.28M DRESSING PODS 7.26M BOTANICAL WORKSTATION 15.90M PLANT PODS 5.85M LABORATORY AREA 56,42M BF1 BF5 LEFT LEFT ELEVATOR HALL 19.80M STORAGE2 2.10M L5 L5 SCALE1:150 SIXTHFLOORFURNITURELAYOUTPLAN 01 FLP SEC A SEC A BUILTFURNITURE CODE DESCRIPTION QTY BF1 LAVATORYSTRUCTUREMAHOGANYWOODC/WACRYLICWHITE PAINTWITHSEMIGLOOSFINISH 1 BF2 STEELFRAMEC/WPOWDERPINTMATTEFINISH 1 BF3 PLASTICWORKSHOPPLANTINGSHELFC/WACRYLICWHITEPAINT W/GLOSSYFINISH 4 BF4 TERRAZZOSINKTABLETOPW/SEMIGLOSSFINISH 1 BF5 BRICKBOTANICALWORKSTATIONC/WLIGHTGREENSTONE TILESW/GLOSSYFINISH 1 LOOSEFURNITURELEGEND CODE DESCRIPTION QTY LF1 700(W)X2470MM(H)WOODDESKC/WWHITEACRYLICPINTWITH SEMIGLOSSFINISH 4 LF2 600MM(W)X450(H)BLACKMESHOFFICECHAIRWITHWOOD FRAME 8 LF3 250MMRADIUSCURLERLABCHAIRWOODC/WWHITEANDBLUE PAINT 4 LF4 700MM(W)X200MM(H)MARBLESINKTOPC/WGLOSSYFINISH 1 LF5 700MM(W)X750MM(L)X2000MM(H)OFFICEPRIVACYFROSTED NON-TRANSPARENTGLASSPARTITION 2 FP_DWD_SM_OBJT_6F_00 PARTITIONLEGEND CODE DESCRIPTION QTY P1 (OAK)WOODRECYCLEDWALLPANELEASYINSTALLWATERPROOFPLASTIC COMPOSITEWALLPANEL 6.70M LENGTH W/C 3.70 W/C 3.70 W/C 3.70 W/C 3.70 W/C 3.70M LABORATORYAREA BOTANICALWORK BOTANICALWORK COWORKINGMEETINGROOM STORAGE1 1.95M EXIT 4.80M EXIT 4.80M STORAGE3 1.95M STORAGE 2.10M P1 LAVATORY 3.70M LAVATORY 3.70M BF4 LF5 50 50 50 50 DRAWINGTITLE: SIXTHFLOORFURNITURELAYOUTPLAN SCALE: DATE: CHECKEDBY: DRAWNBY: DRAWINGNO. REVNO. 1:150 27/OCTOBER/2022 MSSINAI SARAHMOHAMED WDSI_DWD_SM_FLP_6F_03 02 VOID CONSTRUCTIONDRAWINGOFWILDHARVEST INPAMCENTERBANDSAR,MALAYSIA LF3 LF3 LF3 LF3 LF2 LF2 LF2 LF2 BF3 LF1 LF1 LF1 LF4 LF4 LF4 LF5 BF2 BF2 BF2 BF2 BF2 BF2 BF2 BF2 D D D D 07 07 03 04 D 03 D 01 01 D 03 D 03 D D 01 D 01 D 01 D 01 D 07 D 07 D 07 03 D DOORLEGEND CODE DESCRIPTION QTY D1 750MM(W)X2000MM(H)SINGLESWINGWITHPVCDOOR 4 D2 900MM(W)X2100(H)SINGLEALUMINUMSWINGDOORWITH LAMENTEDGLASS 5 D3 750MM(W)X2100MM(H)SINGLEALUMINUMSWINGDOORWITH LAMENTEDGLASS 4 D4 1800MM(W)X2100MM(H)DOUBLESWINGDOORC/WALUMINUM FRAME 1 D5 900MM(W)X2100MM(H)SINGLEALUMINUMSWINGDOORWITH FROSTEDTEMPEREDGLASS 1 D7 900MM(W)X2100MM(H)EMERGENCYDOORWITHGALVANIZED STEEL 2 PANTRY 6.70M
CORRIDOR LANDSCAPE VOID VOID 1 2 3 4 5 6 7 8 4 RISERS ELV STAIR VOID NOTE: CLIENT: ARCHITECT: INTERIORDESIGNCONSULTANT: QUANTITYSURVEYOR: PROJECTNAME: NO. DESCRIPTION DATE THISDRAWINGISCOPYRIGHTDRAWING.THEAUTHORIZED USERISTOCHECKALLDIMENSIONONTHESITE.ONLY FIGUREDDIMENSIONTOBEWORKEDON.DISCREPANCIES MUSTBEREPORTEDIMMEDIATELYTOPARTNERSHIPBEFORE PROCESSING. BANKHQ COMPANYARCHITECTS INTERIOR03GROUP QSQUANTITYSURVEYORSDN. BHD. JALANHAPPY,47500SUBANGJAYA LEVEL5,HANDTOWER,46150 PETALINGJAYA COMMONTOWER,50100KUALA LUMPUR QSBUILDING,47500SUBANGJAYA STAIR3 A B C D E F G H I J 1 2 3 4 61859 DR/HR A/C STAIR3 VOID VOID P-6 VOID VG1 GARDENING WORKSHOP AREA31.21M BOTANICAL WORKSTATION 15.90M L L LEFT ELEVATOR HALL L5 L5 L5 L1 K SEC A SEC A SCALE1:150 SIXTHFLOORREFLECTEDCEILINGPLAN 01 ELP 4 4 4 4 L L 4 4 L L L L 4 4 L L L L L4 4 4 4 4 3 3 3 L L3 L 3 L 3 L2 L2 L2 L2 L2 L2 L2 L2 L2 L1 L5 L5 L5 L5 L5 L1 L1 L1 L1 L1 L1 L1 L1 K LAVATORY L1 L1 L1 L1 LEFT VOID VOID VOID LIGHTINGLEGEND CODE DESCRIPTION QTY CROCSFALED-CEILINGSPOTLIGHT16W 3 LEDSURFACEMOUNTED18W(BUILT-INLED)FORCONCRETE CEILINGPLASTERCEILING 6 SURFACEMOUNTEDLEDDOWNLIGHT28W 10 CEILINGRECESSEDSPOTLIGHT18W 21 LEDCEILINGLAMP,NICKEL-PLATED28W 6 KELUARWAREMERGENCYCEILINGLIGHT 2 SMOKEDETECTOR 10 840(W)MMX840(L)MMX246MM(H)DIKINR322HPCEILING CASSETTE 4 L1 L2 L3 L L5 K CALLINGLEGEND CODE DESCRIPTION CP1 150MM(THK)REINFORCEDCONCRETECEILINGC/WOFFWHITE MATTFINISHPAINT CP2 WOODPLASTICCOMPOSITECEILINGPANELC/WJOTUNWHITE ACRYLICPAINT CP3 PLASTERCEILINGC/WJOTUNWHITEINTERIORACRYLICSEMI GLOSSPINT CP2 EXIT EXIT W/C W/C LAVATORY CP2 CP2 CP2 CP2 CP1 CP3 CP1 CP1 CP1 CP1 CP1 CP2 GARDENCO WORKINGSPACE 31.21 SINKAND WASHAREA 12.28M DRESSING PODS 7.26M PLANT PODS 5.85M LABORATORY AREA 56,42M BRIDGE 8.43M OBJECT 44.76M STORAGE1 STORAGE 1.95M STORAGE3 COWORKINGMEETINGROOM LABORATORYAREA BOTANICALWORK PLANTINGSTATION COWORKINGMEETINGROOM DRAWINGTITLE: SIXTHFLOORFURNITURELAYOUTPLAN SCALE: DATE: CHECKEDBY: DRAWNBY: DRAWINGNO. REVNO. 1:150 27/OCTOBER/2022 MSSINAI SARAHMOHAMED WDSI_DWD_SM_RCP_6F_04 02 CP1 CH3200 CH2900 CH3200 CP3 CP3 CH3200 CP3 CH3200 CH3200CH3200 CH3200 CH3200 CH3200 CH3200 CH3200 CH3200CH3200 CH3200 W/C CH3200 W/C CH3200 CH3200 CH3200 CH3200 CH3200 CH3200 CH6400 CH3200 CH2900 CH2900 CH2900 CH2900 CH2900 50 50 50 50 50 CP3 CP3 CP3 CP3 CP2 CP3 CP3 CP3 CP3 CP3 CP3 CP3 CP3 CEILINGLEGEND CODE DESCRIPTION CP1 CONCRETECEILINGC/WOFFWHITEMATTFINISHPAINT CP2 WOODPLASTICCOMPOSITECEILINGPANELC/WJOTUNWHITE ACRYLICPAINT CONSTRUCTIONDRAWINGOFWILDHARVEST INPAMCENTERBANDSARMALAYSIA STORAGE 2.10M STORAGE 2.10M PANTRY 6.70M
VOID VOID VOID CORRIDOR LANDSCAPE VOID VOID BRIDGE 1 2 3 4 5 6 7 8 4 RISERS STAIR3 VOID NOTE: CLIENT: ARCHITECT: INTERIORDESIGNCONSULTANT: QUANTITYSURVEYOR: PROJECTNAME: NO. DESCRIPTION DATE THISDRAWINGISCOPYRIGHTDRAWING.THEAUTHORIZED USERISTOCHECKALLDIMENSIONONTHESITE.ONLY FIGUREDDIMENSIONTOBEWORKEDON.DISCREPANCIES MUSTBEREPORTEDIMMEDIATELYTOPARTNERSHIPBEFORE PROCESSING. BANKHQ COMPANYARCHITECTS INTERIOR03GROUP QSQUANTITYSURVEYORSDN. BHD. JALANHAPPY,47500SUBANGJAYA LEVEL5,HANDTOWER,46150 PETALINGJAYA COMMONTOWER,50100KUALA LUMPUR QSBUILDING,47500SUBANGJAYA STAIR3 A B C D E F G H I J BREAKOUTSPACE 1 2 3 4 PAMCOUNCILMEETINGROOM MEETINGROOM6 MEETING4,5 D 01 61859 STAIR3 VOID VOID P-6 OBJECT44.76M VOID VG1 GARDENCO WORKINGSPACE 31.21 GARDENING WORKSHOP AREA GARDENING WORKSHOP AREA31.21M SINKAND WASHAREA 12.28M DRESSING PODS BOTANICAL WORKSTATION 15.90M PLANT PODS GARDENING WORKSHOP AREA LAVATORY AREA 56,42M PACKAGING L L L L LEFT LEFT ELEVATOR HALL PANTRY 6.70 L5 L1 K SEC A SEC A LIGHTINGLEGEND CODE DESCRIPTION QTY CROCSFALEDCEILINGSPOTLIGHT16W 3 LEDSURFACEMOUNTED18W(BUILT-INLED)FORCONCRETE CEILINGPLASTERCEILING 6 SURFACEMOUNTEDLEDDOWNLIGHT28W 10 CEILINGRECESSEDSPOTLIGHT18W 21 LEDCEILINGLAMP,NICKEL-PLATED28W 6 KELUARWAREMERGENCYCEILINGLIGHT 2 SMOKEDETECTOR 10 DBBOX 2 L1 L2 L L5 SCALE1:150 SIXTHFLOORELECTRICALPLAN 01 ELP K 4 4 4 4 L L 4 4 L L4 L4 L4 4 L L L L L4 L L L L4 3 3 3 L L3 L 3 L 3 L2 L2 L2 L2 L2 L2 L2 L2 L2 L1 L5 L5 L5 L5 L5 L5 L1 L1 L1 L1 L1 L1 L1 L1 K SWITCHANDPLUGPOINTLEGEND CODE DESCRIPTION QTY ONEGANGONEWAYSWITCH 9 ONEGANGETWOWAYSWITCH 4 TWOGANGTOWWAYSWITCH 3 THREEGANGONEWAYSWITCH 2 THREEGANGTWOWAYSWITCH 2 PUGPOINT 24 L1 L1 L1 L1 EXIT 4.80M EXIT 4.80M LAVATORY 3.70M LAVATORY 3.70M CALLINGLEGEND CODE DESCRIPTION CP1 150MM(THK)REINFORCEDCONCRETECEILINGC/WOFFWHITE MATTFINISHPAINT CP2 WOODPLASTICCOMPOSITECEILINGPANELC/WJOTUNWHITE ACRYLICPAINT DRAWINGTITLE: SIXTHFLOORFURNITURELAYOUTPLAN SCALE: DATE: CHECKEDBY: DRAWNBY: DRAWINGNO. REVNO. 1:150 27/OCTOBER/2022 MSSINAI SARAHMOHAMED WDSI_DWD_VP_LLP_6F_05 03 D B DD D CONSTRUCTIONDRAWINGOFWILDHARVEST INPAMCENTERBANDSARMALAYSIA CH2900 CH3200 CH3200 CH3200 CH6400 CH3200 CH2900 CH2900 CH2900 CH3200 CH3200 CH3200 CH3200 CH3200 CH3200 CH3200 CH3200 CH3200 CH3200 CH3200 CH3200CH3200 CH3200 CH3200 CH3200 L1 STORAGE 2.10
VOID VOID VOID CORRIDOR LANDSCAPE VOID VOID BRIDGE 8.43M 1 2 3 4 5 6 7 8 4 RISERS STORAGE1 1.95M STAIR3 VOID NOTE: CLIENT: ARCHITECT: INTERIORDESIGNCONSULTANT: QUANTITYSURVEYOR: PROJECTNAME: NO. DESCRIPTION DATE THISDRAWINGISCOPYRIGHTDRAWING.THEAUTHORIZED USERISTOCHECKALLDIMENSIONONTHESITE.ONLY FIGUREDDIMENSIONTOBEWORKEDON.DISCREPANCIES MUSTBEREPORTEDIMMEDIATELYTOPARTNERSHIPBEFORE PROCESSING. BANKHQ COMPANYARCHITECTS INTERIOR03GROUP QSQUANTITYSURVEYORSDN. BHD. JALANHAPPY,47500SUBANGJAYA LEVEL5,HANDTOWER,46150 PETALINGJAYA COMMONTOWER,50100KUALA LUMPUR QSBUILDING,47500SUBANGJAYA STAIR3 A B C D E F G H I J 1 2 3 4 COWORKINGMEETINGROOM 61859 A/C STAIR3 VOID VOID P-6 OBJECT 44.76M VG1 GARDENCO WORKINGSPACE 31.21 GARDENING WORKSHOP AREA31.21M SINKAND WASHAREA 12.28M DRESSING PODS 7.26M BOTANICAL WORKSTATION 15.90M PLANT PODS 5.85M LABORATORY AREA 56,42M LEFT LEFT ELEVATOR HALL 19.80M PANTRY 6.70 L5 L5 L5 SCALE1:150 SIXTHFLOORFLOORFINISHESPLAN 01 FFP SEC A SEC A FLOORFINISHLEGEND CODE QTY F1 EXPOSEDCONCRETEFLOOR 453.76M(AREA) F2 INDOORGARDENGRAVEL 31.21M(AREA) F3 GREENGRASS 25.76M(AREA) F4 600MM(W)X600MM(L)X12MMTHKPATTERNEDTILE 14.8M(AREA) F5 300MM(W)X300MM(L)X10MM(THK)MATTGREENPORCINETILES 43.50M(AREA) F6 300MM(W)X300MM(L)X10MM(THK)MATTGRAYPORCINETILES
F7 189MM(W)X1500(L)X20(THK)BAMBOOWOODFLOORTILES
F8 400MM(W)X400MM(L)X10MM(THK)BLACKANDWHITEMARBLE TILES
PARTITIONANDWALLLEGEND CODE QTY P1 (OAK)WOODRECYCLEDWALLPANELEASYINSTALL WATERPROOFPLASTICCOMPOSITEWALLPANEL 6.70M LENGTH WA1 I50MMTHKBRICKWALLC/WNIPPONGRAYMATTFINISH PAINT 10.80M LENGTH WA2 150MMTHKWALLC/WNIPPONWHITESEMIGLOSSFINISH 8.90M LENGTH W/C 3.70 W/C 3.70 W/C 3.70 W/C 3.70 LABORATORYAREA BOTANICALWORK BOTANICALWORK COWORKINGMEETINGROOM STORAGE 1.95M EXIT 4.80M EXIT 4.80M STORAGE3 1.95M STORAGE 2.10M LAVATORY 3.70M LAVATORY 3.70M STORAGE 2.10 P1 W/C 3.70 F7 F7 F7 F3 F2 F2 F2 F2 F3 F1 F1 F1 F1 F5 F5 F5 F5 F5 F5 F5 F8 F8 F8 F6 F6 F6 F6 F7 F7 F4 F4 F4 F4 F4 F9 F2 F3 F3 F3 F3 F3 F3 F3 DRAWINGTITLE: SIXTHFLOORFURNITURELAYOUTPLAN SCALE: DATE: CHECKEDBY: DRAWNBY: DRAWINGNO:
1:150
MSSINAI SARAHMOHAMED 03 DOORLEGEND CODE QTY D1
4 D2
5 D3
D4
1 D5
1 D7
2 D 01 D 01 D 01 D 01 D D 07 07 D 03 D 04 D 03 03 D 03 D D 07 D 07 D 07 D 01 D 01 03 D
CODE QTY W1 1500MM(W)X3200MM(H)GLAZINGWITHALUMINUMFRAME12MM TEMPEREDGLASS 31.72(LENGTH) WA1 WA1 WA1 WA1 WA1 WA1 WA1 WA1 WA1 WA1 WA1 WA1 WA1 WA1 WA1 WA1 WA1 WA1 WA1 WA2 WA2 WA2 CONSTRUCTIONDRAWINGOFWILDHARVEST
WDSI_DWD_SM_FFP_6F_06 W1 W1 W1 W1
25.9M(AREA)
18.5M(AREA)
35.44M(AREA)
REVNO.
27/OCTOBER/2022
750MM(W)X2000MM(H)SINGLESWINGWITHPVCDOOR
900MM(W)X2100(H)SINGLEALUMINUMSWINGDOORWITH LAMENTEDGLASS
750MM(W)X2100MM(H)SINGLEALUMINUMSWINGDOORWITH LAMENTEDGLASS 4
1800MM(W)X2100MM(H)DOUBLESWINGDOORC/WALUMINUM FRAME
900MM(W)X2100MM(H)SINGLEALUMINUMSWINGDOORWITH FROSTEDTEMPEREDGLASS
900MM(W)X2100MM(H)EMERGENCYDOORWITHGALVANIZEDSTEEL
WINDOWLEGEND
INPAMCENTER,BANDSAR,MALAYSIA
FLOORFINISHLEGEND
FLOORFINISHLEGEND CODE DESCRIPTION
F1 EXPOSEDCONCRETEFLOOR
F2 INDOORGARDENGRAVEL
F3 GREENGRASS
F4 600MM(W)X600MM(L)X12MMTHKWHITETILE
F5 300MM(W)X300MM(L)X10MM(THK)MATTGREENPORCINE TILES
F6 300MM(W)X300MM(L)X10MM(THK)MATTGRAYPORCINETILES
F7 189MM(W)X1500(L)X20(THK)BAMBOOWOODFLOORTILES
F8 400MM(W)X400MM(L)X10MM(THK)BLACKANDWHITEMARBLE TILES
WALLFINISHLEGEND
WA3 150MMTHKWALLC/WNIPPONPINKMATTFINISH
WA4 309MM(W)X309MM(H)X20MM(THK)PINKMOSAICTILE
CEILINGFINISHLEGEND
CEILINGLEGEND
CODE DESCRIPTION
CP1 150MM(THK)REINFORCEDCONCRETECEILINGC/WOFFWHITE MATTFINISHPAINT
CP2 WOODPLASTICCOMPOSITECEILINGPANELC/WJOTUNWHITE ACRYLICPAINT
CP3 PLASTERCEILINGC/WJOTUNGRAYGLOSSPAINT
CP4 STEELSUSPENDINGCEILINGPANELSC/WJOUTNWHITEPAINT
WINDOWLEGEND
WINDOWLEGEND
CODE DESCRIPTION
W1 1500MM(W)X3200MM(H)GLAZINGWITHALUMINUMFRAME12MM TEMPEREDGLASS
PARTITIONLEGEND PARTITIONLEGEND CODE DESCRIPTION
P1(OAK)WOODRECYCLEDWALLPANELEASYINSTALLWATERPROOF COMPOSITEWALLPANEL
LOOSEFURNITURE
LOOSEFURNITURELEGEND
CODE DESCRIPTION
LF1 700(W)X2470MM(H)WOODDESKC/WWHITEACRYLICPINTWITH SEMIGLOSSFINISH
LF2 600MM(W)X450(H)BLACKMESHOFFICECHAIRWITHWOOD FRAME
LF3 250MMRADIUSCURLERLABCHAIRWOODC/WWHITEANDBLUE PAINT
LF4 700MM(W)X200MM(H)MARBLESINKTOPC/WGLOSSYFINISH
LF5 700MM(W)X750MM(L)X2000MM(H)OFFICEPRIVACYFROSTED NON-TRANSPARENTGLASSPARTITION
BF1 LABORATORYSTRUCTUREMAHOGANYWOODC/WACRYLICWHITE PAINTWITHSEMIGLOOSFINISH BF2 VERTICALGARDENSTEELFRAMEC/WPOWDERPINTMATTE FINISH
A B C D E F G H I J LIFT LOUNGE LOBBY LIFT OFFICE LOBBY OFFICE LIFT LOBBY LAB OFFICE HERB MACHINE SELFREGISTER LIFT LOBBY LIFT LOBBY LIFT LIFT LOBBY LIFT OFFICE LOBBY OFFICE OFFICE LIFT LOBBY OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE
WALLLEGEND CODE DESCRIPTION WA1 I50MMTHKBRICKWALLC/WNIPPONGRAYMATTFINISHPAINT WA2 150MMTHKWALLC/WNIPPONWHITESEMIGLOSSFINISH
RECEPTIONLOUNGE VERTICALGARDEN
BUILTINFURNITURELEGEND BUILT-INFURNITURE CODE DESCRIPTION
SECTIONA-A SCALE1:150 SEATINGAREA1 PRODUCTDISPLAY INTERACTIVE WALL
BF3 PLASTICWORKSHOPPLANTINGSHELFC/WACRYLICBROWN PAINTW/GLOSSYFINISH BF4 TERRAZZOTABLETOPW/SEMIGLOSSFINISH BF5 BRICKBOTANICALWORKSTATIONC/WLIGHTBLACKSTONE TILESW/GLOSSYFINISH
NOTE: CLIENT: ARCHITECT: INTERIORDESIGNCONSULTANT: QUANTITYSURVEYOR: PROJECTNAME: NO. DESCRIPTION DATE THISDRAWINGISCOPYRIGHTDRAWING.THEAUTHORIZED USERISTOCHECKALLDIMENSIONONTHESITE.ONLY FIGUREDDIMENSIONTOBEWORKEDON.DISCREPANCIES MUSTBEREPORTEDIMMEDIATELYTOPARTNERSHIPBEFORE PROCESSING. BANKHQ COMPANYARCHITECTS INTERIOR03GROUP QSQUANTITYSURVEYORSDN. BHD. JALANHAPPY,47500SUBANGJAYA LEVEL5,HANDTOWER,46150 PETALINGJAYA COMMONTOWER,50100KUALA LUMPUR QSBUILDING,47500SUBANGJAYA DRAWINGTITLE: SECTIONA-A SCALE: DATE: CHECKEDBY: DRAWNBY: DRAWINGNO. REVNO. 1:150 1/DESMBER/2022 MSSINAI SARAHMOHAMED WDSI_DWD_SM_SEC_07 02 CONSTRUCTIONDRAWINGOFWILDHARVEST INPAMCENTERBANDSARMALAYSIA SEC 07 CP1 CP1 CP1 CP1 CP1 CP1 CP1 CP2 CP2 CP2 CP2 CP3 CP3 CP3 CP4 CP4 CP4 CP4 CP3 CP3 F1 F1 F1 F1 F1 F2 F2 F2 F2 F3 F8 F3 F3 F3 F3 F3 F4 F4 F4 F4 F4 F4 F5 F5 F8 F5 F5 P1 P1 P1 P1 P1 WA1 WA1 WA1 WA1 WA1 WA2 WA2 WA2 WA2 CP3 WA3 WA2 LF1 LF1 LF2 LF3 LF3 LF3 LF4 LF4 LF4 BF2 BF2 BF3 BF5 OFFICE OFFICE LF4 ROOFLEVEL ROOFTOPFLOORLEVEL SEVENTHFLOORLEVEL SIXTHFLOORLEVEL FIFTHFLOORLEVEL FOURTHFLOORLEVEL THIRDFLOORLEVEL SECONDFLOORLEVEL FIRSTFLOORLEVEL GROUNDFLOORLEVEL BASEMENTFLOORLEVEL
WHITEMARBLESTONE SEATINGTOP THESIDESC/WPORCELAINTILES 8MMTHKTEMPEREDGLASSTOBECONTAINER TOCONTAINTHESALADDRESSING I0MMTHKFROSTEDGLASS CYLINDRICALCONTAINERTOBECONTAINTHE VEGETABLESANDSALADBOWLS 8.2MMTHKHOLLOWSTEELCONVEYERBUILT NICKELCHROMIUMIRONBLADESTOBE CARRYMUSICSPEAKERS/WPOWDER COATINGWHITEPAINTMATTFINISH 4000 4000 820MMRECYCLEDPLASTICPANELBASE TOBEHOLDTHEMACHINEC/WWHITEACRYLICPAINT 50MMTHKWOODTABLEFIBERBOARDTOP C/WWHITEACRYLICPAINT BESPOKEDETAILPLAN SCALE1:20 GD PL WDSI_DWD_SM_BSBD_10 REFTODETAIL SEC A SEC A NOTE: CLIENT: ARCHITECT: INTERIORDESIGNCONSULTANT: QUANTITYSURVEYOR: PROJECTNAME: SCALE: DATE: CHECKEDBY: DRAWNBY: DRAWINGNO. REVNO. NO. DESCRIPTION DATE THISDRAWINGISCOPYRIGHTDRAWING.THEAUTHORIZED USERISTOCHECKALLDIMENSIONONTHESITE.ONLY FIGUREDDIMENSIONTOBEWORKEDON.DISCREPANCIES MUSTBEREPORTEDIMMEDIATELYTOPARTNERSHIPBEFORE PROCESSING. BANKHQ COMPANYARCHITECTS INTERIOR03GROUP QSQUANTITYSURVEYORSDN. BHD. JALANHAPPY,47500SUBANGJAYA LEVEL5,HANDTOWER,46150 PETALINGJAYA COMMONTOWER,50100KUALA LUMPUR QSBUILDING,47500SUBANGJAYA WDSI_DWD_SM_BSLP_08 02 SARAHMOHAMED Ms.SINAI 1DECEMBER2022 1:20 BESPOKEDETAILPLAN DRAWINGTITLE: CONSTRUCTIONDRAWINGOF INPAMCENTER,BANDSAR,MALAYSIA WILDHARVEST
10MM(THK)SPUN-COPPERWOOFERSPEAKERS, BASEFROMTHETOPTOTHEBOTTOMOFTHE FREQUENCYRESPONSERANGEFROM32HZTO120HZ.
(REFTODETAIL)
1340 1340
WDSI_DWD_SM_BSBD_10
I0MMTHKFROSTEDGLASS CYLINDRICALCONTAINERTOBECONTAINTHE VEGETABLESANDSALADBOWLS
WDSI_DWD_SM_BSSC_09
NOTE: CLIENT: ARCHITECT: INTERIORDESIGNCONSULTANT: QUANTITYSURVEYOR: PROJECTNAME:
NO. DESCRIPTION DATE THISDRAWINGISCOPYRIGHTDRAWING.THEAUTHORIZED USERISTOCHECKALLDIMENSIONONTHESITE.ONLY FIGUREDDIMENSIONTOBEWORKEDON.DISCREPANCIES MUSTBEREPORTEDIMMEDIATELYTOPARTNERSHIPBEFORE PROCESSING. BANKHQ COMPANYARCHITECTS INTERIOR03GROUP QSQUANTITYSURVEYORSDN. BHD.
02
BESPOKESECTIONA-A SCALE1:30 SEC 07
2390
SCALE: DATE CHECKEDBY: DRAWNBY: DRAWINGNO. REVNO.
JALANHAPPY,47500SUBANGJAYA LEVEL5,HANDTOWER,46150 PETALINGJAYA COMMONTOWER,50100KUALA LUMPUR QSBUILDING,47500SUBANGJAYA
SARAHMOHAMED Ms.SINAI 1DECEMBER2022 1:30 BESPOKESECTIONA-A DRAWINGTITLE: CONSTRUCTIONDRAWINGOF INPAMCENTER,BANDSAR,MALAYSIA WILDHARVEST
SIXTHFLOORLEVEL NICKELCHROMIUMIRONHOLLOWFORMTO DESIGNRECTANGULARBLADESC/WPOWDERCOATING WHITEPAINTMATTFINISH 8.2MMTHKSTAINLESSSTEELCONVEYORBELTSYSTEM HEATRESISTANTTOHELDTHEPLANTS 8MMTHKTEMPEREDGLASSTOBECONTAINER TOCONTAINTHESALADDRESSING 4000
50MMTHKWOODTABLEFIBERBOARDTOP C/WWHITEACRYLICPAINT 820MMRECYCLEDPLASTICPANELBASE TOBEHOLDTHEMACHINEC/WWHITEACRYLICPAINT 1200 1400 1400 1218
REFTODETAIL
2.5MMTHKHOLLOWMATTWHITE STAINLESSSTEELLEG STEELBOLTHEAD 2MM(L)X16MM(W)STEELSCREW HEXAGONNUT RUBBERPADS CLAMPMAXOPENIS55MM(REFERTO MANUFACTUREDETAIL) BESPOKEBLOW-UPDETAIL SCALE1:5 GD DT 30 50 179,4 NICKELCHROMIUMIRONJOINTC/W POWDERCOATINGWHITEPAINT 13 (REFERTOMANUFACTUREDETAIL) NOTE: CLIENT: ARCHITECT: INTERIORDESIGNCONSULTANT: QUANTITYSURVEYOR: PROJECTNAME: SCALE: DATE CHECKEDBY: DRAWNBY: DRAWINGNO. REVNO. NO. DESCRIPTION DATE THISDRAWINGISCOPYRIGHTDRAWING.THEAUTHORIZED USERISTOCHECKALLDIMENSIONONTHESITE.ONLY FIGUREDDIMENSIONTOBEWORKEDON.DISCREPANCIES MUSTBEREPORTEDIMMEDIATELYTOPARTNERSHIPBEFORE PROCESSING. BANKHQ COMPANYARCHITECTS INTERIOR03GROUP QSQUANTITYSURVEYORSDN. BHD. JALANHAPPY,47500SUBANGJAYA LEVEL5,HANDTOWER,46150 PETALINGJAYA COMMONTOWER,50100KUALA LUMPUR QSBUILDING,47500SUBANGJAYA 02 SARAHMOHAMED Ms.SINAI 1DECEMBER2022 1:5 BESPOKEBLOW-UPDETAIL DRAWINGTITLE: CONSTRUCTIONDRAWINGOF INPAMCENTER,BANDSAR,MALAYSIA WILDHARVEST WDSI_DWD_SM_BSBD_10 DETAIL1
LF3 F8 F6 WA1 F4 BF1 BF4 BF3 F4 F4 CP1 W1 CP1 BF5 F8
F8 150MM(THK)REINFORCED CONCRETECEILINGC/W OFFWHITEMATTFINISH PAINT 300MM(W)X300MM(L)X 10MM(THK)MATTGREEN PORCINETILES I50MMTHKBRICKWALL C/WNIPPONGRAYMATT FINISHPAINT PLASTICWORKSHOP PLANTINGSHELFC/W ACRYLICBROWNPAINT W/GLOSSYFINISH BRICKBOTANICAL WORKSTATIONC/W LIGHTBLACKSTONE TILESW/GLOSSY FINISH LABORATORYSTRUCTURE MAHOGANYWOODC/W ACRYLICWHITEPAINT WITHSEMIGLOOSFINISH 400MM(W)X400MM(L) X10MM(THK)BLACK ANDWHITEMARBLE TILES 1500MM(W)X3200MM(H) GLAZINGWITH ALUMINUMFRAME 12MMTEMPERED GLASS 250MMRADIUS CURLERLABCHAIR WOODC/WWHITE ANDBLUEPAINT TERRAZZOTABLE TOPW/SEMIGLOSS FINISH 600MM(W)X600MM (L)X12MMTHKWHITE TILE
BOTANICALBOUNTYMALAYSIASDN.BHD. 99L,JLNTANDOK,BANGSAR, 59100KUALALUMPUR, FEDERALTERRITORYOFKUALALUMPUR
BILLOFQUANTITIES
QUOTATION
DATE :23NOV2022 QUOTENO.:ML/DWD/GD/11 :CHEQUE/CASH TERM
ATTENTION: RENOVATIONWORKSFORBOTANICALBOUNTYMALAYSIASDN.BHD.
BILLOFQUANTITIES
DRYWALLPARTITIONWORKS
Tosupplymaterialandlabourtoinstall
1 P1 8 SQM
ECO-WOODWATERPROOFPARTITION DURABLEPVCWPCHOLLOWTIMBERTUBES atcoworkingarea
CEILINGWORK
Tosupplymaterialandlabourtoinstall 1220MMX2440MMX25MMSTEELSUSPENDING CEILINGPANELSC/WJOUTNWHITEPAINT atcoworkingarea
BILLOFQUANTITIES
PAINTINGWORK
Tosupplymaterialandlabourtopaint CEILING PLASTERCEILINGWITHWHITEJOTUN JOTAPLASTMAXWHITEINTERIORPAINT
Code:0851(white) BUILT-INFURNITURE
Tosupplyandinstall LABORATORYSEATINGAREASTRUCTURE MAHOGANYWOODC/WACRYLICWHITEPAINT WITHSEMIGLOOSFINISH ApproxArea:45SQM
BF1 1 SET
Tosupplyandinstall VERTICALGARDENSTEELFRAME C/WPOWDERPINTMATTEFINISH ApproxArea:16SQM
BF2 1 SET
Tosupplyandinstall BRICKBOTANICALWORKSTATIONC/WLIGHT GREENSTONETILESW/GLOSSYFINISH ApproxArea:30SQM
TILINGWORK
Tosupplymaterialandlabourtoinstall FLOOR 900MM(W)X1500(L)X20(THK)BAMBOO WOODFLOORTILES atcoworkingarea
Tosupplymaterialandlabourtoinstall 600MM(W)X600MM(L)X12MMTHKPATTERNED
TILE atcoworkingarea
Tosupplymaterialandlabourtoinstall 400MM(W)X400MM(L)X10MM(THK)BLACKAND WHITEMARBLETILES atbotanicalworkingstation
WALL
Tosupplymaterialandlabourtoinstall 309MM(W)X309MM(H)X20MM(THK)PINK MOSAICTILE
Tosupplymaterialandlabourtoinstall 309MM(W)X309MM(H)X20MM(THK)PINK
MOSAICTILE
F7 120 SQM
F4 350 SQM
F8 160 SQM
2 CP4 56 SQM 3
WA4 70 SQM
5 6 7
LOOSEFURNITURE
Tosupplyandinstall SELECTED700(W)X2470MM(H)WOODDESKC/W WHITEACRYLICPINTWITHSEMIGLOSSFINISH
Tosupplyandinstall atcoworkingarea
ELECTRICALWORKS
LIGHTING
Tosupplymaterialandlabourtoinstall
LEDSURFACEMOUNTED18W(BUILT-INLED) FORCONCRETECEILINGPLASTERCEILING
LF1 LF2
1 4 8 NOS
BF5 NOS atbotanicalcoworkingarea 600MM(W)X450(H)BLACKMESHOFFICE CHAIRWITHWOODFRAME
L2 6 NOS
Tosupplymaterialandlabourtoinstall SURFACEMOUNTEDLEDDOWNLIGHT28W 10 L3 NOS
atcoworkingarea atcoworkingarea
WINDOWWORK
BOTANICALBOUNTYMALAYSIASDN.BHD
NO. DESCRIPTION CODE QTY UNITRATE(RM)TOTAL(RM)
CODE QTY UNITRATE(RM)TOTAL(RM)
NO. DESCRIPTION
4 CP1 50 SQM
Tosupplymaterialandlabourtoinstall 1500MM(W)X3200MM(H)GLAZINGWITH ALUMINUMFRAME12MMTEMPEREDGLASS 64 W1 SQM
6.
1.
2. 3.
TERMSANDCONDITION
Validity:14Days
Periodofcompleted:60Days(referofdownpaymentuponconfirmationoforder)
AllDimensionsubjecttoFinalsitemeasurement.
4.4VariationOrder:AnyalterationnotspecifiedinthequotationwillbeissuedundervariationorderfollowwithaninvoiceVariationOrder(V.O.)
5.PaymentTerms:
THECONTRACTSUMRUM
StageUponconfirmationofproject/service
StageIIProgressClaim(Installationoffixtures&fittings)
StageIIIProgressClaim(Completionoffixtures&fittings)
StageIVFinalpayment(Fullcompletionofallworks)
Services/worksshallcommenceuponreceiptofpaymentofeachphaseexceptforfinalphase.Timeframeofworkthathasbeenagreedby both.
Alloutstandingamountsmustbepaidwithinten(10)workingdaysafterthehandoverofsite(excludeV.O.period).
BOTANICALBOUNTYMalaysiaSdn.Bhd.donotholdanyresponsibilitiesindelayofworkfromtheagreedtimeframethatisresultedbypaymentissues. Paymentnotmadewithinabovementionedperiodwillcarryinterestattherateof2%permonth(30Days)untilfullpaymentismade. Chequeshouldbecrossed“A/CPayee”&MadePayabletoBOTANICALBOUNTYMalaysiaSdn.Bhd.
BOTANICALBOUNTYMalaysiaSdn.Bhd.Shallnotinanycircumstancesoranyreasonwhatsoeverbeliableforanylosses,damages, cost,expenses,including, withoutlimitation,direct,indirect,specialorconsequentialdamagesoreconomiclossesarisingfromanysuchfailuretoperform.
Design/Works/ServiceDisclaimer
BOTANICALBOUNTYMalaysiaSdn.Bhd.Cannotbeheldresponsiblefordesign/works/servicethatmaylaterbeundesirableorcauseinconvenience.TheClient understandsthatalldesigns/contractorinterpretstheClient’srequirementsandwishes.However,anydesign/worksthatarenotdoneaccordingto agreedasperquotedshallberectifiedaccordinglybyBotanicalbountyMalaysiaSdn.Bhd.
7.ProjectAccess
ClientwillprovideBOTANICALBOUNTYMalaysiaSdn.Bhd.Withaccesstotheprojectandallinformationthatmayberequiredtocompletetheproject.Failureto dosobytheClientprovidesBOTANICALBOUNTYMalaysiaSdn.Bhd.Therighttoterminateservice(withawrittennotice)andcollectoutstandingbalances.
8.TerminationofService
BotanicalbountyMalaysiaSdn.Bhd.Hastherighttoterminateorsuspendallworks/services,uponwrittennotice,iftheClientfailstomakepayments/ defaultinaccordancewiththementionedtermsandconditionsherein.
TerminationshallbewithoutprejudicetoallotherrightsandremediesofBOTANICALBOUNTYMalaysiaSdn.Bhd.andClientshallremainliableforall Withinfive(5)Workingdaysofterminationofourserviceforanyreasons,BotanicalbountyMalaysiaSdn.Bhd.shallsubmittoClientanitemizedinvoice foranyfeesorexpensesaccruedunderthisquotation.TheClient,uponpaymentofaccruedamountssoinvoiced,shallthereafterhaveno furtherliabilityorobligationstoBOTANICALBOUNTYMalaysiaSdn.Bhd.whatsoeverforanyfurtherfeesorexpensesarisinghereunder.
9.ProjectTimeFrame&Feesforextraservice
Reasonabletimeframefordrawingsaretobediscussed&agreedbybothpartyBOTANICALBOUNTYMalaysiaSdn.Bhd. Estimatedtimeframeforentireproject’stimeframeinclusiveofrevisionperiodwillbeamaximumofTWO(2)MONTHSstartsfromdateof appointment.
Ifprojectexceedtheestimatedtimeframe,anadditionalminimumfeeofRM200permonthwillbecharged,asconsultationfeesonly,excluded reimbursementclaim&sitevisitcharges.Subjecttotheproject&remainingjobscope.
10.SiteVisit,Inspection&Travelling
SitevisitorinspectionservicesthatrequiresBOTANICALBOUNTYMalaysiaSdn.Bhd.totravelbyair(overseas,Sabah,Sarawak)aresubjecttoclaimall.
11.AcknowledgementofQuotedFees,Terms&Conditions
Uponreceivingpaymentaccordingtothepercentagestatedabove,wewillacknowledgethatyouhaveread&agreedonourscopeofdesign works/services,fees,terms&conditions.Thisquotationshallbetreatedasacontractlegallyoncebeingsigned.
Englishlanguages/wordingsshallprevailandbeusedascontracttermsshallanydiscrepanciesariseduetotranslations.
ISSUEBY
COMPANYNAME
BOTANICALBOUNTYMalaysiaSdn.Bhd. DIRECTOR
Acknowledge&AgreedBy,
SignaturewithI.C.Number (NAME: (ICNO.: ) )
BOTANICALBOUNTYMALAYSIASDN.BHD
WALLFINISHES
WA1
NIPPONPAINT(M)SDN.BHD.LOTI, 17,JALANSU4,TAMANPERINDUSTRIAN SUBANGUTAMA,40300SHAHALAM, SELANGOR WA2
NIPPONPAINT(M)SDN.BHD.LOTI,17, JALANSU4,TAMANPERINDUSTRIAN SUBANGUTAMA,40300SHAHALAM, SELANGOR WA3
NIPPONPAINT(M)SDN.BHD. LOTI,17,JALANSU4,TAMAN PERINDUSTRIANSUBANGUTAMA,40300 SHAHALAM,SELANGOR
JUBINCANTIK JalanJenaris2c,TAMANPERINDUSTRIAN SRIJENARIS,43000Kajang,Selangor
CYCeiling&Renovation 47,JalanPU9/1,TamanPuchongUtama, 47140Puchong,Selangor
SCHEDULEOFFINISHES
IMAGE AREA(SQM) LOCATION DESCRIPTION SUPPLIER
CODE
-COWORKINGAREA -WASHINGAREA
I50MMTHKBRICKWALLC/WNIPPONGRAYMATTFINISHPAINT
-PLANTINGWORKSHOP -AREA
150MMTHKWALLC/WNIPPONWHITESEMIGLOSSFINISH
-LOUNGEWAITINGAREA150MMTHKWALLC/WNIPPONPINKMATTFINISH
-SELFREGISTRATION WAITINGAREA 309MM(W)X309MM(H)X20MM(THK)PINKMOSAICTILE
WA4
CEILINGLEGEND CP1 -COWORKINGAREA -BOTANICALSSTATION -PLANTEXTRACTMACHINE -WASHAREA 150MM(THK)REINFORCEDCONCRETECEILINGC/WOFFWHITEMATT FINISHPAINT
CP2 -LEFTLOBBYAREA WOODPLASTICCOMPOSITECEILINGPANELC/WJOTUNOFFWHITE ACRYLICPAINT
CP3 -EXIT -STORAGE PLASTERCEILINGC/WJOTUNGRAYGLOSSPAINT
-PLANTINGWORKSHOP AREA STEELSUSPENDINGCEILINGPANELSC/WJOUTNWHITEPAINT
NIPPONPAINT(M)SDN.BHD. loti,17,jalansu4,tamanperindustriansubang utama,40300shahalam,selangor
EasyWoodSdnBhd 4,JlnBP5/8,BandarBukitPuchong,47100 Puchong,Selangor
JotunPaintsMalaysiaSdn.Bhd. Lot7,PersiaranPerusahaan,Seksyen23, 43700ShahAlam,Selangor CP4
25.30 120.00 14.50 30.24 14.20 19.80 31.12 24.00 23.60 12.20 9.60 7.50
FLOORFINISHES
FLOORINCMARKETINGSDNBHD 1,JalanUtama2/18,TamanPerindustrian PuchongUtama,47100Puchong,Selangor F2 -COWORKINGAREA -INDOORGARDENGRAVEL
MAXISTONEMARKETING
LOT48,jalansubang-sungaibulohoffkota damansara, 47000sungaibuloh,selangor. malaysia F3 -SALADMACHINE(OBJECT)-GREENGRASS
GRASSMASTER No.13,JalanRT8A,TamanRawangTin,48000 RawangSelangor. F4 -PLANTEXTRACTMACHINE -PLANTPODS -600MM(W)X600MM(L)X12MMTHKWHITETILE
JUBINCANTIK
JalanJenaris2c,TAMANPERINDUSTRIANSRI JENARIS,43000Kajang,Selangor
JUBINCANTIK
JalanJenaris2c,TAMANPERINDUSTRIANSRI JENARIS,43000Kajang,Selangor F7 -LEFTLOBBY -189MM(W)X1500(L)X20(THK)BAMBOOWOODFLOORTILES
EasyWoodSdnBhd 4,JlnBP5/8,BandarBukitPuchong,47100 Puchong,Selangor F8 -WASHAREA -400MM(W)X400MM(L)X10MM(THK)BLACKANDWHITEMARBLE TILES
JUBINCANTIK
JalanJenaris2c,TAMANPERINDUSTRIANSRI JENARIS,43000Kajang,Selangor F9 -PANTRY -PATTERNEDCOLOREDTILE
JUBINCANTIK
JalanJenaris2c,TAMANPERINDUSTRIANSRI JENARIS,43000Kajang,Selangor
SCHEDULEOFFINISHES
CODE IMAGE AREA(SQM) LOCATION DESCRIPTION SUPPLIER
F1 -EXIT -STORAGE1 -STORAGE2 -STORAGE3 -EXPOSEDCONCRETEFLOOR
F6 -PLANTEXTRACTMACHINE -PLANTPODS -300MM(W)X300MM(L)X10MM(THK)MATTGREENPORCINE TILES
9.60 2.10 2.10 2.68 3.64 31.21 44.76 56,42 5.85 44.76 44.76 44.76 44.76 44.76 44.76
COOLEDVisionSdnBhd No29,JalanSILC2/19,KawasanPerindustrianSILC,79200 IskandarPuteri,Johor,Malaysia.
PHILIPSSPOTLIGHT/DOWNLIGHT
A-G-3A,KuchaiExchange, No.43,JalanKuchaiMaju13, 58200KualaLumpur, Malaysia.
CEILINGLIGHT Selangor,KualaLumpur(KL),Puchong...
JLLELECTRICALSDNBHD a-g-3a,kuchaiexchange, no.43,jalankuchaimaju13, 58200kualalumpur, malaysia.
JLLELECTRICALSDNBHD a-g-3a,kuchaiexchange, no.43,jalankuchaimaju13, 58200kualalumpur, malaysia.
JLLELECTRICALSDNBHD a-g-3a,kuchaiexchange, no.43,jalankuchaimaju13, 58200kualalumpur, malaysia.
DAIKINMALAYSIASALES&SERVICESDN. BHD.(HQ)
TB-L22,Level22,TowerB,Plaza33,1,JalanKemajuan, Seksyen13,46200PetalingJaya,Selangor
SCHEDULEOFELECTRIC,LIGHTINGANDEQUIPMENTS CODE IMAGE DESCRIPTION LOCATION PRICE(UNIT) RM QTY SUPPLIER
SURFACEMOUNTEDLEDDOWNLIGHT28W
RM31.40 7
PLANTINGWORKSHOP,WASHAREA L3
SIXTHROOM
CEILINGRECESSEDSPOTLIGHT18W
RM17.90 15
L4
SIXTHROOM
LEDCEILINGLAMP,NICKEL-PLATED28W
RM43.44
L5
SIXTHROOM
5
THREEGANGTWOWAYSWITCH
L7
SIXTHROOM RM14.30 2
L8 150MM(THK)REINFORCEDCONCRETECEILING C/WOFFWHITEMATTFINISHPAINT SIXTHROOM RM6.50 2
L9 SCHNEIDERVIVACE13ASWITCHSOCKET SIRIM
RM19
SIXTHROOM
6
L10 840(W)MMX840(L)MMX246MM(H)DIKINR32 2HPCEILINGCASSETTE SIXTHROOM RM2,519.00 2
PHILIPSSPOTLIGHT/DOWNLIGHT
A-G-3A,KuchaiExchange, No.43,JalanKuchaiMaju13, 58200KualaLumpur, Malaysia.
PHILIPSSPOTLIGHT/DOWNLIGHT A-G-3A,KuchaiExchange, No.43,JalanKuchaiMaju13, 58200KualaLumpur, Malaysia.
JLLELECTRICALSDNBHD a-g-3a,kuchaiexchange, no.43,jalankuchaimaju13, 58200kualalumpur, malaysia.
JLLELECTRICALSDNBHD a-g-3a,kuchaiexchange, no.43,jalankuchaimaju13, 58200kualalumpur, malaysia.
JLLELECTRICALSDNBHD a-g-3a,kuchaiexchange, no.43,jalankuchaimaju13, 58200kualalumpur, malaysia.
JLLELECTRICALSDNBHD a-g-3a,kuchaiexchange, no.43,jalankuchaimaju13, 58200kualalumpur, malaysia.
DaikinMalaysiaSales&ServiceSdn.Bhd.(HQ) TB-L22,Level22,TowerB,Plaza33,1,JalanKemajuan,Seksyen 13,46200PetalingJaya,Selangor
SCHEDULEOFELECTRIC,LIGHTINGANDEQUIPMENTS CODE IMAGE DESCRIPTION LOCATION PRICE (UNIT)RM QTY SUPPLIER PLANTEXTRACTSATIATION L4 CEILINGRECESSEDSPOTLIGHT18W SIXTHROOM RM17.90 15
L5 LEDCEILINGLAMP,NICKEL-PLATED28W SIXTHROOM RM43.44 5
L7 TWOGANGTWOWAYSWITCH SIXTHROOM RM11.40 3
L11 SCHNEIDEREPIENO1GANG1WAYSWITCH SIXTHROOM RM6.50 2
L13 SCHNEIDEREPIENO3GANG1WAYSWITCH SIXTHROOM RM14.30 1
L9 SCHNEIDERVIVACE13ASWITCHSOCKET SIRIM SIXTHROOM RM19 3
L10 840(W)MMX840(L)MMX246MM(H)DIKINR32 2HPCEILINGCASSETTE SIXTHROOM RM2,519.00 2
DECASALIGHTING ,38,JalanSuriaPuchong1,PusatPerniagaanSuria,47110 Puchong,Selangor
LIMSEONGHAILIGHTINGSDNBHD G2&1-2,JlnKajangPerdana3/1,TamanKajangPerdana,43000 Kajang,Selangor
JLLELECTRICALSDNBHD a-g-3a,kuchaiexchange, no.43,jalankuchaimaju13, 58200kualalumpur, malaysia.
JLLELECTRICALSDNBHD a-g-3a,kuchaiexchange, no.43,jalankuchaimaju13, 58200kualalumpur, malaysia.
JLLELECTRICALSDNBHD a-g-3a,kuchaiexchange, no.43,jalankuchaimaju13, 58200kualalumpur, malaysia.
JLLELECTRICALSDNBHD a-g-3a,kuchaiexchange, no.43,jalankuchaimaju13, 58200kualalumpur, malaysia.
KELIPKELIPLEDFLASHINGOUTKELUARSIGN https://shopee.com.my/KELIP-KELIP-LED-Flashing-Out-keluar-SignSign-BE1ST-101B-(Sirim-Fire-Approved)-(-BOMBA-APPROVED-)-i. 26891361.6279570043
SCHEDULEOFELECTRIC,LIGHTINGANDEQUIPMENTS CODE IMAGE DESCRIPTION LOCATION PRICE(UNIT) RM QTY SUPPLIER W/C,LAVATORY,EXIT,STORAGE1,2,3,4 L1 CROCSFALED-CEILINGSPOTLIGHT16W SIXTHROOM RM18.90 11
L2 LEDSURFACEMOUNTED18W(BUILT-INLED )FORCONCRETECEILINGPLASTERCEILING SIXTHROOM RM20
L11 ONEGANGONEWAYSWITCH SIXTHROOM RM6.50 2
L15 ONEGANGETWOWAYSWITCH SIXTHROOM RM6.50 2
L7 TWOGANGTWOWAYSWITCH SIXTHROOM RM14.30 4
L13 THREEGANGONEWAYSWITCH SIXTHROOM RM14.30 2
L10 840(W)MMX840(L)MMX246MM(H)DIKINR32 2HPCEILINGCASSETTE SIXTHROOM RM59.80 2
PHILIPSSPOTLIGHT/DOWNLIGHT A-G-3A,KuchaiExchange, No.43,JalanKuchaiMaju13, 58200KualaLumpur, Malaysia.
PHILIPSSPOTLIGHT/DOWNLIGHT A-G-3A,KuchaiExchange, No.43,JalanKuchaiMaju13, 58200KualaLumpur, Malaysia.
JLLELECTRICALSDNBHD a-g-3a,kuchaiexchange, no.43,jalankuchaimaju13, 58200kualalumpur, malaysia.
JLLELECTRICALSDNBHD a-g-3a,kuchaiexchange, no.43,jalankuchaimaju13, 58200kualalumpur, malaysia.
JLLELECTRICALSDNBHD a-g-3a,kuchaiexchange, no.43,jalankuchaimaju13, 58200kualalumpur, malaysia.
DAIKINMALAYSIASALES&SERVICESDN.BHD. (HQ) TB-L22,Level22,TowerB,Plaza33,1,JalanKemajuan,Seksyen 13,46200PetalingJaya,Selangor
SCHEDULEOFELECTRIC,LIGHTINGANDEQUIPMENTS CODE IMAGE DESCRIPTION LOCATION PRICE (UNIT)RM QTY SUPPLIER COWORLKING1,OBJECTAREA L6 CEILINGGLASSLAMPSPOTLIGHT18W SIXTHROOM RM99 4
L5 LEDCEILINGLAMP,NICKEL-PLATED28W SIXTHROOM RM43.44
IKEADamansara 2,JalanPJU7/2,MutiaraDamansara,47800PetalingJaya,Selangor
L3 TWOGANGTWOWAYSWITCH SIXTHROOM RM17.90
L7 SCHNEIDEREPIENO3GANG2WAYSWITCH SIXTHROOM RM14.30 2
L11 ONEGANGONEWAYSWITCH SIXTHROOM RM6.50
L9 SCHNEIDERVIVACE13ASWITCHSOCKET SIRIM SIXTHROOM RM19 6
L10 840(W)MMX840(L)MMX246MM(H)DIKINR32 2HPCEILINGCASSETTE SIXTHROOM RM2,519.00 2
r e f l e c t i o n
In this course, I learned a lot about technical drawing. I developed a lot in terms of drawing lines and their appropriate thickness for each purpose. I was also able to link the 3D design and the technical drawings and know how to make schedules of materials and bill of quantities ,etc.. and link them to each other. I faced some challenges at the beginning, but I learned to solve the problem and correct the mistakes In a efficiently , the result was satisfaction and I'm happy with the finale out
a)UBBL usage
A good building design is supposed to cater all of the requirements needed for the purpose of the design. The spaces within the building must provide conditions appropriate to the activities satisfactory for comfort and safety of the occupants. in this Building design multi of UBBL used such as emergency exit sign the ventilation etc... these requirements i.e. functional, user, performance and statutory requirements in order to achieve the design goals and comfort
b)Material Selection and application
Choosing the right material is essential for any design success. in this project all the material chosen are consider to achieve the Maine purposes which surfed the function of the design and Durable enough to stand in the test of time not only that also it is Aesthetic outcome and the fine balance between appearance, durability and cost its important All this has been achieved to ensure sufficient comfort for customers and the sustainability of the design.
c)Sustainability –GreenDesign &Efficiency
In this Sustainable design it seeks to reduce negative impacts on the environment, and the health and comfort of building and occupants, therefore improving building performance. The basic objectives of sustainability in this design is the Materials chosen are to reduce consumption of non-renewable resources, minimize waste, and create healthy, productive environments.
REFLECTION
ASSIGNMENT 02
AS-BUILT DRAWINGS +SUSTAINABLE EDUCATION HUB’
IN ORDER TO COMPLETE THIS ASSIGNMENT, WE MUST IDENTIFY PRIOR RESEARCH ON OFFICE LAYOUTS AND COWORKING SPACES HUBS. WE MUST ALSO RECOGNISE THE LAYOUT IN ORDER TO EXTRACT THE PRIOR RESEARCH'S SCHEDULE OF ACCOMMODATION (SOA) AND FURNITURE AND EQUIPMENT (FF&E). ADDITIONALLY, IT TEACHES THE STUDENTS TO THE UBBL AND/OR FIRE REGULATIONS THAT MUST BE TAKEN INTO CONSIDERATION WHEN CONSTRUCTING THE AREA. IT IS THE GOAL TO HELP STUDENTS COMPREHEND HOW LAYOUT DESIGN RELATES TO UBBL AND/OR FIRE REQUIREMENTS. PLAN, INTERNAL ELEVATION, SECTION, SOA, FF&E, AND AN ANALYSIS LINKED TO UBBL AND MATERIALS APPLICATION BASED ON THE CHOSEN PRECEDENT STUDY ARE AMONG THE AS-BUILT DRAWINGS THAT STUDENTS WILL BE COMPLETING. PRECEDENT STUDY, PDF OF CAD DRAWINGS IN A3 FORMAT DOCUMENTATION + MEASUREMENT SCHEDULE OF ACCOMMODATION (SOA), UBBL & FIRE REQUIREMENTS, FF&E, SUSTAINABLE DESIGN
REQUIREMENTS:
DETAILING & WORKING DRAWING MODULE - IDS 60804. ASM 02: Sustainable Education Hub NANE : SARAH MOHAMED BINNABHAN STUDENT ID: 0346977 TOUTER: MS. FATIMAH KHAIRI SEMESTER : AUGUST - DECEMBER 2022
REVISIONTRACKING
SHEETNAME REV DATE DESCRIPTION ISSUE
DRAWINGLIST
INDIVIDUALPRESIDENTSTUDY 0 22/9/2022 NO
CW__DWD__SM__FLP_01 EXITINGGRANDFLOORPLAN 4 13/10/2022 _ NO
CW__DWD__SM__SEC_01 SECTIONA_A 3 13/10/2022 NO CW__DWD__SM__ELE_01 INTERNALELEVATION1 3 13/10/2022 NO
CW_SM_DWD_BFP_02 BESPOKEDETAILPLAN 3 13/10/2022 _ NO CW_SM_DWD_BFE_02 BESPOKEDETAILFRONTELEVATION 3 13/10/2022 _ NO CW_SM_DWD_BSS_03 BESPOKEDETAILSECTIONA_A 2 13/10/2022 NO __ INDIVIDUALUBBL&FIREREQUIREMENT 0 12/10/2022 _ NO __ SCHEDULEOFFINISHES 2 13/10/2022 _ NO __ SCHEDULEOFACCOMMODATION _ 13/10/2022 NO DOORSCHEDULE 15/10/2022 NO __ WINDOWSCHEDULE _ 15/10/2022 _ NO FIXTURE,FITTINGANDEQUIPMENT SCHEDULE 13/10/2022 NO INDIVIDUALREFLECTION 0 13/10/2022 NO
BOHO Décor is a newly built office that was designed to meet with the company's culture and inspire its enthusiastic team. The architectsuseacoredesigntonavigateeyesightintotheheartofthe office,wheretheycreateanalternativeoasisofviewforthepeople.
. Communal spaces & distinctive public features like the reception, construction desk, gallery hall & printing rooms… are gathered into a central space which is called ‘The Core'. They then distribute the main working desk sections around with their sights towards The Core. That way, the office speaks for its spirit of teamwork and gettogether energy. Apart from that, meeting rooms are located privately in the corner to ensure total focus and privacy for all meetingsessions.
INTERIOR SPACES:
The architects also use colors to set the right mood and tone for each distinctive space. For example, bright yellow and neutral gray, representing creativity & professionalism, are used to give the common area a modern dynamic look. While deep blue & muted green, representing wisdom & growth, are used entirely for the meeting rooms.
SECOND FLOOR
COLOR SCHEME :
FIRST FLOOR TERAZO
BOHO DÉCOR HEAD OFFICE ABOUT GREEN MEETING ROOM GALLERY HALL CEO ROOM COFFE LOUNGE PRINTING ROOM LEGEND LEGEND DESK SECTIONS #658354 #40B5BC #7095BC #40B585 CALL ROOMS ARCHITECT PHILOSOPHY SCHEDULE OF ACCOMMODATION RECEPTION FIRST FLOOR SECOND FLOOR MATERIALS GRAY PARQUET FLOATING GLASS CARBET WHITE WOOD SECTIONAL VIEW Architects: BOHO Décor Area : 780 m² Year : 2021 RECEPTION PRINTINGROOM CEOROOM GREENMEETING COFFELOUNGE STORAGEROOM ROOM INDIVIDUAL PRECEDENT STUDY
CHOSEN PRECEDENT STUDY
1 2 3 4 5 6
6497 6032 5888 6021 5987
GROUPMANGER GROUPMANGER
CH1 CH1 CH1 CH1 CH1
CH1
MEETINGROOM 14m
GROUPMANGER
MEETINGROOM 14m PLAYZONE 17m
D2 D2 D2 D2
OPENOFFICES OPENOFFICES ELECTRICALROOM 3.59m ELECTRICALROOM 3.59m ELECTRICALROOM
CH1 CH1
F06 D2 F07
GROUPMANGER MEETINGROOM 22.4m
OPENOFFICES OPENOFFICES GROUPMANGER
CH1 D2 D2
ELECTRICALROOM
D1 D1 D1 D1 D4
D1 D1
CORRIDOR ELEVATORHALL 35m
D1
D1 D1
D3 D3 D3 D3 D3 D3
D2 D2 D2 D2
D2 D2 D1 TP1
OPENOFFICES
CH1
TP1 TP2 F02 CH2 CH2
CH2
5944 38858 A B C D E F G SEC SEC A A EL 1
CH1 CH1
CH1
SOCIALAREA
CH1 CH1
10MM(THK)DARKGRAYMARBLE TILESINGLOSSFINISH D1 GROUPMANGER
MEETINGROOM PROPOSEDINTERIOROFFICEAT INGBANKTURKEYHQ FORBANKHQ.SDN.BHD
GROUPMANGER
D1 SINGLELEAFDOOR 9 D2 ALUMINUMFRAMESINGLEGLASSDOOR 10 D3 SINGLELEAFDOOR 6 F02 900MM(L)X900MM(W)XI0MM(THK) DARKGRAYPORCELAINTILESINMATTE FINISH F06 I50MM(L)X900MM(W)X7MM(THK) RUSTICOAKTIMBERFLOORING F07 600MM(L)X600MM(W)X10MM(THK) LIGHTGRAYPORCELAINW/POLISHED FINISH
CH1 BLACKMESHCHAIROFFICE600Wx 470DX890MM(H) 112 CH2 ITALIANSTYLEWOODENMODERN LEATHERCURVEDCHAIR600Wx470MM (D)X890MM(H) 9
TP1 BROWNCOKLATMEETINGWOODEN TABLEDESK3000MM(L)x1200 (W)x740MM(H) 10
GROUPMANGER 15OCT2022 1:100 MS.FATIMAH SARAHMOHAMED CW__DWD__SM__FLP_01 4
DRAWINGTITLEFURNITURELAYOUTPLANPFFIRSTFLOOR
SCALE1:100 FURNITURELAYOUTPLANPFFIRSTFLOOR 01 FLP CORRIDOR
5943 5971 5998 6127 5827 NOTE: CLIENT: ARCHITECT: INTERIORDESIGNCONSULTANT: QUANTITYSURVEYOR: PROJECTNAME: SCALE DATE CHECKEDBY: DRAWNBY: DRAWINGNO. REVNO. NO. DESCRIPTION DATE THISDRAWINGISCOPYRIGHTDRAWING.THEAUTHORIZED USERISTOCHECKALLDIMENSIONONTHESITE.ONLY FIGUREDDIMENSIONTOBEWORKEDON.DISCREPANCIES MUSTBEREPORTEDIMMEDIATELYTOPARTNERSHIPBEFORE PROCESSING. BANKHQ COMPANYARCHITECTS INTERIOR03GROUP QSQUANTITYSURVEYORSDN. BHD.
LEGEND
DESCRIPTION QTY
10MM(THK)WHITECERAMIC TILESINSEMIGLOSSFINISH I50MM(L)X900MM(W)X7MM (THK)RUSTICOAKTIMBER FLOORING
JALANHAPPY,47500SUBANGJAYA LEVEL5,HANDTOWER,46150 PETALINGJAYA COMMONTOWER,50100KUALA LUMPUR QSBUILDING,47500SUBANGJAYA
CODE
MENW/C 17m WOMANW/C 14.5 CORRIDOR
900MMX900MMGRAY PORCELAINTILESTAIRCASE 35538
NOTE: CLIENT: ARCHITECT: INTERIORDESIGNCONSULTANT: QUANTITYSURVEYOR: PROJECTNAME: DRAWINGTITLE: SCALE DATE CHECKEDBY: DRAWNBY: DRAWINGNO. REVNO. NO. DESCRIPTION DATE THISDRAWINGISCOPYRIGHTDRAWING.THEAUTHORIZED USERISTOCHECKALLDIMENSIONONTHESITE.ONLY FIGUREDDIMENSIONTOBEWORKEDON.DISCREPANCIES MUSTBEREPORTEDIMMEDIATELYTOPARTNERSHIPBEFORE PROCESSING. BANKHQ COMPANYARCHITECTS INTERIOR03GROUP QSQUANTITYSURVEYORSDN. BHD. JALANHAPPY,47500SUBANGJAYA LEVEL5,HANDTOWER,46150 PETALINGJAYA COMMONTOWER,50100KUALA LUMPUR QSBUILDING,47500SUBANGJAYA 12.5MM(THK)GYPSUMTILEDDROP
GROUNDFLOORLEVEL FIRSTFLOORLEVEL 150MM(THK)BRICKWALLC/WWHITEPINT
7578 5953 6038 6012 5974 5974 40415 A B D E F G H SECONDFLOORLEVEL THIRDFLOORLEVEL FORTHFLOORLEVEL FIFTHFLOORLEVEL SIXTHFLOORLEVEL 500 3500 3500 3500 3500 3500 3500 12870 PW1 BW2 CH3 C01 150MM(THK)CONCRETEWALLC/WWHITEPINT
TP1 TP1 TP1 MEETINGROOM 22.4m GROUPMANGER OPENOFFICES OPENOFFICES SOCIALAREA GROUPMANGER OPENOFFICES SCALE1:75 FIRSTFLOORSECTIONA__A 01 SEC 15OCT2022 1:75 MS.FATIMAH SARAHMOHAMED 3 CW__DWD__SM__SEC_01 TP1 TP1 W1 W1 W1 W1 W1 W1 PROPOSEDINTERIOROFFICEAT INGBANKTURKEYHQ FORBANKHQ.SDN.BHD FIRSTFLOORSECTIONA__A
CEILINGINWHITEPAINTFINISH
MATTFINISH
MATTFINISH 2300MM(L)X1500MM(W)X90MM(THK)GLASS WINDOWPANELSWITHTAMPEREDGLASS
W1 W1 W1 CH3 PROPOSEDINTERIOROFFICEAT INGBANKTURKEYHQ FORBANKHQ.SDN.BHD
150MM(THK)CONCRETEWALLC/WWHITEPINT MATTFINISH
BROWNCOKLATMEETINGWOODENTABLEDESK 3000MM(L)x1200(W)x740MM(H)
BLACKMESHCHAIROFFICE600Wx470DX890MM(H)
6076 FIRSTFLOORELEVATION 01 EL 1:50 3
DRAWINGTITLE: FIRSTFLOORELEVATION
15OCT2022 CW__DWD__SM__ELE_01
MS.FATIMAH SARAHMOHAMED
6350 5958 A B C D GROUPMANGER GROUPMANGER OPENOFFICES OPENOFFICES OPENOFFICES 3200 1200 740
NOTE: CLIENT: ARCHITECT: INTERIORDESIGNCONSULTANT: QUANTITYSURVEYOR: PROJECTNAME: SCALE DATE CHECKEDBY: DRAWNBY: DRAWINGNO. REVNO. NO. DESCRIPTION DATE THISDRAWINGISCOPYRIGHTDRAWING.THEAUTHORIZED USERISTOCHECKALLDIMENSIONONTHESITE.ONLY FIGUREDDIMENSIONTOBEWORKEDON.DISCREPANCIES MUSTBEREPORTEDIMMEDIATELYTOPARTNERSHIPBEFORE PROCESSING. BANKHQ COMPANYARCHITECTS INTERIOR03GROUP QSQUANTITYSURVEYORSDN. BHD. JALANHAPPY,47500SUBANGJAYA LEVEL5,HANDTOWER,46150 PETALINGJAYA COMMONTOWER,50100KUALA LUMPUR QSBUILDING,47500SUBANGJAYA
19449
FIRSTFLOORCEILINGLEVEL GROUNDFLOORCEILINGLEVEL C01 PW1 2300MM(L)X1500MM(W)X90MM(THK)GLASS WINDOWPANELSWITHTAMPEREDGLASS
CH1 CH1 CH1 TP1 TP1 TP1
150MM(THK)CONCRETEWALLC/WWHITEPINT MATTFINISH SCALE1:50
NOTE: CLIENT: ARCHITECT: INTERIORDESIGNCONSULTANT: QUANTITYSURVEYOR: PROJECTNAME: SCALE DATE CHECKEDBY: DRAWNBY: DRAWINGNO. REVNO. NO. DESCRIPTION DATE THISDRAWINGISCOPYRIGHTDRAWING.THEAUTHORIZED USERISTOCHECKALLDIMENSIONONTHESITE.ONLY FIGUREDDIMENSIONTOBEWORKEDON.DISCREPANCIES MUSTBEREPORTEDIMMEDIATELYTOPARTNERSHIPBEFORE PROCESSING. BANKHQ COMPANYARCHITECTS INTERIOR03GROUP QSQUANTITYSURVEYORSDN. BHD. JALANHAPPY,47500SUBANGJAYA LEVEL5,HANDTOWER,46150 PETALINGJAYA COMMONTOWER,50100KUALA LUMPUR QSBUILDING,47500SUBANGJAYA SCALE1:20 BESPOKEFURNITURELAYOUTPLAN B5 1240 SEC SEC B B 1240MMX2060MMBAMBOO,TABLE TOPC/WWHITEACRYLICLACQUER MATTEFINISH 870MMX600MMLIGHTBROWN LEATHEROFFICECHAIRC/WWHITE EPOXY/POLYESTERPOWDER COATINGPAINT 2060 600 FLP EL2 HOLLOWMATTWHITESTAINLESS STEELFRAME 870 870 1:20 15OCT2022 MS.FATIMAH SARAHMOHAMED CW_SM_DWD_BFP_01 3 PROPOSEDINTERIOR OFFICEAT INGBANKTURKEYHQ FORBANKHQ.SDN.BHD BESPOKEFURNITURELAYOUTPLANDRAWINGTITLE:
NOTE: CLIENT: ARCHITECT: INTERIORDESIGNCONSULTANT: QUANTITYSURVEYOR: PROJECTNAME: SCALE DATE CHECKEDBY: DRAWNBY: DRAWINGNO. REVNO. NO. DESCRIPTION DATE THISDRAWINGISCOPYRIGHTDRAWING.THEAUTHORIZED USERISTOCHECKALLDIMENSIONONTHESITE.ONLY FIGUREDDIMENSIONTOBEWORKEDON.DISCREPANCIES MUSTBEREPORTEDIMMEDIATELYTOPARTNERSHIPBEFORE PROCESSING. BANKHQ COMPANYARCHITECTS INTERIOR03GROUP QSQUANTITYSURVEYORSDN. BHD. JALANHAPPY,47500SUBANGJAYA LEVEL5,HANDTOWER,46150 PETALINGJAYA COMMONTOWER,50100KUALA LUMPUR QSBUILDING,47500SUBANGJAYA SCALE1:20 BESPOKEFURNITUREELEVATIONB5 EL2 2060 873 FIRSTFLOORLEVEL 1240MMX2060MMBAMBOO,TABLETOPC/W WHITEACRYLICLACQUERMATTEFINISH PLASTICEDGING 2.5mmTHKHOLLOWMATTWHITESTAINLESS STEELFRAME 2.5mmTHKHOLLOWMATTWHITESTAINLESS STEELLEG 870MMX600MMLIGHTBROWNLEATHER OFFICECHAIRC/WWHITEEPOXY/POLYESTER POWDERCOATINGPAINT 4MMTHKNON-SLIPMATBLACKSELF ADHESIVETABLELEGPAD 780 CW_SM_DWD_BFE_02 3 1:20 15OCT2022 MS.FATIMAH SARAHMOHAMED PROPOSEDINTERIOR OFFICEAT INGBANKTURKEYHQ FORBANKHQ.SDN.BHD DRAWINGTITLE:BESPOKEFURNITUREELEVATION
1240MMX2060MMBAMBOO,TABLETOPC/W WHITEACRYLICLACQUERMATTEFINISH PLASTICEDGING
FRAMEBAMBOBOARD,C/WWHITEACRYLIC LACQUERWHITEMATTEFINISHW/PLASTIC EDGING 50MMTHKBAMBOWOODTABLETOP
LSHAPESTEELBRACKET DETAIL-A
2.5mmTHKHOLLOWMATTWHITESTAINLESS STEELFRAME 870MMX600MMLIGHTBROWNLEATHER OFFICECHAIRC/WWHITE EPOXY/POLYESTERPOWDERCOATINGPAINT 4MMTHKNON-SLIPMATBLACKSELF ADHESIVETABLELEGPAD
HEXAGONNUT
PROPOSEDINTERIOR OFFICEAT INGBANKTURKEYHQ FORBANKHQ.SDN.BHD
DRAWINGTITLE:BESPOKEFURNITURESECTIONB_B
1246 780 NOTE: CLIENT: ARCHITECT: INTERIORDESIGNCONSULTANT: QUANTITYSURVEYOR: PROJECTNAME: SCALE DATE CHECKEDBY: DRAWNBY: DRAWINGNO. REVNO. NO. DESCRIPTION DATE THISDRAWINGISCOPYRIGHTDRAWING.THEAUTHORIZED USERISTOCHECKALLDIMENSIONONTHESITE.ONLY FIGUREDDIMENSIONTOBEWORKEDON.DISCREPANCIES MUSTBEREPORTEDIMMEDIATELYTOPARTNERSHIPBEFORE PROCESSING. BANKHQ COMPANYARCHITECTS INTERIOR03GROUP QSQUANTITYSURVEYORSDN. BHD.
600 50
JALANHAPPY,47500SUBANGJAYA LEVEL5,HANDTOWER,46150 PETALINGJAYA COMMONTOWER,50100KUALA LUMPUR QSBUILDING,47500SUBANGJAYA
FIRSTFLOORLEVEL
SCALE1:20 BESPOKEFURNITURESECTIONB_BB5 SEC2 DETAILA
2MM(L)X16MM(W)STEELSCREW NUT WASHER BOLTHEAD CW_SM_DWD_BSS_03
BODY 2.5mmTHKHOLLOWMATTWHITESTAINLESS STEELLEG 1:20 15OCT2022 MS.FATIMAH SARAHMOHAMED 4
(
By-Law 172 emergency exit sign
172. (1) Storey exits and access to such exits shall be marked by readily visible signs and shall not be obscured by any decorations, furnishings or other equipment.
(2) A sign reading "KELUAR" with an arrow indicating the direction shall be placed in every location where the direction of travel to reach the nearest exit is not immediately apparent.
(3) Every exit sign shall have the word "KELUAR" in plainly legible letters not less than 150 millimetres high with the principal strokes of the letters not less than 18 millimetres wide. The lettering shall be in red against a black background.
4) All exit signs shall be illuminated continuously during periods of occupancy.
(5) Illuminated signs shall be provided with two electric lamps of not less :han fifteen watts each 173 (!) All exit doors shall be openable from the inside without the use of a key or any special knowledge or effort
By-Law 184. Seating.
(a) The spacing of rows of seats from back to back shall be not less than 825 millimeters, nor less than 675 millimeters plus the sum of the thickness of the back and inclination of the back.
(b) There shall be a space of not less than 300 millimeters between the back of one seat and the front of the seat immediately behind it as measured between plumb lines.
(c) Rows of seats between gangways shall have not more than fourteen seats.
(d) Rows of seats opening onto a gangway at one end only shall have not more than seven seats
(e) Seats without dividing arms shall have their capacity determined by allowing 450 millimetres per person.
APPLIED UBBL
FIRE REQUIREMENT FIGUER 1.1
EXITSIGN LEGEND FIREESCAPESTAIRS SEATINGAREA WALKWAY
APPLIED UBBL REQUIREMENT
SCHEDULEOFACCOMMODATION
AREAS NO.OFOCCUPANTS NO.OFROOMS SIZEOFONEROOM(m²) TOTALAREAOFROOM(m²)
GROUNDFLOOR
COLDSTORAGE 1 14.5 DRYSTORAGE 1 STORAGE 3 15.5 7.8 59 2.9 TRAYSTORAGE 1 22.6 CHANGINGROOM CONTROLROOM AIRHANDLERUNITROOM ELECTRICROOM ITROOM CHECKROOM
----
1 2 4.3 7.2 11.4 1 1 1 1
56.75 9.9 8.9 9.9 DININGHALL 2 308 855 61.05
KITCHEN
KITCHENSERVICE MENWC WOMENWC CAFE/VITAMINBAR WINTERGARDEN GARDEN 1 CASHIER 1 BASKETBALLCOURT
STAIRCASE
1 66.2 45 1 49 49
CONFERENCEHALL ELEVATORHALL 264 1 354.3 1 49.6 2 31.4 53.8 1 222.75 1 1 13.95 13.95 1 56.9 36 28 1 FOYER
14.5 15.5 69.7 22.6 4.3 25.8 56.75 9.9 8.9 9.9 916.05 354.3 49.6 85.2 222.75 13.95 13.95 56.9 1 -
FIRSTFLOOR
GROUPMANAGER CO-DIRECTOR CO-DIRECTORSECRETARY
MEETINGROOM1
--
4 1 1 1
24.5 5.6 22.4
1MEETINGROOM2 2 14 MEETINGROOM3 1 8.7 MEETINGROOM4 - 1 6.7 MEETINGROOM5 2 2.4
-66.2 49
TOTALAREA(m²): 2065.75
24.5 5.6 70.6
SCHEDULEOFACCOMMODATION
AREAS NO.OFOCCUPANTS NO.OFROOMS SIZEOFONEROOM(m²) TOTALAREAOFROOM(m²)
FIRSTFLOOR
ELECTRICROOM SYSTEMROOM
ELEVATORHALL FIREESCAPE MENWC WOMENWC COMMONAREA PLAYZONE
--
1 3.59 3 5.5 35 2 2.2 17 14.5 37 45 17
3.59 11.7 35 4.4 17 14.5 82 17
4.1 2.1 1 TOTALAREA(m²): 2351.64
1 1 1 1 1
NOTE: CLIENT: ARCHITECT: INTERIORDESIGNCONSULTANT: QUANTITYSURVEYOR: PROJECTNAME:
NO. DESCRIPTION DATE THISDRAWINGISCOPYRIGHTDRAWING.THEAUTHORIZED USERISTOCHECKALLDIMENSIONONTHESITE.ONLY FIGUREDDIMENSIONTOBEWORKEDON.DISCREPANCIES MUSTBEREPORTEDIMMEDIATELYTOPARTNERSHIPBEFORE PROCESSING. BANKHQ COMPANYARCHITECTS INTERIOR03GROUP QSQUANTITYSURVEYORSDN. BHD.
02 CW_DWD_LW_DS_08
SINGLELEAFDOOR
DRAWINGTITLE: SCALE:ASSHOWN DATE: 19OCT2022 CHECKEDBY: DRAWNBY: DRAWINGNO. REVNO.
JALANHAPPY,47500SUBANGJAYA LEVEL5,HANDTOWER,46150 PETALINGJAYA COMMONTOWER,50100KUALA LUMPUR QSBUILDING,47500SUBANGJAYA PROPOSEDINTERIOROFFICEAT INGBANKTURKEYHQ FORBANKHQSDN.BHD. FORBANKHQSDN.BHD. MS.FATIMAH HEELINWEI
DOORSCHEDULE DOORNO. D1 D2 D3 DESCRIPTION TYPE
SINGLEGLASSSWINGDOOR SINGLELEAFDOOR FRAME 50MMTIMBERDOORFRAME 40MMALUMINUMDOORFRAME 30MMTHKTIMBERDOORFRAME DOORLEAF TIMBERDOORLEAF 30MMTHKTEMPEREDGLASSPANEL TIMBERDOORLEAF IRONMONGERY HINGES 2.3MMTHKSTAINLESSSTEELDOORHINGES 2.3MMTHKSTAINLESSSTEELDOORHINGES 2MMTHKSTAINLESSSTEELDOORHINGES LOCK,BOLTS ALUMINUMMORTISELOCKSET N/A PLASTICINDICATORDOORLOCK STOP,PULLS STAINLESSSTEELHANDLE ALUMINUMHANDLE 360DEGREEROTATIONPLASTICHANDLE LOCATION KITCHEN,STORAGE,CONTROLROOM,CONFERENCEHALL BASKETBALLCOURT MENWC&WOMENWC
DOUBLEGLASSSWINGDOOR DOUBLESWINGDOOR FRAME ALUMINUMFRAMEINBRUSHEDFINISH 40MMALUMINUMDOORFRAME 40MMTIMBERDOORFRAME DOORLEAF 30MMTHKGLAZEDWIREGLASSPANEL 30MMTHKTEMPEREDGLASSPANEL TIMBERDOORLEAF IRONMONGERY HINGES FIRERESISTANTFUNCTIONALHINGES 2.3MMTHKSTAINLESSSTEELDOORHINGES 2.3MMTHKSTAINLESSSTEELDOORHINGES LOCK,BOLTS FIRERESISTANTFUNCTIONALLOCK STAINLESSSTEELGLASSDOORLOCKGROUNDLATCHWITH ONESIDELOCKANDOPENKNOB N/A STOP,PULLS STAINLESSSTEELLEVERTYPEHANDLE STAINLESSSTEELLEVERTYPEHANDLE STAINLESSSTEELHANDLE LOCATION ELEVATORHALL KITCHEN&STORAGE ELECTRICROOM FLOORLEVEL FLOORLEVEL 1000 2100 900 50 50 800 50 2100 2050 1200 40 40 2400 40 150 2300 900 210 210 30 30 30 2000 1000 1000 40 40 2100 40 2000 40 2100 40 40 100
DOORNO. D4 D5 D6 DESCRIPTION TYPE ALUMINUMFRAMEWIREGLASSSWINGDOOR
NOTE: CLIENT: ARCHITECT: INTERIORDESIGNCONSULTANT: QUANTITYSURVEYOR: PROJECTNAME: DRAWINGTITLE: SCALE DATE CHECKEDBY: DRAWNBY:
REVNO. NO. DESCRIPTION DATE THISDRAWINGISCOPYRIGHTDRAWING.THEAUTHORIZED USERISTOCHECKALLDIMENSIONONTHESITE.ONLY FIGUREDDIMENSIONTOBEWORKEDON.DISCREPANCIES MUSTBEREPORTEDIMMEDIATELYTOPARTNERSHIPBEFORE PROCESSING. BANKHQ COMPANYARCHITECTS INTERIOR03GROUP QSQUANTITYSURVEYORSDN. BHD. JALANHAPPY,47500SUBANGJAYA LEVEL5,HANDTOWER,46150 PETALINGJAYA COMMONTOWER,50100KUALA LUMPUR QSBUILDING,47500SUBANGJAYA
WINDOWNO. DESCRIPTION IRONMONGERY TYPE FRAME LEAF HINGES LOCK,BOLTS STOP,PULLS LOCATION WINDOWNO. DESCRIPTION IRONMONGERY TYPE FRAME LEAF HINGES LOCK,BOLTS STOP,PULLS LOCATION W01 W02 W05 CURTAINWALL 2400MM(L)x2300MM(W)×50MM(THK)ALUMINUMFRAMEINPOWDERCOATINGFINISH 6MMTHK.CLEARSINGLEGLAZINGTEMPEREDGLASS N/A N/A N/A MEETINGROOMS SINGLEGLAZEDFIXEDCASEMENTWINDOWC/WAWNINGWINDOWPANELABOVE
SINGLEGLAZEDFIXEDCASEMENTWINDOWC/WMUNTIN W03 SINGLEGLAZEDFIXEDCASEMENTWINDOWC/WMUNTIN W06 DININGHALL,KITCHEN
W04 PLAYZONE SINGLEGLAZEDFIXEDCASEMENTWINDOWC/WMUNTIN FLOORLEVEL EXISTING CEILINGLEVEL FLOORLEVEL EXISTING CEILINGLEVEL FLOORLEVEL EXISTING CEILINGLEVEL FLOORLEVEL EXISTING CEILINGLEVEL FLOORLEVEL EXISTING CEILINGLEVEL FLOORLEVEL EXISTING CEILINGLEVEL 800 800 800 2400 4060 1550 60 1550 6040 3375 4060 4060 654 654 654 2300 6540 654 621 654 6040 2300 4060 1550 65 1550 6540 3375 2090 4060 3940 40 60 1200 1200 60 40 1200 2300 513 50 50 2300 6040 6040 660 60 1965 6040 4060 1200 60 1200 60 1200 6040 3940 2900 6040 660 65 1965 6040 1410 6MMTHK.CLEARSINGLEGLAZINGTEMPEREDGLASS PLAYZONE,COMMONAREA,GROUPMANAGER
N/A N/A N/A 100MMTHK.ALUMINUMFRAME(OUTERFRAMEW/ALUMINUMPROFILES) 6MMTHK.CLEARSINGLEGLAZINGTEMPEREDGLASS N/A N/A N/A 100MMTHK.ALUMINUMFRAME(OUTERFRAMEW/ALUMINUMPROFILES)
N/A N/A N/A AWNING FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED FIXED
DRAWINGNO.
WINDOWSCHEDULE
100MMTHK.ALUMINUMFRAME(OUTERFRAMEW/ALUMINUMPROFILES) STAINLESSSTEELBARHINGESYSTEM(OUTWARDS)C/WMATTFINISHES STEELLOCKINGCASEMENTWINDOWHANDLE/FASTENER STAINLESSSTEELMULTI-POINTSECURITYLOCKINGSYSTEM(OUTWARDS)C/WMATTFINISHES PLAYZONE,COMMONAREA,GROUPMANAGER DININGHALL
SINGLEGLAZEDFIXEDCASEMENTWINDOWC/WMUNTIN
100MMTHK.ALUMINUMFRAME(OUTERFRAMEW/ALUMINUMPROFILES) 6MMTHK.CLEARSINGLEGLAZINGTEMPEREDGLASS
6MMTHK.CLEARSINGLEGLAZINGTEMPEREDGLASS
N/A N/A N/A PROPOSEDINTERIOROFFICEAT INGBANKTURKEYHO FORBANKHOSDN.BHD FORBANKHOSDN.BHD ASSHOWN 19OCTOBER2022 MS.FATIMAH ARISHASYED CW_DWD_AS_WS_09 00
100MMTHK.ALUMINUMFRAME(OUTERFRAMEW/ALUMINUMPROFILES) 6MMTHK.CLEARSINGLEGLAZINGTEMPEREDGLASS
1.0GROUNDFLOOR
1.1FLOORFINISH
CODE IMAGE DESCRIPTION SIZE
F01
F02
F03
F04
F05
1.2WALLFINISH
PW01
WP01
TW01
KT01
1.3CEILINGFINISH
C01
HCL10HAZELMAPLEWOODLAMINATEFLOOR 197MM(L)X1218MM(W)X8MM(THK) FOYER RVWOOD
DARKGRAYPORCELAINTILESINMATTEFINISH 900MM(L)X900MM(W)XI0MM(THK) STAIRCASE GUOCERATILES
SOLVENTFREEEPOXYFLOORORANGECOLOR COATINGFORSPORTCOURT 4MM(THK) BASKETBALLCOURT NIPPON
6F041DARKGRAYMATTSURFACECERAMIC RUSTICPORCELAINFLOORTILES 900MM(L)X900MM(W)X10MM(THK) KITCHENSERVICES,RECEPTION,CASHER GUOCERATILES
CR04J6NATURALPAVINGSTONE 600MM(L)X600MM(W)X16MM(THK) GARDEN,WINTERGARDEN GUOCERATILES
BRICKWALLC/WWHITEMATTEPAINTFINISH BRILLIANTWHITECODE1001 I50MM DININGHALL NIPPON
WPCWAINSCOTINGTEAKWOODSTRIPWALL PANEL 3000MM(L)X1500(W)X10MM(THK) DININGHALL,CONTROLROOM
KINGKONGWALLDECORSDNBHD
GRAYPOLISHEDCERAMICTILE 900MM(L)X900MM(W)XI0MM(THK) ELEVATORHALL VIVIDTILES
WHITESUBWAYTILEBACKSPLASHWITHBLACK GROUTFORKITCHEN 300MM(L)X250MM(W)X7MM(THK) KITCHENKITCHENSERVICESAREA VIVIDTILES
GYPSUMCEILINGTILESINWHITEPAINTW/ 12.5MM(THK) ELEVATORHALL DANCITYSPACESOLUTION
ISO900TIMBERSTRIPFALSEWOODCEILING PANELSSUSPENDEDCEILING 12MM(THK) DRAININGHALLITROOM COSACEILING 2.1FIRSTFLOOR 2.2FLOORFINISH FW06 U-6305RUSTICOAKTIMBERFLOORING I50MM(L)X900MM(W)X7MM(THK) ELEVATORHALL,MEETINGROOM1,2,3,4 GUOCERATILES FT07 RUSTICGRAYPORCELAINTILESFLOORING 600MM(L)X600MM(W)X10MM(THK) COMMONAREA,PLAYZONE GUOCERATILES
C02
SCHEDULEOFFINISHES
LOCATION SUPPLIER
2.3WALL
BRICKWALLC/WWHITEMATTEPAINTFINISH 150MMTHK MEETINGROOM1,2,3,4
WHITECODE1001
CLEARTEMPEREDLAMINATEDGLASSWALL FROSTEDSOUNDPROOFOFFICEPARTITION GLASS
BRICKWALLC/WCEMENTTEXTUREPAINT (INTERIOR)
PLAYZONE,COMMONAREA
DANCITYSPACESOLUTION
BW02
NIPPONBRILLIANT
GW02
300MM(L)X1000MM(W)X10MM(THK) MEETINGROOM1,2 OFFICEPRO CW02
150MMTHK
SUZUKA®CementEffect 2.4CEILINGFINISH C03 EXPANDEDMETALSUSPENDEDCEILING 2400mm(L)X2400(W)mmX12MMTHK COMMONAREA COSACEILING C01 GYPSUMCEILINGTILESINWHITEPAINTW/ 12.5MM(THK) ELEVATORHALL,COMMONAREA METTINGROOM1,2,3,4
SCHEDULEOFFURNITURE,FIXTURES&EQUIPMENT(FF&E)
CODE
DININGHALL(GROUNDFLOOR)
LF1
E27PENDANTLAMP
E27LEDFILAMENTGLOBE8W800lmW/ PLASTICPENDANTHOLDERINORANGEFINISH
ILCLIGHTING N/A RM18.00
LF2
EAMESPLASTICSIDECHAIR
460mm(W)X550mm(D)X830mm(H) POLYPROPYLENESEATSHELLW/MAPLELEGS
IKEA 106 RM45.00
LF3
LF4
LF5
POLYPROPYLENEOXHORN PLASTICCHAIR
550mm(L)X560mm(W)X830mm(H) POLYPROPYLENEOXHORNPLASTICCHAIRIN MATTEBLACKFINISH
IKEA 86 RM36.00
LF6
EAMESROUNDDININGTABLE
1200mm(DIA)X50mm(THK)MDFBOARD TABLETOPW/NATURALWOODLEGS
IKEA 13 RM880.00
LF7
MGRECTANGLEDININGTABLE
1970mm(L)X920mm(W)X30mm(THK)MDF BOARDTABLETOPW/STEELLEGBASEIN POWDERCOATEDFINISH
420mm(W)X550mm(D)X1000mm(H)
POLYCARBONATEPLASTICBAR STOOL
POLYCARBONATEPLASTICSEATSHELLW/ BLACKEPOXYMETALLEGS
MGFURNITURE 29 RM610.00
IKEA 20 RM110.00
CEILINGMOUNTEDCASSETTE CENTRALIZEDAIR-CONDITIONERSYSTEM
DAIKIN N/A RM3,200.00
PICTURE PRODUCTNAME SPECIFICATIONS SUPPLIER QUANTITY PRICEUNIT
LF8 ROUNDRINGLEDPENDANTLIGHT 40mm/60mm/80mmDIA120WALUMINUM SHELLPENDANTLIGHTINORANGEPOWDER COATEDFINISH ENRICHLIGHTINGCO. N/A RM48.00
LF9 EAMESSTYLEARMCHAIR
LF10
SCHEDULEOFFURNITURE,FIXTURES&EQUIPMENT(FF&E)
PICTURE PRODUCTNAME SPECIFICATIONS SUPPLIER QUANTITY PRICEUNIT
CODE
FOYER(GROUNDFLOOR)
635mm(L)X600mm(W)X820mm(H)PLASTIC SHELLANDSTEELCHROMEDRODSW/ WOODENLEGS IKEA 30 RM58.00
LF6 POLYCARBONATEPLASTICBAR STOOL 420mm(W)X550mm(D)X1000mm(H) POLYCARBONATEPLASTICSEATSHELLW/ BLACKEPOXYMETALLEGS IKEA 19 RM110.00
CENTRALIZEDAIR-CONDITIONERSYSTEM
PROJECTORSCREEN 1280mm(W)X1710mm(H)PROJECTOR SCREENINMATTEWHITEFABRICFINISH RSCOMPONENTSSB 1 RM700.00 LF7 CEILINGMOUNTEDCASSETTE
DAIKIN N/A RM3,200.00 MEETINGROOM(FIRSTFLOOR) LF11 SUSPENDEDLEDLINEARLIGHT 1200mm(L)X55mm(W)X75mm(H)3600lm ALUMINUMLEDLINEARLIGHTINWHITE POWDERCOATEDFINISH DECASALIGHTING N/A RM28.00 LF12 OFFICECHAIR 580mm(W)X50mm(D)X940mm(H) POLYPROPYLENEBACKRESTFABRICSEATW/ FIVESTARCHROMEDALUMINUMBASE HHTOFFICEFURNITURE 39 RM460.00 LF13 WALLMOUNTEDTVSCREEN 1118mm(W)X655mm(H)X80mm(D)4K ANDROIDTV SONY 5 RM2,600.00
r e f l e c t i o n
REFLECTION
In this project it is highly dependent on the teamwork that we all have to work on together to produce a series of drawings. Communication is Key, it is important that we discuss the task and its distribution evenly to ensure everything makes sense and runs smoothly. We distributed the task equally and created our own group to communicate with each other And also double and triple check the graphics The Miro platform was really helpful. We were reviewing each other's drawings, correcting mistakes, learning from each other, and so on. With great teamwork we managed Successfully come up with a set of graphics well. but nevertheless, We also have an individual as well as a group task where this trains my observational skills Where it leads me to be able to analyze materials and Imagine the space according to the case study.
ASSIGNMENT 01
DRAWING CONVENTION: WORK-SPACE
FOR THIS TASK, WE MUST CHOOSE A "WORKING SPACE" WITHIN THE COMPOUND, SUCH AS A STUDY AREA, BEDROOM, OR WORKSPACE WITH A WINDOW OR A DOOR THAT OPENS WITHIN THE GIVEN PARAMETERS. TO MEASURE THE ROOM'S TRUE SIZE, THE SIZE OF THE OPENINGS, AND THE SIZE OF ONE PIECE OF FURNITURE. THEN CONVERT TO 2D DRAWINGS REPLETE WITH SPECIFICATIONS, A SCHEDULE OF THE ROOM'S FINISHES, INCLUDING THE FLOOR, WALL, AND CEILING, AS WELL AS A SCHEDULE OF ANY DOORS OR WINDOWS THAT WILL BE PRESENT IN THE SPACE. THE GOAL IS TO MAKE IT POSSIBLE FOR US TO PROPERLY CONVERT THE DRAWING CONVENTION INTO 2D DRAWINGS FORMAT AND CAPTURE THE LEVEL OF DETAILING, SUCH AS THE OPENING SIZES, THE FRAMES BEING INSTALLED ON THE WALLS, THE FRAMING PROFILES AND CONSTRUCTION, THE MATERIALS USED, AND OTHER FINISHES CONSIDERATIONS. CHOSEN PRECEDENT RESEARCH
REQUIREMENTS:
PDF OF CAD DRAWING IN A3 FORMAT SIZE, TYPES OF DRAWINGS + FORMAT, OPENINGS + SCHEDULES
DETAILING & WORKING DRAWING MODULE - IDS 60804. ASSIGNMENT 1 : WORK FROM HOME + DOORS / WINDOW STUDENT ID : 0346977 NAME :SARAH MOHAMED BINNABHAN -0346977 TUTOR : MS . FATIMAH KHAIRI SEMESTER : AUGUST- DECEMBER 2022 BROGRAM : BACHELOR OF ARTS (HONS) IN INTERIOR ARCHITECTURE
3500 1600 BEDROOM 5000
WFH-DWD-SA-PL-02 WFH-DWD-SA-PL-04
STUDY DESK WARDROBE
AlldesignsarethepropertyofSarahMohamed DESIGNandcannotbeusewithoutwritten permissioncontractorsmustcheckandverifyall dimensionsonsite.Anydiscretionsonsiteand betweendrawingsmustbereportedimmediatelyto theinteriordesignerbeforeproceedingwiththe works.
DD1 D2 D2
1400MM(L)x600(W) DESKTOPWITHWHITE MATTFINISH
790MM(L)x1760(H) X550MM(W)PLYWOODWARDROBEWITH2DOORS, WHITEPAINTFINISH 2000
QUEENBED
BATHROOM
W1 C1 CONSULTANTS
80MM(H)X760MM(L) REDOAKTIMBERFLOORING 595mm(l)x595(L)FLOORTILE INMATTGRAYFINISH
150THKREINFORCEDCONCRETEWALL 3000 1000
PROJECTTITLE: CLIENT: MRMOHAMED
ASBUILTINTERIORWORKOFASTUDY AREAUSJ12TERRACEHOUSE
MASTERBEDROOM FURNITURE LAYOUTPLAN
MRJOHN
DATE:
DRAWINGTITLE: APPROVEDBY: 15/9/2022
SCALE: DESIGNER: DATE: SARAHMOHAMED
1:25 15SEPTEMBER2022
DRAWINGNO:REV:02
WFH-DWD-SH-PL-01
BEDROOMFURNITURELAYOUTPLAN SCALE1:25 FLP PL
190MM(W)X1600MM(L)
20MMX50MMWOOD HANDELINSEMI GLOSSFINISH
390MM(W)X20MM(THK) PLYWOODDOORPANEL C/W1MMLAMINATEIN WOODMATTFINISH
PLANOF-CABINET
ASBUILTINTERIORWORKOFASTUDY AREAUSJ12TERRACEHOUSE
PROJECTTITLE: CLIENT: MRMOHAMED MASTERBEDROOM LOOSEFURNITURE DETAILEDOPENING PLAN FRONTELEVATION
780 390 390 780 390 390 3800 A A
FIBERBOARDPANEL 80MM(H)CABINETSKIRTING FLOORLEVEL 200 1600 160 190 190 40 FRONTELEVATIONFORCABINET SCALE1:10 SCALE1:20
AlldesignsarethepropertyofSarahMohamed DESIGNandcannotbeusewithoutwritten permissioncontractorsmustcheckandverifyall dimensionsonsite.Anydiscretionsonsiteand betweendrawingsmustbereportedimmediatelyto theinteriordesignerbeforeproceedingwiththe works. DATE: WFH-DWD-SH-PL-04
BFL1
SCALE: DESIGNER: DATE: SARAHMOHAMED 1:25 15SEPTEMBER2022 DRAWINGNO:REV:02 MRJOHN CONSULTANTS DRAWINGTITLE: APPROVEDBY: 15/9/2022 200 500 W1 C1
PL BFL1 PL
AlldesignsarethepropertyofSarahMohamed
500
40
1860
80 FLOORLEVEL
SCALE1:10 PL BOL
390MM(W)XI900(H)X20MM(THK) PLYWOODBOARDDOORPANELC/W1MMTHK LAMINATEDINWOODMATTFINISH 20MMX50MMWOODHANDEL INSEMIGLOSSFINISH 1760MM(L)X20MM(THK)PLYWOOD BOARDDOORPANELC/W1MMTHK LAMINATEDINWOODMATTFINISH 5MMPEGHOLE 5MMSTANLESSSTEEL SHELFSUPPORTSTUDPIN 88MMX50MMSTAINLESSSTEEL CONCEALEDHINGE 100MM(H)CABINETSKIRTING SECTIONOFCABINET
600
DESIGNandcannotbeusewithoutwritten permissioncontractorsmustcheckandverifyall dimensionsonsite.Anydiscretionsonsiteand betweendrawingsmustbereportedimmediatelyto theinteriordesignerbeforeproceedingwiththe works. DATE: ASBUILTINTERIORWORKOFASTUDY AREAUSJ12TERRACEHOUSE WFH-DWD-SH-PL-04 PROJECTTITLE: CLIENT: MRMOHAMED MASTERBEDROOM LOOSEFURNITURE SECTION SCALE: DESIGNER: DATE: SARAHMOHAMED 1:25 15SEPTEMBER2022 DRAWINGNO:REV:02 MRJOHN CONSULTANTS DRAWINGTITLE: APPROVEDBY: 15/9/2022 1900
150THKCONCRETEWALL
AlldesignsarethepropertyofSarahMohamed DESIGNandcannotbeusewithoutwritten permissioncontractorsmustcheckandverifyall dimensionsonsite.Anydiscretionsonsiteand betweendrawingsmustbereportedimmediatelyto theinteriordesignerbeforeproceedingwiththe works. DATE:
MRJOHN CONSULTANTS DRAWINGTITLE: APPROVEDBY: 15/9/2022 1450 500 8585
40mm(L)X20mm(w) ALUMINUMPROFILE
ALUMINUMJOINT 6MMTHK
ASBUILTINTERIORWORKOFASTUDY AREAUSJ12TERRACEHOUSE WFH-DWD-SH-PL-02
1:25 15SEPTEMBER2022 DRAWINGNO:REV:02 500
VINYLWEDGE STANLESSSTEEL WINDOWHANDLE COATEDWITHDARK BROWNMATTFINISH
DT1 DT2 W1 PL SCALE1:10 PLANOFDOUBLEDOOR
150MMTHKCONCRETEWALL COATEDINWHITEMATTPAINTFINISH REDOAKWOOD HANDRAILRAILING48MM X48MMX1450MM
PROJECTTITLE: CLIENT: MRMOHAMED MASTERBEDROOM FURNITURE TWO(2)BLOW-UP DETAILS
SCALE: DESIGNER: DATE: SARAHMOHAMED
ALUMINUMPROFILE VERTICALWINDOWFRAME FDOFRAMEWORK 8MMTHKTEMPEREDGLASS WINDOWPANEL
AlldesignsarethepropertyofSarahMohamed
betweendrawingsmustbereportedimmediatelyto theinteriordesignerbeforeproceedingwiththe works.
150MMTHKBRICKWALL 5MMSCREWTOFITINTHE PLUG PLUGOFPLASTIC(UKEnglish) I0MMPLASTERFINISHEDWITH NEPONWHITEMATTPAINT 59MM(L)X195MM(H) ALUMINUMDOORHANDELC/W POWDERBLACKCOLOR 66 20 150 APPROVEDBY:
PL
DESIGNandcannotbeusewithoutwritten permissioncontractorsmustcheckandverifyall dimensionsonsite.Anydiscretionsonsiteand
DATE: WFH-DWD-SH-PL-02 SWINGDOUBLE DOORDETAILED OPENINGPLAN :DETAIL1/DETAIL2 12/9/2022 SCALE: DESIGNER: DATE: SARAHMOHAMED ASSHOWMEN 15SEPTEMBER2022 DRAWINGNO:REV:02 MRJOHN SCALE1:2 DETAIL1 DT1 DRAWINGTITLE: PL DT2
SCALE1:2 DETAIL2 20 66 150 CONSULTANTS ASBUILTINTERIORWORKOFASTUDY AREAUSJ12TERRACEHOUSE PROJECTTITLE: CLIENT: MRMOHAMED
1450 500 500 2100 FLOORLEVEL
DOORNO DD1 DESCRIPTION BEDROOM TYPE 2PANELALUMINUMDOUBLELEAFSWINGDOOR FRAME 2100MM(H)X30MM(THK)ALUMINUMDOORFRAME DOORLEAF 35MM(THK)ALUMINUMC/WGLASS IRONMONGERY HINGES 2MM(THK)STAINLESSSTEELDOORHINGE LOCK/BOLTS TWO-BOLTLOCKINGSYSTEM STOP/PULLS BLACKPOWDERALUMINUMHANDELLOCK 850
DATE: ASBUILTINTERIORWORKOFASTUDY
FURNITURE LAYOUTPLAN
CONSULTANTS
DOORSCHEDULE
AlldesignsarethepropertyofSarahMohamed DESIGNandcannotbeusewithoutwritten permissioncontractorsmustcheckandverifyall dimensionsonsite.Anydiscretionsonsiteand betweendrawingsmustbereportedimmediatelyto theinteriordesignerbeforeproceedingwiththe works.
AREAUSJ12TERRACEHOUSE PROJECTTITLE: CLIENT: MRMOHAMED MASTERBEDROOM
SCALE: DESIGNER: DATE: SARAHMOHAMED 1:25 15SEPTEMBER2022 DRAWINGNO:REV:02 MRJOHN
DRAWINGTITLE: APPROVEDBY: 15/9/2022
SCHEDULEOFFINISHES
AREA FLOOR WALL CEILING DOOR
BEDROOM CODE:W1
NAME:REDOAKWOOD PARQUET FLOORPANELS SIZE:80MM(H)X760MM(L)
FINISH:SEMI-MATTE BRAND:FLOORMASTER RESOURCESSDNBHD
CODE:C1 NAME:BRICKWALL/W EASYPINTCOTE
SIZE:150MMTHK COLORCODE:BRILLIANT WHITE1001
FINISHES:MATTEFINISH BRAND:NIPPON PAINTMALAYSIA
CODE:P1
NAME:PLASTERCEILING /WEASYPINTCOTE SIZE:3MMTHK COLORCODE:BRILLIANT WHITE1001
FINISHES:MATTEFINISH BRAND:NIPPON PAINTMALAYSIA
CODE:DD1
NAME:ALUMINUMWINDOW DOORFRAMEC/WTEMPERED GLASSPANEL
SIZE:145MM(L)X2100MM(H) COLORCODE:BRONZEBROWN #C6C7C7
FINISHES:MATTFINISH BRAND:JTLWINDOWS SDN.BHD.
AlldesignsarethepropertyofSarahMohamed DESIGNandcannotbeusewithoutwritten permissioncontractorsmustcheckandverifyall dimensionsonsite.Anydiscretionsonsiteand betweendrawingsmustbereportedimmediatelyto theinteriordesignerbeforeproceedingwiththe works.
MRJOHN CONSULTANTS
ASBUILTINTERIORWORKOFASTUDY AREAUSJ12TERRACEHOUSE
PROJECTTITLE: CLIENT: MRMOHAMED
MASTERBEDROOM FURNITURE LAYOUTPLAN
DATE:
DRAWINGTITLE: APPROVEDBY: 15/9/2022
SCALE: DESIGNER: DATE: SARAHMOHAMED
1:25 15SEPTEMBER2022
DRAWINGNO:REV:02
r e f l e c t i o n
REFLECTION
To finish this project, It is essential that we work on series of drawings but first we choose area or workspace that We were able to create a set of drawings for. my workspace was in the bedroom so it was my chosen area for this project with the lecturers' guidance and using our own suitable scale for the space. I am able to complete and achieve this assignment and comprehend how the fundamentals of graphics function and drawings how they relate to one another.
o v e r a l l r e f l e c t i o n
overall reflection
In this course, I learned a lot about drawing . the detailed drawing provides a complete and accurate description of the part's dimensions, shape, and fabrication. i learned that A detailed drawing should be brief, and contain the detailed information needed to create the design in construction industry. The tutorial session is definitely the most beneficial experience and part for this course . The lecturer explains a lot of important ideas that are essential to our assignment in efficient way . I learned a lot through this course and the most important thing is that I was able to apply what i learned such as understanding UBBL in building and architecture also the convention drawing Additionally, I self-taught myself how to conduct research online and look for relevant examples. at the end , I enjoy this module because I learned valuable skills that is helpful and important in the future . I'm also grateful for my extremely kind lecturers , Ms. Fatimah and Ms.SIN AI . for helping us through this subject
DETAILING & WORKING DRAWING MODULE - IDS 60804. 2022 SARAH MOHAMED 0346977 BIA SEM 4 E-PORTFOLIO