Profile
seeking a challenging position in a reputed organization that can effectively utilize my skill to provide excellent career growth opportunities and a good working environment to achieve greater heights with sheer hard work and determination.
UAE –DUBAI DUNCAN & ROSS Engineering Consultant BIM COORDINATOR QATAR – DOHA DUNCAN & ROSS Engineering Consultant BIM COORDINATOR QATAR – DOHA STRUCTREL QATAR W.L.L BIM COORDINATOR QATAR – DOHA BIM LEAD UAE– Dubai RAMTECH Software Solutions PVT LTD BIM Modeler PROJECT WISE REVIT MEP NAVIS WORK (EXCELLENT) (EXCELLENT) AUTO CAD (GOOD) BIM TRACK TANDEM BIM 360 (GOOD) (EXCELLENT) (EXCELLENT) (EXCELLENT) REVIZTO (GOOD) POWER BI (GOOD) (GOOD)
SHARE POINT ACONEX OFFICE THINK PROJECT SYNCHRO 4D (EXCELLENT) (GOOD) (EXCELLENT) (EXCELLENT) (SATISFACTORY)
SOFT SKILL
EXPERIENCES
B. TECH IN MECHANICAL ENGINEERING University of Calicut
EDUCATION SANIL PAUL
THE MOST IMPORTANT PRINCIPLE TO GAIN CREDIBILITY AND EARN THE RESPECT FROM PEOPLE
KEY SKILL
• Excellent level of presentation and communication skills – both oral and written.
• Technical capability of BIM LOD 300 with knowledge of 400 and 500.
DETERMINE TARGET & TRY BEST TO COMPLETE THE MISSION IS AN EASIEST WAY TO MAINTAIN PERSONAL REPUTATION
• Team player, cooperative with other staff with open sharing of information and knowledge.
• Ability to meet challenging deadlines and delegate tasks to staff in cooperation with Project Managers.
• Excellent jugement and decisiveness.
CULTIVATE PASSION IN WORK WHILE DEVELOPING INDIVIDUAL ABILITY TO ACHIEVE BALANCE IN HEART AND MIND
PROJECTS
WARNER BROZ THEME PARK ABUDHABI
GOLD LINE METRO QATAR
AL RAYYAN STADIUM QATAR
OLD DOHA PORT PROJECT COMBINED MINA DISTRICT AND SEA WATER DIVING POOL WORKS QATAR
HATTA PUMPED HYDRO ELECTRIC POWER PLANT UAE
LUSAIL PLAZA TOWER A,B,C&D QATAR
I N D E X
In Abu Dhabi, Six Construct has built the prestigious Warner Bros Theme Park on Yas Island. Warner Bros World Abu Dhabi differs greatly from normal projects regarding buildings and heavy civil construction. Not only because of its nature, but also because we were working with artistic creative consultants from the entertainment industry. Specific features and requirements like guest experience, art direction, show production, 7,430 static and 178 animated props, 68 No show action equipment, 10,667m2 of rockwork, 23,420m2 of themed flooring, state of the art thrill rides, story boards, intellectual property and brand assurance, etc., added an original flavor to our normal expertise!
Client:Miral Asset Management
The Gold Line is a rapid transit line of the Doha Metro. The east-west Gold Line runs through Doha, extending from Ras Abu Aboud Station to Al Aziziya Station over a distance of 32 km. Is a part of the Qatar Integrated Rail Project, which is guided by the Qatar National Vision 2030. It was officially opened on 21 November, 2019.
Client : Qatar Rail
Duties And Responsibilities:
MEP model coordination with other discipline
• •
• •
Ahmad Bin Ali Stadium (Al Rayyan Stadium) for the 2022 FIFA World Cup at Qatar, The 40,000–seater air-cooled open stadium with a total load of 12,800 TR has a GSAS (Global Sustainability) rating of 4. Its distinctive façade, created using a cutting-edge parametric design, contributes significantly to its cooling. The unique patterns in the façade represent different aspects of Qatari culture known as Naquish patterns that characterise different aspects of the country, the importance of family, the beauty of the desert, the native flora and fauna and local and international trade. The fifth shape, a shield brings together the strength and unity of the city of Al Rayyan
Client :supreme committee for delivery& legacy
Doha port provides wide range of passenger facilities, including seamless immigration, customs, foreign exchange, taxi and bus stands, city bus tours as well as Qatar Duty Free, cafe, waiting areas for cruise passengers and staff. It also features various tourist information services offered by Qatar Tourism Authority.
Client :supreme committee for delivery& legacy
LUSAIL PLAZA TOWER A,B,C&D QATAR
The scope consists of two Towers, 50 storey high (approx.219m tall), with elliptical plan. The Podiums are designed to cascade down in scale towards the sea and range in height from G+5 to G+2 storey. The basement contains car parking, services, and links to Light Rail Transit station. The Towers are crowned with cladded structural steel. The Façade has distinctive Fin profile. Built up area Plot 1: 229,596 m² and Plot 2: 249,828 m²
Client :Lusail Real Estate Development Company
The hydroelectric power station in Hatta is the first of its kind in the GCC region. The 250MW station will generate electricity by making use of the water stored in Hatta Dam. It will have a storage capacity of 1,500 MWh and a life span of 80 years. The hydroelectric power station will use water in the Hatta Dam and an upper reservoir that is being built in the mountain. During off-peak hours, advanced turbines will use clean energy to pump water from the dam to the upper reservoir.
Client: DEWA(Dubai Electricity and Water Authority)
Duties And Responsibilities:
• CDE Platform - Generate BIM models and collaborated with design professionals for integration into new projects.
• Manage and coordinate the overall use of BIM within the standard for the multidisciplinary project.
• Oversee, coordinate, and manage BIM projects and teams.
• Upload clash report in bim track for easy access and locating the clash for all the contractor , consultant
• Communicate with the responsible BIM Manager, PMs, and Engineers to ensure project reporting and delivery.
THANKS
My Pleasure to have your attention