Skip to main content

BOOOK-I (INTERNATION TRANSIT AIRPORT)

Page 1

5579 WAICTA

BURKINA FASO, WEST, AFRICA

DESIGNX STUDENT PERFORMANCE CRITERIA SPRING 2014 C.1 COLLABORATION STUDENT B.10 ENVELOP DIASSIBO SAMSON TANKOANO INSTRUCTOR BILL PRICE

STUDENT PERFORMENCE CRITERIA: A.2 DESIGN THINKING SKILLS A.4 TECHNICAL DOCUMENTATION A.5 INVESTIGATIVE SKILLS A.8 ORDERING SYSTEMS A.9 HISTORICAL TRADITIONS AND GLOBAL CULTURE

B.2 ACCESSIBILITY B.3 SUSTAINABILITY B.4 SITE DESIGN B.5 LIFE SAFETY B.6 COMPREHENSIVE DESIGN

OBJECTIVE: PRODUCE A COMPROHENSIVE ARCHITECTURAL PROJECT THAT DEMONSTRATES CAPACITY TO MAKE DESIGN DECISIONS ACROSS SCALES WHILE INTEGRATING STUDENT PERFORMANCE CRITERIA

B.8 ENVIROMENTAL SYSTEMS B.9 STRUCTURAL SYSTEMS B.10 BUILDING ENVELOPE SYSTEMS B.12 BUILDING MATERIALS AND ASSEMBLIES


CONCETP: GRADIANT IDENTITY

THIS

PROJECT

GRAMATICALLY ED

BY

A

AL

LENGTH

EX AMS THE

VOID. AS

THE

USE

OF

BUILDING

IS

DIVIDED

EACH

YOU

MOVE

GRADIANT INTO

VOID

PROGRESSIVELY

FROM

ARRIVALS

TO

AS 5

AN

ORGANIZATIONAL

FIGURES,

INCREASES DEPARTURE.

OR

EACH

FIGURE

GRADIATES

SEQUENCING

PRO- GOAL & OBJECTIVE THE AIRPORT WILL DECENTRALIZE THE AIR WAYS OF WEST AFRICA, AND OPEN A SUSTAINABLE SEPERAT- DIRECTION IN TERMS OF ECONOMIC GROWTH AND CULTURAL EXCHANGE WITH THE REST OF

SYSTEM. IS IT

FROM

DIMENSION-

2:2,2:3,2:4,2:5

GRADIANT

2

3

5

8

2

2

3

3

4

6

1

2

2

9

3

2

11 9

SITE MASTER PLAN

10

1: TREMINAL WITH SATELLITE PIERS 2:RUN WAYS 3:TAXI WAYS 4:AIRCRAFT MAINTENANCE HANGAR 5:FUEL STORAGE 6:TOWER 7:HOTEL 8:GROUNG MAINTENANCE FACILITIY 9:CARGO 10:PROPRETY LINES 11:FIRE STATION 12:CAR RENTAL 13:BUSINESSES OUT SIDE OF AIRPORT (GAS STATION, PARKING...)

7

12

25m

0m

13

terminal longitudinal section

50m

1,000m

250m

500m

3


ROAD N7

ROA D N5

AD RO N4 ROAD N3

RO AD

NEAR BY CITIES

AD RO

N2

N1

NEAR BY MAJOR CITIES

AIPORT

SUN DIRECTION

NEAR BY MAJOR CITIES SUMMER WIND

NEAR BY MAJOR CITIES

NEAR BY MAJOR CITIES

NEAR BY MAJOR CITIES

WATER DRAINAGE

WATER

VEGETATION

WINTER WIND

6

10 km

N AD RO

10 Mi

10 Mi

10 Mi

10 Mi

10 Mi

10 Mi

10 km

10 km

10 km

10 km

10 km


terminal transvers section


satellite pier 1 longitudinal section


satellite pier 1 longitudinal section


explode buildin axo 1.ground 2.structure 3.floors 4.skin 5.roof 6.sky light


1

2

3

4

5

6

7

1-circulation 2-baggage 3-drop & pick up 4-lounge 5-chekin & security 6-offices 7-mep

1

2

3

4

5 67

PROGRAM DIAGRAM

1

1-main column (compose of 4 curve branches). 2.roof curve beam

2

3 PROGRAM DIAGRAM

building section axo

4

5 67


1

2

3

4

5

6

7

8

4

5

6

2

2 3

1.foundation 2.structural concrete column 3.roof 4.curtain wall 5.structural floors 6.structural concret beam 7.rain water drainage 8.lighting systhem 9.ventilation systhem 10.baggage make up

7

2

7

1

8


Turn static files into dynamic content formats.

Create a flipbook
BOOOK-I (INTERNATION TRANSIT AIRPORT) by diassibo tankoano - Issuu