To: Bjørn Sletto, Principal Brush Square Planner, Equitable Planning Firm From: Samantha Bernacki, Public Space Site Analyst Date: March 7, 2021 Re: Brush Square Reimagination, First Site Visit Impressions
Our firm is in the process of reimagining Brush Square in Downtown Austin. On Sunday March 7, 2021 I made a site visit at 409 East 5th Street. I observed the space from 1 pm until 2:30 pm, and the surrounding area from 2:30 pm until 5:00 pm. While on site, I noted physical features and uses of the space. The space in the current state is overlooked and uninviting. The purpose of this memo is to describe the existing conditions of Brush Square and to suggest design and programing interventions.
Brush Square Description The boundaries of the Brush Square study area are highlight in Map 1 below along with the key physical features. The boundaries of my study area include the grassed area of the square, an extended concrete sidewalk outside of the Convention Center, as well as a portion of a bike lane that runs along East Fourth Street.