I am Sergio, a registered architect with over seven years of international experience working on diverse projects, including residential, commercial, and retail spaces. My passion lies in sustainability and interdisciplinary collaboration to develop contemporary solutions for our built environment.
SERGIO SALAZAR
Peruvian / Spanish
Piacenza, Italy
E : salazar.abecasis@gmail.com
T : +39 338 138 7762
Throughout my career, I have been involved in all project phases, from concept design to executive documentation and on-site supervision. In addition, I have experience in project management and proficiency in a wide range of design software, including AutoCAD, Revit, ArchiCAD, Rhino, Photoshop, SketchUp, and V-Ray. As a team player, I am committed to fostering a goal-oriented approach, always focusing on the bigger picture to create resilient, contextually relevant designs.
Beyond professional practice, I believe in the essential link between research and design. This perspective has led me to work as a teaching assistant at Politecnico di Milano, further enriching my critical thinking and approach to architecture. My ultimate goal is to contribute to the positive transformation of our living environments, and I am eager to be part of a team that shares this vision and works passionately toward it.
I would welcome the opportunity to further discuss how my skills and experience align with your firm’s goals. Thank you for your time and consideration—I look forward to connecting with you.
Best regards,
Sergio Salazar
+39 338 138 7762
salazar.abecasis@gmail.com
01 Smart: Boutique Offices Building
Peru 02 LIDL Supermarkets and storages
Italy
Vive Vichayito
PUCP Architecture and Engineering Library
Peru
Oto House Cañete, Peru
San Cristoforo Infrastructure Park
Italy 07 Library + Housing Barcelona, Spain 08 Fishermen´s housing in Paracas Natural Reserve Paracas, Peru
09 Stybis apartments San Pedro de Sula, Honduras 10 Rivas House
Pedro de Macoris, Dominican Republic 11 Africa House
Tanzania
12 Ciudad EnVisible - Low cost housing
Professional Projects
01 Smart: Boutique Offices
Lima, Peru
The project consists in generate a new typology for offices spaces. The local market is full of rental spaces of big areas and there is no space design for small or medium enterprises where young professional can work as a network.
The project proposes a 23 stores office tower in which are developed medium and small office spaces for rent. Every 2 or 3 floors exists a common space thought for casual encounters between the different companies that coexist in the building.
Contributions to the work:
-Concept design
-Project development
-Sanitary, electrical and structural project coordination
-Municipality plans set development
-Construction plans set development
- Detail plans set development
-Construction supervision
Ground Plan: Entrance and Offices Meeting Rooms
Typical Plan: Boutique offices
In-Between floors Social Zone. Design for informal encounters and meetings
6° Flor Plan: Public Space in between floors
Rooftop Dinning and Terrace
Entrance Hall
Section: Hall, inner void and public spaces
02 LIDL supermarkets and storages
Milan, Italy
The main difficulties of the projects are the adaptations that occur in the city of Milan where the scarce of free plots and the requiremnent of commercial projects made possible that buildings with previous uses are taken and re-used. In this process, the minimum standards required by LIDL have to be met along with the security and structural measures imposed by the municipality.
The projecst can be building renovations, demolitions and new constructions and a fully new construction projects in re-urbanized zones of Milan allowing mixed used building proposals.
Contributions to the work:
-Concept design
-Project development
-Coordination with specialists and client
-Executive project development
Via Feraboli project: Main View
Via Feraboli
Two level project with supermarket in the upper parte and parking in the ground floor.
section
First floor: Supermarket and storage area
Longitudinal
Ground floor: Parking and auxiliar areas
Via Solari
Building renovation with change of use. Adaptation of a relatively small plot into a efficient supermarket .
Via Gallarate - Via Grosio
Mixed-used building. First two floors with supermarket and three floors above for student housing.
03 Vive Vichayito
Piura, Peru
Located in one of the most popular beaches in north Peru, the condominium project consists in 5 housing typologies that goes from one store appartments to double stores single family house. The public spaces are located in the center in the axis to the access from the beach. The materials are taken from the zone and the construction system for the roofs of the single family housing is a local technique.
Contributions to the work:
-Project development
-Sanitary, electrical and structural project coordination
-Municipality plans set development
-Construction plans set development
- Detail plans set development
View from pool to double store single family houses
Condominium social terrace
View from the pool to single family houses, social terrace and appartments in the back
04 PUCP Architecture and Engineering Library
Lima, Peru
TThe library is inserted in the square from its mass, it is confronted with the public space as the end of the central road. This location allows a relationship of scale with the square, with the university. the form is defined by the tensions of the square and by the views of the entrances to it, in this way there is a relationship and direct experience with the exterior space.
The library is articulated through a large central entrance space, this space leads to the receipt that is repeated on all levels. The staircase and the elevator are the hinge that allow us a fluid circulation through all levels of the building, their location is centralized with respect to the whole.
The 3 buildings where the various “worlds” are located are connected by this space, at the end of the longest block there is a staircase that facilitates a quick and safe evacuation.
Contributions to the work:
-Concept design
-Drawings for competition panels
-Renders post-production
View from interior street
05 Oto House
Lima, Peru
The main objective for the house was to look for a simple desgin in which the mass and the obertures generate the visuals through the sea conserving the intimacy. The project was desgined thinking about the cross - ventilation to refresh all the spaces.
The house is divided in three levels. The ground floor have the social areas like kitchen and dinning room which is in direct relation with the terrace and the park in front. The basement is where the rooms are located. Natural light is brought through patios located near the dormitories. Finally, in the upper floor is located the terrace, another social space in which the sunset can be enjoyed.
Contributions to the work:
-Concept design
-Project development
-Sanitary, electrical and structural project coordination
-Municipality plans set development
-Construction plans set development
- Detail plans set development
-Construction supervision
Ground floor level. Entrance
View of the social area
Ground floor plan
View of the concret stair and the detail of the concrete wall
Cross section
Longitudinal section
Academic Projects
06 San Cristoforo Infrastructural Park
Milan, Italy
The main challenge is to integrate existent natural resources in order to increase biodiversity, recover the ecosystem and harness the future public infrastructure. Provide the inhabitants Ecosystem Services, which are traduced into high quality leisure places. In other words, the infrastructure park works as a node where several elements converge.
Change the relationship between infrastructure and people becomes an important goal in orde for the project to serve the city, its population and nature. In a first approach the new take improves accessibility and green connectivity amongst important areas in San Cristoforo, and its link with Milano center and Buccinasco district.
Finally, the railway loop destined for the metro trains to circulate and to be stored, is used as an excuse for the new architecture. In a subtle ring-shape building, the program improve its efficiency by reducing the carbon footprint, using the roof for path, greenery and renewable energy. in this way, the paradigm of infrastructure evolves, giving public infrastructure that benefits the people and the urban ecosystem.
Contributions
to the teamwork: Designing, drawing (plans, elevations, sections, renders), team organization.
Fluency between sub-areas of the project
More efficiency. Less footprint
Inlcuding water in the project
Different activities Different types of green
Carbon sequestration
Soil restoration
Water cleaning
Volume diagrams
Photovoltaic Panels
07 Library + Housing
Barcelona, Spain
The project starts recognizing the context in which is located. The Superblock, the museum, the typical cut corner of the Barcelona mesh and the activities surrounding give the building its shape meanwhile the program proposed tries to generate a new synergy between public equipment and public space.
In the other hand, the housing typlogies experiment a new type of accomodation for students in one block and also propose different typologies for contemporary families. The Library and the Co-working Center are the base for these housing typologies generating an special connection between the Library and the students housing. Finally, the public space in the courtyard is divided in two zones: one with a more public spirit and other one with more vegetation and green areas to reduce the noise and give som privacy to the existing housing blocks that conformos the square.
Contributions to the teamwork: Designing, drawing (plans, elevations, sections, renders), team organization.
VOLUMETRIC SCHEMES
FAMILY HOUSING
Ground Floor: Library Entrance / Shops Entrance
1° Floor: Library / Co-Working Offices
Library Longitudinal Section
Library Facade Elevation
Housing Interior Facade Elevation
08 Fishermen´s housing in Paracas
Natural Reserve - Ica, Peru
v project is located in the Paracas National reserve in Ica, a province in the central coast of Peru. Its main function is to provide housing to several groups of fishermen who work in the are and also controlling their expansion in the territory. The project is situated in a slope to minimize the visual impact at the moment of arrival from the upper part. In this way the building does not compete with the landscape but integrates with it.
The program was divided in three horizons: The warehouses, in the lower plan, the social areas in the middle plan and the dormitories in the upper level. The project is build using prefabricated concrete modules that are inserted into an orthogonal meshgenerating spaces of encounter for the fishermen. The roof of the common spaces are cover with the scallops shells that remain in the zone to creat shadow.
Bachelor´s thesis project. Individual work Note: Renders were made by professional visualizer
Project Concept
Aerial view: Arrival to the project
Section: Design strategies to cool down the space. Cross ventilation
Module: Social Plan. Space for leisure connected with views and educational spaces
Modulations: Pre-fabricated concrete walls for the dormitories, kitchen storage and social spaces.
Passarel that connects the social plans
Space for in-situ concrete column
Pre-fabricated Concrete Wall Plan View
Pre-fabricated Concrete Slab Plan View
Structural iron anchored to the pre-fabricated concrete elements
Pre-fabricated Concrete Wall Section View
Pre-fabricated Concrete Slab Section View
Constructive System: Pre-fabricated slab and walls to reduce use of in-situ concrete.
Union: Slabs and walls are united with beams and columns in-situ. The only non pre-fabricated elements.
Wall Detail: Constructive detail of Kitchen in the ground floor and dormitory.
Personal Projects
09 Stybis apartments
San Pedro de Sula, Honduras
The building is located on a 30 x 23 m plot in a rapidly developing neighborhood. The design strategy involved setting the structure back from the property’s edges, allowing all four facades to optimize natural light and views. A central circulation core organizes the layout, with the apartments positioned around it to fully benefit from the exposure on all sides.
Ground floor: General entrance, parkings and apartment
First and second floor: Apartments
10 Rivas House
San Pedro de Macoris, Dominican Republic
The design of the beach house, situated in a seaside condominium on a 15 x 30 m plot, aimed to create an open and airy atmosphere. The common areas feature double-height spaces and expansive views of the ocean, enhancing the sense of openness. Meanwhile, the bedrooms are designed to offer a more private and intimate ambiance, opening onto small garden spaces.
This project provided an opportunity to explore the interplay of volumes and voids, drawing inspiration from both vernacular and contemporary architecture of the region.
The house main idea for this competition is to keep the outside living experience as an identity. The spatial organization proposed aims to optimize the use of the voids generated between the dormitories blocks and the building boundary. The house is an open space that offers different opportunities to inhabit it and at the same time a unified shelter for the family.
In order to have an efficient design in terms of costs and spatial opportunities a simple construction system is proposed. A concrete platform as a base, 3 adobe brick blocks and a wooden structure in the house boundaries that supports the metallic roof.
Contributions
to the teamwork: Design, strategies proposition, renders and post production, drawings, panels layout, team organization.
12 Ciudad EnVisible
Lima, Peru
The project is composed in the design of 5 houses, corresponding to 5 different families within the 3 de Diciembre community in Lurín, Lima. The first condition outlined as the axis of the design is to obtain a complete house with the architectural quality of a middle-class family home. Due to the tight economic budget, a “[in]complete house” logic is created, so the houses would be built in two stages.
In the first stage, the complete structure of the house would be carried out, since this is the most demanding, expensive part and with a technical requirement; and the main environments that the family requires to live. In a second stage the house is completed, with the complementary spaces; These spaces are for example: more rooms for the children, rooms to rent, or simply a flexible space for the use of each family. It was important to understand that the house for each family is an investment, so it can be converted into economic income. With this premise, it was sought to create expansion possibilities, to rent or to give a space to the next generation.
The second condition of the project is to achieve a personalized home for each family, since each one had different needs and requirements. It was based on using the same construction and material system, but inside the spaces have their own language, creating relationships according to each family.
Contributions to the teamwork: Design, strategies proposition, renders and post production, drawings, panels layout, team organization.