Skip to main content

##PROFESSIONAL PORTFOLIO##

Page 1

P

PROFESSIONAL

SAGAR P S

L

R

UNDER GRADUATE

O T F O ARCHITECTURAL I O


SAGAR P S

CURRICULUM VITAE

PROFILE To being a new person, very much interested in learning and understanding new things and I’m very zest to work hard. I would like to explore my skills and abilities are put to best use in my working space. And also there is an more things to gain a knowledge & scope for to learn new techniques and technologies for the betterment of the organization and for myself. CONTACT Email sagarshettigar65@gmail.com Contact +91 - 8861863086, 9845829395 Address ‘’SAHANA’’ kallotte- pervaje, Near, sri kshetra bhrmastana temple karkala- 574104 State Karnataka Nationality indian

TRAVELLING

EDUCATION: - S.V.T PRIMARY SCHOOL, KARKALA 2000-2007 - SRI BHUVANENDRA HIGH SCHOOL, KARKALA 2007-2010 - SRI BHUVANENDRA PRE- UNIVERSITY COLLEGE, KARKALA - 2010-2012 - FACULTY OF ARCHITECTURE,MANIPAL – 20122017 LANGUAGE: TULU , KANNADA, HINDI , ENGLISH

TREKKING MUSIC

PHOTOGRAPHY TELEVISION SPORTS

WORKSHOP AND LECTURES: - VERNACULAR ARCHITECTURE WORKSHOP – GOA, 2016 - CLAY WORKSHOP --MANIPAL,2014 - FIRE AND SAFETY MEASURES (LECTURE) – MANIPAL, 2015 - HISTORICAL TEMPLE DOCUMENTATION OF HALEBIDU AND BELOOR TEMPLES AND LECTURE – 2015. - TEMPLE DOCUMENTATION OF ABHANERI, RAJASTAN – 2014 - WOODEN WORKSHOP – PONDICHERRY, 2016 COLLEGE PROJECTS: 1 Sem COFFEE SHOP KIOSK 2 Sem RESIDENCE 3 Sem INTEPREATION CENTRE 4 Sem OLD AGE HOME 5 Sem RESIDENTIAL & COMMERCIAL( HIGH RISE STRUCTURE) 6 Sem AUTOMOBILE HUB 7 Sem SPIRITUAL CENTRE 8 sem ART MUSEUM-KARKALA

RIDING BIKE AND CAR COOKING TECHNICAL SKILLS: LUMION AUTOCAD

SKETCHUP ADOBE PHOTOSHOP SKETCHUP LAYOUT MS OFFICE V-RAY

WORKING EXPERIENCE: (2 YEARS) SIMONS AND ASSOCIATES - UDUPI & ECUMENE HABITAT SOLUTION - BANGALORE. EXTRA CURRICULAM: MODEL MAKING SKETCHING CLAY MODELING

ADOBE ILLUSTRATOR

HAND DRAFTING

PRODUCT DESIGN

WOODEN CRAFTING

DOCUMENTATION

ADOBE INDESIGN

ON SITE WORK

MY PROFILE DATA

INTERESTS:


CONTENTS

1

RESIDENTIAL AND COMMERCIAL BUILDING,MANGALORE

PAGE NO

4

11

MOHAMMED ASIF RESIDENCE, MANGALORE

13 15

WELLINGTON PARK,MANIPAL

24

GUEST HOUSE,MADIKERI

JW MARRIOTT 5* HOTEL PROJECT, BANGALORE

RENOVATION PROJECT,UDUPI

25 26

27

ECUMENE OFFICE,BANGALORE CARIAPA RESIDENCY,BANGALORE

14 21

ART MUSEUM - KARKALA

INTERIOR PROJECT,UDUPI FREELANCE PROJECTS


The site is about 1.61 acre land it is located near central market mangalore. TRANSFORMER SITE CHARACTER -Majority of the buildings around the site are old buildings constructed using traditional materials(brick and plaster) -Commercial area having small outlets for electronics, clothes, confectionaries etc. SITE TOPOGRAPHY : Flat land SOIL CONDITION : Laterite soil STREETSCAPE : No prominent landscape features No boundary around the site. SOIL PROPERTIES

DRAINAGE & SEWAGE TREATMENT:

MANGALORE.

-thick laterite layer are porous and slightly permeable -compressibilty of soil varies from moderate to low depending on energy of compactation -specific gravity of soil of this region varies from 2.48 to 2.72(soil grain) -platicity index value is between 9.7 -21.4

MAIN SOURCE OF SOUND

LADY GOSCHEN HOSPITAL

N

The natural drainaige occurs towards the north west of the site near the CENTRAL MARKET ROAD. This road is a two way road gurupura river present on one side of the All the drain lines towards the west site. concealed under the pavements The drainaige pattern is pertaining to the slope of the surrounding terrain sloping slightly towards north from townhall to lady goschen CENTRAL MARKET. The central The sewage treatment plants are market is present right next to the located in the south west of the site neighbouring buildings which is henceforth collected by corporation van. Town Hall Sump

STATE BANK OF INDIA

CANTONMENT ROAD. This road is also a two way road (main road).

Advantages: -Gandhi park which is near the site will provide a good view. -2 main road entry so easy access. -Longest side is on major road. -Height of surrounding buildings is not much so view won’t STP (Lady Goshen Hospital) be obstructed. DisadvantagesOver head Tank -Traffic ELECTRICITY (18m high) -Noise The southern grid comprises of various power generating stations of 400kv -Pollution SUN PATH DIRECTION Power generated is stepped up from 11000v to 400kv at udupi power corporation -Slum behind the site ltd. (upcl substation) WATER SUPPLY It is further stepped down to 230kv substation located in kavoor towards airport Water is supplied to the site from mangalore muncipal corporation which is located in road which is again stepped down to 110kv substation at kulshekhar. lalbagh and is 2.8kms from our site through east. From the kulshekhar substation it further divides to 33kv substations and 11kv The neighbouring buildings make use of municipal supply as well as borewell (12-15mdepth) feeders The watertable around the site is at 7-8m . Hence shallow foundations have been used One of the 33kv substation is located 950mts from our site in nehru maidan . Which further distributes electricity to 11kv feeders then 430-440v transformers and for the neighbouring buildings From the municipal supply the water is stored in sumps (underground tank) of capacity reaches the customers at 230v. From feeders to transformers high tension transmission lines are used and from 1.25 lac litres,it can also be stored in overhead tanks kept at a height of 18m and then it transformers to site by low tension transmission lines.

is supplied to the buildings.

MIXED USE BUILDING

RESIDENTIAL AND COMMERCIAL BUILDING, MANGALORE. SITE ANALYSIS:

G+3 floors buildings around Crowded area Every 2m street lights present. Pedestrian- 3m wide with stalls and shops.

5 SEM B.ARCH

Public view Reasonable cost Good service Hygienic View of Gandhi park

1


MIXED USE BUILDING

5 SEM B.ARCH

RESIDENTIAL AND COMMERCIAL BUILDING, MANGALORE. FLOOR PLANS:

GROUND FLOOR PLAN - COMMERCIAL

SECOND AND THIRD FLOOR PLAN

FIFTH TO FOURTEEN FLOOR PLAN - RESIDENTIAL

FIRST FLOOR PLAN

FOURTH FLOOR PLAN – CLUB HOUSE

FIFTEEN TO TWENTY FOUR FLOOR PLAN

BIRD EYE VIEW

SECTION A-A

SECTION B-B

2


MIXED USE BUILDING

5 SEM B.ARCH

RESIDENTIAL AND COMMERCIAL BUILDING, MANGALORE.

VEHICULAR ENTRANCE TO THE COMMERCIAL BUILDING

MASTER PLAN

COMMERCIAL BUILDING PARKING AREA ENTRANCE TO THE RESIDENCE

CLUB HOUSE- SWIMMING POOL VIEW FROM THE TRANSFORMER TO THE COMMERCIAL BUILDING

EXTERIOR VIEW OF RESIDENCE AREA

PEDESTRIAN ENTRANCE TO THE COMMERCIAL BUILDING

3


Museum – thesis project

INTRODUCTION:

8 SEM B.ARCH

Art museum, karkala.

4


Museum – thesis project

SITE ANALYSIS:

8 SEM B.ARCH

Art museum, karkala.

5


Theme: synergy. Inspiration: bahubali and kotichennaya- it involves the pancha butas created by a nature (air, fire, earth, water, sky). It is clearly blended in the form of mudra The design is derived from the hands, when a person he/she wants to express their feeling on the face of various form, but this expressions will represents different form on the context of mudra. This symbol represents the ‘forever’, when the kotichennayya’, died during the war together, But their friendships will motivates the other citizen of the city. and it creates an identity for the unity. This symbol is, when the bahubali in the meditation, he created the mudra, it emphasizes the happiness, concentration and mahavira always express the calmness in his face, but this mudra creates the support for the people and enhance the beauty On the basis of kotichennayya and bahubali of the nature. formed these above expression. It represents the strengthness, unity, supports, friendship and helping nature all kinds of aspects is talking about. As per all this expression this is explaining the proportionality, balance, symmetry, hierarchy. It can be visible in the architecturally and aesthetically finally on the basis the two hands joins creates the magical power.

Museum – thesis project

CONCEPTUAL DESIGN:

8 SEM B.ARCH

Art museum, karkala.

CONCEPT DEVELOPMENT:

6


Museum – thesis project

8 SEM B.ARCH

Art museum, karkala.

MASTER PLAN OF ART MUSEUM

DETAILS OF GROUND FLOOR PLAN

SECTION A-A

SECTION B-B

7


Museum – thesis project

8 SEM B.ARCH

Art museum, karkala.

FIRST FLOOR PLAN

DETAIL OF FIRST FLOOR PLAN

SECOND FLOOR PLAN

DETAIL OF SECOND FLOOR PLAN

8


Museum – thesis project

8 SEM B.ARCH

Art museum, karkala.

BACKYARD OF THE RESTAURANT

EXTERIOR VIEW OF LEFT SIDE LANDSCAPE

BACKYARD OF THE LANDSCAPE

BACKYARD OF THE LANDSCAPE

BACKYARD OF THE OPEN AMPHITHEATRE

MAIN ENTRANCE TO THE MUSEUM

PARKING AREA

EXIT VIEW FROM THE MAIN PUBLIC SPACE

BACKYARD OF MODERN ART INSTALLATION

MAIN ENTRANCE GATE

MAIN EXIT GATE WITH HERITAGE LANDSCAPE

EXTERIOR VIEW OF MUSEUM ADMIN OFFICE

9


AERIAL VIEW OF ART MUSEUM- KARKALA BIRD EYE VIEW EXTERIOR VIEW TOWARDS MODERN ART GALLERY

EXTERIOR BACKYARD VIEW

Museum – thesis project

8 SEM B.ARCH

Art museum, karkala.

10


residential project

PROFESSIONAL TRAINING

MOHAMMED ASIF RESIDENCE, mangalore RESIDENTIAL FEATURE:: -THE SITE IS LOCATED IN MANGALORE AREA IS ABOUT 14811 SQFT. -THE CLIENT HAS THE CONSIDERATION, THAT THE BUILDING WANTS TO BE IN KERALA STYLE OF ARCHITECTURE. -THE ROOF OF THE HOUSE IS CONSIDERED THE OVERHANG OF 1200MM FROM THE EXTERIOR WALL AND ROOF IS TILTING AT ANGLE OF 25 FROM THE BOTTOM TIP OF THE ROOF. -IT HAS THE CERTAIN FEATURE FOR THE REFRESHMENT PROVIDED THE SEATING AREA LIKE GAZEBO, AND GARDEN,SWIMMING POOL WITH WATER FALL. -THIS RESIDENCE HAVING THE OFFICE SPACE IN THE BASEMENT ALONG WITH IT HAS THE CAR PARKING AREA. -THEY HAVE THE SEPARATE 8 NO CAR PARKING AREA IN THE OUT SIDE OF COMPOUND. -IT HAS THE SEPARATE SERVANT ROOM IN THE BACKYARD OF THE HOUSE. -THE FORM AND MASS OF THE BUILDING IS REPRESENTING THE UNIQUE CHARACTER OF THE BUILDING. -THIS RESIDENCE ALLOWING THE NATURAL VENTILATION THROUGH THE GABLE ROOF, IT HAS THE JALI SYSTEM. -IT HAS THE CENTRAL OPEN COURTYARD WITH LANDSCAPE FEATURE. -THE DOOR AND THE GLASS CURTAIN WALL HEIGHT CONSIDERED AS 2400MM.

FRONT VIEW

MASTER PLAN

BASEMENT FLOOR PLAN

GROUND FLOOR PLAN

11


FRONT VIEW

residential project

BACKYARD VIEW

BACKYARD KITCHEN EXIT VIEW

PROFESSIONAL TRAINING

MOHAMMED ASIF RESIDENCE, mangalore

SECTION THROUGH MAIN ENTRANCE

SECTION THROUGH CENTRAL COURTYARD

SWIMMING POOL AREA

GABLE HIP ROOF

BIRD EYE VIEW

THIINNAI AREA

12


Renovation project

PROFESSIONAL TRAINING

Ecumene office, bangalore

13


Residential apartment project

PROFESSIONAL TRAINING

Cariapa residency,bangalore.

14


Gated community

Group housing – residential villas

Wellington park, manipal

SITE LOCATION SITE LOCATION – MANIPAL. SITE AREA – 24459.06 SQMT(6.04 ACRE). TOPOGRAPHY OF THE SITE – GRADUALLY SLOPE CONTOUR. ACCESSIBLE ROAD - DISTRICT ROAD. CLIMATIC CONDITION – HOT AND DRY CLIMATE.

N MASTER PLAN

15


5% LAND AREA FOR CIVIC AMENIITIES

ENTRY FOR VILLAS

HIGHRISE APARTMENT BASEMENT CAR PARKING ENTRY

4BHK CONTEMPORARY VILLAS 5 BHK CONTEMPORARY VILLAS

3 BHK CONTEMPORARY VILLAS

Group housing – residential villas

G+14 STORIED HT WITH 125 FLATS ACCOMODATION

Gated community

Wellington park, manipal

10% FOR THE RECREATIONAL PURPOSE OFCLUB HOUSE ,PLAY AREA,BADMINTION COURT,SWIMMING POOL, GYM AND PARTY HALL

IN SITE LEVEL :- MAIN ROAD – 10 M WIDE. - SECONDARY ROAD – 7.5 M WIDE. - TOTAL NO OF VILLAS – 38 NO. - CLUB HOUSE - 1 NO ( RECREATIONAL BUILDING). BYELAW – 55 % - RESIDENTIAL AREA 45% - PARK, PLAYGROUND, OPEN SPACE

MACRO - LEVEL ZONING - SITE PLAN

16


LG

FF

GF

SF

FF

TF

TF

TYPE – A 4 – BHK 336 SQM (3627.11 SQFT)

TYPE – B 4 – BHK 261.61 SQM (2815.94 SQFT)

GF

FF

GF

SF

FF

TF TYPE – C 4 – BHK 290.91 SQM (3131.32 SQFT)

TF TYPE – D 3 – BHK 223.62 SQM (2407.22 SQFT)

GF

GF

GF

GF

FF

FF

FF

FF

TF

TF

TF

TF

TYPE – G 5 – BHK 298.12 SQM (3208.93 SQFT)

TYPE – H 5 – BHK 361.05 SQM (3886.30 SQFT)

TYPE – E 3 – BHK 214.45 SQM (2308.32 SQFT)

TYPE – F 3 – BHK 206.36 SQM (2221.24 SQFT)

Group housing – residential villas

GF

L G – LOWER GROUND FLOOR B F – BASEMENT FLOOR G F – GROUND FLOOR F F - FIRST FLOOR T F - TERRACE FLOOR

Gated community

Wellington park, manipal

17


GROUND FLOOR 480.08 SQMT(5167.53 SQFT)

FIRST FLOOR 540.41 SQMT(5816.92 SQFT)

3BHK - VILLA

4BHK - VILLA

Group housing – residential villas

CLUB HOUSE – RECREATIONAL ZONE

Gated community

Wellington park, manipal

18


GROUND FLOOR 41 NO PARKING

BASEMENT(-1) FLOOR 50 NO PARKING

BASEMENT(-2) FLOOR 57 NO PARKING

Group housing – residential villas

APARTMENT

Gated community

Wellington park, manipal

19


FIRST FLOOR TOTAL AREA - 1200.29 SQMT (12919.81 SQFT)

Group housing – residential villas

APARTMENT

Gated community

Wellington park, manipal

TYPICAL FLOOR TOTAL AREA - 1190.68 (12816.37 SQFT)

TYPICAL 3BHK FLAT – 128.96 SQMT (1388.11 SQFT)

TYPICAL 2BHK FLAT – 89.74 SQMT (965.95SQFT)

20


HOTEL PROJECT

JW MARRIOTT–5* PROJECT, BANGALORE GROUND FLOOR 3552.14 SQMT(38019.64SQFT) ON THE GROUND SURFACE TWO WHEELER – 20 NO FOUR WHEELER – 53 NO

FIRST FLOOR 2933.83 SQMT(31579.48SQFT)

SITE LOCATION SITE LOCATION – BANGALORE SITE AREA – 12055.14 SQMT(2.97 ACRE). TOPOGRAPHY OF THE SITE – FLAT LAND. ACCESSIBLE ROAD - NATIONAL HIGHWAY CLIMATIC CONDITION – TROPHICAL SAVANNA CLIMATE

BASEMENT FLOOR 5017.61 SQMT(54009.1SQFT) - PARKING (141 NO)

N

21


HOTEL PROJECT

JW MARRIOTT–5* PROJECT, BANGALORE SECOND FLOOR 2597.35SQMT(27957.64SQFT) SUITROOM

THIRD FLOOR 3053.08SQMT(32863.08SQFT)

TYPICAL FLOOR 2331.19SQMT(25092.72SQFT) SUITS ROOM - 42 NO ROOMS EACH FLOOR 8 NO OF FLOOR

SECTION THROUGH SUITS ROOM

22


HOTEL PROJECT

JW MARRIOTT–5* PROJECT, BANGALORE

SECTION THROUGH SWIMMING POOL

TERRACE FLOOR 2053.40SQMT(22102.61SQFT) - LEISURE SWIMMING POOL - BAR - FITTNESS CENTRE - SPA - PLAY AREA.

BACKYARD AERIAL BIRD EYE VIEW OF SWIMMING POOL

23


FRONT ELEVATION

GROUND FLOOR

AREA – 3556.00 SQFT RIGHT SIDE ELEVATION

FIRST FLOOR

LEFT SIDE ELEVATION

America( victorian style2018 - PROJECTS of architecture)

FREELANCEGuest PROJECT house, madikeri

AREA – 3502.00 SQFT

(SOURCE: 3D DESIGNER)

24


RESIDENTIAL AND RELIGIOUS PROJECT

RENOVATION PROJECT,UDUPI

25


VIEW -STAIRCASE AREA

VIEW - KITCHEN

GROUND FLOOR PLAN

VIEW - MASTER BED ROOM

Pent house interior PROJECT

Interior PROJECT, UDUPI

VIEW - DINING ROOM

FIRST FLOOR PLAN

TOTAL AREA – 244.66 SQMT ( GROUND FLOOR AND FIRST FLOOR. MATERIAL CONCEPT - BIEGE COLOUR , WALL AND CEILING WORK MOULDED WITH POP AND GYPSUM BOARD ,WADROBE FIXED WITH 19MM THK LAMINATEPLYWOD AND CONTEMPORARY STYLE CUSHION (SOURCE: 3D DESIGNER) VIEW - LIVING ROOM

26


2018 - PROJECTS

FREELANCE PROJECT

233.83 SQMT(2517 SQFT), BANGALORE.

135.54 SQMT(1459 SQFT), BANGALORE

1832. 32 SQMT(19723SQFT), MYSORE.

220.73 SQMT(2376 SQFT), BANGALORE

27


2018 - PROJECTS

FREELANCE PROJECT

155.03SQMT(1668.75 SQFT), HIRIYADKA 206.80 SQMT(2226 SQFT), BANGALORE

466.69SQMT(5023.04 SQFT), BANGALORE 206.80 SQMT(2226 SQFT), BANGALORE

178.83 SQMT(1925.00 SQFT), BANGALORE

28


2018 - PROJECTS

FREELANCE PROJECT

PLAN

ARRIVAL TERMINAL

PLAN

DEPARTURE TERMINAL

29


30

PRODUCTIVE DESIGN


31

PHOTOGRAPHY


Thank you

CONTACT SAGAR P S PHONE NO - +91 8861863086 8105322068 sagarshettigar65@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
##PROFESSIONAL PORTFOLIO## by sagar shettigar - Issuu