Proposed Steel Beam Schedule Reference Level
200
0
200
400
SCALE 1: 25
AB
C
600
Mark
800 1000 mm
D
2 NC-31
Cut Length
Type
First Floor B1.00 First Floor B1.01 First Floor B1.02 First Floor B1.03 First Floor B1.04 First Floor B1.05 First Floor B1.06 First Floor B1.07 First Floor B1.11 Loft B2.01 Loft B2.02 Loft B2.03 Loft B2.04 Loft B3.01 Grand total: 14
Start Level Volume Offset
UKC254x254x73 UKC203x203x71 UKC203x203x46 UKC203x203x60 UKB203x102x23 UKB203x133x25 UKC203x203x46 UKC203x203x46 UKB254x146x31 UKB203x133x25 UKC203x203x46 UKB203x133x25 UKB203x133x25 UKC152x152x23
7879 5891 4478 4873 3046 3693 3539 4188 6400 3037 4778 4524 3564 1328
0.07 m³ 0.05 m³ 0.03 m³ 0.04 m³ 0.01 m³ 0.01 m³ 0.02 m³ 0.02 m³ 0.03 m³ 0.01 m³ 0.03 m³ 0.01 m³ 0.01 m³ 0.00 m³ 0.34 m³
0 0 0 0 0 0 0 0 -150 1 0 0 0 3000
End Level Offset
Commen ts
0 0 0 0 0 0 0 0 -150 1 0 0 0 3000
1
0x 6
5
4
3
2
1
10
11
12
13
NC-28
3
C SH 4 S 80
UP 8
1 AP-DR-P1-XX-62
x8
ST-DR-P1-XX-21
7
8
Stairs
1
NC-27
14
C SH 6 S 80
x8
0x
8
9
4
Living
5 Garage
6
7
Client :
Porch
Project :
Ahmad and Faiza 56 Moat Drive, Harrow HA1
Drawing : 1 ST-DR-P1-XX-21
1
Proposed Ground Floor Structure
Scale : 1 : 25
Status : Planning
Date :
Dwg No : ST-DR-P1-00-01
12/27/20
Rev :
D E S I G N L A B S L O N D O N
ST 1.0 Proposed Ground Floor 1 : 25 3
2
1
1
ST-DR-P1-XX-20
ST-DR-P1-XX-20
NC-28
ST-DR-P1-XX-20
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD. It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
0.22 m³ Grand total: 8
-800 C8 0 Loft
Roof
SHS 60x60x5
D(-34)-4( 2833 41)
Steel 50-355
0.00 m³
0.0081 3 0.0081 3 0.00 m³ Steel 50-355 2833
0 0 C4 C6
-800 0 Loft
-250 C3
Foundation 0 Foundation 0
-200 C1
Foundation 0
Foundation 0
Foundation 0
0
C7
SHS 60x60x5
D(-34)-3
0.0175 0.0175 0.01 m³ 0.01 m³ Steel 50-355 Steel 50-355 6000 3290 A-3 C-4 SHS 80x80x8 SHS 80x80x8
0.044 0.02 m³ Steel 43-275 UKC152x152x44 D-2
3040
0.044 0.02 m³ Steel 43-275
0.08 m³ 300 x 450mm
C(1127)-7 600 0
Ground Floor Ground Floor First Floor First Floor Loft First Floor Roof
8
2
Foundation 0
Cloak Room
300 x 450mm
Length Base Base Level Offset
W.C.
Type
2
Top Mark Offset
EITHER C1 OR C2 COLUMN
Top Level
C U 3 K C 15 2
C U 1 K C 15 2
x1
x1
52
52
x4
4
x4
Utility
Column Location Mark
4
Proposed Steel Column Schedule
Type Comments
1
0.08 m³
Volume
W
Kitchen
C(1194)-7 600 (559) 3090 UKC152x152x44 B-2
Comments
NC-31