Every crossing, bore, and utility installation starts with a commitment to the people and communities we serve. At Legacy Horizontal Drilling, we partner with contractors, municipalities, and utility providers to deliver critical infrastructure with precision and care. We believe the strongest projects are built on trust, driven by integrity, and completed safely, efficiently, and with quality that lasts.
COMPANY OVERVIEW Legacy Horizontal Drilling (Legacy HD) provides horizontal directional drilling services for underground utility installations throughout the Southeast. With experience across water, sewer, natural gas, power, fiber, and communications infrastructure, Legacy HD specializes in completing complex underground crossings while minimizing disruption to surrounding roadways, properties, and operations. Our team has successfully completed HDD installations in a wide range of ground conditions and project environments, including rock, congested urban corridors, interstate crossings, waterways, active facilities, and other sensitive locations. This experience allows our team to evaluate each crossing individually and develop an approach based on ground conditions, utility requirements, constructability, safety, and schedule. Legacy HD’s experience ranges from individual specialty crossings to multi-bore utility installations. Our work includes large-diameter water mains, steel and HDPE gas lines, power and fiber installations, sewer infrastructure, traffic signal systems, and long-distance rock bores. The team has successfully completed directional bores beneath every interstate in the Atlanta area without incident. At Legacy HD, quality work and strong relationships go hand in hand. We approach every project with a focus on safety, planning, communication, and dependable execution, working closely with contractors, utility providers, and project teams to deliver each installation safely and efficiently. This closely reflects the positioning of the existing Legacy HDD site.
SERVICES Horizontal Directional Drilling (HDD) Rock Drilling Water & Sewer Installations Natural Gas Installations Power & Electrical Installations Fiber & Communications HDPE Pipe Installation & Fusion Steel & Ductile Iron Pipe Installations Interstate, Roadway & Waterway Crossings Congested & Sensitive-Area Crossings
CONTACT US Location: 45 Peachtree Industrial Blvd, Sugar Hill, GA 30518 Phone Number: Gregg Wilder: (404) 925-3499 Zach Towner: (678) 200-8884
RELEVANT EXPERIENCE Smiths Station Water Installation Smiths Station, AL Scope: 2,500 LF of 14” water line installed through multiple rock bores, including pipe fusion
Rome Gas Main Rome, GA Scope: 1,000 LF single-shot installation of 8” plastic gas main
Braselton Water Installation Braselton, GA Scope: Multiple bores for 18” ductile iron water main, including a 700 LF crossing
Magnolia Power Reconduct Savannah, GA Scope: 5,300 LF of directional drilling for power reconduct installation
Dalton Utilities – I-75 Crossing Dalton, GA Scope: 800 LF installation of 14” HDPE beneath I75 Lockheed Aircraft Taxiway Crossing Marietta, GA Scope: 540 LF installation of 12” HDPE beneath an aircraft taxiway Tallapoosa River Fiber Crossing Tallassee, AL Scope: 1,400 LF single rock bore beneath the Tallapoosa River for fiber installation I-475 Fiber Crossing Macon, GA Scope: 1,400 LF single bore beneath I-475 for fiber installation Georgia Power Fiber Athens, GA Scope: Multiple rock bores totaling 2,200 LF, with individual shots ranging from 300 to 520 LF
GREGG WILDER PRESIDENT
Certifications First Aid, CPR & AED, Fire Extinguisher Trained, Hand/Power Tools, Silica, Fall Protection Trained, Excavation & Trenching Certified, Confined Space Trained, OSHA 30 HR, NPDES Blue Card, Utility Manager License
PROJECT LIST Smiths Station Water Installation Smiths Station, AL Scope: 2,500 LF of 14” water line installed through multiple rock bores, including pipe fusion
Rome Gas Main Rome, GA Scope: 1,000 LF single-shot installation of 8” plastic gas main
Braselton Water Installation Braselton, GA Scope: Multiple bores for 18” ductile iron water main, including a 700 LF crossing
Magnolia Power Reconduct Savannah, GA Scope: 5,300 LF of directional drilling for power reconduct installation
Dalton Utilities – I-75 Crossing Dalton, GA Scope: 800 LF installation of 14” HDPE beneath I75
I-475 Fiber Crossing Macon, GA Scope: 1,400 LF single bore beneath I-475 for fiber installation
Lockheed Aircraft Taxiway Crossing Marietta, GA Scope: 540 LF installation of 12” HDPE beneath an aircraft taxiway
Georgia Power Fiber Athens, GA Scope: Multiple rock bores totaling 2,200 LF, with individual shots ranging from 300 to 520 LF
Tallapoosa River Fiber Crossing Tallassee, AL Scope: 1,400 LF single rock bore beneath the Tallapoosa River for fiber installation
ZACH TOWNER
PROJECT MANAGER Certifications First Aid, CPR & AED, Fire Extinguisher Trained, Hand/Power Tools, Silica, Fall Protection Trained, Excavation & Trenching Certified, Confined Space Trained, OSHA 30 HR, NPDES Blue Card, Utility Manager License
PROJECT LIST Smiths Station Water Installation Smiths Station, AL Scope: 2,500 LF of 14” water line installed through multiple rock bores, including pipe fusion
Rome Gas Main Rome, GA Scope: 1,000 LF single-shot installation of 8” plastic gas main
Braselton Water Installation Braselton, GA Scope: Multiple bores for 18” ductile iron water main, including a 700 LF crossing
Magnolia Power Reconduct Savannah, GA Scope: 5,300 LF of directional drilling for power reconduct installation
Dalton Utilities – I-75 Crossing Dalton, GA Scope: 800 LF installation of 14” HDPE beneath I75
I-475 Fiber Crossing Macon, GA Scope: 1,400 LF single bore beneath I-475 for fiber installation
Lockheed Aircraft Taxiway Crossing Marietta, GA Scope: 540 LF installation of 12” HDPE beneath an aircraft taxiway
Georgia Power Fiber Athens, GA Scope: Multiple rock bores totaling 2,200 LF, with individual shots ranging from 300 to 520 LF
Tallapoosa River Fiber Crossing Tallassee, AL Scope: 1,400 LF single rock bore beneath the Tallapoosa River for fiber installation
CONTACT US
Gregg Wilder President
CONTACT
(404) 925-3499
Zach Towner Project Manager
CONTACT
(678) 200-8884
VISIT US 45 Peachtree Industrial Blvd, Sugar Hill, GA 30518