t h r e e
B e d r o o m
d e s i g n
Site plan is not drawn to scale. Rendering, landscaping, street sizes and distances are artist’s concept. Plans and specifications are subject to change without notice. E. & O.E.
CEDARVALE UNIT 8 BUILDING 4 1 74 0 S Q . F T .
Third Floor
Second Floor
The floorplans and elevations shown are pre-construction plans and may be revised or improved as necessitated by architectural controls and the construction process. The measurements adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual usable floor space may vary from the stated floor only where required by O.B.C. Locations of furnace, hot water tank, posts and beams may vary and are to be determined by architect and purchasers shall be deemed to accept the same. All options shown are upgraded. *Side windows only if siting permits. All images are artist’s concept. E.& O. E. November 2020
LAKE
UNIT 1
UNIT 1
UNIT 6
UNIT 6
UNIT 2
UNIT 2
UNIT 7
UNIT 7
UNIT 5
UNIT 5 UNIT 4
UNIT 4
LOWER FLOOR BUILDING 4
UNIT10 UNIT 9 UNIT 3
UNIT 11
FIRST FLOOR BUILDING 4
UNIT 10 UNIT 9 UNIT 8
SECOND FLOOR BUILDING 4
UNIT 3
UNIT 8
THIRD FLOOR BUILDING 4
MAPLEGROVE UNIT 10 BUILDING 1, 2, 3 1 74 0 S Q . F T .
Second Floor
Third Floor
The floorplans and elevations shown are pre-construction plans and may be revised or improved as necessitated by architectural controls and the construction process. The measurements adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual usable floor space may vary from the stated floor only where required by O.B.C. Locations of furnace, hot water tank, posts and beams may vary and are to be determined by architect and purchasers shall be deemed to accept the same. All options shown are upgraded. *Side windows only if siting permits. All images are artist’s concept. E.& O. E. November 2020
UNIT 14
UNIT 14
UNIT 13
UNIT 13
UNIT 12
UNIT 12
UNIT 5
UNIT 4
LAKE
UNIT 11 UNIT 2 UNIT 3
FIRST FLOOR BUILDING 1, 2, 3
UNIT 11
UNIT 1
UNIT 9 UNIT 8 UNIT 7 UNIT 6 UNIT 3
SECOND FLOOR BUILDING 1, 2, 3
UNIT 10
UNIT 9 UNIT 8 UNIT 7 UNIT 6 UNIT 10
THIRD FLOOR BUILDING 1, 2, 3
ELMHURST UNIT 3 BUILDING 1, 2, 3 1825 SQ. F T.
First Floor
The floorplans and elevations shown are pre-construction plans and may be revised or improved as necessitated by architectural controls and the construction process. The measurements adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual usable floor space may vary from the stated floor only where required by O.B.C. Locations of furnace, hot water tank, posts and beams may vary and are to be determined by architect and purchasers shall be deemed to accept the same. All options shown are upgraded. *Side windows only if siting permits. All images are artist’s concept. E.& O. E. November 2020
UNIT 14
UNIT 14
UNIT 13
UNIT 13
UNIT 12
UNIT 12
UNIT 5
UNIT 4
LAKE
UNIT 11 UNIT 2 UNIT 3
FIRST FLOOR BUILDING 1, 2, 3
Second Floor
UNIT 11
UNIT 1
UNIT 9 UNIT 8 UNIT 7 UNIT 6 UNIT 3
SECOND FLOOR BUILDING 1, 2, 3
UNIT 10
UNIT 9 UNIT 8 UNIT 7 UNIT 6 UNIT 10
THIRD FLOOR BUILDING 1, 2, 3
Tamarack UNIT 3 BUILDING 4 1825 SQ. F T.
First Floor
The floorplans and elevations shown are pre-construction plans and may be revised or improved as necessitated by architectural controls and the construction process. The measurements adhere to the rules and regulations of the TARION Warranty Corporation’s official method for the calculation of floor area. Actual usable floor space may vary from the stated floor only where required by O.B.C. Locations of furnace, hot water tank, posts and beams may vary and are to be determined by architect and purchasers shall be deemed to accept the same. All options shown are upgraded. *Side windows only if siting permits. All images are artist’s concept. E.& O. E. November 2020
UNIT 1
UNIT 2 LAKE
UNIT 4
LOWER FLOOR BUILDING 4
UNIT10 UNIT 9 UNIT 3
UNIT 11
FIRST FLOOR BUILDING 4
Second Floor
UNIT 6
UNIT 7
UNIT 2 UNIT 5
UNIT 5 UNIT 4
UNIT 6
UNIT 1
UNIT 8
SECOND FLOOR BUILDING 4
UNIT 7 UNIT 10 UNIT 9
UNIT 3
UNIT 8
THIRD FLOOR BUILDING 4