Skip to main content

RVR & ProSolar Case Study - Caseys Furniture Store Cork & Limerick

Page 1


CASE STUDY

Caseys Furniture Store

Implementation of rooftop air handling integrated with heat pump technology and large scale solar PV installation across two retail sites.

At ProSolar, we provide businesses with longterm, reliable solar energy solutions that drive cost savings, enhance sustainability and futureproof operations.

As a permanent and trusted renewable energy provider in Ireland, we focus on tailored solar PV, battery storage and our ProCharge EV charging solutions designed for maximum efficiency and return on investment.

With rising energy costs and increasing sustainability demands, now is the time to take control of your energy future.

BACKGROUND

THE CLIENT

Established in 1921 by John Casey, Caseys Furniture has been a cornerstone of the Irish furniture retail landscape for over a century. Born from humble beginnings, the company has grown into a renowned name, synonymous with superior service and the creation of comfortable living experiences for generations of Irish families

Under the continued leadership of the Casey family, now in its third generation the company remains committed to its founding principles. Caseys Furniture is celebrated for its superb quality furniture, excellent value, and a commitment to providing an unparalleled retail experience

With a new purpose-built store in Limerick (2005) and a state-of-the-art warehouse (2017), Caseys Furniture continues to expand its reach and enhance its service offerings.

PROJECT REQUIREMENTS

The Caseys Furniture building in Limerick is a modern, highly glazed retail environment with significant solar gain during summer afternoons and substantial heating demand during winter months. This creates a requirement for reliable, year-round heating, cooling and effective ventilation across both the ground and first-floor retail areas.

Across both sites the existing air-handling, heating and cooling plant was nearing endof-life, resulting in unreliable cooling performance and insufficient heating capacity during colder periods.

Project Requirements

Replace the ageing AHU and chiller with a fully integrated modern solution

Improve airflow to ensure consistent comfort and temperature control throughout the store

Deploy a high-efficiency heat pump system to reduce energy consumption and carbon emissions

Meet peak seasonal heating and cooling demands

Maximise reuse of existing ductwork to minimise disruption to trading

Integrate on-site solar PV to reduce running costs and support the electrical load of the new HVAC system

In parallel with the HVAC upgrade, the client also wanted to address rising and volatile energy costs. Strong daytime electricity demand from retail operations and HVAC usage made the building well suited to on-site solar generation. This enabled Caseys to reduce immediate electricity bills, limit exposure to future price increases and offset the additional electrical demand created by the heat-pump system. Solar generation also lowers peak grid import requirements, helping to manage maximum import capacity charges while significantly reducing the site’s carbon footprint.

A high-capacity Thermocold Airtop rooftop unit was selected, providing efficient, lowcarbon heating, cooling and ventilation from a single, fully integrated system.

GRANT FUNDING

GRANT FUNDING

GRANT FUNDING & COMPLIANCE

As part of Casey’s Furniture’s wider sustainability and decarbonisation strategy, both the Limerick and Cork projects secured support through Sustainable Energy Authority of Ireland (SEAI) non-domestic grant schemes, covering renewable energy and low-carbon heating upgrades.

Rather than treating solar and HVAC as separate investments, RVR and ProSolar developed an integrated, phased approach aligned with the client’s long-term energy and operational goals.

IntegratedFundingStrategy

The projects supported a joined-up transition across:

On-site renewable energy generation

High-efficiency heat pump and rooftop HVAC systems

Electrical and system upgrades

Ventilation and airflow improvements

Long-term carbon and energy performance

This approach ensured the sites were future-ready, supporting electrified heating and reducing exposure to energy price volatility.

End-to-EndSupport

RVR and ProSolar managed the full funding and compliance process, including:

Identifying appropriate SEAI schemes

Designing systems aligned with eligibility and performance criteria

Preparing and managing grant applications

Coordinating inspections and approvals

Managing ESB Networks grid and export applications

Following successful inspection and commissioning, both sites now generate renewable energy on-site, export surplus electricity and operate with improved efficiency.

EQUIPMENT

HVAC EQUIPMENT

For the system nits are state-of-theart rooftop HVAC systems designed to provide highly efficient heating, cooling, and ventilation. These systems are specifically engineered to handle airflow capacities ranging from 2880 m³/h to 44000 m³/h, making them suitable for a large range of commercial applications.

Airtop units incorporate integrated control systems that optimize performance while minimizing energy consumption. Whether the requirement is for heating during the colder months or cooling in the summer, these units deliver year-round comfort with significant operational savings.

HVACForAllBuildingTypes

Versatile, packaged solutions for medium to large buildings including new builds & renovation projects.

GrantEligible

Airtop units are classified as heat pumps and are eligible for grant assistance

EconomicalSolution

With high efficiency and energy savings, the Airtop offers a cost-effective solution.

HeatPumpWithAHUFunction

Combining the efficiency of heat pump technology with the versatility of air handling units

CompactRange

Enjoy maximum flexibility with the Airtop; available in three frames to suit any space.

CustomOptions

Including auxiliary heating options, energy recovery and economizer

SOLAR PV EQUIPMENT

JINKO SOLAR 480 WP N-TYPE

The Jinko Tiger Neo N-type 480Wp panels represent the latest in solar cell technology, delivering exceptional efficiency of 22.24% through advanced N-type mono-crystalline cells. These panels feature Hot 2 0 technology that significantly reduces lightinduced degradation.

With a 12-year product warranty and 30-year linear performance guarantee (maintaining 87.4% output at year 30), these panels provide long-term reliability for commercial installations. The robust construction withstands wind loads of 2,400 Pa and snow loads of 5,400 Pa, while salt mist and ammonia resistance make them ideal for Ireland's median wind conditions.

264 of these panels were installed at Caseys Limerick, with 132 at the Cork warehouse.

HUAWEI INVERTER

The SUN2000-100KTL-M1 is a highly efficient (98.8%) string inverter designed for optimizing large-scale solar deployments. Its 8 MPPTs maximize energy harvest across diverse panel configurations and environmental conditions

HighCapacity: 40kW output with flexible voltage options (480V/400V/380V)

AdvancedMonitoring: String-level diagnostics and mobile app interface for streamlined O&M

RobustDesign: Fuse-free architecture and IP66-rated enclosure for enhanced reliability

SafetyFeatures: Integrated surge protection on both AC and DC sides

This inverter has proven an excellent solution for commercial and industrial projects seeking high performance, simplified management, and long-term reliability.

2 of these inverters were installed in Limerick, with 1 of these being installed in Cork.

CASEYS FURNITU

264 solar panels were ins large flat roof surface maximum solar capacity o

The K2 Systems D-Dome was used to mount the p West-facing orientations degrees.

The panels were secured ballast (weight) on the rather than any mechanic the surface of the roof.

On the same day as AIRTOP unit was craned solar panels, mounting fra the solar installation wer the roof.

This structure contained the solar inverters, G10 Relay (for ESB Networks compliance) as well as the main electrical distribution board, with the main supply cable to the

This pre assembly made for a neat installation on the roof, specifically designed to sit on the generator’s plinth, and also greatly reduced the time that was required to be spent on-site on the electrical installation

The mounting of the solar panels on the 3 roofs took 2 weeks

This solar PV array is projected to generate approximately 105 MWh (105,000 units of electricity) each year, and is realistically expected to repay its initial investment in 4.5 years.

CASEYS FURNITURE CORK

132 solar panels were installed on the roof of Caseys Furniture Warehouse Cork for a maximum solar capacity of 63.36 kWp. 66 panels were mounted on the east-facing side of the trapezoidal metal roof, with the same number of panels mounting on the west-facing side of the roof.

These were connected to a 40 kW solar inverter located at a mezzanine level of the warehouse, with Firefighter’s Safety Switches installed for rapid array shutdown

The Clenergy Mycrorail system was used to mount the solar panels to the roof, with panel installation taking 4 days Electrical installation took 3 days

This solar PV array is projected to generate approximately 53 MWh (53,000 units of electricity) each year, and is realistically expected to repay its initial investment in 4.2 years.

Turn static files into dynamic content formats.

Create a flipbook
RVR & ProSolar Case Study - Caseys Furniture Store Cork & Limerick by RVR Energy Technology - Issuu