A DDITIONAL L INKS : the other ongoing electrical projects!). The new transformer has now been installed; has been energized and inspected by the City Electrical Inspector.
Project Update: HVAC Project—3N On May 16, 2010 the winds were calm and Vancouver Island Helicopters (VIH) were able to lift the HVAC equipment on to the roof. If you missed it, it was a spectacular sight to see….. this picture is courtesy of VIH.
•
Picture Courtesy of VIH. •
The HVAC equipment, is now being installed and connected. Start up and commissioning of the equipment will begin early this fall.
Electrical Upgrade •
Picture courtesy of VIH
Electrical Upgrade Pics! As pictures are worth a thousands words….. It will look like this!
O PERATIONS
J UNE 2010
Welcome to the 3rd edition of 2010. Here is a brief update on “what’s happening”.
•
AND
The electrical upgrade project is well underway and 11 power outages were a tell tale sign (and only a few more to go for
•
Many have been wondering what that big very hole on the east side of the building is for…. we are constructing a new concrete emergency generator room for our new emergency generators. The fuel tank for the generators has now been installed and they’ve started on installation of the mechanical piping. The concrete work is nearly finished; installation of new railings is out for tender on BC Bid; planning is underway to relocate plants from the native plant garden to the concrete new planters and the transplanting will begin in
www.bchydro.com www.crd.bc.ca www.livesmartbc.ca
I IN
THIS ISSUE :
P ROJECT U PDATES
1
PMO U PDATE
2
DID YOU KNOW ?
2
O UR R ECYCLING P ROGRAM STATS : G LASS / TIN = 2683 CU FT O RGANICS = 2012 CU FT C ARDBOARD = 11232 CU FT SHREDDED PAPER 1980 LBS I T IS E STIMATED THAT NINE - 40 FOOT TRAILER LOADS KEPT OUT OF THE LANDFILL EACH YEAR !!