Skip to main content

Portfolio_RJ

Page 1

CONTENT

01 | ACADEMIC WORKS

Regeneration of the Market Area in Belfast

SELECTED WORKS

02 | PART 1 PROFESSIONAL WORKS Large scale urban design

2019-2023 03 | PART 2 PROFESSIONAL WORKS

Commercial | Residential | Workspace | Mixed-use

04 | PART 2 TECHNICAL WORKS Technical skills

05 | OTHER WORKS

Model Making | Visualisation | Photography


01 | ACADEMIC WORKS Regeneration of the Market Area in Belfast Location: Category: Project Year:

Belfast , Northern Ireland Mixed-use, Urban Farm, Residential 2021-2022 (Master research and design project)

e fi

e

f e ec e ec f e e e .M e ec focused on the issue of high food carbon footprint in the current food industry. Trying to reduce the food carbon footprint by e ef c . c e e c ef c . e ef e M c ec f c e e e ef e S . e f e e e e effic e cce c ce f f .

e e e M c e e e c focused on the social aspect of the built environment. It discussed the under considered humanistic care in the planning of a rapid e e c e e e e c S e e e e. e e c c e e e e c ee ffic e c development. And stressed the responsibility of the planning e e ec e f e in the planning of a city.

e e e c e ec e M c f ec . f c e e built environment both environmentally and socially.

e

f

e e


THE FARM e

e

e

e

e

f

f ec ff sustainability by localising the food c . e e c e an empty plot next to the Lanyon Place (Belfast Central Station) for easy access by local and surrounding residents. The farm e e e to deliver the food it produced to e c e . f

e

ec c c ec

e f

c

f

e

e ce

e

c

f

e e experience centre.

f

e e c f f

e ec c f production and supply system e fe c e carbon embodied food for Belfast e e e to add cultural and educational value to the community.


01 | ACADEMIC WORKS Regeneration of the Market Area in Belfast Location: Category: Project Year:

Belfast , Northern Ireland Mixed-use, Urban Farm, Residential 2021-2022 (Master research and design project)

e M e e ec ce ef . particularly focused on the social sustainability of the built environment.

eM e e e e fc e e

ec c e e .

e

e

e

fic

ec

ffe e f

e e

c

e

e

e e ce ce c

c e f e c e ec

e ce

e c e e e e c e c e c e e e c e e e the area. f

ce f e

c e e e e ce e ce e fc ec e e ec e e c e e ef e e e fic

e f e f


Housing Units 2 storey 2-bedroom housing e fi e e ec cce e f e c space.

Level 00

Level 01

Level 02

Level 03

Central Market Space The semi-open central market ce c e e e . is the space for daily market c e e exhibition.

First Floor Platform O e fi f connecting 4 blocks and providing outdoor communal space for residents.


Site elevation

Loading area for receiving the food from urban farm and loading the processed food delivering to other area.

Cookery school kitchen with a view into the food production underneath

Food production for processing and packaging the food produced from the urban farm.

Food collection point for collecting the food processed and packaged in the food production space.

Communal BBQ corner in the centre of the second floor roof platform

Double height space for the entrance and reception space of the cookery school.

Linking bridge connecting four residential blocks on the second floor e el

Living room, kitchen and reading room on the lo er floor of the duplex housing, with access to the front arden

o edrooms on the pper floor of the duplex housing.

The vertical circulation core for residents eta l space on ro nd floor for local to access their housing through roof small business, each unit comes with platform on the second floor or shop space on the rst floor

Section

Software Used: SketchUp Enscape Photoshop


2

1

3

1 Vapour control barrier e Vapour control barrier e f ce c c e e e e

f

5 4

2

ee e e c e Vapour control barrier e

3

f c c e ee e c Bituminous-felt seal e e insulation e f ce c c e e e e

4

e c ee e e f ce c

5 e

e

cee

e

e

e e

e e Vapour barrier e f ce c c e e e e Suspended timber ceiling

fe

e e

6 6 e e

e

e

e e e e e f ce c c e e e e e e S e Bituminous sealing layer e

e

Technical details

Street view


02 | PART 1 PROFESSIONAL WORKS Guangzhou Xilang Transportation Hub (Competition) Location: Guangzhou, China Category: Transportation Hub, Commercial Client: Guangzhou Metro Group Co., Ltd Project Year: 2019 GFA: 1,600,000 sqm Work Involved: Conceptual development, Modelling, CAD drawings, Diagrams, Competition packages, Attending key meetings

e

e

China.

c .

e

e

f

f e

ec e f e e e e e e

e e

Me e e c e f

e e

.

e c e e c e e c e e e e e

The masterplan provided an overall development and improvement strategy f e . e e e e f c e e f e f e ec c c e c c e f ce e f transportation station and city. The urban design proposal aimed to create e e ce e c e e c ee e ce e c e e f e ce e a comprehensive public transportation system into the urban fabric. The scheme uses an elevated platform system to organically connect different f c c e e e e e e e e surrounding urban public space. The concept of ‘Integration of transportation ce f c e e e fe c ec ce e ce e e f.

Work involved: Concept development AutoCAD drawings SketchUp model making Diagrams drawings Competition package


DESIGN CONCEPT ec c

ce f e e e e ee c e f ee . e e f e e f e ee c e e c c e . e f e e ee c ec ffe e f c south of the site (station area) to north (commercial & residential area).

e

e f f

e e

Site plan

Conceptual sketch


TRANSFER HALL e ce e e c ce c e e e e fe f c e c ec e space covered by a massive roof. Floating metro platform for metro line e e e fe ce e fe ef the transportation hub.


ransfer hall floor plan

ro nd floor plan

Transfer hall section pper floor plan


02 | PART 1 PROFESSIONAL WORKS Shenzhen Technology Park

Work involved:

Location: Category: Client: Project Year:

Shenzhen, China Urban design Shenzhen City Council 2020

Concept development AutoCAD drawings SketchUp modelling Diagrams drawings Competition package


INNOVATION CLUSTER

空中花园 Sky Garden

e

c e ee f e e c e c e c c e c e e c ffe e e e ce e S e e e e e . e c ec ec e e c e e f e fi extended form the shared indoor communal atrium space in each cluster.

e

空中花园

空中花园

二层云平台

二层云平台

研发者沙龙

研发者沙龙

Sky Sky Garden Garden

Sky Garden

e e e

二层云平台

Cloud Platform (2F)

研发者沙龙

Developer’s Salon

Cloud Cloud Platform Platform (2F) (2F)

Developer’s Developer’s Salon Salon

Cloud Platform (2F)

Developer’s Salon


01 | PART 1 PROFESSIONAL WORKS Xiongan Train Statation and Surrounding Area Urban Design

Work involved:

Location: Category: Client: Project Year:

Hubei, China Urban design Xiongan City Council 2020

Concept development AutoCAD drawings SketchUp modelling Diagrams drawings Competition package


F1

F1

ra n stat on floor plans

e el

B1

B1

ra n stat on floor plans

e el

B2

Xiong’an Intercity Railway

F1

B1

B2

ra n stat on floor plans

e el

B3

雄安城际站及小里站周边建筑设计 Xiong’an Intercity Railway Station, Xiaoli Railway Stations, and Their Surrou

TRAIN STATION + COMMERCIAL SPACE ee

e

ee

e

ce

e

f

B1 e

e f e

e

f e

e

e

B2

B3

B4 ra n stat on floor plans

雄安城际站及小里站周边建筑设计

e el


03 | PART 2 PROFESSIONAL WORKS Large-scale Residential Development Location: Category: Client: Project Year:

Herne Bay, England Residential Kitewood 2022 Project Budget: 40 million

Work involved:

Background Osborne development is a large-scale residential project appointed by the client Kitewood Estates Private Development in relation to the Reserved Masters Application for land south of Osborne Gardens, Hillborough, Herne Bay. It is part of the major extension to the coastal area of Herne Bay.

Design proposal The proposal includes the development of 180 dwellings on greenfield site part of wider master plan of circa 3000 houses. The site layout follows the approved Land Use Parameter Plan which gives structure to the density of homes within the site. Two character areas are proposed within the site, which are defined to reduce

the scale of the residential development, relative to the wider Masterplan. The areas are split strategically by a generous green space and linked by a single road to encourage access routes from opposite sides of the scheme. Pedestrian and access is promoted throughout the scheme.

Concept development AutoCAD drawings Visualization (Vray, Enscape) SketchUp modelling Diagrams drawings Design code Design access statement Planning package


Bathroom Bedroom 1 12.1 sqm

WR

Living / Dining / Kitchen

Balcony Above

22.7 sqm

Plot: 102 1B2P (M4(2))

Storage

WM

WM

Storage

Bathroom Balcony Above

WR

Plot: 101 1B2P (M4(2))

Bedroom 1 12.2 sqm

Living / Dining / Kitchen 26.1 sqm

Canopy Above

Dry riser

WR

Bedroom 1

Riser

Post

13.6 sqm

Entrance

Living / Dining / Kitchen

WR

28.0 sqm

Bedroom 2 13.3 sqm

Plot: 100 2B4P (M4(2))

Bathroom

Lobby

Storage

WM

Plot: 099 2B4P (M4(2))

Lobby

Storage

Buggy Store

Bathroom

WM

Bedroom 1 13.2 sqm

WR

Bedroom 2 13.8 sqm

Living / Dining / Kitchen

WR

30.5 sqm

Stairs

Balcony Above

Balcony Above

partment t p cal floor plan

Fan Coil Unit

Living / Dining Room 30.8 sqm

Bathroom

Ensuite Bedroom

Bedroom 3

Arlington 4B8P

11.5 sqm

10.0 sqm WR

WR

Ensuite

WC

WR

Storage

WR

Bedroom 4

Bedroom 2

10.0 sqm

10.0 sqm

Kitchen

WM

15.1 sqm

Study 8.7 sqm

Storage

KEY Chalvington - 3 bed Square Field - 3 bed Cuckmere - 2 bed Wilmington - 4 bed Arlington - 4 bed Cuckmere and Chalvington - 2 and 3 bed Apartment Blocks - 2 and 3 bed

1 bedroom flats: 2 bedroom flats: 3 bedroom flats: 2 bedroom houses: 3 bedroom houses: 4 bedroom houses:

13 dwellings of which 9 are affordable 20 dwellings of which 12 are affordable 8 dwellings of which 0 are affordable 33 dwellings of which 11 are affordable 68 dwellings of which 17 are affordable 40 dwellings of which 5 are affordable

Total:

180 dwellings of which 54 are affordable

te layout highlighting the various types and quantities proposed throughout the site

Site plan

o se t pe plan

rst floor

o se t pe plan

ro nd floor


Material Combinations Brickwork

R1

Chalvington and Chalvington

Cuckmere and Cuckmere

Chalvington and Cuckmere

B1

Manufacturer: IBSTOCK Product: Morpeth Use: Facing brickwork to external walls Style: Stretcher bond with bucket handle pointing, natural non-coloured mortar Manufacturer: IBSTOCK Product: Cooksbridge Buff Use: Facing brickwork to external walls Style: Stretcher bond with bucket handle pointing, natural non-coloured mortar

Cladding

L1

Arlington

Wilmington

Square Field

D1

Manufacturer: James Hardie Product: Hardieplank Family - Arctic White Use: Vertical cladding to external walls Style: 178mm with 30mm overlap Manufacturer: James Hardie Product: Hardieplank Family - Anthracite Grey Use: Horizontal cladding to external walls Style: 178mm with 30mm overlap

oo

ST

CT

Apartment Block (Private)

Apartment Block (Affordable)

House Types

Manufacturer: SVK - Fibre Cement Greys Product: Montana Textured Blue and Black Use: Roof tiling to pitched roofs Style: Lapped - 600 x 300mm with Riven edge Manufacturer: Redland Product: Rosemary Clay Classic Russet mix Use: Roof tiling to pitched roofs Style: 265 x 165mm with min. 65mm overlap


03 | PART 2 PROFESSIONAL WORKS Ickenham Office and Industrial Warehouse Development Location: Category: Client: Project Year:

Ickenham, England Commercial, Industrial Keltbray 2022

Ickenham development is an industrial and commercial project appointed by client Keltbray. The site is located to the north of Ickenham, a residential suburb situated between Uxbridge and Ruislip.

The subject lands have been vacant for 2 years. The existing buildings sit within a convoluted layout that are not only small in size but unsuitable for re-use for a modern employment operator.

The proposal aims to upgrade the spatial quality within the site pro iding significant percentage of the landscape area and updating existing buildings. The scheme includes an office loc ased on e isting structure and 4 newly built industrial warehouses.

Work involved: Concept development AutoCAD drawings Visualization (Enscape) SketchUp modelling Diagrams drawings Design code Design access statement Planning package


0

50

Key

EX.FFL: 55.4

Retained Buildings

1

Roads

New Buildings

Woodland

00

53.0

59.000

Proposed Trees

Ponds

0

43.00

57.0

54.0

53

51

52

OS

.00

ad dth to

30

31

(e

4.80m

40

3.8m

00

54.500

53.500

54

ED

42

43

00

46

44

45

41

5

50

53.5

COMMERCIAL WASTE (SKIPS)

Y2

FFL: 53.50

53.000

OS

53

54

EB

EB

61

60

59

58

57

56

00

TION

00

52.0

50.5

55

OS

52

51

47

48

WA

00

00

49

BIN

51.90

00

52.0

RE

STO

SH

0m

51.5

MOTO PAR RCYC LE KING

BIN

VER

CO

2.0

53.0

ENTA

FFL: 52.15

EB EB

EB

BIKE (TW STO O TIERRE )

22

52.50

53.20

7.2

33

g wi xistin

35

38

39

51.50

54.5

0

.50

53

57.500

52.000

0 .00

EB

COV STO ERED WAS RE & BIN H

52.0

54.500

00

1

00

00

52.5 55.000

55.5 EX.FFL: 55.4

Proposed Topography

55.500

37

36

34

24

23

32

27

28

29

16

17

25 26

15

12 20

22

21

9 10

18

19

56

14

13

6

11

7 8

0

loc RPZ dress

5

4

3

2

1

s) ation

5

0m

56

BIN PRES

16

50

0

0

.50

0

KING

13

.50

58.5

0 8.0

PAR

14

KING

00

56.500

00

Parking

PAR

15

56.000

12

00

59.500

0

62

.50

64

63

53.5

Y5

OS

OS

65

00

00

53

50.0

55.000

49.5

.50

51.000

54.5

53.500

51

00

0

53.500

53.000

55.000

49.0

00

50.80

50.80

USE KEY:

00 50

53.5

55.0

.00

00

BUILDING 01 Office

0

0

54.5

.50

FFL: 51.00

00

54

50

00 00

53.500

4

00

53.0

.00

FFL: 53.00

53.0

52.5

0

FFL: 45.50

45.5

BUILDING 02 Plant Workshop

FFL: 48.50

52.000 51.500

48.0

BUILDING 03 GF: Small Tools Workshop / Storage FF: Split in half - Spray Shop / Small Tools

48.000 45.5

Y4

48.3

.50

0

0

.00

51

51.000

Y3

50

0m

50.0 00

7.2

BUILDING 04 GF: Storage FF: Workshop

0

0 49.5

45.8

49.000

BUILDING 05 Structures, Fabrication (Overhead Gantry Crane required)

43.0

.50 0

0

.00

y to tie

44

41.500

6.0m

46.000

46.500

locall

42.500

43.500

0

.00

47

Guard

42.000

00

43.0

00

47.5

43

00

48.0

into ex

45.000

46.0

isting

48.0

48.500

00

y roadwa

45.50

45.5

44.500

41.0 00

00

45.000

Proposed Access to HS2 lands

0

YARD 01 Car Parking YARD 02 Plant storage Yard, RTC Machines, Attachments

.00

41

YARD 03 Storage for small tools (Lorries, HIABS, Delivery Vans) YARD 04 Structures Storage, Falsework, Panels, Scaffold YARD 05 Structures Storage. Formwork, Spec Protection, Concrete Plant, Pumps, Booms

Safety, Health and Environmental Information

campbellarchitects 55 Whitfield Street, London W1T 4AH www.campbellarchitects.co.uk

Do not scale

In addition to the hazards/risks normally associated with the types of work detailed on this drawing and noted in the Designer Risk Assessments and health and safety plan, note the following: - It is assured that all works on this will be carried out by a competent Contractor working where appropriate, to be an approved method statement. - Where applicable, significant residual risks are highlighted in the body of the drawing.

General Note - All levels and dimensions are approximate, detailed site surveys must be carried out by Contractor before commencement on building works. All levels and dimensions to be confirmed on site. - All existing drawing informtion is indicative and subject to the detailed site survey. - Drawing is for information only. - Do not scale from this drawing. - This drawing is copyrighted.

Issue

Date

By

Chkd

Appd

00

28/09/22

SN

MM

RS

Issue

Date

By

Chkd

Appd

Client

Drawing Status

Keltbray

PLANNING

Job Title

Scale at A0

Issue

Former MSD Facility, Breakspear Road South, Ickenham

1:500

00

Drawing Title

Project No

Drawing No

Proposed Site Layout

1381

1381-DR-A-00-015


A

B

C

4830.0

D

5000.0

E

5000.0

F

5000.0

G

5000.0

H

5000.0

2

1

4820.0

4

3

6285.0

3805.0

2170.0

5 5750.0

PL +9.53

RL +8.85

Window head level +7.50

Top of Masonry Wall / Precast Concrete Cladding +4.45 FFL +3.95 CL +3.45 Top of Masonry Wall / Precast Concrete Cladding +2.69 Bottom edge of Insulated Cladding Panels +2.50

FFL +0.00 GL -0.15

H

G 4820.0

F 5000.0

E 5000.0

D

C

5000.0

B

5000.0

5000.0

A

4

5

4830.0

PL +9.53

5750.0

2

3 2170.0

3805.0

1 6285.0

PL +9.53

RL +8.85

RL +8.85

Window head level +7.50

Window head level +7.50

Top of Masonry Wall / Precast Concrete Cladding +4.45 FFL +3.95

FFL +3.95

CL +3.45

CL +3.45

Top of Masonry Wall / Precast Concrete Cladding +2.69

Top of Masonry Wall / Precast Concrete Cladding +2.69

Bottom edge of Insulated Cladding Panels +2.50

Bottom edge of Insulated Cladding Panels +2.50

FFL +0.00 GL -0.15

FFL +0.00 GL -0.15

A

Office

Booth

Void

Booth

Meeting

Booth

Booth

CC

07

Acc WC

Storage

Building Fabric Specification

Storage

Male WC

LEVEL 1

Female WC

(Refer to detailed manufacturer specification for further information)

A

A

Meeting room

Meeting room

Element

U-Value (W/m2K)

Roof: -

0.18

Kingspan Quadcore KS1000 RW - 115mm

Wall 1: Kingspan Quadcore AWP KS600-1000MR Wall Panel, Micro-Rib - 74mm

0.26

Wall 2: Forticrete Fairfaced Dense Concrete Block 'Flint' (390mm x 190mm x 90mm) Insulated Cavity - 50mm Kooltherm K108 insulation Creagh Pre-cast Concrete Panel - 150mm (Rekli Formliner (Rib Type N))

0.24

Wall 3: (Buildings 3 & 4 only) Reinforced concrete retaining wall - 300mm Cellecta Hexatherm XPeri (External) - 70mm

0.26

Ground Floor: Entrance

-

Canteen

-

RC Concrete Slab - 250mm (with Sikafloor -1 MetalTop, one part, pre-blended metallic dry shake hardener) Cellecta Hexatherm Xfloor 300 (20mm) insulation 160mm dufaylite clayboard OSA (to S/E specification)

0.18

Openings:

Post Food Service Counter WC WC Storage

up

Acc WC

SH

Kitchen

Meeting room

Storage Acc WC/SH

WC WC

LEVEL 0

up

Access Doors Norton Industrial Doors Insulated Roller Shutter Door

0.69

Personnel Doors Strongdor Climador

1.4

Roof lights Kingspan Day-Lite Trapezoidal Rooflight (KS1000 DLTR - Opal)

1.6

Curtain Walling Reynaers ConceptWall 50 Curtain Walling system

1.6

Windows Reynaers ConceptSystem 77 window system

1.3

A

le at ons

loor plans

pec cat ons


2000mm clear head height

Stair nosings

Steel beam behind

05 2377

04

1600

Accessible door

A

8

2900

FFL +0.05

FFL +0.05

06

7740.0

D3 3400

B4 Typical Stair Core First Floor Plan 1:20

02

Stair nosings as per approved docs

1300.0

1023

Concrete staircase, to S/E design

Riser: 163.4 mm Going: 280 mm

DL +2.25

03

1300.0

HL (+2.287)

FFL +2.49

DL +2.25

02

A

8

FFL +2.49

2900

3550.0

Lowest Point

03

1852

1100.0

2500.0

2000.0

300.0

06 2377

01

977

01 (+4.575)

8

500

300.0

05

3400

777

02

Changing Room Elevation A 1:20

03

Changing Room Elevation B 1:20

06 3400

07 2377

300.0

2500.0

Accessible door

B C

07

FFL +2.49

FFL +2.49

A

1048

D

473

DL +2.25

1023

882

DL +2.25

01

3550.0

00 (+0.00)

1400

Half landing support to S/E design & specification

05

D4 882

2900

300.0

2900

1200.0

1023

473 07

A

A

FFL +0.05

FFL +0.05

7740.0

01 B4 Typical Core Section A-A 1:20

01

Changing Room Plan 1:10

04

Changing Room Elevation C 1:20

05

Changing Room Elevation D 1:20

B4 Typical Stair Core Ground Floor Plan 1:20

03

01 05

03

04

14 3623

12

13

3950

14 3623

3400

3810

3950

FFL +2.49

FFL +2.49

DL +2.25

DL +2.25

CL +2.75

CL +2.75

DL +2.25

DL +2.25

1135

2550

3350

2900

2900

3350

02

03 04

FFL +0.05

FFL +0.05

FFL +0.05

FFL +0.05

1880

12

Office Elevation A 1:20

03

Office Elevation B 1:20

02

3810

3395

1200

02

B1 First Floor Typical WC Elevation A 1:20

03

B1 First Floor Typical WC Elevation B 1:20 03

1065

A

1065

D

1200

07 3810

3623

B C

04

3950

15 3400

1135

FFL +2.49

FFL +2.49

DL +2.25

DL +2.25

13

CL +2.75

CL +2.75

DL +2.25

DL +2.25

3350

3350

1450

2900

2900

1450

06

D1 560

1450

290

FFL +0.05

FFL +0.05

300

01

750

750

1023

FFL +0.05

FFL +0.05

Officee Plan 1:10

04

Office Elevation C 1:20

05

Office Elevation D 1:20

01

B1 First Floor Typical WC Plan 1:10

04

B1 First Floor Typical WC Elevation C 1:20

05

B1 First Floor Typical WC Elevation D 1:20

Detail arrangement


03 | PART 2 PROFESSIONAL WORKS Listed Building Restoration and Mixed-use Development Location: Category: Client: Project Year:

London, England Restoration, Mixed-use Kitewood 2022

Background and Site

e e e e e e f c e ec ee ee Our proposals seek to intensify the existing use of c e e e e c c e e fi f e e ec e f e e c e e e e e e e e e e S O S M e e effic e e ce e e e e e e e ce e e ec e our proposal. accommodation. An increased footprint is supported f c e S e c ce e c ec c e e communal facilities for use by the charity. The site is f e ee e e c e net loss of permanent residential accommodation as a . ec e c e f e e e c e e e cce ce e f e e e e e . units. e e e f e e .

Work involved: Concept development AutoCAD drawings SketchUp modelling Visualization (Photoshop) Diagrams drawings Competition package preparation


Communal space view

DESIGN METHODOLOGY e e materials such as brick and stone to offer e e e Mansion building on Fulham Road. Se e Medical centre and formal garden view

e f

c e

f e

e c

e f

e.

e

f e

Suitable building relationships considered e c e f e the surrounding urban grain and to offer e S e ec initial due diligence. c f e e e central garden to form a key feature of the e. e e f e f ffe e e e ce e ce f ee e f e and the local community.

Formal garden view

Communal space view

e c e e e ec ce e c c provides a depth of amenities and good f c e e ec e e e ec e address.


03 | PART 2 PROFESSIONAL WORKS 45 Old Quay Road House

ec

Location: Category: Client: Project Year:

Holywood, Northern Ireland Residential Private 2023

e

e

e

e

e e fe e c c e e e f c e ce c f e e e e e e ce e ce e e e efi f . e e e and leisure space. The main entrance to the house is c . e e f e e e f e ee . e e e e e e c e ce e f f design of the house includes an open plan living room three bedrooms and a potential fourth bedroom. The ce e f e . e c c e e e e c c c e f e e c e e ce e provides a perfect place for outdoor entertainment and e fice e f ef c . e e e e ee e ffe e e . relaxation.

Work involved: Concept development Revit / AutoCAD drawings 3D modelling Visualization (Vray) Diagrams drawings Planning application package


UP TV Fireplace

UP

pper floor plan

WR

UP WR WR

UP

Visualisation (Vray)

o er floor plan


1500

W-10

*

*

*

*

* *

EXD-03 external steps 2 no. risers, 280mm going, 125mm rise

*

*

*

*

*

*

*

*

*

1245

1533

EXD-02

*

*

W-05

*

*

2135

* *

*

2135

*

*

* *

890

* *

W-12

602

* EXD-05 * * * * *

1866

* 2040

*

3523

* * 1559 2064

*

906

505

Δ Emergency Egress Window (see note)

W-13

3348

1559 2135

*

1559 2135

*

576

W-15

890

*

2135

1245

* *

1263

576

1263

2135

2478

*

04 | PART 2 TECHNICAL WORKS Restoration of a residential house Location: Category: Client: Project Year:

Cultra , Northern Ireland Residential Private 2023

c e e

e e

e e e

.

e e ec e

ef e . e ef e e e e e e e c c

e .

e e e

e

e

e

e

c

e f c e ce e ee

e

ec

e e e e e . e e .

e

e ee e e

e c

Work involved:

f f

Technical drawings


6788

Existing fabric

8200

Proposed areas to be altered Existing BIGT Gully

Carbon monoxide detector positioned 1000mm - 3000mm away from the boiler Smoke detector located to ensure to that no point of the room is more than 5300mm away from a detector.

W-04

Heat detector located to ensure that no point of the room is more than 5300mm away from a detector.

Existing 600mm Wavin IC

Existing SVP

W-05

Existing BIGT Gully

Existing 600mm Wavin IC DXXX

W-03

2478

Existing BIGT Gully

2478

1263

1500

1263

3348

1800

Boiler

Smoke Detector

EXD-03

Existing BIGT Gully

* EXD-05 * * * * *

* *

* *

* *

W-12

*

*

W-10

*

*

*

*

1050 W-08 2100

*

*

1559 2064

W-13

1559 2135

*

2135

*

Δ Emergency Egress Window (see note)

1559 2135

W-15

*

1050

Δ Emergency Egress Window (see note)

* *

505

Living Room

*

*

*

Carbon CM Monoxide Alarm

* *

576

W-06

W-16

576

EXD-02

Ensuite 3

Boiler House

1245

Existing BIGT Gully

2135

A DXXX

890

EXD-01

1245

W-02

Existing BIGT Gully

2135

DXXX

W-01

890

Existing BIGT Gully Existing 600mm Wavin IC

FFL

FFL

EXD-04 *See note re. Safety Glazing

Lounge

Study

D-04

Bedroom 3

W-18

Utility Kitchen HD

Smoke Detector

Ensuite 2

W-17

Existing 600mm Wavin IC

Heat Detector

Hall

Existing SVP

Smoke Detector

Smoke Detector

Garage

TD WM

WC

Ensuite 1

W-14

W-13

EXD-05

D-02

Existing BIGT Gully

Proposed South Elevation

01

D-03

W-12

Porch

D-01

DXXX Existing BIGT Gully W-11

W-10

Existing BIGT Gully W-09

W-08

DXXX

Bedroom 1 A

*

* *

*

* *

*

*

1245

*

W-05

*

*

2135

*

890

1533

EXD-02

*

external steps 2 no. risers, 280mm going, 125mm rise

602

EXD-03

2040

*

2135

1245

*

W-06

2135

*

W-15

890

W-16

*

2478

* EXD-01 * * * * *

* *

* *

* *

FFL

external steps 2 no. risers, 280mm going, 125mm rise

Existing 600mm Wavin IC

01

*

*

W-02

*

Δ Emergency Egress Window (see note)

*

W-01

FFL 2878

Existing 600mm Wavin IC

1897

* *

873

2478

* *

2135

1866

1262

3523

1245

906

2135

1866

890

Existing 600mm Wavin IC

1245

DXXX

2135

Existing 600mm Wavin IC

Existing BIGT Gully

890

3616

Bedroom 2

external steps 2 no. risers, 280mm going, 125mm rise

* See note re. Safety Glazing

Proposed Floor Plan 8200

Proposed North Elevation

02

A

A

KEY Existing Fabric

1050

1800

W-08

838

2478

1263

1000

400

906

1694

2135

Existing window opening to be blocked up and all finishes made good FFL

*See note re. Safety Glazing

03

1700

A

Proposed West Elevation

1074

Existing BIGT Gully

873

1245

*

2135

*

Δ Emergency Egress Window (see note)

Elevation A - 1:50 South elevation of proposed utility room and window

02

W-17

1262

Existing door opening to be partially blocked up and all finishes made good

FFL

890

*

W-18

*

2135

*

890

*

890

*

W-03

2135

FFL

W-04

1245

1245

1050

2100

1866

EXD-04

1430

D-04

830

240

D-03

B

B TD Utility 7240

WM

4883

1981

Smoke Detector

1866

505

*

A

FFL

01

Section A-A - 1:20 Construction detail through utility room

03

600

1245 W-07

*

*

FFL

Existing 600mm Wavin IC 1203

*

2135

W-09

890

W-08 Existing BIGT Gully

1559 2064

1263

*See note re. Safety Glazing

1800

600

1580

Plan A - 1:50 Construction detail through utility room

Floor plans / Technical details

04

Proposed East Elevation

Elevations


04 | PART 2 TECHNICAL WORKS Apartment block refurbishment project in Harrow Location: Category: Client: Project Year:

sealant as per the manufacturer's details

Kenton Road, Harrow, England Residential Strawberry Star 2022 Location Diagram 36-700 Detail 1

Work involved:

Insulated aluminium cladding system fixed back to sheathing board to new steel frame structure

Technical drawings

Aluminium reveal as part of cladding system

See metalwork package for steel balustrade details. Metal capping profile to top of parapet on metsec with cavity stop

New insulated brick slip system fixed to 12mm sheathing board onto new metsec (assume 100mm insulated stud)

Refer to Drawing 36-700 Detail 4

Refer to Drawing 36-700 Detail 5

See window package for details Contractor to allow for EPDM works, cavity stops and cavity trays to all windows where required

Existing Building

Allow for full brick reveal in new brick slip extent New insulated brick slip system fixed to 12mm sheathing board onto new metsec (assume 100mm insulated stud) Contractor to allow for metal trim with cavity tray behind at junction between new brick slip system and existing brick facade

Contractor to allow for metal trim with cavity tray behind at junction between new brick slip system and existing brick facade

Existing brickwork onto existing concrete frame Existing brickwork be repointed where required subject to scope agreement

Existing brickwork be repointed where required subject to scope agreement

Existing brickwork to have colour tint treatment colour to be agreed

Existing brickwork to have colour tint treatment colour to be agreed Refer to Drawing 36-700 Detail 3

Contractor to allow full brick reveal requirement for metal window reveal surround to be reviewed on site See window package for details Windows to existing brickwork areas will be fitted within existing openings. Openings to be primed and made good. Contractor to allow for EPDM to all sides and sealant as per the manufacturer's details

DET A-A

Proposed Scheme

02

Section A-A

01

Typical Envelope Bay Study 01

NOT FOR CONSTRUCTION


J

K

L

M

N

O

P

Q

R

S

U

T

B

DRY RISER INLET

V

W

X

DRY RISER INLET

1

1500x2000

1500x2000

1500x2000

1500x2000

Dry riser at high level

A

DRY RISER

DRY RISER

Core 1

LIFT

Core 2

(min 1700x1750 shaft)

LIFT (min 1700x1750 shaft)

WM

WM

WM

WM DATA / LSS

MAOV WM

MECH

2

MAOV

WM

WM

3

WM

1500x2000

900x2000

900x2000

1500x2000

1500x2000

1500x2000

1500x2000

4

B J

K

L

M

N

O

P

Q

R

S

T

U

V

W

X

Sample Floor Plan - Ground Floor (Not to scale)


SEC Painted finish to wall specification to be confirmed 15mm shadow gap/scribing fillet

WM

Utility Cupboard

Sprayed MDF cupboard doors

1500mm turning circle Sprayed MDF doors - see door package for details

ELE 01 ELE 02

1500mm turning circle

uilt in wardrobe

02

Section A - Typical Apartment 1.4 1 edroom / 1 Person 1:20

Painted finish to wall specification to be confirmed Kitchen finish subject to client agreement and kitchen specialist input Contractor to allow for lac uer finish to doors Contractor to allow for back painted glass splashback

SEC A

Contractor to allow for Corian counter top

SEC A

MDF pained skirting board

01

SEC

Plan - Typical Apartment 1.4 1 edroom / 1 Person 1:25

03

Section 1:20

- Typical Apartment 1.4 1 edroom / 1 Person

Painted finish to wall specification to be confirmed

15mm shadow gap/scribing fillet Painted finish to wall specification to be confirmed

Painted finish to wall specification to be confirmed

Full height tiling to shower enclosure Tile specification to be confirmed

Full height tiling to shower enclosure Tile specification to be confirmed

Wall mounted mirror Frameless glass fixed shower screen Specification to be confirmed

Tiling to splashback Tile selection confirmed Tiled cistern enclosure on softwood frame to match wall tile

Sprayed MDF cupboard doors

Tiled cistern enclosure on softwood frame to match wall tile

Sanitaryware specification to be confirmed

Refer to sanitaryware specification

04

Typical athroom Elevation 01 1:20

05

Typical athroom Elevation 02 1:20

0

Typical Utility Cupboard Elevation 1:20

NOT FOR CONSTRUCTIO Detail Arrangement - Typical Apartment (Not to scale)


Key: ET - External Wall Type (Refer to Envelope Scope) RT - Roof Type (Refer to Roof Scope) CT - Ceiling Type (Refer to Internal Ceiling Scope) WT - Window Type (Refer to Window Scope) IWT- Internal Wall Type (Refer to Internal Wall Scope)

WT01E

WT01

IWT05

IWT05

FT07

Notes to Contractor: - All roofing products based on Alumasc or similar system as noted - Insulation depth and specification subject to U value re uirements and SAP calculation - Contractor to allow for roof drainage outlets as per M E design - Contractor to allow for parapet upstand and service penetrations as per M E design - Contractor to ensure any exposed single ply membrane is robust and suitable for maintenance access - All falls and to insulation to be agreed - All edge protection to be agreed. Contractor to allow for a Latchway system to level 5 main roof including the necessary fixing point upstands - All structural substrates to be confirmed subject to structural engineer s details - All plant re uirements to roof to be confirmed by M E consultant

FT07

RT03 ET04

ET04

ET05

ET01

01

ET03

0 02

03

0

07

WT01C

WT01A

CT03

01

ocation Diagram

CT01

Typical Level 4 Parapet Detail

02

CT01

03

Typical Envelope Detail Floors 2-3 rick Slips on Existing rick

Typical Envelope Detail Floors 2-3 Existing rick Tinted

DETAI 1

DETAI

5

DETAI 2

3

DETAI

7

MT02

WT01C

WT03A

RT01

WT01A

IWT0

FT10

IWT0

FT04 ET01

FT04 ET03

ET05

CT03 WT01C

WT01E

WT01A CT01

CT03

04

Typical Level 4 Terrace Parapet Detail

05

Typical Level 4 Threshold Detail

0

Typical Envelope Detail Level 1-2 Existing rick Tinted

CT01

07

Typical Envelope Detail Level 1-2 Existing rick Tinted

NOT FOR CONSTRUCTION

Envelop Section Details - Typical Wall (Not to scale)


Key:

Note: Insulation thickness to satisfy SAP s

IWT - Internall Wall Type (Refer to Internal Wall Scope) ET - External Wall Type (Refer to Envelope Scope)

2) New building structure - Rheinzinc cladding INTERNAL 2x 15mm sound bloc on 50mm steel frame w/ Isover batts insulation 100mm metsec structure with 100m insulating batts Insulation board Cavity Rheinzink cladding EXTERNAL

brick slips 1) New building structure - Rheinzinc cladding INTERNAL 2x 15mm sound bloc on 50mm steel frame w/ Isover batts insulation 100mm metsec structure with 100m insulating batts 12mm sheathing board Insulation board Cavity rick Slips (P-clad) EXTERNAL

IWT05

Note: Insulation thickness to satisfy SAP s

ET04

Notes to Contractor:

IWT05

- All roofing products based on Alumasc or similar system as noted - Insulation depth and specification subject to U value re uirements and SAP calculation - Contractor to allow for roof drainage outlets as per M E design - Contractor to allow for parapet upstand and service penetrations as per M E design - Contractor to ensure any exposed single ply membrane is robust and suitable for maintenance access - All falls and to insulation to be agreed - All edge protection to be agreed. Contractor to allow for a Latchway system to level 5 main roof including the necessary fixing point upstands - All structural substrates to be confirmed subject to structural engineer s details - All plant re uirements to roof to be confirmed by M E consultant

ET05

Performance Key Re uirements as per JRA report dated 2 /05/22

4) Existing envelope over clad - brick slips INTERNAL 12.5mm plasterboard (soundbloc) on 50mm steel frame w/ Isover batts insulation Existing 100mm block (inner leaf) 50/ 0mm cavity fill between existing masonry Existing 100mm rick (Outer leaf) Insulation board rick slip build up EXTERNAL

3) Existing envelope - brick tinted INTERNAL 12.5mm plasterboard (soundbloc) on 50mm steel frame w/ Isover batts insulation Existing 100mm block (inner leaf) 50/ 0mm cavity fill between existing masonry Existing 100mm rick (Outer leaf) EXTERNAL

Note: Insulation thickness to satisfy SAP s

IWT0

Note: Insulation thickness to satisfy SAP s

5) Existing envelope over clad - Rheinzink INTERNAL 12.5mm plasterboard (soundbloc) on 50mm steel frame w/ Isover batts insulation Existing 100mm block (inner leaf) 50/ 0mm cavity fill between existing masonry Existing 100mm rick (Outer leaf) 12mm Sheathing board Insulation board Cavity Rheinzink cladding EXTERNAL

IWT0

Note: Insulation thickness to satisfy SAP s

IWT0

ET03 ET01

ET02

NOT FOR CONSTRUCTION

Envelop Plan Details - Typical Wall (Not to scale)


Location Diagram

Notes to Contractor:

1500x2000 1500x2000

1500x2000

- Stair balustrade to comply with Approved Document Part K - Final design subject to fire consultant input regarding width of stairs and riser/going - Stair core venting to be agreed with fire consultant and M&E consultant - New structure to levels 03-05 require structural input - Lift shaft and car indicative only and require M&E and lift specialist input - Signage strategy subject to client input

WM WM WM

WM

WM 1500x2000

WM

WM

WM

WM

WM

WM

WM

WM

WM WM

Allow for lift over run and lifting beam

New lift shaft. Subject to SE and M&E engineer input

Allow for new painted steel balustrade with PVC handrail capping to all stair flights

HL (+15.495)

04 (+13.755)

NEW STEEL & TIMBER STRUCTURE TO SE DETAILS

ROOF (+17.265)

New steel & timber stair core to be lined with plasterboard

New steel stair structure from level 03 upwards to structural engineer's details

New ensitue concrete lift shaft

New floor structure over existing slab (L3) - refer engineer's details

New lift car

HL (+11.930)

New steel stair to be lined with plasterboard Existing concrete walls to be finished with a clear seal and super graphic signage

New steel & timber stair core to be lined with plasterboard New core walls to be lined with painted plasterboard and super graphic signage

03 (+10.520)

Existing slab with new structural build up over - refer Structural engineer.

Existing balustrade retained, height to be confirmed

HL (+8.608)

02

Location of dry riser Location of corridor door shown (behind)

Typical Core Section Detail 1:20

Existing concrete stair core and stair retained & made good. Stair core extended with Steel & timber construction to Level 3, L4 & Roof. Refer SE for detail.

Additional steps to level 3 only shown dotted handrail to suit

02 (+6.850)

New ensitu concrete lift shaft formed to host evacuation lift Refer SE for detail

DRY RISER HL (+5.258)

Existing concrete stair to be made good and finish with a clear seal Existing concrete walls to be made good and finished with a clear seal and super graphic signage

Existing and new stair treads to have anti slip edge nosing strips

NEW LIFT New lift shaft. Subject to SE and M&E engineer input

01 (+3.497)

(min 1700x1750 shaft)

Core 1 New concrete lift core - concrete finish exposed in stair lobby

HL (+1.752)

SEC A-A 00 (+0.00)

01

03

Typical Core Section A-A 1:50

Typical Core Plan (Level 03) 1:20

NOT FOR CONSTRUCTION Stair core typical details

DET A-A

Notes to Contractor:

- Drawing to be read in conjunction with window package and envelope scope drawings - Contractor to allow for none combustible brick slip system - Contractor to allow for all required accessories ie cavity trays, sheething board where required, weep holes etc. - Contractor to allow for movement joints as per manufacturer's recommendations - All envelope details yet to be coordinated with structural design - All fire stopping as per the fire strategy package

Metal work typical details

DET B-B

USL

Existing concrete slab

USL

Gypframe soffit cleat fixed to hanger

See metalwork package for steel balustrade details. Contractor to allow for side fixing through brick slip system and weathering as required New insulated brick slip system fixed to 12mm sheathing board onto existing concrete frame/new metsec where required

Existing brickwork to be repointed where required subject to scope agreement

Existing brickwork be repointed where required subject to scope agreement

Gypframe MF6 ceiling perimeter channel fixed to wall at 600mm centres

Existing brickwork to have colour tint treatment colour to be agreed

Gypframe soffit cleat fixed to hanger

Gypframe strap hanger

Gypframe strap hanger

50mm Isover Spacesaver Ready-Cut insulation in the cavity

100mm Isover Spacesaver Ready-Cut insulation in the cavity

Gypframe MF7 primary support channel

Gypframe MF7 primary support channel Gypframe MF5 ceiling section at 450mm centres

Gypframe MF5 ceiling section at 450mm centres 12.5mm Gyproc, taped and jointed with taped and jointed with 12.5mm Gyproc, painted finish

Existing brickwork to have colour tint treatment colour to be agreed

12.5mm Gyproc MR, taped and jointed with painted finish

Gypframe MF6 ceiling perimeter channel fixed to wall at 600mm centres

FCL

01

Existing brickwork to be removed back to existing concrete frame

Brick slip reveals to head and jamb reveals See window package for details Contractor to allow for EPDM works, cavity stops and cavity trays to all windows where required

CT 01 - TYPICAL APARTMENT INSULATED MF CEILING ON EXISTING SLAB Specification ref: K10 11 - TBC

02

FCL

CT 02 - TYPICAL APARTMENT INSULATED MF BATHROOM CEILING ON EXISTING SLAB Specification ref: K10 11 - TBC

Acoustic batts between joists

Acoustic batts between joists

Steel and timber floor build uprefer to structural engineer

Steel and timber floor build uprefer to structural engineer

2x15mm Soundbloc on resilient 2x15mmbars Soundbloc on resilient bars fixed to timber floor joists

2x15mm Soundbloc on resistant bars fixed to timber floor joists

USL

Contractor to allow for metal sill via window supplier Entrance surround to be formed of aluminium profile and cladding by specialist onto steel sub-frame and fixed back to existing concrete frame as per structural engineer's details

Existing brickwork to be repointed where required subject to scope agreement Existing brickwork to have colour tint treatment colour to be agreed

Existing concrete slab

USL Gypframe soffit cleat fixed to hanger

Gypframe soffit cleat fixed to hanger

Gypframe strap hanger

Gypframe strap hanger

Gypframe MF7 primary support channel

Gypframe MF7 primary support channel

Gypframe MF5 ceiling section at 450mm centres

12.5mm Gyproc suspended MR, taped and jointed with painted finish

12.5mm Gyproc 12.5mm Gyproc suspended, taped and suspended, taped and jointed with selected finish

Refer to Drawing 36-700 Detail 7

Gypframe MF6 ceiling perimeter channel fixed to wall at 600mm centres

03 See window package for details Windows to existing brickwork areas will be fitted within existing openings. Openings to be primed and made good. Contractor to allow for EPDM to all sides and sealant as per the manufacturer's details

USL

Existing brickwork to have colour tint treatment colour to be agreed Existing DPC to be reviewed Contractor to allow for new injected DPC if required

FCL

Gypframe MF5 ceiling section at 450mm centres

Existing concrete slab

Potential drop down boxing for image VR inlet and outlet duct to be brought to floor level

Gypframe soffit cleat fixed to hanger

Entrance surround to be formed of aluminium profile and cladding by specialist onto steel sub-frame and fixed back to existing concrete frame as per structural engineer's details

Existing brickwork to be repointed where required subject to scope agreement

Gypframe MF6 ceiling perimeter channel fixed to wall at 600mm centres

FCL

CT 03 - TYPICAL APARTMENT MF CEILING ON NEW FLOOR STRUCTURE

Gypframe strap hanger

Gypframe MF7 primary support channel

Existing DPC to be reviewed Contractor to allow for new injected DPC if required

Gypframe MF5 ceiling section at 450mm centres Suspended ceiling tile

DET B-B

04

DET A-A

02 Location Diagram

Section B-B

03

Section A-A

01

Typical Envelope Bay Study 01

NOT FOR CONSTRUCTION

Gypframe MF6 ceiling perimeter channel fixed to wall at 600mm centres

05

CT 04 - TYPICAL APARTMENT MF BATHROOM CEILING ON NEW FLOOR STRUCTURE

FCL

CT 05 - TYPICAL CORRIDOR ACCESSIBLE CEILING - TYPE TBC Specification ref: K10 11 - TBC

Envelop detailed elevation

DRAWINGS NOT TO SCALE


04 | PART 2 TECHNICAL WORKS Residential Development in Rochester Location: Category: Client: Project Year:

Rochester, England Residential Kitewood 2022-2023

Extract to Bathroom Below terminated with tile vent.

08

02

Extract to Bathroom Below terminated with tile vent.

Extract to Bathroom Below terminated with tile vent.

SVP terminated with tile vent.

SVP terminated with tile vent.

02

02

SVP terminated with tile vent.

1050

1500

2400

2100

Work involved:

12-W06

E 11-W04

E

SG

SG

SG

SG

9-W04

04

04

04

9-W01

8-W01

8-W04

SG

SG

04

1050

600

01

10

12-W01

1050

EXD1

EXD1

SG

SG

RWP

EXD1

EXD1

SG

SG

07

07

04

04

04

07

RWP

C

10-W01

11-W01

04 07

SG

10

04

RWP

RWP

RWP

RWP

NOTE: Extent of required underbuild to be confirmed

terminated with tile vent. Elevation - 1 1:50

01

CB

E 8-W04 2385 Flr to Ceiling

2422 TOJ to U/S Truss

08

02

02

02

300

50°

50°

SG

1050

1500

2400

2100

30°

290

253

E

E 1-W09

04

600

04

SG

SG

SG

SG

SG

SG

1-W03

2-W04

SG

SG

SG

06 SG

SG

SG

SG

SG

SG

SG

3-W03

4-W04

SG

SG

SG

SG

SG

1050

06

SG

09

09

SG

04

SG

09

SG

04

SG

04 1-W04

EXD2

Fire-stopping over separating wall extended into eaves and to continue to underside of roof covering as detailed and as AD.B1 Diagram 11

DPC in external wall to be Minimum 150mm Above Finished Ground Level

RWP

06

SG

1050

600

SG

1050

2700

SG SG

SG

2100

SG SG

E 4-W05

06

2100

EXD1 2410 Flr to Ceiling

EXD1

E 3-W05

06 SG

01

8-W01

E 2-W05

1-W08

05

SG

2650 SSL to U/S Floor Joist

SG

EXD2

2-W03

3-W04

EXD2

EXD2

4-W03

5-W03

DPC in external wall to be Minimum 150mm Above Finished Ground Level

C

Foundations to Speedeck Foundations Ltd's design and drawings

01

Stick Section C-C 1:20

02

50°

E

10-W04

05

1050

600

12-W05

2100

2700

03

E

SG

Technical drawings

50°

03 E

50°

50°

300

50°

50°

08

Elevation - 2 1:50

NOTE: ACOUSTIC CEILING DETAIL TO BE CONFIRMED, WHICH MAY ALTER THE FINAL TRUSS POSITION

DRAWINGS NOT TO SCALE


44090 3648 777.5

7280

2485.0

777.5

385.0

2485.0

3250

7670

1115.0

2485.0

418

777.5

2485.0

1145.0

2485.0

777.5

337.5

3640 427.5

2485.0

777.5

7280

2485.0

377.5

777.5

2485.0

3652

7670

1115.0

417.5

2485.0

777.5

2485.0

1110.0

2485.0

390

812.5

RWP

2485.0

777.5

RWP 3-W02

CB

3-W03

EXD2

2-W02

2-W03

EXD2

CB

3349

1-W03

RWP

1-W04

EXD2

3349 3377

Lounge / Dining (21.7m²)

Lounge / Dining (21.7m²)

CB

5-W03

4-W02

CB

4-W03

EXD2

6-W02

RAD

Lounge / Dining (21.7m²)

910 1182

Hall

85

Kitchen (7.7m²)

Hall dw

9-W01

EXD1

CB

Hall

RWP

dw 8-W01

CB

RWP

EXD1

CB

EX

Kitchen (7.7m²)

187 Kitchen (7.7m²)

Hall

1090 D01

18890

2195

5052

910 1182

wm / td

700

797 3180 551 551 1287

700

1100 93

1090 D01

Hall

WC

EX

85

3-W01

dw 2-W01

CB

EXD1

dw

1-W01

RWP

1672

RWP

900

dw

EXD1

CB

CB

EXD1

93

910 1182

RAD

93 RAD

85

1672

2572

Hall

Kitchen (7.7m²)

685

1100

910

1100

EX WC

RAD

1100

910 1182

12253

RAD

186

93

850 1050

93 186 910 3180 797

RAD

551

797 3180

1287

WC EX

1090 D01

85

464

700 551 551

2168 187

RWP

Kitchen (7.7m²)

RWP

Internal Stairs: 207.7mm Rise (13 Equal Risers) 225mm Going Subject to specialist design

Hall

2572

Hall

85

1287

fr/fz wm / td

wm / td

700

1100 93

187 Kitchen (7.7m²)

93

1287

1100

551

910 1182

2168

187

EXD1 900 dw

EXD1

CB

5-W01

EXD1 RWP

CB

dw 4-W01

RWP

RWP

dw 6-W01

CB

EX

1050 850

RAD

850 1050 1100

2168 187

475

464

93

1100

93 3180 797

797 3180

700

475

551 551 1287

186 910

186 1100

93 1100

910 1182

85

464

RWP

6638

85

2168

Hall

187

93

910 1182

187

2168

85

910 1182

900

910 1182

1672

85

WC

1090 D01

wm / td

Hall

551

fr/fz wm / td

797 3180

RAD

700

1100

1090 D01

WC

464

1090 D01

2168

Kitchen (7.7m²)

551 551 1287

85

Kitchen (7.7m²)

Dining

93 3180 797

RAD

850 1050 910

1100

700 551

1100

551

93 Hall

910 1182

93

WC

1090 D01

EX WC

93

187 Kitchen (7.7m²)

1090 D01

475

186

93

1100

93 3180 797 1287

fr/fz wm / td

187

2572

1100

551 1287

187 Kitchen (7.7m²)

Kitchen (7.7m²)

2168

475

464

475

Dining

1949 2318

Dining WC

464

1090 D01

475

EXD1 900

187

2168

187

2572

2190

RWP

dw

1672

Kitchen (7.7m²)

551

fr/fz

2168

wm / td

910 1182

1090 D01

Store (1.0m²)

464

RAD

85

2168

wm / td

910 1182

2572

700

464

1672

85

wm / td

1100

551 551 1287

700

WC

93

551

1100

551

1090 D01

93

3180 797 1287

fr/fz wm / td

5052

WC

464

fr/fz

475

186

910

1100

910

186 3180 797

93

93

1090 D01

475

93

Dining

797 3180

1100

Dining

797 3180

475

700

464

WC

Store (1.0m²)

93 1100

Store (1.0m²)

93

186

910

Dining

186 910

12-W02

D02

ASHP

475

Store (1.0m²)

fr/fz

685

1100

93

Store (1.0m²)

910

186

1400 1032

475

700

464

fr/fz

12253

1050 850

2

1

1972 2340

1400 1032 Store (1.0m²)

Dining

Dining

1400 1032 93

1949 2318

Store (1.0m²)

1100

850 1050

1949 2318

93

1850

1850

1499

910

1850

fr/fz

1400 1032 1522

1499

551 551 1287

1499

1050 850

1850

Dining

186

1400 1032

WC

Store (1.0m²)

1672

1949 2318

93

850 1050

1949 2318

93

6515

1400 1032

1050 850

4800

19228

93

Store (1.0m²)

910

1400 1032

551 551 1287

1850

1050 850

1499

RAD

4800

4800

1499

Store (1.0m²)

fr/fz

1850

ASHP

Store (1.0m²)

Dining

zf/rf

1949 2318

ASHP

1977 2345

Dining 475

1400 1032 93

1949 2318

93

1850

1949 2318

1527

1400 1032

93

1850 464

1400 1032 1499

Lounge / Dining (21.7m²)

910

186

93 1499

1400 1032

93

1499

850 1050

3372

Lounge / Dining (21.7m²)

1850

1949 2318

1-W02

4800

1850 Lounge / Dining (21.7m²)

1499

1949 2318

Dining

700

3349

Store (1.0m²)

Lounge / Dining (21.7m²)

1100

3349

3349

1499

1850 1400 1032

93

CB

12-W04

Lounge / Dining (21.7m²)

Lounge / Dining (21.7m²)

CB

10-W03

EXD2

4800

EXD2

12-W03

10-W02

4800

RWP

CB

11-W03

EXD2

Lounge / Dining (21.7m²)

CB

7-W03

EXD2

1100

RWP 11-W02

7-W02

4800

RWP

CB

3349

1050 850

3349

4800

-

4800

1850 RWP

A

551

3349

8-W03

EXD2

2572

8-W02

fr/fz

CB

9-W03

EXD2

Lounge / Dining (21.7m²)

wm / td

9-W02

3349 RAD

3349

RWP

wm / td

RWP

CB

6-W03

EXD2

6515

6975

4800

EXD2

4800

RWP 5-W02

4800

RWP

Lounge / Dining (21.7m²)

7-W01

EXD1 900

Hall dw CB

11-W01

EXD1

900

EXD1

RWP

CB

dw 10-W01

RWP

RWP

dw 12-W01

RWP

-

A 1002

1023

553

1010

578

1010

2577

440

1023

1677

1023

553

7313

1010

418 225

1010

392

1023

1428

1660

1023

440

8257

1010

465

1010

638

1023

1002

2663

722

1023

420 113

2165

1010

465

1010

440

1023

1677

1023

552

7313

1010

433 225

1010

377

1023

1443

1677

1023

440

7280

1010

495 65

1010 1075

553

1023

1002

2578

44090

PLOT 12 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.82 m² First Floor: 39.12 m² Total: 76.94 m²

PLOT 11 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²

PLOT 10 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.57 m² First Floor: 38.85 m² Total: 76.42 m²

PLOT 09 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²

PLOT 08 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²

PLOT 07 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.57 m² First Floor: 38.85 m² Total: 76.42m²

PLOT 06 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.57 m² First Floor: 38.85 m² Total: 76.42 m²

PLOT 05 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²

PLOT 04 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.57 m² First Floor: 38.85 m² Total: 76.42 m²

PLOT 03 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²

PLOT 02 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²

PLOT 01 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.87 m² First Floor: 39.17 m² Total: 77.04 m²

NOTE: GIA Measured in accordance with RICS code of measurement practice and excludes internal finishes to external + party walls.

01

Ground Floor Plan 1:50

DRAWINGS NOT TO SCALE


44090

1002.5

7280

215.0

910.0

910.0

610.0

1202.5

1585.0

7670

2015.0

1585.0

892.7

1202.5

1585.0

3250

2060.0

1585.0

592.5

1237.5

3640

215.0

910.0

910.0

622.5

1095.0

7280

215.0

910.0

910.0

510.0

1202.5

1585.0

7670

2015.0

1585.0

892.5

1202.5

1585.0

3652

2095.0

1585.0

CB

3-W05

1202.5

615

2-W05 CB

3349

215.0

910.0

910.0

1002.5

338

3647

1-W09

1-W08

3349

900 1104

1256

3857

93

93

1900

850

1051 93

Bathroom 2000

1104

93

297 834 130

2155

2155 Bathroom 2000 185 93

12253

Store (0.6m²)

758

957

175

93

957

130

834

1283

93

1-W07

93 850 93

175 758

901

Store (0.86m²)

834

1051 93 237

834

185 93

265

1104

1256

2093

1500x2000

4516

185 93

1283

Bedroom 1 (12.9m² Inc Wdr)

3411

3411

3411

Bathroom 2000

4516

4516

2155

834

2093

Bedroom 1 (12.9m² Inc Wdr)

18890

1256

Bedroom 1 (12.9m² Inc Wdr)

130

834

2093

4516

3349 3377

3-W04

CB

CB

1-W05

1-W06

338

1500x2000

CB

2-W04

3411

4516

1500x2000

Ø110 SVP Changes vertical position in boxing void 2475

3411

93

297

1900 Store (0.6m²) 93

93 93

1051 237

1104

957

758 297

2093

1256

3411

93

Bedroom 1 (12.9m² Inc Wdr)

3349

3349

5-W04

CB

1006

Bedroom 1 (12.9m² Inc Wdr)

2093

4516

1900 175 297 834 130

2155

850 175

93

834

185 93

1006

3349

1256

237

Bathroom 2000 93

901

93

Bathroom 2000 2093

Store (0.6m²)

758

957

93 1850

1104

237

93

93

93 93

850

3857 1900 Store (0.6m²) 93 1051 93

237

1006

Store (0.86m²)

Store (0.86m²)

1104

93

1051

93

1900 175 297 834 130

2155

185 93

2155

Store (0.6m²)

758

957

957

834

834 130

93

93

93 850 93

93 850 93

175 758 297

Bathroom 2000

1256

93

901

93

2103

1499

1256

93

1006

185 93

93 1051 130

93

901

93

412

1256

440

1526

4-W04

CB

900

4516

3349

6-W04

6-W05

CB

8-W04

6638

CB

900

7-W04

7-W05

3349

1800

3411

3857

1500x2000

93 1900 Store (0.6m²) 93 1051

1900 Store (0.6m²)

175 297

834 1500x2000

4516 CB

1500x2000

1500x2000

4516

901

834

Bedroom 1 (12.9m² Inc Wdr)

3349

3349

11-W04

CB

1256

93

834

1850

3349

9-W04

CB

834

1256

1500x2000

3411

3411

4516

4516

3349

901

2103

1850

1500x2000

Bedroom 1 (12.9m² Inc Wdr)

2093

93

1006

Store (0.86m²)

237

3411

Bedroom 1 (12.9m² Inc Wdr)

1850

Bedroom 1 (12.9m² Inc Wdr)

3411

2093

Bedroom 1 (12.9m² Inc Wdr) 2093

1256

Bedroom 1 (12.9m² Inc Wdr) 4516

1256

834

185 93

2093

Bedroom 1 (12.9m² Inc Wdr)

185 93 3411

1256

758

957 2155

Bathroom 2000

1256

1500x2000

1104

2093

1256

93

Bathroom 2000 185 93

93

2103

1499

1800

Bathroom 2000

901

Store (0.86m²)

130

834

93

1104

2155

130

834

1256

1104

93 237

1104

2155

130

237

2093

93

93 93 1006

2155

297 834

237

1499

850

957

758

1850

1006

412

Store (0.86m²)

1104

93

237

834

412

1499

Store (0.86m²)

93

850 297 834

175

93

1900 Store (0.6m²) 93 1051

93

901

93

1104

185 93

Store (0.86m²)

93

834

93

834 130

2155

Bathroom 2000

957

758

1006

3857

93

93

93 1900 93

175

Store (0.6m²)

297

1256

2103

850 93

175

93

901

93

2000

1283

10-W04

CB

3377 900

5052

957

93

93 1900 Store (0.6m²)

1850

1051

93 834

185 93

185 93

265

1051 130

Bathroom 2000 D06

93

834

957

D05 Store (0.86m²)

2155

297 834

297

93

175

93

1006

Bathroom D07 834

1256

834

1500x2000

1051

93

901

93

758

D04 1283

1900 175

758

957

Store (0.86m²)

Store (0.6m²)

850

1900

1256

93

4

Store (0.6m²)

901

2103

2103

1499

1850

5

12-W07

93

1006

1256

93

Store (0.86m²)

6

93

1499

7

685

9

8

1850

10

11

12

13

1526

93

93

D03

1499

901

758

93

2103

1006

834

412

1500x2000

93

2103

834

412

1499

834

412

Bedroom 2 (13.0m² Inc Wdr)

2103

412

1499

1500x2000

834

850

1850 440

412 93

93

834

834

412

1499

93

3857 19228

6515

2103

412

850

1850 Bedroom 2 (13.0m² Inc Wdr)

1006 Bedroom 2 (13.0m² Inc Wdr)

12253

834 93

3857

3857

1500x2000

1500x2000

2103

Bedroom 2 (13.0m² Inc Wdr)

Bedroom 2 (13.0m² Inc Wdr)

1850 Bedroom 2 (13.0m² Inc Wdr)

1500x2000

3377

834

Store (0.86m²)

Bedroom 2 (13.0m² Inc Wdr)

Bedroom 2 (13.0m² Inc Wdr)

1500x2000

12-W09

Bedroom 2 (13.0m² Inc Wdr)

3857

3349

CB

1051

900 12-W08

1500x2000

3349

3349

CB

10-W05

3857

CB

11-W05

CB

7-W07

7-W06

3857

CB 1500x2000

-

2103

1800

1800

3349

1500x2000

3349

A

Bedroom 2 (13.0m² Inc Wdr)

1850

900

8-W05

Bedroom 2 (13.0m² Inc Wdr)

CB

3349 CB

9-W05

Bedroom 2 (13.0m² Inc Wdr)

1500x2000

6975

6-W07

6-W06

CB

4-W05 3349

3857

CB

5-W05 3349

1500x2000

1500x2000

3857

1500x2000

2475

3377

12-W05

12-W06

1002.5

A

910.0

910.0

1000.0

1567.7

1022.5

2015.0

1585.0

1090.0

1150.0

1585.0

1530.0

1022.5

1602.5

215.0 4038

7280

6890

982.5

910.0

910.0

1012.5

740.0

910.0

910.0

215.0

215.0

4030

3640

865.0

1579.9

1022.5

1565.0

1585.0

1527.6

707.4

1585.0

1980.0

1022.5

1595.2

1005

910.0

910.0

1002.5

215.0 7280

6890

4042

44090

PLOT 12 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.82 m² First Floor: 39.12 m² Total: 76.94 m²

PLOT 11 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²

PLOT 10 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.57 m² First Floor: 38.85 m² Total: 76.42 m²

PLOT 09 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²

PLOT 08 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²

PLOT 07 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.57 m² First Floor: 38.85 m² Total: 76.42m²

PLOT 06 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.57 m² First Floor: 38.85 m² Total: 76.42 m²

PLOT 05 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²

PLOT 04 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.57 m² First Floor: 38.85 m² Total: 76.42 m²

PLOT 03 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²

PLOT 02 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²

PLOT 01 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.87 m² First Floor: 39.17 m² Total: 77.04 m²

NOTE: GIA Measured in accordance with RICS code of measurement practice and excludes internal finishes to external + party walls.

01

First Floor Plan 1:50

DRAWINGS NOT TO SCALE


07

04

2155

2155

2000 CL +2.40

CL +2.40

CL +2.40

01

02

05 2400

A D

03

08

820

1330

04

1220

06

Typical First Floor Bathroom Plan 1:20

06

05 07 FFL 0.00

FFL 0.00

01

04

415

834

1615

B C

2400

2000

02

02

FFL 0.00

07

Typical First Floor Bathroom Elevation A 1:20

Typical First Floor Bathroom Elevation B 1:20

03

2155

2000 CL +2.40

CL +2.40

01 834

2400

02

1615

2100

2400

02

04

Key Shower head 300 x 600 mm tile Mirror Basin Bath tub Toilet paper holder Toilet Heated towel rail

05

535

01 02 03 04 05 06 07 08

05

FFL 0.00

04

Typical First Floor Bathroom Elevation C 1:20

FFL 0.00

05

Typical First Floor Bathroom Elevation D 1:20

DRAWINGS NOT TO SCALE


PROPOSED MECHANICAL & ELECTRICAL KEY SYMBOL

DESCRIPTION 13 Amp. Twin switched socket outlet 13 Amp. Single un-switched socket outlet 13 Amp. Twin switched external weatherproof socket outlet 13 Amp. Twin switched socket outlet above worktop

EXT

Switched spurs appliance panel above worktop controlling un-switched sockets below worktop / high level and etched with appliance name accordingly.

FSP

13 Amp. Fused switched spur SL = for future Stair Lift, A= for Future Alarm, B=Boiler, F= Extractor fan, TA = TV amplifier) F

13 Amp. Un-switched spur at high level for extractor fan

5A

5 Amp. Switched lighting socket Extractor fan isolation switch (B - with Boost switch)

IH

A

A -

Immersion heater switch with engraved Neon

SH

-

☼

Two way switch

RWP

One way switch Pull cord ceiling switch Push button with time delay switch

RAD M

RWP

Television Point Satellite Point (Dual) Cooker flex outlet plate Cooker switch (Engraved) Consumer service unit with lockable door BT Intake adaptable box. Central Heating wiring junction box with programmer Door bell mains operated Dedicated low energy bathroom bulkhead vapour proof light fitting

P

S

BT

1500x2000

1500x2000

Lounge / Dining (21.7m²) P s

S

Telephone point (M - BT Master Socket)

S

S

RAD

s

CHW

P

Lounge / Dining P (21.7m²)

Shaver socket with light fitting (Low Energy) External photocell dusk to dawn sensor switch

Bedroom 2 (13.0m² Inc Wdr)

S

Recessed down lighter (LED) B

Bedroom 2 (13.0m² Inc Wdr)

RAD

P

RAD

EX

8

9

10

11

12

13

7

EX

750x500 loft hatch over

RAD

RAD

SH

P

EX

RAD

750x500 loft hatch over

SH

Boiler flue

BF

External light fitting.security light Strip Light R-Heat

Under unit lighting Radiant heater

RAD / TR

Radiator / Towel Rail (Indicative only, sized by others)

s CO

R-Heat

H

Bathroom

GAS GM EM

Bathroom TR

RAD

RAD

fr/fz

RAD

wm / td

S

Bedroom 1 (12.9m² Inc Wdr)

EX

H

P 1500x2000

S

Hall

1500x2000

fr/fz wm / td

F

H

Kitchen (7.7m²)

Notes: 1. Heating, gas and electrical layouts on drawings are indicative only and subject to detailed design by specialist installers 2. All gas installation and commissioning to be undertaken by Gas Safe registered persons 3. Gas boiler to be as SAP Calculations and fitted with "Gas Saver" as noted 4. All electrical installation and commissioning to be undertaken by EIC/NIC registered persons 5. All electrical installations to be in accordance with BS7671:2008 (as amended) and Building Regulations Approved Document P 6. Consumer unit enclosure to be manufactured from non-combustible material in compliance with BS 7671:2008 Chapter 42 (Amendment 3:2015)

P

P Hall dw

RWP BT

CHW

Bedroom 1 (12.9m² Inc Wdr)

FSP

CO

P

EX

Mains interlinked heat detector Gas point Gas - Ground meter box Gas - Semi recessed meter box Electric - Wall mounted or wall mounted meter box

PH

WC EX

Kitchen (7.7m²)

Mains interlinked smoke detector Mains interlinked carbon monoxide detector

Plinth Heater

EX WC

F

Stopcock Ceiling / wall mounted extract duct and grill

TR

Dining

R-Heat

4

RAD

Store (1.0m²)

Store (0.86m²) P

Dining

ASHP

5

Store (1.0m²)

Store (0.6m²)

2

1

M

Store (0.86m²)

s

6

RAD

P

ASHP

Store (0.6m²)

s

CO

Light fitting (Low Energy) P=Pendent B=Bayonet W=Wall Light

Room digital thermostat with load compensator SC

P

FSP

W

Illuminated bell push

P

M

P

RAD SC

CHW

BT

RWP RAD

dw

SC

RWP

-

-

A

A

01

Electrical Layout - Ground Floor 1:50

02

Electrical Layout - First Floor 1:50

DRAWINGS NOT TO SCALE


05 | OTHER WORKS

Visualisation | Model making | Photography

- No. 43 Master Bedroom

43 & 45 Old Quay Road, Cultra VISUALISATION

25

Visualisation is a key component of effective communication c ec e. e f e c ec c create visual representations of e e e c e e e e e e fi c. e e e c c e ee c ec c e e e cce f ec . e e e e e e S ec Lumion.

c

e

MODEL MAKING Model making is an important method of architectural thinking. Thinking through making is a ce c thinking alternate back and forth e e e . The making or designing could be ce e . e ec ee e e ce e e e . e e ec e e e ee the making and the thinking opens up an opportunity to also express e e e.


PHOTOGRAPHY Photography has become an exciting hobby of mine since I started to study architecture. Combining travel and photography c e e to appreciate culture from f e fie . architecture through a lens enables you analyse critical c e f f ce e e details. Photography is also a e c e fe through visual diary.


Turn static files into dynamic content formats.

Create a flipbook
Portfolio_RJ by Rongzhen Jiang - Issuu