CONTENT
01 | ACADEMIC WORKS
Regeneration of the Market Area in Belfast
SELECTED WORKS
02 | PART 1 PROFESSIONAL WORKS Large scale urban design
2019-2023 03 | PART 2 PROFESSIONAL WORKS
Commercial | Residential | Workspace | Mixed-use
04 | PART 2 TECHNICAL WORKS Technical skills
05 | OTHER WORKS
Model Making | Visualisation | Photography
01 | ACADEMIC WORKS Regeneration of the Market Area in Belfast Location: Category: Project Year:
Belfast , Northern Ireland Mixed-use, Urban Farm, Residential 2021-2022 (Master research and design project)
e fi
e
f e ec e ec f e e e .M e ec focused on the issue of high food carbon footprint in the current food industry. Trying to reduce the food carbon footprint by e ef c . c e e c ef c . e ef e M c ec f c e e e ef e S . e f e e e e effic e cce c ce f f .
e e e M c e e e c focused on the social aspect of the built environment. It discussed the under considered humanistic care in the planning of a rapid e e c e e e e c S e e e e. e e c c e e e e c ee ffic e c development. And stressed the responsibility of the planning e e ec e f e in the planning of a city.
e e e c e ec e M c f ec . f c e e built environment both environmentally and socially.
e
f
e e
THE FARM e
e
e
e
e
f
f ec ff sustainability by localising the food c . e e c e an empty plot next to the Lanyon Place (Belfast Central Station) for easy access by local and surrounding residents. The farm e e e to deliver the food it produced to e c e . f
e
ec c c ec
e f
c
f
e
e ce
e
c
f
e e experience centre.
f
e e c f f
e ec c f production and supply system e fe c e carbon embodied food for Belfast e e e to add cultural and educational value to the community.
01 | ACADEMIC WORKS Regeneration of the Market Area in Belfast Location: Category: Project Year:
Belfast , Northern Ireland Mixed-use, Urban Farm, Residential 2021-2022 (Master research and design project)
e M e e ec ce ef . particularly focused on the social sustainability of the built environment.
eM e e e e fc e e
ec c e e .
e
e
e
fic
ec
ffe e f
e e
c
e
e
e e ce ce c
c e f e c e ec
e ce
e c e e e e c e c e c e e e c e e e the area. f
ce f e
c e e e e ce e ce e fc ec e e ec e e c e e ef e e e fic
e f e f
Housing Units 2 storey 2-bedroom housing e fi e e ec cce e f e c space.
Level 00
Level 01
Level 02
Level 03
Central Market Space The semi-open central market ce c e e e . is the space for daily market c e e exhibition.
First Floor Platform O e fi f connecting 4 blocks and providing outdoor communal space for residents.
Site elevation
Loading area for receiving the food from urban farm and loading the processed food delivering to other area.
Cookery school kitchen with a view into the food production underneath
Food production for processing and packaging the food produced from the urban farm.
Food collection point for collecting the food processed and packaged in the food production space.
Communal BBQ corner in the centre of the second floor roof platform
Double height space for the entrance and reception space of the cookery school.
Linking bridge connecting four residential blocks on the second floor e el
Living room, kitchen and reading room on the lo er floor of the duplex housing, with access to the front arden
o edrooms on the pper floor of the duplex housing.
The vertical circulation core for residents eta l space on ro nd floor for local to access their housing through roof small business, each unit comes with platform on the second floor or shop space on the rst floor
Section
Software Used: SketchUp Enscape Photoshop
2
1
3
1 Vapour control barrier e Vapour control barrier e f ce c c e e e e
f
5 4
2
ee e e c e Vapour control barrier e
3
f c c e ee e c Bituminous-felt seal e e insulation e f ce c c e e e e
4
e c ee e e f ce c
5 e
e
cee
e
e
e e
e e Vapour barrier e f ce c c e e e e Suspended timber ceiling
fe
e e
6 6 e e
e
e
e e e e e f ce c c e e e e e e S e Bituminous sealing layer e
e
Technical details
Street view
02 | PART 1 PROFESSIONAL WORKS Guangzhou Xilang Transportation Hub (Competition) Location: Guangzhou, China Category: Transportation Hub, Commercial Client: Guangzhou Metro Group Co., Ltd Project Year: 2019 GFA: 1,600,000 sqm Work Involved: Conceptual development, Modelling, CAD drawings, Diagrams, Competition packages, Attending key meetings
e
e
China.
c .
e
e
f
f e
ec e f e e e e e e
e e
Me e e c e f
e e
.
e c e e c e e c e e e e e
The masterplan provided an overall development and improvement strategy f e . e e e e f c e e f e f e ec c c e c c e f ce e f transportation station and city. The urban design proposal aimed to create e e ce e c e e c ee e ce e c e e f e ce e a comprehensive public transportation system into the urban fabric. The scheme uses an elevated platform system to organically connect different f c c e e e e e e e e surrounding urban public space. The concept of ‘Integration of transportation ce f c e e e fe c ec ce e ce e e f.
Work involved: Concept development AutoCAD drawings SketchUp model making Diagrams drawings Competition package
DESIGN CONCEPT ec c
ce f e e e e ee c e f ee . e e f e e f e ee c e e c c e . e f e e ee c ec ffe e f c south of the site (station area) to north (commercial & residential area).
e
e f f
e e
Site plan
Conceptual sketch
TRANSFER HALL e ce e e c ce c e e e e fe f c e c ec e space covered by a massive roof. Floating metro platform for metro line e e e fe ce e fe ef the transportation hub.
ransfer hall floor plan
ro nd floor plan
Transfer hall section pper floor plan
02 | PART 1 PROFESSIONAL WORKS Shenzhen Technology Park
Work involved:
Location: Category: Client: Project Year:
Shenzhen, China Urban design Shenzhen City Council 2020
Concept development AutoCAD drawings SketchUp modelling Diagrams drawings Competition package
INNOVATION CLUSTER
空中花园 Sky Garden
e
c e ee f e e c e c e c c e c e e c ffe e e e ce e S e e e e e . e c ec ec e e c e e f e fi extended form the shared indoor communal atrium space in each cluster.
e
空中花园
空中花园
二层云平台
二层云平台
研发者沙龙
研发者沙龙
Sky Sky Garden Garden
Sky Garden
e e e
二层云平台
Cloud Platform (2F)
研发者沙龙
Developer’s Salon
Cloud Cloud Platform Platform (2F) (2F)
Developer’s Developer’s Salon Salon
Cloud Platform (2F)
Developer’s Salon
01 | PART 1 PROFESSIONAL WORKS Xiongan Train Statation and Surrounding Area Urban Design
Work involved:
Location: Category: Client: Project Year:
Hubei, China Urban design Xiongan City Council 2020
Concept development AutoCAD drawings SketchUp modelling Diagrams drawings Competition package
F1
F1
ra n stat on floor plans
e el
B1
B1
ra n stat on floor plans
e el
B2
Xiong’an Intercity Railway
F1
B1
B2
ra n stat on floor plans
e el
B3
雄安城际站及小里站周边建筑设计 Xiong’an Intercity Railway Station, Xiaoli Railway Stations, and Their Surrou
TRAIN STATION + COMMERCIAL SPACE ee
e
ee
e
ce
e
f
B1 e
e f e
e
f e
e
e
B2
B3
B4 ra n stat on floor plans
雄安城际站及小里站周边建筑设计
e el
03 | PART 2 PROFESSIONAL WORKS Large-scale Residential Development Location: Category: Client: Project Year:
Herne Bay, England Residential Kitewood 2022 Project Budget: 40 million
Work involved:
Background Osborne development is a large-scale residential project appointed by the client Kitewood Estates Private Development in relation to the Reserved Masters Application for land south of Osborne Gardens, Hillborough, Herne Bay. It is part of the major extension to the coastal area of Herne Bay.
Design proposal The proposal includes the development of 180 dwellings on greenfield site part of wider master plan of circa 3000 houses. The site layout follows the approved Land Use Parameter Plan which gives structure to the density of homes within the site. Two character areas are proposed within the site, which are defined to reduce
the scale of the residential development, relative to the wider Masterplan. The areas are split strategically by a generous green space and linked by a single road to encourage access routes from opposite sides of the scheme. Pedestrian and access is promoted throughout the scheme.
Concept development AutoCAD drawings Visualization (Vray, Enscape) SketchUp modelling Diagrams drawings Design code Design access statement Planning package
Bathroom Bedroom 1 12.1 sqm
WR
Living / Dining / Kitchen
Balcony Above
22.7 sqm
Plot: 102 1B2P (M4(2))
Storage
WM
WM
Storage
Bathroom Balcony Above
WR
Plot: 101 1B2P (M4(2))
Bedroom 1 12.2 sqm
Living / Dining / Kitchen 26.1 sqm
Canopy Above
Dry riser
WR
Bedroom 1
Riser
Post
13.6 sqm
Entrance
Living / Dining / Kitchen
WR
28.0 sqm
Bedroom 2 13.3 sqm
Plot: 100 2B4P (M4(2))
Bathroom
Lobby
Storage
WM
Plot: 099 2B4P (M4(2))
Lobby
Storage
Buggy Store
Bathroom
WM
Bedroom 1 13.2 sqm
WR
Bedroom 2 13.8 sqm
Living / Dining / Kitchen
WR
30.5 sqm
Stairs
Balcony Above
Balcony Above
partment t p cal floor plan
Fan Coil Unit
Living / Dining Room 30.8 sqm
Bathroom
Ensuite Bedroom
Bedroom 3
Arlington 4B8P
11.5 sqm
10.0 sqm WR
WR
Ensuite
WC
WR
Storage
WR
Bedroom 4
Bedroom 2
10.0 sqm
10.0 sqm
Kitchen
WM
15.1 sqm
Study 8.7 sqm
Storage
KEY Chalvington - 3 bed Square Field - 3 bed Cuckmere - 2 bed Wilmington - 4 bed Arlington - 4 bed Cuckmere and Chalvington - 2 and 3 bed Apartment Blocks - 2 and 3 bed
1 bedroom flats: 2 bedroom flats: 3 bedroom flats: 2 bedroom houses: 3 bedroom houses: 4 bedroom houses:
13 dwellings of which 9 are affordable 20 dwellings of which 12 are affordable 8 dwellings of which 0 are affordable 33 dwellings of which 11 are affordable 68 dwellings of which 17 are affordable 40 dwellings of which 5 are affordable
Total:
180 dwellings of which 54 are affordable
te layout highlighting the various types and quantities proposed throughout the site
Site plan
o se t pe plan
rst floor
o se t pe plan
ro nd floor
Material Combinations Brickwork
R1
Chalvington and Chalvington
Cuckmere and Cuckmere
Chalvington and Cuckmere
B1
Manufacturer: IBSTOCK Product: Morpeth Use: Facing brickwork to external walls Style: Stretcher bond with bucket handle pointing, natural non-coloured mortar Manufacturer: IBSTOCK Product: Cooksbridge Buff Use: Facing brickwork to external walls Style: Stretcher bond with bucket handle pointing, natural non-coloured mortar
Cladding
L1
Arlington
Wilmington
Square Field
D1
Manufacturer: James Hardie Product: Hardieplank Family - Arctic White Use: Vertical cladding to external walls Style: 178mm with 30mm overlap Manufacturer: James Hardie Product: Hardieplank Family - Anthracite Grey Use: Horizontal cladding to external walls Style: 178mm with 30mm overlap
oo
ST
CT
Apartment Block (Private)
Apartment Block (Affordable)
House Types
Manufacturer: SVK - Fibre Cement Greys Product: Montana Textured Blue and Black Use: Roof tiling to pitched roofs Style: Lapped - 600 x 300mm with Riven edge Manufacturer: Redland Product: Rosemary Clay Classic Russet mix Use: Roof tiling to pitched roofs Style: 265 x 165mm with min. 65mm overlap
03 | PART 2 PROFESSIONAL WORKS Ickenham Office and Industrial Warehouse Development Location: Category: Client: Project Year:
Ickenham, England Commercial, Industrial Keltbray 2022
Ickenham development is an industrial and commercial project appointed by client Keltbray. The site is located to the north of Ickenham, a residential suburb situated between Uxbridge and Ruislip.
The subject lands have been vacant for 2 years. The existing buildings sit within a convoluted layout that are not only small in size but unsuitable for re-use for a modern employment operator.
The proposal aims to upgrade the spatial quality within the site pro iding significant percentage of the landscape area and updating existing buildings. The scheme includes an office loc ased on e isting structure and 4 newly built industrial warehouses.
Work involved: Concept development AutoCAD drawings Visualization (Enscape) SketchUp modelling Diagrams drawings Design code Design access statement Planning package
0
50
Key
EX.FFL: 55.4
Retained Buildings
1
Roads
New Buildings
Woodland
00
53.0
59.000
Proposed Trees
Ponds
0
43.00
57.0
54.0
53
51
52
OS
.00
ad dth to
30
31
(e
4.80m
40
3.8m
00
54.500
53.500
54
ED
42
43
00
46
44
45
41
5
50
53.5
COMMERCIAL WASTE (SKIPS)
Y2
FFL: 53.50
53.000
OS
53
54
EB
EB
61
60
59
58
57
56
00
TION
00
52.0
50.5
55
OS
52
51
47
48
WA
00
00
49
BIN
51.90
00
52.0
RE
STO
SH
0m
51.5
MOTO PAR RCYC LE KING
BIN
VER
CO
2.0
53.0
ENTA
FFL: 52.15
EB EB
EB
BIKE (TW STO O TIERRE )
22
52.50
53.20
7.2
33
g wi xistin
35
38
39
51.50
54.5
0
.50
53
57.500
52.000
0 .00
EB
COV STO ERED WAS RE & BIN H
52.0
54.500
00
1
00
00
52.5 55.000
55.5 EX.FFL: 55.4
Proposed Topography
55.500
37
36
34
24
23
32
27
28
29
16
17
25 26
15
12 20
22
21
9 10
18
19
56
14
13
6
11
7 8
0
loc RPZ dress
5
4
3
2
1
s) ation
5
0m
56
BIN PRES
16
50
0
0
.50
0
KING
13
.50
58.5
0 8.0
PAR
14
KING
00
56.500
00
Parking
PAR
15
56.000
12
00
59.500
0
62
.50
64
63
53.5
Y5
OS
OS
65
00
00
53
50.0
55.000
49.5
.50
51.000
54.5
53.500
51
00
0
53.500
53.000
55.000
49.0
00
50.80
50.80
USE KEY:
00 50
53.5
55.0
.00
00
BUILDING 01 Office
0
0
54.5
.50
FFL: 51.00
00
54
50
00 00
53.500
4
00
53.0
.00
FFL: 53.00
53.0
52.5
0
FFL: 45.50
45.5
BUILDING 02 Plant Workshop
FFL: 48.50
52.000 51.500
48.0
BUILDING 03 GF: Small Tools Workshop / Storage FF: Split in half - Spray Shop / Small Tools
48.000 45.5
Y4
48.3
.50
0
0
.00
51
51.000
Y3
50
0m
50.0 00
7.2
BUILDING 04 GF: Storage FF: Workshop
0
0 49.5
45.8
49.000
BUILDING 05 Structures, Fabrication (Overhead Gantry Crane required)
43.0
.50 0
0
.00
y to tie
44
41.500
6.0m
46.000
46.500
locall
42.500
43.500
0
.00
47
Guard
42.000
00
43.0
00
47.5
43
00
48.0
into ex
45.000
46.0
isting
48.0
48.500
00
y roadwa
45.50
45.5
44.500
41.0 00
00
45.000
Proposed Access to HS2 lands
0
YARD 01 Car Parking YARD 02 Plant storage Yard, RTC Machines, Attachments
.00
41
YARD 03 Storage for small tools (Lorries, HIABS, Delivery Vans) YARD 04 Structures Storage, Falsework, Panels, Scaffold YARD 05 Structures Storage. Formwork, Spec Protection, Concrete Plant, Pumps, Booms
Safety, Health and Environmental Information
campbellarchitects 55 Whitfield Street, London W1T 4AH www.campbellarchitects.co.uk
Do not scale
In addition to the hazards/risks normally associated with the types of work detailed on this drawing and noted in the Designer Risk Assessments and health and safety plan, note the following: - It is assured that all works on this will be carried out by a competent Contractor working where appropriate, to be an approved method statement. - Where applicable, significant residual risks are highlighted in the body of the drawing.
General Note - All levels and dimensions are approximate, detailed site surveys must be carried out by Contractor before commencement on building works. All levels and dimensions to be confirmed on site. - All existing drawing informtion is indicative and subject to the detailed site survey. - Drawing is for information only. - Do not scale from this drawing. - This drawing is copyrighted.
Issue
Date
By
Chkd
Appd
00
28/09/22
SN
MM
RS
Issue
Date
By
Chkd
Appd
Client
Drawing Status
Keltbray
PLANNING
Job Title
Scale at A0
Issue
Former MSD Facility, Breakspear Road South, Ickenham
1:500
00
Drawing Title
Project No
Drawing No
Proposed Site Layout
1381
1381-DR-A-00-015
A
B
C
4830.0
D
5000.0
E
5000.0
F
5000.0
G
5000.0
H
5000.0
2
1
4820.0
4
3
6285.0
3805.0
2170.0
5 5750.0
PL +9.53
RL +8.85
Window head level +7.50
Top of Masonry Wall / Precast Concrete Cladding +4.45 FFL +3.95 CL +3.45 Top of Masonry Wall / Precast Concrete Cladding +2.69 Bottom edge of Insulated Cladding Panels +2.50
FFL +0.00 GL -0.15
H
G 4820.0
F 5000.0
E 5000.0
D
C
5000.0
B
5000.0
5000.0
A
4
5
4830.0
PL +9.53
5750.0
2
3 2170.0
3805.0
1 6285.0
PL +9.53
RL +8.85
RL +8.85
Window head level +7.50
Window head level +7.50
Top of Masonry Wall / Precast Concrete Cladding +4.45 FFL +3.95
FFL +3.95
CL +3.45
CL +3.45
Top of Masonry Wall / Precast Concrete Cladding +2.69
Top of Masonry Wall / Precast Concrete Cladding +2.69
Bottom edge of Insulated Cladding Panels +2.50
Bottom edge of Insulated Cladding Panels +2.50
FFL +0.00 GL -0.15
FFL +0.00 GL -0.15
A
Office
Booth
Void
Booth
Meeting
Booth
Booth
CC
07
Acc WC
Storage
Building Fabric Specification
Storage
Male WC
LEVEL 1
Female WC
(Refer to detailed manufacturer specification for further information)
A
A
Meeting room
Meeting room
Element
U-Value (W/m2K)
Roof: -
0.18
Kingspan Quadcore KS1000 RW - 115mm
Wall 1: Kingspan Quadcore AWP KS600-1000MR Wall Panel, Micro-Rib - 74mm
0.26
Wall 2: Forticrete Fairfaced Dense Concrete Block 'Flint' (390mm x 190mm x 90mm) Insulated Cavity - 50mm Kooltherm K108 insulation Creagh Pre-cast Concrete Panel - 150mm (Rekli Formliner (Rib Type N))
0.24
Wall 3: (Buildings 3 & 4 only) Reinforced concrete retaining wall - 300mm Cellecta Hexatherm XPeri (External) - 70mm
0.26
Ground Floor: Entrance
-
Canteen
-
RC Concrete Slab - 250mm (with Sikafloor -1 MetalTop, one part, pre-blended metallic dry shake hardener) Cellecta Hexatherm Xfloor 300 (20mm) insulation 160mm dufaylite clayboard OSA (to S/E specification)
0.18
Openings:
Post Food Service Counter WC WC Storage
up
Acc WC
SH
Kitchen
Meeting room
Storage Acc WC/SH
WC WC
LEVEL 0
up
Access Doors Norton Industrial Doors Insulated Roller Shutter Door
0.69
Personnel Doors Strongdor Climador
1.4
Roof lights Kingspan Day-Lite Trapezoidal Rooflight (KS1000 DLTR - Opal)
1.6
Curtain Walling Reynaers ConceptWall 50 Curtain Walling system
1.6
Windows Reynaers ConceptSystem 77 window system
1.3
A
le at ons
loor plans
pec cat ons
2000mm clear head height
Stair nosings
Steel beam behind
05 2377
04
1600
Accessible door
A
8
2900
FFL +0.05
FFL +0.05
06
7740.0
D3 3400
B4 Typical Stair Core First Floor Plan 1:20
02
Stair nosings as per approved docs
1300.0
1023
Concrete staircase, to S/E design
Riser: 163.4 mm Going: 280 mm
DL +2.25
03
1300.0
HL (+2.287)
FFL +2.49
DL +2.25
02
A
8
FFL +2.49
2900
3550.0
Lowest Point
03
1852
1100.0
2500.0
2000.0
300.0
06 2377
01
977
01 (+4.575)
8
500
300.0
05
3400
777
02
Changing Room Elevation A 1:20
03
Changing Room Elevation B 1:20
06 3400
07 2377
300.0
2500.0
Accessible door
B C
07
FFL +2.49
FFL +2.49
A
1048
D
473
DL +2.25
1023
882
DL +2.25
01
3550.0
00 (+0.00)
1400
Half landing support to S/E design & specification
05
D4 882
2900
300.0
2900
1200.0
1023
473 07
A
A
FFL +0.05
FFL +0.05
7740.0
01 B4 Typical Core Section A-A 1:20
01
Changing Room Plan 1:10
04
Changing Room Elevation C 1:20
05
Changing Room Elevation D 1:20
B4 Typical Stair Core Ground Floor Plan 1:20
03
01 05
03
04
14 3623
12
13
3950
14 3623
3400
3810
3950
FFL +2.49
FFL +2.49
DL +2.25
DL +2.25
CL +2.75
CL +2.75
DL +2.25
DL +2.25
1135
2550
3350
2900
2900
3350
02
03 04
FFL +0.05
FFL +0.05
FFL +0.05
FFL +0.05
1880
12
Office Elevation A 1:20
03
Office Elevation B 1:20
02
3810
3395
1200
02
B1 First Floor Typical WC Elevation A 1:20
03
B1 First Floor Typical WC Elevation B 1:20 03
1065
A
1065
D
1200
07 3810
3623
B C
04
3950
15 3400
1135
FFL +2.49
FFL +2.49
DL +2.25
DL +2.25
13
CL +2.75
CL +2.75
DL +2.25
DL +2.25
3350
3350
1450
2900
2900
1450
06
D1 560
1450
290
FFL +0.05
FFL +0.05
300
01
750
750
1023
FFL +0.05
FFL +0.05
Officee Plan 1:10
04
Office Elevation C 1:20
05
Office Elevation D 1:20
01
B1 First Floor Typical WC Plan 1:10
04
B1 First Floor Typical WC Elevation C 1:20
05
B1 First Floor Typical WC Elevation D 1:20
Detail arrangement
03 | PART 2 PROFESSIONAL WORKS Listed Building Restoration and Mixed-use Development Location: Category: Client: Project Year:
London, England Restoration, Mixed-use Kitewood 2022
Background and Site
e e e e e e f c e ec ee ee Our proposals seek to intensify the existing use of c e e e e c c e e fi f e e ec e f e e c e e e e e e e e e e S O S M e e effic e e ce e e e e e e e ce e e ec e our proposal. accommodation. An increased footprint is supported f c e S e c ce e c ec c e e communal facilities for use by the charity. The site is f e ee e e c e net loss of permanent residential accommodation as a . ec e c e f e e e c e e e cce ce e f e e e e e . units. e e e f e e .
Work involved: Concept development AutoCAD drawings SketchUp modelling Visualization (Photoshop) Diagrams drawings Competition package preparation
Communal space view
DESIGN METHODOLOGY e e materials such as brick and stone to offer e e e Mansion building on Fulham Road. Se e Medical centre and formal garden view
e f
c e
f e
e c
e f
e.
e
f e
Suitable building relationships considered e c e f e the surrounding urban grain and to offer e S e ec initial due diligence. c f e e e central garden to form a key feature of the e. e e f e f ffe e e e ce e ce f ee e f e and the local community.
Formal garden view
Communal space view
e c e e e ec ce e c c provides a depth of amenities and good f c e e ec e e e ec e address.
03 | PART 2 PROFESSIONAL WORKS 45 Old Quay Road House
ec
Location: Category: Client: Project Year:
Holywood, Northern Ireland Residential Private 2023
e
e
e
e
e e fe e c c e e e f c e ce c f e e e e e e ce e ce e e e efi f . e e e and leisure space. The main entrance to the house is c . e e f e e e f e ee . e e e e e e c e ce e f f design of the house includes an open plan living room three bedrooms and a potential fourth bedroom. The ce e f e . e c c e e e e c c c e f e e c e e ce e provides a perfect place for outdoor entertainment and e fice e f ef c . e e e e ee e ffe e e . relaxation.
Work involved: Concept development Revit / AutoCAD drawings 3D modelling Visualization (Vray) Diagrams drawings Planning application package
UP TV Fireplace
UP
pper floor plan
WR
UP WR WR
UP
Visualisation (Vray)
o er floor plan
1500
W-10
*
*
*
*
* *
EXD-03 external steps 2 no. risers, 280mm going, 125mm rise
*
*
*
*
*
*
*
*
*
1245
1533
EXD-02
*
*
W-05
*
*
2135
* *
*
2135
*
*
* *
890
* *
W-12
602
* EXD-05 * * * * *
1866
* 2040
*
3523
* * 1559 2064
*
906
505
Δ Emergency Egress Window (see note)
W-13
3348
1559 2135
*
1559 2135
*
576
W-15
890
*
2135
1245
* *
1263
576
1263
2135
2478
*
04 | PART 2 TECHNICAL WORKS Restoration of a residential house Location: Category: Client: Project Year:
Cultra , Northern Ireland Residential Private 2023
c e e
e e
e e e
.
e e ec e
ef e . e ef e e e e e e e c c
e .
e e e
e
e
e
e
c
e f c e ce e ee
e
ec
e e e e e . e e .
e
e ee e e
e c
Work involved:
f f
Technical drawings
6788
Existing fabric
8200
Proposed areas to be altered Existing BIGT Gully
Carbon monoxide detector positioned 1000mm - 3000mm away from the boiler Smoke detector located to ensure to that no point of the room is more than 5300mm away from a detector.
W-04
Heat detector located to ensure that no point of the room is more than 5300mm away from a detector.
Existing 600mm Wavin IC
Existing SVP
W-05
Existing BIGT Gully
Existing 600mm Wavin IC DXXX
W-03
2478
Existing BIGT Gully
2478
1263
1500
1263
3348
1800
Boiler
Smoke Detector
EXD-03
Existing BIGT Gully
* EXD-05 * * * * *
* *
* *
* *
W-12
*
*
W-10
*
*
*
*
1050 W-08 2100
*
*
1559 2064
W-13
1559 2135
*
2135
*
Δ Emergency Egress Window (see note)
1559 2135
W-15
*
1050
Δ Emergency Egress Window (see note)
* *
505
Living Room
*
*
*
Carbon CM Monoxide Alarm
* *
576
W-06
W-16
576
EXD-02
Ensuite 3
Boiler House
1245
Existing BIGT Gully
2135
A DXXX
890
EXD-01
1245
W-02
Existing BIGT Gully
2135
DXXX
W-01
890
Existing BIGT Gully Existing 600mm Wavin IC
FFL
FFL
EXD-04 *See note re. Safety Glazing
Lounge
Study
D-04
Bedroom 3
W-18
Utility Kitchen HD
Smoke Detector
Ensuite 2
W-17
Existing 600mm Wavin IC
Heat Detector
Hall
Existing SVP
Smoke Detector
Smoke Detector
Garage
TD WM
WC
Ensuite 1
W-14
W-13
EXD-05
D-02
Existing BIGT Gully
Proposed South Elevation
01
D-03
W-12
Porch
D-01
DXXX Existing BIGT Gully W-11
W-10
Existing BIGT Gully W-09
W-08
DXXX
Bedroom 1 A
*
* *
*
* *
*
*
1245
*
W-05
*
*
2135
*
890
1533
EXD-02
*
external steps 2 no. risers, 280mm going, 125mm rise
602
EXD-03
2040
*
2135
1245
*
W-06
2135
*
W-15
890
W-16
*
2478
* EXD-01 * * * * *
* *
* *
* *
FFL
external steps 2 no. risers, 280mm going, 125mm rise
Existing 600mm Wavin IC
01
*
*
W-02
*
Δ Emergency Egress Window (see note)
*
W-01
FFL 2878
Existing 600mm Wavin IC
1897
* *
873
2478
* *
2135
1866
1262
3523
1245
906
2135
1866
890
Existing 600mm Wavin IC
1245
DXXX
2135
Existing 600mm Wavin IC
Existing BIGT Gully
890
3616
Bedroom 2
external steps 2 no. risers, 280mm going, 125mm rise
* See note re. Safety Glazing
Proposed Floor Plan 8200
Proposed North Elevation
02
A
A
KEY Existing Fabric
1050
1800
W-08
838
2478
1263
1000
400
906
1694
2135
Existing window opening to be blocked up and all finishes made good FFL
*See note re. Safety Glazing
03
1700
A
Proposed West Elevation
1074
Existing BIGT Gully
873
1245
*
2135
*
Δ Emergency Egress Window (see note)
Elevation A - 1:50 South elevation of proposed utility room and window
02
W-17
1262
Existing door opening to be partially blocked up and all finishes made good
FFL
890
*
W-18
*
2135
*
890
*
890
*
W-03
2135
FFL
W-04
1245
1245
1050
2100
1866
EXD-04
1430
D-04
830
240
D-03
B
B TD Utility 7240
WM
4883
1981
Smoke Detector
1866
505
*
A
FFL
01
Section A-A - 1:20 Construction detail through utility room
03
600
1245 W-07
*
*
FFL
Existing 600mm Wavin IC 1203
*
2135
W-09
890
W-08 Existing BIGT Gully
1559 2064
1263
*See note re. Safety Glazing
1800
600
1580
Plan A - 1:50 Construction detail through utility room
Floor plans / Technical details
04
Proposed East Elevation
Elevations
04 | PART 2 TECHNICAL WORKS Apartment block refurbishment project in Harrow Location: Category: Client: Project Year:
sealant as per the manufacturer's details
Kenton Road, Harrow, England Residential Strawberry Star 2022 Location Diagram 36-700 Detail 1
Work involved:
Insulated aluminium cladding system fixed back to sheathing board to new steel frame structure
Technical drawings
Aluminium reveal as part of cladding system
See metalwork package for steel balustrade details. Metal capping profile to top of parapet on metsec with cavity stop
New insulated brick slip system fixed to 12mm sheathing board onto new metsec (assume 100mm insulated stud)
Refer to Drawing 36-700 Detail 4
Refer to Drawing 36-700 Detail 5
See window package for details Contractor to allow for EPDM works, cavity stops and cavity trays to all windows where required
Existing Building
Allow for full brick reveal in new brick slip extent New insulated brick slip system fixed to 12mm sheathing board onto new metsec (assume 100mm insulated stud) Contractor to allow for metal trim with cavity tray behind at junction between new brick slip system and existing brick facade
Contractor to allow for metal trim with cavity tray behind at junction between new brick slip system and existing brick facade
Existing brickwork onto existing concrete frame Existing brickwork be repointed where required subject to scope agreement
Existing brickwork be repointed where required subject to scope agreement
Existing brickwork to have colour tint treatment colour to be agreed
Existing brickwork to have colour tint treatment colour to be agreed Refer to Drawing 36-700 Detail 3
Contractor to allow full brick reveal requirement for metal window reveal surround to be reviewed on site See window package for details Windows to existing brickwork areas will be fitted within existing openings. Openings to be primed and made good. Contractor to allow for EPDM to all sides and sealant as per the manufacturer's details
DET A-A
Proposed Scheme
02
Section A-A
01
Typical Envelope Bay Study 01
NOT FOR CONSTRUCTION
J
K
L
M
N
O
P
Q
R
S
U
T
B
DRY RISER INLET
V
W
X
DRY RISER INLET
1
1500x2000
1500x2000
1500x2000
1500x2000
Dry riser at high level
A
DRY RISER
DRY RISER
Core 1
LIFT
Core 2
(min 1700x1750 shaft)
LIFT (min 1700x1750 shaft)
WM
WM
WM
WM DATA / LSS
MAOV WM
MECH
2
MAOV
WM
WM
3
WM
1500x2000
900x2000
900x2000
1500x2000
1500x2000
1500x2000
1500x2000
4
B J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Sample Floor Plan - Ground Floor (Not to scale)
SEC Painted finish to wall specification to be confirmed 15mm shadow gap/scribing fillet
WM
Utility Cupboard
Sprayed MDF cupboard doors
1500mm turning circle Sprayed MDF doors - see door package for details
ELE 01 ELE 02
1500mm turning circle
uilt in wardrobe
02
Section A - Typical Apartment 1.4 1 edroom / 1 Person 1:20
Painted finish to wall specification to be confirmed Kitchen finish subject to client agreement and kitchen specialist input Contractor to allow for lac uer finish to doors Contractor to allow for back painted glass splashback
SEC A
Contractor to allow for Corian counter top
SEC A
MDF pained skirting board
01
SEC
Plan - Typical Apartment 1.4 1 edroom / 1 Person 1:25
03
Section 1:20
- Typical Apartment 1.4 1 edroom / 1 Person
Painted finish to wall specification to be confirmed
15mm shadow gap/scribing fillet Painted finish to wall specification to be confirmed
Painted finish to wall specification to be confirmed
Full height tiling to shower enclosure Tile specification to be confirmed
Full height tiling to shower enclosure Tile specification to be confirmed
Wall mounted mirror Frameless glass fixed shower screen Specification to be confirmed
Tiling to splashback Tile selection confirmed Tiled cistern enclosure on softwood frame to match wall tile
Sprayed MDF cupboard doors
Tiled cistern enclosure on softwood frame to match wall tile
Sanitaryware specification to be confirmed
Refer to sanitaryware specification
04
Typical athroom Elevation 01 1:20
05
Typical athroom Elevation 02 1:20
0
Typical Utility Cupboard Elevation 1:20
NOT FOR CONSTRUCTIO Detail Arrangement - Typical Apartment (Not to scale)
Key: ET - External Wall Type (Refer to Envelope Scope) RT - Roof Type (Refer to Roof Scope) CT - Ceiling Type (Refer to Internal Ceiling Scope) WT - Window Type (Refer to Window Scope) IWT- Internal Wall Type (Refer to Internal Wall Scope)
WT01E
WT01
IWT05
IWT05
FT07
Notes to Contractor: - All roofing products based on Alumasc or similar system as noted - Insulation depth and specification subject to U value re uirements and SAP calculation - Contractor to allow for roof drainage outlets as per M E design - Contractor to allow for parapet upstand and service penetrations as per M E design - Contractor to ensure any exposed single ply membrane is robust and suitable for maintenance access - All falls and to insulation to be agreed - All edge protection to be agreed. Contractor to allow for a Latchway system to level 5 main roof including the necessary fixing point upstands - All structural substrates to be confirmed subject to structural engineer s details - All plant re uirements to roof to be confirmed by M E consultant
FT07
RT03 ET04
ET04
ET05
ET01
01
ET03
0 02
03
0
07
WT01C
WT01A
CT03
01
ocation Diagram
CT01
Typical Level 4 Parapet Detail
02
CT01
03
Typical Envelope Detail Floors 2-3 rick Slips on Existing rick
Typical Envelope Detail Floors 2-3 Existing rick Tinted
DETAI 1
DETAI
5
DETAI 2
3
DETAI
7
MT02
WT01C
WT03A
RT01
WT01A
IWT0
FT10
IWT0
FT04 ET01
FT04 ET03
ET05
CT03 WT01C
WT01E
WT01A CT01
CT03
04
Typical Level 4 Terrace Parapet Detail
05
Typical Level 4 Threshold Detail
0
Typical Envelope Detail Level 1-2 Existing rick Tinted
CT01
07
Typical Envelope Detail Level 1-2 Existing rick Tinted
NOT FOR CONSTRUCTION
Envelop Section Details - Typical Wall (Not to scale)
Key:
Note: Insulation thickness to satisfy SAP s
IWT - Internall Wall Type (Refer to Internal Wall Scope) ET - External Wall Type (Refer to Envelope Scope)
2) New building structure - Rheinzinc cladding INTERNAL 2x 15mm sound bloc on 50mm steel frame w/ Isover batts insulation 100mm metsec structure with 100m insulating batts Insulation board Cavity Rheinzink cladding EXTERNAL
brick slips 1) New building structure - Rheinzinc cladding INTERNAL 2x 15mm sound bloc on 50mm steel frame w/ Isover batts insulation 100mm metsec structure with 100m insulating batts 12mm sheathing board Insulation board Cavity rick Slips (P-clad) EXTERNAL
IWT05
Note: Insulation thickness to satisfy SAP s
ET04
Notes to Contractor:
IWT05
- All roofing products based on Alumasc or similar system as noted - Insulation depth and specification subject to U value re uirements and SAP calculation - Contractor to allow for roof drainage outlets as per M E design - Contractor to allow for parapet upstand and service penetrations as per M E design - Contractor to ensure any exposed single ply membrane is robust and suitable for maintenance access - All falls and to insulation to be agreed - All edge protection to be agreed. Contractor to allow for a Latchway system to level 5 main roof including the necessary fixing point upstands - All structural substrates to be confirmed subject to structural engineer s details - All plant re uirements to roof to be confirmed by M E consultant
ET05
Performance Key Re uirements as per JRA report dated 2 /05/22
4) Existing envelope over clad - brick slips INTERNAL 12.5mm plasterboard (soundbloc) on 50mm steel frame w/ Isover batts insulation Existing 100mm block (inner leaf) 50/ 0mm cavity fill between existing masonry Existing 100mm rick (Outer leaf) Insulation board rick slip build up EXTERNAL
3) Existing envelope - brick tinted INTERNAL 12.5mm plasterboard (soundbloc) on 50mm steel frame w/ Isover batts insulation Existing 100mm block (inner leaf) 50/ 0mm cavity fill between existing masonry Existing 100mm rick (Outer leaf) EXTERNAL
Note: Insulation thickness to satisfy SAP s
IWT0
Note: Insulation thickness to satisfy SAP s
5) Existing envelope over clad - Rheinzink INTERNAL 12.5mm plasterboard (soundbloc) on 50mm steel frame w/ Isover batts insulation Existing 100mm block (inner leaf) 50/ 0mm cavity fill between existing masonry Existing 100mm rick (Outer leaf) 12mm Sheathing board Insulation board Cavity Rheinzink cladding EXTERNAL
IWT0
Note: Insulation thickness to satisfy SAP s
IWT0
ET03 ET01
ET02
NOT FOR CONSTRUCTION
Envelop Plan Details - Typical Wall (Not to scale)
Location Diagram
Notes to Contractor:
1500x2000 1500x2000
1500x2000
- Stair balustrade to comply with Approved Document Part K - Final design subject to fire consultant input regarding width of stairs and riser/going - Stair core venting to be agreed with fire consultant and M&E consultant - New structure to levels 03-05 require structural input - Lift shaft and car indicative only and require M&E and lift specialist input - Signage strategy subject to client input
WM WM WM
WM
WM 1500x2000
WM
WM
WM
WM
WM
WM
WM
WM
WM WM
Allow for lift over run and lifting beam
New lift shaft. Subject to SE and M&E engineer input
Allow for new painted steel balustrade with PVC handrail capping to all stair flights
HL (+15.495)
04 (+13.755)
NEW STEEL & TIMBER STRUCTURE TO SE DETAILS
ROOF (+17.265)
New steel & timber stair core to be lined with plasterboard
New steel stair structure from level 03 upwards to structural engineer's details
New ensitue concrete lift shaft
New floor structure over existing slab (L3) - refer engineer's details
New lift car
HL (+11.930)
New steel stair to be lined with plasterboard Existing concrete walls to be finished with a clear seal and super graphic signage
New steel & timber stair core to be lined with plasterboard New core walls to be lined with painted plasterboard and super graphic signage
03 (+10.520)
Existing slab with new structural build up over - refer Structural engineer.
Existing balustrade retained, height to be confirmed
HL (+8.608)
02
Location of dry riser Location of corridor door shown (behind)
Typical Core Section Detail 1:20
Existing concrete stair core and stair retained & made good. Stair core extended with Steel & timber construction to Level 3, L4 & Roof. Refer SE for detail.
Additional steps to level 3 only shown dotted handrail to suit
02 (+6.850)
New ensitu concrete lift shaft formed to host evacuation lift Refer SE for detail
DRY RISER HL (+5.258)
Existing concrete stair to be made good and finish with a clear seal Existing concrete walls to be made good and finished with a clear seal and super graphic signage
Existing and new stair treads to have anti slip edge nosing strips
NEW LIFT New lift shaft. Subject to SE and M&E engineer input
01 (+3.497)
(min 1700x1750 shaft)
Core 1 New concrete lift core - concrete finish exposed in stair lobby
HL (+1.752)
SEC A-A 00 (+0.00)
01
03
Typical Core Section A-A 1:50
Typical Core Plan (Level 03) 1:20
NOT FOR CONSTRUCTION Stair core typical details
DET A-A
Notes to Contractor:
- Drawing to be read in conjunction with window package and envelope scope drawings - Contractor to allow for none combustible brick slip system - Contractor to allow for all required accessories ie cavity trays, sheething board where required, weep holes etc. - Contractor to allow for movement joints as per manufacturer's recommendations - All envelope details yet to be coordinated with structural design - All fire stopping as per the fire strategy package
Metal work typical details
DET B-B
USL
Existing concrete slab
USL
Gypframe soffit cleat fixed to hanger
See metalwork package for steel balustrade details. Contractor to allow for side fixing through brick slip system and weathering as required New insulated brick slip system fixed to 12mm sheathing board onto existing concrete frame/new metsec where required
Existing brickwork to be repointed where required subject to scope agreement
Existing brickwork be repointed where required subject to scope agreement
Gypframe MF6 ceiling perimeter channel fixed to wall at 600mm centres
Existing brickwork to have colour tint treatment colour to be agreed
Gypframe soffit cleat fixed to hanger
Gypframe strap hanger
Gypframe strap hanger
50mm Isover Spacesaver Ready-Cut insulation in the cavity
100mm Isover Spacesaver Ready-Cut insulation in the cavity
Gypframe MF7 primary support channel
Gypframe MF7 primary support channel Gypframe MF5 ceiling section at 450mm centres
Gypframe MF5 ceiling section at 450mm centres 12.5mm Gyproc, taped and jointed with taped and jointed with 12.5mm Gyproc, painted finish
Existing brickwork to have colour tint treatment colour to be agreed
12.5mm Gyproc MR, taped and jointed with painted finish
Gypframe MF6 ceiling perimeter channel fixed to wall at 600mm centres
FCL
01
Existing brickwork to be removed back to existing concrete frame
Brick slip reveals to head and jamb reveals See window package for details Contractor to allow for EPDM works, cavity stops and cavity trays to all windows where required
CT 01 - TYPICAL APARTMENT INSULATED MF CEILING ON EXISTING SLAB Specification ref: K10 11 - TBC
02
FCL
CT 02 - TYPICAL APARTMENT INSULATED MF BATHROOM CEILING ON EXISTING SLAB Specification ref: K10 11 - TBC
Acoustic batts between joists
Acoustic batts between joists
Steel and timber floor build uprefer to structural engineer
Steel and timber floor build uprefer to structural engineer
2x15mm Soundbloc on resilient 2x15mmbars Soundbloc on resilient bars fixed to timber floor joists
2x15mm Soundbloc on resistant bars fixed to timber floor joists
USL
Contractor to allow for metal sill via window supplier Entrance surround to be formed of aluminium profile and cladding by specialist onto steel sub-frame and fixed back to existing concrete frame as per structural engineer's details
Existing brickwork to be repointed where required subject to scope agreement Existing brickwork to have colour tint treatment colour to be agreed
Existing concrete slab
USL Gypframe soffit cleat fixed to hanger
Gypframe soffit cleat fixed to hanger
Gypframe strap hanger
Gypframe strap hanger
Gypframe MF7 primary support channel
Gypframe MF7 primary support channel
Gypframe MF5 ceiling section at 450mm centres
12.5mm Gyproc suspended MR, taped and jointed with painted finish
12.5mm Gyproc 12.5mm Gyproc suspended, taped and suspended, taped and jointed with selected finish
Refer to Drawing 36-700 Detail 7
Gypframe MF6 ceiling perimeter channel fixed to wall at 600mm centres
03 See window package for details Windows to existing brickwork areas will be fitted within existing openings. Openings to be primed and made good. Contractor to allow for EPDM to all sides and sealant as per the manufacturer's details
USL
Existing brickwork to have colour tint treatment colour to be agreed Existing DPC to be reviewed Contractor to allow for new injected DPC if required
FCL
Gypframe MF5 ceiling section at 450mm centres
Existing concrete slab
Potential drop down boxing for image VR inlet and outlet duct to be brought to floor level
Gypframe soffit cleat fixed to hanger
Entrance surround to be formed of aluminium profile and cladding by specialist onto steel sub-frame and fixed back to existing concrete frame as per structural engineer's details
Existing brickwork to be repointed where required subject to scope agreement
Gypframe MF6 ceiling perimeter channel fixed to wall at 600mm centres
FCL
CT 03 - TYPICAL APARTMENT MF CEILING ON NEW FLOOR STRUCTURE
Gypframe strap hanger
Gypframe MF7 primary support channel
Existing DPC to be reviewed Contractor to allow for new injected DPC if required
Gypframe MF5 ceiling section at 450mm centres Suspended ceiling tile
DET B-B
04
DET A-A
02 Location Diagram
Section B-B
03
Section A-A
01
Typical Envelope Bay Study 01
NOT FOR CONSTRUCTION
Gypframe MF6 ceiling perimeter channel fixed to wall at 600mm centres
05
CT 04 - TYPICAL APARTMENT MF BATHROOM CEILING ON NEW FLOOR STRUCTURE
FCL
CT 05 - TYPICAL CORRIDOR ACCESSIBLE CEILING - TYPE TBC Specification ref: K10 11 - TBC
Envelop detailed elevation
DRAWINGS NOT TO SCALE
04 | PART 2 TECHNICAL WORKS Residential Development in Rochester Location: Category: Client: Project Year:
Rochester, England Residential Kitewood 2022-2023
Extract to Bathroom Below terminated with tile vent.
08
02
Extract to Bathroom Below terminated with tile vent.
Extract to Bathroom Below terminated with tile vent.
SVP terminated with tile vent.
SVP terminated with tile vent.
02
02
SVP terminated with tile vent.
1050
1500
2400
2100
Work involved:
12-W06
E 11-W04
E
SG
SG
SG
SG
9-W04
04
04
04
9-W01
8-W01
8-W04
SG
SG
04
1050
600
01
10
12-W01
1050
EXD1
EXD1
SG
SG
RWP
EXD1
EXD1
SG
SG
07
07
04
04
04
07
RWP
C
10-W01
11-W01
04 07
SG
10
04
RWP
RWP
RWP
RWP
NOTE: Extent of required underbuild to be confirmed
terminated with tile vent. Elevation - 1 1:50
01
CB
E 8-W04 2385 Flr to Ceiling
2422 TOJ to U/S Truss
08
02
02
02
300
50°
50°
SG
1050
1500
2400
2100
30°
290
253
E
E 1-W09
04
600
04
SG
SG
SG
SG
SG
SG
1-W03
2-W04
SG
SG
SG
06 SG
SG
SG
SG
SG
SG
SG
3-W03
4-W04
SG
SG
SG
SG
SG
1050
06
SG
09
09
SG
04
SG
09
SG
04
SG
04 1-W04
EXD2
Fire-stopping over separating wall extended into eaves and to continue to underside of roof covering as detailed and as AD.B1 Diagram 11
DPC in external wall to be Minimum 150mm Above Finished Ground Level
RWP
06
SG
1050
600
SG
1050
2700
SG SG
SG
2100
SG SG
E 4-W05
06
2100
EXD1 2410 Flr to Ceiling
EXD1
E 3-W05
06 SG
01
8-W01
E 2-W05
1-W08
05
SG
2650 SSL to U/S Floor Joist
SG
EXD2
2-W03
3-W04
EXD2
EXD2
4-W03
5-W03
DPC in external wall to be Minimum 150mm Above Finished Ground Level
C
Foundations to Speedeck Foundations Ltd's design and drawings
01
Stick Section C-C 1:20
02
50°
E
10-W04
05
1050
600
12-W05
2100
2700
03
E
SG
Technical drawings
50°
03 E
50°
50°
300
50°
50°
08
Elevation - 2 1:50
NOTE: ACOUSTIC CEILING DETAIL TO BE CONFIRMED, WHICH MAY ALTER THE FINAL TRUSS POSITION
DRAWINGS NOT TO SCALE
44090 3648 777.5
7280
2485.0
777.5
385.0
2485.0
3250
7670
1115.0
2485.0
418
777.5
2485.0
1145.0
2485.0
777.5
337.5
3640 427.5
2485.0
777.5
7280
2485.0
377.5
777.5
2485.0
3652
7670
1115.0
417.5
2485.0
777.5
2485.0
1110.0
2485.0
390
812.5
RWP
2485.0
777.5
RWP 3-W02
CB
3-W03
EXD2
2-W02
2-W03
EXD2
CB
3349
1-W03
RWP
1-W04
EXD2
3349 3377
Lounge / Dining (21.7m²)
Lounge / Dining (21.7m²)
CB
5-W03
4-W02
CB
4-W03
EXD2
6-W02
RAD
Lounge / Dining (21.7m²)
910 1182
Hall
85
Kitchen (7.7m²)
Hall dw
9-W01
EXD1
CB
Hall
RWP
dw 8-W01
CB
RWP
EXD1
CB
EX
Kitchen (7.7m²)
187 Kitchen (7.7m²)
Hall
1090 D01
18890
2195
5052
910 1182
wm / td
700
797 3180 551 551 1287
700
1100 93
1090 D01
Hall
WC
EX
85
3-W01
dw 2-W01
CB
EXD1
dw
1-W01
RWP
1672
RWP
900
dw
EXD1
CB
CB
EXD1
93
910 1182
RAD
93 RAD
85
1672
2572
Hall
Kitchen (7.7m²)
685
1100
910
1100
EX WC
RAD
1100
910 1182
12253
RAD
186
93
850 1050
93 186 910 3180 797
RAD
551
797 3180
1287
WC EX
1090 D01
85
464
700 551 551
2168 187
RWP
Kitchen (7.7m²)
RWP
Internal Stairs: 207.7mm Rise (13 Equal Risers) 225mm Going Subject to specialist design
Hall
2572
Hall
85
1287
fr/fz wm / td
wm / td
700
1100 93
187 Kitchen (7.7m²)
93
1287
1100
551
910 1182
2168
187
EXD1 900 dw
EXD1
CB
5-W01
EXD1 RWP
CB
dw 4-W01
RWP
RWP
dw 6-W01
CB
EX
1050 850
RAD
850 1050 1100
2168 187
475
464
93
1100
93 3180 797
797 3180
700
475
551 551 1287
186 910
186 1100
93 1100
910 1182
85
464
RWP
6638
85
2168
Hall
187
93
910 1182
187
2168
85
910 1182
900
910 1182
1672
85
WC
1090 D01
wm / td
Hall
551
fr/fz wm / td
797 3180
RAD
700
1100
1090 D01
WC
464
1090 D01
2168
Kitchen (7.7m²)
551 551 1287
85
Kitchen (7.7m²)
Dining
93 3180 797
RAD
850 1050 910
1100
700 551
1100
551
93 Hall
910 1182
93
WC
1090 D01
EX WC
93
187 Kitchen (7.7m²)
1090 D01
475
186
93
1100
93 3180 797 1287
fr/fz wm / td
187
2572
1100
551 1287
187 Kitchen (7.7m²)
Kitchen (7.7m²)
2168
475
464
475
Dining
1949 2318
Dining WC
464
1090 D01
475
EXD1 900
187
2168
187
2572
2190
RWP
dw
1672
Kitchen (7.7m²)
551
fr/fz
2168
wm / td
910 1182
1090 D01
Store (1.0m²)
464
RAD
85
2168
wm / td
910 1182
2572
700
464
1672
85
wm / td
1100
551 551 1287
700
WC
93
551
1100
551
1090 D01
93
3180 797 1287
fr/fz wm / td
5052
WC
464
fr/fz
475
186
910
1100
910
186 3180 797
93
93
1090 D01
475
93
Dining
797 3180
1100
Dining
797 3180
475
700
464
WC
Store (1.0m²)
93 1100
Store (1.0m²)
93
186
910
Dining
186 910
12-W02
D02
ASHP
475
Store (1.0m²)
fr/fz
685
1100
93
Store (1.0m²)
910
186
1400 1032
475
700
464
fr/fz
12253
1050 850
2
1
1972 2340
1400 1032 Store (1.0m²)
Dining
Dining
1400 1032 93
1949 2318
Store (1.0m²)
1100
850 1050
1949 2318
93
1850
1850
1499
910
1850
fr/fz
1400 1032 1522
1499
551 551 1287
1499
1050 850
1850
Dining
186
1400 1032
WC
Store (1.0m²)
1672
1949 2318
93
850 1050
1949 2318
93
6515
1400 1032
1050 850
4800
19228
93
Store (1.0m²)
910
1400 1032
551 551 1287
1850
1050 850
1499
RAD
4800
4800
1499
Store (1.0m²)
fr/fz
1850
ASHP
Store (1.0m²)
Dining
zf/rf
1949 2318
ASHP
1977 2345
Dining 475
1400 1032 93
1949 2318
93
1850
1949 2318
1527
1400 1032
93
1850 464
1400 1032 1499
Lounge / Dining (21.7m²)
910
186
93 1499
1400 1032
93
1499
850 1050
3372
Lounge / Dining (21.7m²)
1850
1949 2318
1-W02
4800
1850 Lounge / Dining (21.7m²)
1499
1949 2318
Dining
700
3349
Store (1.0m²)
Lounge / Dining (21.7m²)
1100
3349
3349
1499
1850 1400 1032
93
CB
12-W04
Lounge / Dining (21.7m²)
Lounge / Dining (21.7m²)
CB
10-W03
EXD2
4800
EXD2
12-W03
10-W02
4800
RWP
CB
11-W03
EXD2
Lounge / Dining (21.7m²)
CB
7-W03
EXD2
1100
RWP 11-W02
7-W02
4800
RWP
CB
3349
1050 850
3349
4800
-
4800
1850 RWP
A
551
3349
8-W03
EXD2
2572
8-W02
fr/fz
CB
9-W03
EXD2
Lounge / Dining (21.7m²)
wm / td
9-W02
3349 RAD
3349
RWP
wm / td
RWP
CB
6-W03
EXD2
6515
6975
4800
EXD2
4800
RWP 5-W02
4800
RWP
Lounge / Dining (21.7m²)
7-W01
EXD1 900
Hall dw CB
11-W01
EXD1
900
EXD1
RWP
CB
dw 10-W01
RWP
RWP
dw 12-W01
RWP
-
A 1002
1023
553
1010
578
1010
2577
440
1023
1677
1023
553
7313
1010
418 225
1010
392
1023
1428
1660
1023
440
8257
1010
465
1010
638
1023
1002
2663
722
1023
420 113
2165
1010
465
1010
440
1023
1677
1023
552
7313
1010
433 225
1010
377
1023
1443
1677
1023
440
7280
1010
495 65
1010 1075
553
1023
1002
2578
44090
PLOT 12 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.82 m² First Floor: 39.12 m² Total: 76.94 m²
PLOT 11 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²
PLOT 10 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.57 m² First Floor: 38.85 m² Total: 76.42 m²
PLOT 09 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²
PLOT 08 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²
PLOT 07 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.57 m² First Floor: 38.85 m² Total: 76.42m²
PLOT 06 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.57 m² First Floor: 38.85 m² Total: 76.42 m²
PLOT 05 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²
PLOT 04 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.57 m² First Floor: 38.85 m² Total: 76.42 m²
PLOT 03 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²
PLOT 02 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²
PLOT 01 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.87 m² First Floor: 39.17 m² Total: 77.04 m²
NOTE: GIA Measured in accordance with RICS code of measurement practice and excludes internal finishes to external + party walls.
01
Ground Floor Plan 1:50
DRAWINGS NOT TO SCALE
44090
1002.5
7280
215.0
910.0
910.0
610.0
1202.5
1585.0
7670
2015.0
1585.0
892.7
1202.5
1585.0
3250
2060.0
1585.0
592.5
1237.5
3640
215.0
910.0
910.0
622.5
1095.0
7280
215.0
910.0
910.0
510.0
1202.5
1585.0
7670
2015.0
1585.0
892.5
1202.5
1585.0
3652
2095.0
1585.0
CB
3-W05
1202.5
615
2-W05 CB
3349
215.0
910.0
910.0
1002.5
338
3647
1-W09
1-W08
3349
900 1104
1256
3857
93
93
1900
850
1051 93
Bathroom 2000
1104
93
297 834 130
2155
2155 Bathroom 2000 185 93
12253
Store (0.6m²)
758
957
175
93
957
130
834
1283
93
1-W07
93 850 93
175 758
901
Store (0.86m²)
834
1051 93 237
834
185 93
265
1104
1256
2093
1500x2000
4516
185 93
1283
Bedroom 1 (12.9m² Inc Wdr)
3411
3411
3411
Bathroom 2000
4516
4516
2155
834
2093
Bedroom 1 (12.9m² Inc Wdr)
18890
1256
Bedroom 1 (12.9m² Inc Wdr)
130
834
2093
4516
3349 3377
3-W04
CB
CB
1-W05
1-W06
338
1500x2000
CB
2-W04
3411
4516
1500x2000
Ø110 SVP Changes vertical position in boxing void 2475
3411
93
297
1900 Store (0.6m²) 93
93 93
1051 237
1104
957
758 297
2093
1256
3411
93
Bedroom 1 (12.9m² Inc Wdr)
3349
3349
5-W04
CB
1006
Bedroom 1 (12.9m² Inc Wdr)
2093
4516
1900 175 297 834 130
2155
850 175
93
834
185 93
1006
3349
1256
237
Bathroom 2000 93
901
93
Bathroom 2000 2093
Store (0.6m²)
758
957
93 1850
1104
237
93
93
93 93
850
3857 1900 Store (0.6m²) 93 1051 93
237
1006
Store (0.86m²)
Store (0.86m²)
1104
93
1051
93
1900 175 297 834 130
2155
185 93
2155
Store (0.6m²)
758
957
957
834
834 130
93
93
93 850 93
93 850 93
175 758 297
Bathroom 2000
1256
93
901
93
2103
1499
1256
93
1006
185 93
93 1051 130
93
901
93
412
1256
440
1526
4-W04
CB
900
4516
3349
6-W04
6-W05
CB
8-W04
6638
CB
900
7-W04
7-W05
3349
1800
3411
3857
1500x2000
93 1900 Store (0.6m²) 93 1051
1900 Store (0.6m²)
175 297
834 1500x2000
4516 CB
1500x2000
1500x2000
4516
901
834
Bedroom 1 (12.9m² Inc Wdr)
3349
3349
11-W04
CB
1256
93
834
1850
3349
9-W04
CB
834
1256
1500x2000
3411
3411
4516
4516
3349
901
2103
1850
1500x2000
Bedroom 1 (12.9m² Inc Wdr)
2093
93
1006
Store (0.86m²)
237
3411
Bedroom 1 (12.9m² Inc Wdr)
1850
Bedroom 1 (12.9m² Inc Wdr)
3411
2093
Bedroom 1 (12.9m² Inc Wdr) 2093
1256
Bedroom 1 (12.9m² Inc Wdr) 4516
1256
834
185 93
2093
Bedroom 1 (12.9m² Inc Wdr)
185 93 3411
1256
758
957 2155
Bathroom 2000
1256
1500x2000
1104
2093
1256
93
Bathroom 2000 185 93
93
2103
1499
1800
Bathroom 2000
901
Store (0.86m²)
130
834
93
1104
2155
130
834
1256
1104
93 237
1104
2155
130
237
2093
93
93 93 1006
2155
297 834
237
1499
850
957
758
1850
1006
412
Store (0.86m²)
1104
93
237
834
412
1499
Store (0.86m²)
93
850 297 834
175
93
1900 Store (0.6m²) 93 1051
93
901
93
1104
185 93
Store (0.86m²)
93
834
93
834 130
2155
Bathroom 2000
957
758
1006
3857
93
93
93 1900 93
175
Store (0.6m²)
297
1256
2103
850 93
175
93
901
93
2000
1283
10-W04
CB
3377 900
5052
957
93
93 1900 Store (0.6m²)
1850
1051
93 834
185 93
185 93
265
1051 130
Bathroom 2000 D06
93
834
957
D05 Store (0.86m²)
2155
297 834
297
93
175
93
1006
Bathroom D07 834
1256
834
1500x2000
1051
93
901
93
758
D04 1283
1900 175
758
957
Store (0.86m²)
Store (0.6m²)
850
1900
1256
93
4
Store (0.6m²)
901
2103
2103
1499
1850
5
12-W07
93
1006
1256
93
Store (0.86m²)
6
93
1499
7
685
9
8
1850
10
11
12
13
1526
93
93
D03
1499
901
758
93
2103
1006
834
412
1500x2000
93
2103
834
412
1499
834
412
Bedroom 2 (13.0m² Inc Wdr)
2103
412
1499
1500x2000
834
850
1850 440
412 93
93
834
834
412
1499
93
3857 19228
6515
2103
412
850
1850 Bedroom 2 (13.0m² Inc Wdr)
1006 Bedroom 2 (13.0m² Inc Wdr)
12253
834 93
3857
3857
1500x2000
1500x2000
2103
Bedroom 2 (13.0m² Inc Wdr)
Bedroom 2 (13.0m² Inc Wdr)
1850 Bedroom 2 (13.0m² Inc Wdr)
1500x2000
3377
834
Store (0.86m²)
Bedroom 2 (13.0m² Inc Wdr)
Bedroom 2 (13.0m² Inc Wdr)
1500x2000
12-W09
Bedroom 2 (13.0m² Inc Wdr)
3857
3349
CB
1051
900 12-W08
1500x2000
3349
3349
CB
10-W05
3857
CB
11-W05
CB
7-W07
7-W06
3857
CB 1500x2000
-
2103
1800
1800
3349
1500x2000
3349
A
Bedroom 2 (13.0m² Inc Wdr)
1850
900
8-W05
Bedroom 2 (13.0m² Inc Wdr)
CB
3349 CB
9-W05
Bedroom 2 (13.0m² Inc Wdr)
1500x2000
6975
6-W07
6-W06
CB
4-W05 3349
3857
CB
5-W05 3349
1500x2000
1500x2000
3857
1500x2000
2475
3377
12-W05
12-W06
1002.5
A
910.0
910.0
1000.0
1567.7
1022.5
2015.0
1585.0
1090.0
1150.0
1585.0
1530.0
1022.5
1602.5
215.0 4038
7280
6890
982.5
910.0
910.0
1012.5
740.0
910.0
910.0
215.0
215.0
4030
3640
865.0
1579.9
1022.5
1565.0
1585.0
1527.6
707.4
1585.0
1980.0
1022.5
1595.2
1005
910.0
910.0
1002.5
215.0 7280
6890
4042
44090
PLOT 12 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.82 m² First Floor: 39.12 m² Total: 76.94 m²
PLOT 11 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²
PLOT 10 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.57 m² First Floor: 38.85 m² Total: 76.42 m²
PLOT 09 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²
PLOT 08 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²
PLOT 07 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.57 m² First Floor: 38.85 m² Total: 76.42m²
PLOT 06 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.57 m² First Floor: 38.85 m² Total: 76.42 m²
PLOT 05 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²
PLOT 04 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.57 m² First Floor: 38.85 m² Total: 76.42 m²
PLOT 03 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²
PLOT 02 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 38.85 m² First Floor: 38.85 m² Total: 77.70 m²
PLOT 01 Occupancy - 2 Bedroom 3 Person GIA - Ground Floor: 37.87 m² First Floor: 39.17 m² Total: 77.04 m²
NOTE: GIA Measured in accordance with RICS code of measurement practice and excludes internal finishes to external + party walls.
01
First Floor Plan 1:50
DRAWINGS NOT TO SCALE
07
04
2155
2155
2000 CL +2.40
CL +2.40
CL +2.40
01
02
05 2400
A D
03
08
820
1330
04
1220
06
Typical First Floor Bathroom Plan 1:20
06
05 07 FFL 0.00
FFL 0.00
01
04
415
834
1615
B C
2400
2000
02
02
FFL 0.00
07
Typical First Floor Bathroom Elevation A 1:20
Typical First Floor Bathroom Elevation B 1:20
03
2155
2000 CL +2.40
CL +2.40
01 834
2400
02
1615
2100
2400
02
04
Key Shower head 300 x 600 mm tile Mirror Basin Bath tub Toilet paper holder Toilet Heated towel rail
05
535
01 02 03 04 05 06 07 08
05
FFL 0.00
04
Typical First Floor Bathroom Elevation C 1:20
FFL 0.00
05
Typical First Floor Bathroom Elevation D 1:20
DRAWINGS NOT TO SCALE
PROPOSED MECHANICAL & ELECTRICAL KEY SYMBOL
DESCRIPTION 13 Amp. Twin switched socket outlet 13 Amp. Single un-switched socket outlet 13 Amp. Twin switched external weatherproof socket outlet 13 Amp. Twin switched socket outlet above worktop
EXT
Switched spurs appliance panel above worktop controlling un-switched sockets below worktop / high level and etched with appliance name accordingly.
FSP
13 Amp. Fused switched spur SL = for future Stair Lift, A= for Future Alarm, B=Boiler, F= Extractor fan, TA = TV amplifier) F
13 Amp. Un-switched spur at high level for extractor fan
5A
5 Amp. Switched lighting socket Extractor fan isolation switch (B - with Boost switch)
IH
A
A -
Immersion heater switch with engraved Neon
SH
-
☼
Two way switch
RWP
One way switch Pull cord ceiling switch Push button with time delay switch
RAD M
RWP
Television Point Satellite Point (Dual) Cooker flex outlet plate Cooker switch (Engraved) Consumer service unit with lockable door BT Intake adaptable box. Central Heating wiring junction box with programmer Door bell mains operated Dedicated low energy bathroom bulkhead vapour proof light fitting
P
S
BT
1500x2000
1500x2000
Lounge / Dining (21.7m²) P s
S
Telephone point (M - BT Master Socket)
S
S
RAD
s
CHW
P
Lounge / Dining P (21.7m²)
Shaver socket with light fitting (Low Energy) External photocell dusk to dawn sensor switch
Bedroom 2 (13.0m² Inc Wdr)
S
Recessed down lighter (LED) B
Bedroom 2 (13.0m² Inc Wdr)
RAD
P
RAD
EX
8
9
10
11
12
13
7
EX
750x500 loft hatch over
RAD
RAD
SH
P
EX
RAD
750x500 loft hatch over
SH
Boiler flue
BF
External light fitting.security light Strip Light R-Heat
Under unit lighting Radiant heater
RAD / TR
Radiator / Towel Rail (Indicative only, sized by others)
s CO
R-Heat
H
Bathroom
GAS GM EM
Bathroom TR
RAD
RAD
fr/fz
RAD
wm / td
S
Bedroom 1 (12.9m² Inc Wdr)
EX
H
P 1500x2000
S
Hall
1500x2000
fr/fz wm / td
F
H
Kitchen (7.7m²)
Notes: 1. Heating, gas and electrical layouts on drawings are indicative only and subject to detailed design by specialist installers 2. All gas installation and commissioning to be undertaken by Gas Safe registered persons 3. Gas boiler to be as SAP Calculations and fitted with "Gas Saver" as noted 4. All electrical installation and commissioning to be undertaken by EIC/NIC registered persons 5. All electrical installations to be in accordance with BS7671:2008 (as amended) and Building Regulations Approved Document P 6. Consumer unit enclosure to be manufactured from non-combustible material in compliance with BS 7671:2008 Chapter 42 (Amendment 3:2015)
P
P Hall dw
RWP BT
CHW
Bedroom 1 (12.9m² Inc Wdr)
FSP
CO
P
EX
Mains interlinked heat detector Gas point Gas - Ground meter box Gas - Semi recessed meter box Electric - Wall mounted or wall mounted meter box
PH
WC EX
Kitchen (7.7m²)
Mains interlinked smoke detector Mains interlinked carbon monoxide detector
Plinth Heater
EX WC
F
Stopcock Ceiling / wall mounted extract duct and grill
TR
Dining
R-Heat
4
RAD
Store (1.0m²)
Store (0.86m²) P
Dining
ASHP
5
Store (1.0m²)
Store (0.6m²)
2
1
M
Store (0.86m²)
s
6
RAD
P
ASHP
Store (0.6m²)
s
CO
Light fitting (Low Energy) P=Pendent B=Bayonet W=Wall Light
Room digital thermostat with load compensator SC
P
FSP
W
Illuminated bell push
P
M
P
RAD SC
CHW
BT
RWP RAD
dw
SC
RWP
-
-
A
A
01
Electrical Layout - Ground Floor 1:50
02
Electrical Layout - First Floor 1:50
DRAWINGS NOT TO SCALE
05 | OTHER WORKS
Visualisation | Model making | Photography
- No. 43 Master Bedroom
43 & 45 Old Quay Road, Cultra VISUALISATION
25
Visualisation is a key component of effective communication c ec e. e f e c ec c create visual representations of e e e c e e e e e e fi c. e e e c c e ee c ec c e e e cce f ec . e e e e e e S ec Lumion.
c
e
MODEL MAKING Model making is an important method of architectural thinking. Thinking through making is a ce c thinking alternate back and forth e e e . The making or designing could be ce e . e ec ee e e ce e e e . e e ec e e e ee the making and the thinking opens up an opportunity to also express e e e.
PHOTOGRAPHY Photography has become an exciting hobby of mine since I started to study architecture. Combining travel and photography c e e to appreciate culture from f e fie . architecture through a lens enables you analyse critical c e f f ce e e details. Photography is also a e c e fe through visual diary.