Skip to main content

P184 - Staines Road West

Page 1

have rebranded to

21C-DESIGN


BS1192 2007 : 21-C-184-00-.E-A-002010

1

Elevation 1 - a

11

A B

4

C D E F G H I J K L M rev

N

description of revision

2

P

Š Copyright 1985-2017

N

BS1192 2007 : 21-C-184-00-.E-A-0020-

M

AE 00 00.00.00.07 0020

L

Proposed Elevation - South - Front

K

drawing no.

2.5 J

1 : 50

0 I

scale

H

21-C-57

G

1

AA - Long

AE.DR-00-00.00.00.07-0020 A1

5

7

8

1

AE.DR-00-00.00.00.07-0020 A1 AA - Long

checked by

sub no.

F

title

3 originator

E

21-C-184

project ref

D

430 Staines Road West Ashford TW15 1RZ

drawn by

C

FL202

900

B

site address

Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

9 Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

6

2700

A1

A P date

5.0 m

1


BS1192 2007 : 21-C-184-21-C-TW15-00-DR.E-A-0040- S1-

1

11

A

Elevation 3 - a

10

TW15

B C D E F G

9

H I J K L M

1

AA - Long

AE.DR-00-00.00.00.07-0020 A1

N

2

4

1

P

BS1192 2007 : 21-C-184-21-C-TW15-00-DR.E-A-0040- S1-

Š Copyright 1985-2017

description of revision

A DR.E 00 00.00.00.07 0040

rev

Proposed Elevation - North - Rear

N

drawing no.

M

1 : 50

L

scale

K

21-C-57

2.5 J

AE.DR-00-00.00.00.07-0020 A1

AA - Long

5

6

7

8 checked by

0 I

title

H

21-C

sub no.

G

21-C-184

3 originator

F

430 Staines Road West Ashford TW15 1RZ

project ref

E

FL202

D

drawn by

C

site address

Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

B

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

A1

A P date

5.0 m

1


BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-A-0002- S111

A B

4

C D E F G

9

H I J K L M

1

AA - Long

N

1

AA - Long

AE.DR-00-00.00.00.07-0020 A1

10

TW15

P

Š Copyright 1985-2017

description of revision

BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-A-0002- S1-

rev

A DR.S 00 00.00.00.08 0002

N

Proposed Transverse Section

M

drawing no.

L

1 : 50

2.5 K

scale

0 J

21-C-57

2

I

5

6

7

8

AE.DR-00-00.00.00.07-0020 A1

BB - Trans checked by

H

title

G

21-C

sub no.

F

21-C-184

3 originator

E

430 Staines Road West Ashford TW15 1RZ

project ref

D

FL202

drawn by

C

site address

1

Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

B

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

A1

A P date

5.0 m

1


BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-A-0001- S110

11

TW15

A B

4

C D E F G H I J K L M

1

BB - Trans

AP.DR-U0-00.00.00.04-0001 A1

9

N

2

1

BB - Trans

AP.DR-U0-00.00.00.04-0001 A1

P

BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-A-0001- S1-

Š Copyright 1985-2017

description of revision

A DR.S 00 00.00.00.08 0001

rev

Proposed Long Section

N

drawing no.

M

1 : 50

L

scale

K

21-C-57

J

5

6

7

8

AA - Long checked by

3

I

title

H

21-C

G

21-C-184

sub no.

F

originator

E

430 Staines Road West Ashford TW15 1RZ

project ref

D

FL202

drawn by

C

site address

Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

1

B

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

A1

A P date

1


L

M

N rev P1

ST-B1-20.05.15.92-0001 - Trench Foundations

Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems

Length

Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35

Foundation Thickness

Width

15511.0 2861.2 2844.8 3479.6 17390.4 6976.3 2201.3 2531.3 9287.0 2869.8 3344.2 3174.8 1295.2 804.5 4042.6 643.7 643.7 7759.7

650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0

1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0

Structural Usage

Volume 11.85 m³ 2.48 m³ 2.02 m³ 2.60 m³ 13.56 m³ 5.44 m³ 1.72 m³ 2.23 m³ 6.24 m³ 2.98 m³ 2.24 m³ 2.48 m³ 0.74 m³ 0.39 m³ 3.40 m³ 0.25 m³

Comments

Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing

5.92 m³ 66.54 m³

Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Submerged element. Excavations to be inspected by relevant authority before pouring

21-C DESIGNS Westcraft Limited Design Office

C

2

C

D

E

1200.0 1200.0 1200.0 1200.0 1200.0 1200.0

F

1200.0 1200.0 1200.0 1200.0 1200.0 1200.0

1.728 m³ 1.728 m³ 1.728 m³ 1.728 m³ 1.728 m³ 1.728 m³ 10.368 m³

Concrete Grade CN35 CN35 CN35 CN35 CN35 CN35

G

Comments Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring

H

e:: k21cdesigns@gmail.com t : : +44(0)20 8935 5856 united kingdom northolt

D

Volume

I

J

K

L

M

N

P

Foundation Plan

1200.0 1200.0 1200.0 1200.0 1200.0 1200.0

Foundation Thickness

site address

P10 P10 P10 P10 P10 P10

Pad Width

E

BP01 - B1 level 13.019 BP01 - B1 level 13.019 BP01 - B1 level 13.019 BP01 - B1 level 13.019 BP01 - B1 level 13.019 BP01 - B1 level 13.019

Pad Length

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

1 C1

C B

Unreinforced concrete pad and strip foundation systems Unreinforced concrete pad and strip foundation systems Unreinforced concrete pad and strip foundation systems Unreinforced concrete pad and strip foundation systems Unreinforced concrete pad and strip foundation systems Unreinforced concrete pad and strip foundation systems

Pad Type

1

N 170403817.7 E 508140110.3

600

B A

Ss_20_05_15_91 Ss_20_05_15_91 Ss_20_05_15_91 Ss_20_05_15_91 Ss_20_05_15_91 Ss_20_05_15_91

Level

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

353 600 1200

600

BS1192 2007 : 21-C-184-21-C-TW15-B1-DR.P-S-0001- S1- P1

2429.9

TW15

FPC12.12.12 FPC12.12.12 FPC12.12.12 FPC12.12.12 FPC12.12.12 FPC12.12.12

Classification.Uniclass.Ss.Description

57 summit road

647

S8 0/ 2 .1 .0 65 800 0 C 1 . FS Lb - 600 E Lt E

600 1200

600

A

3344.7

11

P1 P2 P3 P4 P5 P6

Classification.Unicl ass.Ss.Number

BP01.20.05 - SUBSTRUCTURE - B1 level

600 1200

600

5 /P .2 12 .1 .0 12 800 0 C 1 . FP Lb - 600 E Lt E

1200

4 /P 2 1 2. 0 2.1 00. 1 C 18 .0 FP Lb - 600 E Lt E

600

664

3 /P .2 12 .1 .0 12 800 0 C 1 . FP Lb - 600 E Lt E

2 /P .2 12 .1 .0 12 800 0 C 1 . FP Lb - 600 E Lt E

664 1200 536

6260.3

2267

ST-B1-20.05.15.91-0001 - Pad foundations Type Mark

2216.9

N 170420899.4 E 508143277.5

2417

1200 2308

3121.0

2643

1200

1200 2471

536

600

1078

550 1200

292

10

Mark

650

122

600

908

9

353

1200

1

650

8

338

1 /P 2 1 2. 0 2.1 00. 1 C 18 .0 FP Lb - 600 E Lt E

3131.8

650

S1 0/ 2 .1 .0 65 800 0 C 1 . FS Lb - 600 E Lt E

3

353

2

650

middlesex

650

S7 0/ 2 .1 .0 65 800 0 C 1 . FS Lb - 600 E Lt E

6 /S 0 .12 .0 65 800 0 C 1 . FS Lb - 600 E Lt E

12 /S 0 .12 .0 65 800 0 C 1 . FS Lb - 600 E Lt E

S9 0/ 2 .1 .0 65 800 0 C 1 . FS Lb - 600 E Lt E

650

7

ub5 5hl

4

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

650

1212 650

S2 0/ 2 .1 .0 65 800 0 C 1 . FS Lb - 600 E Lt E

650

3146.7

checked by

650

10 /S 0 2 0 5.1 00. 6 C 18 .0 FS Lb - 600 E Lt E

650

333

1262

6

(STN A3) N 170398585.0 E 508152477.0

5 13 /S 0 2 0 5.1 00. 6 C 18 .0 FS Lb - 600 E Lt E

14 /S 0 2 0 5.1 00. 6 C 18 .0 FS Lb - 600 E Lt E

15 /S 0 2 0 5.1 00. 6 C 18 .0 FS Lb - 600 E Lt E 650

S3 0/ 2 .1 .0 65 800 0 C 1 . FS Lb - 600 E Lt E

3198.6

650

1200

3

11 /S 0 2 0 5.1 00. 6 C 18 .0 FS Lb - 600 E Lt E

600

1200

349

1912

5

title

E

600

329

6 /P 2 .1 .12 0.0 2 C1 180 .0 FP Lb - 600 E Lt E

N 170401460.3 E 508152823.1

D

drawn by

C1

S4 0/ 2 .1 .0 65 800 0 C 1 . FS Lb - 600 E Lt E

3452.2

225

975

4

338

4

5 /S 0 .12 .0 65 800 0 C 1 . FS Lb - 600 E Lt E

650

project ref

B

329

N 170418542.3 E 508155990.1

5

(STN A1) N 170429016.0 E 508155665.0

A

3DI-B1-00.60.00.00-01

2

Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92

Description

© Copyright 1985-2017

2

FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120

Classification.Uniclass.Ss.Description

date 180214

BS1192 2007 : 21-C-184-21-C-TW15-B1-DR.P-S-0001- S1- P1

S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15 S16 S17 S18

Classification.Unicla ss.Ss.Number

Foundation setting out

originator

1

Type Mark

P description of revision

sub no.

Mark

3

K

S DR.P B1 20.05.00.00 0001

J

drawing no.

I

1 : 50

H

scale

G

21-C-57

F

21-C

E

21-C-184

D

430 Staines Road West Ashford TW15 1RZ

C

FL202

B

A1

A


B

C

D

E

F

G

H

I

J

K

L

M

N rev P1

1

P description of revision

Beam and block arrangement

date 180216

2 3

20.20 - KEY - Beams

Tag01

5

B0.1 : F BC01 T225

Tag02

2

xy.## : FnB.** TYPE

xy.## TYPE

Element

21-C DESIGNS Westcraft Limited Design Office

Beam length inc. bearing

Padstone

Padstone lengths

5 :: FB S.BB2 25.510

E

SBS.0 .0

B0.43 : FBC01 T225

CC

8

510.0 mm

3 :: FB S.BB2 25.510

SBS.0 .0

B0.40 : FBC01 T225

D

2 3

9

E

B0.80 : FBC01 T225

4 5 1

UP00.30.12.85.17 - STRUCTURAL FLOOR - 0 Level - Beam block system

BS1192 2007 : 21-C-184-21-C-TW15-U0-DR.P-S-0001- S1- P1

10

ST-U0-30.12.85.17-0001 - Concrete beam and block floor deck systems

11

TW15 A

B

Mark

Type Mark

SBS.0.01 SBS.0.02 SBS.0.03 SBS.0.04 SBS.0.05

FBS.BB225.510 FBS.BB225.285 FBS.BB225.510 FBS.BB225.510 FBS.BB225.510

C

Classification.Uni class.Ss.Number Ss_30_12_05 Ss_30_12_05 Ss_30_12_05 Ss_30_12_05 Ss_30_12_05

Classification.Uniclass.Ss.Description

Elevation

Beam and block floor systems Beam and block floor systems Beam and block floor systems Beam and block floor systems Beam and block floor systems

D

-212.0 -212.0 -212.0 -212.0 -212.0

E

Beam Type _nnl_T225 beams : T225 _nnl_T225 beams : T225 _nnl_T225 beams : T225 _nnl_T225 beams : T225 _nnl_T225 beams : T225

F

G

H

I

J

K

L

F=Frame element n=Property : S=steel; C=concrete; W=wood

drawing no. scale

As indicated t : : +44(0)20 8935 5856

e:: k21cdesigns@gmail.com

20.10 - KEY - Framing reference

united kingdom ub5 5hl middlesex

B0.38 : FBC01 T225

D

CC

C1

https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf

northolt

CC 285.0 mm

SBS.0 .0

7

C

Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank

57 summit road

B0.65 : FBC01 T225

-587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0

checked by

C1

2 :: FB S.BB2 25.285

6

B0.20 : FBC01 T225

-212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0

Comments

title

1

3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 3402.3 3402.3 3402.3 3402.3 3402.3 3362.6 6533.4 6533.4 6533.4 6533.4 6533.4 6533.4 6533.4 6533.4 6533.4 6533.4 6533.4 1927.0 6533.4 3080.0 6533.4 6533.4 6533.4 6533.4 6533.4 6533.4 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1

URL

430 Staines Road West Ashford TW15 1RZ

B0.64 : FBC01 T225

Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66

Elevation at Bottom Manufacturer

FL202

B0.19 : FBC01 T225 B0.20 : FBC01 T225

Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams

z Offset Value

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

C

B

510.0 mm

5

B0.1 FBC01 B0.2 FBC01 B0.3 FBC01 B0.4 FBC01 B0.5 FBC01 B0.6 FBC01 B0.7 FBC01 B0.8 FBC01 B0.9 FBC01 B0.10 FBC01 B0.11 FBC01 B0.55 : FBC01 B0.12 FBC01 T225 B0.13 FBC01 B0.14 FBC01 B0.57 : FBC01 B0.15 FBC01 T225 B0.16 FBC01 B0.17 FBC01 B0.18 FBC01 B0.19 FBC01 B0.20 FBC01 B0.21 FBC01 B0.22 FBC01 B0.23 FBC01 B0.24 FBC01 B0.25 FBC01 B0.26 FBC01 B0.64 : FBC01 B0.27 FBC01 T225 B0.28 FBC01 B0.29 FBC01 B0.30 FBC01 B0.31 FBC01 B0.32 FBC01 B0.33 FBC01 B0.34 FBC01 B0.35 FBC01 B0.36 FBC01 B0.37 FBC01 B0.38 FBC01 B0.39 FBC01 B0.40 FBC01 B0.41 FBC01 B0.42 FBC01 B0.43 FBC01 B0.44 FBC01 B0.45 FBC01 B0.46 FBC01 B0.47 FBC01 B0.48 FBC01 B0.49 FBC01 B0.50 FBC01 B0.51 FBC01 B0.52 FBC01 B0.53 FBC01 B0.54 FBC01 B0.55 FBC01 B0.56 FBC01 B0.57 FBC01 B0.58 FBC01 B0.59 FBC01 B0.60 FBC01 B0.61 FBC01 B0.62 FBC01 B0.63 FBC01 B0.64 FBC01 B0.65 FBC01 B0.66 FBC01 B0.67 FBC01 B0.68 FBC01 B0.69 FBC01 B0.70 FBC01 B0.71 FBC01 B0.72 FBC01 B0.73 FBC01 Layout Rule B0.74 FBC01 B0.75 FBC01 Fixed Distance B0.76 FBC01 Fixed Distance B0.77 FBC01 Fixed Distance B0.78 FBC01 Fixed Distance B0.79 FBC01 Fixed Distance B0.80 FBC01 Grand total: 80

Classification.Uniclass.Pr.Descript Classification.Uniclass. ion Pr.Number Cut Length

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

CC 510.0 mm

B0.58 : FBC01 T225

Type Mark

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

CC

B0.56 : FBC01 T225

SBS.0 .0

4

4 :: FB S.BB2 25.510

SBS.0 .0

B

510.0 mm

1 :: FB S.BB2 25.510

Mark

project ref

FnB = Framework - Beam FnC = Framework - Column FnP = Framework - Purlin FnT = Framework - Truss FnL = Framework - Lintel FnQ' = Framework - Bearing pads

ST-U0-20.20.75.15-0001 - Concrete beam systems

21-C-57

20.10 - KEY - Structural Frame Systems 3

21-C

sub no.

20.20 - KEY - Beams

originator

3DI-U0-00.60.00.00-01

2

drawn by

B0.44 : FBC01 T225

21-C-184

Steel Plate

M

N

P

site address

A

BS1192 2007 : 21-C-184-21-C-TW15-U0-DR.P-S-0001- S1- P1

A

x = Element Type B=BEAM y = Associated start level of the element 0=GROUND LEVEL 1=LEVEL 1 2=LEVEL 2 etc ## = Number of variant ** = Type variant TYPE = Type of element e.g. UB203 x 133 x 30

© Copyright 1985-2017

4

S DR.P U0 30.12.85.17 0001

1

Concrete beam and block floor

A1

A


A

B

C

D

E

F

G

H

I

J

K

L

M

N

A1

rev P1

1

P description of revision

Steel frame arrangement

date 180216

ss01

1

SP.DR-U1-20.10.75.35-0001 A1

2

1

ss02

3

2

SP.DR-U1-20.10.75.35-0001 A1

A

4 5

180

A

2899.8 2899.8 2899.8

BP01 - B1 level 13.019 BP01 - B1 level 13.019 BP01 - B1 level 13.019

P1.10

P1.4

98

84

20

B1.8 : F S UB203x B01 133x25

P60.10 - 600x215x100

C

B1.9 : F S UC203x B02 203x86

UC152x152x37

B1.se2 : FS L100x10 B03 0x10

P1.5

P1.2

7

Reference Level

Elevation at Bottom

Elevation at Top

Length

Cut Length

Classification.Uniclass. Classification.Uniclass. Pr.Description Pr.Number

drawing no. scale

As indicated

project ref

Comments

D

B1.1 FSB01 B1.2 FSB01 B1.3 FSB01 B1.4 FSB01 B1.5 FSB01 B1.6 FSB01 B1.7 FSB01 B1.8 FSB01 B1.9 FSB02 B1.10 FSB01 B1.10.1 FSB03 B1.11 FSB01 B1.11.1 FSB03 B1.12 FSB01 B1.13 FSB01 B1.14 FSB01 B1.15 FSB01 B1.16 FSB02 B1.17 FSB04 B1.se1 FSB03 B1.se2 FSB03 B1.se3 FSB03 B1.se4 FSB07 Grand total: 23

UB203x133x25 UB203x133x25 UB203x133x25 UB203x133x25 UB203x133x25 UB203x133x25 UB203x133x25 UB203x133x25 UC203x203x86 UB203x133x25 L100x100x10 UB203x133x25 L100x100x10 UB203x133x25 UB203x133x25 UB203x133x25 UB203x133x25 UC203x203x86 UC203x203x46 L100x100x10 L100x100x10 L100x100x10 L150x150x10

UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619

2503.0 2503.0 2503.0 2503.0 2503.0 2503.0 2503.0 2503.0 2704.7 2706.2 2648.0 2706.2 2648.0 2606.0 2606.0 2606.0 2606.0 2704.7 2750.2 693.8 1560.9 2254.7 2760.2

2299.8 2299.8 2299.8 2299.8 2299.8 2299.8 2299.8 2299.8 2482.5 2503.0 2548.0 2503.0 2548.0 2402.8 2402.8 2402.8 2402.8 2482.5 2547.0 593.8 1460.9 2154.7 2610.2

3080.0 3080.0 5678.0 5740.0 5624.0 5624.0 3144.0 3040.0 5822.2 1425.0 1447.0 1645.0 1640.0 3028.2 3015.0 3015.0 3015.0 6370.0 2045.0 900.0 900.0 900.0 1080.0

3145.2 3145.2 5709.3 5714.6 5604.0 5604.1 3144.9 3145.0 5798.8 1420.3 1420.3 1613.8 1613.8 3536.4 3417.7 3357.1 3357.1 6370.0 2019.8 900.0 900.0 900.0 1014.5

Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams

Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11

e:: k21cdesigns@gmail.com

B

P30.21 - 300x215x215

C0:1.3

Type

t : : +44(0)20 8935 5856

404

B1.5 : F S UB203x B01 133x25

B1.se3 : FS L100x10 B03 0x10

B1.7 : F S UB203x B01 133x25

Type Mark

6 FW to B1.10 6 FW to B1.10

Fixed to precast stair element Fixed to precast stair element Fixed to precast stair element Fixed to precast stair element

united kingdom

P1.12

P30.10 - 300x215x100

B1.se1 : FS L100x10 B03 0x10

P30.21 - 300x215x215

Carbon steel columns Carbon steel columns Carbon steel columns

ub5 5hl

P1.13

C16

Pr_20_85_16_11 Pr_20_85_16_11 Pr_20_85_16_11

middlesex

1112

CP44.1 - 440x440x215x100

C

-475.2 -475.2 -475.2

Comments

CP44.1 - 440x440x215x100

B1.se4 : FS L150x15 B07 0x10 UP

5

Mark

290

B1.6 : F S UB203x B01 133x25

56

B1.17 : F UC203x SB04 203x46

66

UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394

Classification.Uniclass.Pr.Nu Classification.Uniclass.Pr.Descriptio mber n

ST-U1-20.20.75.80-0001 - Steel beam systems

P44.10 - 440x215x100

UC152x152x37

0.0 0.0 0.0

Top Offset

checked by

A(-359.9)-1 B-1 C1-1

Top Level

title

UC152x152x37 UC152x152x37 UC152x152x37

Base Offset

Base Level

167

FSC01 FSC01 FSC01

Length

430 Staines Road West Ashford TW15 1RZ

P1.14

C0:1.1 C0:1.2 C0:1.3

Column Location Mark

Type

FL202

C0:1.2

B1.11 : F UB203x SB01 133x25

Type Mark

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

64

1500

4

1667

20

B

P1.7

CP44.1 - 440x440x215x100

Mark

drawn by

B1.10 : F UB203x SB01 133x25

P1.6

P60.10 - 600x215x100

B1.16 : F UC203x SB02 203x86

ST-U0-20.30.75.80-0001 - Steel column systems

21-C-57

B1.3 : F S UB203x B01 133x25

3

21-C

3DI-U1-00.60.00.00-01

originator

2

21-C-184

P1.8

CP44.1 - 440x440x215x100

ST-U1-20.05.15.65-0001 - Precast concrete pads

P1.11

P60.10 - 600x215x100

B1.15 : F S UB203x B01 133x25

D

1 ss01

1

SP.DR-U1-20.10.75.35-0001 A1

9

2 3 SP.DR-U1-20.10.75.35-0001 A1

Tag01

4 5

Tag02

20.10 - KEY - Structural Frame Systems

10

BS1192 2007 : 21-C-184-21-C-TW15-U1-DR.P-S-0001- S1- P1

FnB = Framework - Beam FnC = Framework - Column FnP = Framework - Purlin FnT = Framework - Truss FnL = Framework - Lintel FnQ' = Framework - Bearing pads

UP00.20.10 - FRAMES - ABOVE - 0 Level

xy.## : FnB.** TYPE

xy.## TYPE

northolt

20.30 - KEY - Columns

E

2

1

Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32

20.20 - KEY - Beams ss02

Comments

57 summit road

69

98

B1.14 : F UB203x SB01 133x25

B1.13 : F UB203x SB01 133x25

URL

x = Element Type B=BEAM y = Associated start level of the element 0=GROUND LEVEL 1=LEVEL 1 2=LEVEL 2 etc ## = Number of variant ** = Type variant TYPE = Type of element e.g. UB203 x 133 x 30

Element

Beam length inc. bearing

Tag01

Tag02

xy:z.##

Tag03

xy:z.## TYPE

Padstone

Padstone lengths

Steel Plate

x = Element Type C=COLUMN y = Associated start level of the element 0=GROUND LEVEL 1=LEVEL 1 2=LEVEL 2 etc z = Associated end level of the element 1=LEVEL 1 2=LEVEL 2 etc ## = Number of variant ** = Type variant TYPE = Type of element e.g. UC125 x 152 x37 Element

Column length

F=Frame element n=Property : S=steel; C=concrete; W=wood 11

TW15 A

20.10 - KEY - Framing reference

B

C

D

E

F

G

H

I

20.20 - KEY - Beams

J

20.30 - KEY - Columns

K

L

M

N

P

Steel frame above 0 Level

156

8

B1.12 : F S UB203x B01 133x25

Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads

Manufacturer

site address

P1.1 P60.10 - 600x215x100 P1.2 P60.10 - 600x215x100 P1.3 CP44.1 - 440x440x215x100 P1.4 P30.21 - 300x215x215 P1.5 P30.21 - 300x215x215 P1.6 P60.10 - 600x215x100 P1.7 CP44.1 - 440x440x215x100 P1.8 CP44.1 - 440x440x215x100 P1.9 P30.10 - 300x215x100 P1.10 CP44.1 - 440x440x215x100 P1.11 P60.10 - 600x215x100 P1.12 P30.10 - 300x215x100 P1.13 CP44.1 - 440x440x215x100 P1.14 P44.10 - 440x215x100 Grand total: 14

CP44.1 - 440x440x215x100

Classification.Uniclass.Pr.Descript Classification.Uniclass. ion Pr.Number

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

P1.3

Type

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

Mark

xy Fn :z.## C* *

C1

13

E

© Copyright 1985-2017

P1.1

P60.10 - 600x215x100

B1.4 : F S UB203x B01 133x25

139

sub no.

2

P1.9

P30.10 - 300x215x100

BS1192 2007 : 21-C-184-21-C-TW15-U1-DR.P-S-0001- S1- P1

B1.2 : F S UB203x B01 133x25

11

Westcraft Limited Design Office

270

C0:1.1

UC152x152x37

21-C DESIGNS

S DR.P U1 20.10.75.35 0001

B1.1 : F S UB203x B01 133x25 451

360

531

64


E

G

H

D

1 2 3

Tag01

xy.## : FnB.** TYPE

9

Tag02

xy.## TYPE

Element

5 20.10 - KEY - Structural Frame Systems FnB = Framework - Beam FnC = Framework - Column FnP = Framework - Purlin FnT = Framework - Truss FnL = Framework - Lintel FnQ' = Framework - Bearing pads

Beam length inc. bearing

Padstone Steel Plate

E

4

x = Element Type B=BEAM y = Associated start level of the element 0=GROUND LEVEL 1=LEVEL 1 2=LEVEL 2 etc ## = Number of variant ** = Type variant TYPE = Type of element e.g. UB203 x 133 x 30

F=Frame element n=Property : S=steel; C=concrete; W=wood

Padstone lengths

BS1192 2007 : 21-C-184-21-C-TW15-U1-DR.P-S-0001- S1- P1

10

20.20 - KEY - Beams

20.10 - KEY - Framing reference ST-U1-30.12.85.17-0001 - Concrete beam and block floor deck systems

11

TW15 A

B

C

Mark

Type Mark

SBS.1.01 SBS.1.02 SBS.1.03 SBS.1.04 SBS.1.05

FBS.BB155.510 FBS.BB155.510 FBS.BB155.510 FBS.BB155.510 FBS.BB155.510

Classification.Uni class.Ss.Number Ss_30_12_05 Ss_30_12_05 Ss_30_12_05 Ss_30_12_05 Ss_30_12_05

D

Classification.Uniclass.Ss.Description Beam and block floor systems Beam and block floor systems Beam and block floor systems Beam and block floor systems Beam and block floor systems

E

Elevation -117.0 -117.0 -117.0 -117.0 -117.0

Beam Type _nnl_T155 beams : T155 _nnl_T155 beams : T155 _nnl_T155 beams : T155 _nnl_T155 beams : T155 _nnl_T155 beams : T155

F

Layout Rule Fixed Distance Fixed Distance Fixed Distance Fixed Distance Fixed Distance

G

H

I

J

K

https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf

L

M

21-C DESIGNS

drawing no.

© Copyright 1985-2017

scale

As indicated

S DR.P U1 30.12.85.17 0001

Westcraft Limited Design Office

21-C-57 e:: k21cdesigns@gmail.com t : : +44(0)20 8935 5856 united kingdom ub5 5hl middlesex northolt

Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank

21-C

2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0

Comments

21-C-184

-117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 0.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 0.0 0.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 0.0

URL

sub no.

2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3144.8 3144.8 3144.8 3144.8 3144.8 3144.8 3144.8 3144.8 3144.8 3144.8 3144.8 3117.3 3117.3 3117.3 3117.3 3117.3 3117.3 3117.3 3117.3 3117.3 3117.3 3117.3 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1

Manufacturer

57 summit road

B1.129 : FCB.T 155 T155

Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66

Elevation at Bottom

N

P

BS1192 2007 : 21-C-184-21-C-TW15-U1-DR.P-S-0001- S1- P1

7

Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams

z Offset Value

Concrete beam and block floor

B1.74 : FCB.T1 55 T155

B1.21 FCB.T155 B1.22 FCB.T155 B1.25 FCB.T155 B1.26 FCB.T155 B1.27 FCB.T155 B1.28 FCB.T155 B1.29 FCB.T155 B1.30 FCB.T155 B1.31 FCB.T155 B1.32 FCB.T155 B1.33 FCB.T155 B1.34 FCB.T155 B1.35 FCB.T155 B1.36 FCB.T155 B1.37 FCB.T155 B1.38 FCB.T155 B1.39 FCB.T155 B1.40 FCB.T155 B1.41 FCB.T155 B1.42 FCB.T155 B1.43 FCB.T155 B1.44 FCB.T155 B1.45 FCB.T155 B1.46 FCB.T155 B1.47 FCB.T155 B1.48 FCB.T155 B1.49 FCB.T155 B1.50 FCB.T155 B1.51 FCB.T155 B1.52 FCB.T155 B1.53 FCB.T155 B1.54 FCB.T155 B1.55 FCB.T155 B1.56 FCB.T155 B1.57 FCB.T155 B1.58 FCB.T155 B1.59 FCB.T155 B1.60 FCB.T155 B1.61 FCB.T155 B1.62 FCB.T155 B1.63 FCB.T155 B1.64 FCB.T155 B1.65 FCB.T155 B1.66 FCB.T155 B1.67 FCB.T155 B1.68 FCB.T155 B1.69 FCB.T155 B1.70 FCB.T155 B1.71 FCB.T155 B1.72 FCB.T155 B1.73 FCB.T155 B1.74 FCB.T155 B1.75 FCB.T155 B1.76 FCB.T155 B1.78 FCB.T155 B1.79 FCB.T155 B1.80 FCB.T155 B1.81 FCB.T155 B1.82 FCB.T155 B1.83 FCB.T155 B1.84 FCB.T155 B1.85 FCB.T155 B1.86 FCB.T155 B1.88 FCB.T155 B1.89 FCB.T155 B1.90 FCB.T155 B1.91 FCB.T155 B1.92 FCB.T155 B1.93 FCB.T155 B1.94 FCB.T155 B1.95 FCB.T155 B1.96 FCB.T155 B1.97 FCB.T155 B1.98 FCB.T155 B1.99 FCB.T155 B1.100 FCB.T155 B1.101 FCB.T155 B1.102 FCB.T155 B1.103 FCB.T155 B1.104 FCB.T155 B1.105 FCB.T155 B1.106 FCB.T155 B1.107 FCB.T155 B1.108 FCB.T155 B1.109 FCB.T155 B1.110 FCB.T155 B1.112 FCB.T155 B1.113 FCB.T155 B1.114 FCB.T155 B1.115 FCB.T155 B1.116 FCB.T155 B1.117 FCB.T155 B1.118 FCB.T155 B1.119 FCB.T155 B1.120 FCB.T155 B1.121 FCB.T155 B1.122 FCB.T155 B1.123 FCB.T155 B1.124 FCB.T155 B1.125 FCB.T155 B1.126 FCB.T155 B1.127 FCB.T155 B1.128 FCB.T155 B1.129 FCB.T155 Grand total: 104

Classification.Uniclass.Pr.Descript Classification.Uniclass. ion Pr.Number Cut Length

checked by

CC

C1

Type Mark

title

SBS.1 .0

510.0 mm

3 :: FB S.BB1 55.510

C

20.20 - KEY - Beams

date 180216

430 Staines Road West Ashford TW15 1RZ

CC 510.0 mm

4 :: FB S.BB1 55.510 SBS.1 .0

B1.88 : FCB.T1 55 T155

B1.43 : FCB.T1 55 T155

8

Beam and block arrangement

originator

CC 510.0 mm

5 :: FB S.BB1 55.510 SBS.1 .0 SBS.1 .0

CC

2 :: FB S.BB1 55.510

CC 510.0 mm

1 :: FB S.BB1 55.510 SBS.1 .0

510.0 mm

B

B1.98 : FCB.T1 55 T155

P description of revision

project ref

B1.100 : FCB.T 155 T155

B1.17 : FUP UC203x SB04 203x46

6

N

FL202

5

3

5

M

drawn by

B1.99 : FCB.T1 55 T155

2

C

L

site address

Mark

A

4

K

ST-U1-20.20.75.15-0001 - Concrete beam systems

B1.75 : FCB.T1 55 T155

B

J

rev P1

B1.44 : FCB.T1 55 T155

B1.21 : FCB.T1 55 T155

I

4

3

A 1

F

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

D

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

C

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

B

A1

A


B

C

A1

A

D

1

E

F

G

H

I

J

K

L

M

N rev P1

ss01

1

SP.DR-U1-20.10.75.35-0001 A1

P description of revision

Steel frame arrangement

date 180216

2 3

1

A

ss02

2

SP.DR-U1-20.10.75.35-0001 A1

4 5

21-C DESIGNS

A

drawing no.

originator

32

project ref

2632

B2.1 : F S UC203x B04 203x46

P2.15

P44.10 - 440x215x100

scale

P2.14

P44.10 - 440x215x100

As indicated

58

3629

3

P2.2

P44.10 - 440x215x100

21-C-184

B2.2 : F S UC203x B04 203x46

84

21-C

sub no.

P2.1

P44.10 - 440x215x100

© Copyright 1985-2017

3629

2

S DR.P U2 20.10.75.35 0001

Westcraft Limited Design Office

P2.7

P44.10 - 440x215x100 58

C

P2.8

P44.10 - 440x215x100

P2.6

P30.21 - 300x215x215

32

B2.6 : F S UC203x B04 203x46

394

394

49

P30.21 - 300x215x215

P2.9

Mark 7

Type Mark

B2.1 FSB04 B2.2 FSB04 B2.3 FSB04 B2.4 FSB04 B2.5 FSB04 B2.6 FSB04 B2.7 FSB04 B2.8 FSB04 B2.9 FSB04 B2.se3 FSB03 B2.se5 FSB07 Grand total: 11

C1

D

8

e:: k21cdesigns@gmail.com

ST-U2-20.20.75.80-0001 - Steel beam systems

P60.10 - 600x215x100

E

Type UC203x203x46 UC203x203x46 UC203x203x46 UC203x203x46 UC203x203x46 UC203x203x46 UC203x203x46 UC203x203x46 UC203x203x46 L100x100x10 L150x150x10

Reference Level UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394

Elevation at Top 5530.0 5532.0 5530.0 5530.0 5530.0 5530.0 5530.0 5530.0 5525.2 5029.7 5535.2

Elevation at Bottom 5326.8 5328.8 5326.8 5326.8 5326.8 5326.8 5326.8 5326.8 5322.0 4929.7 5385.2

Length 6590.6 6214.9 6115.4 3640.0 3047.2 6558.9 3373.0 3357.0 2045.0 900.0 1080.0

Cut Length 6558.9 6136.4 6136.3 3525.5 2973.9 6557.6 3356.6 3357.0 2019.8 900.0 1014.5

Classification.Uniclas Classification.Uniclass.Pr. s.Pr.Description Number Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams

Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11

Comments

middlesex

B2.5 : F S UC203x B04 203x46

P2.5

Fixed to precast stair element

D 1

ss01

1

SP.DR-U1-20.10.75.35-0001 A1

2

20.20 - KEY - Beams

3

9

ss02

2

SP.DR-U1-20.10.75.35-0001 A1

E

Tag01

4

20.10 - KEY - Structural Frame Systems

10

BS1192 2007 : 21-C-184-21-C-TW15-U2-DR.P-S-0001- S1- P1

Tag02

FnB = Framework - Beam FnC = Framework - Column FnP = Framework - Purlin FnT = Framework - Truss FnL = Framework - Lintel FnQ' = Framework - Bearing pads

5

11

UP01.20.10 - FRAMES - ABOVE - 1 Level

xy.## TYPE

x = Element Type B=BEAM y = Associated start level of the element 0=GROUND LEVEL 1=LEVEL 1 2=LEVEL 2 etc ## = Number of variant ** = Type variant TYPE = Type of element e.g. UB203 x 133 x 30

Element

Beam length inc. bearing

Padstone

F=Frame element n=Property : S=steel; C=concrete; W=wood

1

xy.## : FnB.** TYPE

Steel Plate

20.10 - KEY - Framing reference

Padstone lengths

20.20 - KEY - Beams

TW15 A

B

C

D

E

F

G

H

I

J

K

L

M

t : : +44(0)20 8935 5856

1160

C1 6

united kingdom

60

northolt

B2.4 : F S UC203x B04 203x46

P2.11

P44.10 - 440x215x100

35

Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32

ub5 5hl

B2.7 : F S UC203x B04 203x46

Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads

Comments

57 summit road

2185

P2.10

P44.10 - 440x215x100

P2.1 P44.10 - 440x215x100 P2.2 P44.10 - 440x215x100 P2.3 P44.10 - 440x215x100 P2.4 P44.10 - 440x215x100 P2.5 P30.21 - 300x215x215 P2.6 P30.21 - 300x215x215 P2.7 P44.10 - 440x215x100 P2.8 P44.10 - 440x215x100 P2.9 P60.10 - 600x215x100 P2.10 P44.10 - 440x215x100 P2.11 P44.10 - 440x215x100 P2.12 CP44.1 - 440x440x215x100 P2.13 P44.10 - 440x215x100 P2.14 P44.10 - 440x215x100 P2.15 P44.10 - 440x215x100 Grand total: 15

URL

N

P

BS1192 2007 : 21-C-184-21-C-TW15-U2-DR.P-S-0001- S1- P1

B

P44.10 - 440x215x100

Manufacturer

Steel Frame above 1 Level

P2.4

Classification.Uniclass.Pr.Descript Classification.Uniclass. ion Pr.Number

Type

site address

Mark

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

35

58

checked by

ST-U2-20.05.15.65-0001 - Precast concrete pads

P2.13

P44.10 - 440x215x100

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

5

84

1164

C

UP

title

2632

B2.8 : F S UC203x B04 203x46

P2.3

P44.10 - 440x215x100

B2.3 : F S UC203x B04 203x46

430 Staines Road West Ashford TW15 1RZ

P2.12

CP44.1 - 440x440x215x100

3DI-U2-00.60.00.00-01

FL202

2

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

2181

4

drawn by

60

B2.9 : F S UC203x B04 203x46

21-C-57

B


A

B

C

D

E

F

G

H

I

J

K

L

M

N

A1

rev P1

1

1

P description of revision

Steel frame arrangement

date 180216

ss01

1

SP.DR-U1-20.10.75.35-0001 A1

2 3

1885

A

ss02

2

SP.DR-U1-20.10.75.35-0001 A1

4

1247

21-C DESIGNS Westcraft Limited Design Office

P.CAST - 440x215x300

1420

45 .12 °

15

P3.7

D

C1

P.CAST - 440x215x300

06 SB 7 : F 2x3 .11 15 B3 152x UC

Varies Varies 8990.0 Varies Varies 8990.0 Varies Varies 8990.0 8990.0 Varies Varies Varies Varies Varies 8990.0 8990.0 8990.0

Varies Varies 8828.2 Varies Varies 8828.2 Varies Varies 8786.8 8828.2 Varies Varies Varies Varies Varies 8786.8 8786.8 8828.2

3440.0 3440.0 3440.0 3440.0 3440.0 3440.0 3440.0 3440.0 3440.0 3440.0 3440.0 3299.5 3298.2 3298.2 3440.0 3440.0 3440.0 3440.0

1682.7 1679.6 3440.0 1679.6 1665.7 3440.0 2094.9 2232.0 3440.0 3440.0 1534.7 1584.6 1615.2 1615.2 1489.5 3440.0 3440.0 3440.0

3260.0 2570.0 4996.9 2570.0 3335.0 3098.8 1960.0 2212.0 6812.2 3098.8 3490.0 2495.0 2448.5 2448.5 3555.0 9433.2 9433.2 4996.9

drawing no.

21-C-57 e:: k21cdesigns@gmail.com t : : +44(0)20 8935 5856

Cut Classification.Uniclas Classification.Uniclass.Pr. Length s.Pr.Description Number 3154.3 2482.3 4767.9 2482.3 3195.9 2869.8 1913.4 2404.5 6812.3 2869.8 3314.5 2632.6 2632.5 2632.5 3297.8 9433.3 9433.3 4882.4

Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams

Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11

Comments

Crank beam assembly B2,14,16 Crank beam assembly B4,13,17

Crank beam assembly B7,9,12

united kingdom

UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169

Length

ub5 5hl

B3.12 : F UC203x SB04 203x46

UC152x152x37 UC203x203x46 UC152x152x37 UC203x203x46 UC152x152x37 UC152x152x37 UC203x203x46 UC152x152x37 UC203x203x46 UC152x152x37 UC152x152x37 UC203x203x46 UC203x203x46 UC203x203x46 UC152x152x37 UC203x203x46 UC203x203x46 UC152x152x37

Reference Level

End Level Offset

Crank beam assembly B7,9,12

middlesex

P3.9

P.CAST - 600x215x300

Type

Elevation at Elevation Start Level Top at Bottom Offset

Crank beam assembly B7,9,12 Crank beam assembly B4,13,17 Crank beam assembly B2,14,16 Crank beam assembly B4,13,17 Crank beam assembly B2,14,16

northolt

7

Type Mark

B3.1 FSB06 B3.2 FSB04 B3.3 FSB06 B3.4 FSB04 B3.5 FSB06 B3.6 FSB06 B3.7 FSB04 B3.8 FSB06 B3.9 FSB04 B3.10 FSB06 B3.11 FSB06 B3.12 FSB04 B3.13 FSB04 B3.14 FSB04 B3.15 FSB06 B3.16 FSB04 B3.17 FSB04 B3.18 FSB06 Grand total: 18

C

06 SB x37 F .8 : 52 B3 152x1 UC

Nominal size cast in situ. CN40 Nominal size cast in situ. CN40 Nominal size cast in situ. CN40 Nominal size cast in situ. CN40 Nominal size cast in situ. CN40 Nominal size cast in situ. CN40 Nominal size cast in situ. CN40 Nominal size cast in situ. CN40 Nominal size cast in situ. CN40 Nominal size cast in situ. CN40 Nominal size cast in situ. CN40

57 summit road

970

° 45.00

B3.9 : F S UC203x B04 203x46

checked by

392

Mark

B3.7 : F S UC203x B04 203x46

Comments

ST-U3-20.20.75.80-0001 - Steel beam systems

B3.13 : F UC203x SB04 203x46

B3.10 : F UC152x SB06 152x37

P.CAST - 600x215x300

P.CAST - 600x215x300

B3.6 : F S UC152x B06 152x37

P3.6

P3.4

URL

Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32

P3.10

1760

P.CAST - 440x215x300

Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads

Manufacturer

title

1387

6

C1

B

B3.17 : F UC203x SB04 203x46

06 SB x37 F .5 : 52 B3 152x1 UC

2038

C

UP

° 45.00

1058

5

Classification.Uniclass.Pr.Descript Classification.Uniclass. ion Pr.Number

430 Staines Road West Ashford TW15 1RZ

B3.18 : F UC152x SB06 152x37

B3.4 : F S UC203x B04 203x46

Type

P3.1 P.CAST - 440x215x300 P3.2 P.CAST - 600x215x300 P3.3 P.CAST - 600x215x300 P3.4 P.CAST - 440x215x300 P3.6 P.CAST - 600x215x300 P3.7 P.CAST - 440x215x300 P3.8 P.CAST - 440x215x300 P3.9 P.CAST - 600x215x300 P3.10 P.CAST - 600x215x300 P3.11 P.CAST - 600x215x300 P3.12 P.CAST - 440x215x300 Grand total: 11

2287

P3.3

scale

project ref

Mark

FL202

B3.3 : F S UC152x B06 152x37

ST-U3-20.05.15.65-0001 - Precast concrete pads

P3.11

B3.14 : F UC203x SB04 203x46

P.CAST - 600x215x300

3DI-U3-00.60.00.00-01

drawn by

2710

2

P.CAST - 600x215x300

° 45.12

B

4

6 B0 FS 2x37 : .15 15 B3 152x UC

B3.16 : F UC203x SB04 203x46

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

B3.2 : F S UC203x B04 203x46

As indicated

45 .00 °

3

originator

P3.12

P.CAST - 440x215x300

21-C

A

21-C-184

6 B0 FS x37 .1 : 52 B3 152x1 UC

P3.2

P.CAST - 600x215x300

sub no.

3547

2033

8

P3.8

E

SP.DR-U1-20.10.75.35-0001 A1

2

Tag01

3

20.10 - KEY - Structural Frame Systems

ss02

2

Tag02

SP.DR-U1-20.10.75.35-0001 A1

FnB = Framework - Beam FnC = Framework - Column FnP = Framework - Purlin FnT = Framework - Truss FnL = Framework - Lintel FnQ' = Framework - Bearing pads

E 4 5

BS1192 2007 : 21-C-184-21-C-TW15-U3-DR.P-S-0001- S1- P1

10

xy.## TYPE

Element

Beam length inc. bearing

Padstone

F=Frame element n=Property : S=steel; C=concrete; W=wood

UP02.20.10 - FRAMES - Above - Level 2

1

xy.## : FnB.** TYPE

x = Element Type B=BEAM y = Associated start level of the element 0=GROUND LEVEL 1=LEVEL 1 2=LEVEL 2 etc ## = Number of variant ** = Type variant TYPE = Type of element e.g. UB203 x 133 x 30

Steel Plate

20.10 - KEY - Framing reference

Padstone lengths

20.20 - KEY - Beams

TW15 A

B

C

D

E

F

G

H

I

J

K

L

M

N

P

BS1192 2007 : 21-C-184-21-C-TW15-U3-DR.P-S-0001- S1- P1

1

9

Steel frame above 2 Level

ss01

site address

20.20 - KEY - Beams

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

1

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

P.CAST - 440x215x300

D

11

© Copyright 1985-2017

P3.1

2

S DR.P U3 20.10.75.35 0001

5


A B C D E

2

10

F G H I J K L

S6 0/ 2 .1 .0 65 800 0 C 1 . FS Lb - 600 E Lt E

M N

TW15

P

BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-S-0001- S1- P1

northolt

middlesex

ub5 5hl

united kingdom

t : : +44(0)20 8935 5856

e:: k21cdesigns@gmail.com

1 : 50

scale

© Copyright 1985-2017

S DR.S 00 20.10.75.35 0001

drawing no.

2

Frame sections

21-C-57

checked by

sub no.

-600.0

BP01 - B1 level 13.019

0.0

UP00 - Ground Level - 13.619

Steel frame arrangement

21-C

originator

S3 0/ 2 .1 .0 65 800 0 C 1 . FS Lb - 600 E Lt E

B0.45 : FBC01 T225

2775.0

UP01 - 1 Level - 16.394

description of revision

21-C-184

project ref

B1.10.1 : FSB03 L100x100x10

2658 SFL 2.658 m

rev P1

title

drawn by

2706 TOS 2.706 m

N

430 Staines Road West Ashford TW15 1RZ

10 /S 0 2 0 5.1 00. 6 C 18 .0 FS Lb - 600 E Lt E

B1.11.1 : FSB03 L100x100x10

B0.57 : FBC01 T225

B1.17 : FSB04 UC203x203x46

2750 TOS 2.750 m

M

FL202

57 summit road

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

12 /S 0 2 0 5.1 00. 6 C 18 .0 FS Lb - 600 E Lt E

B0.20 : FBC01 T225 B0.64 : FBC01 T225

2255 2.255 m

B1.se3 : FSB03 L100x100x10

5550.0

UP02 - 2 Level - 19.169

L

site address

-600.0

BP01 - B1 level 13.019

0.0

SFL -212 -0.212 m

2658 SFL 2.658 m

5530 TOS 5.530 m

B2.1 : FSB04 UC203x203x46

9150.0

UP03 - 3 Level - 22.769

K

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

B0.43 : FBC01 T225

2403 BOS 2.403 m

2606 TOS 2.606 m

B1.se4 : FSB07 L150x150x10

B2.9 : FSB04 UC203x203x46

5525 TOS 5.525 m

B2.se5 : FSB07 L150x150x10

B3.16 : FSB04 UC203x203x46

8990 TOS 8.990 m

A

J

UP00 - Ground Level - 13.619

2775.0

B1.13 : FSB01 UB203x133x25

B1.12 : FSB01 UB203x133x25

5030 5.030 m

B2.se3 : FSB03 L100x100x10

8990 TOS 8.990 m

B

I

UP01 - 1 Level - 16.394

5550.0

5530 TOS 5.530 m

B3.17 : FSB04 UC203x203x46

C

H

B2.6 : FSB04 UC203x203x46

B3.9 : FSB04 UC203x203x46

8990 TOS 8.990 m

C1

G

UP02 - 2 Level - 19.169

D

-600.0

BP01 - B1 level 13.019

0.0

UP00 - Ground Level - 13.619

2775.0

UP01 - 1 Level - 16.394

B1.1 : FSB01 UB203x133x25

F

9150.0

UP03 - 3 Level - 22.769

E

B1.21 : FCB.T155 T155

5550.0

UP02 - 2 Level - 19.169

E

ss02

ss01

-600.0

BP01 - B1 level 13.019

B1.2 : FSB01 UB203x133x25

B2.2 : FSB04 UC203x203x46

D

0.0

5532 TOS 5.532 m

B UC 3.1 15 : F 2x SB 15 06 2x 37

A

A1

C

UP00 - Ground Level - 13.619

7

BOS 2300 2.300 m

SFL 2658 2.658 m

B1.32 : FCB.T155 T155

5

B1.7 : FSB01 UB203x133x25

5530 TOS 5.530 m

B

3

2775.0

UP01 - 1 Level - 16.394

8

B1.8 : FSB01 UB203x133x25

B1.43 : FCB.T155 T155

B2.3 : FSB04 UC203x203x46

06 SB 2x37 F : .5 x15 B3 152 UC

C B3.4 : FSB04 UC203x203x46

11 5550.0

C1

6

B

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

1

9 UP02 - 2 Level - 19.169

D

4

B3.2 : FSB04 UC203x203x46

BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-S-0001- S1- P1

A P date 180216

1

21-C DESIGNS Westcraft Limited Design Office


BS1192 2007 : 21-C-184-21-C-TW15-00-DR.3-S-0001- S1- P5 11

A B

8

C D E F G

TW15

H

1

I J K L M

northolt

7

middlesex

N

10

3DI-00-20.10.00.00-0001 - Frame

P

t : : +44(0)20 8935 5856

5

e:: k21cdesigns@gmail.com

2

Š Copyright 1985-2018

Roofing systems Timbers frames and systems Steel frame arrangement Beam and block arrangement Foundation setting out

united kingdom

description of revision

ub5 5hl

rev P5 P4 P3 P2 P1

BS1192 2007 : 21-C-184-21-C-TW15-00-DR.3-S-0001- S1- P5

N

S DR.3 00 20.10.75.35 0001

M

Frame 3D

L

drawing no.

K

scale

J

21-C-57

I

checked by

H

title

G

21-C

sub no.

F

21-C-184

3 originator

E

430 Staines Road West Ashford TW15 1RZ

project ref

D

FL202

57 summit road

4 drawn by

C

site address

6 Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

B

Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

9 Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

A1

A P date 180219 180219 180216 180216 180214

1

21-C DESIGNS Westcraft Limited Design Office


B

C

D

E

F

G

H

I

J

K

L

M

[HC] aggregate hardcore

1

N rev P2 P1

A1

A

[GF] geomembrane

[HC] aggregate hardcore

[HC] aggregate hardcore

[CN] lite site concrete

[CN] lite site concrete

[SN] bedding sharp sand

[AB] binder bitumac

[SN] bedding sharp sand

[AS] Hot-rolled asphalt (HRA) surface

[CF] Paving concrete flags

P description of revision

Sanitary systems Flooring systems

date 180517 180220

keyblock permeable paver

21-C DESIGNS

[TP] planting top soil

checked by

430 Staines Road West Ashford TW15 1RZ

title

drawn by

4

FL202

project ref

[GR] grass

EFS51

EFS52

Š Copyright 1985-2018

drawing no.

[TP] planting top soil

[SG] shingle

21-C

[SN] bedding sharp sand

[GF] geomembrane

21-C-184

[SN] bedding sharp sand

3

originator

[UG] unmade ground

1 : 10

RFS06.3

scale

EFS06.1

sub no.

EFS04

21-C-57

2

A DR.A 00 30.20.00.00 0001

Westcraft Limited Design Office

EFS61

e::

5

t : : +44(0)20 8935 5856

[SK] plaster skim [PB] Plasterboard [SK] plaster skim

[WM] DPM - liquid asphaltic composition

[WM] DPM - liquid asphaltic composition

[IN] rigid floor insulation

[IN] rigid floor insulation

[AR] acoustic resiliant layer

[WM] PVC - 1200ga damp proof membrane

[TB] Tanerlised batterns 25 x 38

[SD] Sand cement floor screed loaded with fibres

[SD] Sand cement floor screed loaded with fibres

[PW] 18mm Flooring WBP Plywood

[FE] Finishes element

[SE] Structural element [TB] Tanerlised batterns 25 x 38

6

[FE] Finishes element

middlesex

[SE:IN] Rigid insulation between structural elements

united kingdom

[SE] Structural element

ub5 5hl

[SE] Structural element

[RF] Resiliant isolation element

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

[SV] Services void

[PB] plasterboard Soundbloc

northolt

7

FGF03-BB225

57 summit road

FIF03-BB155

8

[LS] Leveling screed

[PS] Polished stone

9

FEFW.40

Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

FEFS.10.10.S

BS1192 2007 : 21-C-184-21-C-TW15-00-DR.A-A-0001- S1- P2

10

30.20.00.00-0001 - Assemblies - Floors 1 : 10

11

TW15 A

B

C

D

E

F

G

H

I

J

K

L

M

N

P

Flooring assemblies

[BA] tile bonding adhesive

site address

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

[FE] Tiled surface finish

BS1192 2007 : 21-C-184-21-C-TW15-00-DR.A-A-0001- S1- P2

FIF10.1.1


G

H

I

J

K

L

M

N

A1

rev P2 P1

1

[SK] plaster skim

[SK] plaster skim

[SK] plaster skim

[SK] plaster skim

P description of revision

Sanitary systems Wall systems & assemblies

2

PLANS

[SK] plaster skim

Westcraft Limited Design Office

Schulter Kerdi fleese

IWS03

IWS04.1

[BK] 100mm 2.9kN block

[BK] 100mm 2.9kN block

[SC] sand cement render - two coat

[PP] 10mm plaster parge

[SK] plaster skim

[PB] plasterboard Soundbloc

[PW] sheathing ply

21-C

[PB] plasterboard Soundbloc [SK] plaster skim

checked by

[IN] Rockwool Flexi insulation

title

[IN] Rockwool Flexi insulation

Schulter Kerdi fleese

[SF:IN] 70mm C stud + acoustic insulation

21-C-184

[BK] 100mm 2.9kN block

[BK] 100mm 2.9kN block

[PB] plasterboard Soundbloc

[PW] sheathing ply

430 Staines Road West Ashford TW15 1RZ

[PP] 10mm plaster parge

[PP] 10mm plaster parge

[PW] sheathing ply

[PB] plasterboard Soundbloc

project ref

[PB] plasterboard Soundbloc

[PB] plasterboard Soundbloc

[SF:IN] 70mm C stud + acoustic insulation

[SK] plaster skim

FL202

[SK] plaster skim

[SK] plaster skim

drawn by

4

SECTIONS

3

originator

sub no.

IWS01.1

21-C DESIGNS

[SF:IN] 70mm C stud + acoustic insulation

[SK] plaster skim

IWS01

date 180517 180217

Š Copyright 1985-2018

F

A DR.A 00 25.13.00.00 0002

E

drawing no.

D

1 : 10

C

scale

B

21-C-57

A

[SK] plaster skim

middlesex

[BA] tile bonding adhesive

ub5 5hl

[SK] plaster skim

united kingdom

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

6

[SK] plaster skim

t : : +44(0)20 8935 5856

e::

5

[FE] wall tiles

IWS05.2

57 summit road

northolt

PLANS

7

FEWS.10.10

8

[SK] plaster skim

SECTIONS

BS1192 2007 : 21-C-184-21-C-TW15-00-DR.A-A-0002- S1- P2

10

Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

9

25.13.00.00-0002 - Assemblies - Internal Walls 1 : 10

11

TW15 A

B

C

D

E

F

G

H

I

J

K

L

M

N

P

BS1192 2007 : 21-C-184-21-C-TW15-00-DR.A-A-0002- S1- P2

[FE] wall tiles

[SC] sand cement render - two coat

Internal wall assemblies

[BA] tile bonding adhesive

[BK] 100mm 2.9kN block

site address

[SC] sand cement render - two coat

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

[SK] plaster skim


BS1192 2007 : 21-C-184-21-C-TW15-00-DR.A-A-0001- S1- P1 10

11

TW15

A B

30.10.00.00-0001 - Assemblies - Roofs

RFS10

C D E F

7

middlesex

[SK] plaster skim

[PB] Plasterboard

[SE] Structural element

[PW] Sheathing plywood

[WM] PVC - 1200ga damp proof membrane [SK] plaster skim [PB] Plasterboard [SE] Structural element

[IN] Rigid roof insulation

[PW] Sheathing plywood

[WM] polyester reinforcement fleece system [WM] wet on wet 2 coat cold liquid system [PW] Sheathing plywood [IN] Rigid roof insulation [PW] Sheathing plywood [WM] polyester reinforcement fleece system [WM] wet on wet 2 coat cold liquid system

G H

e:: k21cdesigns@gmail.com

[TB] Tanerlised batterns 25 x 38

6

9

I J K L M N P

t : : +44(0)20 8935 5856

[TB] Tanerlised batterns 25 x 38

united kingdom

[AG] Debris free air gap

ub5 5hl

[AG] Debris free air gap

[RT] Marley clay roof tile

RFS01.1

RFS10.1

BS1192 2007 : 21-C-184-21-C-TW15-00-DR.A-A-0001- S1- P1

[SE:IN] Rigid insulation between structural elements

Š Copyright 1985-2018

Roofing systems

A DR.A 00 30.10.00.00 0001

[SE:IN] Rigid insulation between structural elements

description of revision

Roof assemblies

rev P1

drawing no.

[IN] Insulation bonded to plasterboard

N

1 : 10

[IN] Insulation bonded to plasterboard

M

scale

[PB] Plasterboard bonded to insulation

L

21-C-57

[PB] Plasterboard bonded to insulation

K

checked by

[SK] plaster skim J

title

[SK] plaster skim I

21-C

sub no.

[RT] Marley clay roof tile

H

21-C-184

3 originator

G

430 Staines Road West Ashford TW15 1RZ

RFS01.2

F

northolt

5

E

project ref

2

D

FL202

57 summit road

4 drawn by

C

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

B

site address

Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

8

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

A1

A P date 180219

1

21-C DESIGNS Westcraft Limited Design Office


A

B

C

D

E

F

G

H

I

J

K

L

M

N

A1

rev P4 P3 P2 P1

P description of revision

Stair systems Flooring systems Beam and block arrangement Foundation setting out

date 180517 180220 180216 180214

1

21-C DESIGNS

Š Copyright 1985-2018

drawing no. scale

As indicated

title

21-C-57

checked by

430 Staines Road West Ashford TW15 1RZ

drawn by

4

FL202

project ref

originator

3

21-C

4

21-C-184

3

sub no.

2

S DR.P 00 35.10.85.65 0001

Westcraft Limited Design Office

SS-35.10.85.65-04

4

SP.DR-00-35.10.85.65-0001 A1

ST-00-20.85.48.15-0001 - Concrete lintes for stairs systems

SP.DR-00-35.10.85.65-0001 A1

Mark 5

B0.cl1 B0.cl2 B0.cl3 B0.cl4 B1.cl2 B1.cl3 B1.cl4

SS-35.10.85.65-01

1

SP.DR-00-35.10.85.65-0001 A1

B

UP

Type Mark FBC02 FBC03 FBC03 FBC03 FBC03 FBC03 FBC03

Classification.Uniclass.Pr. Classification.Uniclass.Pr.Descript Number ion

Type ER8 ER1 ER1 ER1 ER1 ER1 ER1

Pr_20_85_48_15 Pr_20_85_48_15 Pr_20_85_48_15 Pr_20_85_48_15 Pr_20_85_48_15 Pr_20_85_48_15 Pr_20_85_48_15

Concrete lintels Concrete lintels Concrete lintels Concrete lintels Concrete lintels Concrete lintels Concrete lintels

Manufacturer Naylor Naylor Naylor Naylor Naylor Naylor Naylor

Comments to be used in conjunction with stair systems to be used in conjunction with stair systems to be used in conjunction with stair systems to be used in conjunction with stair systems to be used in conjunction with stair systems to be used in conjunction with stair systems to be used in conjunction with stair systems

e::

2

1

6

SS-35.10.85.65-03

3345

2997

SP.DR-00-35.10.85.65-0001 A1

ub5 5hl

ER1

SS-35.10.85.65-01

united kingdom

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

B0.cl2

t : : +44(0)20 8935 5856

SS-35.10.85.65-02

B

middlesex

3

SP.DR-00-35.10.85.65-0001 A1

7

northolt

C SS-35.10.85.65-03

3

57 summit road

SP.DR-00-35.10.85.65-0001 A1

ST-00-20.20.75.80-0001 - Steel beam systems for stairs Mark

2852 B0.cl3

3199

C

ER1

B0.se1 FSB03 B0.se2 FSB03 B1.se1 FSB03 B1.se2 FSB03 B1.se3 FSB03 B1.se4 FSB07 B1.se5 FSB07 B2.se1 FSB03 B2.se2 FSB07 Grand total: 9

SS-35.10.85.65-04

4

SP.DR-00-35.10.85.65-0001 A1

SS-35.10.85.65-02

2

3

SP.DR-00-35.10.85.65-0001 A1

4

9

Type L100x100x10 L100x100x10 L100x100x10 L100x100x10 L100x100x10 L150x150x10 L150x150x10 L100x100x10 L150x150x10

Reference Level UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169

Elevation at Top Varies Varies Varies Varies Varies Varies Varies Varies Varies

Elevation at Bottom Varies Varies Varies Varies Varies Varies Varies Varies Varies

Length 900.0 900.0 900.0 900.0 900.0 1080.0 900.0 900.0 1080.0

Cut Length 900.0 900.0 900.0 900.0 900.0 1014.5 900.0 900.0 1014.5

Classification.Uniclass.Pr.De Classification.Unic scription lass.Pr.Number Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams

Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11

Comments Fixed to precast stair element Fixed to precast stair element Fixed to precast stair element Fixed to precast stair element Fixed to precast stair element Fixed to precast stair element Fixed to precast stair element Fixed to precast stair element Fixed to precast stair element

UP00.35.10 - STAIRS - Ground Level

STR = Straircase(s)

xx : yy : ABC

11

TW15 A

xx = calculated riser yy = calculated going ABC = constrcution type - precast - cast in situ - steel fabrication - timber construction

35.10.40.42 - KEY - Stairs 1:1

B

C

D

E

F

G

H

I

J

K

L

M

N

P

BS1192 2007 : 21-C-184-21-C-TW15-00-DR.P-S-0001- S1- P4

35.10.40.42

Precast stair systems

BS1192 2007 : 21-C-184-21-C-TW15-00-DR.P-S-0001- S1- P4

10

site address

1 : 25

Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

1

Type Mark

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

8


B

C

D

E

F

G

H

I

J

K

L

M

N rev P3 P2 P1

A1

A

C

3

B SS-35.10.85.65-03

date 180517 180220 180214

SS-35.10.85.65-01

3

2

4

Stair systems Flooring systems Foundation setting out

B

SS-35.10.85.65-02

SS-35.10.85.65-04

SP.DR-00-35.10.85.65-0001 A1

SP.DR-00-35.10.85.65-0001 A1

SP.DR-00-35.10.85.65-0001 A1

C SS-35.10.85.65-03

1

SP.DR-00-35.10.85.65-0001 A1

2

4

4

SS-35.10.85.65-01

3

SS-35.10.85.65-02

SS-35.10.85.65-04

1

3

P description of revision

1

SP.DR-00-35.10.85.65-0001 A1

SP.DR-00-35.10.85.65-0001 A1

SP.DR-00-35.10.85.65-0001 A1

SP.DR-00-35.10.85.65-0001 A1

UP03 - 3 Level - 22.769

UP03 - 3 Level - 22.769

9150.0

9150.0

21-C DESIGNS

originator

IWS01

3

120

U2.68 IWS01

21-C

U2.55

© Copyright 1985-2018

drawing no.

sub no.

2

S DR.S 00 35.10.85.65 0001

Westcraft Limited Design Office

19.043

5350 5.350 m

5550.0

1 : 25

scale

21-C-57

5550 5.550 m

checked by

UP02 - 2 Level - 19.169

drawn by

4

title

Precast Stair 17 R @ 173.4 mm G @ 280.0mm

430 Staines Road West Ashford TW15 1RZ

120

120

FL202

project ref

U2.67 IWS01 U2.57 IWS01

21-C-184

120

UP02 - 2 Level - 19.169 5550.0

B2.se2

5030 5.030 m

L150x150x10

B2.se1

B2.9

UC203x203x46

L100x100x10

U1.26 IWS01

U1.28 IWS01

120

120

B1.cl4

4336 4.336 m

U1.27 IWS01

4336 4.336 m

ER1

e::

5 120

4136 4.136 m

4136 4.136 m

t : : +44(0)20 8935 5856

4136 4.136 m

U1.14 IWS01

B1.se2

120

L100x100x10

B1.cl2

3269 3.269 m

6

3269 3.269 m

B1.se1

L100x100x10

B1.cl3

150 UP01 - 1 Level - 16.394

2775.0

1922 Precast Stair 17 R @ 173.4 mm G @ 280.0mm

2255 2.255 m

B1.se5

L150x150x10

B1.se4

L150x150x10

B1.se3

2055 2.055 m

U0.17 IWS01

7

2775.0

1050

B1.17

L100x100x10

middlesex

UP01 - 1 Level - 16.394

1509

ER1

2775 2.775 m

united kingdom

3469 3.469 m

ub5 5hl

3469 3.469 m

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

ER1

UC203x203x46

120

2118 B0.cl4

U0.12 IWS01

1361 1.361 m

120

120

U0.15 IWS01

1915

B0.se2

120

B0.cl3

1361 1.361 m

L100x100x10

ER1

Precast Stair 17 R @ 173.4 mm G @ 280.0mm

8

1561 1.561 m

northolt

U0.16 IWS01

ER1

Precast Stair 17 R @ 173.4 mm G @ 280.0mm

57 summit road

1561 1.561 m

694 0.694 m

694 0.694 m 494 0.494 m

B0.se1

B0.cl2 ER1

UP00 - Ground Level - 13.619

UP00 - Ground Level - 13.619

0.0

0.0 EWS11.4.1 120 EWS11.4.1 120

9 BP01 - B1 level 13.019

BP01 - B1 level 13.019

-600.0

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

L100x100x10

-600.0

B0.cl1

SS-35.10.85.65-04

SS-35.10.85.65-03

4

SS-35.10.85.65-03

4

3

3

SP.DR-00-35.10.85.65-0001 A1

SP.DR-00-35.10.85.65-0001 A1

SP.DR-00-35.10.85.65-0001 A1

SS-35.10.85.65-01

SS-35.10.85.65-02

11

1

SS-35.10.85.65-01

2

TW15 A

1 : 25

B

C

D

SS-35.10.85.65-02

F

G

SP.DR-00-35.10.85.65-0001 A1

SS-35.10.85.65-03

3

1 : 25

E

1

2

SP.DR-00-35.10.85.65-0001 A1

SP.DR-00-35.10.85.65-0001 A1

SS-35.10.85.65-01

SS-35.10.85.65-02

1

2

4

1 : 25

H

I

J

K

SP.DR-00-35.10.85.65-0001 A1

SS-35.10.85.65-04 1 : 25

L

M

N

P

BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-S-0001- S1- P3

SS-35.10.85.65-04 SP.DR-00-35.10.85.65-0001 A1

Precast stair systems - sectons

BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-S-0001- S1- P3

10

site address

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

ER8


B

A1

A

C

E

D

E

F

H

I

J

3

D

2

G

K

4

L

M

N rev P2 P1

5

1

P description of revision

Roofing systems Timbers frames and systems

date 180219 180219

AS-30.12.85.90-01

AS-30.12.85.90-02

AE.DR-00-00.00.00.07-0020 A1

AP.DR-U0-00.00.00.04-0001 A1

1

2217

21-C DESIGNS

2201

2040.0

0.0

2370.0 0.0

RFS10 Ss_30_40_30_43 <324.5 mm>

48x225 C24

B1.308

B1.310

48x225 C24

48x225 C24

2750 2.750 m

UP01 - 1 Level - 16.394

2667 2.667 m

UP01 - 1 Level - 16.394

2553 2.553 m

2775.0 project ref

2775.0

2667 2.667 m 2403 2.403 m TOS 2606 2.606 m

FCL 2391 2.391 m

B1.319

48x150 C24

B1.320

48x150 C24

B1.328

48x150 C24

48x150 C24

UB203x133x25

120

drawn by

L0.8

4

B1.311

B1.14

U0.10 EWS11.A0736A

checked by

B1.305

48x225 C24

FFL 2712 2.712 m

B1.309

Ss_30_40_30_43 <324.5 mm>

title

B1.301

48x225 C24

48x225 C24

RFS10

48x225 C24

430 Staines Road West Ashford TW15 1RZ

25x110 C24

B1.307

48x225 C24

originator

B1.302

FL202

3

962

B1.306

B1.304

sub no.

B1.303

48x225 C24

CG90/125

B1.15

UB203x133x25

© Copyright 1985-2018

W1.19

2370.0

21-C-57

2040.0

21-C

0.0

HRS06.900 Balcony hand rail system to BS 6399 UDL.h 0.36kN/m2; UDL.i 0.5kN/m2; PL.i 0.25kN

EGS09

W1.18

drawing no.

EGS09

2370.0

21-C-184

W1.19 2040.0

scale

EGS09

As indicated

2

A DR.S 00 30.12.85.90 0001

Westcraft Limited Design Office

U0.18 IWS01.1 120

5

U0.1

U0.9 EWS11.A0736A

EWS11.A0736A

120

120

EGS09

e::

W0.16 2040.0

2370.0

Ss_30_12_05 <437.0 mm>

UP00 - Ground Level - 13.619

UP00 - Ground Level - 13.619

0.0

0.0

BP01 - B1 level 13.019

BP01 - B1 level 13.019

-600.0

-600.0

united kingdom

6

FGF03.BB225

Ss_30_12_05 <437.0 mm>

Ss_30_12_05 <437.0 mm>

ub5 5hl

FGF03.BB225

FGF03.BB225

3DI-00-30.12.85.90-0001 Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

5

t : : +44(0)20 8935 5856

0.0

AS-30.12.85.90-02

1 AS-30.12.85.90-01

AP.DR-U0-00.00.00.04-0001 A1

2

1 : 20

57 summit road

8

AE.DR-00-00.00.00.07-0020 A1

AS-30.12.85.90-01

1

northolt

2

F EL SC6 EL b - 5.1 t - 180 20 60 0 / S 0.0 .0 5

F EL SC6 EL b - 5.1 t - 180 20 60 0 / S 0.0 .0 7

F EL SC6 EL b - 5.1 t - 180 20 60 0 / S 0.0 .0 18

120

7

middlesex

EWS11.4.1

AS-30.12.85.90-02 1 : 20

ST-U1-30.20.10.50-0001 - Timber joists

AS-30.12.85.90-02 AP.DR-U0-00.00.00.04-0001 A1

2 AS-30.12.85.90-02 BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-A-0001- S1- P2

10

AP.DR-U0-00.00.00.04-0001 A1

1

4

AS-30.12.85.90-01

AS.DR-00-30.12.85.90-0001 A1

3 11

AE.DR-00-00.00.00.07-0020 A1

UP01.30.12.85.90 - ROOF DECK - 1 Level - Roof and balcony systems 1 : 200

UP01.30.12.85.90.1 - ROOF DECK - 1 Level - Roof and balcony systems

4

1 : 100

TW15 A

B

C

D

E

F

G

H

I

J

Classification.Uniclass. Classification.Uniclass.Pr.Des Pr.Number cription

7180.0 7180.0 7180.0 7180.0 6693.3 6693.3 2200.4 2200.0 2200.4 2200.0 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2269.4 2289.1 2289.1

Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81

K

Comments

Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams

L

M

N

P

BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-A-0001- S1- P2

2

7180.0 7180.0 7180.0 7180.0 7180.0 7180.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 97156.0

Cut Length

Balcony and roof deck systems

AE.DR-00-00.00.00.07-0020 A1

UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394

Length

site address

AS-30.12.85.90-01

B1.301 FWB48.225.C24 B1.302 FWB48.225.C24 B1.303 FWB48.225.C24 B1.304 FWB25.110.C24 B1.305 FWB48.225.C24 B1.306 FWB48.225.C24 B1.307 FWB48.225.C24 B1.308 FWB48.225.C24 B1.309 FWB48.225.C24 B1.310 FWB48.225.C24 B1.311 FWB48.150.C24 B1.312 FWB48.150.C24 B1.313 FWB48.150.C24 B1.314 FWB48.150.C24 B1.315 FWB48.150.C24 B1.316 FWB48.150.C24 B1.317 FWB48.150.C24 B1.318 FWB48.150.C24 B1.319 FWB48.150.C24 B1.320 FWB48.150.C24 B1.321 FWB48.150.C24 B1.322 FWB48.150.C24 B1.323 FWB48.150.C24 B1.324 FWB48.150.C24 B1.325 FWB48.150.C24 B1.326 FWB48.150.C24 B1.327 FWB48.150.C24 B1.328 FWB48.150.C24 Grand total: 28

Reference Level

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

1

9

Type Mark

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

Mark


BS1192 2007 : 21-C-184-21-C-TW15-U0-DR.P-M-0001- S1- P1 11

A B C D E F G H

TW15

I J K

f s

L M N

8

9

10

50.30.08 DRAINAGE BELOW GROUND DRAINAGE - FOUL

DRAINAGE BELOW GROUND DRAINAGE - SURFACE WATER

50.30.08 - KEY - BELOW GROUND GRAVITY DRAINAGE SYSTEMS 1:1

P

57 summit road

northolt

middlesex

7

BS1192 2007 : 21-C-184-21-C-TW15-U0-DR.P-M-0001- S1- P1

Drainage map ub5 5hl

united kingdom

t : : +44(0)20 8935 5856

e::

© Copyright 1985-2018

M DR.P U0 50.00.00.00 0001

drawing no.

2

scale

Drainage BG

As indicated

description of revision

21-C-57

rev P1

checked by

N

title

M

21-C

sub no.

L

21-C-184

3 originator

5 K

430 Staines Road West Ashford TW15 1RZ

project ref

0 J

FL202

drawn by

I

site address

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

H

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

G

1 : 100

f N 170411953.2 E 508154531.8

F

UP00.50.0 - DISPOSAL SYSTEMS - Ground Level

5 N 170399797.9 E 508152674.9

4 N 170412895.9 E 508155905.9

E

N 170409526.4 E 508150558.9

0 0.000 m

150

UP

f D

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

1

N 170403475.7 E 508141166.1

N 170423743.2 E 508146487.0

s

-139 -0.139 m

C

N 170414393.4 E 508145469.5

N 170415357.5 E 508144282.0

N 170425847.5 E 508145205.4

6 -150 -0.150 m

A1

B

150

A P date 180517

10 m

1

21-C DESIGNS Westcraft Limited Design Office


A

B

C

D

E

F

G

H

I

J

K

L

M

N

P

A1

rev P1

description of revision

Sanitary systems

date 180517

2

Westcraft Limited Design Office

drawing no. scale

As indicated

checked by

drawn by

4

21-C-57

1:1

title

1:1

3DR-U0-40.15.75.00-0004

21-C-184

5

430 Staines Road West Ashford TW15 1RZ

4

1 : 20

3DR-U0-40.15.75.00-0003

FL202

1

UP00.40.15.75.00.1.3 - SANITARY SYSTEMS - 0 Level - F.0.1.3 - Ensuite

project ref

originator

3

21-C

sub no.

420

700

400

MP U0 40.15.75.00 0001

5.75.00 .1.3 F.0.1.3 -0040

© Copyright 1985-2018

AE.40.1

3

21-C DESIGNS 350

668

MP.DR-U0-40.15.75.00-0001 A1

AE.40.1 2

5.75.00 .1.3 F.0.1.3 -0010

1

B

UP01 - 1 Level - 16.394

2775.0

UP01 - 1 Level - 16.394

2775.0

UP01 - 1 Level - 16.394

2775.0

2775.0

t : : +44(0)20 8935 5856

UP01 - 1 Level - 16.394

e::

5

6 1.3.6 SPE.SH.06.ZZ.1000

1.3.7 1.3.1

SPE.SH.03.ZZ.1004

1.3.8

1.3.3

1.3.3

SWB.06.ZZ.1030

1.3.2

1.3.5 SSC.01.ZZ.1200

northolt

1300

STL.01.ZZ.1030

1038

850

1045

SWB.06.ZZ.1030

1800

7

middlesex

SPE.WB.07.ZZ.1004

1200

1.3.8 SPE.WB.07.ZZ.1004

164

STL.04.ZZ.1030

ub5 5hl

793

united kingdom

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

200

220

1.3.2 STL.01.ZZ.1030

FEFS.10.10.S

57 summit road

458

1.3.4 SST.01.ZZ.1234

Ss_30_42_32_40 <23.0 mm>

UP00 - Ground Level - 13.619

0.0

2

UP00 - Ground Level - 13.619

0.0

UP00 - Ground Level - 13.619

0.0

AE.40.15.75.00.1.3-0010 F.0.1.3

3

1 : 20

0.0

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

UP00 - Ground Level - 13.619

8

AE.40.15.75.00.1.3-0040 F.0.1.3 1 : 20

9

BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0001- S1- P1

11

ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE

Mark 1.3.1 1.3.2 1.3.3 1.3.4 1.3.5 1.3.6 1.3.7 1.3.8

Type Mark STL.04.ZZ.1030 STL.01.ZZ.1030 SWB.06.ZZ.1030 SST.01.ZZ.1234 SSC.01.ZZ.1200 SPE.SH.06.ZZ.1000 SPE.SH.03.ZZ.1004 SPE.WB.07.ZZ.1004

Description Cistern unit Wall hung toilet pan with seat Cabinet mounted basin Flush level tray Fixed shower screen Shower head Bath wall spout Basin wall filler set

Classification.Uniclass.S Classification.Uniclass.Ss. Classification.Uniclass s.Number Description .Pr.Number Ss_40_15_90_97 Ss_40_15_90_97 Ss_40_15_75_94 Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_75_94

WC systems WC systems Wash basin systems Shower area systems Shower area systems Shower area systems Shower area systems Wash basin systems

Pr_40_20_93_89 Pr_40_20_93_94 Pr_40_20_96_96 Pr_40_20_06_84 Pr_40_20_06_79 Pr_40_20_87_76 Pr_40_20_87_81 Pr_40_20_87_99

Classification.Uniclass.Pr.Description WC cisterns WC pans Wall-hung wash basins Shower trays Shower enclosures Shower heads Shower thermostatic water supply sets Washbasin thermostatic water supply sets

Manufacturer

Comments

STL.01.ZZ.1234[0] STL STB SWB SST SBD SSC SPE.BT SPE.WB SPE.SH SPE.BD

Geberit

TW15 A

Toilet Bathtub Wash basin Shower tray Bidet Screens Plumbing equipment - bath Plumbing equipment - basin Plumbing equipment - shower Plumbing equipment - bidet

STL = appliance name 01 = type ZZ = manufacturer 1 = size requirement 2 = material requirement 3 = colour requirement 4 = finish requirement [0] = no requirements

40.15.75 - KEY - Sanitary Appliance Systems 1:1

B

C

D

E

F

G

H

I

J

K

L

M

N

P

BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0001- S1- P1

F.0.1.3 F.0.1.3 F.0.1.3 F.0.1.3 F.0.1.3 F.0.1.3 F.0.1.3 F.0.1.3

10

Room: Name

x = space reference y = room number # = equipment mark

F.0.1.3 Sanitary systems

Room: Number

x.y.#

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

MT-U0-40.15.75.00-0001 -Sanitary systems F1.3

site address

40.15.75 - Sanitary Appliance Systems


A

B

C

D

E

F

G

H

I

J

K

L

M

N

A1

rev P1

P description of revision

Sanitary systems

date 180517

1

21-C DESIGNS

originator

5

1:1

3DR-U0-40.15.75.00-0006

checked by

3DR-U0-40.15.75.00-0005

title

4

1 : 20

430 Staines Road West Ashford TW15 1RZ

project ref

UP00.40.15.75.00.2.2 - SANITARY SYSTEMS - 0 Level - F.0.2.2 - Ensuite

FL202

1

drawn by

4

1:1

B

drawing no.

341

3

scale

357

sub no.

393

As indicated

5.75.00 .2.2 F.0.2.2 -0040

21-C-57

3

21-C

AE.40.1

MP U0 40.15.75.00 0004

2

© Copyright 1985-2018

MP.DR-U0-40.15.75.00-0004 A1

21-C-184

466

AE.40.1

2

5.75.00 .2.2 F.0.2.2 -0030

466

Westcraft Limited Design Office

2

UP01 - 1 Level - 16.394

UP01 - 1 Level - 16.394

2775.0

2775.0

6

2.2.1 SSC.01.ZZ.1200

200

2.2.9 SSC.01.ZZ.1200

FEFW.40

2.2.2

Ss_40_45_70_24 <40.0 mm>

SPE.SH.06.ZZ.1000

1510 1.510 m

783

united kingdom

115

2775.0

ub5 5hl

UP01 - 1 Level - 16.394

2775.0

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

UP01 - 1 Level - 16.394

t : : +44(0)20 8935 5856

e::

5

2.2.3

middlesex

SPE.SH.03.ZZ.1004

164

7 2.2.5 2.2.8

STL.04.ZZ.1030

northolt

1800

SPE.WB.07.ZZ.1004

2.2.6

2.2.7

FEFS.10.10.S UP00 - Ground Level - 13.619

Ss_30_42_32_40 <23.0 mm>

UP00 - Ground Level - 13.619

0.0

SST.01.ZZ.1234

UP00 - Ground Level - 13.619

0.0

AE.40.15.75.00.2.2-0030 F.0.2.2

3

1 : 20

0.0 Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

0.0

2

57 summit road

1200 SWB.06.ZZ.1030

UP00 - Ground Level - 13.619

9

940

850

1038

2.2.4

435

8

STL.01.ZZ.1030

AE.40.15.75.00.2.2-0040 F.0.2.2 1 : 20

11

F.0.2.2 F.0.2.2 F.0.2.2 F.0.2.2 F.0.2.2 F.0.2.2 F.0.2.2 F.0.2.2 F.0.2.2

TW15 A

ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE

Mark 2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 2.2.6 2.2.7 2.2.8 2.2.9

Type Mark SSC.01.ZZ.1200 SPE.SH.06.ZZ.1000 SPE.SH.03.ZZ.1004 SWB.06.ZZ.1030 STL.04.ZZ.1030 STL.01.ZZ.1030 SST.01.ZZ.1234 SPE.WB.07.ZZ.1004 SSC.01.ZZ.1200

Description Fixed shower screen Shower head Bath wall spout Cabinet mounted basin Cistern unit Wall hung toilet pan with seat Flush level tray Basin wall filler set Fixed shower screen

Classification.Uniclass.S Classification.Uniclass.Ss. Classification.Uniclass s.Number Description .Pr.Number Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_75_94 Ss_40_15_90_97 Ss_40_15_90_97 Ss_40_15_75_78 Ss_40_15_75_94 Ss_40_15_75_78

Shower area systems Shower area systems Shower area systems Wash basin systems WC systems WC systems Shower area systems Wash basin systems Shower area systems

Pr_40_20_06_79 Pr_40_20_87_76 Pr_40_20_87_81 Pr_40_20_96_96 Pr_40_20_93_89 Pr_40_20_93_94 Pr_40_20_06_84 Pr_40_20_87_99 Pr_40_20_06_79

Classification.Uniclass.Pr.Description Shower enclosures Shower heads Shower thermostatic water supply sets Wall-hung wash basins WC cisterns WC pans Shower trays Washbasin thermostatic water supply sets Shower enclosures

Manufacturer

Comments

STL.01.ZZ.1234[0] STL STB SWB SST SBD SSC SPE.BT SPE.WB SPE.SH SPE.BD

Hüppe-FI

Geberit

Hüppe-FI

Toilet Bathtub Wash basin Shower tray Bidet Screens Plumbing equipment - bath Plumbing equipment - basin Plumbing equipment - shower Plumbing equipment - bidet

STL = appliance name 01 = type ZZ = manufacturer 1 = size requirement 2 = material requirement 3 = colour requirement 4 = finish requirement [0] = no requirements

40.15.75 - KEY - Sanitary Appliance Systems 1:1

B

C

D

E

F

G

H

I

J

K

L

M

N

P

BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0004- S1- P1

BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0004- S1- P1

10

Room: Name

x = space reference y = room number # = equipment mark

F.0.2.3 Sanitary systems

Room: Number

x.y.#

site address

MT-U0-40.15.75.00-0003 -Sanitary systems F2.2

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

40.15.75 - Sanitary Appliance Systems


A

B

C

D

E

F

G

H

I

J

K

L

M

N

P

A1

rev P1

description of revision

Sanitary systems

date 180517

1

21-C DESIGNS Westcraft Limited Design Office

5.75.00 .2.3 F.0.2.3 -0040

21-C 21-C-184

UP00.40.15.75.00.2.3 - SANITARY SYSTEMS - 0 Level - F.0.2.3 - Bathroom

checked by

430 Staines Road West Ashford TW15 1RZ

title

drawn by

4

UP01 - 1 Level - 16.394

UP01 - 1 Level - 16.394

UP01 - 1 Level - 16.394

2775.0

2

1:1

UP01 - 1 Level - 16.394

2775.0

UP01 - 1 Level - 16.394

2775.0

UP01 - 1 Level - 16.394

2775.0

2775.0

200

2775.0

3DR-U0-40.15.75.00-0008

6

1:1

e::

3DR-U0-40.15.75.00-0007

t : : +44(0)20 8935 5856

5

5

2.3.5

220 SPE.SH.06.ZZ.1000

6 2.3.5 SSC.01.ZZ.1200

1504 1.504 m

1504 1.504 m

2.3.7 SPE.SH.03.ZZ.1004

2.3.7 2.3.8

2.3.1

7

2.3.8

1800

STL.04.ZZ.1030

SWB.06.ZZ.1030

northolt

FEFS.10.10.S

2.3.4 SST.01.ZZ.1234

UP00 - Ground Level - 13.619

UP00 - Ground Level - 13.619

0.0

UP00 - Ground Level - 13.619

0.0

2.3.3 STL.01.ZZ.1030

940

438

850

965

STL.01.ZZ.1030

SWB.06.ZZ.1030

1300

2.3.3

STL.01.ZZ.1030

STL.04.ZZ.1030

2.3.1

1200

2.3.3

2.3.2

SPE.WB.07.ZZ.1004

middlesex

164

SPE.WB.07.ZZ.1004

2.3.2

57 summit road

SPE.SH.03.ZZ.1004

united kingdom

SPE.SH.06.ZZ.1000

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

2.3.6

ub5 5hl

SSC.01.ZZ.1200

2.3.6

Ss_30_42_32_40 <23.0 mm>

UP00 - Ground Level - 13.619

0.0

UP00 - Ground Level - 13.619

0.0

UP00 - Ground Level - 13.619

0.0

0.0

8

AE.40.15.75.00.2.3-0030 F.0.2.3

4

1 : 20

AE.40.15.75.00.2.3-0040 F.0.2.3 1 : 20

9

MT-U0-40.15.75.00-0004 -Sanitary systems F2.3 Room: Number

BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0003- S1- P1

10

11

F.0.2.3 F.0.2.3 F.0.2.3 F.0.2.3 F.0.2.3 F.0.2.3 F.0.2.3 F.0.2.3

TW15 A

Room: Name BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM

Mark 2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 2.3.6 2.3.7 2.3.8

Type Mark SWB.06.ZZ.1030 STL.04.ZZ.1030 STL.01.ZZ.1030 SST.01.ZZ.1234 SSC.01.ZZ.1200 SPE.SH.06.ZZ.1000 SPE.SH.03.ZZ.1004 SPE.WB.07.ZZ.1004

Description Cabinet mounted basin Cistern unit Wall hung toilet pan with seat Flush level tray Fixed shower screen Shower head Bath wall spout Basin wall filler set

Classification.Uniclass.S Classification.Uniclass.Ss. Classification.Uniclass s.Number Description .Pr.Number Ss_40_15_75_94 Ss_40_15_90_97 Ss_40_15_90_97 Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_75_94

Wash basin systems WC systems WC systems Shower area systems Shower area systems Shower area systems Shower area systems Wash basin systems

Pr_40_20_96_96 Pr_40_20_93_89 Pr_40_20_93_94 Pr_40_20_06_84 Pr_40_20_06_79 Pr_40_20_87_76 Pr_40_20_87_81 Pr_40_20_87_99

Classification.Uniclass.Pr.Description Wall-hung wash basins WC cisterns WC pans Shower trays Shower enclosures Shower heads Shower thermostatic water supply sets Washbasin thermostatic water supply sets

Manufacturer

x.y.#

Comments

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

40.15.75 - Sanitary Appliance Systems x = space reference y = room number # = equipment mark

STL.01.ZZ.1234[0] STL STB SWB SST SBD SSC SPE.BT SPE.WB SPE.SH SPE.BD

Geberit

Toilet Bathtub Wash basin Shower tray Bidet Screens Plumbing equipment - bath Plumbing equipment - basin Plumbing equipment - shower Plumbing equipment - bidet

STL = appliance name 01 = type ZZ = manufacturer 1 = size requirement 2 = material requirement 3 = colour requirement 4 = finish requirement [0] = no requirements

40.15.75 - KEY - Sanitary Appliance Systems 1:1 B

C

D

E

F

G

H

I

J

K

L

M

N

P

F.0.2.2 Sanitary systems

3

1 : 20

site address

AE.40.15.75.00.2.3-0020 F.0.2.3

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

2

BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0003- S1- P1

2

21-C-57

1 : 20

FL202

1

project ref

originator

3

© Copyright 1985-2018

4

MP U0 40.15.75.00 0003

AE.40.1

drawing no.

3

scale

2 MP.DR-U0-40.15.75.00-0003 A1

sub no.

AE.40.1

2

5.75.00 .2.3 F.0.2.3 -0020

As indicated

5.75.00 .2.3 F.0.2.3 -0030

AE.40.1


A

B

C

D

E

F

G

H

I

J

K

L

M

N

A1

rev P1

P description of revision

Sanitary systems

date 180517

335

1

21-C DESIGNS

3DR-U0-40.15.75.00-0002 1:1

5

drawing no. checked by

6

1:1

title

3DR-U0-40.15.75.00-0001

430 Staines Road West Ashford TW15 1RZ

5

1 : 20

drawn by

UP00.40.15.75.00.1.4 - SANITARY SYSTEMS - 0 Level - F.0.1.4 - Bathroom

1

4

FL202

project ref

923

21-C

originator

3

21-C-184

251

671

251

sub no.

5.75.00 .1.4 F.0.1.4 -0040

scale

4

AE.40.1

AE.40.1

As indicated

2

608

3 MP.DR-U0-40.15.75.00-0002 A1

MP U0 40.15.75.00 0002

5.75.00 .1.4 F.0.1.4 -0020

21-C-57

2

5.75.00 .1.4 F.0.1.4 -0010

AE.40.1

© Copyright 1985-2018

Westcraft Limited Design Office

5

e::

5 UP01 - 1 Level - 16.394

UP01 - 1 Level - 16.394

2775.0

UP01 - 1 Level - 16.394

2775.0

2775.0

FEFW.40 Ss_40_45_70_24 <40.0 mm>

1504 1.504 m

1.4.8

40

SSC.01.ZZ.1200

united kingdom

1.4.6 SPE.SH.06.ZZ.1000

ub5 5hl

200

6

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

220

2775.0

t : : +44(0)20 8935 5856

UP01 - 1 Level - 16.394

164

1.4.7 SPE.SH.03.ZZ.1004

SPE.WB.07.ZZ.1004

1.4.9

1800

middlesex

1.4.3

7

STL.04.ZZ.1030

684

1.4.2

AE.40.15.75.00.1.4-0010 F.0.1.4

northolt UP00 - Ground Level - 13.619

0.0

AE.40.15.75.00.1.4-0020 F.0.1.4

3

1 : 20

UP00 - Ground Level - 13.619

0.0

0.0

AE.40.15.75.00.1.4-0040 F.0.1.4

4

1 : 20

57 summit road

UP00 - Ground Level - 13.619

0.0

1 : 20

9

MT-U0-40.15.75.00-0002 -Sanitary systems F1.4

BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0002- S1- P1

10

11

Room: Number F.0.1.4 F.0.1.4 F.0.1.4 F.0.1.4 F.0.1.4 F.0.1.4 F.0.1.4 F.0.1.4 F.0.1.4

TW15 A

Room: Name BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM

Mark 1.4.1 1.4.2 1.4.3 1.4.4 1.4.5 1.4.6 1.4.7 1.4.8 1.4.9

Type Mark STB.01.ZZ.1030 SWB.06.ZZ.1030 SPE.WB.07.ZZ.1004 STL.01.ZZ.1030 SPE.BT.08.ZZ.1004 SPE.SH.06.ZZ.1000 SPE.SH.03.ZZ.1004 SSC.01.ZZ.1200 STL.04.ZZ.1030

Description Bath tub Cabinet mounted basin Basin wall filler set Wall hung toilet pan with seat Bath wall spout Shower head Bath wall spout Fixed shower screen Cistern unit

x.y.#

Classification.Uniclass.S Classification.Uniclass.Ss. Classification.Uniclass s.Number Description .Pr.Number Ss_40_15_75_05 Ss_40_15_75_94 Ss_40_15_75_94 Ss_40_15_90_97 Ss_40_15_75_05 Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_90_97

Bath systems Wash basin systems Wash basin systems WC systems Bath systems Shower area systems Shower area systems Shower area systems WC systems

Pr_40_20_06_08 Pr_40_20_96_96 Pr_40_20_87_99 Pr_40_20_93_94 Pr_40_20_87_08 Pr_40_20_87_76 Pr_40_20_87_81 Pr_40_20_06_79 Pr_40_20_93_89

Classification.Uniclass.Pr.Description

Manufacturer

Baths Wall-hung wash basins Washbasin thermostatic water supply sets WC pans Bath spouts Shower heads Shower thermostatic water supply sets Shower enclosures WC cisterns

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

40.15.75 - Sanitary Appliance Systems x = space reference y = room number # = equipment mark

STL.01.ZZ.1234[0]

Comments STL STB SWB SST SBD SSC SPE.BT SPE.WB SPE.SH SPE.BD

Hüppe-FI Geberit

Toilet Bathtub Wash basin Shower tray Bidet Screens Plumbing equipment - bath Plumbing equipment - basin Plumbing equipment - shower Plumbing equipment - bidet

STL = appliance name 01 = type ZZ = manufacturer 1 = size requirement 2 = material requirement 3 = colour requirement 4 = finish requirement [0] = no requirements

40.15.75 - KEY - Sanitary Appliance Systems 1:1 B

C

D

E

F

G

H

I

J

K

L

M

N

P

BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0002- S1- P1

UP00 - Ground Level - 13.619

0.0

F.0.1.4 Sanitary systems

1.4.4 STL.01.ZZ.1030

site address

UP00 - Ground Level - 13.619

0.0

1.4.2 SWB.06.ZZ.1030

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

UP00 - Ground Level - 13.619

2

STB.01.ZZ.1030

611

850 458

634 8

1.4.1

1.4.5 SPE.BT.08.ZZ.1004

1038

1200

1300

SWB.06.ZZ.1030


A

B

C

D

E

F

G

H

I

J

K

L

M

N

A1

rev P1

P description of revision Fire planning requirements BC

date 180628

1

21-C DESIGNS

D1.11

MP U1 75.50.28.29 0001

drawing no.

1 : 50

scale checked by title

FD30(S)mins

430 Staines Road West Ashford TW15 1RZ

FD30mins

FD30(S)mins

drawn by

4

D1.9

FL202

D1.8 D1.10

21-C-57

21-C-184

project ref

originator

3

21-C

sub no.

2

Š Copyright 1985-2018

Westcraft Limited Design Office

D1.2

FD30mins

FD30(S)mins

D1.3 FD30(S)mins

D1.7 FD30(S)mins

D1.1

D1.4

FD30(S)mins

FD30mins

D1.12 FD30mins

t : : +44(0)20 8935 5856

e::

5

D1.13

D1.6

middlesex

FD30(S)mins

ub5 5hl

D1.5 FD30mins

6

united kingdom

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

FD30(S)mins

57 summit road

northolt

7

8

60 Min. Fire Sub Compartment Wall

Class B

Flammable liquids

30 Min. Fire Sub Compartment Wall

Class C

Flammable gases

AOV protected area

Class D

Flammable metals

Dry Riser

Not Classified Electrical Fires

20 Min. Fire Rating

Class F

Cooking oils and fats

FD30SC 30 Min. Fire Rating. Fire Door with Smoke Seal FD60SC 60 Min. Fire Rating. Fire Door with Smoke Seal

Cooking areas - residential - Class F Risk General protected lobby Internal protected lobby

Mains connected sensors

FIRE SUPRESSION

Sprinkler head

Class A

Water, Foam, Dry Powder, Wet Chemical

Final Exit

Class B

Foam, Dry powder, CO2 Gas

Class C

Dry powder M28/L2 Special powders

Exit point

Sleeping areas - residential - Class A Risk 0.3 m 0.3 m

Risk Exit point

Class D

Direction of Escape

Electrical fires Non conducting dry powder, CO2

Dwelling Escape Distances

Class F

Wet chemical

General Escape Distances

BS1192 2007 : 21-C-184-21-C-TW15-U1-.P-M-0001- S1- P1

10

1

11

75.50.28.29 - KEY - Fire plan

UP01.75.50.28.29 - FIRE SYSTEMS - 1 Level 1 : 50

TW15 A

B

C

D

E

F

G

H

I

J

K

L

M

N

P

BS1192 2007 : 21-C-184-21-C-TW15-U1-.P-M-0001- S1- P1

Combustible materials (wood, paper, fabric, refuse)

Fire Planning

AOV protected area

Class A

Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

9

120 Min. Fire Compartment Wall

site address

FD20

FIRE TYPE CLASSIFICATION Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

75.50.28.29


A

B

C

D

E

F

G

H

I

J

K

L

M

N

A1

rev P1

P description of revision Fire planning requirements BC

date 180628

1

MT-U0-40.10.30.30-0001 - Fire Equipment

EFS.[0]02.ZZ.1111

Pr_75_75_30_65 Point smoke detectors

Ss_75_50_28_29 Fire detection and alarm systems

F.0.1.6 ENTRANCE LOBBY

Internal protected lobby

U.0.3

EFS.[0]02.ZZ.1111

Pr_75_75_30_65 Point smoke detectors

Ss_75_50_28_29 Fire detection and alarm systems

F.0.1.5 KITCHEN/LOUNGE/DINER

Cooking areas - residential U.0.4 - Class F Risk

EFS.[0]03.ZZ.1111

Pr_75_75_30_64 Point heat detectors

Ss_75_50_28_29 Fire detection and alarm systems

F.0.2.6 KITCHEN/LOUNGE/DINER

Cooking areas - residential U.0.5 - Class F Risk

EFS.[0]03.ZZ.1111

Pr_75_75_30_64 Point heat detectors

Ss_75_50_28_29 Fire detection and alarm systems

F.0.2.5 BEDROOM2

Sleeping areas - residential U.0.6 - Class A Risk

EFS.[0]05.ZZ.1111

Pr_75_75_30_65 Point smoke detectors

Ss_75_50_28_29 Fire detection and alarm systems

F.0.2.1 BEDROOM1

Sleeping areas - residential U.0.7 - Class A Risk

EFS.[0]05.ZZ.1111

Pr_75_75_30_65 Point smoke detectors

Ss_75_50_28_29 Fire detection and alarm systems

F.0.1.1 BEDROOM2

Sleeping areas - residential U.0.8 - Class A Risk

EFS.[0]05.ZZ.1111

Pr_75_75_30_65 Point smoke detectors

Ss_75_50_28_29 Fire detection and alarm systems

F.0.1.2 BEDROOM1

Sleeping areas - residential U.0.9 - Class A Risk

EFS.[0]05.ZZ.1111

Pr_75_75_30_65 Point smoke detectors

Ss_75_50_28_29 Fire detection and alarm systems

C.0.1

ENTRANCE HALL

General protected lobby

U.0.10

C.0.2

STAIRS

AOV protected area

U.0.11

C.0.1

ENTRANCE HALL

General protected lobby

U.0.12

EFT.[1]04.BO.1111 Pr_75_75_30_50 Manual call points Ss_75_50_28_29 Fire detection and alarm systems EFT.[1]04.BO.1111 Pr_75_75_30_50 Manual call points Ss_75_50_28_29 Fire detection and alarm systems EFA.[0]01.BO.1110 Pr_75_75_30_30 Fire alarm Ss_75_50_28_29 Fire detection and alarm sounders systems

=

1000

=

400

U.0.10 EFT.[1]04.BO.1111

=

=

1000

U.0.9 EFS.[0]05.ZZ.1111

=

=

U.0.1 EFS.[0]02.ZZ.1111

900

5

U.0.11 EFT.[1]04.BO.1111

U.0.2 EFT.[0]02.BO.0111

U.0.4 EFE.[0]01.ZZ.0110 U.0.5 EFE.[0]04.ZZ.0110

6 U.0.3 EFT.[0]02.BO.0111 U.0.3 EFS.[0]02.ZZ.1111

U.0.2 EFS.[0]02.ZZ.1111

=

=

=

=

1200

=

900 =

=

2100

=

U.0.5 :: SSD15.1

U.0.3 :: SSD15.1

=

=

U.0.6 EFS.[0]05.ZZ.1111

7

=

50 13

506

=

U.0.4 EFS.[0]03.ZZ.1111

U.0.7 :: SSD15.1

=

U.0.5 EFS.[0]03.ZZ.1111

1200

=

=

=

1800

8

=

=

=

= U.0.8 :: SSD15.1

=

=

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

9

BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0002- S1- P1

10

1

11

UP00.75.50.28.29 - FIRE SYSTEMS - CEILING PLAN - 0 Level - Ground Level 1 : 50

TW15 A

B

C

D

21-C

originator

© Copyright 1985-2018

Addressable unit to be installed btween 1800-2200mm above finished floor level

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

U.0.4 :: SSD15.1

Addressable unit to be installed btween 900-1100mm above finished floor level

E

F

G

H

I

J

K

L

M

N

P

BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0002- S1- P1

500

=

1000 4

Fire Systems

=

U.0.2 :: SSD15.1 U.0.8 EFS.[0]05.ZZ.1111

e::

U.0.2

=

500

t : : +44(0)20 8935 5856

Internal protected lobby

= U.0.7 EFS.[0]05.ZZ.1111

united kingdom

F.0.2.7 ENTRANCE LOBBY

Optical Beam Smoke sensors are used to provide “wide area” smoke detection. These shall be used in situations where it is either impractical, inappropriate or not cost effective (installation, wiring and maintenance) to use traditional point-type detectors. Optical Beam Smoke Detectors are also ideally suited for situations that might include high ceilings, dusty and dirty environments, or environments that experience temperature extremes. General applications are in commercial environments eg. Atriums, Conference / Exhibition Centres, Shopping Malls, Historic Buildings etc. Residential applications are for high atriums or vaulted ceilings where access is difficult. Optical Beam Smoke sensors are used to provide “wide area” smoke detection. These shall be used in situations where it is either impractical, inappropriate or not cost effective (installation, wiring and maintenance) to use traditional point-type detectors. Optical Beam Smoke Detectors are also ideally suited for situations that might include high ceilings, dusty and dirty environments, or environments that experience temperature extremes. General applications are in commercial environments eg. Atriums, Conference / Exhibition Centres, Shopping Malls, Historic Buildings etc. Residential applications are for high atriums or vaulted ceilings where access is difficult. Optical Beam Smoke sensors are used to provide “wide area” smoke detection. These shall be used in situations where it is either impractical, inappropriate or not cost effective (installation, wiring and maintenance) to use traditional point-type detectors. Optical Beam Smoke Detectors are also ideally suited for situations that might include high ceilings, dusty and dirty environments, or environments that experience temperature extremes. General applications are in commercial environments eg. Atriums, Conference / Exhibition Centres, Shopping Malls, Historic Buildings etc. Residential applications are for high atriums or vaulted ceilings where access is difficult. Heat sensors shall be shall be mains powered with a backup rechargeable lithium battery. Heat detectors shall be used in applications where smoke detectors are unsuitable. Commercial applications shall be subject to full fire engineering and design. The residential applications of the heat sensors shall be use in accordance with recommendations from BS 5839: Part 6: 2004 - heat sensors should be used in the kitchens, appliance rooms; utility rooms and in the main living room. Heat Sensors should not be installed in the circulation spaces or areas. Heat sensors shall be shall be mains powered with a backup rechargeable lithium battery. Heat detectors shall be used in applications where smoke detectors are unsuitable. Commercial applications shall be subject to full fire engineering and design. The residential applications of the heat sensors shall be use in accordance with recommendations from BS 5839: Part 6: 2004 - heat sensors should be used in the kitchens, appliance rooms; utility rooms and in the main living room. Heat Sensors should not be installed in the circulation spaces or areas. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Addressable unit to be installed btween 900-1100mm above finished floor level

ub5 5hl

Ss_75_50_28_29 Fire detection and alarm systems

middlesex

Pr_75_75_30_65 Point smoke detectors

northolt

EFS.[0]02.ZZ.1111

57 summit road

U.0.1

checked by

General protected lobby

title

ENTRANCE HALL

U.0.1 :: SSD15.1

_nnl_SS.01_System usage

21-C-184

C.0.1

Classification.Unic Classification.Unic Classification.Unic Classification.Uniclass.Ss. lass.Pr.Number lass.Pr.Description lass.Ss.Number Description

site address

U.0.12 EFA.[0]01.BO.1110

Type Mark

430 Staines Road West Ashford TW15 1RZ

=

600

Mark

project ref

=

Room: Name

FL202

=

U.0.6 :: SSD15.1

Room: _nnl_75_50_28_29.01 Space category

drawn by

=

Room: Number

MP U0 75.50.28.29 0002

Fire signage systems Fire signage systems Portable fire extinguisher systems Portable fire extinguisher systems Fire signage systems

MT-U0-75.50.28.29-0001 - Fire Devices & Sensors

=

=

Ss_40_10_30_30 Ss_40_10_30_30 Ss_55_30_65_65 Ss_55_30_65_65 Ss_40_10_30_30

drawing no.

Fire escape route signs Fire escape route signs Water fire extinguishers Carbon dioxide fire extinguishers Fire escape route signs

Westcraft Limited Design Office

1 : 50

Pr_40_10_77_32 Pr_40_10_77_32 Pr_40_50_28_96 Pr_40_50_28_11 Pr_40_10_77_32

Classification.Uniclass.Ss.Description

sub no.

EFT.[0]01.BO.0111 EFT.[0]02.BO.0111 EFE.[0]01.ZZ.0110 EFE.[0]04.ZZ.0110 EFT.[0]02.BO.0111

Classification.Uniclass.Pr.Description

U.0.1 EFT.[0]01.BO.0111

=

3

U.0.1 U.0.2 U.0.4 U.0.5 U.0.3

Type Mark

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

=

2

ENTRANCE HALL STAIRS STAIRS STAIRS STAIRS

Mark

21-C DESIGNS

scale

C.0.1 C.0.2 C.0.2 C.0.2 C.0.2

Room: Name

Classification.Uniclas s.Ss.Number

21-C-57

Room: Number

Classification.Unic lass.Pr.Number


A

B

C

D

E

F

G

H

I

J

K

L

M

N

A1

rev P1

P description of revision Fire planning requirements BC

date 180628

1

21-C DESIGNS

D0.3 FD30(S)mins

D0.2

Š Copyright 1985-2018

drawing no.

1 : 50

project ref

D0.9 FD30(S)mins

scale

D0.10 FD30mins

21-C-184

originator

3

21-C

sub no.

2

M DR.P U0 75.50.28.29 0001

Westcraft Limited Design Office

checked by

430 Staines Road West Ashford TW15 1RZ

title

drawn by

FD30(S)mins

FL202

D0.4

4 D0.8

21-C-57

FD30(S)mins

FD30(S)mins

D0.1 FD30(S)mins

D0.5 FD30mins

UP

D0.11 FD30mins

t : : +44(0)20 8935 5856

e::

5

D0.6

D0.7 FD30(S)mins

D0.12 FD30(S)mins

D0.13

middlesex

FD30(S)mins

ub5 5hl

6

united kingdom

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

FD30mins

57 summit road

northolt

7

75.50.28.29

9

FD20

60 Min. Fire Sub Compartment Wall

Class B

Flammable liquids

30 Min. Fire Sub Compartment Wall

Class C

Flammable gases

AOV protected area

Class D

Flammable metals

Dry Riser

Not Classified Electrical Fires

20 Min. Fire Rating

Class F

Combustible materials (wood, paper, fabric, refuse)

Cooking oils and fats

Class A

Water, Foam, Dry Powder, Wet Chemical

Final Exit

Class B

Foam, Dry powder, CO2 Gas

Class C

Dry powder M28/L2 Special powders

Sleeping areas - residential - Class A Risk

0.3 m 0.3 m

UP00.75.50.28.29 - FIRE SYSTEMS - 0 Level - Ground

Risk Exit point

Class D

Direction of Escape

Electrical fires Non conducting dry powder, CO2

Dwelling Escape Distances

Class F

Wet chemical

General Escape Distances

75.50.28.29 - KEY - Fire plan

1 : 50

TW15 A

B

C

D

E

F

G

H

I

J

K

L

M

N

P

BS1192 2007 : 21-C-184-21-C-TW15-U0-DR.P-M-0001- S1- P1

Sprinkler head

Fire Planning

FIRE SUPRESSION

site address

Mains connected sensors

Exit point

Internal protected lobby BS1192 2007 : 21-C-184-21-C-TW15-U0-DR.P-M-0001- S1- P1

Class A

Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

General protected lobby

11

120 Min. Fire Compartment Wall

FD60SC 60 Min. Fire Rating. Fire Door with Smoke Seal

Cooking areas - residential - Class F Risk

1

FIRE TYPE CLASSIFICATION

FD30SC 30 Min. Fire Rating. Fire Door with Smoke Seal

AOV protected area

10

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

8


A

B

C

D

E

F

G

H

I

J

K

L

M

N

A1

rev P1

P description of revision Fire planning requirements BC

date 180628

1

21-C DESIGNS

Carbon dioxide fire extinguishers Water fire extinguishers Fire escape route signs Fire escape route signs Fire escape route signs

Ss_55_30_65_65 Ss_55_30_65_65 Ss_40_10_30_30 Ss_40_10_30_30 Ss_40_10_30_30

Classification.Uniclass.Ss.Description Portable fire extinguisher systems Portable fire extinguisher systems Fire signage systems Fire signage systems Fire signage systems

= 1100

General protected lobby

U.2.2

EFA.[0]01.BO.1110

Pr_75_75_30_30 Fire alarm sounders

F.2.6.4 LOUNGE/KITCHEN/DINER

Cooking areas - residential U.2.7 - Class F Risk

EFS.[0]03.ZZ.1111

Pr_75_75_30_64 Point heat detectors

F.2.5.5 KITCHEN/LOUNGE/DINER

Cooking areas - residential U.2.6 - Class F Risk

EFS.[0]03.ZZ.1111

Pr_75_75_30_64 Point heat detectors

F.2.6.2 BEDROOM1

Sleeping areas - residential U.2.10 - Class A Risk

EFS.[0]05.ZZ.1111

Pr_75_75_30_65 Point smoke detectors Ss_75_50_28_29 Fire detection and alarm systems

F.2.6.1 BEDROOM2

Sleeping areas - residential U.2.11 - Class A Risk

EFS.[0]05.ZZ.1111

Pr_75_75_30_65 Point smoke detectors Ss_75_50_28_29 Fire detection and alarm systems

F.2.5.1 BEDROOM2

Sleeping areas - residential U.2.3 - Class A Risk

EFS.[0]05.ZZ.1111

Pr_75_75_30_65 Point smoke detectors Ss_75_50_28_29 Fire detection and alarm systems

F.2.5.2 BEDROOM1

Sleeping areas - residential U.2.4 - Class A Risk

EFS.[0]05.ZZ.1111

Pr_75_75_30_65 Point smoke detectors Ss_75_50_28_29 Fire detection and alarm systems

F.2.5.6 ENTRANCE LOBBY

Internal protected lobby

U.2.5

EFS.[0]02.ZZ.1111

Pr_75_75_30_65 Point smoke detectors Ss_75_50_28_29 Fire detection and alarm systems

F.2.6.6 ENTRANCE LOBBY

Internal protected lobby

U.2.8

EFS.[0]02.ZZ.1111

Pr_75_75_30_65 Point smoke detectors Ss_75_50_28_29 Fire detection and alarm systems

1600

1800

U.2.8 EFS.[0]02.ZZ.1111 U.2.1 EFT.[0]01.BO.0111

=

U.2.6 :: SSD15.1

200

=

U.2.5 EFS.[0]02.ZZ.1111

U.2.7 EFS.[0]03.ZZ.1111

3350

Ss_75_50_28_29 Fire detection and alarm systems

U.2.3 EFT.[0]02.BO.0111

1200

7

3500

2100

2000

U.2.2 EFT.[0]02.BO.0111

U.2.6 EFS.[0]03.ZZ.1111

U.2.5 :: SSD15.1

1800

8

BS1192 2007 : 21-C-184-21-C-TW15-U2-.P-M-0002- S1- P1

10

1

11

UP02.75.50.28.29 - FIRE SYSTEMS - CEILING PLAN - 2 Level 1 : 50

TW15 A

B

C

D

E

F

G

H

I

J

K

L

M

N

21-C-57

drawn by Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

9

e::

LANDING 2 LEVEL

t : : +44(0)20 8935 5856

C.2.1

Addressable unit to be installed btween900-1100mm above finished floor level Addressable unit to be installed btween1800-2100mm above finished floor level Heat sensors shall be shall be mains powered with a backup rechargeable lithium battery. Heat detectors shall be used in applications where smoke detectors are unsuitable. Commercial applications shall be subject to full fire engineering and design. The residential applications of the heat sensors shall be use in accordance with recommendations from BS 5839: Part 6: 2004 - heat sensors should be used in the kitchens, appliance rooms; utility rooms and in the main living room. Heat Sensors should not be installed in the circulation spaces or areas. Heat sensors shall be shall be mains powered with a backup rechargeable lithium battery. Heat detectors shall be used in applications where smoke detectors are unsuitable. Commercial applications shall be subject to full fire engineering and design. The residential applications of the heat sensors shall be use in accordance with recommendations from BS 5839: Part 6: 2004 - heat sensors should be used in the kitchens, appliance rooms; utility rooms and in the main living room. Heat Sensors should not be installed in the circulation spaces or areas. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (optical type) shall be mains powered with a backup rechargeable lithium battery. The optical smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used in escape or circulation routes and in areas where there is danger of ignition of furniture and surroundings by cigarettes producing slow, smouldering fires. Smoke sensor (optical type) shall be mains powered with a backup rechargeable lithium battery. The optical smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used in escape or circulation routes and in areas where there is danger of ignition of furniture and surroundings by cigarettes producing slow, smouldering fires.

united kingdom

Ss_75_50_28_29 Fire detection and alarm systems Ss_75_50_28_29 Fire detection and alarm systems Ss_75_50_28_29 Fire detection and alarm systems

ub5 5hl

Pr_75_75_30_50 Manual call points

middlesex

EFT.[1]04.BO.1111

U.2.5 EFE.[0]04.ZZ.0110

=

1800 6

U.2.1

northolt

=

General protected lobby

1350

U.2.4 EFE.[0]01.ZZ.0110

5

LANDING 2 LEVEL

57 summit road

U.2.3 EFS.[0]05.ZZ.1111

U.2.4 :: SSD15.1

C.2.1

_nnl_SS.01_System usage

P

BS1192 2007 : 21-C-184-21-C-TW15-U2-.P-M-0002- S1- P1

U.2.4 EFS.[0]05.ZZ.1111

500

500

500

Classification.Unic Classification.Uniclass. Classification.Unic Classification.Uniclass.Ss.Desc lass.Pr.Number Pr.Description lass.Ss.Number ription

Fire Systems

500

Type Mark

checked by

1350

U.2.3 :: SSD15.1

900

U.2.1 EFT.[1]04.BO.1111

Mark

title

900

Room: Name

430 Staines Road West Ashford TW15 1RZ

U.2.2 EFA.[0]01.BO.1110

=

Room: _nnl_75_50_28_29.01 Space category

FL202

U.2.10 EFS.[0]05.ZZ.1111

Room: Number

=

400

= =

=

350

4

U.2.11 EFS.[0]05.ZZ.1111

site address

U.2.2 :: SSD15.1

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

=

U.2.1 :: SSD15.1

MT-U2-75.50.28.29-0001 - Fire Devices & Sensors

500

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

=

drawing no.

Pr_40_50_28_11 Pr_40_50_28_96 Pr_40_10_77_32 Pr_40_10_77_32 Pr_40_10_77_32

Classification.Uniclas s.Ss.Number

1 : 50

EFE.[0]04.ZZ.0110 EFE.[0]01.ZZ.0110 EFT.[0]01.BO.0111 EFT.[0]02.BO.0111 EFT.[0]02.BO.0111

Classification.Uniclass.Pr.Description

21-C

U.2.5 U.2.4 U.2.1 U.2.2 U.2.3

Classification.Unic lass.Pr.Number

21-C-184

LANDING 2 LEVEL LANDING 2 LEVEL LANDING 2 LEVEL STAIRS STAIRS

Type Mark

project ref

3

Mark

sub no.

C.2.1 C.2.1 C.2.1 C.2.2 C.2.2

Room: Name

originator

Room: Number

scale

MT-U2-40.10.30.30-0001 - Fire Equipment

MP U2 75.50.28.29 0002

2

Š Copyright 1985-2018

Westcraft Limited Design Office


A

B

C

D

E

F

G

H

I

J

K

L

M

N

A1

rev P1

P description of revision Fire planning requirements BC

date 180628

1

21-C DESIGNS

MP U2 75.50.28.29 0001

drawing no.

1 : 50

scale

21-C-57

checked by title

21-C-184 430 Staines Road West Ashford TW15 1RZ

drawn by

4

FL202

project ref

originator

3

21-C

sub no.

2

Š Copyright 1985-2018

Westcraft Limited Design Office

D2.10 FD30mins

D2.9

D2.8

FD30(S)mins

FD30(S)mins

D2.2 FD30(S)mins

D2.3

D2.7

5

FD30(S)mins

e::

FD30(S)mins

D2.4

D2.1

t : : +44(0)20 8935 5856

FD30mins

FD30(S)mins

D2.12 FD30mins

6

D2.5 FD30mins

ub5 5hl

D2.13 FD30(S)mins

united kingdom

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

UP

D2.6

middlesex

FD30(S)mins

57 summit road

northolt

7

75.50.28.29

9

FD20

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

8

FIRE TYPE CLASSIFICATION

120 Min. Fire Compartment Wall

Class A

Combustible materials (wood, paper, fabric, refuse)

60 Min. Fire Sub Compartment Wall

Class B

Flammable liquids

30 Min. Fire Sub Compartment Wall

Class C

Flammable gases

AOV protected area

Class D

Flammable metals

Dry Riser

Not Classified Electrical Fires

20 Min. Fire Rating

Class F

Cooking oils and fats

BS1192 2007 : 21-C-184-21-C-TW15-U2-.P-M-0001- S1- P1

0.3 m 0.3 m

Sleeping areas - residential - Class A Risk

1

11

Class A

Water, Foam, Dry Powder, Wet Chemical

Final Exit

Class B

Foam, Dry powder, CO2 Gas

Exit point

Internal protected lobby

10

Sprinkler head

Class C

Dry powder M28/L2 Special powders

Risk Exit point

Class D

Direction of Escape

Electrical fires Non conducting dry powder, CO2

Dwelling Escape Distances

Class F

Wet chemical

General Escape Distances

UP02.75.50.28.29 - FIRE SYSTEMS - 2 Level

75.50.28.29 - KEY - Fire plan

1 : 50

1 : 50

TW15 A

B

C

D

E

F

G

H

I

J

K

L

M

N

P

BS1192 2007 : 21-C-184-21-C-TW15-U2-.P-M-0001- S1- P1

General protected lobby

FIRE SUPRESSION

Fire Planning

Cooking areas - residential - Class F Risk

Mains connected sensors

site address

FD60SC 60 Min. Fire Rating. Fire Door with Smoke Seal

AOV protected area

Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

FD30SC 30 Min. Fire Rating. Fire Door with Smoke Seal


A

B

C

D

E

F

G

H

I

J

K

L

M

N

A1

rev

P description of revision

date

1

MT-U1-40.10.30.30-0001 - Fire Equipment

Carbon dioxide fire extinguishers Water fire extinguishers Fire escape route signs Fire escape route signs

Classification.Uniclas s.Ss.Number Ss_55_30_65_65 Ss_55_30_65_65 Ss_40_10_30_30 Ss_40_10_30_30

Classification.Uniclass.Ss.Description

21-C DESIGNS Westcraft Limited Design Office

Portable fire extinguisher systems Portable fire extinguisher systems Fire signage systems Fire signage systems

EFT.[1]04.BO.1111

F.1.3.5 KITCHEN/LOUNGE/DINER

Cooking areas - residential U.1.8 - Class F Risk

EFS.[0]03.ZZ.1111

900

= U.1.1 EFA.[0]01.BO.1110

900

F.1.4.4 KITCHEN/LOUNGE/DINER

Cooking areas - residential U.1.9 - Class F Risk

EFS.[0]03.ZZ.1111

Pr_75_75_30_64 Point heat detectors

Ss_75_50_28_29 Fire detection and alarm systems

F.1.4.2 BEDROOM2

Sleeping areas - residential U.1.3 - Class A Risk

EFS.[0]05.ZZ.1111

Pr_75_75_30_65 Point smoke detectors

Ss_75_50_28_29 Fire detection and alarm systems

F.1.4.1 BEDROOM1

Sleeping areas - residential U.1.4 - Class A Risk

EFS.[0]05.ZZ.1111

Pr_75_75_30_65 Point smoke detectors

Ss_75_50_28_29 Fire detection and alarm systems

F.1.3.1 BEDROOM2

Sleeping areas - residential U.1.5 - Class A Risk

EFS.[0]05.ZZ.1111

Pr_75_75_30_65 Point smoke detectors

Ss_75_50_28_29 Fire detection and alarm systems

F.1.3.2 BEDROOM1

Sleeping areas - residential U.1.6 - Class A Risk

EFS.[0]05.ZZ.1111

Pr_75_75_30_65 Point smoke detectors

Ss_75_50_28_29 Fire detection and alarm systems

F.1.3.6 ENTRANCE LOBBY

Internal protected lobby

U.1.7

EFS.[0]02.ZZ.1111

Pr_75_75_30_65 Point smoke detectors

Ss_75_50_28_29 Fire detection and alarm systems

F.1.4.6 ENTRANCE LOBBY

Internal protected lobby

U.1.10

EFS.[0]02.ZZ.1111

Pr_75_75_30_65 Point smoke detectors

Ss_75_50_28_29 Fire detection and alarm systems

1500 U.1.6 EFS.[0]05.ZZ.1111

1500

900

U.1.3 EFE.[0]04.ZZ.0110 U.1.4 EFE.[0]01.ZZ.0110

= U.1.2 EFT.[0]01.BO.0111

U.1.10 EFS.[0]02.ZZ.1111

2000

=

=

U.1.1 EFT.[0]02.BO.0111

=

=

=

U.1.8 :: SSD15.1 U.1.7 EFS.[0]02.ZZ.1111

=

=

=

2000

6

1500

= =

=

=

=

U.1.7 :: SSD15.1

=

7

=

=

sub no.

=

U.1.6 :: SSD15.1

=

northolt

U.1.8 EFS.[0]03.ZZ.1111

e::

U.1.2

t : : +44(0)20 8935 5856

General protected lobby

united kingdom

LANDING 1 LEVEL

ub5 5hl

C.1.1

Addressable unit to be installed btween1800-2100mm above finished floor level Addressable unit to be installed btween 900-1100mm above finished floor level Heat sensors shall be shall be mains powered with a backup rechargeable lithium battery. Heat detectors shall be used in applications where smoke detectors are unsuitable. Commercial applications shall be subject to full fire engineering and design. The residential applications of the heat sensors shall be use in accordance with recommendations from BS 5839: Part 6: 2004 - heat sensors should be used in the kitchens, appliance rooms; utility rooms and in the main living room. Heat Sensors should not be installed in the circulation spaces or areas. Heat sensors shall be shall be mains powered with a backup rechargeable lithium battery. Heat detectors shall be used in applications where smoke detectors are unsuitable. Commercial applications shall be subject to full fire engineering and design. The residential applications of the heat sensors shall be use in accordance with recommendations from BS 5839: Part 6: 2004 - heat sensors should be used in the kitchens, appliance rooms; utility rooms and in the main living room. Heat Sensors should not be installed in the circulation spaces or areas. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (optical type) shall be mains powered with a backup rechargeable lithium battery. The optical smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used in escape or circulation routes and in areas where there is danger of ignition of furniture and surroundings by cigarettes producing slow, smouldering fires. Smoke sensor (optical type) shall be mains powered with a backup rechargeable lithium battery. The optical smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used in escape or circulation routes and in areas where there is danger of ignition of furniture and surroundings by cigarettes producing slow, smouldering fires.

middlesex

825

U.1.5 EFS.[0]05.ZZ.1111

=

=

U.1.3 EFS.[0]05.ZZ.1111

1500

Pr_75_75_30_30 Fire alarm Ss_75_50_28_29 Fire detection and alarm sounders systems Pr_75_75_30_50 Manual call points Ss_75_50_28_29 Fire detection and alarm systems Pr_75_75_30_64 Point heat Ss_75_50_28_29 Fire detection and alarm detectors systems

checked by

EFA.[0]01.BO.1110

title

U.1.1

21-C

General protected lobby

=

=

=

LANDING 1 LEVEL

U.1.4 :: SSD15.1

U.1.2 EFT.[1]04.BO.1111

U.1.9 EFS.[0]03.ZZ.1111

=

U.1.3 :: SSD15.1

C.1.1

_nnl_SS.01_System usage

21-C-184

=

=

900

U.1.4 EFS.[0]05.ZZ.1111

825

4

5

=

=

Classification.Unic Classification.Unic Classification.Unic Classification.Uniclass.Ss.Desc lass.Pr.Number lass.Pr.Description lass.Ss.Number ription

430 Staines Road West Ashford TW15 1RZ

= U.1.2 :: SSD15.1

U.1.1 :: SSD15.1

Type Mark

originator

= =

Mark

project ref

=

3

Room: Name

FL202

=

Room: _nnl_75_50_28_29.01 Space category

drawn by

Room: Number

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

=

=

MT-U1-75.50.28.29-0001 - Fire Devices & Sensors

Š Copyright 1985-2018

Pr_40_50_28_11 Pr_40_50_28_96 Pr_40_10_77_32 Pr_40_10_77_32

Classification.Uniclass.Pr.Description

MP U1 75.50.28.29 0001

EFE.[0]04.ZZ.0110 EFE.[0]01.ZZ.0110 EFT.[0]01.BO.0111 EFT.[0]02.BO.0111

Classification.Unic lass.Pr.Number

drawing no.

U.1.3 U.1.4 U.1.2 U.1.1

Type Mark

1 : 50

2

LANDING 1 LEVEL LANDING 1 LEVEL LANDING 1 LEVEL STAIRS

Mark

scale

C.1.1 C.1.1 C.1.1 C.1.2

Room: Name

21-C-57

Room: Number

U.1.5 :: SSD15.1

=

57 summit road

=

1

11

UP01.75.50.28.29 - FIRE SYSTEMS - CEILING PLAN - 1 Level 1 : 50

TW15 A

B

C

D

E

F

G

H

I

J

K

L

M

N

P

BS1192 2007 : 21-C-184-21-C-TW15-U1-.P-M-0001- S1-

BS1192 2007 : 21-C-184-21-C-TW15-U1-.P-M-0001- S1-

10

Fire Systems

Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

9

site address

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

=

8


A

B

C

D

E

F

G

H

I

J

K

L

M

N

A1

rev P1

P description of revision Fire planning requirements BC

date 180628

MT-00-55.30.96.23-0001 - Sprinkler system Classification.Uniclass.Pr. Classification.Unic Classification.Unic Classification.Uniclass.Ss.Descri Number lass.Pr.Description lass.Ss.Number ption

SSD15.1

Pr_70_55_97_84

Sprinkler heads

Ss_55_30_96_23 Domestic sprinkler systems

F.0.1.5

KITCHEN/LOUNGE/DINER Cooking areas - residential - Class F Risk U.0.4

SSD15.1

Pr_70_55_97_84

Sprinkler heads

Ss_55_30_96_23 Domestic sprinkler systems

F.0.2.6

KITCHEN/LOUNGE/DINER Cooking areas - residential - Class F Risk U.0.5

SSD15.1

Pr_70_55_97_84

Sprinkler heads

Ss_55_30_96_23 Domestic sprinkler systems

F.0.2.1

BEDROOM1

Sleeping areas - residential - Class A Risk U.0.6

SSD15.1

Pr_70_55_97_84

Sprinkler heads

Ss_55_30_96_23 Domestic sprinkler systems

F.0.2.6

KITCHEN/LOUNGE/DINER Cooking areas - residential - Class F Risk U.0.8

SSD15.1

Pr_70_55_97_84

Sprinkler heads

Ss_55_30_96_23 Domestic sprinkler systems

F.1.4.2

BEDROOM2

Sleeping areas - residential - Class A Risk U.1.1

SSD15.1

Pr_70_55_97_84

Sprinkler heads

Ss_55_30_96_23 Domestic sprinkler systems

F.1.4.1

BEDROOM1

Sleeping areas - residential - Class A Risk U.1.2

SSD15.1

Pr_70_55_97_84

Sprinkler heads

Ss_55_30_96_23 Domestic sprinkler systems

F.1.3.1

BEDROOM2

Sleeping areas - residential - Class A Risk U.1.3

SSD15.1

Pr_70_55_97_84

Sprinkler heads

Ss_55_30_96_23 Domestic sprinkler systems

F.1.3.2

BEDROOM1

Sleeping areas - residential - Class A Risk U.1.4

SSD15.1

Pr_70_55_97_84

Sprinkler heads

Ss_55_30_96_23 Domestic sprinkler systems

F.1.3.5

KITCHEN/LOUNGE/DINER Cooking areas - residential - Class F Risk U.1.5

SSD15.1

Pr_70_55_97_84

Sprinkler heads

Ss_55_30_96_23 Domestic sprinkler systems

F.1.4.4

KITCHEN/LOUNGE/DINER Cooking areas - residential - Class F Risk U.1.8

SSD15.1

Pr_70_55_97_84

Sprinkler heads

Ss_55_30_96_23 Domestic sprinkler systems

F.1.4.4

KITCHEN/LOUNGE/DINER Cooking areas - residential - Class F Risk U.1.7

SSD15.1

Pr_70_55_97_84

Sprinkler heads

Ss_55_30_96_23 Domestic sprinkler systems

F.1.3.5

KITCHEN/LOUNGE/DINER Cooking areas - residential - Class F Risk U.1.6

SSD15.1

Pr_70_55_97_84

Sprinkler heads

Ss_55_30_96_23 Domestic sprinkler systems

F.2.5.5

KITCHEN/LOUNGE/DINER Cooking areas - residential - Class F Risk U.2.5

SSD15.1

Pr_70_55_97_84

Sprinkler heads

Ss_55_30_96_23 Domestic sprinkler systems

F.2.6.4

LOUNGE/KITCHEN/DINER Cooking areas - residential - Class F Risk U.2.6

SSD15.1

Pr_70_55_97_84

Sprinkler heads

Ss_55_30_96_23 Domestic sprinkler systems

F.2.6.2

BEDROOM1

Sleeping areas - residential - Class A Risk U.2.1

SSD15.1

Pr_70_55_97_84

Sprinkler heads

Ss_55_30_96_23 Domestic sprinkler systems

F.2.6.1

BEDROOM2

Sleeping areas - residential - Class A Risk U.2.2

SSD15.1

Pr_70_55_97_84

Sprinkler heads

Ss_55_30_96_23 Domestic sprinkler systems

F.2.5.1

BEDROOM2

Sleeping areas - residential - Class A Risk U.2.3

SSD15.1

Pr_70_55_97_84

Sprinkler heads

Ss_55_30_96_23 Domestic sprinkler systems

F.2.5.2

BEDROOM1

Sleeping areas - residential - Class A Risk U.2.4

SSD15.1

Pr_70_55_97_84

Sprinkler heads

Ss_55_30_96_23 Domestic sprinkler systems

3

4

5

6

7

8

9

BS1192 2007 : 21-C-184-21-C-TW15-00-SH.T-M-0001- S1- P1

10

11

TW15 A

B

C

D

E

F

G

H

I

Š Copyright 1985-2018

Sleeping areas - residential - Class A Risk U.0.7

e::

BEDROOM2

t : : +44(0)20 8935 5856

F.0.2.5

united kingdom

Ss_55_30_96_23 Domestic sprinkler systems

ub5 5hl

Sprinkler heads

middlesex

Pr_70_55_97_84

northolt

SSD15.1

57 summit road

KITCHEN/LOUNGE/DINER Cooking areas - residential - Class F Risk U.0.3

Westcraft Limited Design Office

J

K

L

M

N

P

BS1192 2007 : 21-C-184-21-C-TW15-00-SH.T-M-0001- S1- P1

F.0.1.5

21-C DESIGNS

M SH.T 00 55.30.96.23 0001

Ss_55_30_96_23 Domestic sprinkler systems

Sprinkler schedule

Sprinkler heads

drawing no.

Pr_70_55_97_84

scale

SSD15.1

21-C-57

Sleeping areas - residential - Class A Risk U.0.2

checked by

BEDROOM1

title

F.0.1.2

The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442.

21-C

Ss_55_30_96_23 Domestic sprinkler systems

21-C-184

Sprinkler heads

430 Staines Road West Ashford TW15 1RZ

Pr_70_55_97_84

sub no.

SSD15.1

originator

Sleeping areas - residential - Class A Risk U.0.1

project ref

BEDROOM2

FL202

F.0.1.1

_nnl_SS.01_System usage

drawn by

Type Mark

site address

Mark

Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

Room: _nnl_75_50_28_29.01 - Space category

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

2

Room: Name

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

1

Room: Number


A

B

C

D

E

F

G

H

I

J

K

L

M

A1

rev P1

Lighting Systems

date 180517

EQ

L0.32

EQ

L0.13

500

EQ

EQ

L0.38

866

L0.18

L0.56

L0.19

1121

EQ

EQ

900

EQ

EQ

L0.17

500

EQ

746 L0.20

500 L0.21

900

EQ 1100

899

L0.58

750

L0.59

EQ

L0.69

1987

750

L0.22

747

EQ

EQ

750

747

EQ

L0.77

6

2000

500

EQ

EQ

L0.57

L0.60

L0.23

EQ

1350

EQ

L0.70

L0.71 L0.72

L0.61

L0.24

EQ

L0.62

L0.25

L0.78

EQ

EQ

7

L0.63 L0.73 L0.64

L0.74

EQ

EQ

L0.26

750

L0.27

EQ

1300 L0.65

EQ

L0.66

8

L0.28

EQ

L0.29 L0.68

EQ

L0.67

L0.30

750

L0.31

750

EQ

1670

750 1625

L0.37

9

750

L0.36

10

UP00.70.80.33 - LIGHTING SYSTEMS - Ground Level

1

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W

BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1

F.0.1.2 F.0.1.2 F.0.1.2 F.0.1.2 F.0.1.2 F.0.1.2

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W 12 W 12 W

ENSUITE ENSUITE ENSUITE ENSUITE

F.0.1.3 F.0.1.3 F.0.1.3 F.0.1.3

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W

BATHROOM BATHROOM BATHROOM BATHROOM

F.0.1.4 F.0.1.4 F.0.1.4 F.0.1.4

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W

KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER

F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W

ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY

F.0.1.6 F.0.1.6 F.0.1.6

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights

Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm

12 W 12 W 12 W

BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1

F.0.2.1 F.0.2.1 F.0.2.1 F.0.2.1 F.0.2.1 F.0.2.1

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W 12 W 12 W

ENSUITE ENSUITE ENSUITE ENSUITE

F.0.2.2 F.0.2.2 F.0.2.2 F.0.2.2

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W

BATHROOM BATHROOM BATHROOM BATHROOM

F.0.2.3 F.0.2.3 F.0.2.3 F.0.2.3

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W

STORE

F.0.2.4

Pr_70_70_48_24

Downlights

Ss_70_80_33_35 Hard-wired general lighting systems

1800 lm

12 W

BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2

F.0.2.5 F.0.2.5 F.0.2.5 F.0.2.5 F.0.2.5 F.0.2.5

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W 12 W 12 W

KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER

F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W

ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY

F.0.2.7 F.0.2.7 F.0.2.7 F.0.2.7

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W

1 : 50

TW15 A

B

C

D

E

F

G

H

I

J

K

L

© Copyright 1985-2018

Downlights Downlights Downlights Downlights

EP U0 70.80.33.00 0001

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

drawing no.

F.0.1.1 F.0.1.1 F.0.1.1 F.0.1.1

e::

L0.14

380

L0.16

BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2

t : : +44(0)20 8935 5856

EQ

600

EQ

5

L0.55

6W 6W

united kingdom

385 L0.53

390

607 L0.52

600

385

658

916

L0.12

880 lm 880 lm

ub5 5hl

L0.11

Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems

middlesex

EQ

1938

390

EQ

L0.51

EQ

EQ

L0.50

Surface luminaires Surface luminaires

northolt

L0.15

L0.54

Pr_70_70_48_85 Pr_70_70_48_85

57 summit road

1000

C.0.2 C.0.2

M

N

P

BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-E-0001- S1- P1

EQ

L0.49

450

L0.76

EQ

EQ

L0.47

4

L0.10

1190

822

L0.9

STAIRS STAIRS

Lighting Systems - 0 Level

EQ

L0.34

L0.46

6W 6W

1 : 50

352

L0.8

880 lm 880 lm

scale

L0.7

1087

EQ 450

790 L0.45

EQ

L0.3

Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems

21-C-57

L0.4

L0.44

Surface luminaires Surface luminaires

checked by

EQ

L0.43

Pr_70_70_48_85 Pr_70_70_48_85

title

3

C.0.1 C.0.1

Westcraft Limited Design Office

21-C

1350 EQ

L0.6

ENTRANCE HALL ENTRANCE HALL

21-C DESIGNS

21-C-184

750

L0.5

6W 6W 6W 12 W 12 W 12 W 6W

430 Staines Road West Ashford TW15 1RZ

1350

880 lm 880 lm 880 lm 1783 lm 1783 lm 1783 lm 880 lm

sub no.

EQ

590

L0.2

L0.33

L0.42

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

Comments

originator

450

L0.1

L0.41

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Wattage

project ref

EQ

1000

Surface luminaires Surface luminaires Surface luminaires Hazardous area luminaires Hazardous area luminaires Hazardous area luminaires Surface luminaires

Luminous Flux

FL202

750

L0.40

Pr_70_70_48_85 Pr_70_70_48_85 Pr_70_70_48_85 Pr_70_70_48_36 Pr_70_70_48_36 Pr_70_70_48_36 Pr_70_70_48_85

Classification.Uniclass.Ss.Description

drawn by

EQ

748

L0.39

Classification.Unicl Classification.Uniclass.Pr.Descri Classification.Unic ass.Pr.Number ption lass.Ss.Number

site address

L0.35

1300

L0.75

Room: Number

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

750

1498

L0.35 ELF1.1 L0.36 ELF1.1 L0.37 ELF1.1 L0.75 ELF2.3 L0.76 ELF2.3 L0.77 ELF2.3 L0.78 ELF1.1 C.0.1 L0.33 ELF1.1 L0.34 ELF1.1 C.0.2 L0.32 ELF1.1 L0.38 ELF1.1 F.0.1.1 L0.1 ELF1.0 L0.2 ELF1.0 L0.3 ELF1.0 L0.4 ELF1.0 F.0.1.2 L0.5 ELF1.0 L0.6 ELF1.0 L0.7 ELF1.0 L0.8 ELF1.0 L0.9 ELF1.0 L0.10 ELF1.0 F.0.1.3 L0.11 ELF1.0 L0.12 ELF1.0 L0.13 ELF1.0 L0.14 ELF1.0 F.0.1.4 L0.18 ELF1.0 L0.19 ELF1.0 L0.20 ELF1.0 L0.21 ELF1.0 F.0.1.5 L0.22 ELF1.0 L0.23 ELF1.0 L0.24 ELF1.0 L0.25 ELF1.0 L0.26 ELF1.0 L0.27 ELF1.0 L0.28 ELF1.0 L0.29 ELF1.0 L0.30 ELF1.0 L0.31 ELF1.0 F.0.1.6 L0.15 ELF1.0 L0.16 ELF1.0 L0.17 ELF1.0 F.0.2.1 L0.39 ELF1.0 L0.40 ELF1.0 L0.41 ELF1.0 L0.42 ELF1.0 L0.43 ELF1.0 L0.44 ELF1.0 F.0.2.2 L0.45 ELF1.0 L0.46 ELF1.0 L0.47 ELF1.0 L0.49 ELF1.0 F.0.2.3 L0.50 ELF1.0 L0.51 ELF1.0 L0.52 ELF1.0 L0.53 ELF1.0 F.0.2.4 L0.56 ELF1.0 F.0.2.5 L0.69 ELF1.0 L0.70 ELF1.0 L0.71 ELF1.0 L0.72 ELF1.0 L0.73 ELF1.0 L0.74 ELF1.0 F.0.2.6 L0.59 ELF1.0 L0.60 ELF1.0 L0.61 ELF1.0 L0.62 ELF1.0 L0.63 ELF1.0 L0.64 ELF1.0 L0.65 ELF1.0 L0.66 ELF1.0 L0.67 ELF1.0 L0.68 ELF1.0 F.0.2.7 L0.54 ELF1.0 L0.55 ELF1.0 L0.57 ELF1.0 L0.58 ELF1.0 Grand total: 77

Room: Name

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

2

Type Mark

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

Mark

BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-E-0001- S1- P1

P description of revision

ET-U0-70.80.33.00-0001 - Lighting systems

1

11

N


A

B

C

D

E

F

G

H

I

J

K

L

M

N

A1

rev P3 P2 P1

P description of revision Fire planning requirements BC Electrical systems Lighting Systems

date 180628 180628 180517

1

21-C DESIGNS

600

U0.37

Room: Name

Description

Classification.Unicla ss.Pr.Number

Classification.Uniclass.Pr.Description

Classification.Uniclas s.Ss.Number

Classification.Uniclass.Ss.Description

Comments

U0.7

600 U0.9 EPO.[2]01.ZZ.1110

U0.51 ELS.[1]01.ZZ.1110

5 U0.44 ELS.[1]01.ZZ.1110

2800

800

U0.31 EPO.[2]01.ZZ.1110

900 U0.32 EPO.[2]01.ZZ.1110

U0.20

U0.16

EPO.[2]01.ZZ.1110

6

EPO.[2]01.ZZ.1110

U0.21

U0.27

U0.17

EPO.[2]01.ZZ.1110

EPO.[2]01.ZZ.1110

U0.49

EPO.[2]01.ZZ.1110

U0.19

ELS.[1]01.ZZ.1110

U0.15

EPO.[2]01.ZZ.1110

EPO.[2]01.ZZ.1110

U0.22 EPO.[2]01.ZZ.1110

U0.45

U0.18

U0.54

ELS.[1]01.ZZ.1110

EPO.[2]01.ZZ.1110

EPS.[4]01.ZZ.1110

U0.56 EPS.[4]01.ZZ.1110

U0.30

U0.55 U0.48

EPO.[2]01.ZZ.1110

U0.57

EPS.[4]01.ZZ.1110

EPS.[4]01.ZZ.1110

3600

ELS.[1]01.ZZ.1110

U0.26

7

U0.12

EPO.[2]01.ZZ.1110

EPO.[2]01.ZZ.1110

U0.28

U0.23

EPO.[2]01.ZZ.1110

EPO.[2]01.ZZ.1110

2500

U0.11 EPO.[2]01.ZZ.1110

U0.29

800

900

EPO.[2]01.ZZ.1110

U0.13

4000

EPO.[2]01.ZZ.1110

4000

5000

4000

8

U0.25 EPO.[2]01.ZZ.1110

U0.24 EPO.[2]01.ZZ.1110

3000

804

U0.10 EPO.[2]01.ZZ.1110

800

U0.14

800

EPO.[2]01.ZZ.1110

800

U0.47 ELS.[1]01.ZZ.1110

9

U0.46 ELS.[1]01.ZZ.1110

ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL SWITCH - SINGLE LIGHT SWITCH

Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_60_70_48_48

Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Low voltage switches

Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_80_33_35

Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired general lighting systems

F.0.1.2 F.0.1.2 F.0.1.2 F.0.1.2 F.0.1.2 F.0.1.2

BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1

ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH

Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_60_70_48_48 Pr_60_70_48_48

Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Low voltage switches Low voltage switches

Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired general lighting systems Hard-wired general lighting systems

F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5

KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER

ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH Quad fused switch spur with illuminating indicator Quad fused switch spur with illuminating indicator

Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_46 Pr_60_70_48_46

Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Low voltage switches Low voltage switches Low voltage switch-disconnector fuses Low voltage switch-disconnector fuses

Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_30_80_35 Ss_70_30_80_35

Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired voltage small power systems Hard-wired voltage small power systems

F.0.1.6 F.0.1.6 F.0.1.6 F.0.1.6

ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY

ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH

Pr_65_72_97_84 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48

Standard socket outlets Low voltage switches Low voltage switches Low voltage switches

Ss_70_30_80_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired voltage small power systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

F.0.2.1 F.0.2.1 F.0.2.1 F.0.2.1 F.0.2.1 F.0.2.1

BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1

ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH

Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_60_70_48_48 Pr_60_70_48_48

Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Low voltage switches Low voltage switches

Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired general lighting systems Hard-wired general lighting systems

F.0.2.4 STORE F.0.2.4 STORE

ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED

Pr_65_72_97_84 Pr_65_72_97_84

Standard socket outlets Standard socket outlets

Ss_70_30_80_35 Ss_70_30_80_35

Hard-wired voltage small power systems Hard-wired voltage small power systems

F.0.2.5 F.0.2.5 F.0.2.5 F.0.2.5 F.0.2.5

BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2

ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL SWITCH - SINGLE LIGHT SWITCH

Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_60_70_48_48

Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Low voltage switches

Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_80_33_35

Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired general lighting systems

F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6

KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER

ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH Quad fused switch spur with illuminating indicator Quad fused switch spur with illuminating indicator

Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_46 Pr_60_70_48_46

Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Low voltage switches Low voltage switches Low voltage switch-disconnector fuses Low voltage switch-disconnector fuses

Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_30_80_35 Ss_70_30_80_35

Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired voltage small power systems Hard-wired voltage small power systems

F.0.2.7 F.0.2.7 F.0.2.7 F.0.2.7

ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY

ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH

Pr_65_72_97_84 Pr_65_72_97_84 Pr_60_70_48_48 Pr_60_70_48_48

Standard socket outlets Standard socket outlets Low voltage switches Low voltage switches

Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired general lighting systems Hard-wired general lighting systems

70.30.80 - Electrical Systems

BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-E-0001- S1- P3

10

UP00.70.30.80 - ELECTRICAL SYSTEMS - Ground Level

1

11

x.y.# EPO.01.ZZ.1111[0]

1 : 50

EPO EPS ESO EPI EMU EPU

TW15 A

Power outlet Spur switch Spur outlet Isolator Meter unit Panel

x = space reference y = room number # = equipment mark EPO = equipment name 01 = type ZZ = manufacturer 1 = load requirement 1 = material requirement 1 = colour requirement 1 = finish requirement [0] = no requirements

70.30.80 - KEY - ELECTRICAL SYSTEMS B

C

D

E

F

G

H

I

J

K

L

M

21-C

BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2

e::

ELS.[1]04.ZZ.1110

F.0.1.1 F.0.1.1 F.0.1.1 F.0.1.1 F.0.1.1

t : : +44(0)20 8935 5856

U0.58 U0.33 EPO.[2]01.ZZ.1110

Hard-wired general lighting systems

united kingdom

ELS.[1]01.ZZ.1110

U0.50 ELS.[1]01.ZZ.1110

Ss_70_80_33_35

ub5 5hl

U0.41

Time switches

middlesex

ELS.[1]01.ZZ.1110

Pr_75_51_17_89

northolt

U0.42 ELS.[1]01.ZZ.1110

Single Time Switch

57 summit road

4

STAIRS

checked by

U0.8 EPO.[2]01.ZZ.1110

U0.40

C.0.2

title

ELS.[1]01.ZZ.1110

Hard-wired general lighting systems

21-C-184

600

U0.43

U0.34 EPO.[2]01.ZZ.1110

Ss_70_80_33_35

430 Staines Road West Ashford TW15 1RZ

U0.39 ELS.[1]01.ZZ.1110

Time switches

project ref

EPO.[2]01.ZZ.1110

ELS.[1]01.ZZ.1110

Pr_75_51_17_89

FL202

U0.53

EPO.[2]01.ZZ.1110

EPO.[2]01.ZZ.1110

Single Time Switch

drawn by

U0.52 ELS.[1]01.ZZ.1110

U0.4

U0.2

ENTRANCE HALL

N

P

site address

U0.6

EPO.[2]01.ZZ.1110

C.0.1

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

3800

U0.35

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

C.0.1 U0.59 ELS.[1]04.ZZ.1110 C.0.2 U0.58 ELS.[1]04.ZZ.1110 F.0.1.1 U0.1 EPO.[2]01.ZZ.1110 U0.2 EPO.[2]01.ZZ.1110 U0.3 EPO.[2]01.ZZ.1110 U0.4 EPO.[2]01.ZZ.1110 U0.39 ELS.[1]01.ZZ.1110 F.0.1.2 U0.5 EPO.[2]01.ZZ.1110 U0.6 EPO.[2]01.ZZ.1110 U0.7 EPO.[2]01.ZZ.1110 U0.8 EPO.[2]01.ZZ.1110 U0.40 ELS.[1]01.ZZ.1110 U0.41 ELS.[1]01.ZZ.1110 F.0.1.5 U0.10 EPO.[2]01.ZZ.1110 U0.11 EPO.[2]01.ZZ.1110 U0.12 EPO.[2]01.ZZ.1110 U0.13 EPO.[2]01.ZZ.1110 U0.14 EPO.[2]01.ZZ.1110 U0.15 EPO.[2]01.ZZ.1110 U0.16 EPO.[2]01.ZZ.1110 U0.17 EPO.[2]01.ZZ.1110 U0.18 EPO.[2]01.ZZ.1110 U0.45 ELS.[1]01.ZZ.1110 U0.46 ELS.[1]01.ZZ.1110 U0.56 EPS.[4]01.ZZ.1110 U0.57 EPS.[4]01.ZZ.1110 F.0.1.6 U0.9 EPO.[2]01.ZZ.1110 U0.42 ELS.[1]01.ZZ.1110 U0.43 ELS.[1]01.ZZ.1110 U0.44 ELS.[1]01.ZZ.1110 F.0.2.1 U0.35 EPO.[2]01.ZZ.1110 U0.36 EPO.[2]01.ZZ.1110 U0.37 EPO.[2]01.ZZ.1110 U0.38 EPO.[2]01.ZZ.1110 U0.52 ELS.[1]01.ZZ.1110 U0.53 ELS.[1]01.ZZ.1110 F.0.2.4 U0.31 EPO.[2]01.ZZ.1110 U0.32 EPO.[2]01.ZZ.1110 F.0.2.5 U0.27 EPO.[2]01.ZZ.1110 U0.28 EPO.[2]01.ZZ.1110 U0.29 EPO.[2]01.ZZ.1110 U0.30 EPO.[2]01.ZZ.1110 U0.49 ELS.[1]01.ZZ.1110 F.0.2.6 U0.19 EPO.[2]01.ZZ.1110 U0.20 EPO.[2]01.ZZ.1110 U0.21 EPO.[2]01.ZZ.1110 U0.22 EPO.[2]01.ZZ.1110 U0.23 EPO.[2]01.ZZ.1110 U0.24 EPO.[2]01.ZZ.1110 U0.25 EPO.[2]01.ZZ.1110 U0.26 EPO.[2]01.ZZ.1110 U0.47 ELS.[1]01.ZZ.1110 U0.48 ELS.[1]01.ZZ.1110 U0.54 EPS.[4]01.ZZ.1110 U0.55 EPS.[4]01.ZZ.1110 F.0.2.7 U0.33 EPO.[2]01.ZZ.1110 U0.34 EPO.[2]01.ZZ.1110 U0.50 ELS.[1]01.ZZ.1110 U0.51 ELS.[1]01.ZZ.1110 Grand total: 59

U0.38 EPO.[2]01.ZZ.1110

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

3

originator

EPO.[2]01.ZZ.1110

Electrical Systems

Room: Number

Type Mark

drawing no.

2300

2200

2534

Mark

sub no.

EPO.[2]01.ZZ.1110

EPO.[2]01.ZZ.1110

ET-U0-70.30.80.00-0001 - Electrical System

1000

U0.5

U0.3

scale

U0.1 EPO.[2]01.ZZ.1110

As indicated

675 600

3000

600

3000

U0.59 ELS.[1]04.ZZ.1110

21-C-57

U0.36 EPO.[2]01.ZZ.1110

EP U0 70.30.80.00 0001

EPO.[2]01.ZZ.1110

BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-E-0001- S1- P3

2

© Copyright 1985-2018

600

Westcraft Limited Design Office


A

B

C

D

E

F

G

H

I

J

K

L

M

N

A1

rev P3 P2 P1

P description of revision

Fire information - BC01 Electrical systems Lighting Systems

date 180710 180628 180517

1

21-C DESIGNS

5

U2.10 EPO.[2]01.ZZ.1110

EPO.[2]01.ZZ.1110

U2.27 EPO.[2]01.ZZ.1110

U2.53 EPS.[4]01.ZZ.1110

U2.26 EPO.[2]01.ZZ.1110

U2.31 EPO.[2]01.ZZ.1110

U2.1 ELS.[1]04.ZZ.1110

800

U2.54 EPS.[4]01.ZZ.1110

U2.46

1000

ELS.[1]01.ZZ.1110

U2.11

EQ

EPO.[2]01.ZZ.1110

EQ U2.30

U2.45 ELS.[1]01.ZZ.1110

U2.43 ELS.[1]01.ZZ.1110

EPO.[2]01.ZZ.1110

6

U2.24

U2.25

EQ

EPO.[2]01.ZZ.1110

EQ

EPO.[2]01.ZZ.1110

U2.13

1600

EPO.[2]01.ZZ.1110

U2.20 EPO.[2]01.ZZ.1110

U2.14 EPO.[2]01.ZZ.1110

U2.12 EPO.[2]01.ZZ.1110

U2.44

U2.15

ELS.[1]01.ZZ.1110

EPO.[2]01.ZZ.1110

U2.51

3500

7 U2.22

EPS.[4]01.ZZ.1110

U2.23

EPO.[2]01.ZZ.1110

U2.52

EPO.[2]01.ZZ.1110

EPS.[4]01.ZZ.1110

850

U2.19

750

1200

EPO.[2]01.ZZ.1110

EQ

EQ

EQ

U2.21 EPO.[2]01.ZZ.1110

U2.18

EQ

EPO.[2]01.ZZ.1110

U2.16 EPO.[2]01.ZZ.1110

EQ

500

8

U2.17

EQ

EPO.[2]01.ZZ.1110

9

EPO EPS ESO EPI EMU EPU

TW15 A

Power outlet Spur switch Spur outlet Isolator Meter unit Panel

EPO = equipment name 01 = type ZZ = manufacturer 1 = load requirement 1 = material requirement 1 = colour requirement 1 = finish requirement [0] = no requirements

70.30.80 - KEY - ELECTRICAL SYSTEMS 1:1 B

C

D

E

F

G

H

I

J

K

L

M

N

P

EP U2 70.30.80.00 0001

drawing no.

BS1192 2007 : 21-C-184-21-C-TW15-U2-.P-E-0001- S1- P3

x.y.# EPO.01.ZZ.1111[0]

x = space reference y = room number # = equipment mark

Electrical Systems

BS1192 2007 : 21-C-184-21-C-TW15-U2-.P-E-0001- S1- P3

10

site address

1 : 50

70.30.80 - Electrical Systems

11

scale

UP02.70.30.80 - ELECTRICAL SYSTEMS - 2 Level Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

1

21-C-57 e::

U2.28

EPO.[2]01.ZZ.1110

t : : +44(0)20 8935 5856

U2.41 ELS.[1]01.ZZ.1110

U2.29

Hard-wired general lighting systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems

united kingdom

U2.42 ELS.[1]01.ZZ.1110

Ss_70_80_33_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35

ub5 5hl

U2.40 ELS.[1]01.ZZ.1110

Time switches Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switch-disconnector fuses Low voltage switch-disconnector fuses Low voltage switch-disconnector fuses Low voltage switch-disconnector fuses

middlesex

ELS.[1]01.ZZ.1110

Pr_75_51_17_89 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_46 Pr_60_70_48_46 Pr_60_70_48_46 Pr_60_70_48_46

northolt

U2.39 ELS.[1]01.ZZ.1110

U2.47

Single Time Switch ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH Quad fused switch spur with illuminating indicator Quad fused switch spur with illuminating indicator Quad fused switch spur with illuminating indicator Quad fused switch spur with illuminating indicator

57 summit road

EPO.[2]01.ZZ.1110

2500

EPO.[2]01.ZZ.1110

EPO.[2]01.ZZ.1110

ELS.[1]04.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 EPS.[4]01.ZZ.1110 EPS.[4]01.ZZ.1110 EPS.[4]01.ZZ.1110 EPS.[4]01.ZZ.1110

checked by

U2.7

U2.5

U2.3

Comments

title

U2.9 EPO.[2]01.ZZ.1110

U2.49

Classification.Uniclass.Ss.Description

430 Staines Road West Ashford TW15 1RZ

U2.1 U2.2 U2.3 U2.4 U2.5 U2.6 U2.7 U2.8 U2.9 U2.10 U2.11 U2.12 U2.13 U2.14 U2.15 U2.16 U2.17 U2.18 U2.19 U2.20 U2.21 U2.22 U2.23 U2.24 U2.25 U2.26 U2.27 U2.28 U2.29 U2.30 U2.31 U2.32 U2.33 U2.34 U2.35 U2.36 U2.37 U2.38 U2.39 U2.40 U2.41 U2.42 U2.43 U2.44 U2.45 U2.46 U2.47 U2.48 U2.49 U2.50 U2.51 U2.52 U2.53 U2.54

EPO.[2]01.ZZ.1110

ELS.[1]01.ZZ.1110

ELS.[1]01.ZZ.1110

Classification.Uniclas s.Ss.Number

FL202

4

STAIRS BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 ENTRANCE LOBBY KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER ENTRANCE LOBBY BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM1 BEDROOM1 ENTRANCE LOBBY ENTRANCE LOBBY KITCHEN/LOUNGE/DINER LOUNGE/KITCHEN/DINER ENTRANCE LOBBY ENTRANCE LOBBY BEDROOM1 BEDROOM1 BEDROOM2 KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER

Classification.Uniclass.Pr.Description

drawn by

U2.48

C.2.2 F.2.5.1 F.2.5.1 F.2.5.1 F.2.5.1 F.2.5.2 F.2.5.2 F.2.5.2 F.2.5.2 F.2.5.2 F.2.5.6 F.2.5.5 F.2.5.5 F.2.5.5 F.2.5.5 F.2.5.5 F.2.5.5 F.2.5.5 F.2.5.5 F.2.5.5 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.6 F.2.6.2 F.2.6.2 F.2.6.2 F.2.6.2 F.2.6.1 F.2.6.1 F.2.6.1 F.2.5.1 F.2.5.2 F.2.5.2 F.2.5.6 F.2.5.6 F.2.5.5 F.2.6.4 F.2.6.6 F.2.6.6 F.2.6.2 F.2.6.2 F.2.6.1 F.2.5.5 F.2.5.5 F.2.6.4 F.2.6.4

Classification.Unicla ss.Pr.Number

Description

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

U2.6

ELS.[1]01.ZZ.1110

EPO.[2]01.ZZ.1110

Room: Name

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

U2.50

U2.32

Room: Number

EPO.[2]01.ZZ.1110

1320

1500

2060

EPO.[2]01.ZZ.1110

EPO.[2]01.ZZ.1110

Type Mark

U2.8

620

EPO.[2]01.ZZ.1110

U2.37 U2.35

U2.4

600

EPO.[2]01.ZZ.1110

Mark

EQ

400

U2.2

As indicated

EQ

500

U2.38 EPO.[2]01.ZZ.1110

project ref

ET-U2-70.30.80.00-0001 - Electrical System 800

1700

2300

U2.36 EPO.[2]01.ZZ.1110

21-C-184

500

U2.34 EPO.[2]01.ZZ.1110

1400

U2.33 EPO.[2]01.ZZ.1110

21-C

300

3

originator

500

sub no.

2

© Copyright 1985-2018

Westcraft Limited Design Office


A

B

C

D

E

F

G

H

I

J

K

L

M

N

A1

rev P3 P2 P1

P description of revision

Fire information - BC01 Fire planning requirements BC Electrical systems

date 180710 180628 180628

1

21-C DESIGNS

EPO.[2]01.ZZ.1110

U1.29

EPO.[2]01.ZZ.1110

600

U1.33

U1.32

EPO.[2]01.ZZ.1110

ET-U1-70.30.80.00-0001 - Electrical System

U1.54

Mark

ELS.[1]01.ZZ.1110

U1.53

Type Mark

Room: Number

Room: Name

F.1.3.1 F.1.3.1 F.1.3.1 F.1.3.1 F.1.3.2 F.1.3.2 F.1.3.2 F.1.3.2 F.1.3.6 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.2 F.1.4.2 F.1.4.2 F.1.4.2 F.1.4.1 F.1.4.1 F.1.4.1 F.1.4.1 F.1.4.6 F.1.3.5 F.1.3.5 F.1.4.4 F.1.4.4 F.1.3.1 F.1.3.2 F.1.3.2 F.1.3.6 F.1.3.5 F.1.3.5 F.1.3.5 F.1.4.4 F.1.4.6 F.1.4.6 F.1.4.6 F.1.4.2 F.1.4.1 F.1.4.2 C.1.2

BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 ENTRANCE LOBBY KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 ENTRANCE LOBBY KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER BEDROOM2 BEDROOM1 BEDROOM1 ENTRANCE LOBBY KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY BEDROOM2 BEDROOM1 BEDROOM2 STAIRS

Classification.Unicla ss.Pr.Number

Description

Classification.Uniclass.Pr.Description

Classification.Uniclas s.Ss.Number

Classification.Uniclass.Ss.Description

Comments

ELS.[1]01.ZZ.1110

U1.37

U1.22

EPO.[2]01.ZZ.1110

U1.56

EPO.[2]01.ZZ.1110

ELS.[1]04.ZZ.1110

EPS.[4]01.ZZ.1110

450

U1.40

ELS.[1]01.ZZ.1110

1000

U1.50

U1.41 EPS.[4]01.ZZ.1110

U1.9 EPO.[2]01.ZZ.1110

U1.24 EPO.[2]01.ZZ.1110

5

U1.49

2650

ELS.[1]01.ZZ.1110

U1.23

6

U1.28

550

U1.25

U1.47

2400

1200

550

EPO.[2]01.ZZ.1110

ELS.[1]01.ZZ.1110

U1.11

U1.14

EPO.[2]01.ZZ.1110

EPO.[2]01.ZZ.1110

U1.46

EPO.[2]01.ZZ.1110

U1.10

U1.12 EPO.[2]01.ZZ.1110

EPO.[2]01.ZZ.1110

ELS.[1]01.ZZ.1110

EPO.[2]01.ZZ.1110

U1.13 EPO.[2]01.ZZ.1110

U1.15 EPO.[2]01.ZZ.1110

U1.38 EPS.[4]01.ZZ.1110

U1.39 EPS.[4]01.ZZ.1110

7 U1.27

U1.16 EPO.[2]01.ZZ.1110

750

U1.26 EPO.[2]01.ZZ.1110

550

750

EPO.[2]01.ZZ.1110

U1.18

EQ U1.48

EPO.[2]01.ZZ.1110

U1.17

EQ

EPO.[2]01.ZZ.1110

750

ELS.[1]01.ZZ.1110

8

project ref

e::

U1.19 EPO.[2]01.ZZ.1110

9

BS1192 2007 : 21-C-184-21-C-TW15-U1-.P-E-0001- S1- P3

10

x.y.# EPO.01.ZZ.1111[0] EPO EPS ESO EPI EMU EPU 11

TW15 A

Power outlet Spur switch Spur outlet Isolator Meter unit Panel

x = space reference y = room number # = equipment mark EPO = equipment name 01 = type ZZ = manufacturer 1 = load requirement 1 = material requirement 1 = colour requirement 1 = finish requirement [0] = no requirements

70.30.80 - KEY - ELECTRICAL SYSTEMS B

C

D

E

F

G

H

I

J

K

L

M

N

P

BS1192 2007 : 21-C-184-21-C-TW15-U1-.P-E-0001- S1- P3

70.30.80 - Electrical Systems

Electrical Systems

1 : 50

site address

UP01.70.30.80 - ELECTRICAL SYSTEMS - 1 Level Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

1

t : : +44(0)20 8935 5856

ELS.[1]01.ZZ.1110

united kingdom

U1.51

U1.21 EPO.[2]01.ZZ.1110

ub5 5hl

U1.20 EPO.[2]01.ZZ.1110

middlesex

U1.44 ELS.[1]01.ZZ.1110

Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

northolt

4

Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

57 summit road

U1.45 ELS.[1]01.ZZ.1110

Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Low voltage switch-disconnector fuses Low voltage switch-disconnector fuses Low voltage switch-disconnector fuses Low voltage switch-disconnector fuses Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Time switches

checked by

ELS.[1]01.ZZ.1110

Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_60_70_48_46 Pr_60_70_48_46 Pr_60_70_48_46 Pr_60_70_48_46 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_75_51_17_89

title

EPO.[2]01.ZZ.1110

ELS.[1]01.ZZ.1110

ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED Quad fused switch spur with illuminating indicator Quad fused switch spur with illuminating indicator Quad fused switch spur with illuminating indicator Quad fused switch spur with illuminating indicator ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH Single Time Switch

430 Staines Road West Ashford TW15 1RZ

U1.8 U1.43

U1.52

EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPS.[4]01.ZZ.1110 EPS.[4]01.ZZ.1110 EPS.[4]01.ZZ.1110 EPS.[4]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]04.ZZ.1110

FL202

U1.42 ELS.[1]01.ZZ.1110

U1.1 U1.2 U1.3 U1.4 U1.5 U1.6 U1.7 U1.8 U1.9 U1.10 U1.11 U1.12 U1.13 U1.14 U1.15 U1.16 U1.17 U1.18 U1.19 U1.20 U1.21 U1.22 U1.23 U1.24 U1.25 U1.26 U1.27 U1.28 U1.29 U1.30 U1.31 U1.32 U1.33 U1.34 U1.35 U1.36 U1.37 U1.38 U1.39 U1.40 U1.41 U1.42 U1.43 U1.44 U1.45 U1.46 U1.47 U1.48 U1.49 U1.50 U1.51 U1.52 U1.53 U1.54 U1.55 U1.56

drawn by

EPO.[2]01.ZZ.1110

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

U1.7

U1.55 ELS.[1]01.ZZ.1110

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

U1.1 EPO.[2]01.ZZ.1110

21-C-184

EPO.[2]01.ZZ.1110

originator

U1.35

EPO.[2]01.ZZ.1110

3450

3

U1.30

21-C

EPO.[2]01.ZZ.1110

EPO.[2]01.ZZ.1110

drawing no.

U1.31

sub no.

U1.34

U1.6

3000

2875

3000

EPO.[2]01.ZZ.1110

scale

754

U1.5 EPO.[2]01.ZZ.1110

U1.3

As indicated

U1.2 EPO.[2]01.ZZ.1110

21-C-57

600

2700

750

2700

2700

3000

U1.36 EPO.[2]01.ZZ.1110

EP U1 70.30.80.00 0001

EPO.[2]01.ZZ.1110

600

2

© Copyright 1985-2018

350

500

750

Westcraft Limited Design Office


A

B

C

D

E

F

G

H

I

J

K

L

M

N

A1

rev P3 P2 P1

P description of revision

Fire information - BC01 Fire planning requirements BC Lighting Systems

date 180710 180628 180517

1

21-C DESIGNS

L2.13

EQ

770 L2.40

L2.29 L2.31

EQ

L2.43

L2.14

EQ

900

EQ

EQ

L2.7

L2.36

315

EQ

EQ

1096

EQ

L2.15

L2.32 L2.8

EQ

350

5

350

EQ

EQ

EQ

400

L2.28

L2.30

L2.16 L2.45

L2.33

L2.44

EQ

L2.41

220

1400

6

550

141

EQ EQ

L2.34

EQ

EQ

EQ

EQ EQ EQ

L2.35

L2.12

741

L2.11 L2.10

EQ

EQ

912

L2.9 L2.17

7

8

6W 6W

BEDROOM2 BEDROOM2 BEDROOM2

F.2.5.1 F.2.5.1 F.2.5.1

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights

Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm

12 W 12 W 12 W

BEDROOM1 BEDROOM1

F.2.5.2 F.2.5.2

Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights

Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems

1800 lm 1800 lm

12 W 12 W

ENSUITE ENSUITE ENSUITE

F.2.5.3 F.2.5.3 F.2.5.3

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_85

Downlights Downlights Surface luminaires

Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems

1800 lm 1800 lm 3000 lm

12 W 12 W 10 W

BATHROOM BATHROOM BATHROOM BATHROOM

F.2.5.4 F.2.5.4 F.2.5.4 F.2.5.4

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_85 Pr_70_70_48_85

Downlights Downlights Surface luminaires Surface luminaires

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 3000 lm 3000 lm

12 W 12 W 10 W 10 W

KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER

F.2.5.5 F.2.5.5 F.2.5.5 F.2.5.5 F.2.5.5

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W 12 W

ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY

F.2.5.6 F.2.5.6 F.2.5.6

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights

Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm

12 W 12 W 12 W

BEDROOM2 BEDROOM2 BEDROOM2

F.2.6.1 F.2.6.1 F.2.6.1

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights

Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm

12 W 12 W 12 W

BEDROOM1 BEDROOM1 BEDROOM1

F.2.6.2 F.2.6.2 F.2.6.2

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights

Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm

12 W 12 W 12 W

ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE

F.2.6.3 F.2.6.3 F.2.6.3 F.2.6.3 F.2.6.3

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_85 Pr_70_70_48_71 Pr_70_70_48_71

Downlights Downlights Surface luminaires Recessed luminaires Recessed luminaires

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 3000 lm 450 lm 450 lm

12 W 12 W 10 W 3W 3W

LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER

F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W 12 W 12 W

BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM

F.2.6.5 F.2.6.5 F.2.6.5 F.2.6.5 F.2.6.5

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_85

Downlights Downlights Downlights Downlights Surface luminaires

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm 3000 lm

12 W 12 W 12 W 12 W 10 W

ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY

F.2.6.6 F.2.6.6 F.2.6.6

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights

Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm

12 W 12 W 12 W

9

UP02.70.80.33 - LIGHTING SYSTEMS - 2 Level

1

A

B

C

D

E

F

G

H

I

J

K

L

M

N

sub no.

P

BS1192 2007 : 21-C-184-21-C-TW15-U2-.P-E-0001- S1- P3

Lighting Systems - 2 Level

BS1192 2007 : 21-C-184-21-C-TW15-U2-.P-E-0001- S1- P3

TW15

site address

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

1 : 50

10

11

drawing no.

880 lm 880 lm

1 : 50

Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems

scale

Surface luminaires Surface luminaires

21-C

Pr_70_70_48_85 Pr_70_70_48_85

originator

C.2.2 C.2.2

e::

EQ

605

STAIRS STAIRS

t : : +44(0)20 8935 5856

EQ

EQ

L2.6

6W

united kingdom

900

L2.27

350

EQ

L2.26

400

880 lm

ub5 5hl

EQ

200

550

300

949

Ss_70_80_33_35 Hard-wired general lighting systems

middlesex

L2.39 L2.38

L2.25

L2.46

L2.5

EQ

EQ

597

750

EQ

625

300

L2.37

L2.4

454

Surface luminaires

northolt

L2.3

1040

4 L2.24

650

Pr_70_70_48_85

57 summit road

1040

625

EQ

EQ

650

L2.48 L2.49

600

L2.2

C.2.1

checked by

EQ

L2.23

375

L2.1

527

LANDING 2 LEVEL

Comments

title

L2.20

380

EQ

EQ

EQ

Wattage

21-C-184

186

EQ

L2.19

L2.22

EQ

EQ

L2.18

Luminous Flux

430 Staines Road West Ashford TW15 1RZ

EQ

Classification.Uniclass.Ss.Description

project ref

EQ

L2.21

Classification.Unicl Classification.Uniclass.P Classification.Unic ass.Pr.Number r.Description lass.Ss.Number

FL202

EQ

Room: Number

drawn by

EQ

Room: Name

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

C.2.1 L2.39 ELF1.1 C.2.2 L2.40 ELF1.1 L2.41 ELF1.1 F.2.5.1 L2.1 ELF1.0 L2.2 ELF1.0 L2.3 ELF1.0 F.2.5.2 L2.4 ELF1.0 L2.5 ELF1.0 F.2.5.3 L2.13 ELF1.0 L2.14 ELF1.0 L2.43 ELF1.2 F.2.5.4 L2.15 ELF1.0 L2.16 ELF1.0 L2.44 ELF1.2 L2.45 ELF1.2 F.2.5.5 L2.9 ELF1.0 L2.10 ELF1.0 L2.11 ELF1.0 L2.12 ELF1.0 L2.17 ELF1.0 F.2.5.6 L2.6 ELF1.0 L2.7 ELF1.0 L2.8 ELF1.0 F.2.6.1 L2.18 ELF1.0 L2.19 ELF1.0 L2.20 ELF1.0 F.2.6.2 L2.21 ELF1.0 L2.22 ELF1.0 L2.23 ELF1.0 F.2.6.3 L2.24 ELF1.0 L2.25 ELF1.0 L2.46 ELF1.2 L2.48 ELF1.3 L2.49 ELF1.3 F.2.6.4 L2.30 ELF1.0 L2.31 ELF1.0 L2.32 ELF1.0 L2.33 ELF1.0 L2.34 ELF1.0 L2.35 ELF1.0 F.2.6.5 L2.26 ELF1.0 L2.27 ELF1.0 L2.28 ELF1.0 L2.29 ELF1.0 L2.47 ELF1.2 F.2.6.6 L2.36 ELF1.0 L2.37 ELF1.0 L2.38 ELF1.0 Grand total: 48

3 EQ

Type Mark

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

Mark

21-C-57

ET-U2-70.80.33.00-0001 - Lighting systems

EP U2 70.80.33.00 0001

2

© Copyright 1985-2018

Westcraft Limited Design Office


A

B

C

D

E

F

G

H

I

J

K

L

M

N

A1

rev P1

P description of revision

Lighting Systems

date 180517

1

ET-U1-70.80.33.00-0001 - Lighting systems Room: Name

Room: Number

Classification.Unicl Classification.Uniclass.P Classification.Unic ass.Pr.Number r.Description lass.Ss.Number

Classification.Uniclass.Ss.Description

21-C DESIGNS Luminous Flux

Wattage

Westcraft Limited Design Office

Comments

718 L1.35

L1.18 L1.14

EQ

EQ

5 750

585

L1.75

1284

EQ

L1.74

EQ

L1.21

L1.15

1400

L1.22 L1.37

EQ

L1.69

L1.77

L1.23

675

1500

EQ

L1.76

1284

1309

L1.68

1284

6

450

L1.20

1600

L1.73

741

969

L1.72

900

L1.19

385

L1.36

EQ

350

900

1284

L1.61

EQ

700

L1.62

L1.70

L1.17

EQ

EQ

1542

1000 L1.67

2000

EQ EQ

1309

L1.28

L1.24

1309

1444

EQ

L1.66

7

EQ

L1.29

L1.65

L1.30

L1.25 L1.31

EQ

L1.63

EQ L1.32

1309

750

1444

L1.64

L1.26 L1.33

EQ

EQ

750

L1.27

750

8

L1.38

9

1

UP01.70.80.33 - LIGHTING SYSTEMS - 1 Level 1 : 50

BS1192 2007 : 21-C-184-21-C-TW15-U1-.P-E-0001- S1- P1

10

11

12 W 12 W 12 W 12 W 12 W 12 W

BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1

F.1.3.2 F.1.3.2 F.1.3.2 F.1.3.2 F.1.3.2 F.1.3.2

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W 12 W 12 W

ENSUITE ENSUITE ENSUITE ENSUITE

F.1.3.3 F.1.3.3 F.1.3.3 F.1.3.3

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W

BATHROOM BATHROOM BATHROOM BATHROOM

F.1.3.4 F.1.3.4 F.1.3.4 F.1.3.4

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W

KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER

F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W

ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY

F.1.3.6 F.1.3.6 F.1.3.6

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights

Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm

12 W 12 W 12 W

BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1

F.1.4.1 F.1.4.1 F.1.4.1 F.1.4.1 F.1.4.1 F.1.4.1

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W 12 W 12 W

BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2

F.1.4.2 F.1.4.2 F.1.4.2 F.1.4.2 F.1.4.2 F.1.4.2 F.1.4.2 F.1.4.2

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W

ENSUITE ENSUITE ENSUITE

F.1.4.3 F.1.4.3 F.1.4.3

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights

Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm

12 W 12 W 12 W

KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER

F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W

BATHROOM BATHROOM BATHROOM BATHROOM

F.1.4.5 F.1.4.5 F.1.4.5 F.1.4.5

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights Downlights

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm 1800 lm

12 W 12 W 12 W 12 W

ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY

F.1.4.6 F.1.4.6 F.1.4.6

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

Downlights Downlights Downlights

Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems

1800 lm 1800 lm 1800 lm

12 W 12 W 12 W

TW15 A

B

C

D

E

F

G

H

I

J

K

L

© Copyright 1985-2018

1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm

EP U1 70.80.33.00 0001

Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems

drawing no.

Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35

1 : 50

Downlights Downlights Downlights Downlights Downlights Downlights

scale

Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24

21-C

F.1.3.1 F.1.3.1 F.1.3.1 F.1.3.1 F.1.3.1 F.1.3.1

e::

964

L1.58

EQ L1.71

450

L1.16

BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2

t : : +44(0)20 8935 5856

EQ

915

1284

L1.60

6W 6W 6W

united kingdom

L1.13

880 lm 880 lm 880 lm

ub5 5hl

500

L1.59

1284

900

Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems

middlesex

760

801

750

L1.57

EQ

400

L1.34

Surface luminaires Surface luminaires Surface luminaires

northolt

1597 EQ

200

700

4

Pr_70_70_48_85 Pr_70_70_48_85 Pr_70_70_48_85

57 summit road

750 EQ

C.1.2 C.1.2 C.1.2

M

N

P

BS1192 2007 : 21-C-184-21-C-TW15-U1-.P-E-0001- S1- P1

450 L1.55

STAIRS STAIRS STAIRS

Lighting Systems - 1 Level

919

400

L1.54

L1.12

EQ

EQ

EQ

L1.53 EQ

750

L1.56

EQ 1000

6W

21-C-57

600 EQ

L1.11

880 lm

checked by

L1.6

1575

Ss_70_80_33_35 Hard-wired general lighting systems

title

750

EQ

L1.5

600

EQ

750

EQ

L1.52

Surface luminaires

21-C-184

L1.10

750 1524

400

L1.9

1346

Pr_70_70_48_85

430 Staines Road West Ashford TW15 1RZ

EQ

L1.4

750

L1.48

750

L1.3

L1.41

L1.51

EQ

3

EQ

L1.44

L1.47

EQ

L1.8

C.1.1

originator

L1.7

L1.2

EQ

EQ

L1.50

LANDING 1 LEVEL

project ref

EQ

L1.1 L1.40

6W

FL202

EQ

EQ

EQ

L1.43

L1.46

880 lm

drawn by

L1.39

L1.49

Ss_70_80_33_35 Hard-wired general lighting systems

site address

L1.42

Surface luminaires

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

750

L1.45

Pr_70_70_48_85

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

1374

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

L1.38 ELF1.1 C.1.1 L1.34 ELF1.1 C.1.2 L1.35 ELF1.1 L1.36 ELF1.1 L1.37 ELF1.1 F.1.3.1 L1.1 ELF1.0 L1.2 ELF1.0 L1.3 ELF1.0 L1.4 ELF1.0 L1.5 ELF1.0 L1.6 ELF1.0 F.1.3.2 L1.7 ELF1.0 L1.8 ELF1.0 L1.9 ELF1.0 L1.10 ELF1.0 L1.11 ELF1.0 L1.12 ELF1.0 F.1.3.3 L1.16 ELF1.0 L1.17 ELF1.0 L1.18 ELF1.0 L1.19 ELF1.0 F.1.3.4 L1.20 ELF1.0 L1.21 ELF1.0 L1.22 ELF1.0 L1.23 ELF1.0 F.1.3.5 L1.24 ELF1.0 L1.25 ELF1.0 L1.26 ELF1.0 L1.27 ELF1.0 L1.28 ELF1.0 L1.29 ELF1.0 L1.30 ELF1.0 L1.31 ELF1.0 L1.32 ELF1.0 L1.33 ELF1.0 F.1.3.6 L1.13 ELF1.0 L1.14 ELF1.0 L1.15 ELF1.0 F.1.4.1 L1.39 ELF1.0 L1.40 ELF1.0 L1.41 ELF1.0 L1.42 ELF1.0 L1.43 ELF1.0 L1.44 ELF1.0 F.1.4.2 L1.45 ELF1.0 L1.46 ELF1.0 L1.47 ELF1.0 L1.48 ELF1.0 L1.49 ELF1.0 L1.50 ELF1.0 L1.51 ELF1.0 L1.52 ELF1.0 F.1.4.3 L1.53 ELF1.0 L1.54 ELF1.0 L1.55 ELF1.0 F.1.4.4 L1.63 ELF1.0 L1.64 ELF1.0 L1.65 ELF1.0 L1.66 ELF1.0 L1.67 ELF1.0 L1.68 ELF1.0 L1.69 ELF1.0 L1.70 ELF1.0 L1.71 ELF1.0 L1.72 ELF1.0 L1.73 ELF1.0 L1.74 ELF1.0 L1.75 ELF1.0 L1.76 ELF1.0 L1.77 ELF1.0 F.1.4.5 L1.59 ELF1.0 L1.60 ELF1.0 L1.61 ELF1.0 L1.62 ELF1.0 F.1.4.6 L1.56 ELF1.0 L1.57 ELF1.0 L1.58 ELF1.0 Grand total: 77

EQ

750

2

sub no.

EQ

Mark

Type Mark


A

B

C

D

E

F

G

H

I

J

K

L

M

N

A1

rev P2 P1

P description of revision

Roofing systems Steel frame arrangement

date 180219 180216

1

1 2 189

Westcraft Limited Design Office

169

919 813

5550 5.550 m

59

4

2845

1329

185

1493

1329 481

5

3452

704 869

869

7663 7.663 m

173 1011

7663 7.663 m

RFS01.1

7663 7.663 m

RFS01.1

8529 8.529 m

Ss_30_10_30_85 <250.0 mm>

RFS01.ANTIQUE

7211 7.211 m

3490

RFS01.1 Ss_30_10_30_85 <250.0 mm>

Ss_30_10_30_85 <270.0 mm>

8981 8.981 m

8481 8.481 m

Ridge feature tiles 5120

checked by

4

title

1797

430 Staines Road West Ashford TW15 1RZ

8525 8.525 m

A

7663 7.663 m

Ss_30_10_30_85 <250.0 mm>

21-C-184

7728 7.728 m

project ref

3

21-C

sub no.

Ss_30_10_30_85 <250.0 mm>

originator

7728 7.728 m

FL202

RFS01.1

5550 5.550 m

drawn by

7663 7.663 m

318

3490

7663 7.663 m

1434

7269 7.269 m

© Copyright 1985-2018

919

5861 5.861 m

AP U3 25.13.00.00 0001

12

A

2

3

3147

497

21-C DESIGNS

drawing no.

914

1 : 50

914

scale

2943

970

21-C-57

187

9150 9.150 m

9259

2771

B RFS01.ANTIQUE

1873

Ss_30_10_30_85 <270.0 mm>

e::

5

RFS10.1

B

AT-U3-30.10.90.00-0001 - Roofing systems

RFS01.1 Mark

997

838

1443

Ss_30_10_30_85 <250.0 mm>

Comments

8885 8.885 m

7

C

187 1444

8885 8.885 m

922

RFS01.ANTIQUE

2845

Ss_30_10_30_85 <270.0 mm>

8525 8.525 m

RFS01.1 Ss_30_10_30_85 <250.0 mm>

C1

RFS01.1

7728 7.728 m

Ss_30_10_30_85 <250.0 mm>

8

7728 7.728 m

RFS01.1

7728 7.728 m

Ss_30_10_30_85 <250.0 mm>

7728 7.728 m

Front bonnet 1 Front bonnet 2 Front bonnet 3 Front bonnet 4 Rear bonnet 4 Rear bonnet 3 Rear bonnet 2 Rear bonnet 1

7211 7.211 m

7663 7.663 m

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

1614

D

51.11 m² 17.82 m² 26.64 m² 37.63 m² 13.34 m² 7.86 m² 65.30 m² 3.50 m² 3.53 m² 6.10 m² 3.27 m² 4.33 m² 6.58 m² 6.58 m² 4.42 m² 16.07 m² 274.10 m²

middlesex

Ss_30_10_30_85 <270.0 mm>

5326 5.326 m

RFS01.ANTIQUE RFS01.ANTIQUE RFS01.ANTIQUE RFS01.ANTIQUE RFS01.ANTIQUE RFS01.ANTIQUE RFS10.1 RFS01.1 RFS01.1 RFS01.1 RFS01.1 RFS01.1 RFS01.1 RFS01.1 RFS01.1 RFS10

northolt

U3.1 U3.2 U3.3 U3.4 U3.5 U3.6 U3.7 U3.8 U3.9 U3.10 U3.11 U3.12 U3.13 U3.14 U3.15 U3.16 Grand total: 16

RFS01.ANTIQUE

7663 7.663 m

116

1228

1394

E 536

1228 161

9

5566 5.566 m

Ridge feature tiles

1228

D

1

342

1228 247

9971

914 914 1376

2

BS1192 2007 : 21-C-184-21-C-TW15-U3-.P-A-0001- S1- P2

UP03.10.20 - DIMENSIONS - 3 Level - Roof Plan 1 : 50

TW15 A

B

C

D

E

F

G

H

I

J

K

L

M

N

P

BS1192 2007 : 21-C-184-21-C-TW15-U3-.P-A-0001- S1- P2

4

10

11

E 5

GA Roofing plan

3

Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

173

site address

618

Area

57 summit road

Ss_30_10_30_85 <270.0 mm>

7663 7.663 m

2102

C1

Type Mark

RFS01.ANTIQUE

7663 7.663 m

united kingdom

995

Ss_30_10_30_85 <270.0 mm>

ub5 5hl

RFS01.ANTIQUE

7269 7.269 m

6

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

987

2348

C

1

t : : +44(0)20 8935 5856

995

Ss_30_40_30_43 <374.5 mm>


11

A B C D E F G H I J K L

TW15

M N P

northolt

middlesex

ub5 5hl

united kingdom

t : : +44(0)20 8935 5856

e:: k21cdesigns@gmail.com

FEN03 Vertical featherboard panels with concrete post

1 : 50

scale

sub no.

Š Copyright 1985-2018

LP 00 45.00.00.00 0001

drawing no.

21-C

originator

2

BS1192 2007 : 21-C-184-21-C-TW15-00-.P-L-0001- S1- P1

Condition 2 - Landscaping proposal

21-C-57

checked by

title

21-C-184

project ref

3

430 Staines Road West Ashford TW15 1RZ

drawn by

Landscaping for Condition 2

FL202

57 summit road

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

description of revision

site address

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

rev P1

1 : 50

UP00.45.0.1- FLORA FAUNA - 0 Level - Landscaping - Ground Level

N

Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

[?] ?

1

M

45.83 silver birch

L

45.82 silver birch

K

45.81 silver birch

J

45.57 oleander

keyblock permeable paver

45.30 privet

45.31 privet

[TP] planting top soil

2.5

45.55 oleander

45.28 privet

45.29 privet

45.19 lavander

I

45.53 oleander

45.26 privet

45.27 privet

45.21 lavander

45.20 lavander

H

45.52 oleander

45.24 privet

45.25 privet

45.22 lavander

0

45.50 oleander

45.6 christmas berry

45.10 christmas berry

45.23 privet

G

45.49 oleander

45.48 oleander

45.7 christmas berry

45.8 christmas berry 45.9 christmas berry

45.14 lavander

45.12 christmas berry

F

45.47 oleander

45.46 oleander

8

45.13 christmas berry

45.43 christmas berry 45.15 lavander

45.16 lavander

45.17 lavander

45.18 lavander

E

45.44 christmas berry

45.42 christmas berry

45.41 christmas berry

45.39 christmas berry

45.1 christmas berry

D

45.40 christmas berry

45.38 christmas berry

45.36 christmas berry

45.37 christmas berry

6

keyblock permeable paver

45.2 christmas berry

45.3 christmas berry

4

45.35 christmas berry

7

45.34 christmas berry

5

45.5 christmas berry

45.4 christmas berry C

45.45 christmas berry

9

45.33 christmas berry

45.32 christmas berry

A1

B

45.56 oleander

10

45.51 oleander

BS1192 2007 : 21-C-184-21-C-TW15-00-.P-L-0001- S1- P1

A P date 190309

5.0 m

1

21-C DESIGNS Westcraft Limited Design Office


11

A B C D E F G H

TW15

I J

45.76 golden flame spirea

45.75 golden flame spirea K L M

9

N P

northolt

middlesex

ub5 5hl

united kingdom

t : : +44(0)20 8935 5856

e:: k21cdesigns@gmail.com

1 : 50

scale

Š Copyright 1985-2018

LP 00 45.00.00.00 0002

drawing no.

21-C

sub no.

2

BS1192 2007 : 21-C-184-21-C-TW15-00-.P-L-0002- S1- P1

Condition 2 - Landscaping proposal

21-C-57

checked by

57 summit road

5

title

21-C-184

3 originator

Landscaping for Condition 2

430 Staines Road West Ashford TW15 1RZ

project ref

description of revision

FL202

drawn by

N

site address

Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)

rev P1

Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use

M

1 : 50

[GR] grass

[SG] shingle

L

UP00.45.0.2- FLORA FAUNA - - 0 Level - Landscaping - Ground Level

[HG] Hedging

keyblock permeable paver

K

45.79 golden flame spirea

45.78 golden flame spirea

[CF] Paving concrete flags

J

Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.

1

10

45.74 golden flame spirea

7

45.73 golden flame spirea

I

45.72 golden flame spirea

keyblock permeable paver

4

45.71 golden flame spirea

2.5

45.70 golden flame spirea

45.90 silver birch

H

45.69 golden flame spirea

45.89 silver birch

0

45.68 golden flame spirea

45.88 silver birch G

45.67 golden flame spirea

45.66 golden flame spirea

45.65 common box

45.64 common box

45.87 silver birch

45.86 silver birch

F

keyblock permeable paver

45.62 common box

E

45.63 common box

[HG] Hedging

[GR] grass

FEN03 Vertical featherboard panels with concrete post

1

FEN21.200 Box Hedge

6

45.85 silver birch

[CF] Paving concrete flags

D

45.61 common box

45.60 common box

keyblock permeable paver

A1

C

45.59 common box

45.58 common box

45.84 silver birch

45.83 silver birch

45.82 silver birch

8

B

45.77 golden flame spirea

BS1192 2007 : 21-C-184-21-C-TW15-00-.P-L-0002- S1- P1

45.81 silver birch

A P date 190309

5.0 m

21-C DESIGNS Westcraft Limited Design Office


Turn static files into dynamic content formats.

Create a flipbook
P184 - Staines Road West by rkitekdesign - Issuu