have rebranded to
21C-DESIGN
BS1192 2007 : 21-C-184-00-.E-A-002010
1
Elevation 1 - a
11
A B
4
C D E F G H I J K L M rev
N
description of revision
2
P
Š Copyright 1985-2017
N
BS1192 2007 : 21-C-184-00-.E-A-0020-
M
AE 00 00.00.00.07 0020
L
Proposed Elevation - South - Front
K
drawing no.
2.5 J
1 : 50
0 I
scale
H
21-C-57
G
1
AA - Long
AE.DR-00-00.00.00.07-0020 A1
5
7
8
1
AE.DR-00-00.00.00.07-0020 A1 AA - Long
checked by
sub no.
F
title
3 originator
E
21-C-184
project ref
D
430 Staines Road West Ashford TW15 1RZ
drawn by
C
FL202
900
B
site address
Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
9 Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
6
2700
A1
A P date
5.0 m
1
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.E-A-0040- S1-
1
11
A
Elevation 3 - a
10
TW15
B C D E F G
9
H I J K L M
1
AA - Long
AE.DR-00-00.00.00.07-0020 A1
N
2
4
1
P
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.E-A-0040- S1-
Š Copyright 1985-2017
description of revision
A DR.E 00 00.00.00.07 0040
rev
Proposed Elevation - North - Rear
N
drawing no.
M
1 : 50
L
scale
K
21-C-57
2.5 J
AE.DR-00-00.00.00.07-0020 A1
AA - Long
5
6
7
8 checked by
0 I
title
H
21-C
sub no.
G
21-C-184
3 originator
F
430 Staines Road West Ashford TW15 1RZ
project ref
E
FL202
D
drawn by
C
site address
Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
B
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
A1
A P date
5.0 m
1
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-A-0002- S111
A B
4
C D E F G
9
H I J K L M
1
AA - Long
N
1
AA - Long
AE.DR-00-00.00.00.07-0020 A1
10
TW15
P
Š Copyright 1985-2017
description of revision
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-A-0002- S1-
rev
A DR.S 00 00.00.00.08 0002
N
Proposed Transverse Section
M
drawing no.
L
1 : 50
2.5 K
scale
0 J
21-C-57
2
I
5
6
7
8
AE.DR-00-00.00.00.07-0020 A1
BB - Trans checked by
H
title
G
21-C
sub no.
F
21-C-184
3 originator
E
430 Staines Road West Ashford TW15 1RZ
project ref
D
FL202
drawn by
C
site address
1
Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
B
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
A1
A P date
5.0 m
1
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-A-0001- S110
11
TW15
A B
4
C D E F G H I J K L M
1
BB - Trans
AP.DR-U0-00.00.00.04-0001 A1
9
N
2
1
BB - Trans
AP.DR-U0-00.00.00.04-0001 A1
P
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-A-0001- S1-
Š Copyright 1985-2017
description of revision
A DR.S 00 00.00.00.08 0001
rev
Proposed Long Section
N
drawing no.
M
1 : 50
L
scale
K
21-C-57
J
5
6
7
8
AA - Long checked by
3
I
title
H
21-C
G
21-C-184
sub no.
F
originator
E
430 Staines Road West Ashford TW15 1RZ
project ref
D
FL202
drawn by
C
site address
Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
1
B
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
A1
A P date
1
L
M
N rev P1
ST-B1-20.05.15.92-0001 - Trench Foundations
Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems Unreinforced concrete trench fill foundation systems
Length
Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35 Trench foundations to CN35
Foundation Thickness
Width
15511.0 2861.2 2844.8 3479.6 17390.4 6976.3 2201.3 2531.3 9287.0 2869.8 3344.2 3174.8 1295.2 804.5 4042.6 643.7 643.7 7759.7
650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0 650.0
1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0
Structural Usage
Volume 11.85 m³ 2.48 m³ 2.02 m³ 2.60 m³ 13.56 m³ 5.44 m³ 1.72 m³ 2.23 m³ 6.24 m³ 2.98 m³ 2.24 m³ 2.48 m³ 0.74 m³ 0.39 m³ 3.40 m³ 0.25 m³
Comments
Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing Bearing
5.92 m³ 66.54 m³
Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Submerged element. Excavations to be inspected by relevant authority before pouring
21-C DESIGNS Westcraft Limited Design Office
C
2
C
D
E
1200.0 1200.0 1200.0 1200.0 1200.0 1200.0
F
1200.0 1200.0 1200.0 1200.0 1200.0 1200.0
1.728 m³ 1.728 m³ 1.728 m³ 1.728 m³ 1.728 m³ 1.728 m³ 10.368 m³
Concrete Grade CN35 CN35 CN35 CN35 CN35 CN35
G
Comments Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring Excavations to be inspected by relevant authority before pouring
H
e:: k21cdesigns@gmail.com t : : +44(0)20 8935 5856 united kingdom northolt
D
Volume
I
J
K
L
M
N
P
Foundation Plan
1200.0 1200.0 1200.0 1200.0 1200.0 1200.0
Foundation Thickness
site address
P10 P10 P10 P10 P10 P10
Pad Width
E
BP01 - B1 level 13.019 BP01 - B1 level 13.019 BP01 - B1 level 13.019 BP01 - B1 level 13.019 BP01 - B1 level 13.019 BP01 - B1 level 13.019
Pad Length
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
1 C1
C B
Unreinforced concrete pad and strip foundation systems Unreinforced concrete pad and strip foundation systems Unreinforced concrete pad and strip foundation systems Unreinforced concrete pad and strip foundation systems Unreinforced concrete pad and strip foundation systems Unreinforced concrete pad and strip foundation systems
Pad Type
1
N 170403817.7 E 508140110.3
600
B A
Ss_20_05_15_91 Ss_20_05_15_91 Ss_20_05_15_91 Ss_20_05_15_91 Ss_20_05_15_91 Ss_20_05_15_91
Level
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
353 600 1200
600
BS1192 2007 : 21-C-184-21-C-TW15-B1-DR.P-S-0001- S1- P1
2429.9
TW15
FPC12.12.12 FPC12.12.12 FPC12.12.12 FPC12.12.12 FPC12.12.12 FPC12.12.12
Classification.Uniclass.Ss.Description
57 summit road
647
S8 0/ 2 .1 .0 65 800 0 C 1 . FS Lb - 600 E Lt E
600 1200
600
A
3344.7
11
P1 P2 P3 P4 P5 P6
Classification.Unicl ass.Ss.Number
BP01.20.05 - SUBSTRUCTURE - B1 level
600 1200
600
5 /P .2 12 .1 .0 12 800 0 C 1 . FP Lb - 600 E Lt E
1200
4 /P 2 1 2. 0 2.1 00. 1 C 18 .0 FP Lb - 600 E Lt E
600
664
3 /P .2 12 .1 .0 12 800 0 C 1 . FP Lb - 600 E Lt E
2 /P .2 12 .1 .0 12 800 0 C 1 . FP Lb - 600 E Lt E
664 1200 536
6260.3
2267
ST-B1-20.05.15.91-0001 - Pad foundations Type Mark
2216.9
N 170420899.4 E 508143277.5
2417
1200 2308
3121.0
2643
1200
1200 2471
536
600
1078
550 1200
292
10
Mark
650
122
600
908
9
353
1200
1
650
8
338
1 /P 2 1 2. 0 2.1 00. 1 C 18 .0 FP Lb - 600 E Lt E
3131.8
650
S1 0/ 2 .1 .0 65 800 0 C 1 . FS Lb - 600 E Lt E
3
353
2
650
middlesex
650
S7 0/ 2 .1 .0 65 800 0 C 1 . FS Lb - 600 E Lt E
6 /S 0 .12 .0 65 800 0 C 1 . FS Lb - 600 E Lt E
12 /S 0 .12 .0 65 800 0 C 1 . FS Lb - 600 E Lt E
S9 0/ 2 .1 .0 65 800 0 C 1 . FS Lb - 600 E Lt E
650
7
ub5 5hl
4
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
650
1212 650
S2 0/ 2 .1 .0 65 800 0 C 1 . FS Lb - 600 E Lt E
650
3146.7
checked by
650
10 /S 0 2 0 5.1 00. 6 C 18 .0 FS Lb - 600 E Lt E
650
333
1262
6
(STN A3) N 170398585.0 E 508152477.0
5 13 /S 0 2 0 5.1 00. 6 C 18 .0 FS Lb - 600 E Lt E
14 /S 0 2 0 5.1 00. 6 C 18 .0 FS Lb - 600 E Lt E
15 /S 0 2 0 5.1 00. 6 C 18 .0 FS Lb - 600 E Lt E 650
S3 0/ 2 .1 .0 65 800 0 C 1 . FS Lb - 600 E Lt E
3198.6
650
1200
3
11 /S 0 2 0 5.1 00. 6 C 18 .0 FS Lb - 600 E Lt E
600
1200
349
1912
5
title
E
600
329
6 /P 2 .1 .12 0.0 2 C1 180 .0 FP Lb - 600 E Lt E
N 170401460.3 E 508152823.1
D
drawn by
C1
S4 0/ 2 .1 .0 65 800 0 C 1 . FS Lb - 600 E Lt E
3452.2
225
975
4
338
4
5 /S 0 .12 .0 65 800 0 C 1 . FS Lb - 600 E Lt E
650
project ref
B
329
N 170418542.3 E 508155990.1
5
(STN A1) N 170429016.0 E 508155665.0
A
3DI-B1-00.60.00.00-01
2
Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92 Ss_20_05_15_92
Description
© Copyright 1985-2017
2
FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120 FSC65.120
Classification.Uniclass.Ss.Description
date 180214
BS1192 2007 : 21-C-184-21-C-TW15-B1-DR.P-S-0001- S1- P1
S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15 S16 S17 S18
Classification.Unicla ss.Ss.Number
Foundation setting out
originator
1
Type Mark
P description of revision
sub no.
Mark
3
K
S DR.P B1 20.05.00.00 0001
J
drawing no.
I
1 : 50
H
scale
G
21-C-57
F
21-C
E
21-C-184
D
430 Staines Road West Ashford TW15 1RZ
C
FL202
B
A1
A
B
C
D
E
F
G
H
I
J
K
L
M
N rev P1
1
P description of revision
Beam and block arrangement
date 180216
2 3
20.20 - KEY - Beams
Tag01
5
B0.1 : F BC01 T225
Tag02
2
xy.## : FnB.** TYPE
xy.## TYPE
Element
21-C DESIGNS Westcraft Limited Design Office
Beam length inc. bearing
Padstone
Padstone lengths
5 :: FB S.BB2 25.510
E
SBS.0 .0
B0.43 : FBC01 T225
CC
8
510.0 mm
3 :: FB S.BB2 25.510
SBS.0 .0
B0.40 : FBC01 T225
D
2 3
9
E
B0.80 : FBC01 T225
4 5 1
UP00.30.12.85.17 - STRUCTURAL FLOOR - 0 Level - Beam block system
BS1192 2007 : 21-C-184-21-C-TW15-U0-DR.P-S-0001- S1- P1
10
ST-U0-30.12.85.17-0001 - Concrete beam and block floor deck systems
11
TW15 A
B
Mark
Type Mark
SBS.0.01 SBS.0.02 SBS.0.03 SBS.0.04 SBS.0.05
FBS.BB225.510 FBS.BB225.285 FBS.BB225.510 FBS.BB225.510 FBS.BB225.510
C
Classification.Uni class.Ss.Number Ss_30_12_05 Ss_30_12_05 Ss_30_12_05 Ss_30_12_05 Ss_30_12_05
Classification.Uniclass.Ss.Description
Elevation
Beam and block floor systems Beam and block floor systems Beam and block floor systems Beam and block floor systems Beam and block floor systems
D
-212.0 -212.0 -212.0 -212.0 -212.0
E
Beam Type _nnl_T225 beams : T225 _nnl_T225 beams : T225 _nnl_T225 beams : T225 _nnl_T225 beams : T225 _nnl_T225 beams : T225
F
G
H
I
J
K
L
F=Frame element n=Property : S=steel; C=concrete; W=wood
drawing no. scale
As indicated t : : +44(0)20 8935 5856
e:: k21cdesigns@gmail.com
20.10 - KEY - Framing reference
united kingdom ub5 5hl middlesex
B0.38 : FBC01 T225
D
CC
C1
https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T225-Complete-1.pdf
northolt
CC 285.0 mm
SBS.0 .0
7
C
Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank
57 summit road
B0.65 : FBC01 T225
-587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0 -587.0
checked by
C1
2 :: FB S.BB2 25.285
6
B0.20 : FBC01 T225
-212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0 -212.0
Comments
title
1
3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 3079.2 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 6255.5 3402.3 3402.3 3402.3 3402.3 3402.3 3362.6 6533.4 6533.4 6533.4 6533.4 6533.4 6533.4 6533.4 6533.4 6533.4 6533.4 6533.4 1927.0 6533.4 3080.0 6533.4 6533.4 6533.4 6533.4 6533.4 6533.4 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1 3357.1
URL
430 Staines Road West Ashford TW15 1RZ
B0.64 : FBC01 T225
Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66
Elevation at Bottom Manufacturer
FL202
B0.19 : FBC01 T225 B0.20 : FBC01 T225
Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams
z Offset Value
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
C
B
510.0 mm
5
B0.1 FBC01 B0.2 FBC01 B0.3 FBC01 B0.4 FBC01 B0.5 FBC01 B0.6 FBC01 B0.7 FBC01 B0.8 FBC01 B0.9 FBC01 B0.10 FBC01 B0.11 FBC01 B0.55 : FBC01 B0.12 FBC01 T225 B0.13 FBC01 B0.14 FBC01 B0.57 : FBC01 B0.15 FBC01 T225 B0.16 FBC01 B0.17 FBC01 B0.18 FBC01 B0.19 FBC01 B0.20 FBC01 B0.21 FBC01 B0.22 FBC01 B0.23 FBC01 B0.24 FBC01 B0.25 FBC01 B0.26 FBC01 B0.64 : FBC01 B0.27 FBC01 T225 B0.28 FBC01 B0.29 FBC01 B0.30 FBC01 B0.31 FBC01 B0.32 FBC01 B0.33 FBC01 B0.34 FBC01 B0.35 FBC01 B0.36 FBC01 B0.37 FBC01 B0.38 FBC01 B0.39 FBC01 B0.40 FBC01 B0.41 FBC01 B0.42 FBC01 B0.43 FBC01 B0.44 FBC01 B0.45 FBC01 B0.46 FBC01 B0.47 FBC01 B0.48 FBC01 B0.49 FBC01 B0.50 FBC01 B0.51 FBC01 B0.52 FBC01 B0.53 FBC01 B0.54 FBC01 B0.55 FBC01 B0.56 FBC01 B0.57 FBC01 B0.58 FBC01 B0.59 FBC01 B0.60 FBC01 B0.61 FBC01 B0.62 FBC01 B0.63 FBC01 B0.64 FBC01 B0.65 FBC01 B0.66 FBC01 B0.67 FBC01 B0.68 FBC01 B0.69 FBC01 B0.70 FBC01 B0.71 FBC01 B0.72 FBC01 B0.73 FBC01 Layout Rule B0.74 FBC01 B0.75 FBC01 Fixed Distance B0.76 FBC01 Fixed Distance B0.77 FBC01 Fixed Distance B0.78 FBC01 Fixed Distance B0.79 FBC01 Fixed Distance B0.80 FBC01 Grand total: 80
Classification.Uniclass.Pr.Descript Classification.Uniclass. ion Pr.Number Cut Length
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
CC 510.0 mm
B0.58 : FBC01 T225
Type Mark
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
CC
B0.56 : FBC01 T225
SBS.0 .0
4
4 :: FB S.BB2 25.510
SBS.0 .0
B
510.0 mm
1 :: FB S.BB2 25.510
Mark
project ref
FnB = Framework - Beam FnC = Framework - Column FnP = Framework - Purlin FnT = Framework - Truss FnL = Framework - Lintel FnQ' = Framework - Bearing pads
ST-U0-20.20.75.15-0001 - Concrete beam systems
21-C-57
20.10 - KEY - Structural Frame Systems 3
21-C
sub no.
20.20 - KEY - Beams
originator
3DI-U0-00.60.00.00-01
2
drawn by
B0.44 : FBC01 T225
21-C-184
Steel Plate
M
N
P
site address
A
BS1192 2007 : 21-C-184-21-C-TW15-U0-DR.P-S-0001- S1- P1
A
x = Element Type B=BEAM y = Associated start level of the element 0=GROUND LEVEL 1=LEVEL 1 2=LEVEL 2 etc ## = Number of variant ** = Type variant TYPE = Type of element e.g. UB203 x 133 x 30
© Copyright 1985-2017
4
S DR.P U0 30.12.85.17 0001
1
Concrete beam and block floor
A1
A
A
B
C
D
E
F
G
H
I
J
K
L
M
N
A1
rev P1
1
P description of revision
Steel frame arrangement
date 180216
ss01
1
SP.DR-U1-20.10.75.35-0001 A1
2
1
ss02
3
2
SP.DR-U1-20.10.75.35-0001 A1
A
4 5
180
A
2899.8 2899.8 2899.8
BP01 - B1 level 13.019 BP01 - B1 level 13.019 BP01 - B1 level 13.019
P1.10
P1.4
98
84
20
B1.8 : F S UB203x B01 133x25
P60.10 - 600x215x100
C
B1.9 : F S UC203x B02 203x86
UC152x152x37
B1.se2 : FS L100x10 B03 0x10
P1.5
P1.2
7
Reference Level
Elevation at Bottom
Elevation at Top
Length
Cut Length
Classification.Uniclass. Classification.Uniclass. Pr.Description Pr.Number
drawing no. scale
As indicated
project ref
Comments
D
B1.1 FSB01 B1.2 FSB01 B1.3 FSB01 B1.4 FSB01 B1.5 FSB01 B1.6 FSB01 B1.7 FSB01 B1.8 FSB01 B1.9 FSB02 B1.10 FSB01 B1.10.1 FSB03 B1.11 FSB01 B1.11.1 FSB03 B1.12 FSB01 B1.13 FSB01 B1.14 FSB01 B1.15 FSB01 B1.16 FSB02 B1.17 FSB04 B1.se1 FSB03 B1.se2 FSB03 B1.se3 FSB03 B1.se4 FSB07 Grand total: 23
UB203x133x25 UB203x133x25 UB203x133x25 UB203x133x25 UB203x133x25 UB203x133x25 UB203x133x25 UB203x133x25 UC203x203x86 UB203x133x25 L100x100x10 UB203x133x25 L100x100x10 UB203x133x25 UB203x133x25 UB203x133x25 UB203x133x25 UC203x203x86 UC203x203x46 L100x100x10 L100x100x10 L100x100x10 L150x150x10
UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619
2503.0 2503.0 2503.0 2503.0 2503.0 2503.0 2503.0 2503.0 2704.7 2706.2 2648.0 2706.2 2648.0 2606.0 2606.0 2606.0 2606.0 2704.7 2750.2 693.8 1560.9 2254.7 2760.2
2299.8 2299.8 2299.8 2299.8 2299.8 2299.8 2299.8 2299.8 2482.5 2503.0 2548.0 2503.0 2548.0 2402.8 2402.8 2402.8 2402.8 2482.5 2547.0 593.8 1460.9 2154.7 2610.2
3080.0 3080.0 5678.0 5740.0 5624.0 5624.0 3144.0 3040.0 5822.2 1425.0 1447.0 1645.0 1640.0 3028.2 3015.0 3015.0 3015.0 6370.0 2045.0 900.0 900.0 900.0 1080.0
3145.2 3145.2 5709.3 5714.6 5604.0 5604.1 3144.9 3145.0 5798.8 1420.3 1420.3 1613.8 1613.8 3536.4 3417.7 3357.1 3357.1 6370.0 2019.8 900.0 900.0 900.0 1014.5
Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams
Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11
e:: k21cdesigns@gmail.com
B
P30.21 - 300x215x215
C0:1.3
Type
t : : +44(0)20 8935 5856
404
B1.5 : F S UB203x B01 133x25
B1.se3 : FS L100x10 B03 0x10
B1.7 : F S UB203x B01 133x25
Type Mark
6 FW to B1.10 6 FW to B1.10
Fixed to precast stair element Fixed to precast stair element Fixed to precast stair element Fixed to precast stair element
united kingdom
P1.12
P30.10 - 300x215x100
B1.se1 : FS L100x10 B03 0x10
P30.21 - 300x215x215
Carbon steel columns Carbon steel columns Carbon steel columns
ub5 5hl
P1.13
C16
Pr_20_85_16_11 Pr_20_85_16_11 Pr_20_85_16_11
middlesex
1112
CP44.1 - 440x440x215x100
C
-475.2 -475.2 -475.2
Comments
CP44.1 - 440x440x215x100
B1.se4 : FS L150x15 B07 0x10 UP
5
Mark
290
B1.6 : F S UB203x B01 133x25
56
B1.17 : F UC203x SB04 203x46
66
UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394
Classification.Uniclass.Pr.Nu Classification.Uniclass.Pr.Descriptio mber n
ST-U1-20.20.75.80-0001 - Steel beam systems
P44.10 - 440x215x100
UC152x152x37
0.0 0.0 0.0
Top Offset
checked by
A(-359.9)-1 B-1 C1-1
Top Level
title
UC152x152x37 UC152x152x37 UC152x152x37
Base Offset
Base Level
167
FSC01 FSC01 FSC01
Length
430 Staines Road West Ashford TW15 1RZ
P1.14
C0:1.1 C0:1.2 C0:1.3
Column Location Mark
Type
FL202
C0:1.2
B1.11 : F UB203x SB01 133x25
Type Mark
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
64
1500
4
1667
20
B
P1.7
CP44.1 - 440x440x215x100
Mark
drawn by
B1.10 : F UB203x SB01 133x25
P1.6
P60.10 - 600x215x100
B1.16 : F UC203x SB02 203x86
ST-U0-20.30.75.80-0001 - Steel column systems
21-C-57
B1.3 : F S UB203x B01 133x25
3
21-C
3DI-U1-00.60.00.00-01
originator
2
21-C-184
P1.8
CP44.1 - 440x440x215x100
ST-U1-20.05.15.65-0001 - Precast concrete pads
P1.11
P60.10 - 600x215x100
B1.15 : F S UB203x B01 133x25
D
1 ss01
1
SP.DR-U1-20.10.75.35-0001 A1
9
2 3 SP.DR-U1-20.10.75.35-0001 A1
Tag01
4 5
Tag02
20.10 - KEY - Structural Frame Systems
10
BS1192 2007 : 21-C-184-21-C-TW15-U1-DR.P-S-0001- S1- P1
FnB = Framework - Beam FnC = Framework - Column FnP = Framework - Purlin FnT = Framework - Truss FnL = Framework - Lintel FnQ' = Framework - Bearing pads
UP00.20.10 - FRAMES - ABOVE - 0 Level
xy.## : FnB.** TYPE
xy.## TYPE
northolt
20.30 - KEY - Columns
E
2
1
Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32
20.20 - KEY - Beams ss02
Comments
57 summit road
69
98
B1.14 : F UB203x SB01 133x25
B1.13 : F UB203x SB01 133x25
URL
x = Element Type B=BEAM y = Associated start level of the element 0=GROUND LEVEL 1=LEVEL 1 2=LEVEL 2 etc ## = Number of variant ** = Type variant TYPE = Type of element e.g. UB203 x 133 x 30
Element
Beam length inc. bearing
Tag01
Tag02
xy:z.##
Tag03
xy:z.## TYPE
Padstone
Padstone lengths
Steel Plate
x = Element Type C=COLUMN y = Associated start level of the element 0=GROUND LEVEL 1=LEVEL 1 2=LEVEL 2 etc z = Associated end level of the element 1=LEVEL 1 2=LEVEL 2 etc ## = Number of variant ** = Type variant TYPE = Type of element e.g. UC125 x 152 x37 Element
Column length
F=Frame element n=Property : S=steel; C=concrete; W=wood 11
TW15 A
20.10 - KEY - Framing reference
B
C
D
E
F
G
H
I
20.20 - KEY - Beams
J
20.30 - KEY - Columns
K
L
M
N
P
Steel frame above 0 Level
156
8
B1.12 : F S UB203x B01 133x25
Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads
Manufacturer
site address
P1.1 P60.10 - 600x215x100 P1.2 P60.10 - 600x215x100 P1.3 CP44.1 - 440x440x215x100 P1.4 P30.21 - 300x215x215 P1.5 P30.21 - 300x215x215 P1.6 P60.10 - 600x215x100 P1.7 CP44.1 - 440x440x215x100 P1.8 CP44.1 - 440x440x215x100 P1.9 P30.10 - 300x215x100 P1.10 CP44.1 - 440x440x215x100 P1.11 P60.10 - 600x215x100 P1.12 P30.10 - 300x215x100 P1.13 CP44.1 - 440x440x215x100 P1.14 P44.10 - 440x215x100 Grand total: 14
CP44.1 - 440x440x215x100
Classification.Uniclass.Pr.Descript Classification.Uniclass. ion Pr.Number
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
P1.3
Type
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
Mark
xy Fn :z.## C* *
C1
13
E
© Copyright 1985-2017
P1.1
P60.10 - 600x215x100
B1.4 : F S UB203x B01 133x25
139
sub no.
2
P1.9
P30.10 - 300x215x100
BS1192 2007 : 21-C-184-21-C-TW15-U1-DR.P-S-0001- S1- P1
B1.2 : F S UB203x B01 133x25
11
Westcraft Limited Design Office
270
C0:1.1
UC152x152x37
21-C DESIGNS
S DR.P U1 20.10.75.35 0001
B1.1 : F S UB203x B01 133x25 451
360
531
64
E
G
H
D
1 2 3
Tag01
xy.## : FnB.** TYPE
9
Tag02
xy.## TYPE
Element
5 20.10 - KEY - Structural Frame Systems FnB = Framework - Beam FnC = Framework - Column FnP = Framework - Purlin FnT = Framework - Truss FnL = Framework - Lintel FnQ' = Framework - Bearing pads
Beam length inc. bearing
Padstone Steel Plate
E
4
x = Element Type B=BEAM y = Associated start level of the element 0=GROUND LEVEL 1=LEVEL 1 2=LEVEL 2 etc ## = Number of variant ** = Type variant TYPE = Type of element e.g. UB203 x 133 x 30
F=Frame element n=Property : S=steel; C=concrete; W=wood
Padstone lengths
BS1192 2007 : 21-C-184-21-C-TW15-U1-DR.P-S-0001- S1- P1
10
20.20 - KEY - Beams
20.10 - KEY - Framing reference ST-U1-30.12.85.17-0001 - Concrete beam and block floor deck systems
11
TW15 A
B
C
Mark
Type Mark
SBS.1.01 SBS.1.02 SBS.1.03 SBS.1.04 SBS.1.05
FBS.BB155.510 FBS.BB155.510 FBS.BB155.510 FBS.BB155.510 FBS.BB155.510
Classification.Uni class.Ss.Number Ss_30_12_05 Ss_30_12_05 Ss_30_12_05 Ss_30_12_05 Ss_30_12_05
D
Classification.Uniclass.Ss.Description Beam and block floor systems Beam and block floor systems Beam and block floor systems Beam and block floor systems Beam and block floor systems
E
Elevation -117.0 -117.0 -117.0 -117.0 -117.0
Beam Type _nnl_T155 beams : T155 _nnl_T155 beams : T155 _nnl_T155 beams : T155 _nnl_T155 beams : T155 _nnl_T155 beams : T155
F
Layout Rule Fixed Distance Fixed Distance Fixed Distance Fixed Distance Fixed Distance
G
H
I
J
K
https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf https://www.milbank.co.uk/wp-content/uploads/2016/09/T155-Complete.pdf
L
M
21-C DESIGNS
drawing no.
© Copyright 1985-2017
scale
As indicated
S DR.P U1 30.12.85.17 0001
Westcraft Limited Design Office
21-C-57 e:: k21cdesigns@gmail.com t : : +44(0)20 8935 5856 united kingdom ub5 5hl middlesex northolt
Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank Millbank
21-C
2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0 2353.0
Comments
21-C-184
-117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 0.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 0.0 0.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 -117.0 0.0
URL
sub no.
2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 2994.9 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3077.2 3144.8 3144.8 3144.8 3144.8 3144.8 3144.8 3144.8 3144.8 3144.8 3144.8 3144.8 3117.3 3117.3 3117.3 3117.3 3117.3 3117.3 3117.3 3117.3 3117.3 3117.3 3117.3 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1 3379.1
Manufacturer
57 summit road
B1.129 : FCB.T 155 T155
Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66 Pr_20_85_08_66
Elevation at Bottom
N
P
BS1192 2007 : 21-C-184-21-C-TW15-U1-DR.P-S-0001- S1- P1
7
Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams Prestressed concrete T-beams
z Offset Value
Concrete beam and block floor
B1.74 : FCB.T1 55 T155
B1.21 FCB.T155 B1.22 FCB.T155 B1.25 FCB.T155 B1.26 FCB.T155 B1.27 FCB.T155 B1.28 FCB.T155 B1.29 FCB.T155 B1.30 FCB.T155 B1.31 FCB.T155 B1.32 FCB.T155 B1.33 FCB.T155 B1.34 FCB.T155 B1.35 FCB.T155 B1.36 FCB.T155 B1.37 FCB.T155 B1.38 FCB.T155 B1.39 FCB.T155 B1.40 FCB.T155 B1.41 FCB.T155 B1.42 FCB.T155 B1.43 FCB.T155 B1.44 FCB.T155 B1.45 FCB.T155 B1.46 FCB.T155 B1.47 FCB.T155 B1.48 FCB.T155 B1.49 FCB.T155 B1.50 FCB.T155 B1.51 FCB.T155 B1.52 FCB.T155 B1.53 FCB.T155 B1.54 FCB.T155 B1.55 FCB.T155 B1.56 FCB.T155 B1.57 FCB.T155 B1.58 FCB.T155 B1.59 FCB.T155 B1.60 FCB.T155 B1.61 FCB.T155 B1.62 FCB.T155 B1.63 FCB.T155 B1.64 FCB.T155 B1.65 FCB.T155 B1.66 FCB.T155 B1.67 FCB.T155 B1.68 FCB.T155 B1.69 FCB.T155 B1.70 FCB.T155 B1.71 FCB.T155 B1.72 FCB.T155 B1.73 FCB.T155 B1.74 FCB.T155 B1.75 FCB.T155 B1.76 FCB.T155 B1.78 FCB.T155 B1.79 FCB.T155 B1.80 FCB.T155 B1.81 FCB.T155 B1.82 FCB.T155 B1.83 FCB.T155 B1.84 FCB.T155 B1.85 FCB.T155 B1.86 FCB.T155 B1.88 FCB.T155 B1.89 FCB.T155 B1.90 FCB.T155 B1.91 FCB.T155 B1.92 FCB.T155 B1.93 FCB.T155 B1.94 FCB.T155 B1.95 FCB.T155 B1.96 FCB.T155 B1.97 FCB.T155 B1.98 FCB.T155 B1.99 FCB.T155 B1.100 FCB.T155 B1.101 FCB.T155 B1.102 FCB.T155 B1.103 FCB.T155 B1.104 FCB.T155 B1.105 FCB.T155 B1.106 FCB.T155 B1.107 FCB.T155 B1.108 FCB.T155 B1.109 FCB.T155 B1.110 FCB.T155 B1.112 FCB.T155 B1.113 FCB.T155 B1.114 FCB.T155 B1.115 FCB.T155 B1.116 FCB.T155 B1.117 FCB.T155 B1.118 FCB.T155 B1.119 FCB.T155 B1.120 FCB.T155 B1.121 FCB.T155 B1.122 FCB.T155 B1.123 FCB.T155 B1.124 FCB.T155 B1.125 FCB.T155 B1.126 FCB.T155 B1.127 FCB.T155 B1.128 FCB.T155 B1.129 FCB.T155 Grand total: 104
Classification.Uniclass.Pr.Descript Classification.Uniclass. ion Pr.Number Cut Length
checked by
CC
C1
Type Mark
title
SBS.1 .0
510.0 mm
3 :: FB S.BB1 55.510
C
20.20 - KEY - Beams
date 180216
430 Staines Road West Ashford TW15 1RZ
CC 510.0 mm
4 :: FB S.BB1 55.510 SBS.1 .0
B1.88 : FCB.T1 55 T155
B1.43 : FCB.T1 55 T155
8
Beam and block arrangement
originator
CC 510.0 mm
5 :: FB S.BB1 55.510 SBS.1 .0 SBS.1 .0
CC
2 :: FB S.BB1 55.510
CC 510.0 mm
1 :: FB S.BB1 55.510 SBS.1 .0
510.0 mm
B
B1.98 : FCB.T1 55 T155
P description of revision
project ref
B1.100 : FCB.T 155 T155
B1.17 : FUP UC203x SB04 203x46
6
N
FL202
5
3
5
M
drawn by
B1.99 : FCB.T1 55 T155
2
C
L
site address
Mark
A
4
K
ST-U1-20.20.75.15-0001 - Concrete beam systems
B1.75 : FCB.T1 55 T155
B
J
rev P1
B1.44 : FCB.T1 55 T155
B1.21 : FCB.T1 55 T155
I
4
3
A 1
F
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
D
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
C
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
B
A1
A
B
C
A1
A
D
1
E
F
G
H
I
J
K
L
M
N rev P1
ss01
1
SP.DR-U1-20.10.75.35-0001 A1
P description of revision
Steel frame arrangement
date 180216
2 3
1
A
ss02
2
SP.DR-U1-20.10.75.35-0001 A1
4 5
21-C DESIGNS
A
drawing no.
originator
32
project ref
2632
B2.1 : F S UC203x B04 203x46
P2.15
P44.10 - 440x215x100
scale
P2.14
P44.10 - 440x215x100
As indicated
58
3629
3
P2.2
P44.10 - 440x215x100
21-C-184
B2.2 : F S UC203x B04 203x46
84
21-C
sub no.
P2.1
P44.10 - 440x215x100
© Copyright 1985-2017
3629
2
S DR.P U2 20.10.75.35 0001
Westcraft Limited Design Office
P2.7
P44.10 - 440x215x100 58
C
P2.8
P44.10 - 440x215x100
P2.6
P30.21 - 300x215x215
32
B2.6 : F S UC203x B04 203x46
394
394
49
P30.21 - 300x215x215
P2.9
Mark 7
Type Mark
B2.1 FSB04 B2.2 FSB04 B2.3 FSB04 B2.4 FSB04 B2.5 FSB04 B2.6 FSB04 B2.7 FSB04 B2.8 FSB04 B2.9 FSB04 B2.se3 FSB03 B2.se5 FSB07 Grand total: 11
C1
D
8
e:: k21cdesigns@gmail.com
ST-U2-20.20.75.80-0001 - Steel beam systems
P60.10 - 600x215x100
E
Type UC203x203x46 UC203x203x46 UC203x203x46 UC203x203x46 UC203x203x46 UC203x203x46 UC203x203x46 UC203x203x46 UC203x203x46 L100x100x10 L150x150x10
Reference Level UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394
Elevation at Top 5530.0 5532.0 5530.0 5530.0 5530.0 5530.0 5530.0 5530.0 5525.2 5029.7 5535.2
Elevation at Bottom 5326.8 5328.8 5326.8 5326.8 5326.8 5326.8 5326.8 5326.8 5322.0 4929.7 5385.2
Length 6590.6 6214.9 6115.4 3640.0 3047.2 6558.9 3373.0 3357.0 2045.0 900.0 1080.0
Cut Length 6558.9 6136.4 6136.3 3525.5 2973.9 6557.6 3356.6 3357.0 2019.8 900.0 1014.5
Classification.Uniclas Classification.Uniclass.Pr. s.Pr.Description Number Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams
Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11
Comments
middlesex
B2.5 : F S UC203x B04 203x46
P2.5
Fixed to precast stair element
D 1
ss01
1
SP.DR-U1-20.10.75.35-0001 A1
2
20.20 - KEY - Beams
3
9
ss02
2
SP.DR-U1-20.10.75.35-0001 A1
E
Tag01
4
20.10 - KEY - Structural Frame Systems
10
BS1192 2007 : 21-C-184-21-C-TW15-U2-DR.P-S-0001- S1- P1
Tag02
FnB = Framework - Beam FnC = Framework - Column FnP = Framework - Purlin FnT = Framework - Truss FnL = Framework - Lintel FnQ' = Framework - Bearing pads
5
11
UP01.20.10 - FRAMES - ABOVE - 1 Level
xy.## TYPE
x = Element Type B=BEAM y = Associated start level of the element 0=GROUND LEVEL 1=LEVEL 1 2=LEVEL 2 etc ## = Number of variant ** = Type variant TYPE = Type of element e.g. UB203 x 133 x 30
Element
Beam length inc. bearing
Padstone
F=Frame element n=Property : S=steel; C=concrete; W=wood
1
xy.## : FnB.** TYPE
Steel Plate
20.10 - KEY - Framing reference
Padstone lengths
20.20 - KEY - Beams
TW15 A
B
C
D
E
F
G
H
I
J
K
L
M
t : : +44(0)20 8935 5856
1160
C1 6
united kingdom
60
northolt
B2.4 : F S UC203x B04 203x46
P2.11
P44.10 - 440x215x100
35
Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32
ub5 5hl
B2.7 : F S UC203x B04 203x46
Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads
Comments
57 summit road
2185
P2.10
P44.10 - 440x215x100
P2.1 P44.10 - 440x215x100 P2.2 P44.10 - 440x215x100 P2.3 P44.10 - 440x215x100 P2.4 P44.10 - 440x215x100 P2.5 P30.21 - 300x215x215 P2.6 P30.21 - 300x215x215 P2.7 P44.10 - 440x215x100 P2.8 P44.10 - 440x215x100 P2.9 P60.10 - 600x215x100 P2.10 P44.10 - 440x215x100 P2.11 P44.10 - 440x215x100 P2.12 CP44.1 - 440x440x215x100 P2.13 P44.10 - 440x215x100 P2.14 P44.10 - 440x215x100 P2.15 P44.10 - 440x215x100 Grand total: 15
URL
N
P
BS1192 2007 : 21-C-184-21-C-TW15-U2-DR.P-S-0001- S1- P1
B
P44.10 - 440x215x100
Manufacturer
Steel Frame above 1 Level
P2.4
Classification.Uniclass.Pr.Descript Classification.Uniclass. ion Pr.Number
Type
site address
Mark
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
35
58
checked by
ST-U2-20.05.15.65-0001 - Precast concrete pads
P2.13
P44.10 - 440x215x100
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
5
84
1164
C
UP
title
2632
B2.8 : F S UC203x B04 203x46
P2.3
P44.10 - 440x215x100
B2.3 : F S UC203x B04 203x46
430 Staines Road West Ashford TW15 1RZ
P2.12
CP44.1 - 440x440x215x100
3DI-U2-00.60.00.00-01
FL202
2
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
2181
4
drawn by
60
B2.9 : F S UC203x B04 203x46
21-C-57
B
A
B
C
D
E
F
G
H
I
J
K
L
M
N
A1
rev P1
1
1
P description of revision
Steel frame arrangement
date 180216
ss01
1
SP.DR-U1-20.10.75.35-0001 A1
2 3
1885
A
ss02
2
SP.DR-U1-20.10.75.35-0001 A1
4
1247
21-C DESIGNS Westcraft Limited Design Office
P.CAST - 440x215x300
1420
45 .12 °
15
P3.7
D
C1
P.CAST - 440x215x300
06 SB 7 : F 2x3 .11 15 B3 152x UC
Varies Varies 8990.0 Varies Varies 8990.0 Varies Varies 8990.0 8990.0 Varies Varies Varies Varies Varies 8990.0 8990.0 8990.0
Varies Varies 8828.2 Varies Varies 8828.2 Varies Varies 8786.8 8828.2 Varies Varies Varies Varies Varies 8786.8 8786.8 8828.2
3440.0 3440.0 3440.0 3440.0 3440.0 3440.0 3440.0 3440.0 3440.0 3440.0 3440.0 3299.5 3298.2 3298.2 3440.0 3440.0 3440.0 3440.0
1682.7 1679.6 3440.0 1679.6 1665.7 3440.0 2094.9 2232.0 3440.0 3440.0 1534.7 1584.6 1615.2 1615.2 1489.5 3440.0 3440.0 3440.0
3260.0 2570.0 4996.9 2570.0 3335.0 3098.8 1960.0 2212.0 6812.2 3098.8 3490.0 2495.0 2448.5 2448.5 3555.0 9433.2 9433.2 4996.9
drawing no.
21-C-57 e:: k21cdesigns@gmail.com t : : +44(0)20 8935 5856
Cut Classification.Uniclas Classification.Uniclass.Pr. Length s.Pr.Description Number 3154.3 2482.3 4767.9 2482.3 3195.9 2869.8 1913.4 2404.5 6812.3 2869.8 3314.5 2632.6 2632.5 2632.5 3297.8 9433.3 9433.3 4882.4
Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams
Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11
Comments
Crank beam assembly B2,14,16 Crank beam assembly B4,13,17
Crank beam assembly B7,9,12
united kingdom
UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169
Length
ub5 5hl
B3.12 : F UC203x SB04 203x46
UC152x152x37 UC203x203x46 UC152x152x37 UC203x203x46 UC152x152x37 UC152x152x37 UC203x203x46 UC152x152x37 UC203x203x46 UC152x152x37 UC152x152x37 UC203x203x46 UC203x203x46 UC203x203x46 UC152x152x37 UC203x203x46 UC203x203x46 UC152x152x37
Reference Level
End Level Offset
Crank beam assembly B7,9,12
middlesex
P3.9
P.CAST - 600x215x300
Type
Elevation at Elevation Start Level Top at Bottom Offset
Crank beam assembly B7,9,12 Crank beam assembly B4,13,17 Crank beam assembly B2,14,16 Crank beam assembly B4,13,17 Crank beam assembly B2,14,16
northolt
7
Type Mark
B3.1 FSB06 B3.2 FSB04 B3.3 FSB06 B3.4 FSB04 B3.5 FSB06 B3.6 FSB06 B3.7 FSB04 B3.8 FSB06 B3.9 FSB04 B3.10 FSB06 B3.11 FSB06 B3.12 FSB04 B3.13 FSB04 B3.14 FSB04 B3.15 FSB06 B3.16 FSB04 B3.17 FSB04 B3.18 FSB06 Grand total: 18
C
06 SB x37 F .8 : 52 B3 152x1 UC
Nominal size cast in situ. CN40 Nominal size cast in situ. CN40 Nominal size cast in situ. CN40 Nominal size cast in situ. CN40 Nominal size cast in situ. CN40 Nominal size cast in situ. CN40 Nominal size cast in situ. CN40 Nominal size cast in situ. CN40 Nominal size cast in situ. CN40 Nominal size cast in situ. CN40 Nominal size cast in situ. CN40
57 summit road
970
° 45.00
B3.9 : F S UC203x B04 203x46
checked by
392
Mark
B3.7 : F S UC203x B04 203x46
Comments
ST-U3-20.20.75.80-0001 - Steel beam systems
B3.13 : F UC203x SB04 203x46
B3.10 : F UC152x SB06 152x37
P.CAST - 600x215x300
P.CAST - 600x215x300
B3.6 : F S UC152x B06 152x37
P3.6
P3.4
URL
Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32 Pr_20_85_13_32
P3.10
1760
P.CAST - 440x215x300
Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads Concrete foundation pads
Manufacturer
title
1387
6
C1
B
B3.17 : F UC203x SB04 203x46
06 SB x37 F .5 : 52 B3 152x1 UC
2038
C
UP
° 45.00
1058
5
Classification.Uniclass.Pr.Descript Classification.Uniclass. ion Pr.Number
430 Staines Road West Ashford TW15 1RZ
B3.18 : F UC152x SB06 152x37
B3.4 : F S UC203x B04 203x46
Type
P3.1 P.CAST - 440x215x300 P3.2 P.CAST - 600x215x300 P3.3 P.CAST - 600x215x300 P3.4 P.CAST - 440x215x300 P3.6 P.CAST - 600x215x300 P3.7 P.CAST - 440x215x300 P3.8 P.CAST - 440x215x300 P3.9 P.CAST - 600x215x300 P3.10 P.CAST - 600x215x300 P3.11 P.CAST - 600x215x300 P3.12 P.CAST - 440x215x300 Grand total: 11
2287
P3.3
scale
project ref
Mark
FL202
B3.3 : F S UC152x B06 152x37
ST-U3-20.05.15.65-0001 - Precast concrete pads
P3.11
B3.14 : F UC203x SB04 203x46
P.CAST - 600x215x300
3DI-U3-00.60.00.00-01
drawn by
2710
2
P.CAST - 600x215x300
° 45.12
B
4
6 B0 FS 2x37 : .15 15 B3 152x UC
B3.16 : F UC203x SB04 203x46
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
B3.2 : F S UC203x B04 203x46
As indicated
45 .00 °
3
originator
P3.12
P.CAST - 440x215x300
21-C
A
21-C-184
6 B0 FS x37 .1 : 52 B3 152x1 UC
P3.2
P.CAST - 600x215x300
sub no.
3547
2033
8
P3.8
E
SP.DR-U1-20.10.75.35-0001 A1
2
Tag01
3
20.10 - KEY - Structural Frame Systems
ss02
2
Tag02
SP.DR-U1-20.10.75.35-0001 A1
FnB = Framework - Beam FnC = Framework - Column FnP = Framework - Purlin FnT = Framework - Truss FnL = Framework - Lintel FnQ' = Framework - Bearing pads
E 4 5
BS1192 2007 : 21-C-184-21-C-TW15-U3-DR.P-S-0001- S1- P1
10
xy.## TYPE
Element
Beam length inc. bearing
Padstone
F=Frame element n=Property : S=steel; C=concrete; W=wood
UP02.20.10 - FRAMES - Above - Level 2
1
xy.## : FnB.** TYPE
x = Element Type B=BEAM y = Associated start level of the element 0=GROUND LEVEL 1=LEVEL 1 2=LEVEL 2 etc ## = Number of variant ** = Type variant TYPE = Type of element e.g. UB203 x 133 x 30
Steel Plate
20.10 - KEY - Framing reference
Padstone lengths
20.20 - KEY - Beams
TW15 A
B
C
D
E
F
G
H
I
J
K
L
M
N
P
BS1192 2007 : 21-C-184-21-C-TW15-U3-DR.P-S-0001- S1- P1
1
9
Steel frame above 2 Level
ss01
site address
20.20 - KEY - Beams
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
1
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
P.CAST - 440x215x300
D
11
© Copyright 1985-2017
P3.1
2
S DR.P U3 20.10.75.35 0001
5
A B C D E
2
10
F G H I J K L
S6 0/ 2 .1 .0 65 800 0 C 1 . FS Lb - 600 E Lt E
M N
TW15
P
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-S-0001- S1- P1
northolt
middlesex
ub5 5hl
united kingdom
t : : +44(0)20 8935 5856
e:: k21cdesigns@gmail.com
1 : 50
scale
© Copyright 1985-2017
S DR.S 00 20.10.75.35 0001
drawing no.
2
Frame sections
21-C-57
checked by
sub no.
-600.0
BP01 - B1 level 13.019
0.0
UP00 - Ground Level - 13.619
Steel frame arrangement
21-C
originator
S3 0/ 2 .1 .0 65 800 0 C 1 . FS Lb - 600 E Lt E
B0.45 : FBC01 T225
2775.0
UP01 - 1 Level - 16.394
description of revision
21-C-184
project ref
B1.10.1 : FSB03 L100x100x10
2658 SFL 2.658 m
rev P1
title
drawn by
2706 TOS 2.706 m
N
430 Staines Road West Ashford TW15 1RZ
10 /S 0 2 0 5.1 00. 6 C 18 .0 FS Lb - 600 E Lt E
B1.11.1 : FSB03 L100x100x10
B0.57 : FBC01 T225
B1.17 : FSB04 UC203x203x46
2750 TOS 2.750 m
M
FL202
57 summit road
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
12 /S 0 2 0 5.1 00. 6 C 18 .0 FS Lb - 600 E Lt E
B0.20 : FBC01 T225 B0.64 : FBC01 T225
2255 2.255 m
B1.se3 : FSB03 L100x100x10
5550.0
UP02 - 2 Level - 19.169
L
site address
-600.0
BP01 - B1 level 13.019
0.0
SFL -212 -0.212 m
2658 SFL 2.658 m
5530 TOS 5.530 m
B2.1 : FSB04 UC203x203x46
9150.0
UP03 - 3 Level - 22.769
K
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
B0.43 : FBC01 T225
2403 BOS 2.403 m
2606 TOS 2.606 m
B1.se4 : FSB07 L150x150x10
B2.9 : FSB04 UC203x203x46
5525 TOS 5.525 m
B2.se5 : FSB07 L150x150x10
B3.16 : FSB04 UC203x203x46
8990 TOS 8.990 m
A
J
UP00 - Ground Level - 13.619
2775.0
B1.13 : FSB01 UB203x133x25
B1.12 : FSB01 UB203x133x25
5030 5.030 m
B2.se3 : FSB03 L100x100x10
8990 TOS 8.990 m
B
I
UP01 - 1 Level - 16.394
5550.0
5530 TOS 5.530 m
B3.17 : FSB04 UC203x203x46
C
H
B2.6 : FSB04 UC203x203x46
B3.9 : FSB04 UC203x203x46
8990 TOS 8.990 m
C1
G
UP02 - 2 Level - 19.169
D
-600.0
BP01 - B1 level 13.019
0.0
UP00 - Ground Level - 13.619
2775.0
UP01 - 1 Level - 16.394
B1.1 : FSB01 UB203x133x25
F
9150.0
UP03 - 3 Level - 22.769
E
B1.21 : FCB.T155 T155
5550.0
UP02 - 2 Level - 19.169
E
ss02
ss01
-600.0
BP01 - B1 level 13.019
B1.2 : FSB01 UB203x133x25
B2.2 : FSB04 UC203x203x46
D
0.0
5532 TOS 5.532 m
B UC 3.1 15 : F 2x SB 15 06 2x 37
A
A1
C
UP00 - Ground Level - 13.619
7
BOS 2300 2.300 m
SFL 2658 2.658 m
B1.32 : FCB.T155 T155
5
B1.7 : FSB01 UB203x133x25
5530 TOS 5.530 m
B
3
2775.0
UP01 - 1 Level - 16.394
8
B1.8 : FSB01 UB203x133x25
B1.43 : FCB.T155 T155
B2.3 : FSB04 UC203x203x46
06 SB 2x37 F : .5 x15 B3 152 UC
C B3.4 : FSB04 UC203x203x46
11 5550.0
C1
6
B
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
1
9 UP02 - 2 Level - 19.169
D
4
B3.2 : FSB04 UC203x203x46
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-S-0001- S1- P1
A P date 180216
1
21-C DESIGNS Westcraft Limited Design Office
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.3-S-0001- S1- P5 11
A B
8
C D E F G
TW15
H
1
I J K L M
northolt
7
middlesex
N
10
3DI-00-20.10.00.00-0001 - Frame
P
t : : +44(0)20 8935 5856
5
e:: k21cdesigns@gmail.com
2
Š Copyright 1985-2018
Roofing systems Timbers frames and systems Steel frame arrangement Beam and block arrangement Foundation setting out
united kingdom
description of revision
ub5 5hl
rev P5 P4 P3 P2 P1
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.3-S-0001- S1- P5
N
S DR.3 00 20.10.75.35 0001
M
Frame 3D
L
drawing no.
K
scale
J
21-C-57
I
checked by
H
title
G
21-C
sub no.
F
21-C-184
3 originator
E
430 Staines Road West Ashford TW15 1RZ
project ref
D
FL202
57 summit road
4 drawn by
C
site address
6 Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
B
Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
9 Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
A1
A P date 180219 180219 180216 180216 180214
1
21-C DESIGNS Westcraft Limited Design Office
B
C
D
E
F
G
H
I
J
K
L
M
[HC] aggregate hardcore
1
N rev P2 P1
A1
A
[GF] geomembrane
[HC] aggregate hardcore
[HC] aggregate hardcore
[CN] lite site concrete
[CN] lite site concrete
[SN] bedding sharp sand
[AB] binder bitumac
[SN] bedding sharp sand
[AS] Hot-rolled asphalt (HRA) surface
[CF] Paving concrete flags
P description of revision
Sanitary systems Flooring systems
date 180517 180220
keyblock permeable paver
21-C DESIGNS
[TP] planting top soil
checked by
430 Staines Road West Ashford TW15 1RZ
title
drawn by
4
FL202
project ref
[GR] grass
EFS51
EFS52
Š Copyright 1985-2018
drawing no.
[TP] planting top soil
[SG] shingle
21-C
[SN] bedding sharp sand
[GF] geomembrane
21-C-184
[SN] bedding sharp sand
3
originator
[UG] unmade ground
1 : 10
RFS06.3
scale
EFS06.1
sub no.
EFS04
21-C-57
2
A DR.A 00 30.20.00.00 0001
Westcraft Limited Design Office
EFS61
e::
5
t : : +44(0)20 8935 5856
[SK] plaster skim [PB] Plasterboard [SK] plaster skim
[WM] DPM - liquid asphaltic composition
[WM] DPM - liquid asphaltic composition
[IN] rigid floor insulation
[IN] rigid floor insulation
[AR] acoustic resiliant layer
[WM] PVC - 1200ga damp proof membrane
[TB] Tanerlised batterns 25 x 38
[SD] Sand cement floor screed loaded with fibres
[SD] Sand cement floor screed loaded with fibres
[PW] 18mm Flooring WBP Plywood
[FE] Finishes element
[SE] Structural element [TB] Tanerlised batterns 25 x 38
6
[FE] Finishes element
middlesex
[SE:IN] Rigid insulation between structural elements
united kingdom
[SE] Structural element
ub5 5hl
[SE] Structural element
[RF] Resiliant isolation element
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
[SV] Services void
[PB] plasterboard Soundbloc
northolt
7
FGF03-BB225
57 summit road
FIF03-BB155
8
[LS] Leveling screed
[PS] Polished stone
9
FEFW.40
Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
FEFS.10.10.S
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.A-A-0001- S1- P2
10
30.20.00.00-0001 - Assemblies - Floors 1 : 10
11
TW15 A
B
C
D
E
F
G
H
I
J
K
L
M
N
P
Flooring assemblies
[BA] tile bonding adhesive
site address
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
[FE] Tiled surface finish
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.A-A-0001- S1- P2
FIF10.1.1
G
H
I
J
K
L
M
N
A1
rev P2 P1
1
[SK] plaster skim
[SK] plaster skim
[SK] plaster skim
[SK] plaster skim
P description of revision
Sanitary systems Wall systems & assemblies
2
PLANS
[SK] plaster skim
Westcraft Limited Design Office
Schulter Kerdi fleese
IWS03
IWS04.1
[BK] 100mm 2.9kN block
[BK] 100mm 2.9kN block
[SC] sand cement render - two coat
[PP] 10mm plaster parge
[SK] plaster skim
[PB] plasterboard Soundbloc
[PW] sheathing ply
21-C
[PB] plasterboard Soundbloc [SK] plaster skim
checked by
[IN] Rockwool Flexi insulation
title
[IN] Rockwool Flexi insulation
Schulter Kerdi fleese
[SF:IN] 70mm C stud + acoustic insulation
21-C-184
[BK] 100mm 2.9kN block
[BK] 100mm 2.9kN block
[PB] plasterboard Soundbloc
[PW] sheathing ply
430 Staines Road West Ashford TW15 1RZ
[PP] 10mm plaster parge
[PP] 10mm plaster parge
[PW] sheathing ply
[PB] plasterboard Soundbloc
project ref
[PB] plasterboard Soundbloc
[PB] plasterboard Soundbloc
[SF:IN] 70mm C stud + acoustic insulation
[SK] plaster skim
FL202
[SK] plaster skim
[SK] plaster skim
drawn by
4
SECTIONS
3
originator
sub no.
IWS01.1
21-C DESIGNS
[SF:IN] 70mm C stud + acoustic insulation
[SK] plaster skim
IWS01
date 180517 180217
Š Copyright 1985-2018
F
A DR.A 00 25.13.00.00 0002
E
drawing no.
D
1 : 10
C
scale
B
21-C-57
A
[SK] plaster skim
middlesex
[BA] tile bonding adhesive
ub5 5hl
[SK] plaster skim
united kingdom
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
6
[SK] plaster skim
t : : +44(0)20 8935 5856
e::
5
[FE] wall tiles
IWS05.2
57 summit road
northolt
PLANS
7
FEWS.10.10
8
[SK] plaster skim
SECTIONS
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.A-A-0002- S1- P2
10
Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
9
25.13.00.00-0002 - Assemblies - Internal Walls 1 : 10
11
TW15 A
B
C
D
E
F
G
H
I
J
K
L
M
N
P
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.A-A-0002- S1- P2
[FE] wall tiles
[SC] sand cement render - two coat
Internal wall assemblies
[BA] tile bonding adhesive
[BK] 100mm 2.9kN block
site address
[SC] sand cement render - two coat
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
[SK] plaster skim
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.A-A-0001- S1- P1 10
11
TW15
A B
30.10.00.00-0001 - Assemblies - Roofs
RFS10
C D E F
7
middlesex
[SK] plaster skim
[PB] Plasterboard
[SE] Structural element
[PW] Sheathing plywood
[WM] PVC - 1200ga damp proof membrane [SK] plaster skim [PB] Plasterboard [SE] Structural element
[IN] Rigid roof insulation
[PW] Sheathing plywood
[WM] polyester reinforcement fleece system [WM] wet on wet 2 coat cold liquid system [PW] Sheathing plywood [IN] Rigid roof insulation [PW] Sheathing plywood [WM] polyester reinforcement fleece system [WM] wet on wet 2 coat cold liquid system
G H
e:: k21cdesigns@gmail.com
[TB] Tanerlised batterns 25 x 38
6
9
I J K L M N P
t : : +44(0)20 8935 5856
[TB] Tanerlised batterns 25 x 38
united kingdom
[AG] Debris free air gap
ub5 5hl
[AG] Debris free air gap
[RT] Marley clay roof tile
RFS01.1
RFS10.1
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.A-A-0001- S1- P1
[SE:IN] Rigid insulation between structural elements
Š Copyright 1985-2018
Roofing systems
A DR.A 00 30.10.00.00 0001
[SE:IN] Rigid insulation between structural elements
description of revision
Roof assemblies
rev P1
drawing no.
[IN] Insulation bonded to plasterboard
N
1 : 10
[IN] Insulation bonded to plasterboard
M
scale
[PB] Plasterboard bonded to insulation
L
21-C-57
[PB] Plasterboard bonded to insulation
K
checked by
[SK] plaster skim J
title
[SK] plaster skim I
21-C
sub no.
[RT] Marley clay roof tile
H
21-C-184
3 originator
G
430 Staines Road West Ashford TW15 1RZ
RFS01.2
F
northolt
5
E
project ref
2
D
FL202
57 summit road
4 drawn by
C
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
B
site address
Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
8
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
A1
A P date 180219
1
21-C DESIGNS Westcraft Limited Design Office
A
B
C
D
E
F
G
H
I
J
K
L
M
N
A1
rev P4 P3 P2 P1
P description of revision
Stair systems Flooring systems Beam and block arrangement Foundation setting out
date 180517 180220 180216 180214
1
21-C DESIGNS
Š Copyright 1985-2018
drawing no. scale
As indicated
title
21-C-57
checked by
430 Staines Road West Ashford TW15 1RZ
drawn by
4
FL202
project ref
originator
3
21-C
4
21-C-184
3
sub no.
2
S DR.P 00 35.10.85.65 0001
Westcraft Limited Design Office
SS-35.10.85.65-04
4
SP.DR-00-35.10.85.65-0001 A1
ST-00-20.85.48.15-0001 - Concrete lintes for stairs systems
SP.DR-00-35.10.85.65-0001 A1
Mark 5
B0.cl1 B0.cl2 B0.cl3 B0.cl4 B1.cl2 B1.cl3 B1.cl4
SS-35.10.85.65-01
1
SP.DR-00-35.10.85.65-0001 A1
B
UP
Type Mark FBC02 FBC03 FBC03 FBC03 FBC03 FBC03 FBC03
Classification.Uniclass.Pr. Classification.Uniclass.Pr.Descript Number ion
Type ER8 ER1 ER1 ER1 ER1 ER1 ER1
Pr_20_85_48_15 Pr_20_85_48_15 Pr_20_85_48_15 Pr_20_85_48_15 Pr_20_85_48_15 Pr_20_85_48_15 Pr_20_85_48_15
Concrete lintels Concrete lintels Concrete lintels Concrete lintels Concrete lintels Concrete lintels Concrete lintels
Manufacturer Naylor Naylor Naylor Naylor Naylor Naylor Naylor
Comments to be used in conjunction with stair systems to be used in conjunction with stair systems to be used in conjunction with stair systems to be used in conjunction with stair systems to be used in conjunction with stair systems to be used in conjunction with stair systems to be used in conjunction with stair systems
e::
2
1
6
SS-35.10.85.65-03
3345
2997
SP.DR-00-35.10.85.65-0001 A1
ub5 5hl
ER1
SS-35.10.85.65-01
united kingdom
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
B0.cl2
t : : +44(0)20 8935 5856
SS-35.10.85.65-02
B
middlesex
3
SP.DR-00-35.10.85.65-0001 A1
7
northolt
C SS-35.10.85.65-03
3
57 summit road
SP.DR-00-35.10.85.65-0001 A1
ST-00-20.20.75.80-0001 - Steel beam systems for stairs Mark
2852 B0.cl3
3199
C
ER1
B0.se1 FSB03 B0.se2 FSB03 B1.se1 FSB03 B1.se2 FSB03 B1.se3 FSB03 B1.se4 FSB07 B1.se5 FSB07 B2.se1 FSB03 B2.se2 FSB07 Grand total: 9
SS-35.10.85.65-04
4
SP.DR-00-35.10.85.65-0001 A1
SS-35.10.85.65-02
2
3
SP.DR-00-35.10.85.65-0001 A1
4
9
Type L100x100x10 L100x100x10 L100x100x10 L100x100x10 L100x100x10 L150x150x10 L150x150x10 L100x100x10 L150x150x10
Reference Level UP00 - Ground Level - 13.619 UP00 - Ground Level - 13.619 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP02 - 2 Level - 19.169 UP02 - 2 Level - 19.169
Elevation at Top Varies Varies Varies Varies Varies Varies Varies Varies Varies
Elevation at Bottom Varies Varies Varies Varies Varies Varies Varies Varies Varies
Length 900.0 900.0 900.0 900.0 900.0 1080.0 900.0 900.0 1080.0
Cut Length 900.0 900.0 900.0 900.0 900.0 1014.5 900.0 900.0 1014.5
Classification.Uniclass.Pr.De Classification.Unic scription lass.Pr.Number Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams Carbon steel beams
Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11 Pr_20_85_08_11
Comments Fixed to precast stair element Fixed to precast stair element Fixed to precast stair element Fixed to precast stair element Fixed to precast stair element Fixed to precast stair element Fixed to precast stair element Fixed to precast stair element Fixed to precast stair element
UP00.35.10 - STAIRS - Ground Level
STR = Straircase(s)
xx : yy : ABC
11
TW15 A
xx = calculated riser yy = calculated going ABC = constrcution type - precast - cast in situ - steel fabrication - timber construction
35.10.40.42 - KEY - Stairs 1:1
B
C
D
E
F
G
H
I
J
K
L
M
N
P
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.P-S-0001- S1- P4
35.10.40.42
Precast stair systems
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.P-S-0001- S1- P4
10
site address
1 : 25
Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
1
Type Mark
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
8
B
C
D
E
F
G
H
I
J
K
L
M
N rev P3 P2 P1
A1
A
C
3
B SS-35.10.85.65-03
date 180517 180220 180214
SS-35.10.85.65-01
3
2
4
Stair systems Flooring systems Foundation setting out
B
SS-35.10.85.65-02
SS-35.10.85.65-04
SP.DR-00-35.10.85.65-0001 A1
SP.DR-00-35.10.85.65-0001 A1
SP.DR-00-35.10.85.65-0001 A1
C SS-35.10.85.65-03
1
SP.DR-00-35.10.85.65-0001 A1
2
4
4
SS-35.10.85.65-01
3
SS-35.10.85.65-02
SS-35.10.85.65-04
1
3
P description of revision
1
SP.DR-00-35.10.85.65-0001 A1
SP.DR-00-35.10.85.65-0001 A1
SP.DR-00-35.10.85.65-0001 A1
SP.DR-00-35.10.85.65-0001 A1
UP03 - 3 Level - 22.769
UP03 - 3 Level - 22.769
9150.0
9150.0
21-C DESIGNS
originator
IWS01
3
120
U2.68 IWS01
21-C
U2.55
© Copyright 1985-2018
drawing no.
sub no.
2
S DR.S 00 35.10.85.65 0001
Westcraft Limited Design Office
19.043
5350 5.350 m
5550.0
1 : 25
scale
21-C-57
5550 5.550 m
checked by
UP02 - 2 Level - 19.169
drawn by
4
title
Precast Stair 17 R @ 173.4 mm G @ 280.0mm
430 Staines Road West Ashford TW15 1RZ
120
120
FL202
project ref
U2.67 IWS01 U2.57 IWS01
21-C-184
120
UP02 - 2 Level - 19.169 5550.0
B2.se2
5030 5.030 m
L150x150x10
B2.se1
B2.9
UC203x203x46
L100x100x10
U1.26 IWS01
U1.28 IWS01
120
120
B1.cl4
4336 4.336 m
U1.27 IWS01
4336 4.336 m
ER1
e::
5 120
4136 4.136 m
4136 4.136 m
t : : +44(0)20 8935 5856
4136 4.136 m
U1.14 IWS01
B1.se2
120
L100x100x10
B1.cl2
3269 3.269 m
6
3269 3.269 m
B1.se1
L100x100x10
B1.cl3
150 UP01 - 1 Level - 16.394
2775.0
1922 Precast Stair 17 R @ 173.4 mm G @ 280.0mm
2255 2.255 m
B1.se5
L150x150x10
B1.se4
L150x150x10
B1.se3
2055 2.055 m
U0.17 IWS01
7
2775.0
1050
B1.17
L100x100x10
middlesex
UP01 - 1 Level - 16.394
1509
ER1
2775 2.775 m
united kingdom
3469 3.469 m
ub5 5hl
3469 3.469 m
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
ER1
UC203x203x46
120
2118 B0.cl4
U0.12 IWS01
1361 1.361 m
120
120
U0.15 IWS01
1915
B0.se2
120
B0.cl3
1361 1.361 m
L100x100x10
ER1
Precast Stair 17 R @ 173.4 mm G @ 280.0mm
8
1561 1.561 m
northolt
U0.16 IWS01
ER1
Precast Stair 17 R @ 173.4 mm G @ 280.0mm
57 summit road
1561 1.561 m
694 0.694 m
694 0.694 m 494 0.494 m
B0.se1
B0.cl2 ER1
UP00 - Ground Level - 13.619
UP00 - Ground Level - 13.619
0.0
0.0 EWS11.4.1 120 EWS11.4.1 120
9 BP01 - B1 level 13.019
BP01 - B1 level 13.019
-600.0
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
L100x100x10
-600.0
B0.cl1
SS-35.10.85.65-04
SS-35.10.85.65-03
4
SS-35.10.85.65-03
4
3
3
SP.DR-00-35.10.85.65-0001 A1
SP.DR-00-35.10.85.65-0001 A1
SP.DR-00-35.10.85.65-0001 A1
SS-35.10.85.65-01
SS-35.10.85.65-02
11
1
SS-35.10.85.65-01
2
TW15 A
1 : 25
B
C
D
SS-35.10.85.65-02
F
G
SP.DR-00-35.10.85.65-0001 A1
SS-35.10.85.65-03
3
1 : 25
E
1
2
SP.DR-00-35.10.85.65-0001 A1
SP.DR-00-35.10.85.65-0001 A1
SS-35.10.85.65-01
SS-35.10.85.65-02
1
2
4
1 : 25
H
I
J
K
SP.DR-00-35.10.85.65-0001 A1
SS-35.10.85.65-04 1 : 25
L
M
N
P
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-S-0001- S1- P3
SS-35.10.85.65-04 SP.DR-00-35.10.85.65-0001 A1
Precast stair systems - sectons
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-S-0001- S1- P3
10
site address
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
ER8
B
A1
A
C
E
D
E
F
H
I
J
3
D
2
G
K
4
L
M
N rev P2 P1
5
1
P description of revision
Roofing systems Timbers frames and systems
date 180219 180219
AS-30.12.85.90-01
AS-30.12.85.90-02
AE.DR-00-00.00.00.07-0020 A1
AP.DR-U0-00.00.00.04-0001 A1
1
2217
21-C DESIGNS
2201
2040.0
0.0
2370.0 0.0
RFS10 Ss_30_40_30_43 <324.5 mm>
48x225 C24
B1.308
B1.310
48x225 C24
48x225 C24
2750 2.750 m
UP01 - 1 Level - 16.394
2667 2.667 m
UP01 - 1 Level - 16.394
2553 2.553 m
2775.0 project ref
2775.0
2667 2.667 m 2403 2.403 m TOS 2606 2.606 m
FCL 2391 2.391 m
B1.319
48x150 C24
B1.320
48x150 C24
B1.328
48x150 C24
48x150 C24
UB203x133x25
120
drawn by
L0.8
4
B1.311
B1.14
U0.10 EWS11.A0736A
checked by
B1.305
48x225 C24
FFL 2712 2.712 m
B1.309
Ss_30_40_30_43 <324.5 mm>
title
B1.301
48x225 C24
48x225 C24
RFS10
48x225 C24
430 Staines Road West Ashford TW15 1RZ
25x110 C24
B1.307
48x225 C24
originator
B1.302
FL202
3
962
B1.306
B1.304
sub no.
B1.303
48x225 C24
CG90/125
B1.15
UB203x133x25
© Copyright 1985-2018
W1.19
2370.0
21-C-57
2040.0
21-C
0.0
HRS06.900 Balcony hand rail system to BS 6399 UDL.h 0.36kN/m2; UDL.i 0.5kN/m2; PL.i 0.25kN
EGS09
W1.18
drawing no.
EGS09
2370.0
21-C-184
W1.19 2040.0
scale
EGS09
As indicated
2
A DR.S 00 30.12.85.90 0001
Westcraft Limited Design Office
U0.18 IWS01.1 120
5
U0.1
U0.9 EWS11.A0736A
EWS11.A0736A
120
120
EGS09
e::
W0.16 2040.0
2370.0
Ss_30_12_05 <437.0 mm>
UP00 - Ground Level - 13.619
UP00 - Ground Level - 13.619
0.0
0.0
BP01 - B1 level 13.019
BP01 - B1 level 13.019
-600.0
-600.0
united kingdom
6
FGF03.BB225
Ss_30_12_05 <437.0 mm>
Ss_30_12_05 <437.0 mm>
ub5 5hl
FGF03.BB225
FGF03.BB225
3DI-00-30.12.85.90-0001 Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
5
t : : +44(0)20 8935 5856
0.0
AS-30.12.85.90-02
1 AS-30.12.85.90-01
AP.DR-U0-00.00.00.04-0001 A1
2
1 : 20
57 summit road
8
AE.DR-00-00.00.00.07-0020 A1
AS-30.12.85.90-01
1
northolt
2
F EL SC6 EL b - 5.1 t - 180 20 60 0 / S 0.0 .0 5
F EL SC6 EL b - 5.1 t - 180 20 60 0 / S 0.0 .0 7
F EL SC6 EL b - 5.1 t - 180 20 60 0 / S 0.0 .0 18
120
7
middlesex
EWS11.4.1
AS-30.12.85.90-02 1 : 20
ST-U1-30.20.10.50-0001 - Timber joists
AS-30.12.85.90-02 AP.DR-U0-00.00.00.04-0001 A1
2 AS-30.12.85.90-02 BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-A-0001- S1- P2
10
AP.DR-U0-00.00.00.04-0001 A1
1
4
AS-30.12.85.90-01
AS.DR-00-30.12.85.90-0001 A1
3 11
AE.DR-00-00.00.00.07-0020 A1
UP01.30.12.85.90 - ROOF DECK - 1 Level - Roof and balcony systems 1 : 200
UP01.30.12.85.90.1 - ROOF DECK - 1 Level - Roof and balcony systems
4
1 : 100
TW15 A
B
C
D
E
F
G
H
I
J
Classification.Uniclass. Classification.Uniclass.Pr.Des Pr.Number cription
7180.0 7180.0 7180.0 7180.0 6693.3 6693.3 2200.4 2200.0 2200.4 2200.0 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2289.1 2269.4 2289.1 2289.1
Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81 Pr_20_85_08_81
K
Comments
Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams Softwood beams
L
M
N
P
BS1192 2007 : 21-C-184-21-C-TW15-00-DR.S-A-0001- S1- P2
2
7180.0 7180.0 7180.0 7180.0 7180.0 7180.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 2458.0 97156.0
Cut Length
Balcony and roof deck systems
AE.DR-00-00.00.00.07-0020 A1
UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394 UP01 - 1 Level - 16.394
Length
site address
AS-30.12.85.90-01
B1.301 FWB48.225.C24 B1.302 FWB48.225.C24 B1.303 FWB48.225.C24 B1.304 FWB25.110.C24 B1.305 FWB48.225.C24 B1.306 FWB48.225.C24 B1.307 FWB48.225.C24 B1.308 FWB48.225.C24 B1.309 FWB48.225.C24 B1.310 FWB48.225.C24 B1.311 FWB48.150.C24 B1.312 FWB48.150.C24 B1.313 FWB48.150.C24 B1.314 FWB48.150.C24 B1.315 FWB48.150.C24 B1.316 FWB48.150.C24 B1.317 FWB48.150.C24 B1.318 FWB48.150.C24 B1.319 FWB48.150.C24 B1.320 FWB48.150.C24 B1.321 FWB48.150.C24 B1.322 FWB48.150.C24 B1.323 FWB48.150.C24 B1.324 FWB48.150.C24 B1.325 FWB48.150.C24 B1.326 FWB48.150.C24 B1.327 FWB48.150.C24 B1.328 FWB48.150.C24 Grand total: 28
Reference Level
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
1
9
Type Mark
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
Mark
BS1192 2007 : 21-C-184-21-C-TW15-U0-DR.P-M-0001- S1- P1 11
A B C D E F G H
TW15
I J K
f s
L M N
8
9
10
50.30.08 DRAINAGE BELOW GROUND DRAINAGE - FOUL
DRAINAGE BELOW GROUND DRAINAGE - SURFACE WATER
50.30.08 - KEY - BELOW GROUND GRAVITY DRAINAGE SYSTEMS 1:1
P
57 summit road
northolt
middlesex
7
BS1192 2007 : 21-C-184-21-C-TW15-U0-DR.P-M-0001- S1- P1
Drainage map ub5 5hl
united kingdom
t : : +44(0)20 8935 5856
e::
© Copyright 1985-2018
M DR.P U0 50.00.00.00 0001
drawing no.
2
scale
Drainage BG
As indicated
description of revision
21-C-57
rev P1
checked by
N
title
M
21-C
sub no.
L
21-C-184
3 originator
5 K
430 Staines Road West Ashford TW15 1RZ
project ref
0 J
FL202
drawn by
I
site address
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
H
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
G
1 : 100
f N 170411953.2 E 508154531.8
F
UP00.50.0 - DISPOSAL SYSTEMS - Ground Level
5 N 170399797.9 E 508152674.9
4 N 170412895.9 E 508155905.9
E
N 170409526.4 E 508150558.9
0 0.000 m
150
UP
f D
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
1
N 170403475.7 E 508141166.1
N 170423743.2 E 508146487.0
s
-139 -0.139 m
C
N 170414393.4 E 508145469.5
N 170415357.5 E 508144282.0
N 170425847.5 E 508145205.4
6 -150 -0.150 m
A1
B
150
A P date 180517
10 m
1
21-C DESIGNS Westcraft Limited Design Office
A
B
C
D
E
F
G
H
I
J
K
L
M
N
P
A1
rev P1
description of revision
Sanitary systems
date 180517
2
Westcraft Limited Design Office
drawing no. scale
As indicated
checked by
drawn by
4
21-C-57
1:1
title
1:1
3DR-U0-40.15.75.00-0004
21-C-184
5
430 Staines Road West Ashford TW15 1RZ
4
1 : 20
3DR-U0-40.15.75.00-0003
FL202
1
UP00.40.15.75.00.1.3 - SANITARY SYSTEMS - 0 Level - F.0.1.3 - Ensuite
project ref
originator
3
21-C
sub no.
420
700
400
MP U0 40.15.75.00 0001
5.75.00 .1.3 F.0.1.3 -0040
© Copyright 1985-2018
AE.40.1
3
21-C DESIGNS 350
668
MP.DR-U0-40.15.75.00-0001 A1
AE.40.1 2
5.75.00 .1.3 F.0.1.3 -0010
1
B
UP01 - 1 Level - 16.394
2775.0
UP01 - 1 Level - 16.394
2775.0
UP01 - 1 Level - 16.394
2775.0
2775.0
t : : +44(0)20 8935 5856
UP01 - 1 Level - 16.394
e::
5
6 1.3.6 SPE.SH.06.ZZ.1000
1.3.7 1.3.1
SPE.SH.03.ZZ.1004
1.3.8
1.3.3
1.3.3
SWB.06.ZZ.1030
1.3.2
1.3.5 SSC.01.ZZ.1200
northolt
1300
STL.01.ZZ.1030
1038
850
1045
SWB.06.ZZ.1030
1800
7
middlesex
SPE.WB.07.ZZ.1004
1200
1.3.8 SPE.WB.07.ZZ.1004
164
STL.04.ZZ.1030
ub5 5hl
793
united kingdom
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
200
220
1.3.2 STL.01.ZZ.1030
FEFS.10.10.S
57 summit road
458
1.3.4 SST.01.ZZ.1234
Ss_30_42_32_40 <23.0 mm>
UP00 - Ground Level - 13.619
0.0
2
UP00 - Ground Level - 13.619
0.0
UP00 - Ground Level - 13.619
0.0
AE.40.15.75.00.1.3-0010 F.0.1.3
3
1 : 20
0.0
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
UP00 - Ground Level - 13.619
8
AE.40.15.75.00.1.3-0040 F.0.1.3 1 : 20
9
BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0001- S1- P1
11
ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE
Mark 1.3.1 1.3.2 1.3.3 1.3.4 1.3.5 1.3.6 1.3.7 1.3.8
Type Mark STL.04.ZZ.1030 STL.01.ZZ.1030 SWB.06.ZZ.1030 SST.01.ZZ.1234 SSC.01.ZZ.1200 SPE.SH.06.ZZ.1000 SPE.SH.03.ZZ.1004 SPE.WB.07.ZZ.1004
Description Cistern unit Wall hung toilet pan with seat Cabinet mounted basin Flush level tray Fixed shower screen Shower head Bath wall spout Basin wall filler set
Classification.Uniclass.S Classification.Uniclass.Ss. Classification.Uniclass s.Number Description .Pr.Number Ss_40_15_90_97 Ss_40_15_90_97 Ss_40_15_75_94 Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_75_94
WC systems WC systems Wash basin systems Shower area systems Shower area systems Shower area systems Shower area systems Wash basin systems
Pr_40_20_93_89 Pr_40_20_93_94 Pr_40_20_96_96 Pr_40_20_06_84 Pr_40_20_06_79 Pr_40_20_87_76 Pr_40_20_87_81 Pr_40_20_87_99
Classification.Uniclass.Pr.Description WC cisterns WC pans Wall-hung wash basins Shower trays Shower enclosures Shower heads Shower thermostatic water supply sets Washbasin thermostatic water supply sets
Manufacturer
Comments
STL.01.ZZ.1234[0] STL STB SWB SST SBD SSC SPE.BT SPE.WB SPE.SH SPE.BD
Geberit
TW15 A
Toilet Bathtub Wash basin Shower tray Bidet Screens Plumbing equipment - bath Plumbing equipment - basin Plumbing equipment - shower Plumbing equipment - bidet
STL = appliance name 01 = type ZZ = manufacturer 1 = size requirement 2 = material requirement 3 = colour requirement 4 = finish requirement [0] = no requirements
40.15.75 - KEY - Sanitary Appliance Systems 1:1
B
C
D
E
F
G
H
I
J
K
L
M
N
P
BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0001- S1- P1
F.0.1.3 F.0.1.3 F.0.1.3 F.0.1.3 F.0.1.3 F.0.1.3 F.0.1.3 F.0.1.3
10
Room: Name
x = space reference y = room number # = equipment mark
F.0.1.3 Sanitary systems
Room: Number
x.y.#
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
MT-U0-40.15.75.00-0001 -Sanitary systems F1.3
site address
40.15.75 - Sanitary Appliance Systems
A
B
C
D
E
F
G
H
I
J
K
L
M
N
A1
rev P1
P description of revision
Sanitary systems
date 180517
1
21-C DESIGNS
originator
5
1:1
3DR-U0-40.15.75.00-0006
checked by
3DR-U0-40.15.75.00-0005
title
4
1 : 20
430 Staines Road West Ashford TW15 1RZ
project ref
UP00.40.15.75.00.2.2 - SANITARY SYSTEMS - 0 Level - F.0.2.2 - Ensuite
FL202
1
drawn by
4
1:1
B
drawing no.
341
3
scale
357
sub no.
393
As indicated
5.75.00 .2.2 F.0.2.2 -0040
21-C-57
3
21-C
AE.40.1
MP U0 40.15.75.00 0004
2
© Copyright 1985-2018
MP.DR-U0-40.15.75.00-0004 A1
21-C-184
466
AE.40.1
2
5.75.00 .2.2 F.0.2.2 -0030
466
Westcraft Limited Design Office
2
UP01 - 1 Level - 16.394
UP01 - 1 Level - 16.394
2775.0
2775.0
6
2.2.1 SSC.01.ZZ.1200
200
2.2.9 SSC.01.ZZ.1200
FEFW.40
2.2.2
Ss_40_45_70_24 <40.0 mm>
SPE.SH.06.ZZ.1000
1510 1.510 m
783
united kingdom
115
2775.0
ub5 5hl
UP01 - 1 Level - 16.394
2775.0
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
UP01 - 1 Level - 16.394
t : : +44(0)20 8935 5856
e::
5
2.2.3
middlesex
SPE.SH.03.ZZ.1004
164
7 2.2.5 2.2.8
STL.04.ZZ.1030
northolt
1800
SPE.WB.07.ZZ.1004
2.2.6
2.2.7
FEFS.10.10.S UP00 - Ground Level - 13.619
Ss_30_42_32_40 <23.0 mm>
UP00 - Ground Level - 13.619
0.0
SST.01.ZZ.1234
UP00 - Ground Level - 13.619
0.0
AE.40.15.75.00.2.2-0030 F.0.2.2
3
1 : 20
0.0 Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
0.0
2
57 summit road
1200 SWB.06.ZZ.1030
UP00 - Ground Level - 13.619
9
940
850
1038
2.2.4
435
8
STL.01.ZZ.1030
AE.40.15.75.00.2.2-0040 F.0.2.2 1 : 20
11
F.0.2.2 F.0.2.2 F.0.2.2 F.0.2.2 F.0.2.2 F.0.2.2 F.0.2.2 F.0.2.2 F.0.2.2
TW15 A
ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE
Mark 2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 2.2.6 2.2.7 2.2.8 2.2.9
Type Mark SSC.01.ZZ.1200 SPE.SH.06.ZZ.1000 SPE.SH.03.ZZ.1004 SWB.06.ZZ.1030 STL.04.ZZ.1030 STL.01.ZZ.1030 SST.01.ZZ.1234 SPE.WB.07.ZZ.1004 SSC.01.ZZ.1200
Description Fixed shower screen Shower head Bath wall spout Cabinet mounted basin Cistern unit Wall hung toilet pan with seat Flush level tray Basin wall filler set Fixed shower screen
Classification.Uniclass.S Classification.Uniclass.Ss. Classification.Uniclass s.Number Description .Pr.Number Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_75_94 Ss_40_15_90_97 Ss_40_15_90_97 Ss_40_15_75_78 Ss_40_15_75_94 Ss_40_15_75_78
Shower area systems Shower area systems Shower area systems Wash basin systems WC systems WC systems Shower area systems Wash basin systems Shower area systems
Pr_40_20_06_79 Pr_40_20_87_76 Pr_40_20_87_81 Pr_40_20_96_96 Pr_40_20_93_89 Pr_40_20_93_94 Pr_40_20_06_84 Pr_40_20_87_99 Pr_40_20_06_79
Classification.Uniclass.Pr.Description Shower enclosures Shower heads Shower thermostatic water supply sets Wall-hung wash basins WC cisterns WC pans Shower trays Washbasin thermostatic water supply sets Shower enclosures
Manufacturer
Comments
STL.01.ZZ.1234[0] STL STB SWB SST SBD SSC SPE.BT SPE.WB SPE.SH SPE.BD
Hüppe-FI
Geberit
Hüppe-FI
Toilet Bathtub Wash basin Shower tray Bidet Screens Plumbing equipment - bath Plumbing equipment - basin Plumbing equipment - shower Plumbing equipment - bidet
STL = appliance name 01 = type ZZ = manufacturer 1 = size requirement 2 = material requirement 3 = colour requirement 4 = finish requirement [0] = no requirements
40.15.75 - KEY - Sanitary Appliance Systems 1:1
B
C
D
E
F
G
H
I
J
K
L
M
N
P
BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0004- S1- P1
BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0004- S1- P1
10
Room: Name
x = space reference y = room number # = equipment mark
F.0.2.3 Sanitary systems
Room: Number
x.y.#
site address
MT-U0-40.15.75.00-0003 -Sanitary systems F2.2
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
40.15.75 - Sanitary Appliance Systems
A
B
C
D
E
F
G
H
I
J
K
L
M
N
P
A1
rev P1
description of revision
Sanitary systems
date 180517
1
21-C DESIGNS Westcraft Limited Design Office
5.75.00 .2.3 F.0.2.3 -0040
21-C 21-C-184
UP00.40.15.75.00.2.3 - SANITARY SYSTEMS - 0 Level - F.0.2.3 - Bathroom
checked by
430 Staines Road West Ashford TW15 1RZ
title
drawn by
4
UP01 - 1 Level - 16.394
UP01 - 1 Level - 16.394
UP01 - 1 Level - 16.394
2775.0
2
1:1
UP01 - 1 Level - 16.394
2775.0
UP01 - 1 Level - 16.394
2775.0
UP01 - 1 Level - 16.394
2775.0
2775.0
200
2775.0
3DR-U0-40.15.75.00-0008
6
1:1
e::
3DR-U0-40.15.75.00-0007
t : : +44(0)20 8935 5856
5
5
2.3.5
220 SPE.SH.06.ZZ.1000
6 2.3.5 SSC.01.ZZ.1200
1504 1.504 m
1504 1.504 m
2.3.7 SPE.SH.03.ZZ.1004
2.3.7 2.3.8
2.3.1
7
2.3.8
1800
STL.04.ZZ.1030
SWB.06.ZZ.1030
northolt
FEFS.10.10.S
2.3.4 SST.01.ZZ.1234
UP00 - Ground Level - 13.619
UP00 - Ground Level - 13.619
0.0
UP00 - Ground Level - 13.619
0.0
2.3.3 STL.01.ZZ.1030
940
438
850
965
STL.01.ZZ.1030
SWB.06.ZZ.1030
1300
2.3.3
STL.01.ZZ.1030
STL.04.ZZ.1030
2.3.1
1200
2.3.3
2.3.2
SPE.WB.07.ZZ.1004
middlesex
164
SPE.WB.07.ZZ.1004
2.3.2
57 summit road
SPE.SH.03.ZZ.1004
united kingdom
SPE.SH.06.ZZ.1000
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
2.3.6
ub5 5hl
SSC.01.ZZ.1200
2.3.6
Ss_30_42_32_40 <23.0 mm>
UP00 - Ground Level - 13.619
0.0
UP00 - Ground Level - 13.619
0.0
UP00 - Ground Level - 13.619
0.0
0.0
8
AE.40.15.75.00.2.3-0030 F.0.2.3
4
1 : 20
AE.40.15.75.00.2.3-0040 F.0.2.3 1 : 20
9
MT-U0-40.15.75.00-0004 -Sanitary systems F2.3 Room: Number
BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0003- S1- P1
10
11
F.0.2.3 F.0.2.3 F.0.2.3 F.0.2.3 F.0.2.3 F.0.2.3 F.0.2.3 F.0.2.3
TW15 A
Room: Name BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM
Mark 2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 2.3.6 2.3.7 2.3.8
Type Mark SWB.06.ZZ.1030 STL.04.ZZ.1030 STL.01.ZZ.1030 SST.01.ZZ.1234 SSC.01.ZZ.1200 SPE.SH.06.ZZ.1000 SPE.SH.03.ZZ.1004 SPE.WB.07.ZZ.1004
Description Cabinet mounted basin Cistern unit Wall hung toilet pan with seat Flush level tray Fixed shower screen Shower head Bath wall spout Basin wall filler set
Classification.Uniclass.S Classification.Uniclass.Ss. Classification.Uniclass s.Number Description .Pr.Number Ss_40_15_75_94 Ss_40_15_90_97 Ss_40_15_90_97 Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_75_94
Wash basin systems WC systems WC systems Shower area systems Shower area systems Shower area systems Shower area systems Wash basin systems
Pr_40_20_96_96 Pr_40_20_93_89 Pr_40_20_93_94 Pr_40_20_06_84 Pr_40_20_06_79 Pr_40_20_87_76 Pr_40_20_87_81 Pr_40_20_87_99
Classification.Uniclass.Pr.Description Wall-hung wash basins WC cisterns WC pans Shower trays Shower enclosures Shower heads Shower thermostatic water supply sets Washbasin thermostatic water supply sets
Manufacturer
x.y.#
Comments
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
40.15.75 - Sanitary Appliance Systems x = space reference y = room number # = equipment mark
STL.01.ZZ.1234[0] STL STB SWB SST SBD SSC SPE.BT SPE.WB SPE.SH SPE.BD
Geberit
Toilet Bathtub Wash basin Shower tray Bidet Screens Plumbing equipment - bath Plumbing equipment - basin Plumbing equipment - shower Plumbing equipment - bidet
STL = appliance name 01 = type ZZ = manufacturer 1 = size requirement 2 = material requirement 3 = colour requirement 4 = finish requirement [0] = no requirements
40.15.75 - KEY - Sanitary Appliance Systems 1:1 B
C
D
E
F
G
H
I
J
K
L
M
N
P
F.0.2.2 Sanitary systems
3
1 : 20
site address
AE.40.15.75.00.2.3-0020 F.0.2.3
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
2
BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0003- S1- P1
2
21-C-57
1 : 20
FL202
1
project ref
originator
3
© Copyright 1985-2018
4
MP U0 40.15.75.00 0003
AE.40.1
drawing no.
3
scale
2 MP.DR-U0-40.15.75.00-0003 A1
sub no.
AE.40.1
2
5.75.00 .2.3 F.0.2.3 -0020
As indicated
5.75.00 .2.3 F.0.2.3 -0030
AE.40.1
A
B
C
D
E
F
G
H
I
J
K
L
M
N
A1
rev P1
P description of revision
Sanitary systems
date 180517
335
1
21-C DESIGNS
3DR-U0-40.15.75.00-0002 1:1
5
drawing no. checked by
6
1:1
title
3DR-U0-40.15.75.00-0001
430 Staines Road West Ashford TW15 1RZ
5
1 : 20
drawn by
UP00.40.15.75.00.1.4 - SANITARY SYSTEMS - 0 Level - F.0.1.4 - Bathroom
1
4
FL202
project ref
923
21-C
originator
3
21-C-184
251
671
251
sub no.
5.75.00 .1.4 F.0.1.4 -0040
scale
4
AE.40.1
AE.40.1
As indicated
2
608
3 MP.DR-U0-40.15.75.00-0002 A1
MP U0 40.15.75.00 0002
5.75.00 .1.4 F.0.1.4 -0020
21-C-57
2
5.75.00 .1.4 F.0.1.4 -0010
AE.40.1
© Copyright 1985-2018
Westcraft Limited Design Office
5
e::
5 UP01 - 1 Level - 16.394
UP01 - 1 Level - 16.394
2775.0
UP01 - 1 Level - 16.394
2775.0
2775.0
FEFW.40 Ss_40_45_70_24 <40.0 mm>
1504 1.504 m
1.4.8
40
SSC.01.ZZ.1200
united kingdom
1.4.6 SPE.SH.06.ZZ.1000
ub5 5hl
200
6
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
220
2775.0
t : : +44(0)20 8935 5856
UP01 - 1 Level - 16.394
164
1.4.7 SPE.SH.03.ZZ.1004
SPE.WB.07.ZZ.1004
1.4.9
1800
middlesex
1.4.3
7
STL.04.ZZ.1030
684
1.4.2
AE.40.15.75.00.1.4-0010 F.0.1.4
northolt UP00 - Ground Level - 13.619
0.0
AE.40.15.75.00.1.4-0020 F.0.1.4
3
1 : 20
UP00 - Ground Level - 13.619
0.0
0.0
AE.40.15.75.00.1.4-0040 F.0.1.4
4
1 : 20
57 summit road
UP00 - Ground Level - 13.619
0.0
1 : 20
9
MT-U0-40.15.75.00-0002 -Sanitary systems F1.4
BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0002- S1- P1
10
11
Room: Number F.0.1.4 F.0.1.4 F.0.1.4 F.0.1.4 F.0.1.4 F.0.1.4 F.0.1.4 F.0.1.4 F.0.1.4
TW15 A
Room: Name BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM
Mark 1.4.1 1.4.2 1.4.3 1.4.4 1.4.5 1.4.6 1.4.7 1.4.8 1.4.9
Type Mark STB.01.ZZ.1030 SWB.06.ZZ.1030 SPE.WB.07.ZZ.1004 STL.01.ZZ.1030 SPE.BT.08.ZZ.1004 SPE.SH.06.ZZ.1000 SPE.SH.03.ZZ.1004 SSC.01.ZZ.1200 STL.04.ZZ.1030
Description Bath tub Cabinet mounted basin Basin wall filler set Wall hung toilet pan with seat Bath wall spout Shower head Bath wall spout Fixed shower screen Cistern unit
x.y.#
Classification.Uniclass.S Classification.Uniclass.Ss. Classification.Uniclass s.Number Description .Pr.Number Ss_40_15_75_05 Ss_40_15_75_94 Ss_40_15_75_94 Ss_40_15_90_97 Ss_40_15_75_05 Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_75_78 Ss_40_15_90_97
Bath systems Wash basin systems Wash basin systems WC systems Bath systems Shower area systems Shower area systems Shower area systems WC systems
Pr_40_20_06_08 Pr_40_20_96_96 Pr_40_20_87_99 Pr_40_20_93_94 Pr_40_20_87_08 Pr_40_20_87_76 Pr_40_20_87_81 Pr_40_20_06_79 Pr_40_20_93_89
Classification.Uniclass.Pr.Description
Manufacturer
Baths Wall-hung wash basins Washbasin thermostatic water supply sets WC pans Bath spouts Shower heads Shower thermostatic water supply sets Shower enclosures WC cisterns
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
40.15.75 - Sanitary Appliance Systems x = space reference y = room number # = equipment mark
STL.01.ZZ.1234[0]
Comments STL STB SWB SST SBD SSC SPE.BT SPE.WB SPE.SH SPE.BD
Hüppe-FI Geberit
Toilet Bathtub Wash basin Shower tray Bidet Screens Plumbing equipment - bath Plumbing equipment - basin Plumbing equipment - shower Plumbing equipment - bidet
STL = appliance name 01 = type ZZ = manufacturer 1 = size requirement 2 = material requirement 3 = colour requirement 4 = finish requirement [0] = no requirements
40.15.75 - KEY - Sanitary Appliance Systems 1:1 B
C
D
E
F
G
H
I
J
K
L
M
N
P
BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0002- S1- P1
UP00 - Ground Level - 13.619
0.0
F.0.1.4 Sanitary systems
1.4.4 STL.01.ZZ.1030
site address
UP00 - Ground Level - 13.619
0.0
1.4.2 SWB.06.ZZ.1030
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
UP00 - Ground Level - 13.619
2
STB.01.ZZ.1030
611
850 458
634 8
1.4.1
1.4.5 SPE.BT.08.ZZ.1004
1038
1200
1300
SWB.06.ZZ.1030
A
B
C
D
E
F
G
H
I
J
K
L
M
N
A1
rev P1
P description of revision Fire planning requirements BC
date 180628
1
21-C DESIGNS
D1.11
MP U1 75.50.28.29 0001
drawing no.
1 : 50
scale checked by title
FD30(S)mins
430 Staines Road West Ashford TW15 1RZ
FD30mins
FD30(S)mins
drawn by
4
D1.9
FL202
D1.8 D1.10
21-C-57
21-C-184
project ref
originator
3
21-C
sub no.
2
Š Copyright 1985-2018
Westcraft Limited Design Office
D1.2
FD30mins
FD30(S)mins
D1.3 FD30(S)mins
D1.7 FD30(S)mins
D1.1
D1.4
FD30(S)mins
FD30mins
D1.12 FD30mins
t : : +44(0)20 8935 5856
e::
5
D1.13
D1.6
middlesex
FD30(S)mins
ub5 5hl
D1.5 FD30mins
6
united kingdom
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
FD30(S)mins
57 summit road
northolt
7
8
60 Min. Fire Sub Compartment Wall
Class B
Flammable liquids
30 Min. Fire Sub Compartment Wall
Class C
Flammable gases
AOV protected area
Class D
Flammable metals
Dry Riser
Not Classified Electrical Fires
20 Min. Fire Rating
Class F
Cooking oils and fats
FD30SC 30 Min. Fire Rating. Fire Door with Smoke Seal FD60SC 60 Min. Fire Rating. Fire Door with Smoke Seal
Cooking areas - residential - Class F Risk General protected lobby Internal protected lobby
Mains connected sensors
FIRE SUPRESSION
Sprinkler head
Class A
Water, Foam, Dry Powder, Wet Chemical
Final Exit
Class B
Foam, Dry powder, CO2 Gas
Class C
Dry powder M28/L2 Special powders
Exit point
Sleeping areas - residential - Class A Risk 0.3 m 0.3 m
Risk Exit point
Class D
Direction of Escape
Electrical fires Non conducting dry powder, CO2
Dwelling Escape Distances
Class F
Wet chemical
General Escape Distances
BS1192 2007 : 21-C-184-21-C-TW15-U1-.P-M-0001- S1- P1
10
1
11
75.50.28.29 - KEY - Fire plan
UP01.75.50.28.29 - FIRE SYSTEMS - 1 Level 1 : 50
TW15 A
B
C
D
E
F
G
H
I
J
K
L
M
N
P
BS1192 2007 : 21-C-184-21-C-TW15-U1-.P-M-0001- S1- P1
Combustible materials (wood, paper, fabric, refuse)
Fire Planning
AOV protected area
Class A
Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
9
120 Min. Fire Compartment Wall
site address
FD20
FIRE TYPE CLASSIFICATION Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
75.50.28.29
A
B
C
D
E
F
G
H
I
J
K
L
M
N
A1
rev P1
P description of revision Fire planning requirements BC
date 180628
1
MT-U0-40.10.30.30-0001 - Fire Equipment
EFS.[0]02.ZZ.1111
Pr_75_75_30_65 Point smoke detectors
Ss_75_50_28_29 Fire detection and alarm systems
F.0.1.6 ENTRANCE LOBBY
Internal protected lobby
U.0.3
EFS.[0]02.ZZ.1111
Pr_75_75_30_65 Point smoke detectors
Ss_75_50_28_29 Fire detection and alarm systems
F.0.1.5 KITCHEN/LOUNGE/DINER
Cooking areas - residential U.0.4 - Class F Risk
EFS.[0]03.ZZ.1111
Pr_75_75_30_64 Point heat detectors
Ss_75_50_28_29 Fire detection and alarm systems
F.0.2.6 KITCHEN/LOUNGE/DINER
Cooking areas - residential U.0.5 - Class F Risk
EFS.[0]03.ZZ.1111
Pr_75_75_30_64 Point heat detectors
Ss_75_50_28_29 Fire detection and alarm systems
F.0.2.5 BEDROOM2
Sleeping areas - residential U.0.6 - Class A Risk
EFS.[0]05.ZZ.1111
Pr_75_75_30_65 Point smoke detectors
Ss_75_50_28_29 Fire detection and alarm systems
F.0.2.1 BEDROOM1
Sleeping areas - residential U.0.7 - Class A Risk
EFS.[0]05.ZZ.1111
Pr_75_75_30_65 Point smoke detectors
Ss_75_50_28_29 Fire detection and alarm systems
F.0.1.1 BEDROOM2
Sleeping areas - residential U.0.8 - Class A Risk
EFS.[0]05.ZZ.1111
Pr_75_75_30_65 Point smoke detectors
Ss_75_50_28_29 Fire detection and alarm systems
F.0.1.2 BEDROOM1
Sleeping areas - residential U.0.9 - Class A Risk
EFS.[0]05.ZZ.1111
Pr_75_75_30_65 Point smoke detectors
Ss_75_50_28_29 Fire detection and alarm systems
C.0.1
ENTRANCE HALL
General protected lobby
U.0.10
C.0.2
STAIRS
AOV protected area
U.0.11
C.0.1
ENTRANCE HALL
General protected lobby
U.0.12
EFT.[1]04.BO.1111 Pr_75_75_30_50 Manual call points Ss_75_50_28_29 Fire detection and alarm systems EFT.[1]04.BO.1111 Pr_75_75_30_50 Manual call points Ss_75_50_28_29 Fire detection and alarm systems EFA.[0]01.BO.1110 Pr_75_75_30_30 Fire alarm Ss_75_50_28_29 Fire detection and alarm sounders systems
=
1000
=
400
U.0.10 EFT.[1]04.BO.1111
=
=
1000
U.0.9 EFS.[0]05.ZZ.1111
=
=
U.0.1 EFS.[0]02.ZZ.1111
900
5
U.0.11 EFT.[1]04.BO.1111
U.0.2 EFT.[0]02.BO.0111
U.0.4 EFE.[0]01.ZZ.0110 U.0.5 EFE.[0]04.ZZ.0110
6 U.0.3 EFT.[0]02.BO.0111 U.0.3 EFS.[0]02.ZZ.1111
U.0.2 EFS.[0]02.ZZ.1111
=
=
=
=
1200
=
900 =
=
2100
=
U.0.5 :: SSD15.1
U.0.3 :: SSD15.1
=
=
U.0.6 EFS.[0]05.ZZ.1111
7
=
50 13
506
=
U.0.4 EFS.[0]03.ZZ.1111
U.0.7 :: SSD15.1
=
U.0.5 EFS.[0]03.ZZ.1111
1200
=
=
=
1800
8
=
=
=
= U.0.8 :: SSD15.1
=
=
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
9
BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0002- S1- P1
10
1
11
UP00.75.50.28.29 - FIRE SYSTEMS - CEILING PLAN - 0 Level - Ground Level 1 : 50
TW15 A
B
C
D
21-C
originator
© Copyright 1985-2018
Addressable unit to be installed btween 1800-2200mm above finished floor level
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
U.0.4 :: SSD15.1
Addressable unit to be installed btween 900-1100mm above finished floor level
E
F
G
H
I
J
K
L
M
N
P
BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-M-0002- S1- P1
500
=
1000 4
Fire Systems
=
U.0.2 :: SSD15.1 U.0.8 EFS.[0]05.ZZ.1111
e::
U.0.2
=
500
t : : +44(0)20 8935 5856
Internal protected lobby
= U.0.7 EFS.[0]05.ZZ.1111
united kingdom
F.0.2.7 ENTRANCE LOBBY
Optical Beam Smoke sensors are used to provide “wide area” smoke detection. These shall be used in situations where it is either impractical, inappropriate or not cost effective (installation, wiring and maintenance) to use traditional point-type detectors. Optical Beam Smoke Detectors are also ideally suited for situations that might include high ceilings, dusty and dirty environments, or environments that experience temperature extremes. General applications are in commercial environments eg. Atriums, Conference / Exhibition Centres, Shopping Malls, Historic Buildings etc. Residential applications are for high atriums or vaulted ceilings where access is difficult. Optical Beam Smoke sensors are used to provide “wide area” smoke detection. These shall be used in situations where it is either impractical, inappropriate or not cost effective (installation, wiring and maintenance) to use traditional point-type detectors. Optical Beam Smoke Detectors are also ideally suited for situations that might include high ceilings, dusty and dirty environments, or environments that experience temperature extremes. General applications are in commercial environments eg. Atriums, Conference / Exhibition Centres, Shopping Malls, Historic Buildings etc. Residential applications are for high atriums or vaulted ceilings where access is difficult. Optical Beam Smoke sensors are used to provide “wide area” smoke detection. These shall be used in situations where it is either impractical, inappropriate or not cost effective (installation, wiring and maintenance) to use traditional point-type detectors. Optical Beam Smoke Detectors are also ideally suited for situations that might include high ceilings, dusty and dirty environments, or environments that experience temperature extremes. General applications are in commercial environments eg. Atriums, Conference / Exhibition Centres, Shopping Malls, Historic Buildings etc. Residential applications are for high atriums or vaulted ceilings where access is difficult. Heat sensors shall be shall be mains powered with a backup rechargeable lithium battery. Heat detectors shall be used in applications where smoke detectors are unsuitable. Commercial applications shall be subject to full fire engineering and design. The residential applications of the heat sensors shall be use in accordance with recommendations from BS 5839: Part 6: 2004 - heat sensors should be used in the kitchens, appliance rooms; utility rooms and in the main living room. Heat Sensors should not be installed in the circulation spaces or areas. Heat sensors shall be shall be mains powered with a backup rechargeable lithium battery. Heat detectors shall be used in applications where smoke detectors are unsuitable. Commercial applications shall be subject to full fire engineering and design. The residential applications of the heat sensors shall be use in accordance with recommendations from BS 5839: Part 6: 2004 - heat sensors should be used in the kitchens, appliance rooms; utility rooms and in the main living room. Heat Sensors should not be installed in the circulation spaces or areas. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Addressable unit to be installed btween 900-1100mm above finished floor level
ub5 5hl
Ss_75_50_28_29 Fire detection and alarm systems
middlesex
Pr_75_75_30_65 Point smoke detectors
northolt
EFS.[0]02.ZZ.1111
57 summit road
U.0.1
checked by
General protected lobby
title
ENTRANCE HALL
U.0.1 :: SSD15.1
_nnl_SS.01_System usage
21-C-184
C.0.1
Classification.Unic Classification.Unic Classification.Unic Classification.Uniclass.Ss. lass.Pr.Number lass.Pr.Description lass.Ss.Number Description
site address
U.0.12 EFA.[0]01.BO.1110
Type Mark
430 Staines Road West Ashford TW15 1RZ
=
600
Mark
project ref
=
Room: Name
FL202
=
U.0.6 :: SSD15.1
Room: _nnl_75_50_28_29.01 Space category
drawn by
=
Room: Number
MP U0 75.50.28.29 0002
Fire signage systems Fire signage systems Portable fire extinguisher systems Portable fire extinguisher systems Fire signage systems
MT-U0-75.50.28.29-0001 - Fire Devices & Sensors
=
=
Ss_40_10_30_30 Ss_40_10_30_30 Ss_55_30_65_65 Ss_55_30_65_65 Ss_40_10_30_30
drawing no.
Fire escape route signs Fire escape route signs Water fire extinguishers Carbon dioxide fire extinguishers Fire escape route signs
Westcraft Limited Design Office
1 : 50
Pr_40_10_77_32 Pr_40_10_77_32 Pr_40_50_28_96 Pr_40_50_28_11 Pr_40_10_77_32
Classification.Uniclass.Ss.Description
sub no.
EFT.[0]01.BO.0111 EFT.[0]02.BO.0111 EFE.[0]01.ZZ.0110 EFE.[0]04.ZZ.0110 EFT.[0]02.BO.0111
Classification.Uniclass.Pr.Description
U.0.1 EFT.[0]01.BO.0111
=
3
U.0.1 U.0.2 U.0.4 U.0.5 U.0.3
Type Mark
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
=
2
ENTRANCE HALL STAIRS STAIRS STAIRS STAIRS
Mark
21-C DESIGNS
scale
C.0.1 C.0.2 C.0.2 C.0.2 C.0.2
Room: Name
Classification.Uniclas s.Ss.Number
21-C-57
Room: Number
Classification.Unic lass.Pr.Number
A
B
C
D
E
F
G
H
I
J
K
L
M
N
A1
rev P1
P description of revision Fire planning requirements BC
date 180628
1
21-C DESIGNS
D0.3 FD30(S)mins
D0.2
Š Copyright 1985-2018
drawing no.
1 : 50
project ref
D0.9 FD30(S)mins
scale
D0.10 FD30mins
21-C-184
originator
3
21-C
sub no.
2
M DR.P U0 75.50.28.29 0001
Westcraft Limited Design Office
checked by
430 Staines Road West Ashford TW15 1RZ
title
drawn by
FD30(S)mins
FL202
D0.4
4 D0.8
21-C-57
FD30(S)mins
FD30(S)mins
D0.1 FD30(S)mins
D0.5 FD30mins
UP
D0.11 FD30mins
t : : +44(0)20 8935 5856
e::
5
D0.6
D0.7 FD30(S)mins
D0.12 FD30(S)mins
D0.13
middlesex
FD30(S)mins
ub5 5hl
6
united kingdom
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
FD30mins
57 summit road
northolt
7
75.50.28.29
9
FD20
60 Min. Fire Sub Compartment Wall
Class B
Flammable liquids
30 Min. Fire Sub Compartment Wall
Class C
Flammable gases
AOV protected area
Class D
Flammable metals
Dry Riser
Not Classified Electrical Fires
20 Min. Fire Rating
Class F
Combustible materials (wood, paper, fabric, refuse)
Cooking oils and fats
Class A
Water, Foam, Dry Powder, Wet Chemical
Final Exit
Class B
Foam, Dry powder, CO2 Gas
Class C
Dry powder M28/L2 Special powders
Sleeping areas - residential - Class A Risk
0.3 m 0.3 m
UP00.75.50.28.29 - FIRE SYSTEMS - 0 Level - Ground
Risk Exit point
Class D
Direction of Escape
Electrical fires Non conducting dry powder, CO2
Dwelling Escape Distances
Class F
Wet chemical
General Escape Distances
75.50.28.29 - KEY - Fire plan
1 : 50
TW15 A
B
C
D
E
F
G
H
I
J
K
L
M
N
P
BS1192 2007 : 21-C-184-21-C-TW15-U0-DR.P-M-0001- S1- P1
Sprinkler head
Fire Planning
FIRE SUPRESSION
site address
Mains connected sensors
Exit point
Internal protected lobby BS1192 2007 : 21-C-184-21-C-TW15-U0-DR.P-M-0001- S1- P1
Class A
Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
General protected lobby
11
120 Min. Fire Compartment Wall
FD60SC 60 Min. Fire Rating. Fire Door with Smoke Seal
Cooking areas - residential - Class F Risk
1
FIRE TYPE CLASSIFICATION
FD30SC 30 Min. Fire Rating. Fire Door with Smoke Seal
AOV protected area
10
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
8
A
B
C
D
E
F
G
H
I
J
K
L
M
N
A1
rev P1
P description of revision Fire planning requirements BC
date 180628
1
21-C DESIGNS
Carbon dioxide fire extinguishers Water fire extinguishers Fire escape route signs Fire escape route signs Fire escape route signs
Ss_55_30_65_65 Ss_55_30_65_65 Ss_40_10_30_30 Ss_40_10_30_30 Ss_40_10_30_30
Classification.Uniclass.Ss.Description Portable fire extinguisher systems Portable fire extinguisher systems Fire signage systems Fire signage systems Fire signage systems
= 1100
General protected lobby
U.2.2
EFA.[0]01.BO.1110
Pr_75_75_30_30 Fire alarm sounders
F.2.6.4 LOUNGE/KITCHEN/DINER
Cooking areas - residential U.2.7 - Class F Risk
EFS.[0]03.ZZ.1111
Pr_75_75_30_64 Point heat detectors
F.2.5.5 KITCHEN/LOUNGE/DINER
Cooking areas - residential U.2.6 - Class F Risk
EFS.[0]03.ZZ.1111
Pr_75_75_30_64 Point heat detectors
F.2.6.2 BEDROOM1
Sleeping areas - residential U.2.10 - Class A Risk
EFS.[0]05.ZZ.1111
Pr_75_75_30_65 Point smoke detectors Ss_75_50_28_29 Fire detection and alarm systems
F.2.6.1 BEDROOM2
Sleeping areas - residential U.2.11 - Class A Risk
EFS.[0]05.ZZ.1111
Pr_75_75_30_65 Point smoke detectors Ss_75_50_28_29 Fire detection and alarm systems
F.2.5.1 BEDROOM2
Sleeping areas - residential U.2.3 - Class A Risk
EFS.[0]05.ZZ.1111
Pr_75_75_30_65 Point smoke detectors Ss_75_50_28_29 Fire detection and alarm systems
F.2.5.2 BEDROOM1
Sleeping areas - residential U.2.4 - Class A Risk
EFS.[0]05.ZZ.1111
Pr_75_75_30_65 Point smoke detectors Ss_75_50_28_29 Fire detection and alarm systems
F.2.5.6 ENTRANCE LOBBY
Internal protected lobby
U.2.5
EFS.[0]02.ZZ.1111
Pr_75_75_30_65 Point smoke detectors Ss_75_50_28_29 Fire detection and alarm systems
F.2.6.6 ENTRANCE LOBBY
Internal protected lobby
U.2.8
EFS.[0]02.ZZ.1111
Pr_75_75_30_65 Point smoke detectors Ss_75_50_28_29 Fire detection and alarm systems
1600
1800
U.2.8 EFS.[0]02.ZZ.1111 U.2.1 EFT.[0]01.BO.0111
=
U.2.6 :: SSD15.1
200
=
U.2.5 EFS.[0]02.ZZ.1111
U.2.7 EFS.[0]03.ZZ.1111
3350
Ss_75_50_28_29 Fire detection and alarm systems
U.2.3 EFT.[0]02.BO.0111
1200
7
3500
2100
2000
U.2.2 EFT.[0]02.BO.0111
U.2.6 EFS.[0]03.ZZ.1111
U.2.5 :: SSD15.1
1800
8
BS1192 2007 : 21-C-184-21-C-TW15-U2-.P-M-0002- S1- P1
10
1
11
UP02.75.50.28.29 - FIRE SYSTEMS - CEILING PLAN - 2 Level 1 : 50
TW15 A
B
C
D
E
F
G
H
I
J
K
L
M
N
21-C-57
drawn by Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
9
e::
LANDING 2 LEVEL
t : : +44(0)20 8935 5856
C.2.1
Addressable unit to be installed btween900-1100mm above finished floor level Addressable unit to be installed btween1800-2100mm above finished floor level Heat sensors shall be shall be mains powered with a backup rechargeable lithium battery. Heat detectors shall be used in applications where smoke detectors are unsuitable. Commercial applications shall be subject to full fire engineering and design. The residential applications of the heat sensors shall be use in accordance with recommendations from BS 5839: Part 6: 2004 - heat sensors should be used in the kitchens, appliance rooms; utility rooms and in the main living room. Heat Sensors should not be installed in the circulation spaces or areas. Heat sensors shall be shall be mains powered with a backup rechargeable lithium battery. Heat detectors shall be used in applications where smoke detectors are unsuitable. Commercial applications shall be subject to full fire engineering and design. The residential applications of the heat sensors shall be use in accordance with recommendations from BS 5839: Part 6: 2004 - heat sensors should be used in the kitchens, appliance rooms; utility rooms and in the main living room. Heat Sensors should not be installed in the circulation spaces or areas. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (optical type) shall be mains powered with a backup rechargeable lithium battery. The optical smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used in escape or circulation routes and in areas where there is danger of ignition of furniture and surroundings by cigarettes producing slow, smouldering fires. Smoke sensor (optical type) shall be mains powered with a backup rechargeable lithium battery. The optical smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used in escape or circulation routes and in areas where there is danger of ignition of furniture and surroundings by cigarettes producing slow, smouldering fires.
united kingdom
Ss_75_50_28_29 Fire detection and alarm systems Ss_75_50_28_29 Fire detection and alarm systems Ss_75_50_28_29 Fire detection and alarm systems
ub5 5hl
Pr_75_75_30_50 Manual call points
middlesex
EFT.[1]04.BO.1111
U.2.5 EFE.[0]04.ZZ.0110
=
1800 6
U.2.1
northolt
=
General protected lobby
1350
U.2.4 EFE.[0]01.ZZ.0110
5
LANDING 2 LEVEL
57 summit road
U.2.3 EFS.[0]05.ZZ.1111
U.2.4 :: SSD15.1
C.2.1
_nnl_SS.01_System usage
P
BS1192 2007 : 21-C-184-21-C-TW15-U2-.P-M-0002- S1- P1
U.2.4 EFS.[0]05.ZZ.1111
500
500
500
Classification.Unic Classification.Uniclass. Classification.Unic Classification.Uniclass.Ss.Desc lass.Pr.Number Pr.Description lass.Ss.Number ription
Fire Systems
500
Type Mark
checked by
1350
U.2.3 :: SSD15.1
900
U.2.1 EFT.[1]04.BO.1111
Mark
title
900
Room: Name
430 Staines Road West Ashford TW15 1RZ
U.2.2 EFA.[0]01.BO.1110
=
Room: _nnl_75_50_28_29.01 Space category
FL202
U.2.10 EFS.[0]05.ZZ.1111
Room: Number
=
400
= =
=
350
4
U.2.11 EFS.[0]05.ZZ.1111
site address
U.2.2 :: SSD15.1
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
=
U.2.1 :: SSD15.1
MT-U2-75.50.28.29-0001 - Fire Devices & Sensors
500
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
=
drawing no.
Pr_40_50_28_11 Pr_40_50_28_96 Pr_40_10_77_32 Pr_40_10_77_32 Pr_40_10_77_32
Classification.Uniclas s.Ss.Number
1 : 50
EFE.[0]04.ZZ.0110 EFE.[0]01.ZZ.0110 EFT.[0]01.BO.0111 EFT.[0]02.BO.0111 EFT.[0]02.BO.0111
Classification.Uniclass.Pr.Description
21-C
U.2.5 U.2.4 U.2.1 U.2.2 U.2.3
Classification.Unic lass.Pr.Number
21-C-184
LANDING 2 LEVEL LANDING 2 LEVEL LANDING 2 LEVEL STAIRS STAIRS
Type Mark
project ref
3
Mark
sub no.
C.2.1 C.2.1 C.2.1 C.2.2 C.2.2
Room: Name
originator
Room: Number
scale
MT-U2-40.10.30.30-0001 - Fire Equipment
MP U2 75.50.28.29 0002
2
Š Copyright 1985-2018
Westcraft Limited Design Office
A
B
C
D
E
F
G
H
I
J
K
L
M
N
A1
rev P1
P description of revision Fire planning requirements BC
date 180628
1
21-C DESIGNS
MP U2 75.50.28.29 0001
drawing no.
1 : 50
scale
21-C-57
checked by title
21-C-184 430 Staines Road West Ashford TW15 1RZ
drawn by
4
FL202
project ref
originator
3
21-C
sub no.
2
Š Copyright 1985-2018
Westcraft Limited Design Office
D2.10 FD30mins
D2.9
D2.8
FD30(S)mins
FD30(S)mins
D2.2 FD30(S)mins
D2.3
D2.7
5
FD30(S)mins
e::
FD30(S)mins
D2.4
D2.1
t : : +44(0)20 8935 5856
FD30mins
FD30(S)mins
D2.12 FD30mins
6
D2.5 FD30mins
ub5 5hl
D2.13 FD30(S)mins
united kingdom
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
UP
D2.6
middlesex
FD30(S)mins
57 summit road
northolt
7
75.50.28.29
9
FD20
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
8
FIRE TYPE CLASSIFICATION
120 Min. Fire Compartment Wall
Class A
Combustible materials (wood, paper, fabric, refuse)
60 Min. Fire Sub Compartment Wall
Class B
Flammable liquids
30 Min. Fire Sub Compartment Wall
Class C
Flammable gases
AOV protected area
Class D
Flammable metals
Dry Riser
Not Classified Electrical Fires
20 Min. Fire Rating
Class F
Cooking oils and fats
BS1192 2007 : 21-C-184-21-C-TW15-U2-.P-M-0001- S1- P1
0.3 m 0.3 m
Sleeping areas - residential - Class A Risk
1
11
Class A
Water, Foam, Dry Powder, Wet Chemical
Final Exit
Class B
Foam, Dry powder, CO2 Gas
Exit point
Internal protected lobby
10
Sprinkler head
Class C
Dry powder M28/L2 Special powders
Risk Exit point
Class D
Direction of Escape
Electrical fires Non conducting dry powder, CO2
Dwelling Escape Distances
Class F
Wet chemical
General Escape Distances
UP02.75.50.28.29 - FIRE SYSTEMS - 2 Level
75.50.28.29 - KEY - Fire plan
1 : 50
1 : 50
TW15 A
B
C
D
E
F
G
H
I
J
K
L
M
N
P
BS1192 2007 : 21-C-184-21-C-TW15-U2-.P-M-0001- S1- P1
General protected lobby
FIRE SUPRESSION
Fire Planning
Cooking areas - residential - Class F Risk
Mains connected sensors
site address
FD60SC 60 Min. Fire Rating. Fire Door with Smoke Seal
AOV protected area
Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
FD30SC 30 Min. Fire Rating. Fire Door with Smoke Seal
A
B
C
D
E
F
G
H
I
J
K
L
M
N
A1
rev
P description of revision
date
1
MT-U1-40.10.30.30-0001 - Fire Equipment
Carbon dioxide fire extinguishers Water fire extinguishers Fire escape route signs Fire escape route signs
Classification.Uniclas s.Ss.Number Ss_55_30_65_65 Ss_55_30_65_65 Ss_40_10_30_30 Ss_40_10_30_30
Classification.Uniclass.Ss.Description
21-C DESIGNS Westcraft Limited Design Office
Portable fire extinguisher systems Portable fire extinguisher systems Fire signage systems Fire signage systems
EFT.[1]04.BO.1111
F.1.3.5 KITCHEN/LOUNGE/DINER
Cooking areas - residential U.1.8 - Class F Risk
EFS.[0]03.ZZ.1111
900
= U.1.1 EFA.[0]01.BO.1110
900
F.1.4.4 KITCHEN/LOUNGE/DINER
Cooking areas - residential U.1.9 - Class F Risk
EFS.[0]03.ZZ.1111
Pr_75_75_30_64 Point heat detectors
Ss_75_50_28_29 Fire detection and alarm systems
F.1.4.2 BEDROOM2
Sleeping areas - residential U.1.3 - Class A Risk
EFS.[0]05.ZZ.1111
Pr_75_75_30_65 Point smoke detectors
Ss_75_50_28_29 Fire detection and alarm systems
F.1.4.1 BEDROOM1
Sleeping areas - residential U.1.4 - Class A Risk
EFS.[0]05.ZZ.1111
Pr_75_75_30_65 Point smoke detectors
Ss_75_50_28_29 Fire detection and alarm systems
F.1.3.1 BEDROOM2
Sleeping areas - residential U.1.5 - Class A Risk
EFS.[0]05.ZZ.1111
Pr_75_75_30_65 Point smoke detectors
Ss_75_50_28_29 Fire detection and alarm systems
F.1.3.2 BEDROOM1
Sleeping areas - residential U.1.6 - Class A Risk
EFS.[0]05.ZZ.1111
Pr_75_75_30_65 Point smoke detectors
Ss_75_50_28_29 Fire detection and alarm systems
F.1.3.6 ENTRANCE LOBBY
Internal protected lobby
U.1.7
EFS.[0]02.ZZ.1111
Pr_75_75_30_65 Point smoke detectors
Ss_75_50_28_29 Fire detection and alarm systems
F.1.4.6 ENTRANCE LOBBY
Internal protected lobby
U.1.10
EFS.[0]02.ZZ.1111
Pr_75_75_30_65 Point smoke detectors
Ss_75_50_28_29 Fire detection and alarm systems
1500 U.1.6 EFS.[0]05.ZZ.1111
1500
900
U.1.3 EFE.[0]04.ZZ.0110 U.1.4 EFE.[0]01.ZZ.0110
= U.1.2 EFT.[0]01.BO.0111
U.1.10 EFS.[0]02.ZZ.1111
2000
=
=
U.1.1 EFT.[0]02.BO.0111
=
=
=
U.1.8 :: SSD15.1 U.1.7 EFS.[0]02.ZZ.1111
=
=
=
2000
6
1500
= =
=
=
=
U.1.7 :: SSD15.1
=
7
=
=
sub no.
=
U.1.6 :: SSD15.1
=
northolt
U.1.8 EFS.[0]03.ZZ.1111
e::
U.1.2
t : : +44(0)20 8935 5856
General protected lobby
united kingdom
LANDING 1 LEVEL
ub5 5hl
C.1.1
Addressable unit to be installed btween1800-2100mm above finished floor level Addressable unit to be installed btween 900-1100mm above finished floor level Heat sensors shall be shall be mains powered with a backup rechargeable lithium battery. Heat detectors shall be used in applications where smoke detectors are unsuitable. Commercial applications shall be subject to full fire engineering and design. The residential applications of the heat sensors shall be use in accordance with recommendations from BS 5839: Part 6: 2004 - heat sensors should be used in the kitchens, appliance rooms; utility rooms and in the main living room. Heat Sensors should not be installed in the circulation spaces or areas. Heat sensors shall be shall be mains powered with a backup rechargeable lithium battery. Heat detectors shall be used in applications where smoke detectors are unsuitable. Commercial applications shall be subject to full fire engineering and design. The residential applications of the heat sensors shall be use in accordance with recommendations from BS 5839: Part 6: 2004 - heat sensors should be used in the kitchens, appliance rooms; utility rooms and in the main living room. Heat Sensors should not be installed in the circulation spaces or areas. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (ionisation type) shall be mains powered with a backup rechargeable lithium battery. The ionisation smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used where sensitive especially to smoke (which is almost invisible to the human eye) that is produced by the fast flaming fires. Smoke sensor (optical type) shall be mains powered with a backup rechargeable lithium battery. The optical smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used in escape or circulation routes and in areas where there is danger of ignition of furniture and surroundings by cigarettes producing slow, smouldering fires. Smoke sensor (optical type) shall be mains powered with a backup rechargeable lithium battery. The optical smoke sensor shall be use in accordance with BS 5839: Part 6: 2004 shall be used in escape or circulation routes and in areas where there is danger of ignition of furniture and surroundings by cigarettes producing slow, smouldering fires.
middlesex
825
U.1.5 EFS.[0]05.ZZ.1111
=
=
U.1.3 EFS.[0]05.ZZ.1111
1500
Pr_75_75_30_30 Fire alarm Ss_75_50_28_29 Fire detection and alarm sounders systems Pr_75_75_30_50 Manual call points Ss_75_50_28_29 Fire detection and alarm systems Pr_75_75_30_64 Point heat Ss_75_50_28_29 Fire detection and alarm detectors systems
checked by
EFA.[0]01.BO.1110
title
U.1.1
21-C
General protected lobby
=
=
=
LANDING 1 LEVEL
U.1.4 :: SSD15.1
U.1.2 EFT.[1]04.BO.1111
U.1.9 EFS.[0]03.ZZ.1111
=
U.1.3 :: SSD15.1
C.1.1
_nnl_SS.01_System usage
21-C-184
=
=
900
U.1.4 EFS.[0]05.ZZ.1111
825
4
5
=
=
Classification.Unic Classification.Unic Classification.Unic Classification.Uniclass.Ss.Desc lass.Pr.Number lass.Pr.Description lass.Ss.Number ription
430 Staines Road West Ashford TW15 1RZ
= U.1.2 :: SSD15.1
U.1.1 :: SSD15.1
Type Mark
originator
= =
Mark
project ref
=
3
Room: Name
FL202
=
Room: _nnl_75_50_28_29.01 Space category
drawn by
Room: Number
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
=
=
MT-U1-75.50.28.29-0001 - Fire Devices & Sensors
Š Copyright 1985-2018
Pr_40_50_28_11 Pr_40_50_28_96 Pr_40_10_77_32 Pr_40_10_77_32
Classification.Uniclass.Pr.Description
MP U1 75.50.28.29 0001
EFE.[0]04.ZZ.0110 EFE.[0]01.ZZ.0110 EFT.[0]01.BO.0111 EFT.[0]02.BO.0111
Classification.Unic lass.Pr.Number
drawing no.
U.1.3 U.1.4 U.1.2 U.1.1
Type Mark
1 : 50
2
LANDING 1 LEVEL LANDING 1 LEVEL LANDING 1 LEVEL STAIRS
Mark
scale
C.1.1 C.1.1 C.1.1 C.1.2
Room: Name
21-C-57
Room: Number
U.1.5 :: SSD15.1
=
57 summit road
=
1
11
UP01.75.50.28.29 - FIRE SYSTEMS - CEILING PLAN - 1 Level 1 : 50
TW15 A
B
C
D
E
F
G
H
I
J
K
L
M
N
P
BS1192 2007 : 21-C-184-21-C-TW15-U1-.P-M-0001- S1-
BS1192 2007 : 21-C-184-21-C-TW15-U1-.P-M-0001- S1-
10
Fire Systems
Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
9
site address
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
=
8
A
B
C
D
E
F
G
H
I
J
K
L
M
N
A1
rev P1
P description of revision Fire planning requirements BC
date 180628
MT-00-55.30.96.23-0001 - Sprinkler system Classification.Uniclass.Pr. Classification.Unic Classification.Unic Classification.Uniclass.Ss.Descri Number lass.Pr.Description lass.Ss.Number ption
SSD15.1
Pr_70_55_97_84
Sprinkler heads
Ss_55_30_96_23 Domestic sprinkler systems
F.0.1.5
KITCHEN/LOUNGE/DINER Cooking areas - residential - Class F Risk U.0.4
SSD15.1
Pr_70_55_97_84
Sprinkler heads
Ss_55_30_96_23 Domestic sprinkler systems
F.0.2.6
KITCHEN/LOUNGE/DINER Cooking areas - residential - Class F Risk U.0.5
SSD15.1
Pr_70_55_97_84
Sprinkler heads
Ss_55_30_96_23 Domestic sprinkler systems
F.0.2.1
BEDROOM1
Sleeping areas - residential - Class A Risk U.0.6
SSD15.1
Pr_70_55_97_84
Sprinkler heads
Ss_55_30_96_23 Domestic sprinkler systems
F.0.2.6
KITCHEN/LOUNGE/DINER Cooking areas - residential - Class F Risk U.0.8
SSD15.1
Pr_70_55_97_84
Sprinkler heads
Ss_55_30_96_23 Domestic sprinkler systems
F.1.4.2
BEDROOM2
Sleeping areas - residential - Class A Risk U.1.1
SSD15.1
Pr_70_55_97_84
Sprinkler heads
Ss_55_30_96_23 Domestic sprinkler systems
F.1.4.1
BEDROOM1
Sleeping areas - residential - Class A Risk U.1.2
SSD15.1
Pr_70_55_97_84
Sprinkler heads
Ss_55_30_96_23 Domestic sprinkler systems
F.1.3.1
BEDROOM2
Sleeping areas - residential - Class A Risk U.1.3
SSD15.1
Pr_70_55_97_84
Sprinkler heads
Ss_55_30_96_23 Domestic sprinkler systems
F.1.3.2
BEDROOM1
Sleeping areas - residential - Class A Risk U.1.4
SSD15.1
Pr_70_55_97_84
Sprinkler heads
Ss_55_30_96_23 Domestic sprinkler systems
F.1.3.5
KITCHEN/LOUNGE/DINER Cooking areas - residential - Class F Risk U.1.5
SSD15.1
Pr_70_55_97_84
Sprinkler heads
Ss_55_30_96_23 Domestic sprinkler systems
F.1.4.4
KITCHEN/LOUNGE/DINER Cooking areas - residential - Class F Risk U.1.8
SSD15.1
Pr_70_55_97_84
Sprinkler heads
Ss_55_30_96_23 Domestic sprinkler systems
F.1.4.4
KITCHEN/LOUNGE/DINER Cooking areas - residential - Class F Risk U.1.7
SSD15.1
Pr_70_55_97_84
Sprinkler heads
Ss_55_30_96_23 Domestic sprinkler systems
F.1.3.5
KITCHEN/LOUNGE/DINER Cooking areas - residential - Class F Risk U.1.6
SSD15.1
Pr_70_55_97_84
Sprinkler heads
Ss_55_30_96_23 Domestic sprinkler systems
F.2.5.5
KITCHEN/LOUNGE/DINER Cooking areas - residential - Class F Risk U.2.5
SSD15.1
Pr_70_55_97_84
Sprinkler heads
Ss_55_30_96_23 Domestic sprinkler systems
F.2.6.4
LOUNGE/KITCHEN/DINER Cooking areas - residential - Class F Risk U.2.6
SSD15.1
Pr_70_55_97_84
Sprinkler heads
Ss_55_30_96_23 Domestic sprinkler systems
F.2.6.2
BEDROOM1
Sleeping areas - residential - Class A Risk U.2.1
SSD15.1
Pr_70_55_97_84
Sprinkler heads
Ss_55_30_96_23 Domestic sprinkler systems
F.2.6.1
BEDROOM2
Sleeping areas - residential - Class A Risk U.2.2
SSD15.1
Pr_70_55_97_84
Sprinkler heads
Ss_55_30_96_23 Domestic sprinkler systems
F.2.5.1
BEDROOM2
Sleeping areas - residential - Class A Risk U.2.3
SSD15.1
Pr_70_55_97_84
Sprinkler heads
Ss_55_30_96_23 Domestic sprinkler systems
F.2.5.2
BEDROOM1
Sleeping areas - residential - Class A Risk U.2.4
SSD15.1
Pr_70_55_97_84
Sprinkler heads
Ss_55_30_96_23 Domestic sprinkler systems
3
4
5
6
7
8
9
BS1192 2007 : 21-C-184-21-C-TW15-00-SH.T-M-0001- S1- P1
10
11
TW15 A
B
C
D
E
F
G
H
I
Š Copyright 1985-2018
Sleeping areas - residential - Class A Risk U.0.7
e::
BEDROOM2
t : : +44(0)20 8935 5856
F.0.2.5
united kingdom
Ss_55_30_96_23 Domestic sprinkler systems
ub5 5hl
Sprinkler heads
middlesex
Pr_70_55_97_84
northolt
SSD15.1
57 summit road
KITCHEN/LOUNGE/DINER Cooking areas - residential - Class F Risk U.0.3
Westcraft Limited Design Office
J
K
L
M
N
P
BS1192 2007 : 21-C-184-21-C-TW15-00-SH.T-M-0001- S1- P1
F.0.1.5
21-C DESIGNS
M SH.T 00 55.30.96.23 0001
Ss_55_30_96_23 Domestic sprinkler systems
Sprinkler schedule
Sprinkler heads
drawing no.
Pr_70_55_97_84
scale
SSD15.1
21-C-57
Sleeping areas - residential - Class A Risk U.0.2
checked by
BEDROOM1
title
F.0.1.2
The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442. The sprinkler system shall be designed by a specialist in conjunction with Authorities Having Jurisdiction (AHJ) following BS 9251Codes of Practice. The Code of Practice is primarily for the protection of life and NOT intended for the protection of property. Category system 1 shall be used for this application. Installed system shall be a wet system with each apartment as an independent zone. Sprinkler heads to BS9252 shall be quick response type and flush to the ceiling. Supply piping to ne copper to BS EN 1057: 2006 or CPVC to ASTM F442.
21-C
Ss_55_30_96_23 Domestic sprinkler systems
21-C-184
Sprinkler heads
430 Staines Road West Ashford TW15 1RZ
Pr_70_55_97_84
sub no.
SSD15.1
originator
Sleeping areas - residential - Class A Risk U.0.1
project ref
BEDROOM2
FL202
F.0.1.1
_nnl_SS.01_System usage
drawn by
Type Mark
site address
Mark
Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
Room: _nnl_75_50_28_29.01 - Space category
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
2
Room: Name
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
1
Room: Number
A
B
C
D
E
F
G
H
I
J
K
L
M
A1
rev P1
Lighting Systems
date 180517
EQ
L0.32
EQ
L0.13
500
EQ
EQ
L0.38
866
L0.18
L0.56
L0.19
1121
EQ
EQ
900
EQ
EQ
L0.17
500
EQ
746 L0.20
500 L0.21
900
EQ 1100
899
L0.58
750
L0.59
EQ
L0.69
1987
750
L0.22
747
EQ
EQ
750
747
EQ
L0.77
6
2000
500
EQ
EQ
L0.57
L0.60
L0.23
EQ
1350
EQ
L0.70
L0.71 L0.72
L0.61
L0.24
EQ
L0.62
L0.25
L0.78
EQ
EQ
7
L0.63 L0.73 L0.64
L0.74
EQ
EQ
L0.26
750
L0.27
EQ
1300 L0.65
EQ
L0.66
8
L0.28
EQ
L0.29 L0.68
EQ
L0.67
L0.30
750
L0.31
750
EQ
1670
750 1625
L0.37
9
750
L0.36
10
UP00.70.80.33 - LIGHTING SYSTEMS - Ground Level
1
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W
BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1
F.0.1.2 F.0.1.2 F.0.1.2 F.0.1.2 F.0.1.2 F.0.1.2
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W 12 W 12 W
ENSUITE ENSUITE ENSUITE ENSUITE
F.0.1.3 F.0.1.3 F.0.1.3 F.0.1.3
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W
BATHROOM BATHROOM BATHROOM BATHROOM
F.0.1.4 F.0.1.4 F.0.1.4 F.0.1.4
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W
KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER
F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W
ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY
F.0.1.6 F.0.1.6 F.0.1.6
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights
Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm
12 W 12 W 12 W
BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1
F.0.2.1 F.0.2.1 F.0.2.1 F.0.2.1 F.0.2.1 F.0.2.1
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W 12 W 12 W
ENSUITE ENSUITE ENSUITE ENSUITE
F.0.2.2 F.0.2.2 F.0.2.2 F.0.2.2
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W
BATHROOM BATHROOM BATHROOM BATHROOM
F.0.2.3 F.0.2.3 F.0.2.3 F.0.2.3
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W
STORE
F.0.2.4
Pr_70_70_48_24
Downlights
Ss_70_80_33_35 Hard-wired general lighting systems
1800 lm
12 W
BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2
F.0.2.5 F.0.2.5 F.0.2.5 F.0.2.5 F.0.2.5 F.0.2.5
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W 12 W 12 W
KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER
F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W
ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY
F.0.2.7 F.0.2.7 F.0.2.7 F.0.2.7
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W
1 : 50
TW15 A
B
C
D
E
F
G
H
I
J
K
L
© Copyright 1985-2018
Downlights Downlights Downlights Downlights
EP U0 70.80.33.00 0001
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
drawing no.
F.0.1.1 F.0.1.1 F.0.1.1 F.0.1.1
e::
L0.14
380
L0.16
BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2
t : : +44(0)20 8935 5856
EQ
600
EQ
5
L0.55
6W 6W
united kingdom
385 L0.53
390
607 L0.52
600
385
658
916
L0.12
880 lm 880 lm
ub5 5hl
L0.11
Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems
middlesex
EQ
1938
390
EQ
L0.51
EQ
EQ
L0.50
Surface luminaires Surface luminaires
northolt
L0.15
L0.54
Pr_70_70_48_85 Pr_70_70_48_85
57 summit road
1000
C.0.2 C.0.2
M
N
P
BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-E-0001- S1- P1
EQ
L0.49
450
L0.76
EQ
EQ
L0.47
4
L0.10
1190
822
L0.9
STAIRS STAIRS
Lighting Systems - 0 Level
EQ
L0.34
L0.46
6W 6W
1 : 50
352
L0.8
880 lm 880 lm
scale
L0.7
1087
EQ 450
790 L0.45
EQ
L0.3
Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems
21-C-57
L0.4
L0.44
Surface luminaires Surface luminaires
checked by
EQ
L0.43
Pr_70_70_48_85 Pr_70_70_48_85
title
3
C.0.1 C.0.1
Westcraft Limited Design Office
21-C
1350 EQ
L0.6
ENTRANCE HALL ENTRANCE HALL
21-C DESIGNS
21-C-184
750
L0.5
6W 6W 6W 12 W 12 W 12 W 6W
430 Staines Road West Ashford TW15 1RZ
1350
880 lm 880 lm 880 lm 1783 lm 1783 lm 1783 lm 880 lm
sub no.
EQ
590
L0.2
L0.33
L0.42
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
Comments
originator
450
L0.1
L0.41
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Wattage
project ref
EQ
1000
Surface luminaires Surface luminaires Surface luminaires Hazardous area luminaires Hazardous area luminaires Hazardous area luminaires Surface luminaires
Luminous Flux
FL202
750
L0.40
Pr_70_70_48_85 Pr_70_70_48_85 Pr_70_70_48_85 Pr_70_70_48_36 Pr_70_70_48_36 Pr_70_70_48_36 Pr_70_70_48_85
Classification.Uniclass.Ss.Description
drawn by
EQ
748
L0.39
Classification.Unicl Classification.Uniclass.Pr.Descri Classification.Unic ass.Pr.Number ption lass.Ss.Number
site address
L0.35
1300
L0.75
Room: Number
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
750
1498
L0.35 ELF1.1 L0.36 ELF1.1 L0.37 ELF1.1 L0.75 ELF2.3 L0.76 ELF2.3 L0.77 ELF2.3 L0.78 ELF1.1 C.0.1 L0.33 ELF1.1 L0.34 ELF1.1 C.0.2 L0.32 ELF1.1 L0.38 ELF1.1 F.0.1.1 L0.1 ELF1.0 L0.2 ELF1.0 L0.3 ELF1.0 L0.4 ELF1.0 F.0.1.2 L0.5 ELF1.0 L0.6 ELF1.0 L0.7 ELF1.0 L0.8 ELF1.0 L0.9 ELF1.0 L0.10 ELF1.0 F.0.1.3 L0.11 ELF1.0 L0.12 ELF1.0 L0.13 ELF1.0 L0.14 ELF1.0 F.0.1.4 L0.18 ELF1.0 L0.19 ELF1.0 L0.20 ELF1.0 L0.21 ELF1.0 F.0.1.5 L0.22 ELF1.0 L0.23 ELF1.0 L0.24 ELF1.0 L0.25 ELF1.0 L0.26 ELF1.0 L0.27 ELF1.0 L0.28 ELF1.0 L0.29 ELF1.0 L0.30 ELF1.0 L0.31 ELF1.0 F.0.1.6 L0.15 ELF1.0 L0.16 ELF1.0 L0.17 ELF1.0 F.0.2.1 L0.39 ELF1.0 L0.40 ELF1.0 L0.41 ELF1.0 L0.42 ELF1.0 L0.43 ELF1.0 L0.44 ELF1.0 F.0.2.2 L0.45 ELF1.0 L0.46 ELF1.0 L0.47 ELF1.0 L0.49 ELF1.0 F.0.2.3 L0.50 ELF1.0 L0.51 ELF1.0 L0.52 ELF1.0 L0.53 ELF1.0 F.0.2.4 L0.56 ELF1.0 F.0.2.5 L0.69 ELF1.0 L0.70 ELF1.0 L0.71 ELF1.0 L0.72 ELF1.0 L0.73 ELF1.0 L0.74 ELF1.0 F.0.2.6 L0.59 ELF1.0 L0.60 ELF1.0 L0.61 ELF1.0 L0.62 ELF1.0 L0.63 ELF1.0 L0.64 ELF1.0 L0.65 ELF1.0 L0.66 ELF1.0 L0.67 ELF1.0 L0.68 ELF1.0 F.0.2.7 L0.54 ELF1.0 L0.55 ELF1.0 L0.57 ELF1.0 L0.58 ELF1.0 Grand total: 77
Room: Name
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
2
Type Mark
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
Mark
BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-E-0001- S1- P1
P description of revision
ET-U0-70.80.33.00-0001 - Lighting systems
1
11
N
A
B
C
D
E
F
G
H
I
J
K
L
M
N
A1
rev P3 P2 P1
P description of revision Fire planning requirements BC Electrical systems Lighting Systems
date 180628 180628 180517
1
21-C DESIGNS
600
U0.37
Room: Name
Description
Classification.Unicla ss.Pr.Number
Classification.Uniclass.Pr.Description
Classification.Uniclas s.Ss.Number
Classification.Uniclass.Ss.Description
Comments
U0.7
600 U0.9 EPO.[2]01.ZZ.1110
U0.51 ELS.[1]01.ZZ.1110
5 U0.44 ELS.[1]01.ZZ.1110
2800
800
U0.31 EPO.[2]01.ZZ.1110
900 U0.32 EPO.[2]01.ZZ.1110
U0.20
U0.16
EPO.[2]01.ZZ.1110
6
EPO.[2]01.ZZ.1110
U0.21
U0.27
U0.17
EPO.[2]01.ZZ.1110
EPO.[2]01.ZZ.1110
U0.49
EPO.[2]01.ZZ.1110
U0.19
ELS.[1]01.ZZ.1110
U0.15
EPO.[2]01.ZZ.1110
EPO.[2]01.ZZ.1110
U0.22 EPO.[2]01.ZZ.1110
U0.45
U0.18
U0.54
ELS.[1]01.ZZ.1110
EPO.[2]01.ZZ.1110
EPS.[4]01.ZZ.1110
U0.56 EPS.[4]01.ZZ.1110
U0.30
U0.55 U0.48
EPO.[2]01.ZZ.1110
U0.57
EPS.[4]01.ZZ.1110
EPS.[4]01.ZZ.1110
3600
ELS.[1]01.ZZ.1110
U0.26
7
U0.12
EPO.[2]01.ZZ.1110
EPO.[2]01.ZZ.1110
U0.28
U0.23
EPO.[2]01.ZZ.1110
EPO.[2]01.ZZ.1110
2500
U0.11 EPO.[2]01.ZZ.1110
U0.29
800
900
EPO.[2]01.ZZ.1110
U0.13
4000
EPO.[2]01.ZZ.1110
4000
5000
4000
8
U0.25 EPO.[2]01.ZZ.1110
U0.24 EPO.[2]01.ZZ.1110
3000
804
U0.10 EPO.[2]01.ZZ.1110
800
U0.14
800
EPO.[2]01.ZZ.1110
800
U0.47 ELS.[1]01.ZZ.1110
9
U0.46 ELS.[1]01.ZZ.1110
ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL SWITCH - SINGLE LIGHT SWITCH
Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_60_70_48_48
Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Low voltage switches
Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_80_33_35
Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired general lighting systems
F.0.1.2 F.0.1.2 F.0.1.2 F.0.1.2 F.0.1.2 F.0.1.2
BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1
ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH
Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_60_70_48_48 Pr_60_70_48_48
Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Low voltage switches Low voltage switches
Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired general lighting systems Hard-wired general lighting systems
F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5 F.0.1.5
KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER
ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH Quad fused switch spur with illuminating indicator Quad fused switch spur with illuminating indicator
Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_46 Pr_60_70_48_46
Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Low voltage switches Low voltage switches Low voltage switch-disconnector fuses Low voltage switch-disconnector fuses
Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_30_80_35 Ss_70_30_80_35
Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired voltage small power systems Hard-wired voltage small power systems
F.0.1.6 F.0.1.6 F.0.1.6 F.0.1.6
ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY
ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH
Pr_65_72_97_84 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48
Standard socket outlets Low voltage switches Low voltage switches Low voltage switches
Ss_70_30_80_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired voltage small power systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
F.0.2.1 F.0.2.1 F.0.2.1 F.0.2.1 F.0.2.1 F.0.2.1
BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1
ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH
Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_60_70_48_48 Pr_60_70_48_48
Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Low voltage switches Low voltage switches
Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired general lighting systems Hard-wired general lighting systems
F.0.2.4 STORE F.0.2.4 STORE
ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED
Pr_65_72_97_84 Pr_65_72_97_84
Standard socket outlets Standard socket outlets
Ss_70_30_80_35 Ss_70_30_80_35
Hard-wired voltage small power systems Hard-wired voltage small power systems
F.0.2.5 F.0.2.5 F.0.2.5 F.0.2.5 F.0.2.5
BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2
ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL SWITCH - SINGLE LIGHT SWITCH
Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_60_70_48_48
Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Low voltage switches
Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_80_33_35
Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired general lighting systems
F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6 F.0.2.6
KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER
ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH Quad fused switch spur with illuminating indicator Quad fused switch spur with illuminating indicator
Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_46 Pr_60_70_48_46
Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Low voltage switches Low voltage switches Low voltage switch-disconnector fuses Low voltage switch-disconnector fuses
Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_30_80_35 Ss_70_30_80_35
Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired voltage small power systems Hard-wired voltage small power systems
F.0.2.7 F.0.2.7 F.0.2.7 F.0.2.7
ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY
ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH
Pr_65_72_97_84 Pr_65_72_97_84 Pr_60_70_48_48 Pr_60_70_48_48
Standard socket outlets Standard socket outlets Low voltage switches Low voltage switches
Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired general lighting systems Hard-wired general lighting systems
70.30.80 - Electrical Systems
BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-E-0001- S1- P3
10
UP00.70.30.80 - ELECTRICAL SYSTEMS - Ground Level
1
11
x.y.# EPO.01.ZZ.1111[0]
1 : 50
EPO EPS ESO EPI EMU EPU
TW15 A
Power outlet Spur switch Spur outlet Isolator Meter unit Panel
x = space reference y = room number # = equipment mark EPO = equipment name 01 = type ZZ = manufacturer 1 = load requirement 1 = material requirement 1 = colour requirement 1 = finish requirement [0] = no requirements
70.30.80 - KEY - ELECTRICAL SYSTEMS B
C
D
E
F
G
H
I
J
K
L
M
21-C
BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2
e::
ELS.[1]04.ZZ.1110
F.0.1.1 F.0.1.1 F.0.1.1 F.0.1.1 F.0.1.1
t : : +44(0)20 8935 5856
U0.58 U0.33 EPO.[2]01.ZZ.1110
Hard-wired general lighting systems
united kingdom
ELS.[1]01.ZZ.1110
U0.50 ELS.[1]01.ZZ.1110
Ss_70_80_33_35
ub5 5hl
U0.41
Time switches
middlesex
ELS.[1]01.ZZ.1110
Pr_75_51_17_89
northolt
U0.42 ELS.[1]01.ZZ.1110
Single Time Switch
57 summit road
4
STAIRS
checked by
U0.8 EPO.[2]01.ZZ.1110
U0.40
C.0.2
title
ELS.[1]01.ZZ.1110
Hard-wired general lighting systems
21-C-184
600
U0.43
U0.34 EPO.[2]01.ZZ.1110
Ss_70_80_33_35
430 Staines Road West Ashford TW15 1RZ
U0.39 ELS.[1]01.ZZ.1110
Time switches
project ref
EPO.[2]01.ZZ.1110
ELS.[1]01.ZZ.1110
Pr_75_51_17_89
FL202
U0.53
EPO.[2]01.ZZ.1110
EPO.[2]01.ZZ.1110
Single Time Switch
drawn by
U0.52 ELS.[1]01.ZZ.1110
U0.4
U0.2
ENTRANCE HALL
N
P
site address
U0.6
EPO.[2]01.ZZ.1110
C.0.1
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
3800
U0.35
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
C.0.1 U0.59 ELS.[1]04.ZZ.1110 C.0.2 U0.58 ELS.[1]04.ZZ.1110 F.0.1.1 U0.1 EPO.[2]01.ZZ.1110 U0.2 EPO.[2]01.ZZ.1110 U0.3 EPO.[2]01.ZZ.1110 U0.4 EPO.[2]01.ZZ.1110 U0.39 ELS.[1]01.ZZ.1110 F.0.1.2 U0.5 EPO.[2]01.ZZ.1110 U0.6 EPO.[2]01.ZZ.1110 U0.7 EPO.[2]01.ZZ.1110 U0.8 EPO.[2]01.ZZ.1110 U0.40 ELS.[1]01.ZZ.1110 U0.41 ELS.[1]01.ZZ.1110 F.0.1.5 U0.10 EPO.[2]01.ZZ.1110 U0.11 EPO.[2]01.ZZ.1110 U0.12 EPO.[2]01.ZZ.1110 U0.13 EPO.[2]01.ZZ.1110 U0.14 EPO.[2]01.ZZ.1110 U0.15 EPO.[2]01.ZZ.1110 U0.16 EPO.[2]01.ZZ.1110 U0.17 EPO.[2]01.ZZ.1110 U0.18 EPO.[2]01.ZZ.1110 U0.45 ELS.[1]01.ZZ.1110 U0.46 ELS.[1]01.ZZ.1110 U0.56 EPS.[4]01.ZZ.1110 U0.57 EPS.[4]01.ZZ.1110 F.0.1.6 U0.9 EPO.[2]01.ZZ.1110 U0.42 ELS.[1]01.ZZ.1110 U0.43 ELS.[1]01.ZZ.1110 U0.44 ELS.[1]01.ZZ.1110 F.0.2.1 U0.35 EPO.[2]01.ZZ.1110 U0.36 EPO.[2]01.ZZ.1110 U0.37 EPO.[2]01.ZZ.1110 U0.38 EPO.[2]01.ZZ.1110 U0.52 ELS.[1]01.ZZ.1110 U0.53 ELS.[1]01.ZZ.1110 F.0.2.4 U0.31 EPO.[2]01.ZZ.1110 U0.32 EPO.[2]01.ZZ.1110 F.0.2.5 U0.27 EPO.[2]01.ZZ.1110 U0.28 EPO.[2]01.ZZ.1110 U0.29 EPO.[2]01.ZZ.1110 U0.30 EPO.[2]01.ZZ.1110 U0.49 ELS.[1]01.ZZ.1110 F.0.2.6 U0.19 EPO.[2]01.ZZ.1110 U0.20 EPO.[2]01.ZZ.1110 U0.21 EPO.[2]01.ZZ.1110 U0.22 EPO.[2]01.ZZ.1110 U0.23 EPO.[2]01.ZZ.1110 U0.24 EPO.[2]01.ZZ.1110 U0.25 EPO.[2]01.ZZ.1110 U0.26 EPO.[2]01.ZZ.1110 U0.47 ELS.[1]01.ZZ.1110 U0.48 ELS.[1]01.ZZ.1110 U0.54 EPS.[4]01.ZZ.1110 U0.55 EPS.[4]01.ZZ.1110 F.0.2.7 U0.33 EPO.[2]01.ZZ.1110 U0.34 EPO.[2]01.ZZ.1110 U0.50 ELS.[1]01.ZZ.1110 U0.51 ELS.[1]01.ZZ.1110 Grand total: 59
U0.38 EPO.[2]01.ZZ.1110
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
3
originator
EPO.[2]01.ZZ.1110
Electrical Systems
Room: Number
Type Mark
drawing no.
2300
2200
2534
Mark
sub no.
EPO.[2]01.ZZ.1110
EPO.[2]01.ZZ.1110
ET-U0-70.30.80.00-0001 - Electrical System
1000
U0.5
U0.3
scale
U0.1 EPO.[2]01.ZZ.1110
As indicated
675 600
3000
600
3000
U0.59 ELS.[1]04.ZZ.1110
21-C-57
U0.36 EPO.[2]01.ZZ.1110
EP U0 70.30.80.00 0001
EPO.[2]01.ZZ.1110
BS1192 2007 : 21-C-184-21-C-TW15-U0-.P-E-0001- S1- P3
2
© Copyright 1985-2018
600
Westcraft Limited Design Office
A
B
C
D
E
F
G
H
I
J
K
L
M
N
A1
rev P3 P2 P1
P description of revision
Fire information - BC01 Electrical systems Lighting Systems
date 180710 180628 180517
1
21-C DESIGNS
5
U2.10 EPO.[2]01.ZZ.1110
EPO.[2]01.ZZ.1110
U2.27 EPO.[2]01.ZZ.1110
U2.53 EPS.[4]01.ZZ.1110
U2.26 EPO.[2]01.ZZ.1110
U2.31 EPO.[2]01.ZZ.1110
U2.1 ELS.[1]04.ZZ.1110
800
U2.54 EPS.[4]01.ZZ.1110
U2.46
1000
ELS.[1]01.ZZ.1110
U2.11
EQ
EPO.[2]01.ZZ.1110
EQ U2.30
U2.45 ELS.[1]01.ZZ.1110
U2.43 ELS.[1]01.ZZ.1110
EPO.[2]01.ZZ.1110
6
U2.24
U2.25
EQ
EPO.[2]01.ZZ.1110
EQ
EPO.[2]01.ZZ.1110
U2.13
1600
EPO.[2]01.ZZ.1110
U2.20 EPO.[2]01.ZZ.1110
U2.14 EPO.[2]01.ZZ.1110
U2.12 EPO.[2]01.ZZ.1110
U2.44
U2.15
ELS.[1]01.ZZ.1110
EPO.[2]01.ZZ.1110
U2.51
3500
7 U2.22
EPS.[4]01.ZZ.1110
U2.23
EPO.[2]01.ZZ.1110
U2.52
EPO.[2]01.ZZ.1110
EPS.[4]01.ZZ.1110
850
U2.19
750
1200
EPO.[2]01.ZZ.1110
EQ
EQ
EQ
U2.21 EPO.[2]01.ZZ.1110
U2.18
EQ
EPO.[2]01.ZZ.1110
U2.16 EPO.[2]01.ZZ.1110
EQ
500
8
U2.17
EQ
EPO.[2]01.ZZ.1110
9
EPO EPS ESO EPI EMU EPU
TW15 A
Power outlet Spur switch Spur outlet Isolator Meter unit Panel
EPO = equipment name 01 = type ZZ = manufacturer 1 = load requirement 1 = material requirement 1 = colour requirement 1 = finish requirement [0] = no requirements
70.30.80 - KEY - ELECTRICAL SYSTEMS 1:1 B
C
D
E
F
G
H
I
J
K
L
M
N
P
EP U2 70.30.80.00 0001
drawing no.
BS1192 2007 : 21-C-184-21-C-TW15-U2-.P-E-0001- S1- P3
x.y.# EPO.01.ZZ.1111[0]
x = space reference y = room number # = equipment mark
Electrical Systems
BS1192 2007 : 21-C-184-21-C-TW15-U2-.P-E-0001- S1- P3
10
site address
1 : 50
70.30.80 - Electrical Systems
11
scale
UP02.70.30.80 - ELECTRICAL SYSTEMS - 2 Level Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
1
21-C-57 e::
U2.28
EPO.[2]01.ZZ.1110
t : : +44(0)20 8935 5856
U2.41 ELS.[1]01.ZZ.1110
U2.29
Hard-wired general lighting systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems
united kingdom
U2.42 ELS.[1]01.ZZ.1110
Ss_70_80_33_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35
ub5 5hl
U2.40 ELS.[1]01.ZZ.1110
Time switches Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switch-disconnector fuses Low voltage switch-disconnector fuses Low voltage switch-disconnector fuses Low voltage switch-disconnector fuses
middlesex
ELS.[1]01.ZZ.1110
Pr_75_51_17_89 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_46 Pr_60_70_48_46 Pr_60_70_48_46 Pr_60_70_48_46
northolt
U2.39 ELS.[1]01.ZZ.1110
U2.47
Single Time Switch ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH Quad fused switch spur with illuminating indicator Quad fused switch spur with illuminating indicator Quad fused switch spur with illuminating indicator Quad fused switch spur with illuminating indicator
57 summit road
EPO.[2]01.ZZ.1110
2500
EPO.[2]01.ZZ.1110
EPO.[2]01.ZZ.1110
ELS.[1]04.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 EPS.[4]01.ZZ.1110 EPS.[4]01.ZZ.1110 EPS.[4]01.ZZ.1110 EPS.[4]01.ZZ.1110
checked by
U2.7
U2.5
U2.3
Comments
title
U2.9 EPO.[2]01.ZZ.1110
U2.49
Classification.Uniclass.Ss.Description
430 Staines Road West Ashford TW15 1RZ
U2.1 U2.2 U2.3 U2.4 U2.5 U2.6 U2.7 U2.8 U2.9 U2.10 U2.11 U2.12 U2.13 U2.14 U2.15 U2.16 U2.17 U2.18 U2.19 U2.20 U2.21 U2.22 U2.23 U2.24 U2.25 U2.26 U2.27 U2.28 U2.29 U2.30 U2.31 U2.32 U2.33 U2.34 U2.35 U2.36 U2.37 U2.38 U2.39 U2.40 U2.41 U2.42 U2.43 U2.44 U2.45 U2.46 U2.47 U2.48 U2.49 U2.50 U2.51 U2.52 U2.53 U2.54
EPO.[2]01.ZZ.1110
ELS.[1]01.ZZ.1110
ELS.[1]01.ZZ.1110
Classification.Uniclas s.Ss.Number
FL202
4
STAIRS BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 ENTRANCE LOBBY KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER ENTRANCE LOBBY BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM1 BEDROOM1 ENTRANCE LOBBY ENTRANCE LOBBY KITCHEN/LOUNGE/DINER LOUNGE/KITCHEN/DINER ENTRANCE LOBBY ENTRANCE LOBBY BEDROOM1 BEDROOM1 BEDROOM2 KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER
Classification.Uniclass.Pr.Description
drawn by
U2.48
C.2.2 F.2.5.1 F.2.5.1 F.2.5.1 F.2.5.1 F.2.5.2 F.2.5.2 F.2.5.2 F.2.5.2 F.2.5.2 F.2.5.6 F.2.5.5 F.2.5.5 F.2.5.5 F.2.5.5 F.2.5.5 F.2.5.5 F.2.5.5 F.2.5.5 F.2.5.5 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.6 F.2.6.2 F.2.6.2 F.2.6.2 F.2.6.2 F.2.6.1 F.2.6.1 F.2.6.1 F.2.5.1 F.2.5.2 F.2.5.2 F.2.5.6 F.2.5.6 F.2.5.5 F.2.6.4 F.2.6.6 F.2.6.6 F.2.6.2 F.2.6.2 F.2.6.1 F.2.5.5 F.2.5.5 F.2.6.4 F.2.6.4
Classification.Unicla ss.Pr.Number
Description
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
U2.6
ELS.[1]01.ZZ.1110
EPO.[2]01.ZZ.1110
Room: Name
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
U2.50
U2.32
Room: Number
EPO.[2]01.ZZ.1110
1320
1500
2060
EPO.[2]01.ZZ.1110
EPO.[2]01.ZZ.1110
Type Mark
U2.8
620
EPO.[2]01.ZZ.1110
U2.37 U2.35
U2.4
600
EPO.[2]01.ZZ.1110
Mark
EQ
400
U2.2
As indicated
EQ
500
U2.38 EPO.[2]01.ZZ.1110
project ref
ET-U2-70.30.80.00-0001 - Electrical System 800
1700
2300
U2.36 EPO.[2]01.ZZ.1110
21-C-184
500
U2.34 EPO.[2]01.ZZ.1110
1400
U2.33 EPO.[2]01.ZZ.1110
21-C
300
3
originator
500
sub no.
2
© Copyright 1985-2018
Westcraft Limited Design Office
A
B
C
D
E
F
G
H
I
J
K
L
M
N
A1
rev P3 P2 P1
P description of revision
Fire information - BC01 Fire planning requirements BC Electrical systems
date 180710 180628 180628
1
21-C DESIGNS
EPO.[2]01.ZZ.1110
U1.29
EPO.[2]01.ZZ.1110
600
U1.33
U1.32
EPO.[2]01.ZZ.1110
ET-U1-70.30.80.00-0001 - Electrical System
U1.54
Mark
ELS.[1]01.ZZ.1110
U1.53
Type Mark
Room: Number
Room: Name
F.1.3.1 F.1.3.1 F.1.3.1 F.1.3.1 F.1.3.2 F.1.3.2 F.1.3.2 F.1.3.2 F.1.3.6 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.2 F.1.4.2 F.1.4.2 F.1.4.2 F.1.4.1 F.1.4.1 F.1.4.1 F.1.4.1 F.1.4.6 F.1.3.5 F.1.3.5 F.1.4.4 F.1.4.4 F.1.3.1 F.1.3.2 F.1.3.2 F.1.3.6 F.1.3.5 F.1.3.5 F.1.3.5 F.1.4.4 F.1.4.6 F.1.4.6 F.1.4.6 F.1.4.2 F.1.4.1 F.1.4.2 C.1.2
BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 ENTRANCE LOBBY KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 ENTRANCE LOBBY KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER BEDROOM2 BEDROOM1 BEDROOM1 ENTRANCE LOBBY KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY BEDROOM2 BEDROOM1 BEDROOM2 STAIRS
Classification.Unicla ss.Pr.Number
Description
Classification.Uniclass.Pr.Description
Classification.Uniclas s.Ss.Number
Classification.Uniclass.Ss.Description
Comments
ELS.[1]01.ZZ.1110
U1.37
U1.22
EPO.[2]01.ZZ.1110
U1.56
EPO.[2]01.ZZ.1110
ELS.[1]04.ZZ.1110
EPS.[4]01.ZZ.1110
450
U1.40
ELS.[1]01.ZZ.1110
1000
U1.50
U1.41 EPS.[4]01.ZZ.1110
U1.9 EPO.[2]01.ZZ.1110
U1.24 EPO.[2]01.ZZ.1110
5
U1.49
2650
ELS.[1]01.ZZ.1110
U1.23
6
U1.28
550
U1.25
U1.47
2400
1200
550
EPO.[2]01.ZZ.1110
ELS.[1]01.ZZ.1110
U1.11
U1.14
EPO.[2]01.ZZ.1110
EPO.[2]01.ZZ.1110
U1.46
EPO.[2]01.ZZ.1110
U1.10
U1.12 EPO.[2]01.ZZ.1110
EPO.[2]01.ZZ.1110
ELS.[1]01.ZZ.1110
EPO.[2]01.ZZ.1110
U1.13 EPO.[2]01.ZZ.1110
U1.15 EPO.[2]01.ZZ.1110
U1.38 EPS.[4]01.ZZ.1110
U1.39 EPS.[4]01.ZZ.1110
7 U1.27
U1.16 EPO.[2]01.ZZ.1110
750
U1.26 EPO.[2]01.ZZ.1110
550
750
EPO.[2]01.ZZ.1110
U1.18
EQ U1.48
EPO.[2]01.ZZ.1110
U1.17
EQ
EPO.[2]01.ZZ.1110
750
ELS.[1]01.ZZ.1110
8
project ref
e::
U1.19 EPO.[2]01.ZZ.1110
9
BS1192 2007 : 21-C-184-21-C-TW15-U1-.P-E-0001- S1- P3
10
x.y.# EPO.01.ZZ.1111[0] EPO EPS ESO EPI EMU EPU 11
TW15 A
Power outlet Spur switch Spur outlet Isolator Meter unit Panel
x = space reference y = room number # = equipment mark EPO = equipment name 01 = type ZZ = manufacturer 1 = load requirement 1 = material requirement 1 = colour requirement 1 = finish requirement [0] = no requirements
70.30.80 - KEY - ELECTRICAL SYSTEMS B
C
D
E
F
G
H
I
J
K
L
M
N
P
BS1192 2007 : 21-C-184-21-C-TW15-U1-.P-E-0001- S1- P3
70.30.80 - Electrical Systems
Electrical Systems
1 : 50
site address
UP01.70.30.80 - ELECTRICAL SYSTEMS - 1 Level Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
1
t : : +44(0)20 8935 5856
ELS.[1]01.ZZ.1110
united kingdom
U1.51
U1.21 EPO.[2]01.ZZ.1110
ub5 5hl
U1.20 EPO.[2]01.ZZ.1110
middlesex
U1.44 ELS.[1]01.ZZ.1110
Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired voltage small power systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
northolt
4
Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_30_80_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
57 summit road
U1.45 ELS.[1]01.ZZ.1110
Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Standard socket outlets Low voltage switch-disconnector fuses Low voltage switch-disconnector fuses Low voltage switch-disconnector fuses Low voltage switch-disconnector fuses Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Low voltage switches Time switches
checked by
ELS.[1]01.ZZ.1110
Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_65_72_97_84 Pr_60_70_48_46 Pr_60_70_48_46 Pr_60_70_48_46 Pr_60_70_48_46 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_60_70_48_48 Pr_75_51_17_89
title
EPO.[2]01.ZZ.1110
ELS.[1]01.ZZ.1110
ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED ELECTRICAL OUTLET - DOUBLE SOCKET - SWITCHED Quad fused switch spur with illuminating indicator Quad fused switch spur with illuminating indicator Quad fused switch spur with illuminating indicator Quad fused switch spur with illuminating indicator ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH ELECTRICAL SWITCH - SINGLE LIGHT SWITCH Single Time Switch
430 Staines Road West Ashford TW15 1RZ
U1.8 U1.43
U1.52
EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPO.[2]01.ZZ.1110 EPS.[4]01.ZZ.1110 EPS.[4]01.ZZ.1110 EPS.[4]01.ZZ.1110 EPS.[4]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]01.ZZ.1110 ELS.[1]04.ZZ.1110
FL202
U1.42 ELS.[1]01.ZZ.1110
U1.1 U1.2 U1.3 U1.4 U1.5 U1.6 U1.7 U1.8 U1.9 U1.10 U1.11 U1.12 U1.13 U1.14 U1.15 U1.16 U1.17 U1.18 U1.19 U1.20 U1.21 U1.22 U1.23 U1.24 U1.25 U1.26 U1.27 U1.28 U1.29 U1.30 U1.31 U1.32 U1.33 U1.34 U1.35 U1.36 U1.37 U1.38 U1.39 U1.40 U1.41 U1.42 U1.43 U1.44 U1.45 U1.46 U1.47 U1.48 U1.49 U1.50 U1.51 U1.52 U1.53 U1.54 U1.55 U1.56
drawn by
EPO.[2]01.ZZ.1110
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
U1.7
U1.55 ELS.[1]01.ZZ.1110
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
U1.1 EPO.[2]01.ZZ.1110
21-C-184
EPO.[2]01.ZZ.1110
originator
U1.35
EPO.[2]01.ZZ.1110
3450
3
U1.30
21-C
EPO.[2]01.ZZ.1110
EPO.[2]01.ZZ.1110
drawing no.
U1.31
sub no.
U1.34
U1.6
3000
2875
3000
EPO.[2]01.ZZ.1110
scale
754
U1.5 EPO.[2]01.ZZ.1110
U1.3
As indicated
U1.2 EPO.[2]01.ZZ.1110
21-C-57
600
2700
750
2700
2700
3000
U1.36 EPO.[2]01.ZZ.1110
EP U1 70.30.80.00 0001
EPO.[2]01.ZZ.1110
600
2
© Copyright 1985-2018
350
500
750
Westcraft Limited Design Office
A
B
C
D
E
F
G
H
I
J
K
L
M
N
A1
rev P3 P2 P1
P description of revision
Fire information - BC01 Fire planning requirements BC Lighting Systems
date 180710 180628 180517
1
21-C DESIGNS
L2.13
EQ
770 L2.40
L2.29 L2.31
EQ
L2.43
L2.14
EQ
900
EQ
EQ
L2.7
L2.36
315
EQ
EQ
1096
EQ
L2.15
L2.32 L2.8
EQ
350
5
350
EQ
EQ
EQ
400
L2.28
L2.30
L2.16 L2.45
L2.33
L2.44
EQ
L2.41
220
1400
6
550
141
EQ EQ
L2.34
EQ
EQ
EQ
EQ EQ EQ
L2.35
L2.12
741
L2.11 L2.10
EQ
EQ
912
L2.9 L2.17
7
8
6W 6W
BEDROOM2 BEDROOM2 BEDROOM2
F.2.5.1 F.2.5.1 F.2.5.1
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights
Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm
12 W 12 W 12 W
BEDROOM1 BEDROOM1
F.2.5.2 F.2.5.2
Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights
Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems
1800 lm 1800 lm
12 W 12 W
ENSUITE ENSUITE ENSUITE
F.2.5.3 F.2.5.3 F.2.5.3
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_85
Downlights Downlights Surface luminaires
Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems
1800 lm 1800 lm 3000 lm
12 W 12 W 10 W
BATHROOM BATHROOM BATHROOM BATHROOM
F.2.5.4 F.2.5.4 F.2.5.4 F.2.5.4
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_85 Pr_70_70_48_85
Downlights Downlights Surface luminaires Surface luminaires
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 3000 lm 3000 lm
12 W 12 W 10 W 10 W
KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER
F.2.5.5 F.2.5.5 F.2.5.5 F.2.5.5 F.2.5.5
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W 12 W
ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY
F.2.5.6 F.2.5.6 F.2.5.6
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights
Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm
12 W 12 W 12 W
BEDROOM2 BEDROOM2 BEDROOM2
F.2.6.1 F.2.6.1 F.2.6.1
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights
Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm
12 W 12 W 12 W
BEDROOM1 BEDROOM1 BEDROOM1
F.2.6.2 F.2.6.2 F.2.6.2
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights
Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm
12 W 12 W 12 W
ENSUITE ENSUITE ENSUITE ENSUITE ENSUITE
F.2.6.3 F.2.6.3 F.2.6.3 F.2.6.3 F.2.6.3
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_85 Pr_70_70_48_71 Pr_70_70_48_71
Downlights Downlights Surface luminaires Recessed luminaires Recessed luminaires
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 3000 lm 450 lm 450 lm
12 W 12 W 10 W 3W 3W
LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER LOUNGE/KITCHEN/DINER
F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4 F.2.6.4
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W 12 W 12 W
BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM
F.2.6.5 F.2.6.5 F.2.6.5 F.2.6.5 F.2.6.5
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_85
Downlights Downlights Downlights Downlights Surface luminaires
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm 3000 lm
12 W 12 W 12 W 12 W 10 W
ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY
F.2.6.6 F.2.6.6 F.2.6.6
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights
Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm
12 W 12 W 12 W
9
UP02.70.80.33 - LIGHTING SYSTEMS - 2 Level
1
A
B
C
D
E
F
G
H
I
J
K
L
M
N
sub no.
P
BS1192 2007 : 21-C-184-21-C-TW15-U2-.P-E-0001- S1- P3
Lighting Systems - 2 Level
BS1192 2007 : 21-C-184-21-C-TW15-U2-.P-E-0001- S1- P3
TW15
site address
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
1 : 50
10
11
drawing no.
880 lm 880 lm
1 : 50
Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems
scale
Surface luminaires Surface luminaires
21-C
Pr_70_70_48_85 Pr_70_70_48_85
originator
C.2.2 C.2.2
e::
EQ
605
STAIRS STAIRS
t : : +44(0)20 8935 5856
EQ
EQ
L2.6
6W
united kingdom
900
L2.27
350
EQ
L2.26
400
880 lm
ub5 5hl
EQ
200
550
300
949
Ss_70_80_33_35 Hard-wired general lighting systems
middlesex
L2.39 L2.38
L2.25
L2.46
L2.5
EQ
EQ
597
750
EQ
625
300
L2.37
L2.4
454
Surface luminaires
northolt
L2.3
1040
4 L2.24
650
Pr_70_70_48_85
57 summit road
1040
625
EQ
EQ
650
L2.48 L2.49
600
L2.2
C.2.1
checked by
EQ
L2.23
375
L2.1
527
LANDING 2 LEVEL
Comments
title
L2.20
380
EQ
EQ
EQ
Wattage
21-C-184
186
EQ
L2.19
L2.22
EQ
EQ
L2.18
Luminous Flux
430 Staines Road West Ashford TW15 1RZ
EQ
Classification.Uniclass.Ss.Description
project ref
EQ
L2.21
Classification.Unicl Classification.Uniclass.P Classification.Unic ass.Pr.Number r.Description lass.Ss.Number
FL202
EQ
Room: Number
drawn by
EQ
Room: Name
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
C.2.1 L2.39 ELF1.1 C.2.2 L2.40 ELF1.1 L2.41 ELF1.1 F.2.5.1 L2.1 ELF1.0 L2.2 ELF1.0 L2.3 ELF1.0 F.2.5.2 L2.4 ELF1.0 L2.5 ELF1.0 F.2.5.3 L2.13 ELF1.0 L2.14 ELF1.0 L2.43 ELF1.2 F.2.5.4 L2.15 ELF1.0 L2.16 ELF1.0 L2.44 ELF1.2 L2.45 ELF1.2 F.2.5.5 L2.9 ELF1.0 L2.10 ELF1.0 L2.11 ELF1.0 L2.12 ELF1.0 L2.17 ELF1.0 F.2.5.6 L2.6 ELF1.0 L2.7 ELF1.0 L2.8 ELF1.0 F.2.6.1 L2.18 ELF1.0 L2.19 ELF1.0 L2.20 ELF1.0 F.2.6.2 L2.21 ELF1.0 L2.22 ELF1.0 L2.23 ELF1.0 F.2.6.3 L2.24 ELF1.0 L2.25 ELF1.0 L2.46 ELF1.2 L2.48 ELF1.3 L2.49 ELF1.3 F.2.6.4 L2.30 ELF1.0 L2.31 ELF1.0 L2.32 ELF1.0 L2.33 ELF1.0 L2.34 ELF1.0 L2.35 ELF1.0 F.2.6.5 L2.26 ELF1.0 L2.27 ELF1.0 L2.28 ELF1.0 L2.29 ELF1.0 L2.47 ELF1.2 F.2.6.6 L2.36 ELF1.0 L2.37 ELF1.0 L2.38 ELF1.0 Grand total: 48
3 EQ
Type Mark
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
Mark
21-C-57
ET-U2-70.80.33.00-0001 - Lighting systems
EP U2 70.80.33.00 0001
2
© Copyright 1985-2018
Westcraft Limited Design Office
A
B
C
D
E
F
G
H
I
J
K
L
M
N
A1
rev P1
P description of revision
Lighting Systems
date 180517
1
ET-U1-70.80.33.00-0001 - Lighting systems Room: Name
Room: Number
Classification.Unicl Classification.Uniclass.P Classification.Unic ass.Pr.Number r.Description lass.Ss.Number
Classification.Uniclass.Ss.Description
21-C DESIGNS Luminous Flux
Wattage
Westcraft Limited Design Office
Comments
718 L1.35
L1.18 L1.14
EQ
EQ
5 750
585
L1.75
1284
EQ
L1.74
EQ
L1.21
L1.15
1400
L1.22 L1.37
EQ
L1.69
L1.77
L1.23
675
1500
EQ
L1.76
1284
1309
L1.68
1284
6
450
L1.20
1600
L1.73
741
969
L1.72
900
L1.19
385
L1.36
EQ
350
900
1284
L1.61
EQ
700
L1.62
L1.70
L1.17
EQ
EQ
1542
1000 L1.67
2000
EQ EQ
1309
L1.28
L1.24
1309
1444
EQ
L1.66
7
EQ
L1.29
L1.65
L1.30
L1.25 L1.31
EQ
L1.63
EQ L1.32
1309
750
1444
L1.64
L1.26 L1.33
EQ
EQ
750
L1.27
750
8
L1.38
9
1
UP01.70.80.33 - LIGHTING SYSTEMS - 1 Level 1 : 50
BS1192 2007 : 21-C-184-21-C-TW15-U1-.P-E-0001- S1- P1
10
11
12 W 12 W 12 W 12 W 12 W 12 W
BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1
F.1.3.2 F.1.3.2 F.1.3.2 F.1.3.2 F.1.3.2 F.1.3.2
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W 12 W 12 W
ENSUITE ENSUITE ENSUITE ENSUITE
F.1.3.3 F.1.3.3 F.1.3.3 F.1.3.3
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W
BATHROOM BATHROOM BATHROOM BATHROOM
F.1.3.4 F.1.3.4 F.1.3.4 F.1.3.4
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W
KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER
F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5 F.1.3.5
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W
ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY
F.1.3.6 F.1.3.6 F.1.3.6
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights
Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm
12 W 12 W 12 W
BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1 BEDROOM1
F.1.4.1 F.1.4.1 F.1.4.1 F.1.4.1 F.1.4.1 F.1.4.1
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W 12 W 12 W
BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2
F.1.4.2 F.1.4.2 F.1.4.2 F.1.4.2 F.1.4.2 F.1.4.2 F.1.4.2 F.1.4.2
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W
ENSUITE ENSUITE ENSUITE
F.1.4.3 F.1.4.3 F.1.4.3
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights
Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm
12 W 12 W 12 W
KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER KITCHEN/LOUNGE/DINER
F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4 F.1.4.4
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W
BATHROOM BATHROOM BATHROOM BATHROOM
F.1.4.5 F.1.4.5 F.1.4.5 F.1.4.5
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights Downlights
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm 1800 lm
12 W 12 W 12 W 12 W
ENTRANCE LOBBY ENTRANCE LOBBY ENTRANCE LOBBY
F.1.4.6 F.1.4.6 F.1.4.6
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
Downlights Downlights Downlights
Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems
1800 lm 1800 lm 1800 lm
12 W 12 W 12 W
TW15 A
B
C
D
E
F
G
H
I
J
K
L
© Copyright 1985-2018
1800 lm 1800 lm 1800 lm 1800 lm 1800 lm 1800 lm
EP U1 70.80.33.00 0001
Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems Hard-wired general lighting systems
drawing no.
Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35 Ss_70_80_33_35
1 : 50
Downlights Downlights Downlights Downlights Downlights Downlights
scale
Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24 Pr_70_70_48_24
21-C
F.1.3.1 F.1.3.1 F.1.3.1 F.1.3.1 F.1.3.1 F.1.3.1
e::
964
L1.58
EQ L1.71
450
L1.16
BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2 BEDROOM2
t : : +44(0)20 8935 5856
EQ
915
1284
L1.60
6W 6W 6W
united kingdom
L1.13
880 lm 880 lm 880 lm
ub5 5hl
500
L1.59
1284
900
Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems Ss_70_80_33_35 Hard-wired general lighting systems
middlesex
760
801
750
L1.57
EQ
400
L1.34
Surface luminaires Surface luminaires Surface luminaires
northolt
1597 EQ
200
700
4
Pr_70_70_48_85 Pr_70_70_48_85 Pr_70_70_48_85
57 summit road
750 EQ
C.1.2 C.1.2 C.1.2
M
N
P
BS1192 2007 : 21-C-184-21-C-TW15-U1-.P-E-0001- S1- P1
450 L1.55
STAIRS STAIRS STAIRS
Lighting Systems - 1 Level
919
400
L1.54
L1.12
EQ
EQ
EQ
L1.53 EQ
750
L1.56
EQ 1000
6W
21-C-57
600 EQ
L1.11
880 lm
checked by
L1.6
1575
Ss_70_80_33_35 Hard-wired general lighting systems
title
750
EQ
L1.5
600
EQ
750
EQ
L1.52
Surface luminaires
21-C-184
L1.10
750 1524
400
L1.9
1346
Pr_70_70_48_85
430 Staines Road West Ashford TW15 1RZ
EQ
L1.4
750
L1.48
750
L1.3
L1.41
L1.51
EQ
3
EQ
L1.44
L1.47
EQ
L1.8
C.1.1
originator
L1.7
L1.2
EQ
EQ
L1.50
LANDING 1 LEVEL
project ref
EQ
L1.1 L1.40
6W
FL202
EQ
EQ
EQ
L1.43
L1.46
880 lm
drawn by
L1.39
L1.49
Ss_70_80_33_35 Hard-wired general lighting systems
site address
L1.42
Surface luminaires
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
750
L1.45
Pr_70_70_48_85
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
1374
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
L1.38 ELF1.1 C.1.1 L1.34 ELF1.1 C.1.2 L1.35 ELF1.1 L1.36 ELF1.1 L1.37 ELF1.1 F.1.3.1 L1.1 ELF1.0 L1.2 ELF1.0 L1.3 ELF1.0 L1.4 ELF1.0 L1.5 ELF1.0 L1.6 ELF1.0 F.1.3.2 L1.7 ELF1.0 L1.8 ELF1.0 L1.9 ELF1.0 L1.10 ELF1.0 L1.11 ELF1.0 L1.12 ELF1.0 F.1.3.3 L1.16 ELF1.0 L1.17 ELF1.0 L1.18 ELF1.0 L1.19 ELF1.0 F.1.3.4 L1.20 ELF1.0 L1.21 ELF1.0 L1.22 ELF1.0 L1.23 ELF1.0 F.1.3.5 L1.24 ELF1.0 L1.25 ELF1.0 L1.26 ELF1.0 L1.27 ELF1.0 L1.28 ELF1.0 L1.29 ELF1.0 L1.30 ELF1.0 L1.31 ELF1.0 L1.32 ELF1.0 L1.33 ELF1.0 F.1.3.6 L1.13 ELF1.0 L1.14 ELF1.0 L1.15 ELF1.0 F.1.4.1 L1.39 ELF1.0 L1.40 ELF1.0 L1.41 ELF1.0 L1.42 ELF1.0 L1.43 ELF1.0 L1.44 ELF1.0 F.1.4.2 L1.45 ELF1.0 L1.46 ELF1.0 L1.47 ELF1.0 L1.48 ELF1.0 L1.49 ELF1.0 L1.50 ELF1.0 L1.51 ELF1.0 L1.52 ELF1.0 F.1.4.3 L1.53 ELF1.0 L1.54 ELF1.0 L1.55 ELF1.0 F.1.4.4 L1.63 ELF1.0 L1.64 ELF1.0 L1.65 ELF1.0 L1.66 ELF1.0 L1.67 ELF1.0 L1.68 ELF1.0 L1.69 ELF1.0 L1.70 ELF1.0 L1.71 ELF1.0 L1.72 ELF1.0 L1.73 ELF1.0 L1.74 ELF1.0 L1.75 ELF1.0 L1.76 ELF1.0 L1.77 ELF1.0 F.1.4.5 L1.59 ELF1.0 L1.60 ELF1.0 L1.61 ELF1.0 L1.62 ELF1.0 F.1.4.6 L1.56 ELF1.0 L1.57 ELF1.0 L1.58 ELF1.0 Grand total: 77
EQ
750
2
sub no.
EQ
Mark
Type Mark
A
B
C
D
E
F
G
H
I
J
K
L
M
N
A1
rev P2 P1
P description of revision
Roofing systems Steel frame arrangement
date 180219 180216
1
1 2 189
Westcraft Limited Design Office
169
919 813
5550 5.550 m
59
4
2845
1329
185
1493
1329 481
5
3452
704 869
869
7663 7.663 m
173 1011
7663 7.663 m
RFS01.1
7663 7.663 m
RFS01.1
8529 8.529 m
Ss_30_10_30_85 <250.0 mm>
RFS01.ANTIQUE
7211 7.211 m
3490
RFS01.1 Ss_30_10_30_85 <250.0 mm>
Ss_30_10_30_85 <270.0 mm>
8981 8.981 m
8481 8.481 m
Ridge feature tiles 5120
checked by
4
title
1797
430 Staines Road West Ashford TW15 1RZ
8525 8.525 m
A
7663 7.663 m
Ss_30_10_30_85 <250.0 mm>
21-C-184
7728 7.728 m
project ref
3
21-C
sub no.
Ss_30_10_30_85 <250.0 mm>
originator
7728 7.728 m
FL202
RFS01.1
5550 5.550 m
drawn by
7663 7.663 m
318
3490
7663 7.663 m
1434
7269 7.269 m
© Copyright 1985-2018
919
5861 5.861 m
AP U3 25.13.00.00 0001
12
A
2
3
3147
497
21-C DESIGNS
drawing no.
914
1 : 50
914
scale
2943
970
21-C-57
187
9150 9.150 m
9259
2771
B RFS01.ANTIQUE
1873
Ss_30_10_30_85 <270.0 mm>
e::
5
RFS10.1
B
AT-U3-30.10.90.00-0001 - Roofing systems
RFS01.1 Mark
997
838
1443
Ss_30_10_30_85 <250.0 mm>
Comments
8885 8.885 m
7
C
187 1444
8885 8.885 m
922
RFS01.ANTIQUE
2845
Ss_30_10_30_85 <270.0 mm>
8525 8.525 m
RFS01.1 Ss_30_10_30_85 <250.0 mm>
C1
RFS01.1
7728 7.728 m
Ss_30_10_30_85 <250.0 mm>
8
7728 7.728 m
RFS01.1
7728 7.728 m
Ss_30_10_30_85 <250.0 mm>
7728 7.728 m
Front bonnet 1 Front bonnet 2 Front bonnet 3 Front bonnet 4 Rear bonnet 4 Rear bonnet 3 Rear bonnet 2 Rear bonnet 1
7211 7.211 m
7663 7.663 m
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
1614
D
51.11 m² 17.82 m² 26.64 m² 37.63 m² 13.34 m² 7.86 m² 65.30 m² 3.50 m² 3.53 m² 6.10 m² 3.27 m² 4.33 m² 6.58 m² 6.58 m² 4.42 m² 16.07 m² 274.10 m²
middlesex
Ss_30_10_30_85 <270.0 mm>
5326 5.326 m
RFS01.ANTIQUE RFS01.ANTIQUE RFS01.ANTIQUE RFS01.ANTIQUE RFS01.ANTIQUE RFS01.ANTIQUE RFS10.1 RFS01.1 RFS01.1 RFS01.1 RFS01.1 RFS01.1 RFS01.1 RFS01.1 RFS01.1 RFS10
northolt
U3.1 U3.2 U3.3 U3.4 U3.5 U3.6 U3.7 U3.8 U3.9 U3.10 U3.11 U3.12 U3.13 U3.14 U3.15 U3.16 Grand total: 16
RFS01.ANTIQUE
7663 7.663 m
116
1228
1394
E 536
1228 161
9
5566 5.566 m
Ridge feature tiles
1228
D
1
342
1228 247
9971
914 914 1376
2
BS1192 2007 : 21-C-184-21-C-TW15-U3-.P-A-0001- S1- P2
UP03.10.20 - DIMENSIONS - 3 Level - Roof Plan 1 : 50
TW15 A
B
C
D
E
F
G
H
I
J
K
L
M
N
P
BS1192 2007 : 21-C-184-21-C-TW15-U3-.P-A-0001- S1- P2
4
10
11
E 5
GA Roofing plan
3
Copyright © All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
173
site address
618
Area
57 summit road
Ss_30_10_30_85 <270.0 mm>
7663 7.663 m
2102
C1
Type Mark
RFS01.ANTIQUE
7663 7.663 m
united kingdom
995
Ss_30_10_30_85 <270.0 mm>
ub5 5hl
RFS01.ANTIQUE
7269 7.269 m
6
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
987
2348
C
1
t : : +44(0)20 8935 5856
995
Ss_30_40_30_43 <374.5 mm>
11
A B C D E F G H I J K L
TW15
M N P
northolt
middlesex
ub5 5hl
united kingdom
t : : +44(0)20 8935 5856
e:: k21cdesigns@gmail.com
FEN03 Vertical featherboard panels with concrete post
1 : 50
scale
sub no.
Š Copyright 1985-2018
LP 00 45.00.00.00 0001
drawing no.
21-C
originator
2
BS1192 2007 : 21-C-184-21-C-TW15-00-.P-L-0001- S1- P1
Condition 2 - Landscaping proposal
21-C-57
checked by
title
21-C-184
project ref
3
430 Staines Road West Ashford TW15 1RZ
drawn by
Landscaping for Condition 2
FL202
57 summit road
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
description of revision
site address
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
rev P1
1 : 50
UP00.45.0.1- FLORA FAUNA - 0 Level - Landscaping - Ground Level
N
Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
[?] ?
1
M
45.83 silver birch
L
45.82 silver birch
K
45.81 silver birch
J
45.57 oleander
keyblock permeable paver
45.30 privet
45.31 privet
[TP] planting top soil
2.5
45.55 oleander
45.28 privet
45.29 privet
45.19 lavander
I
45.53 oleander
45.26 privet
45.27 privet
45.21 lavander
45.20 lavander
H
45.52 oleander
45.24 privet
45.25 privet
45.22 lavander
0
45.50 oleander
45.6 christmas berry
45.10 christmas berry
45.23 privet
G
45.49 oleander
45.48 oleander
45.7 christmas berry
45.8 christmas berry 45.9 christmas berry
45.14 lavander
45.12 christmas berry
F
45.47 oleander
45.46 oleander
8
45.13 christmas berry
45.43 christmas berry 45.15 lavander
45.16 lavander
45.17 lavander
45.18 lavander
E
45.44 christmas berry
45.42 christmas berry
45.41 christmas berry
45.39 christmas berry
45.1 christmas berry
D
45.40 christmas berry
45.38 christmas berry
45.36 christmas berry
45.37 christmas berry
6
keyblock permeable paver
45.2 christmas berry
45.3 christmas berry
4
45.35 christmas berry
7
45.34 christmas berry
5
45.5 christmas berry
45.4 christmas berry C
45.45 christmas berry
9
45.33 christmas berry
45.32 christmas berry
A1
B
45.56 oleander
10
45.51 oleander
BS1192 2007 : 21-C-184-21-C-TW15-00-.P-L-0001- S1- P1
A P date 190309
5.0 m
1
21-C DESIGNS Westcraft Limited Design Office
11
A B C D E F G H
TW15
I J
45.76 golden flame spirea
45.75 golden flame spirea K L M
9
N P
northolt
middlesex
ub5 5hl
united kingdom
t : : +44(0)20 8935 5856
e:: k21cdesigns@gmail.com
1 : 50
scale
Š Copyright 1985-2018
LP 00 45.00.00.00 0002
drawing no.
21-C
sub no.
2
BS1192 2007 : 21-C-184-21-C-TW15-00-.P-L-0002- S1- P1
Condition 2 - Landscaping proposal
21-C-57
checked by
57 summit road
5
title
21-C-184
3 originator
Landscaping for Condition 2
430 Staines Road West Ashford TW15 1RZ
project ref
description of revision
FL202
drawn by
N
site address
Shared S1 Suitable for Co-ordination - Work In Progress S2 Suitable for Information - Work in Progress S3 Suitable for Review & Comment - Work in Progress S4 Suitable for Stage Approval - Issued S5 Suitable for Manufacture - Issied S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6)
rev P1
Project Stages 0.0 Project Brief Concept 1.1 Consultations 2.2 Concept Design 3.3 Developed design - planning 4.4 Technical Design - Building Regulations 4.5 Technical Design - Details 4.6 Technical Design - Contractor Procurement 5.7 Construction 6.8 Handover Close out - Financial completions 6.9 Handover Close out - Post Project Activity 7.10 In use
M
1 : 50
[GR] grass
[SG] shingle
L
UP00.45.0.2- FLORA FAUNA - - 0 Level - Landscaping - Ground Level
[HG] Hedging
keyblock permeable paver
K
45.79 golden flame spirea
45.78 golden flame spirea
[CF] Paving concrete flags
J
Copyright Š All copies of this drawing are for information only about the application/s and shall not be used for any other purpose.
1
10
45.74 golden flame spirea
7
45.73 golden flame spirea
I
45.72 golden flame spirea
keyblock permeable paver
4
45.71 golden flame spirea
2.5
45.70 golden flame spirea
45.90 silver birch
H
45.69 golden flame spirea
45.89 silver birch
0
45.68 golden flame spirea
45.88 silver birch G
45.67 golden flame spirea
45.66 golden flame spirea
45.65 common box
45.64 common box
45.87 silver birch
45.86 silver birch
F
keyblock permeable paver
45.62 common box
E
45.63 common box
[HG] Hedging
[GR] grass
FEN03 Vertical featherboard panels with concrete post
1
FEN21.200 Box Hedge
6
45.85 silver birch
[CF] Paving concrete flags
D
45.61 common box
45.60 common box
keyblock permeable paver
A1
C
45.59 common box
45.58 common box
45.84 silver birch
45.83 silver birch
45.82 silver birch
8
B
45.77 golden flame spirea
BS1192 2007 : 21-C-184-21-C-TW15-00-.P-L-0002- S1- P1
45.81 silver birch
A P date 190309
5.0 m
21-C DESIGNS Westcraft Limited Design Office