Architectural Design Portfolio

Page 1

REGINA KIM

INTERIOR DESIGNER

BDes. Interior Architecture, CIDA Accredited reginahanjookim@gmail.com

REGINA KIM

INTERIOR DESIGNER

BDes. Interior Architecture, CIDA Accredited reginahanjookim@gmail.com

7/11/2019

REGINA KIM

INTERIOR DESIGNER

BDes. Interior Architecture, CIDA Accredited reginahanjookim@gmail.com

TABLE OF CONTENTS

COLBORNE ARCHITECTURAL GROUP PACIFIC INC. 2016 - Present

• Bcit Cari Computer Lab

• Chief Maquinna Elementary School Seismic Upgrade

• Vcc Downtown Campus 1st Renovation

• Other Minor Projects

AVISSA DESIGN INC. 2016

• Home Restoration

ACADEMIC WORK OCAD

, OCAD University, 2016

•Wonderland Advertisement Inc.

• Condominium Penthouse: Autumn

7/11/2019

BCIT CARI LAB & OFFICE RENOVATION

Centre for Applied Research & Innovation

Address : Burnaby, B.C.

Area: 552 gm2 (5942 gsf)

Project Budget: Est. cost, $600K construction: In progress 2019 Team members: 3 Computer Program: Revit BOTTOM LEFT

• Proposed partial foor plan

• Schematic design considering plumbing requirements

UPPER & BOTTOM RIGHT

• Detail sections for exterior and interior walls

BCIT CARI LAB & OFFICE RENOVATION Centre for Applied Research & Innovation Cont`d 32" 84" 32" x 84" 32" 84" 36" 84" 32" 84" WALLS TO BE DEMOLISHED EXISTING WALLS TO REMAIN. EXISTING GLAZING. 3280 124 2570 124 1740 1660 660 MENS W/C 1011 WOMENS W/C 1010 GENDER NEUTRAL W/C 1010A MENS W/C 1011 WOMENS W/C 1010 GENDER NEUTRAL W/C 1010A 905 905 905 827 W1 2018F 914 MENS W/C 1011 W1 GB TTD MENS W/C 1011 GB MR SD PD 76 152 561 GENDER NEUTRAL W/C 1010A MR GB SND SD 544 1060 GB 152 548 GENDER NEUTRAL W/C 1010A GB 544 TTD 305 WASHROOM ACCESSORY ABBREVIATION LEGEND: NOTE: INSTALL SOLID BACKING AT ALL WALL MOUNTED WASHROOM ACCESSORIES. MINUMUM 3/4" PLYWOOD, TYP. X DENOTES EXISTING ACCESSORIES TO BE RETAINED: ie: XSD = EXIST SOAP DISPENSER TO REMOVED AND REINSTALLED GB GRAB BAR MR MIRROR PD PAPER TOWEL DISPENSER SND SANITARY NAPKIN DISPOSAL SD SOAP DISPOSAL TTD TOILET TISSUE DISPENSER UR URINAL WP WASHROOM PARTITIONS. REFER TO SPECIFICATIONS. 1060 960 PD GENDER NEUTRAL W/C 1010A 1038 1060 PD MR MENS W/C 1011 500 711 76 MR SD GB SND W1 WOMENS W/C 1010 THE COLBORNE ARCHITECTURAL GROUP Pacific Inc. 1201 WESTPENDERSTREET SUITE730 VANCOUVER,B.C.,V6E2V2 Ph:(604) 669-4166 Fax: (604) 669-4144 PROJECT TITLE CAGPPROJ.NO. DRAWN DATE GENERALNOTES THE FIELD AND REPORT ANY DISCREPANCY TO THE ARCHITECT. DRAWINGS ARE NOT TO BE SCALED. CLEARLYLABELED "ISSUED FORCONSTRUCTION"IN THE REVISIONCOLUMN. DRAWINGSARETOBEREAD INCONJUNCTION WITH ALL OTHER OFMATERIALS TO THEAREASINDICATEDONTHEDRAWINGS ANDPROTECTALLOTHERAREAS OFTHE SITEFROMDAMAGE. THE CONTRACTORSHALLACCOMMODATE ACCESS AND SAFETYFOR THEPUBLIC DURINGTHECONSTRUCTION PERIOD, Asindicated BCITCARICOMPUTER LABS RENOVATION DEMOLITION & PROPOSED WASHROOMS 1010&1011 A-905 06/10/19 MG SQ 1906 4355 MathissiPL,Burnaby,BC V5G4S8 12019/05/27ISSUED FOR DESIGNREVIEW SQ 25 WASHROOM 1010 & 1011-EXISTING & DEMOLITION 1 1 25 WASHROOM 1010 & 1011-PROPOSED 2 25 W/C 1011 -ELEVATION 3 1 25 W/C 1011 -ELEVATION 3 5 1 25 W/C 1010A -ELEVATION 6 1 25 W/C 1010A -ELEVATION 2 7 1 25 W/C 1010A -ELEVATION 3 8 1 25 W/C 1011 -ELEVATION 2 4 1 25 W/C 1010 -ELEVATION 9 36" 84" 34" 84" 30" 84" OFFICE 1121A 2800 SHOP 1120 STORAGE 1121 WALLS TO BE DEMOLISHED EXISTING WALLS TO REMAIN. EXISTING GLAZING. GB 524 TTD GENDER NEUTRAL W/C 1121B W1 GENDER NEUTRAL W/C 1121B PD SD MR GB GB TTD 711 1060 420 420 W1 200 GENDER NEUTRAL W/C 1121B W1 PD 711 W1 2018X 892 1000 2018CC 3124 2018W W1 2800 3900 OFFICE 1121A 3000 EXG' WALL WALL INDICATED ON BCIT DRWGS NOTE: CORRIDOR WIDTH DOES NOT COMPLY FOR ACCESSIBILITY. 906 906 W1 W1 W1 W1 2018X 2018W GENDER NEUTRAL W/C 1121B COLBORNE ARCHITECTURAL Pacific 1201 WESTPENDERSTREET VANCOUVER,B.C.,V6E2V2 Ph:(604) Fax: REVIEWED DATE GENERALNOTES DRAWINGS ARE NOT TO BE SCALED. ALL DRAWINGS, SPECIFICATIONS ANDRELATEDDOCUMENTS ARE THE COPYRIGHTPROPERTY OFTHEARCHITECT DRAWINGSARETOBEREAD INCONJUNCTION CONTRACTDOCUMENTS. ANDPROTECTALLOTHERAREAS OFTHE THE CONTRACTORSHALLACCOMMODATE SAFETYFOR THEPUBLIC DURINGTHECONSTRUCTION AND SHALL PROVIDETEMPORARYHOARDINGOR Asindicated BCITCARICOMPUTER LABS RENOVATION DEMOLITION & PROPOSED WASHROOM_OFFICE 1121A A06/10/19 MG SQ 1906 4355 MathissiPL,Burnaby,BC V5G4S8 12019/05/27ISSUED FOR DESIGNREVIEW 1 25 WASHROOM_OFFICE 1121A-EXISTING & DEMOLITION 1 25 W/C 1121A -ELEV. 3 1 25 W/C 1121A -ELEV. 2 4 1 25 W/C 1121A -ELEV. 3 5 1 25 CORR. -ELEV. 6 25 CORR. -ELEV. 2 7 1 25 WASHROOM_OFFICE 1121A-PROPOSED 2 3 4 CORR. 2016 LOUNGE 2025 1067 SLOPED METAL TOP NEWMETAL LOCKERS METAL BASE 100mm RB,TYP'L CORR. 2020 NEW GWB, PTD 3 4 CORR. 2016 2015B 2015 2015A XGWB,PTD NEW GWB, PTD 2016 5091450 56 559 2184 3 4 CORR. 2025 2027 LOUNGE 2025 100mmRB,TYP'L XGWB,PTD CONT.MDF FILLER PANEL PTD.,TYP'L 38 19 44 457 NEW MILLWORK 4 A-602 SIM. 2025 519145140651 55951 2032 102 3 4 CORR. 2025 2015B CORR. 2018 100mm RB, TYP'L SLOPED METAL TOP NEWMETAL LOCKERS METAL BASE 2025 ENTRY DOOR CORR. 2020 NEW GWB, PTD THE COLBORNE
GROUP Pacific Inc. 1201 WEST PENDER STREET SUITE 730 VANCOUVER, B.C., V6E 2V2 Ph: (604) 669-4166 Fax: (604) 669-4144 DRAWING TITLE PROJECT TITLE CAGP PROJ. NO. REVIEWED DRAWN DATE CLIENT SHEET NO. GENERALNOTES THE CONTRACTOR MUST CHECK AND VERIFY ALL DIMENSIONS IN THEFIELDAND REPORTANYDISCREPANCYTO THE ARCHITECT. DRAWINGS ARE NOT TO BE SCALED. ALL DRAWINGS, SPECIFICATIONS AND RELATED DOCUMENTS ARE THE COPYRIGHT PROPERTYOFTHE ARCHITECT AND MUST BE RETURNED UPON REQUEST.REPRODUCTION OF THE DRAWINGS, SPECIFICATIONS AND RELATED DOCUMENTS IS FORBIDDEN UNLESS PERMITTED IN WRITING BY THE ARCHITECT. DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS CLEARLY LABELED "ISSUED FOR CONSTRUCTION" IN THE REVISION COLUMN. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER CONTRACT DOCUMENTS. ALL WORK SHALLBE TO THEMOSTRECENTBRITISH COLUMBIA BUILDING CODE STANDARDS AND ALLOTHER BY LAWS AND REGULATIONS APPLICABLE TO THE TRADES INVOLVED. THE CONTRACTOR SHALL CONFINE ACTIVITIES AND STORAGE OF MATERIALS TO THE AREAS INDICATED ON THE DRAWINGS AND PROTECT ALL OTHER AREAS OF THE SITE FROM DAMAGE. THE CONTRACTOR SHALL ACCOMMODATE ACCESS AND SAFETY FOR THE PUBLIC DURING THE CONSTRUCTION PERIOD, AND SHALL PROVIDE TEMPORARY HOARDING OR FENCING AS REQUIRED. REFER TO SPECIFICATIONS FOR DETAILS. 1. 2. 3. 4. 5. 6. 7. 1 25 BCIT CARI COMPUTER LABS RENOVATION INTERIOR ELEVATION - CORRIDORS 2016 & 2025 A-901 06/24/19 MG SQ 1906 4355 Mathissi PL, Burnaby, BC V5G 4S8 BCIT PROJECT NO. D0531CARI TECH19 CORRIDOR 2016 - NORTH ELEVATION CORRIDOR 2016 - SOUTH ELEVATION No.DATE REVISION BY 12019/04/25ISSUED FOR DESIGN REVIEW SQ 22019/06/10ISSUED FOR 50% TECH'L REVIEW SQ 32019/06/28ISSUED FOR 75% TECH'L REVIEW SQ 1 25 ENTRY DOOR #2 3 CORRIDOR 2025 - NORTH ELEVATION 1 25 ACCESSIBLE ENTRY DOOR #1 5 CORRIDOR 2025 - SOUTH ELEVATION Accessibility & Gender Neutral Washrooms Interior Elevations and Interior Finishes SS218 - 105019 Crossroad/Laguna 270128004 Taconic Stone SHEFFIELD 3 4 CORR. 2016 LOUNGE 2025 1067 SLOPED METAL TOP NEWMETAL LOCKERS METAL BASE CORR. 2020 NEW GWB, PTD 4 2015B 2015 2015A XGWB,PTD 3 4 CORR. 2025 2027 LOUNGE 2025 100mm RB, TYP'L XGWB, PTD CONT. MDF FILLER PANEL PTD., TYP'L 38 19 44 457 NEW MILLWORK 4 A-602 SIM. 519145140651 3 4 CORR. CORR. 2018 SLOPED METAL TOP ENTRY DOOR CORR. NEWGWB,PTD 1 : 25 CORRIDOR 2016 - NORTH ELEVATION 1 1 : 25 CORRIDOR 2016 - SOUTH ELEVATION 2 3 1 : 25 CORRIDOR 2025 - NORTH ELEVATION 4 5
ARCHITECTURAL

VSB CHEIF MAQUINNA ELEMENTARY SCHOOL - SEISMIC UPGRADE

Vancouver School Board

Address : Vancouver, B.C.

Area: 3,070 m2 (33045 sf)

Project Budget: Est. cost, $12.2M construction: In progress 2019

Team members: 4

Computer Program: Revit, Photoshop and PowerPoint

BOTTOM LEFT

• Proposed elevations for classroos, corridors and location for lockers

PROJECT TIMELINE

PROPOSED PLANS AND ELEVATIONS <School Name> <School Replacement or Seismic Upgrade> Public Information Session 1 May 2019 Chief Maquinna Elementary School Seismic Upgrade Public Information Session 5 SCOPE OF WORK • • • • • NewConcrete Pilasters New WoodShearWall Replaced orbraced blockwalls New SteelBracing 1 3 4 6 7 8 9 10 11 12 13 14 15 013 014-1 E1 E1 E4 E4 E4 E3 E3 E3 E3 E3 E3 E3 E6 A310 A310 A B C D E F G H J K L M N 104-2 E3 E3 E6 E6 E6 E3 A310 A310 A311 No. COMMENTS E1 EXISTING PTD VERTICAL WOOD SIDING E3 EXISTING PDT CONCRETE E5 EXISTING PTD CONCRETE COLUMN NEW STEEL BRACING,PTD. REFER TO STRUCTURAL NEW CONCRETE INFILL, PTD. REFER TO STRUCTURAL NEW CONCRETE PILASTER, PTD. REFER TO STRUCTURAL NEW PREFINISHED METAL CAP FLASHING MATERIAL LEGEND THE COLBORNE ARCHITECTURAL GROUP Pacific Inc. 1201 WEST PENDER STREET SUITE 730 VANCOUVER, B.C., V6E 2V2 Ph: (604) 669-4166 Fax: (604) 669-4144 CAGP PROJ. NO. SHEET NO. THE FIELD ANDREPORTANY DISCREPANCY TOTHE ALL DRAWINGS, SPECIFICATIO SAFETY FOR THE PUBLIC DURINGTHE CONSTRUCTION PERIOD, As indicated CHIEF MAQUINNA ELEMENTARY SCHOOL SEISMIC UPGRADE EXTERIOR ELEVATIONS A402 10/24/18 Author Checker 1902 2684 AVE E, Vancouver, BC V5M 1C9 100 SOUTH ELEVATION 1 100 WEST ELEVATION 2

UBC TOTEM FIELD RENOVATION

Linguistics Department

Address : Vancouver, B.C.

Area: 3,070 m2 (33045 sf)

Project Budget: $560K+FF&E

Construction: 2018

Team members: 3

Computer Program: Revit, AutoCAD, Photoshop

DN DN 1 2 3 C B A 3 A301 2 A301 CORRIDOR 200 ELECT. RM. 202 OFFICE 203 FEMALE WC. 204 OFFICE 205 MALE WC. 206 OFFICE 207 OFFICE 209 OFFICE 210 OFFICE 211 OFFICE 212 CORRIDOR 213 OFFICE 214 OFFICE 215 CORRIDOR 220 126 SF OFFICE 221 146 SF OFFICE 223 345 SF MEETING 224 STORAGE 221A 145 SF OFFICE 225 207 SF OFFICE 227 123 SF RECORDING RM. 226 141 SF RECORDING RM. 224A 225 X221 X202 X204 X206 X203 X205 X212 X207 X209 X214 X215 X211 X213A X213 X220 X227 226-1 226 224A X223 X208 LIFT 208 224 X210 X220-2 350 SF LOUNGE 201 163 SF OFFICE 222 Field Tile (80%): #138830AK00 'Iron', Size: 250 x 1000 mm Field Tile (20%): #163230AK00 'Iron/Berry', Size: 250 x 1000 mm THE COLBORNE ARCHITECTURAL GROUP PacificInc. Date UPPER FLOOR-FLOORINGPATTERN 31/07/2018 Totem Field Studio Renovation 2613 WestMall,Vancouver,BCV6T1Z2 ASK 016 1 : 100 UPPER FLOOR PLAN - FLOORING PATTERN 1 NOTE: PATTERN SHOWN FOR ILLUSTRATION PURPOSES NOT INTENDED AS A PRECISE LAYOUT. REFER ALSO TO SAMPLE PHOTO. MAIN FLOOR 0 X108 X110 X112 NEW RUBBER BASE NEWFEATURE WALL CUSTOMPATTERN VINYLWALLMURAL OVER DEEP BASE PAINT. REFERTO SECTION 0121 00 ALLOWANCES DOOR & FRAME TO BE PAINTEDFFEATUREWALL COLOUR,CORRIDOR SIDE NEW100MMHIGH WOODBASE 3490 2400 MAIN FLOOR 0 B 3 A301 CORRIDOR 100 917 EQ. EQ. EQ. 3781 445 NEW GLAZING MW-2 2400 102 927 457 813 102 103 PRIVACY FILM WITH CUSTOM LASER-CUT CLEAR PATTERN (TBD) UPPER FLOOR 3350 2 NEWFEATUREWALL CUSTOMPATTERN VINYLWALL MURAL OVERDEEP BASE PAINT. REFERTOSECTION 01 21 00 ALLOWANCES NEW100MMHIGHWOODBASE PRIVACYFILM WITH CUSTOMLASER-CUT CLEAR PATTERN(TBD) DOOR &FRAMETOBE PAINTEDFFEATUREWALL COLOUR,CORRIDOR SIDE 3939 2400 762 457 THE COLBORNE ARCHITECTURAL GROUP Pacific Inc. Date WALL COVERING 29/05/2018 Totem Field Studio Renovation 2613 West Mall, Vancouver, BC V6T 1Z2 1 : 50 WALL COVERING_MAIN FLOOR 1 1 : 50 WALL COVERING_MAIN FLOOR_2 2 1 : 50 WALL COVERING_UPPER FLOOR 3 MAIN FLOOR 0 X108 X110 X112 NEW RUBBER BASE NEW FEATURE WALL CUSTOM PATTERN VINYL WALL MURAL OVER DEEP BASE PAINT. REFER TO SECTION 01 21 00 ALLOWANCES DOOR & FRAME TO BE PAINTED FFEATURE WALL COLOUR, CORRIDOR SIDE NEW100MM HIGH WOOD BASE 3490 2400 CORRIDOR 100 UPPER FLOOR 3350 2 NEWFEATUREWALL CUSTOMPATTERN VINYLWALL MURAL OVERDEEP BASE PAINT. REFERTOSECTION 01 21 00 ALLOWANCES NEW100MMHIGHWOODBASE PRIVACYFILM WITH CUSTOMLASER-CUT CLEAR PATTERN(TBD) DOOR &FRAMETOBE PAINTEDFFEATUREWALL COLOUR,CORRIDOR SIDE 3939 2400 762 457 1 : 50 WALL COVERING_MAIN FLOOR 1 1 : 50 WALL 2 WALL COVERING_UPPER FLOOR MAIN FLOOR 0 X108 X110 X112 NEW RUBBER BASE NEWFEATURE WALL CUSTOMPATTERN VINYLWALLMURAL OVER DEEP BASE PAINT. REFERTO SECTION 0121 00 ALLOWANCES DOOR & FRAME TO BE PAINTEDFFEATUREWALL COLOUR,CORRIDOR SIDE NEW100MMHIGH WOODBASE 3490 2400 CORRIDOR 100 UPPER FLOOR 3350 2 NEW FEATURE WALL CUSTOM PATTERN VINYL WALL MURAL OVER DEEP BASE PAINT. REFER TO SECTION 01 21 00 ALLOWANCES NEW100MM HIGH WOOD BASE PRIVACY FILM WITH CUSTOM LASER-CUT CLEAR PATTERN (TBD) DOOR & FRAME TO BE PAINTED FFEATURE WALL COLOUR, CORRIDOR SIDE 3939 2400 762 457 1 : 50 WALL COVERING_MAIN FLOOR 1 1 : 50 WALL 2 1 : 50 WALL COVERING_UPPER FLOOR 3 WALL COVERING % OF CARPET TILINGS W2 INTERIOR STEEL FRAME WALL: 16mm GWB 92mm STEEL STUDS @406 O.C. TO U/S STRUCTURE BATT INSULATION TO STUD CAVITY 16mm GWB WALLTYPES W1 INTERIOR FURRING @ BLOCK WALL: EXG. BLOCK WALL 64mm STEEL STUDS @406 O.C. 16mm GWB W3 INTERIORLAMINATEDBLOCKWALL: EXG.BLOCKWALL 13mmGWB. MAINTAIN 25MM REVEAL ATCEILING FINISH WITH J MOULD. INTERIORSTEELFRAME WALL: 2 LAYERSOF16mmGWB 152mm25GASTEEL STUDS@406 O.C. TOU/SSTRUCTURE BATTINSULATION TOSTUD CAVITY ACOUSTICSEALBASEANDHEADTRACK 2 LAYERSOF16mmGWB W4 INTERIOR WOOD FRAME WALL, MODIFIED: EXG.GWBONEXG.FRAMING NEWBATTINSULATION TO STUD CAVITY NEW2LAYERS OF16mmGWB W5 PROJECTLOCATION UMRD. DR. 1 UNIVERSAL TOILET ROOM DRAWINGTITLE PROJECTTITLE CAGP PROJ.NO. REVIEWED DRAWN SCALE DATE CLIENT SHEETNO. Asindicated TotemFieldStudio Renovation PROJECT DATA & SITE PLAN A000 03/05/18 SA RN 1740 2613 WestMall,Vancouver,BCV6T1Z2 No.DATE REVISION BY P319/03/201850%PROGRESSSET RN P427/03/201890%PROGRESSSET RN P506/04/2018ISSUED FOR B.P. &TENDER RN FINISHED WORK UP UP 1 2 3 C B ADMIN OFFICE 116 543 SF NEW COHORT GRAD STUDENT SPACE 103 301 SF ADMIN 101 100 SF ADMIN 101B 712 SF NEW SEMINAR ROOM 122 100 SF ADMIN 101A CORRIDOR 100 FACULTY OFFICE 121 WC. 123 FACULTY OFFICE 125 FACULTY OFFICE 126 ELEC'L RM. 104 COMMUNICATIONS 102 FACULTY OFFICE 114 FACULTY OFFICE 112 STORAGE 112A LIFT 110 JAN. RM. 108 MECH'L RM. 106 X106 X104 X102 X121 123 X125X126 X122 101B 101A X108 X110 X112 X114 X116 103-1 100-1 X112A X104A X100-2 103 100 STAIR X 122-1 Field Tile (80%): #138830AK00 'Iron', Size: 250 x 1000 mm Field Tile (20%): #163230AK00 'Iron/Berry', Size: 250 1000 mm THE COLBORNE ARCHITECTURAL GROUP PacificInc. Date MAIN FLOOR - FLOORINGPATTERN 31/07/2018 Totem Field Studio Renovation 2613 WestMall,Vancouver,BCV6T1Z2 ASK 015 1 : 100 MAIN FLOOR PLAN - FLOORING PATTERN 1 NOTE: PATTERN SHOWN FOR ILLUSTRATION PURPOSES NOT INTENDED AS A PRECISE LAYOUT. REFER ALSO TO SAMPLE PHOTO.

OTHER PROJECTS

PBS COBBLE HILL INDUSTRIAL PARK

BCIT ELEVATED LAB SAFETY GUARDRAILS

SOURCING FINISHES
Construction: 2016 - Prsent Team members: 2 - 3
7 3%Slop e Rampl eng t h = 68 m EXISTING RONA STORE OFFICE/ WAREHOUSE =1500 m² FRONT SETBACK = 4.5 m REAR SETBACK=9 m SIDE SETBACK=9 m SIDE SETBACK=9 m EXISTING BUILDING OFFICE/ WAREHOUSE =1000 m² Option C_WATT Report 90.00 122.58 251.33 NEW RETAINING REQUIRED 66.1 EXISTING PAVED ROAD PL PL PL PERMEABLE GRAVEL PAVING TRANSCANADAHIGHWAY#1 F I SHER ROAD NEW RETAINING REQUIRED LOT2 LOT1 6 9 MINI STORAGE 2ACRE SITE =0.8 HA 1.5 7.0 5.8 1.5 OFFICE/ WAREHOUSE =1500 m² OFFICE/ WAREHOUSE =1500 m² OFFICE/ WAREHOUSE =1000m² OFFICE/ WAREHOUSE =1000 m² OFFICE/ WAREHOUSE =1500 m² 6.0 6.0 6.0 6.0 6.0 6 1 LOT-1 LOT-2 LOT-3 LOT-4 6.0 LOT-5 LOT-6 LOT-7 LOT-8 15.8 15.8 6.0 15.8 6.0 1.5 LL L 450 m² SEPTIC FIELD 450 m² SEPTIC FIELD 450 m² SEPTIC FIELD 6.0 LLL 15.8 450 m² SEPTIC FIELD LL 450 m² SEPTIC FIELD 1.5 2.5 7.0 2.5 1.5 OFFICE/ WAREHOUSE =1000 m² LL 15.8 6.0 60 LLL 6.0 6.0 LLL 7.0 6.0 7.0 7.0 450 m² SEPTIC FIELD 450 FISEPmC ELD 450 m² SEPTIC FIELD 7.0 7 0 7 5 7.0 7.0 2.5 2.8 15.8 7.0 7.0 6.0 186 m² =2000 SF SEPTIC FIELD 186 m² =2000 SF SEPTIC FIELD 186 m² =2000 SF SEPTIC FIELD 186 m² =2000 SF SEPTIC FIELD 186 m² =2000 SF SEPTIC FIELD 186 m² =2000 SF SEPTIC FIELD 186 m 2 SEP00SF T C FIELD 186 m² =2000 SF SEPTIC FIELD EXISTING (LOTS 1&2): EXISTING LOT AREAOF SUBJECT PROPERTY= 127,197 m =12.7197 HA= 31.43 ACRES EXISTING BUILDING GROSSFLOOR AREA (APPROXIMATE) =7,145 m²=76,908SF PROPOSED LOT1 (NEW DEVELOPMENT): •AREA OF PROPOSED LOT: 48,597.60 m²= 4.85 HA =12 ACRES EXISTING ZONING: A-1 AGRICULTURAL RESOURCE PROPOSED ZONING:I-1CLIGHT INDUSTRIAL •PROPOSED FLOOR AREA, ALL 2 STOREY BUILDINGS 20,000 m² =215,278 SF •MINI STORAGE: 120UNITS @ 20.8m²/UNIT= 223.9 SF/UNIT, SINGLE STOREY TOTAL STORAGE AREA= 2,496m² 26,866SF= 5%OF SITEAREA •BUILDING HEIGHT MAX=8.3 m= 27.2 FT (*MAX. PERMITTED HEIGHT=10 m=32.8 FT) •PARCEL COVERAGE: PROPOSED BUILDING FOOTPRINT AREA: 10,000 m² = 107,639 SF = 20% OF SITE AREA TOTAL PROPOSED BUILDING FOOTPRINT AREA= 10,000 m² 2,496 m² = 12,496 m² = 134,506 SF •IMPERVIOUS SURFACE COVERAGE AREA OF PROPOSED ROADWAY=17,988 m² = 193621 SF 37% OF SITE AREA *MAX PERMITTED IMPERVIOUS SURFACE COVERAGE= 60%(INCLUDING 50% BUILDING) TOTAL IMPERVIOUS SURFACE COVERAGE (INCLUDING PARCEL COVERAGE)=10,000 m²(2 STOREY BUILDINGS)+ 2,496 m²(MINI STORAGE)+17,988 m²(ROADWAY)= 30,484 m²=328,127 SF= 62% OF SITE AREA TOTAL PARCEL COVERAGE=20%(BUILDING)+5%(MINI STORAGE)+37%(ROADWAY)= 62% OF SITE AREA LOT2 (EXISTING BUILDING): •AREA PROPOSED FOR LOT2= 78,599.4 m² =7.85 HA= 19.42 ACRES •PARCEL COVERAGE (APPROXIMATE) =7,145 m²=76,90 SF= 9% OF SITE AREA (*MAX PARCEL COVERAGE PERMITTED= 50%) •IMPERVIOUS SURFACE COVERAGE: UNKNOWN MINI STORAGE OPTION A: MAJOR USE 80% OFFICE 15% RETAIL 5% 16,000 m² 172222 SF REQ'D. PRK'G 1,000 m² 107,64 SF 3,000 m² 32,292 SF 160 8650 308 2,496 m² 26,867 SF 12 PROVIDED PRK'G 221 MANUFACTURING REQ. PARKING OPTION B: WAREHOUSE REQ. PARKING 16,000 m² 172222 SF 1,000 m² 107,64 SF 3,000 m² 32,292 SF 2,496 m² 26,867 SF 80 8650 228 12 221 SITE DATA DEVELOPMENT OPTIONS 0 SCALE: THE COLBORNE ARCHITECTURAL GROUP Pacific Inc. Date 250 5 1015 SITE PLAN 21/04/2017 PBS Cobble Hill Industrial Park FisherRoad,Duncan,BC 1 1000 1 Site UBC NURSING LAB RENOVATION UBC IONA ROBOTICS LABS/CLASSROOMS FINISHED WORK
Computer Program: Revit, AutoCAD and Photoshop

AVISSA MOJTAHEDI ARCHITECTURE DESIGN INC.

Home Restoration

Address : Toronto Ont. construction: 2016

Team members: 2

Skills: Construction sets using AutoCAD, interior fnishes & furnishing selections and custom millwork

ACADEMIC WORK

OFFICE AREA & LOUNGE
PRESENTATION & LOBBY Wonderland Creative & Marketing Inc. Computer Program: Skechup Pro + Podium Plugins and Photoshop

ACADEMIC WORK

Residences & Restoration

Address : Toronto Ont.

Area: Condominium Penthouse

Team members: 1

Computer Program: AutoCAD, Skechup Pro + Podium Plugins and Photoshop

THEME

Autumn: Falling Leaves in the Late Autumn

CONCEPT Contemporary Modern

WORK Cont`d
ACADEMIC

REGINA KIM

INTERIOR DESIGNER

BDes. Interior Architecture, CIDA Accredited reginahanjookim@gmail.com

7/11/2019

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.