FALL/WINTER 2026
BUILDING BRIDGES
Canada’s newest port of entry is changing the way we travel between nations.
LITHIUM-ION BATTERY RISKS
ACHIEVING AMBITIOUS
CARBON REDUCTION
AT U B C
PA R T O F T H E
ONTARIO RAMPS UP
WASTE DIVERSION GOALS
P A R T
Canadian Publications Mail Product Sales Agreement No. 40063056
O F
T H E
Fall/Winter 2026 CFM&D / 1
[ contents ] 20
8
PHOTO BY MATT MONIZ
COVER PHOTO BY RICHARD SECK
26 The Gordie Howe International Bridge at sunset.
SHOWCASING THE STRENGTH OF THE FM COMMUNITY
The industry unites at the Canadian Asset & Facility Conference.
11
RECYCLING REVIEW PROMISES PAPERWORK RELIEF
The Ontario government prepares to update rules that govern waste diversion for IC&I sectors.
30
16 LEGIONNAIRES OUTBREAK RENEWS FOCUS ON FACILITY RISK Reducing potential liabilities and creating a disaster response plan.
24 A GATEWAY BETWEEN NATIONS
Connecting communities and simplifying the journey across the Canada-U.S. border.
30 UBC’S MACISSAC HEALTH BUILDING A new academic, research, and student health and well-being facility opens on the Vancouver campus.
columns 7 MANAGEMENT MEMO 16 OPERATION AND MAINTENANCE 20 REGULATORY 32 WORKPLACE 35 LAST WORD
department
focus on
4 OBSERVATIONS 6 FOUNDATIONS
34 FLOORING
Fall/Winter 2026 CFM&D / 3
[ observations ]
BUILDING BRIDGES
T
he way we design and manage a facility significantly influences how occupants feel. This issue explores how the built environment can become more welcoming, resilient, and responsive to people and communities. At the newly unveiled Canadian Port of Entry, which connects Windsor, Ontario, and Detroit, Michigan, thoughtful design is transforming the border-crossing experience. As our cover story shows, Moriyama Teshima Architects created a campus that maintains a visual connection to Black Oak Heritage Park, bringing a sense of calm and connection to nature within a highly secured environment. Another story about The University of British Columbia’s new MacIsaac Health Building showcases a similar commitment to meaningful design. Shaped in collaboration with Musqueam representatives, the project celebrates Indigenous presence through native landscaping, public art, natural materials, and filtered daylight. Cultural awareness creates a stronger sense of place, but heightening our expectations around health and safety is also crucial. For example, a recent Legionella outbreak in Toronto underscores the importance of regular inspections, maintenance plans, and emergency preparedness. We also look at the safety concerns surrounding lithium-ion batteries. Educating the industry about hazards and misuse are critical steps to protect people. Many of these responsibilities were also at the heart of the recent Canadian Asset & Facility Conference (CAF) 2026, hosted by the Canadian Association for Facility and Asset Education. The conference brought FM professionals together to explore operational resilience, sustainability, leadership, workforce development, and technological advancement. Together, these stories reflect a common purpose among facility management professionals, which is to create environments that serve people. We hope this issue offers fresh perspectives and inspiration to continue making a difference!
EBECCA MELNYK R EDITOR, CANADIAN FACILITY MANAGEMENT & DESIGN REBECCAM@MEDIAEDGE.CA
SPRING/SUMMER 2026 Volume 41, Issue No.1 PUBLISHER: Ron Guerra rong@mediaedge.ca EDITOR: Rebecca Melnyk rebeccam@mediaedge.ca SENIOR GRAPHIC DESIGNER: Roxy Guinane roxyh@mediaedge.ca GRAPHIC DESIGNER: Amanda Spearman amandas@mediaedge.ca PRODUCTION MANAGER: Ines Louis inesl@mediaedge.ca CONTRIBUTORS: Chris Barcus, Maxime Duzyk, Cheryl Mah, Marcia O’Connor, and Bashar Qawas. CIRCULATION: Adrian Holland circulation@mediaedge.ca PRESIDENT: Kevin Brown kevinb@mediaedge.ca GROUP PUBLISHER: Sean Foley seanf@mediaedge.ca
Canadian Facility Management & Design (CFM&D) magazine is published two times a year by MediaEdge Communications Inc., 251 Consumers Road, Suite 1020, Toronto, Ontario M2J 4R3 Tel (416) 512-8186; Fax 416-512-8344 Email: circulation@mediaedge.ca SUBSCRIPTIONS Canada 1 yr $25* 2 yr $45* USA 1 yr $40* 2 yr $70* Int 1 yr $50* 2 yr $90* Single Copy Sales Canada $15* * Plus applicable taxes. Authors: CFM&D magazine accepts unsolicited query letters and article suggestions. Manufacturers: Those wishing to have their products reviewed should contact the publisher or send information to the attention of the editor. Sworn Statement of Circulation: Available from the publisher upon written request. Although Canadian Facility Management & Design makes every effort to ensure the accuracy of the information published, we cannot be held liable for any errors or omissions, however caused. Printed in Canada. Copyright 2026 Canada Post Canadian Publications Mail Sales Product Agreement no. 40063056 ISSN 1193-7505 Return undeliverable Canadian addresses to: MediaEdge Communications Inc. 251 Consumers Road, Suite 1020 Toronto, Ontario M2J 4R3
4 / CFM&D | Part of the REMI network | www.REMInetwork.com
PERFORMANCE BEYOND THE SURFACE
ASPHALT PAVING SNOW REMOVAL SERVICE LANDSCAPE CONSTRUCTION estimating@forestgroup.ca service@forestgroup.ca
SITE SERVICING BUILDING RESTORATION CONCRETE CONSTRUCTION 24 Hour Emergency Service 416.524.3000
forestgroup.ca
[ foundations ] MODERNIZING PASSENGER RAIL VIA Rail Canada has finished modernizing its Toronto Maintenance Centre project. The new facilities combine purpose-built infrastructure, advanced technology, and modern maintenance capabilities to support a new Corridor fleet of 32 bidirectional trainsets, while continuing to service existing equipment. The facility also includes specialized heavy-maintenance equipment and upgraded yard tracks designed to improve train movements and reduce operational bottlenecks. As part of a move toward more predictive, data-driven maintenance, a new vehicle equipment measurement system (VEMS) was also added to help reduce unplanned downtime, extend asset life and keep more trains available and ready for service.
DECARBONIZING GTHA HOSPITALS A pilot initiative to support facility-wide decarbonization efforts in the health care sector has received Clean50 recognition as a leading example of an innovative and replicable climate action project. The Canadian Coalition for Green Health Care makes this year’s list of honourees for Decarbonization in Action, which provides resources, targeted technical expertise and facilitation for a diverse cross-section of departments in 13 hospitals in the Greater Toronto and Hamilton Area. The Clean50 Top Project award comes as the Coalition is expanding the program within Ontario and across Canada. Participating hospitals can get support from the Coalition’s facilitation team to identify and calculate the impact of operational sources of greenhouse gas emissions, assess the costs and benefits of responsive action, and develop required business cases and engagement strategies. The approach emphasizes peer networks to foster collaboration among the clinicians, service administrators and facilities management personnel within each hospital, and to share experiences and best practices among all participants. An associated, open-access Solutions Atlas has been developed to compile guidance documents, case studies and practical advice about decarbonization initiatives.
ARTISTIC ACCESSIBILITY Construction is underway on the Accessible Arts Learning Campus in Calgary, marking the development of the world’s first accessible arts learning campus. The National accessArts Centre (NaAC) officially broke ground on the project in June. The campus will feature two facilities situated side-by-side. The Joseph Chung Centre for Creativity, a two-storey, 16,279 square-foot mass timber building that is scheduled for completion by winter 2027, will serve as a performing arts training and creation centre for artists living with disabilities. Designed by Dialog, the project is targeting Zero Carbon Building certification and will feature 100 per cent barrier-free circulation, a cantilevered canopy, and a rooftop solar array. The Trico Communities Accessible Arts Centre, designed by Iwanski Architecture and scheduled for completion in summer 2027, will see the overhaul of Scouts Hall into Canada’s largest dedicated visual arts learning facility for artists living with disabilities. It will be home to NaAC’s world-renowned visual arts/ digital media programs, with accessible studio spaces, communal spaces for artists, and administrative offices.
6 / CFM&D | Part of the REMI network | www.REMInetwork.com
[ management memo ] BY MARCIA O’CONNOR
BUILDING COLLECTIVE KNOWLEDGE
F
acilities operate efficiently because various people bring different strengths, experiences, and perspectives to work and share them among one another. Collaboration is what turns individual expertise into collective capability. It’s the difference between a team that reacts and a team that is ready. A long‑time employee might know that “HVAC Unit 4” tends to trip when the building hits full capacity on a humid day — a detail that never shows up in a drawing or a procedure. Someone else knows the building’s history and quirks. Another brings deep technical expertise. Someone else knows the occupants, contractors, and suppliers and understands the relationships that keep the operation moving. A newer team member may bring fresh training, new tools, or a different way of viewing a problem. No one person holds the full picture. The strength of a facilities team comes from the mix of knowledge, best practices, experience, and skills that exist across it. The opportunity is to turn what people know individually into knowledge the team can share and use collectively. Collaboration is how that happens. When only one person possesses important knowledge, their absence quickly becomes the team’s problem. For example, if a familiar issue arises and the person who handled it before is away sick, there may be no one else who is sure about previous solutions and then the team is left trying to piece together the answer. Having knowledgeable people, good data, procedures, and maintenance systems offers a team a strong foundation. Systems can preserve asset histories, procedures can document how work should be done, and records can help teams understand what has
happened before. But even the best system can only capture what people put into it. Teams still need to decide what is worth capturing, where it should live, and what context someone else will need to make sense of it. And not everything worth knowing fits neatly into a database. Judgement develops through experience. Relationships are built over time. The reason behind a past decision may never appear in a work order, even though understanding why something was done can be just as important as knowing what was done. Sharing knowledge is important, but collaboration does more than that; it builds new knowledge. When people with different skills and experience work through a problem together, each brings something to the situation. One person’s experience may challenge an assumption, introduce another solution, or help someone see the issue differently. Collaboration turns individual insight into collective capability. Strong teams recognize that expertise comes from different roles, backgrounds, and levels of experience. Sharing what you know matters, but so does asking questions, listening to another perspective, and being open to learning a different way of doing something. Through collaboration, teams learn from experience, exchange best practices, and build on what each person brings. Teams don’t develop this way by accident. Knowledge sharing and collaboration need to be part of how people work
together. Job shadowing lets employees see how someone else approaches their role. Cross‑training and shared responsibilities expose people to different parts of the operation. Working through problems together — and talking about unusual incidents afterward — allows lessons learned to benefit the wider team. Succession planning should begin well before a known retirement. Identify the responsibilities and knowledge that need to remain with the team. Determine who needs exposure to them, and then create opportunities for that knowledge to be shared through job shadowing, cross‑training, and shared responsibilities. The goal is to build that knowledge into the team before the transition happens. Creating the opportunity, however, doesn’t guarantee people will share what they know. Leaders need to make it clear that employees’ knowledge and experience are valued and that sharing them strengthens rather than diminishes their contribution. Building collective knowledge also requires people to recognize the value others bring and be willing to learn from their experience. The strongest facilities teams aren’t built by trying to equip each person with every piece of knowledge. They are built by bringing together different expertise, experience, and skills, and creating opportunities for people to learn from one another. When team knowledge evolves, so does the organization’s resilience. | CFM&D
Marcia O’Connor is president of AM FM Consulting Group, Chair of Membership & Education for IFMA’s Greater Toronto and South Central Ontario and lead instructor for the University of Toronto School of Continued Studies, Facility Management Certificate Program. She is a strategic-minded leader with more than 20-plus years of progressive experience in corporate real estate, asset management, and integrated facilities management. Marcia has a passion for mentoring young professionals and helping people, teams, and organizations see their potential.
Fall/Winter 2026 CFM&D / 7
[ management ]
SHOWCASING THE STRENGTH OF THE FM COMMUNITY CAF Conference 2026: learning, collaboration, meaningful conversations
T
he Canadian Asset & Facility Conference (CAF) 2026, hosted by the Canadian Association for Facility and Asset Education (CAFAE), proved that facilities management is about far more than buildings, systems, and infrastructure. It brought people together to share ideas, solve challenges, build partnerships, and shape the future of the profession. Set against the unique backdrop of the
Toronto Zoo, this year’s conference brought together facility leaders, industry partners, educators, students, and emerging professionals for a day filled with learning, collaboration, and meaningful conversations. What emerged was a powerful reminder that the Canadian facilities management community continues to thrive when knowledge is shared openly and relationships are strengthened. Throughout the conference, discussions explored many of the issues currently in-
8 / CFM&D | Part of the REMI network | www.REMInetwork.com
fluencing facilities management, including operational resilience, sustainability, leadership, workforce development, technological advancement, and the growing complexity of managing facilities in an ever-changing environment. Speakers challenged attendees to think differently, while peers shared practical lessons learned from their own experiences, creating an atmosphere where innovation and real-world application went hand in hand.
One of the most valuable aspects of the event was the opportunity for participants to connect beyond the conference sessions themselves. Hallway conversations, networking breaks, and exchanges between facility professionals and industry partners often became as impactful as the formal presentations. New connections were formed, long-standing relationships were renewed, and attendees discovered that many of the challenges they face are shared by colleagues across the country.
One attendee captured the spirit of the event perfectly: “What made this event exceptional wasn’t just the content, it was the atmosphere. Marcia O’Connor’s passion for the profession, her ability to connect people, and her commitment to creating opportunities for learning and collaboration made this one of the most valuable conferences I’ve attended. You could feel that every detail was designed to help people learn, share, and succeed.” The partnership between practitioners and vendors was particularly evident throughout the day. Industry partners engaged in conversations around solutions, collaboration, and long-term support. The result was an environment where everyone had an opportunity to learn from one another and contribute to the broader success of the profession. The Toronto Zoo venue added another dimension to the experience. Beyond serving as a gathering space, it provided participants with a unique opportunity to gain insight into the operational realities of managing one of Canada’s most recognizable public facilities. From sustainability initiatives to the complexities of maintaining diverse infrastructure assets, the setting encouraged attendees to think differently about the challenges and opportunities facing facility managers today. Equally inspiring was the number of first-time attendees who joined seasoned industry professionals throughout the event. Students and emerging leaders were welcomed into conversations that showcased
the collaborative and supportive nature of the facilities management community. The willingness of experienced professionals to share their knowledge and mentor the next generation reinforced a message heard throughout the conference: the future of the profession depends on our ability to learn from one another. As the day progressed, a common theme continued to surface in conversations: the facilities management profession is evolving rapidly, but its greatest strength remains the people who are committed to advancing it. Participants demonstrated a shared commitment to continuous improvement and professional growth. Attendees left with new ideas, new connections, and renewed enthusiasm for the role facilities management plays in supporting organizations, communities, and the people they serve. More importantly, they left knowing they are part of a professional community that is committed to helping one another succeed. CAF Conference 2026 demonstrated that Canada’s facility professionals are eager to collaborate, innovate, and lead. The conversations sparked throughout the event will continue long after the conference has ended, influencing projects, partnerships, and professional development. The next opportunity to continue those conversations is already on the horizon. CAF Conference 2026 demonstrated just how powerful those connections can be, and CAF Conference 2027 (set for Oct 21) promises to continue that journey. | CFM&D Fall/Winter 2026 CFM&D / 9
[ regulatory ]
RECYCLING REVIEW PROMISES PAPERWORK RELIEF Ontario ramps up waste diversion expectations for the IC&I sectors.
T
he Ontario government is preparing to update the rules that govern recycling and waste diversion at commercial, institutional and multifamily properties. Proposed regulatory amendments would clarify that recycling is mandatory, designate additional materials to be collected and introduce new record-keeping requirements. That would come with some paperwork relief through fewer compulsory elements in waste audits and withdrawal of the current requirement for waste reduction work plans. The proposals are part of a package of initiatives aimed at prolonging the lifespan of Ontario’s landfill sites. Other contemplated changes to the industrial, commercial and institutional (IC&I) recycling regula-
tions would introduce additional oversight of waste service providers to better track whether collected materials are making it to intended destinations for recycling and recovery. As well, the government is signalling some tweaks to its policy directives for food and organic waste diversion. “Landfills are central to Ontario’s waste management, and the province must maintain sufficient landfill space as its population and economy continues to grow,” states the accompanying explanatory summary posted on the provincial regulatory registry. “Although there have been several landfill expansions since 2018, only one large new landfill has been approved in the last 20 years, and Ontario continues to rely on facilities in the United States to manage approximately 25 per cent of its waste, raising
10 / CFM&D | Part of the REMI network | www.REMInetwork.com
concerns about the province’s long-term disposal capacity and reliance on out-ofcountry facilities.” It’s currently estimated that about 15 per cent of solid waste generated within the IC&I sectors gets diverted from landfill, while its total waste output accounts for about 60 per cent of Ontario’s waste stream. That’s partly reflective of regulatory instructions that are now more than 30 years old. New types of materials, which could feasibly be extracted from the waste stream, have since hit the market, and policies for recycling and diversion in the single-family/ low-rise residential and small business sectors have been significantly revamped. As of January 2026, manufacturers, wholesalers/distributors and retailers that convey designated “blue box” materials into
the marketplace are responsible for funding their collection and recovery. Ontario’s Resource Productivity and Recovery Authority (RPRA) manages this extended producer responsibility (EPR) model, which operates in parallel with municipal solid waste services for qualifying households, businesses and institutions. Provincial government officials are aiming to keep the same types of materials out of the IC&I waste stream, and to revise other provisions that are considered to be outdated. Proposed changes would be introduced for properties subject to the existing IC&I regulations, including: • office/retail properties with at least 10,000 square metres (roughly 108,000 square feet) of total floor area; • hotels and motels with more than 75 rooms; • Hospitals; • educational institutions with annual enrollment greater than 350; and • restaurants with gross annual sales of at least $3 million. Multifamily buildings with six or more dwelling units would be expected to comply with the mandate to collect and recover additional categories of materials, but would continue to be exempt from waste audit requirements. PROPOSED REGULATORY CHANGES
To begin, the amended regulation would close wiggle room the circa-1994 wording leaves open. A new directive to state that subject entities “must” implement a recycling program would replace the current instruction to make “reasonable efforts” to do so. It’s proposed that the list of mandated recyclables would be expanded to include: rigid plastic food containers; flexible, unmoulded plastic bags and wrapping; all plastic and composite beverage containers; and any paper not captured in the existing categories of fine paper, newsprint and cardboard. These materials are already collected from the RPRA’s blue box recycling program. Other proposed changes would intro-
duce record-keeping requirements for subject commercial and institutional property operators. These are not yet specified, but the government’s summary and consultation document hints it would be basic documentation, such as contracts with waste service providers, that a prudent property/ facilities manager would have on file. It’s proposed that the updated regulation could specifically obligate subject entities to ensure their service contractors will keep recycled materials separate from waste destined for landfill. Correspondingly, a new amendment would specifically prohibit waste haulers and transfer stations from mixing recyclables into the waste stream or depositing them in landfill. That would be monitored through new requirements to submit data such as pickup addresses and volumes of materials carried to transfer stations and then onward to processing. This would largely mirror the records waste contractors keep to support the RPRA’s blue box administration and oversight. “Businesses and institutions are already prohibited from co-mingling source-separated materials, but there is not a way for them to ensure that material does not get co-mingled and sent to landfill once it leaves their establishment without placing obligations on haulers and processors,” the consultation document acknowledges. “By requiring records to be kept, the Ministry could investigate if there were concerns that source separated materials were being sent to landfill prior to sorting.” The Ontario government contends that other required exercises are overly bur-
densome and contribute little to achieving waste diversion objectives. It is proposing to narrow the scope of waste audits, and eliminate the mandate for waste reduction work plans and associated annual reporting. Subject entities (multifamily property operators are exempt) would still have to produce an annual written report of audit findings about the amount and composition of waste generated from operations at the property, but they would no longer be asked to identify processes and policies that contribute to waste generation or to provide a breakdown of recycled and reused content in the products they use or sell. Meanwhile, property/facility managers could always voluntarily develop their own plans for reducing waste and promoting reuse and recycling, but would not be compelled to follow the previous exacting specifications for the task. The Ontario government calls waste audits “an important first step” to help businesses and facility managers develop effective recycling and waste diversion programs, and notes that the bulk data could also be useful to the Ministry for “identifying or assessing factors that could merit flexibility” related to separating materials from the waste stream. However, it discounts the benefits of digging deeper. “Assessments of why businesses and institutions are generating waste or using recycled content are not essential to implement and enforce a source separation program,” the consultation document states. “Waste reduction work plans have proven ineffective and are not essential to implement and enforce a source separation program.”
Fall/Winter 2026 CFM&D / 11
[ regulatory ] FOOD AND ORGANIC WASTE DIVERSION
Proposed changes to Ontario’s policy statement for food and organic waste would adjust overdue scheduling for reaching diversion targets, and introduce reporting requirements for designated entities. The latter group includes: multifamily properties with six or more dwelling units; commercial and industrial properties that generate more than 300 kilograms (kg) of food and organic waste per week; and hospitals and educational facilities that generate more than 150 kg of food and organic waste per week. Most large and mid-sized municipalities — with population surpassing 20,000 in southern Ontario or 50,000 in northern Ontario — are also designated to capture the household and small business waste stream. The policy statement, which was issued in 2018 under Ontario’s Resource Recovery and Circular Economy Act, initially set
a 2025 deadline for IC&I entities to reach stipulated diversion targets of 50 or 70 per cent, depending on a property’s size and function. The proposed revision would push that timeline out to 2028. New guidance is promised to help steer compliance. “The delay would align with the planned release of guidance materials and, when combined with new reporting requirements, the delay is expected to result in overall improved diversion outcomes,” the consultation document maintains. Beginning in 2029, it’s proposed that designated entities would be mandated to submit annual tallies of the amount of food and organic waste generated at the property, with a further breakdown of the volumes sent to processing, food rescue or disposal. The previous year’s data would be due by March 31 each year, along with submitters’ formal attestations of their reports’ accuracy.
“Annual reporting would help the Ministry to better understand diversion performance, assess progress toward targets and help determine whether additional actions may be required to improve diversion performance,” the consultation document advises. Two other actions are included in the package of proposals related to landfill capacity: • a proposed amendment to the Environmental Assessment Act to remove the requirement that landfill development proponents must receive approval from the host municipality and any affected adjacent municipalities in addition to satisfying the environmental assessment process; and • notice of the upcoming 10-year review of the Strategy for a Waste-free Ontario, under the Resource Recovery and Circular Economy Act. | CFM&D
26_012623_Canadian_Facility_Mgmt_Design_FALL_WINTER_CN Mod: September 29, 2026 10:21 AM Print: 10/07/26 page 1 v2.5
π FLAWLESS FACILITIES MAINTENANCE MUST-HAVES IN STOCK MICROFIBER TOWELS
OFFICE TRASH CANS
BROOMS
BOOT-BOY® BOOT CLEANER
COMPLETE CATALOG
12 / CFM&D | Part of the REMI network | www.REMInetwork.com
1-800-295-5510
CAFÉ TABLES
uline.ca
Building Knowledge. Managing Tomorrow.
Build Your Skills in the New Year Practical, industry-relevant learning to solve real challenges, strengthen your expertise and advance your career in facility and asset management. LEARN. CONNECT. APPLY.
Learn from Industry Experts
Gain practical insights from experienced SMEs.
Apply What You Learn
Real-world examples, tools and approaches you can use right away.
Connect with Your Peers
Share ideas, challenges and solutions with a diverse FM community.
Starting This Winter Quick Courses
Programs & Webinars
2-HOUR LIVE INTENSIVES
Advanced FM Certificate
The Art of Building a Compelling Business Case Adapting to the Changing Job Market Breaking the Corporate Silos Before it Breaks Your AM Strategy How to Become an Exceptional Leader Navigating Data Management 3-WEEK LIVE COURSES
Capital Planning, Risk & Trade-Offs Interpersonal Skills for Workplace Impact
REGISTRATION OPEN NOW
Register at CAFAE.ca
WED, JAN 20 TO APR 14, 2027 · LIVE ONLINE
Self-Paced: FM Budgeting Essentials COMMENCING JANUARY 2027
Cappuccino Hour
FREE MONTHLY WEBINARS · NEXT: WED, JAN 13, 2027
Canadian Women in Facilities: The Unwritten Path to Opportunity WED, JAN 20, 2027
For additional information, contact us connect@cafae.ca · (647) 367-0652
[ operations & maintenance ] BY MAXIME DUZYK
RADON IN COMMERCIAL BUILDINGS Managing an invisible indoor air-quality risk.
B
uilding performance is often evaluated through energy consumption, ventilation, moisture control and occupant comfort. Yet radon is an indoor air quality risk that can remain undetected in otherwise well-maintained facilities. Radon is a naturally occurring radioactive gas produced by the breakdown of uranium in soil and rock. Colourless, odourless and tasteless, it cannot be identified without testing, and long-term exposure increases the risk of lung cancer. Although often associated with homes, radon can affect offices, schools, healthcare facilities and other commercial or institutional properties,
particularly occupied ground-floor and below-grade spaces. For facility managers, understanding how radon enters a building is the first step toward effective protection. HOW RADON MOVES THROUGH FOUNDATIONS
Radon migrates through soil and can enter through cracks in concrete slabs, foundation-wall joints, sump openings and gaps around service penetrations. Pressure differences play a significant role in radon infiltration. When indoor air pressure is lower than the pressure beneath the foundation, soil gases can be drawn into occupied areas. Exhaust systems, mechanical
14 / CFM&D | Part of the REMI network | www.REMInetwork.com
ventilation and temperature differences can all influence this movement. As a result, even small openings can become pathways for radon entry. A well-insulated, airtight above-grade building envelope does not necessarily prevent radon infiltration below grade. Effective protection requires a continuous soil gas control layer across the foundation and slab, including at joints and penetrations. START WITH TESTING
Visual inspections alone cannot determine whether radon concentrations are elevated. Health Canada’s guideline is 200 becquerels per cubic metre (Bq/m³), with corrective action recommended when the long-term
average exceeds this level in normally occupied spaces. In commercial buildings, testing should account for layout, occupancy patterns and mechanical system operation. Larger facilities may require multiple test locations, particularly where occupied spaces are in contact with the ground. Long-term testing over at least three months is recommended because radon concentrations can fluctuate with seasonal conditions and building operations. If elevated concentrations are detected, a qualified radon professional can assess the building and recommend appropriate mitigation measures. One common approach is active sub-slab depressurization, which uses a fan piping system to draw soil gases from beneath the concrete slab and exhaust them safely outdoors. Follow-up testing is then conducted to confirm that radon concentrations have been reduced. DESIGNING A CONTINUOUS SOIL GAS BARRIER
New construction provides an opportunity to incorporate radon protection before a building is occupied. Radon-resistant foundation assemblies typically include a gas-permeable layer beneath the concrete slab, a continuous soil gas barrier, sealed penetrations and provisions for sub-slab venting or depressurization. The effectiveness of these assemblies depends largely on maintaining a continuous barrier. Even materials with strong resistance to radon diffusion can be compromised by damaged membranes, poorly sealed seams or gaps at wall-to-floor transitions. Conventional designs often use polyethylene membranes, rigid insulation and sealants, which require careful detailing and installation to prevent gaps that could allow soil gases to enter. Closed-cell spray
“In commercial buildings, testing should account for the layout, occupancy patterns and mechanical system operation.” polyurethane foam offers an alternative when appropriately specified. Applied as a liquid, it expands and adheres to compatible substrates, helping create a continuous layer across irregular surfaces and complex transitions. Certain systems have also been independently evaluated for their resistance to radon diffusion. When incorporated into a properly designed and installed foundation assembly, closed-cell spray polyurethane foam can contribute to soil gas resistance while also providing thermal insulation and air-sealing benefits. However, not all spray foam products are suitable for radon control. Performance documentation, application thickness, substrate preparation and installation quality must all be considered to ensure the system meets applicable building codes. The barrier must also be integrated with appropriate sub-slab venting and depressurization provisions. CONSIDERING RADON DURING RENOVATIONS
Existing buildings present additional challenges because original soil gas control layers may be difficult to access. Where elevated radon levels are detected, active sub-slab depressurization is generally the preferred mit-
igation approach. However, major renovations can provide opportunities to improve foundation protection. Basement floor replacement, foundation repairs and below-grade redevelopment may allow for the installation or upgrading of soil gas barriers. In certain retrofit applications, appropriately specified closed-cell spray foam can be installed over an existing concrete slab beneath a new concrete topping. These installations require careful consideration of structural loads, floor heights, moisture conditions, service penetrations and radon extraction requirements/ The goal is not simply to add insulation, but to ensure the foundation assembly delivers effective soil gas control and thermal performance. A PRACTICAL FACILITY MANAGEMENT PRIORITY
To identify potential risks, facility managers can review testing records, identify occupied spaces that may require assessment and incorporate radon protection into future capital planning. Integrating radon management into routine indoor environmental quality programs can help protect occupants and support long-term building performance. | CFM&D
Maxime Duzyk is the senior global director of building science and engineering at Huntsman Building Solutions. He holds a background in architecture and has been in the spray foam insulation business for the last 15 years. Duzyk is involved with different building envelope committees and associations in North America such as CSC, SFC, SPFA, CCMC, and ULC Standards.
Fall/Winter 2026 CFM&D / 15
[ health & safety ] BY REBECCA MELNYK
LEGIONNAIRES OUTBREAK RENEWS FOCUS ON FACILITY RISK Addressing preparedness gaps and evolving biological hazards in public spaces.
A
recent Toronto Public Health investigation identified a cooling tower at the Toronto Transit Commission’s Hillcrest Complex as the source of a Legionnaires’ disease outbreak this past summer. The incident, which occurred within a one-kilometre radius of the Bathurst and Dupont intersection and resulted in six confirmed cases, has prompted facility management professionals to raise awareness about preparedness gaps.
“We have seen outbreaks over the years, and they can be costly to mitigate and create bad PR and liability for facility managers and owners,” says Tom Peter, senior vice-president of regulatory business practice at First Onsite Property Restoration. Cooling towers are a typical source for Legionella growth. The bacteria thrive under ideal conditions that include a water temperature between 20 and 50 degrees Celsius, a lack of disinfection, and the presence of organic debris and biofilms.
16 / CFM&D | Part of the REMI network | www.REMInetwork.com
“The cooling towers are large and typically elevated on rooftops, and if there is an aerosolized mist and a slight breeze, the droplets with Legionella bacteria can be dispersed and people can be exposed a few blocks away,” warns Peter. The issue is especially pertinent near hospitals or nursing homes. Some people who have been exposed to Legionella may never exhibit symptoms; whereas compromised individuals, such as the elderly and individuals with re-
spiratory health issues, face a higher risk of illness. Cooling towers aren’t the only culprit. Legionella bacteria are present in many water sources. with the right temperature and biofilm. Peter says many incidents have been traced to decorative fountains. If left uncleaned and untreated they can aerosolize water and Legionella bacteria. Shower heads that have accumulated biofilms are another source of exposure. “As an industrial hygienist, I think of these things wherever I go: fountains, mists, water parks, produce markets with mists, and especially ponds with fountains,” he muses. “We know that ponds can have Legionella, and a fountain in a pond can aerosolize all kinds of potential pathogens. We know ponds do not get treated, so when I see a pond with a fountain, I typically will stay upwind from the mist.” CONTAMINATION CONTROL
Facility managers can help minimize Legionella risks by regularly cleaning and treating cooling towers. Periodic testing and inspections can also help determine the appropriate cleaning frequency. Overall, cooling towers require a thorough cleaning if biofilms accumulate or a test detects elevated Legionella levels. The process entails removing scale, debris and biofilms, and potential mechanical scrubbing or power washing, before applying an antimicrobial solution. “There are many antimicrobial chemicals on the market for treating systems for Legionella bacteria,” Peter explains. “There are chemicals for descaling, and there is a broad spectrum of bactericides, fungicides, and algicides. The decision on what chemicals to use is determined by the system, compatibility with components, the environment, and what is the safest and most effective.”
REDUCING HEALTH AND LIABILITY RISKS
Preventive maintenance and documentation can further reduce health and liability risks. Various programs in Canada and the United States prescribe specific methods and procedures. Peter recommends following guidance from Public Services and Procurement Canada (PSPC), National Research Council of Canada, and the National Joint Council. The Centers for Disease Control and Prevention and the National Institute for Occupational Safety and Health, two agencies based in the U.S., offer other resources. In New York City, legislation requires that cooling towers are tested for Legionella every 90 days. “In 2015, NYC had an outbreak, and since that outbreak they have implemented regulations for cooling towers, mandating registration of cooling towers, inspection and maintenance of cooling towers, among other requirements,” says Peter. ““Facility managers can decide to take the advice of the agencies and go beyond what is required, or do the minimum that is required and take a risk.” PSPC has a rigorous five-step program to control the growth of Legionella in federal building water systems. Here is a summary: • Design buildings and install new systems to minimize risk;
• Implement a control management program: this is a specific plan for each building to identify areas of risk and control measures; • Maintenance and prevention: control water temperatures, improve water flow, and treat the water; • Testing: PSPC may perform monthly testing; and • Clean, disinfect, and retest: if Legionella levels exceed 1,000 colony-forming units per millilitre (CFU/mL), there should be mandatory cleaning and disinfection. CREATING A DISASTER RESPONSE PLAN
Before an incident occurs, Peter recommends training staff to be aware of potential sources of Legionella. As well, facility managers should implement an inspection and management plan, document inspection and maintenance, and create a plan of action in case of an outbreak. A Legionella outbreak plan should involve internal staff, outside contractors, testing companies, and any related agencies. “I know facility managers have a lot on their to-do lists, and things change from day to day and sometimes hour to hour, but they need to think about prioritizing the high-risk or potential-risk items,” he urges. “Legionella is one of those high-risk items.” | CFM&D Fall/Winter 2026 CFM&D / 17
Cascades PRO® Bathroom Tissues By choosing a Cascades PRO® bathroom tissue made of 100% recycled fibers, instead of an equivalent product made from virgin fibers, you can significantly reduce your environmental footprint while keeping your business clean and efficient.
26% less impact on climate change*
62% less impact on ecosystem quality*
53% less water consumption*
Ask your distributor about Cascades PRO® or visit cascadespro.com to learn more. *Potential savings based on the life cycle assessment (LCA) approach for each Cascades’ product category, compared to equivalent industry products made of 100% virgin fibers. LCA study on Cascades tissue paper products (2023) conducted by Groupe AGÉCO, an independent third party, in accordance with ISO 14040 and ISO 14044. Basis for comparison (functional unit): 1 square meter (m²).
[ regulatory ]
HAZARDS SWITCHING OUT IN THE ENERGY TRANSITION New fire safety guidance emerging for lithium-ion batteries.
T
he energy transition comes with a risk management learning curve as one potentially hazardous mainstay gives way to another. The pervasive presence of flammable hydrocarbons has long been an unthinkingly accepted fact of the built environment and transportation systems, but safety assurances and public familiarity with battery basics are at an earlier evolutionary stage. A round of grants dispersed through the Canadian government’s zero-emissions vehicle infrastructure program (ZEVIP) includes funds for the Canadian Association of Fire Chiefs (CAFC) to produce national fire safety guidance and an associated digital gateway to resources. Meanwhile, fire code
developers in the United States have released a new chapter containing provisions for lithium-ion and lithium metal batteries in advance of the scheduled 2027 update to the International Fire Code (IFC), which serves as the model national code in the U.S. and is widely referenced beyond that country. “As our society moves toward a more electrified future, the presence of lithium-ion batteries has transitioned from a specialized technology to a ubiquitous component of daily life,” notes the accompanying guidance from the International Code Council (ICC). “By accelerating the availability of the 2027 battery provisions, ICC is ensuring that code officials are not ‘playing catch-up’ with technology but are
20 / CFM&D | Part of the REMI network | www.REMInetwork.com
instead equipped to facilitate innovation safely as soon as possible.” This new chapter 43 consolidates some provisions from disparate locations within earlier editions of the code and introduces measures for other activities and circumstances that have not previously been regulated. It does not apply to stationary energy storage systems, which are currently covered in a dedicated National Fire Protection Association (NFPA) standard that will continued to be referenced, but addresses a broad sweep of battery use, handling and mitigating safeguards across the rest of the built environment. The code developers frame this as five distinct but interrelated risk management categories:
• R&D, manufacturing and/or recycling; • storage in indoor and outdoor spaces; • charging, operation and/or repair of micromobility devices, appliances, robotic and industrial equipment; • fire detection and suppression measures; and • labelling, fire safety plans and other communications to inform first responders. The new chapter also addresses portable power packs and the storage of other types of non-lithium batteries, such as lead-acid and nickel-cadmium. “The safety considerations presented by current and emerging battery technology warrant action now,”the ICC guidance states. “Through proactive leadership and rigorous science, we can embrace the benefits of new energy technologies while maintaining our unwavering commitment to public safety.” The early release of the model code
“Emerging technologies can hold promise for a greener future, but also need new fire, emergency and life safety considerations.”
chapter occurs with good timing to complement the CAFC’s efforts to synthesize existing standards and recommended best practices into comprehensive and practical fire safety guidance for EV charging infrastructure. Project proponents have promised a toolkit of options for local officials, emergency responders, building designers, developers, operators and their service providers related to policy development,
emergency response preparedness, planning, training and public education. “Emerging technologies can hold promise for a greener future, but also need new fire, emergency and life safety considerations. This project can help consolidate questions and available responses, allowing different groups to become aware of, and manage this information going forward,” says Tina Saryeddine, the CAFC’s executive director.
Fall/Winter 2026 CFM&D / 21
[ regulatory ]
ONTARIO TO CODIFY LITHIUM-ION BATTERY HAZARDS Proposed changes to Ontario’s Fire Code introduce new rules for the safe handling of lithium-ion batteries and micromobility devices, such as electric bikes and scooters, that contain them. This would give municipal fire prevention officers authority to address battery-related fire hazards in multifamily and commercial buildings, and enable an additional set of fines for non-compliance in municipalities that opt to invoke administrative penalties. As outlined on the provincial regulatory registry, the Fire Code would be amended to prohibit charging, parking or storage of micromobility devices and/or their lithium-ion batteries in public corridors, lobbies encompassing an exit to the outdoors or near any other exit. Another proposed provision would prohibit any commercial activities involving lithium-ion batteries in residential occupancies — including charging, display, storage, parking, retail, recycling or disposal of either batteries or associated micromobility devices. As well, businesses conducting any of those activities at a commercial or industrial property would be required to inform the local chief fire official. It’s proposed that existing business operators would have 15 days to do so once the new regulations come into force, while new business would be expected to do so before commencing operation. Motorized wheelchairs, medical scooters, shopping carts or golf carts would not be designated as “powered micromobility devices” for the purpose of the regulations. However, general rules for the handling of lithium-ion batteries would apply. These would clarify that batteries must be charged and used in accordance with the manufacturer’s instructions; must not be altered; and must be disposed of properly. The proposed new rules would be enforced under Ontario’s Provincial Offences Act, but the government is also considering giving municipalities leeway to charge additional administrative penalties that could serve as a “progressive enforcement tool”. A regulation of Ontario’s Fire Protection and Prevention Act already enables the penalties for a list of designation contraventions. That fee schedule imposes a $200 fine for a first-time violation. Repeat offences within three years of the first occurrence merit a second-time fine of $400 and a $600-penalty for all subsequent incidents.
The initiative is sponsored under ZEVIP’s awareness building stream, and comes after the federal government conducted a preliminary consultation process last winter to gather feedback on the potential introduction of mandatory requirements for lithium-ion batteries and consumer products that contain them. The Canada Consumer Product Safety Act (CCPSA) authorizes regulations that place controls on products that could negatively affect human health and/or safety, but, to date, there are no regulations specific to lithium-ion batteries.
(Both the United States and the European Union do stipulate compliance with specified safety criteria.) The government’s exploratory inquiries — related to mandatory certification of required performance criteria and parameters for safe operation — do not apply to electric vehicles or micromobility devices like E-bikes and E-scooters since they fall under the auspices of the Motor Vehicle Safety Act. However, CAFC touched on those issues in its submission to the consultation, citing insight garnered through its annual
22 / CFM&D | Part of the REMI network | www.REMInetwork.com
survey of Canadian fire departments. “The Great Canadian Fire Census 2025 indicates that about 96 per cent of urban centres are responding to lithium-ion battery fires that are also present in electric vehicles. Toronto Fire Service reported a 162 per cent rise in lithium-ion battery fires and recommended that consumers only use manufacturers’ batteries for their devices, avoid second-hand or off-market batteries and avoid making modifications to the batteries,” the submission states. “Safe storage, packaging and labelling practices, as well as public awareness campaigns on the safe use of lithium-ion batteries, will help reduce any safety risks to consumers.” The latter considerations are particularly important since safeguards in the battery design may not function as intended if its compromised through misuse, inappropriate storage or exposure to other hazards. This is where clear manufacturers’ instructions to identify compatible charging equipment, warnings at the retail interface, certification and associated authenticating symbols can guide consumer decision-making. Firefighting responses are also evolving. The CAFC submission reiterates that battery-source fires burn hotter and faster than other types and “there is no consensus on how to best extinguish them”. It calls for more research into suppression methods, more training for fire departments, more R&D for effective personal protective equipment and careful scrutiny of the risks in the context of taller wood frame construction and the push for single-staircase multi-storey configurations in some jurisdictions. “While lithium-ion battery technology is progressing with improved battery management systems, safety regarding storage or installation locations, education on the risks, or awareness of the consequences of misuse is not,” the CAFC submission maintains. Health Canada, the sponsoring department for the preliminary consultation, is assessing the responses. Any subsequent regulatory proposals will trigger further public consultation. | CFM&D
FEATURE
A GATEWAY BETWEEN NAT Stress-reducing design and subtle nods to hockey define the new Canada-U.S. port of entry and Gordie Howe International Bridge. BY REBECCA MELNYK
PHOTO BY RILEY SNELLING 24 / CFM&D | Part of the REMI network | www.REMInetwork.com
FEATURE
TIONS
Fall/Winter 2026 CFM&D / 25
T
ravellers can reflect on a vista of natural landscape amidst an otherwise hyper-surveillanced area at the Canadian port of entry at the Michigan-Ontario border and Gordie Howe International Bridge. Designers of the 53-acre campus, Moriyama Teshima Architects, aimed for a calming space to temper 24 inspection lanes, 16 toll lanes and the longest cable-stayed bridge in North America. “Crossing an international border can be inherently stressful, so our approach was to reduce that stress wherever possible and create a welcoming, intuitive experience for people entering Canada—one that reflects our country’s reputation for friendliness and hospitality,” says MTA Partner Brian Rudy. “The architecture plays a role in shaping a sense of clarity and reassurance for visitors: we used simple and legible building forms, materials, and landscape design to guide travelers intuitively through the site, creating a sense of welcome rather than intimidation.” Located at the busiest Canada–U.S. border crossing, the $6.4 billion-project was named in honour of Gordie Howe, the Canadian-born hockey legend who played 25 seasons for the Detroit Red Wings and led them to four Stanley Cup championships. In that respect, the project is much more than a physical bridge, but a vital connection between two nations, and a symbol of cross-border trade.
the moment when travelers and their vehicles are subject to closer inspection. “We deliberately gave the canopy a lighter, more playful character, shaping it to evoke an open hockey net and covering it in translucent polycarbonate to bring natural light into the space,” says Rudy. “The intent was to make an otherwise intimidating environment feel brighter, more open and less institutional.” Stress-reducing design is also evident in the staff spaces. The architects framed calming woodland views of Black Oak Heritage Park through the orientation of buildings and circulation routes for those working on site. The spaces where staff are situated are organized around a central, raised superin-
ALLEVIATING STRESS THROUGH DESIGN
The architects approached the project as an exercise in “stress-reducing” design. The first priority was to make traffic and pedestrian movement feel clear and intuitive. As Rudy explains, the architecture reinforces that wayfinding while using form, scale, views and landscape. One feature, the primary inspection canopy, creates a strong gateway into Canada as it gently curves upward at its centre, and forms a welcoming arch. This directly references the subtle curve of the Gordie Howe Bridge over the Detroit River. A secondary inspection canopy addresses 26 / CFM&D | Part of the REMI network | www.REMInetwork.com
tendent observation area with clear sightlines to the visitor reception areas. “This, coupled with intuitive movement patterns, multiple routes from sensitive areas, and appropriate primary and secondary surveillance, helps reinforce for frontline staff that there are always colleagues “watching their backs.” says Rudy. “Reducing stress for staff ultimately contributes to reducing stress for travelers as well.” As staff arrive from the parking lot they ascend into an elevated staff circulation spine that connects them to the main buildings at the second level. Along this bridge, sunshades in warm autumnal tones reflect the changing colours of the surrounding forest. “At the end of this spine, a carefully framed
view of the Black Oak forest creates a moment of connection to the natural landscape—one that staff experiences both as they begin their workday and as they leave at the end of their shift,” says Rudy. The park also played a key role in the material selection. “Much of the building is clad in precast concrete incorporating randomized vertical patterns that shift from tightly spaced to quite open,” he adds. “The pattern abstracts the experience of walking through a forest, where the perceived spacing and density of trees continually changes as you move through the landscape.” SUSTAINABLE WITH DISTINCTION
Sustainability and building performance
CLOCKWISE FROM LEFT TO RIGHT: PHOTO BY THE GORDIE HOWE INTERNATIONAL BRIDGE PROJECT; PHOTOS BY RILEY SNELLING.
Fall/Winter 2026 CFM&D / 27
Gordie Howe International Bridge - Context Plan
Detroit, Michigan, USA
Detroit River
Windsor, Ontario, Canada
US Port of Entry
Canadian Port of Entry
e How idge r die Gor ional B t a tern
In
Black Oak Heritage Park
16 - Drawing Credit: Moriyama Teshima Architects
CLOCKWISE FROM LEFT TO RIGHT: PHOTOS BY RILEY SNELLING.
were key components of the campus. By the time of its opening in July 2026, the project had already earned the highest-level Envision Platinum Award from the Institute for Sustainable Infrastructure for its overall civic design. The Canadian Port of Entry is LEED v4 Silver certified. The facilities incorporate high performance envelope systems and double-pane insulated glass units with thermally broken aluminium frames, argon fill, low-e coating and warm edge spacers. Occupancy and daylighting controls, high-effi-
ciency boiler and chiller plants, air-side heat recovery, and a cogeneration system help reduce energy demand. As one of the largest infrastructure projects to date in North America, the undertaking came with challenges, particularly when balancing the budgetary and design constraints of a large P3 project with the architectural quality and complex functional, operational and security requirements of a high-security border facility. Rudy says this required coordinating the needs of a large consortium and multiple stakeholder groups
28 / CFM&D | Part of the REMI network | www.REMInetwork.com
while maintaining the clarity of the overall design through multiple years of design and construction. Since the cross border traffic study in 2000 to the project’s ground-breaking in 2018, opening day this past summer came with much acknowledgment for the collaboration over the past 25 years, from the Canadian and American steel that went into the bridge deck to the Indigenous knowledge that shaped the landscape on both sides of the border. During the ribbon-cutting ceremony by the Detroit River, Nikki Van Orskott, chief at Caldwell First Nation, gave thanks for a moment that will connect people, communities, and nations for generations to come. “Long before there were roads or bridges, these waters carried our ancestors, our stories, our trade, and our relationships,” she said. “They remain a living reminder that connection has always been at the heart of this place. As Potawatomi people of Caldwell First Nation, we recognize that every journey begins with respect for the land, for the water, and for one another. May this bridge serve not only as a pathway for commerce and travel, but also as a symbol of friendship, understanding, and cooperation between nations who all cross it.” | CFM&D
Validate your FM skills and mastery with the CFM® Stand out as an industry leader with the Certified Facility Manager® (CFM®) credential, the gold standard of FM.
Showcase your mastery of the globally recognized FM body of knowledge
Gain credibility in your professional network Empower your career Did you know that no coursework is required to take the CFM? Because you're tested on your ability to apply FM knowledge, your eligibility is based on your experience and education. Everything you need to prep for the exam is available through IFMA’s learning portal, fm.training:
Take a practice exam and experience the methodology
Brush up on a specific subject with our Core Competency Courses
Check your knowledge with our exam prep resource
Enroll in one of our exam prep workshops • Offered virtually and in-person
Prepare, apply, pass and get recognized for your expertise. Learn more and prep:
ANSI-ACCREDITED PROGRAM Materials offered by IFMA to prepare for the CFM Exam, such as the CFM Exam Prep Workshop, the FM Learning System and CFM practice exams, are optional study resources and are not a requirement of eligibility, nor are they endorsed by the IFMA Certification Commission.
[ design ] BY CHERYL MAH
UBC’S MacISAAC HEALTH BUILDING Achieving ambitious carbon reduction goals.
T
he new MacIsaac Health Building at the University of British Columbia is an academic, research, and student health and wellbeing facility at the historic entrance to UBC’s Vancouver campus. The approximately 270,000-square-foot facility brings together the MacIsaac School of Nursing, the School of Kinesiology, UBC Student Health and Wellbeing ser-
vices, a Team-based Care Teaching Clinic, and other academic and research functions. Its design creates a new campus arrival experience while advancing UBC’s priorities for sustainability, Musqueam (xwməθkw əỷəm) engagement, and student health and wellbeing. Sustainability was a a key project goal. Designed by Perkins&Will and its Danish partners Schmidt Hammer Lassen, The MacIsaac Health Building is the first on
30 / CFM&D | Part of the REMI network | www.REMInetwork.com
UBC’s Vancouver campus to achieve Canada Green Building Council (CAGBC) Zero Carbon Building – Design Standard (v2) certification, and it also achieved LEED Gold certification, supporting both UBC’s and Perkins&Will’s long-standing commitments to climate leadership. The project incorporates a high-performance building envelope, natural ventilation strategies, heat recovery systems, and the design included a whole-building
life-cycle assessment that informed opportunities to reduce embodied carbon. Modular and prefabricated construction systems also contributed to construction efficiency, reduced material waste, enhanced quality control, and lowered the project’s overall embodied carbon. Mass timber plays a central role in the building’s low-carbon strategy. Beyond reducing embodied carbon, the exposed timber structure reflects the Pacific Northwest’s rich building traditions and contributes warmth, character, and a strong connection to place, thus enhancing and supporting the human experience. Low-carbon concrete mixes were also specified to further reduce the building’s embodied carbon. “The sustainability strategy is woven into many aspects of the building, from material selection to building systems and construction methods,” says Kathy Wardle, regional director of regenerative design at Perkins&Will. “This project demonstrates how ambitious carbon reduction goals can be achieved while creating spaces that are welcoming, healthy, and inspiring for the people who use them every day.” A NEW ARRIVAL EXPERIENCE
As the principal point of arrival to campus, the MacIsaac Health Building reimagines the relationship between building, landscape, and public realm. Set back from University Boulevard, the siting and massing of the building establish a generous public plaza to create a distinct sense of arrival. The ground floor is conceived as an extension of the landscape, with multiple entrances responding to movement patterns across the site and creating an accessible experience for students, faculty, staff, and visitors alike. The ground floor structure is exposed at the perimeter of the building and exterior walls set back from the upper-level facade to give the appearance of
“As a new front door to the UBC campus, the MacIssac Health Building demonstrates how architecture can express institutional values while enriching human experience.” the building floating above the landscape. The column expression at the ground floor is a reinterpretation of the forest that once occupied the site. At the centre of the building, a six-storey skylit atrium serves as a vibrant social heart, connecting programs, people, and activities throughout the day. “From the outset, we saw an opportunity to create more than a building. We wanted to create a place that welcomes people into campus and brings them together,” says Jana Foit, principal at Perkins&Will. “The atrium creates opportunities for connection, collaboration, and community while reinforcing the building’s role as a gateway to UBC.” MUSQUEAM ENGAGEMENT IN BUILDING AND LANDSCAPE DESIGN
The UBC Vancouver campus is located on the ancestral and unceded territory of the Musqueam people. In recognition of this, one of UBC’s core goals for the project was to create a Musqueam welcome when entering the campus and cultural presence throughout the building. Musqueam representatives helped shape the design and landscape of the MacIsaac Health Building. Their involvement is reflected in a prominent landscape with native plants surrounding the building, indoor and outdoor public artworks, and a building with natural materials and filtered daylight.
A MODEL FOR HEALTH AND WELLBEING
Health and wellbeing are central to the mission of the schools, services, and programs housed within the MacIsaac Health Building, and were fundamental drivers of its design. The building encourages movement, social interaction, and interdisciplinary collaboration through its open circulation network and visually connected atrium. Access to daylight, views to landscape, healthy materials, and a variety of formal and informal gathering spaces support the wellbeing of students, faculty, staff, and visitors. The project is also pursuing gold under the Rick Hansen Foundation Accessibility Certification. The exposed mass timber structure further enhances the experience of building occupants through its biophilic qualities. Exposed wood beams and columns are expressed throughout the central atrium, creating a warm and welcoming environment that supports comfort, connection, and wellbeing. “As a new front door to the UBC campus, the MacIsaac Health Building demonstrates how architecture can express institutional values while enriching human experience. Bringing together learning, research, sustainability, and wellbeing, it creates a welcoming destination for the university community and future generations,” says Kasper Heiberg Frandsen, design principal, Schmidt Hammer Lassen. | CFM&D
Cheryl Mah is the editor of Design Quarterly.
Fall/Winter 2026 CFM&D / 31
[ workplace ] BY CHRIS BARCUS
THE MIDWEEK CAPACITY TRAP IN HYBRID OFFICES Why weekly averages hide the days when desks, rooms and workplace services face the most pressure.
A
hybrid office can look comfortably under capacity for the week and still fail on its busiest day. Demand may collect on Tuesday, Wednesday and Thursday, while Monday and Friday pull the weekly average down. The result can be a workplace that appears efficient in a monthly report but feels crowded when employees actually need it most. A 2026 analysis of 4.2 million anonymized desk and room reservations across
more than 400 organizations found that nearly 73 per cent of weekday demand landed between Tuesday and Thursday. Tuesday was the busiest scheduled day. Wednesday followed closely, Thursday remained strong, and Friday carried far less demand. The same pattern appeared across both desks and meeting rooms. The finding is not a universal schedule. Every workplace has its own policy, commute patterns, team rhythms and local culture. It is a warning about averages. A single weekly utilization rate can conceal the operation-
32 / CFM&D | Part of the REMI network | www.REMInetwork.com
al pressure that employees and facility teams experience during the middle of the week. PLAN FOR THE PEAK, NOT ONLY THE AVERAGE
Capacity planning should begin with the highest recurring demand period. Facility teams can compare the busiest day’s reservations with available desks, meeting rooms, parking spaces and support capacity. The comparison should use effective supply rather than the number printed on a floor plan. A desk with broken equipment, a
room awaiting repair or an area closed for construction is not usable capacity. A simple peak-to-average ratio can show how uneven the week has become. If the busiest day is materially above the weekday average, one staffing and service plan for all five days is unlikely to work. The building may not need more space. It may need a different operating plan for peak days. TREAT DESKS AND ROOMS AS ONE DEMAND SIGNAL
Desk pressure is only part of the office-day experience. When desk and room reservations rise together, the entire workplace system is under load. Employees may be able to find a seat but still struggle to locate a meeting room, find their teammates, park, receive technical support or access food and hospitality services. Facility teams should review the demand curve across resource types on the same timeline. A floor with spare desks and no small meeting rooms is not truly under capacity. A building with open rooms and an overloaded parking area has a different constraint. Looking at the parts together reveals which bottleneck is limiting the day. OPERATE THE SHOULDER DAYS DIFFERENTLY
Monday and Friday should not automatically receive the same service model as the midweek peak. A lighter Friday may be an appropriate time for maintenance, floorplan changes, deep cleaning, vendor work or employee programming designed for smaller groups. Monday may need a moderate service level that recognizes meaningful demand without assuming Tuesday conditions. The goal is to match service to real patterns. Flexible cleaning schedules, food orders, reception coverage, parking support and meeting-room assistance can improve the employee experience while reducing
waste. Changes should be tested by location because a headquarters, regional office and project site may have very different curves. COMPARE PLANNED DEMAND WITH WHAT HAPPENED
Reservations measure intent. They do not confirm that an employee arrived, how long a resource was used or whether the office supported the work. A useful review pairs reservations with approved attendance or check-in signals, room use, service requests and employee feedback. The gaps often explain more than the totals. High reservations with low attendance may indicate stale recurring bookings or weak cancellation habits. Strong attendance with low recorded desk use may point to untracked spaces or informal work areas. Heavy midweek demand combined with
repeated room conflicts or support requests may identify a service or configuration problem before it becomes a request for more real estate. USE A REPEATABLE MONTHLY REVIEW
A practical monthly capacity review can remain small. Facility teams can track the busiest scheduled day, the peak-to-average ratio, usable supply, no-show levels, room pressure and the most common workplace requests. Quarterly reviews can test whether changes in policy, headcount, season or local conditions have altered the curve. When facility teams plan for the peak, distinguish the shoulder days and compare intent with actual experience, the weekly average becomes context rather than a false sense of certainty. | CFM&D
Chris Barcus is the founder and chief revenue officer of Tactic, a workplace management software company. He works with workplace and facilities teams on hybrid operations, resource booking and space-utilization decisions. Fall/Winter 2026 CFM&D / 33
FLOORING
TIMELESS FOUNDATIONS New flooring collections are using craftsmanship and cultural influences to create designs with lasting appeal. The Transcribe collection by Tarkett is inspired by humanity’s instinct to communicate through marks, symbols, and layered forms that carry meaning across time. From ancient etchings to contemporary icons, the designs translate visual language into textured, dynamic patterns that bring movement and identity to the floor. The choices include four styles in ethos carpet tile and Flex-Aire cushion carpet and six styles in 3.0 mm Contour luxury vinyl tile.
Mohawk Group’s Assembled Threads carpet tile collection draws inspiration from the tactile precision of wood joinery and the natural variation of hand-set stone. The collection won a recent NeoCon award and includes Threadline (24”x 24”), Contour Drift (24”x 24”), and Composite Ground (12” x 36”).
Cult Classics by Shaw Contract is a timeless collection of modular carpet tile, broadloom rugs, LVT and porcelain that feels both timeless and modern. The flooring draws from visual references that have shaped culture over decades. 34 / CFM&D | Part of the REMI network | www.REMInetwork.com
[ last word ] BY BASHAR QAWAS
REVISITING CONTRACTOR ARRANGEMENTS BEFORE THE CRA
F
acilities rely on outside contractors for cleaning, maintenance, groundskeeping and specialized trades. These arrangements can continue for years without review. A relationship that was a genuine business arrangement in year one may look very different by year five, even though no one deliberately changed it. That is where the risk lies. This concerns individuals and sole proprietors whom facility owners pay directly. A worker who incorporates is a different case. If, without the corporation, the individual would be the facility owner’s employee, the CRA’s Personal Services Business (PSB) rules may apply, subject to specific conditions. If they do, the tax consequences fall primarily on the corporation, although the facility owner generally retains certain information-reporting obligations.
WHAT DETERMINES CLASSIFICATION
For contracts formed outside Quebec, unless the contract specifies otherwise, the CRA applies a two-step approach based on common law and jurisprudence. First, intention: did the parties intend
a contract of service (employment) or a contract for services (business relationship)? Second, whether the actual working relationship reflects that intention. The CRA considers the degree of control over the worker, who provides tools and equipment, whether the worker can subcontract or hire assistants, financial risk, investment and management responsibilities, opportunity for profit, and other relevant factors, including the written contract. These indicators are considered individually and together. No set number of factors determines the outcome. The written contract matters, but cannot override working conditions that contradict it. Intention is the starting point, not the deciding factor. For contracts formed in Quebec, the Civil Code of Québec applies and the CRA uses a three-step approach. A national portfolio may therefore have comparable arrangements assessed under different legal frameworks. Worth knowing: CRA Guide RC4110 was cancelled in January 2026 and replaced by current employment status guidance. Printed copies are now outdated.
WHY FACILITIES ARE EXPOSED
Misclassification can develop without anyone intending to cut corners. Consider a maintenance contractor who initially operates independently. They own their equipment, choose their methods, serve other clients and absorb costs when jobs run long. Over time, the facility standardizes operations. Access hours become fixed, materials are supplied through bulk purchasing, methods are specified for safety or insurance purposes, and the contractor stops accepting other clients because the site fills their week. Each change may be reasonable, but several affect factors the CRA considers. Control extends beyond directing how work is performed; it includes the right to determine what is done, when and by whom. Purchasing a defined result differs from directing the worker’s activities. No single fact decides status, but collectively these changes may make the working relationship inconsistent with the contract. WHAT A REASSESSMENT MEANS
Employee status does not automatically mean CPP and EI contributions are owing. Whether employment is pensionable Fall/Winter 2026 CFM&D / 35
[ last word ] and insurable requires a separate determination. In Quebec, QPP replaces CPP, while EI applies to insurable employment at the Quebec premium rate, alongside QPIP. Where contributions and premiums are owing, the payer may be assessed for both employer and employee portions, plus penalties and interest. Income tax not deducted is different because the worker may have already paid it through their tax return. However, a failure-to-deduct penalty may still apply. A determination can also affect the worker’s entitlement to EI benefits. WHAT SHOULD FACILITIES DO?
Start with the arrangements showing the strongest indicators of employment. Duration alone does not determine status, although continuity and the ongoing nature of the relationship are relevant. Longer arrangements can also mean greater potential exposure, subject to applicable assessment limits. Preserve genuine independence where it
exists. Where possible, define the required work, deliverables and standards rather than directing the contractor’s day-to-day methods. For example, specify the maintenance result and completion deadline instead of prescribing every step. The goal is to preserve legitimate business independence, not compromise safety, procurement or operational requirements. Keep evidence of actual business independence. Retain independently negotiated job pricing, records of unreimbursed expenses, the contractor’s insurance, evidence of other clients or declined work, and examples of the contractor hiring and paying substitutes without needing the facility’s approval of the substitute. These help demonstrate genuine financial risk and opportunity for profit. Know the ruling deadline. For individuals and sole proprietors paid directly, the CRA issues CPP/EI rulings. General guid-
ance does not replace an individual ruling. Such a ruling cannot determine PSB status, which asks whether the individual would be an employee but for their corporation. A payer or worker generally must request a ruling by June 29 of the year following the year in question. For 2026 employment, that means June 29, 2027. A ruling can still address a current period in a long-standing relationship, but the deadline limits how far back a request can reach. It is separate from the assessment limitation periods established under the CPP and Employment Insurance Act. Even where no deliberate change was made, the payer remains responsible for defending the arrangement. The important question is which contractor relationships would withstand scrutiny and which should be addressed before they become a problem. | CFM&D
Bashar Qawas is a partner at Better Books Canada and a former Canada Revenue Agency auditor. betterbookscanada.ca
Don’t let your mechanical room control your capital plan. Aging boilers, HVAC, and water heating systems need more maintenance, repairs, and may need replacing. Enercare Advantage® lets you upgrade your equipment for $0 upfront* while providing ongoing service and maintenance.
$0 Upfront Repairs & maintenance Same-day service**
Plan your next equipment upgrade.
enercare.ca/commercial 800-321-1508
*Terms and conditions and certain exceptions apply. See rental agreement for details. **Available to Enercare’s Heating/Cooling protection plan customers, rental water heater customers and/or rental HVAC customers whose equipment is not operational (for example – no heat, no cooling or no hot water). On average, Enercare attends to furnace/boiler, central air conditioner, or water heater non-operational calls 80% of the time the same day. Subject to exclusions in accordance with the terms and conditions of the applicable protection plan or rental agreement. ®Enercare, Enercare Advantage and the design are trademarks of Enercare Inc., used under license.
ECH3989_EnercareAdvantageAd_7_125x4_75_Apt_d2.indd 1
36 / CFM&D | Part of the REMI network | www.REMInetwork.com
2026-08-28 11:18 AM
WHEN YOUR FACILITY IS AT RISK, WE'RE READY TO RESPOND.
24/7 Emergency Response
Fire & Smoke Damage Restoration
Water & Flood Damage Restoration
Catastrophic Storm Response
WHETHER IT’S ROUTINE DAMAGE OR A SUDDEN EMERGENCY, WE'RE READY TO HELP
877.778.6731
FIRSTONSITE.CA
CLEAN SPACES WORK BETTER
BUILT FOR THE TOUGHEST FACILITY CLEANING CHALLENGES. Introducing Rust-Oleum Professional Cleaners. A complete line of cleaners, degreasers and specialty solutions designed to help maintenance teams tackle everyday cleaning challenges.
COMMERCIAL STRENGTH
CONCENTRATES & RTU
MULTI-SURFACE CLEANING
PROFESSIONAL PERFORMANCE
Available now at authorized Canadian distributors. Visit Rustoleum.ca for product information and distributor locations.