Chapter 4. Design Strategy PHASED SITE PLAN - 2033
South Downs Way
Principal Interventions
Advertisement
2030
The third phase is the culmination of the spinal interventions to activate and connect the site.
It brings people to live and to create a community. There are two main areas identified for compact residential developments (1 and 2), which together with a riverfront restoration (3) will complete the riverside area.
The quarry side will be complemented with an integrated flexible open amphitheatre space (4) embedded in the topography and small huts/pods (5) for use as work spaces/ visitor accommodation in nature.
New buildings in the lower quarry to be lightweight to prevent from foundations that encounter land contamination.
New buildings to be located away from the shade of cliffs and have photovoltaic panels on roofs.
Each phase would be landscaped with planting to define routes, frame vistas and provide shade in warmer months.