creating the bridge between where you are and where you want to be. The answers to the problems we solve can’t always be found in a textbook. Experience matters.

need transportation drainage solutions?

What we offer:

Our seamless veteran team has extensive experience in delivering transportation drainage engineering services and specializes in bridge hydraulics and scour analysis. RESPEC’s team understands the transportation drainage design criteria and can successfully integrate our drainage recommendations into a project working with roadway, bridge, and maintenance personnel.  Our professionals analyze, design, and prepare drainage construction plans for projects ranging from small, maintenance-type efforts to large drainage improvements for major interstate highway corridors.   We provide transportation drainage design recommendations and a wide array of infrastructure design capabilities to our clients.

// Permanent Water Quality Facilities

“I have worked with RESPEC on several projects over the years and they have always been easy to work with, very responsive, and have always done a great job.” —Tom Hunt, Project Manager, CDOT

// Roadside Ditches and Channels // Culverts

// Channel Modifications // Pavement and Area Inlets // Culvert Outlet Protection // Detention Basins

// Bridge Waterway Openings

// Riprap or Other Armoring

// Bridge Scour Countermeasures

// Channel Stability Measures

// Storm Sewers

// Sediment Control Facilities

// Erosion-Control Measures

// Low-Water Crossings

// Improved Culvert Entrances

// Wetland/Riparian Vegetation.

// Grade-Control Structures

// I-25 Reconstruction Castle Rock, CO This design project involved all potential drainage elements of a highway project. Hydrologic analyses were completed for off-site watersheds, including identifying hydrologic characteristics. Pavement drainage analyses were performed to establish inlet spacing along the concrete median barrier. In addition, FEMA floodplains within the corridor were identified and floodplain modeling was completed by using the HEC-RAS model. Erosion and sediment-control plans were developed for the corridor as well as a . stormwater management plan report. The plans and the report were prepared in accordance with the National Pollutant Discharge Elimination System (NPDES) stormwater requirements and a stormwater permit obtained from the state for construction activities. The location, type, and design of permanent stormwater quality BMPs were also provided to mitigate potential adverse impacts to receiving water quality from the highway runoff. Approximately 13 permanent stormwater­quality facilities were designed and constructed. Channel restoration design and construction observation services were provided for the installation of five steel sheet, pilinggrade-control structures and channel modification to approximately 2,000 feet of channel along 1-25. Support of the required environmental permitting services, including 404 permit, wetland mitigation, and restoration of the Preble’s Mouse Habitat, was completed.

Dorothy Eisenbraun // Dorothy.Eisenbraun@respec.com // 720.775.6411