Concept plans for data center project in Wallingford

Page 1

Cul-De-Sac

PROJECT TOTALS

909,550±SF : TOTAL BUILDING FOOTPRINT 1,819,100±SF : TOTAL BUILDING AREA (2 STY) 192 MW : TOTAL IT DATA 270 MW : TOTAL POWER REQUIREMENT

W ME AL R LI IDE NG N FO RD

INDEX KEY

50 FT PROPERTY BUFFER

2

ELECTRIC SWITCHYARD / SUBSTATION & POWER GENERATION FACILITY

JIM WAS HERE

JIM WAS HERE TOO

JIM WAS HERE

15

Gated Emergency Entry

HERE

JIM WAS HERE

A G T IN SF A D ILD51± W U ,3 M B 32 32

Web: www.stadiaeng.com E-Mail: Info@stadiaeng.com 516 Vauxhall Street - Suite 103 New London, Connecticut 06320 (860) 333-3533

JIM WAS

ENGINEERS ∙ ENVIRONMENTAL PLANNERS ∙ SURVEYORS

JIM WAS JIM WAS HERE HERE

13

JIM WAS HERE

14

SS O R Y C A R W U K B R L I PA W

S TADIA E NGINEERING A SSOCIATES, INC.

DEVELOPMENT DATA & FOOTPRINT

TA N

1

KW

1

T

O

D BUILATA 156, DING 8

A G T IN SF A D ILD51± W U ,3 M B 32 32

36 32 M ± SF W

3

AD

1

D BUILATA DIN 156

4 5

FOR CLIENT DISCUSSIONS

FA

R

M

S

G ,836 32 M ± SF W

RO

T C

R

DR OA D

36 32 M ± SF W

U

15

D BUILATA 156, DING 8

E

OO

SUBPOWER STA TIO NS

CL&

DRIVE

WALLINGFORD DEVELOPMENT North Farms Road, Tower Drive, Tankwood Road

NO

RT H

-WA Y

Wallingford, Connecticut

TOW DRI ER VE CONCEPTUAL LAYOUT PLAN

Gated Main Entry

ER ST © copyright 2021 Stadia Engineering Associates, Inc.

Gated Emergency Entry

T-OF

Gated Main Entry

LI NG

BA N ES INDUR ST ROADRIAL N.

7,17 G 0 16 M± SF W

D BUI ATA LDIN 8

7

D BUI ATA LDIN 8

7,17 G 0 16 M± SF W

6

P EL ECT RIC RIG H

CONNECTICUT DATA CENTER DEVELOPMENT

E

16 June 2021 Parcel & design modificationsAR

D

14 June 2021 Parcel & design modificationsAR

C

7 June 2021 Parcel & design modificationsAR

Fairfield Boulevard Extension

(Requires Municipal Approval

2021-100 25 May 2021

Former Data Center Campus Layout (Dated: 23 February 2021, Last Revised: 03 June 2021)

16 June 2021

FAIRFIELD BOULEVARD

DATA CENTER CAMPUS LAYOUT

A. Reinhart

D-399


W ME AL R LI IDE NG N FO RD

PROJECT TOTALS

909,550±SF : TOTAL BUILDING FOOTPRINT 1,819,100±SF : TOTAL BUILDING AREA (2 STY) 192 MW : TOTAL IT DATA 270 MW : TOTAL POWER REQUIREMENT

HERE

JIM WAS HERE

JIM WAS HERE

JIM WAS HERE TOO

JIM WAS HERE

15

INDEX KEY

9

ft ft ft ft tf 55± 128±1198±262± 1 9± 10 1 9 9

RO

Web: www.stadiaeng.com E-Mail: Info@stadiaeng.com

AD

ft

3

OD

AD

1

982±

±f

926± 738± 810±

39

7±

ft

ft

S

T-OF

ft

-WA Y

RT H

485±

P EL ECT RIC RIG H

CONNECTICUT DATA CENTER DEVELOPMENT

ft 681±

ft

WALLINGFORD DEVELOPMENT North Farms Road, Tower Drive, Tankwood Road

NO

7,17 G 0 16 M± SF W

D BUI ATA LDIN 8

ft

335±

Wallingford, Connecticut

65

9±

6± 94 ft

± ft

TOW DRI ER VE

782

DRIVE

739±

465± 651± ft ft 46 1± 309± ft ft

947± ft

BA N ES INDUR ST ROADRIAL N.

7,17 G 0 16 M± SF W

837±

FOR CLIENT DISCUSSIONS

ft

CL&

6 7

ft

ft

ft

SUBPOWER STA TIO NS

D BUI ATA LDIN 8

t

823±

M

5

61 1

36 32 M ± SF W

G ,836 32 M ± SF W

4 D BUILATA 156, DING 8

D BUILATA DIN 156

ft

R

T C

36 32 M ± SF W

WO

RO

O

R

A G T IN SF A D ILD51± W U ,3 M B 32 32

± 26

ft

FA

U

1

T

D BUILATA 156, DING 8

NK

566± ft 78 8± ft 83 80 9± 7± ft f 88 t 5± ft

E

15

TA 6 66± f 705± t ft

1

630±

A G T IN SF A D ILD51± W U ,3 M B 32 32

± ft

ELECTRIC SWITCHYARD / SUBSTATION & POWER GENERATION FACILITY

536

2

887± f 866± t ft 511± ft 414 ± ft 5 45± ft 59 2± 395 ft 54 ± ft 2± ft

50 FT PROPERTY BUFFER

516 Vauxhall Street - Suite 103 New London, Connecticut 06320 (860) 333-3533

JIM WAS

ENGINEERS ∙ ENVIRONMENTAL PLANNERS ∙ SURVEYORS

JIM WAS JIM WAS HERE HERE

13

JIM WAS HERE

14

SS O R Y C A R W U K B R L I PA W

S TADIA E NGINEERING A SSOCIATES, INC.

DEVELOPMENT DATA & FOOTPRINT

ft

78

7±

ft

E

16 June 2021 Parcel & design modificationsAR

D

14 June 2021 Parcel & design modificationsAR

C

7 June 2021 Parcel & design modificationsAR

© copyright 2021 Stadia Engineering Associates, Inc.

ST

ER

LI NG

CONCEPTUAL LAYOUT PLAN

2021-100 25 May 2021 16 June 2021

FAIRFIELD BOULEVARD

DATA CENTER CAMPUS LAYOUT

A. Reinhart

D-399


JIM WAS

HERE

JIM WAS HERE

INDEX KEY

JIM WAS HERE

JIM WAS HERE TOO

JIM WAS HERE

50 FT PROPERTY BUFFER

15

ELECTRIC SWITCHYARD / SUBSTATION & POWER GENERATION FACILITY

Web: www.stadiaeng.com E-Mail: Info@stadiaeng.com 516 Vauxhall Street - Suite 103 New London, Connecticut 06320 (860) 333-3533

JIM WAS JIM WAS HERE HERE

ENGINEERS ∙ ENVIRONMENTAL PLANNERS ∙ SURVEYORS

JIM WAS HERE

13

397,053±SF : TOTAL BUILDING FOOTPRINT 794,106±SF : TOTAL BUILDING AREA (2 STY) 96 MW : TOTAL IT DATA 135 MW : TOTAL POWER REQUIREMENT

14

PROJECT TOTALS

S TADIA E NGINEERING A SSOCIATES, INC.

DEVELOPMENT DATA & FOOTPRINT

3 D BU ATA 132 ILDIN ,

35 G 32 1± SF MW

Gated Emergency Entry

CARPENTER

2 D BU ATA 132 ILDIN ,35 G

LANE FOR CLIENT DISCUSSIONS

TH F ARM S RO AD

32 1± SF MW

CONNECTICUT DATA CENTER DEVELOPMENT

SU POW BS ER TA TIO N

32

± MW SF

ATE 91

Northrop Road, Barnes Road (CT Rte 68)

RST

HR

OP D BU ATA 132 ILD ,35 ING 1

RT

1

NO

NOR

Gated Main Entry

WALLINGFORD DEVELOPMENT

Wallingford, Connecticut

INTE

RO

AD

SU POW BS ER TA TIO N

NORTH FARMS RESERVOIR

CONCEPTUAL LAYOUT PLAN

© copyright 2021 Stadia Engineering Associates, Inc.

CT RO UTE

68 BARN

C

07 June 2021 design & parcel modificationsAR

B

26 Feb 2021

design modifications

AR

A

25 Feb 2021

design modifications

AR

2021-100

ES RO AD

17 February 2021 07 June 2021

DATA CENTER CAMPUS LAYOUT