Cul-De-Sac
PROJECT TOTALS
909,550±SF : TOTAL BUILDING FOOTPRINT 1,819,100±SF : TOTAL BUILDING AREA (2 STY) 192 MW : TOTAL IT DATA 270 MW : TOTAL POWER REQUIREMENT
W ME AL R LI IDE NG N FO RD
INDEX KEY
50 FT PROPERTY BUFFER
2
ELECTRIC SWITCHYARD / SUBSTATION & POWER GENERATION FACILITY
JIM WAS HERE
JIM WAS HERE TOO
JIM WAS HERE
15
Gated Emergency Entry
HERE
JIM WAS HERE
A G T IN SF A D ILD51± W U ,3 M B 32 32
Web: www.stadiaeng.com E-Mail: Info@stadiaeng.com 516 Vauxhall Street - Suite 103 New London, Connecticut 06320 (860) 333-3533
JIM WAS
ENGINEERS ∙ ENVIRONMENTAL PLANNERS ∙ SURVEYORS
JIM WAS JIM WAS HERE HERE
13
JIM WAS HERE
14
SS O R Y C A R W U K B R L I PA W
S TADIA E NGINEERING A SSOCIATES, INC.
DEVELOPMENT DATA & FOOTPRINT
TA N
1
KW
1
T
O
D BUILATA 156, DING 8
A G T IN SF A D ILD51± W U ,3 M B 32 32
36 32 M ± SF W
3
AD
1
D BUILATA DIN 156
4 5
FOR CLIENT DISCUSSIONS
FA
R
M
S
G ,836 32 M ± SF W
RO
T C
R
DR OA D
36 32 M ± SF W
U
15
D BUILATA 156, DING 8
E
OO
SUBPOWER STA TIO NS
CL&
DRIVE
WALLINGFORD DEVELOPMENT North Farms Road, Tower Drive, Tankwood Road
NO
RT H
-WA Y
Wallingford, Connecticut
TOW DRI ER VE CONCEPTUAL LAYOUT PLAN
Gated Main Entry
ER ST © copyright 2021 Stadia Engineering Associates, Inc.
Gated Emergency Entry
T-OF
Gated Main Entry
LI NG
BA N ES INDUR ST ROADRIAL N.
7,17 G 0 16 M± SF W
D BUI ATA LDIN 8
7
D BUI ATA LDIN 8
7,17 G 0 16 M± SF W
6
P EL ECT RIC RIG H
CONNECTICUT DATA CENTER DEVELOPMENT
E
16 June 2021 Parcel & design modificationsAR
D
14 June 2021 Parcel & design modificationsAR
C
7 June 2021 Parcel & design modificationsAR
Fairfield Boulevard Extension
(Requires Municipal Approval
2021-100 25 May 2021
Former Data Center Campus Layout (Dated: 23 February 2021, Last Revised: 03 June 2021)
16 June 2021
FAIRFIELD BOULEVARD
DATA CENTER CAMPUS LAYOUT
A. Reinhart
D-399
W ME AL R LI IDE NG N FO RD
PROJECT TOTALS
909,550±SF : TOTAL BUILDING FOOTPRINT 1,819,100±SF : TOTAL BUILDING AREA (2 STY) 192 MW : TOTAL IT DATA 270 MW : TOTAL POWER REQUIREMENT
HERE
JIM WAS HERE
JIM WAS HERE
JIM WAS HERE TOO
JIM WAS HERE
15
INDEX KEY
9
ft ft ft ft tf 55± 128±1198±262± 1 9± 10 1 9 9
RO
Web: www.stadiaeng.com E-Mail: Info@stadiaeng.com
AD
ft
3
OD
AD
1
982±
±f
926± 738± 810±
39
7±
ft
ft
S
T-OF
ft
-WA Y
RT H
485±
P EL ECT RIC RIG H
CONNECTICUT DATA CENTER DEVELOPMENT
ft 681±
ft
WALLINGFORD DEVELOPMENT North Farms Road, Tower Drive, Tankwood Road
NO
7,17 G 0 16 M± SF W
D BUI ATA LDIN 8
ft
335±
Wallingford, Connecticut
65
9±
6± 94 ft
± ft
TOW DRI ER VE
782
DRIVE
739±
465± 651± ft ft 46 1± 309± ft ft
947± ft
BA N ES INDUR ST ROADRIAL N.
7,17 G 0 16 M± SF W
837±
FOR CLIENT DISCUSSIONS
ft
CL&
6 7
ft
ft
ft
SUBPOWER STA TIO NS
D BUI ATA LDIN 8
t
823±
M
5
61 1
36 32 M ± SF W
G ,836 32 M ± SF W
4 D BUILATA 156, DING 8
D BUILATA DIN 156
ft
R
T C
36 32 M ± SF W
WO
RO
O
R
A G T IN SF A D ILD51± W U ,3 M B 32 32
± 26
ft
FA
U
1
T
D BUILATA 156, DING 8
NK
566± ft 78 8± ft 83 80 9± 7± ft f 88 t 5± ft
E
15
TA 6 66± f 705± t ft
1
630±
A G T IN SF A D ILD51± W U ,3 M B 32 32
± ft
ELECTRIC SWITCHYARD / SUBSTATION & POWER GENERATION FACILITY
536
2
887± f 866± t ft 511± ft 414 ± ft 5 45± ft 59 2± 395 ft 54 ± ft 2± ft
50 FT PROPERTY BUFFER
516 Vauxhall Street - Suite 103 New London, Connecticut 06320 (860) 333-3533
JIM WAS
ENGINEERS ∙ ENVIRONMENTAL PLANNERS ∙ SURVEYORS
JIM WAS JIM WAS HERE HERE
13
JIM WAS HERE
14
SS O R Y C A R W U K B R L I PA W
S TADIA E NGINEERING A SSOCIATES, INC.
DEVELOPMENT DATA & FOOTPRINT
ft
78
7±
ft
E
16 June 2021 Parcel & design modificationsAR
D
14 June 2021 Parcel & design modificationsAR
C
7 June 2021 Parcel & design modificationsAR
© copyright 2021 Stadia Engineering Associates, Inc.
ST
ER
LI NG
CONCEPTUAL LAYOUT PLAN
2021-100 25 May 2021 16 June 2021
FAIRFIELD BOULEVARD
DATA CENTER CAMPUS LAYOUT
A. Reinhart
D-399
JIM WAS
HERE
JIM WAS HERE
INDEX KEY
JIM WAS HERE
JIM WAS HERE TOO
JIM WAS HERE
50 FT PROPERTY BUFFER
15
ELECTRIC SWITCHYARD / SUBSTATION & POWER GENERATION FACILITY
Web: www.stadiaeng.com E-Mail: Info@stadiaeng.com 516 Vauxhall Street - Suite 103 New London, Connecticut 06320 (860) 333-3533
JIM WAS JIM WAS HERE HERE
ENGINEERS ∙ ENVIRONMENTAL PLANNERS ∙ SURVEYORS
JIM WAS HERE
13
397,053±SF : TOTAL BUILDING FOOTPRINT 794,106±SF : TOTAL BUILDING AREA (2 STY) 96 MW : TOTAL IT DATA 135 MW : TOTAL POWER REQUIREMENT
14
PROJECT TOTALS
S TADIA E NGINEERING A SSOCIATES, INC.
DEVELOPMENT DATA & FOOTPRINT
3 D BU ATA 132 ILDIN ,
35 G 32 1± SF MW
Gated Emergency Entry
CARPENTER
2 D BU ATA 132 ILDIN ,35 G
LANE FOR CLIENT DISCUSSIONS
TH F ARM S RO AD
32 1± SF MW
CONNECTICUT DATA CENTER DEVELOPMENT
SU POW BS ER TA TIO N
32
± MW SF
ATE 91
Northrop Road, Barnes Road (CT Rte 68)
RST
HR
OP D BU ATA 132 ILD ,35 ING 1
RT
1
NO
NOR
Gated Main Entry
WALLINGFORD DEVELOPMENT
Wallingford, Connecticut
INTE
RO
AD
SU POW BS ER TA TIO N
NORTH FARMS RESERVOIR
CONCEPTUAL LAYOUT PLAN
© copyright 2021 Stadia Engineering Associates, Inc.
CT RO UTE
68 BARN
C
07 June 2021 design & parcel modificationsAR
B
26 Feb 2021
design modifications
AR
A
25 Feb 2021
design modifications
AR
2021-100
ES RO AD
17 February 2021 07 June 2021
DATA CENTER CAMPUS LAYOUT
A. Reinhart
D-394