SAMPL ES
WORK
Community Health Center at Edward M Kennedy
PROJECT NARRATIVE: This project is an expansion of the new branch for the Community Health Center at Edward M Kennedy . The scope of work consisted converting an existing 5,020 S.F. retail space into a clinic with daily capacity of 300 patients. My Role: DD Active involvemnet in design meetings with facilities managers,end users, Department of Public Health officials, senior architects and MEP consultants. CD Allocated work to the project team, staffed drafters to meat the deadlines in developing DPH submittals, Bid-set documents, and construction documents. Project Administration Response to RFIs, submittals throughout construction phase.
3 form panels
Structured Parking
This study was Structured a small part to the Parking Project: master plan for the redevelopment of the North This Campus ofwas a small part to the study UMASS Lowell. Thismaster proposal plan for the redevelopincluded a two- bayment structured of the North Campus of parking that was toUMASS add 450 new This proposal Lowell. parking spaces; it would replace included a two- bay structured the existing parking with green parking that was to add 450 new space. This will allow for the po- it would replace parking spaces; tential expansion ofthe theexisting existingparking with green athletic fields. space. This will allow for the poMy Role:
tential expansion of the existing athletic fields.
I have used Revit Architecture My Role: as a BIM modeling tool to create different designI have options with used Revit Architecture materials to reflectasthe existing a BIM modeling tool to crebuildings on campus. ate different design options with materials to reflect the existing buildings on campus.
164
164
Structured Parking Structured Parking
Design Tools: Construction Documents -Revit Architecture with green space. This will allow for Presentation - 3Ds Studio Max 2010/ Photoshop cs3 Project:My Role: the potential expansion of the existing Diagrams - Illustrator cs3 This study wasused a small to the master I have Revitpart Architecture as a BIM Design Tools: athletic fields. Construction Documents -Revit Architecture plan formodeling the redevelopment of different the North tool to create design Design Tools: Presentation - 3Ds Studio MaxCampus 2010/ Photoshop cs3 withLowell. Construction Documents -Revit Architecture options materials to proposal reflect the of UMASS This Project: My Role: Diagrams Illustrator cs3 Presentation - 3Ds Studio Max 2010/ Photoshop cs3 existing onThis campus. included a two-buildings bay structured parking study wasused a small to the master I have Revitpart Architecture as a BIM Diagrams - Illustrator cs3 that was to add 450 new parking spaces; plan for the redevelopment of the North modeling tool to create different design Design Tools: it would replace the existing parking Construction Documents -Revit Architecture withLowell. materials to proposal reflect the Campusoptions of UMASS This Presentation - 3Ds Studio Max 2010/ Photoshop cs3 space. This will allow with green forexisting on campus. included a two-buildings bay structured parking Diagrams - Illustrator cs3 the potential expansion of the existing
that was to add 450 new parking spaces; it would replace the existing parking with green space. This will allow for My Role: the potential expansion of the existing I have used Revit Architecture as a BIM athletic fields. modeling tool to create different design options with materials to reflect the My Role: existing buildings on campus. I have used Revit Architecture as a BIM modeling tool to create different design options with materials to reflect the existing buildings on campus. athletic fields.
with green space.tool Thistowill allow for modeling create different design the potential of thetoexisting optionsexpansion with materials reflect the athleticexisting fields. buildings on campus.
Structured Project: Parking
Structured Parking
My Role: I have used Revit Architecture as a BIM modeling tool to create different design options with materials to reflect the existing buildings on campus.
Project: This study was a small part to the master plan for the redevelopment of the North Campus of UMASS Lowell. This proposal Project: included a two- bay structured parking This study was a small part to the master Project: that was to add 450 new parking spaces; plan for the redevelopment of the North it would replace the parking This study was a small part toexisting the master Campus of UMASS Lowell. This proposal green space. This willNorth allow for plan for with the redevelopment of the included a two- bay structured parking potential expansion of the existing Campusthe of UMASS Lowell. This proposal Project: that was to add 450 new parking spaces; includedathletic a two- fields. bay structured parking it would replace the parking This study was a small part toexisting the master that was to add 450 new parking spaces; with green space. This will allow for plan for the redevelopment of the North Role: the existing parking it wouldMy replace the potential expansion of the existing Campus of UMASS Lowell. This proposal I have usedThis Revit with green space. willArchitecture allow for as a BIM athletic includeddesign a two- fields. bay structured parking modeling tool toof create different the potential expansion the existing that was to add 450 new parking spaces; options with materials to reflect the athletic fields. My Role: it would replace the existing parking existing buildings on campus. I have used Revit with green space. This willArchitecture allow for as a BIM My Role: modeling tool to create different design the potential expansion of the existing I have used Revit Architecture as a BIM options with materials to reflect the athletic fields. modeling tool to create different design existing buildings on campus. options with materials to reflect the My Role: existing buildings on campus. I have used Revit Architecture as a BIM modeling tool to create different design options with materials to reflect the existing buildings on campus.
it would replace the existingCampus parking of UMASS Lowell. This proposal with green space. This will allow for a two- bay structured parking included the potential expansion of the existing that was to add 450 new parking spaces; athletic fields. it would replace the existing parking
Structured Parking
My Role: I have used Revit Architecture as a BIM modeling tool to create different design options with materials to reflect the existing buildings on campus.
Project: This study was a small part to the master plan for the redevelopment of the North Campus of UMASS Lowell. This proposal included a two- bay structured parking that was to add 450 new parking spaces; it would replace the existing parking with green space. This will allow for the potential expansion of the existing athletic fields.
Design Tools: Construction Documents -Revit Architecture Presentation - 3Ds Studio Max 2010/ Photoshop cs3 Diagrams - Illustrator cs3
165
De Co Pr Di
1 MIN UTE W ALK
UML NOR T H C AM P US G A R AG E
SP AR
RIVE
123’ x 313’
Area/Level:
38,499 ft 2
Total Area:
192,000 ft 2
AVE
630 T
Footprint:
ST
Parking Spaces:
RSI
KS
ST DE
ALK UTE W
UN
IVE
RSI
TY
8 MIN
W VF
HIGHWAY
K M A C I R M E R LEGEND
S IT E S TAT IS T ICS
STUDY A R E A AC A DEMIC B UILD IN G SUPPOR T B U ILD IN G ATHLE TIC S DORMITO RY C AMPUS ACC E S S P O IN TS SER VIC E E N T RY BUILDIN G E N T RY
bertaux +iwerks architects 105 Beach Street
TOTAL AREA: PARK I NG AREA: F IEL D AREA: L AND S C APE AREA: # O F PARK ING S PACE S :
584,500 330,000 176,420 78,080
ft 2 ft 2 ft 2 ft 2 956
UMASS LOWELL | NORTH CAMPUS PLANNING STUDY t (617) 423-6500
R I V E R
Lowell, Massachusetts
100% 57% 30% 13%
E X I S T I N G CON D I T I ON S
0’
125’
250’
500’
date: scale:
8/14/08 reduced
sheet number
Scheme A
Total Site Area
Parking Footprint
Fields Area
Landscape Areas
956
Footprint per Car
Existing Campus
Total Spaces
Spaces per Level
Net Gain Spaces
No. Structured Spaces
Surface Spaces Lost
Garage SF
Footprint SF
Site Area Distribution
Foot Print
No. Levels
Parking
345
584,500
330,000 56%
176,420 30%
78,080 13%
4
280
x
185
51,800
207,200
192
648
456
162
1,412
234
584,500
330,000 56%
176,420 30%
78,080 13%
Scheme B
4
280
x
185
51,800
207,200
192
648
456
162
1,412
234
584,500
330,000 56%
176,420 30%
78,080 13%
Scheme C
5
298
x
124
36,952
184,760
140
595
455
119
1,411
234
584,500
330,000 56%
176,420 30%
78,080 13%
Scheme D
3
518
x
124
64,232
192,696
48
500
452
167
1,408
280
584,500
394,232 67%
112,188 19%
78,080 13%
Scheme E
3
272
x
185
50,320
150,960
24
468
444
156
1,400
272
584,500
380,320 65%
126,100 22%
78,080 13%
Scheme F
3
365
x
124
45,260
135,780
-
456
456
152
1,412
266
584,500
375,260 64%
131,160 22%
78,080 13%
Scheme G
1
900
x
480
226,830
226,830
287
740
453
740
1,409
198
584,500
279,590 48%
226,830 39%
78,080 13%
SP AR
RIVE
RSI
KS
ST
DE
UN
IVE
RSI
TY
AVE
ST
VF
W
HIGHWAY
SP AR
RIVE
RSI
KS
ST
DE
UN
IVE
RSI
TY
AVE
ST
VF
W
HIGHWAY
SP AR
RIVE
RSI
KS
ST
DE
UN
IVE
RSI
TY
AVE
ST
VF
W
HIGHWAY
SP AR
RIVE
RSI
KS
ST
DE
UN
IVE
RSI
TY
AVE
ST
VF
W
HIGHWAY
SP AR
RIVE
KS
ST
D RSI
E
UN
IVE
RSI
TY
AVE
ST
VF
W
HIGHWAY
SP AR
R
KS
ST
SI IVER
DE
UN
IVE
RSI
TY
AVE
ST
VF
W
HIGHWAY
SP
DE
KS
RSI
AR
ST
RIVE
ST
UN
IVE
RSI
TY
AVE
. VF
W
HIGHWAY
bertaux +iwerks architects 105 Beach Street Boston, MA 02111
UMASS LOWELL | NORTH CAMPUS PLANNING STUDY t (617) 423-6500 f (617) 423-6502 w bi-arch.com
.
Lowell, Massachusetts
SCHE ME CO MPAR ISO N S
date: scale: by:
8/14/08 reduced DH
sheet number
3
RIVE
RSI
KS
DE
AR
KS
RSI
ST
AR
RIVE
4 LE VEL GA R AGE
SP
SP
ST
DE
ST
IVE
IVE
RSI
RSI
TY
TY
AVE
AVE
ST
UN
UN
3 L E VE L G AR AG E
VF
W
HIGHWAY
VF
0’
125’
250’
0’
125’
250’
500’
Phase 1
AVE TY
AVE
IVE UN
UN
UN
IVE
IVE
RSI
RSI
RSI
TY
AVE TY
AVE TY RSI IVE UN
UMASS LOWELL | NORTH CAMPUS PLANNING STUDY
S C H EM E F - S I T E P L A N
Lowell, Massachusetts
Parking Spaces: Footprint:
Lost 0 | Gained 456 | Net 456 | Cars/Level 152 365’ x 124’ | 45,260 ft 2 | 135,780 ft 2
S C H EM E F - A ER I A L V I E W
W
HIGHWAY
Phase 2
date: scale: by:
date: scale: by:
8/8/08 reduced DH
8/8/08 reduced DH
sheet number
F-1
sheet number
F-2
bertaux +iwerks architects 105 Beach Street Boston, MA 02111
t (617) 423-6500 f (617) 423-6502 w bi-arch.com
bertaux +iwerks architects 105 Beach Street Boston, MA 02111
VF
W
HIGHWAY
0’
Phase 3
UMASS LOWELL | NORTH CAMPUS PLANNING STUDY
S CH E M E A - S IT E PL AN
Lowell, Massachusetts
Parking Spaces: Footprint:
UMASS LOWELL | NORTH CAMPUS PLANNING STUDY t (617) 423-6500 f (617) 423-6502 w bi-arch.com
DE
E X PAN D E D PL AYI N G FI E L D S
ST
VF
500’
RSI
KS
HIGHWAY
0’
AR
ST RIVE ST
W
AC A DEMIC BUILDINGS
SP
DE
KS
VF
Phase 3
Lowell, Massachusetts
RSI
AR
HIGHWAY
UMASS LOWELL | NORTH CAMPUS PLANNING STUDY t (617) 423-6500 f (617) 423-6502 w bi-arch.com
SP
bertaux +iwerks architects
ST RIVE ST
ST
W
Phase 2
t (617) 423-6500 f (617) 423-6502 w bi-arch.com
DE
E X PA N D E D P L AYI N G F I E L D S
5 L E V E L G A R AG E VF
bertaux +iwerks architects
RSI
KS
RIVE
6 L E VE L G AR AG E
AR
ST
KS
DE
AR
RSI
AC A D E M I C B U I L D I N G S
SP
SP
ST RIVE
105 Beach Street Boston, MA 02111
HIGHWAY
500’
Phase 1
105 Beach Street Boston, MA 02111
W
Lowell, Massachusetts
Lost 192 | Gained 648 | Net 456 | Cars/Level 156 280’ x185’ | 51,800 ft 2 | 207,200 ft 2
S CH E M E A - AE R IAL VIE W
500’
date: scale: by:
date: scale: by:
8/8/08 reduced DH
8/8/08 reduced DH
sheet number
A-1
sheet number
A-2
SP AR
DE
SP
RSI
KS
ST
RIVE
AR
ST RSI
KS
ST
RIVE
DE
AVE
TY
AVE
ST
IVE
RSI
3 L E VE L G AR AG E
HIGHWAY
IVE
W
UN
VF
RSI
UN
TY
3 LE VEL GA R AGE
VF 0’
125’
250’
W
HIGHWAY
500’
Phase 1 0’
SP
RIVE
AVE TY
AVE
RSI IVE
TY
105 Beach Street Boston, MA 02111
t (617) 423-6500 f (617) 423-6502 w bi-arch.com
UMASS LOWELL | NORTH CAMPUS PLANNING STUDY
S C H EM E E - S I T E P L A N
Lowell, Massachusetts
Parking Spaces: Footprint:
Lost 24 | Gained 468 | Net 444 | Cars/Level 156 272’ x185’ | 50,320 ft 2 | 150,960 ft 2
date: scale: by:
8/8/08 reduced DH
sheet number
bertaux +iwerks architects 105 Beach Street Boston, MA 02111
bertaux +iwerks architects 105 Beach Street Boston, MA 02111
UMASS LOWELL | NORTH CAMPUS PLANNING STUDY t (617) 423-6500 f (617) 423-6502 w bi-arch.com
Lowell, Massachusetts
S C H EM E E - A ER I A L V I E W
date: scale: by:
8/8/08 reduced DH
sheet number
E-2
W
t (617) 423-6500 f (617) 423-6502 w bi-arch.com
bertaux +iwerks architects 105 Beach Street Boston, MA 02111
VF
W
UMASS LOWELL | NORTH CAMPUS PLANNING STUDY
S CH E M E D - S IT E PL AN
Lowell, Massachusetts
Parking Spaces: Footprint:
Lowell, Massachusetts
HIGHWAY
0’
Phase 3
UMASS LOWELL | NORTH CAMPUS PLANNING STUDY t (617) 423-6500 f (617) 423-6502 w bi-arch.com
RSI
HIGHWAY
Phase 2
E-1
IVE UN
VF
bertaux +iwerks architects
DE
TY
AVE RSI
TY
5 L E VE L G AR AG E
IVE
500’
UN
0’
Phase 3
RSI
AVE
UN
ST RIVE
E X PAN D E D PL AYI N G FI E L D S
ST
UN
DE
HIGHWAY
KS
W VF
AR
RSI
ST
Phase 2
AC A DEMIC BUILDINGS
SP
ST RIVE
KS
W
HIGHWAY
AR
RSI
DE
SP
VF
500’
ST
ST
E X PA N D E D P L AYI N G F I E L D S 5 L E V E L G A R AG E
IVE
RSI
250’
KS
ST
KS
DE
AR
RSI
125’
Phase 1
AR
SP
ST RIVE
AC A D E M I C B U I L D I N G S
500’
date: scale: by:
Lost 48 | Gained 500 | Net 452 | Cars/Level167 518’ x 124’ | 64,232 ft 2 | 192,696 ft 2
S CH E M E D - AE R IAL VIE W
date: scale: by:
8/8/08 reduced DH
sheet number
8/18/08 reduced DH
D-1
sheet number
D-2
DEMOLITION
WINCHESTER HOSPITAL RAPID RESPONSE LAB Project: This laboratory serves the rapid response unit with Hisology, Hematology, Pathology and the Blood Bank and the Mourge funktions. The project was designed and constructed in phases in order to stay fully funktional during construction.
NE WC ON STR UC TIO N
WINC
41 HIGHL
TEMPORARY PARTITION TEMPORARY DOOR
TEMPORARY PARTITION
LABO
TEMPORARY PARTITION TEMPORARY BLOOD BANK
TEMPORARY PARTITION TEMPORARY DOOR
TEMPORARY DOOR UP
MORGUE
UP
TEMPORARY DOOR
B081
HEMATOLOGY
TEMPORARY PARTITION
TEMPORARY HISTOLOGY
My Role: DD Developed phasing plans seperating departments in the order of operations. I havemodeled the equipment and accomidating spaces to codes.
PLANNING
NE WC ON STR UC TIO N
DE MO LIT ION
CHEMISTRY
ARCHITECTURE ENGINEERING
INTERIOR DESIGN CONSTRUCTION
1A
CD Developed permit sets and construction documents.
1. 2.
CA I was involved in Design Meeting with hospital representatives, equipments consultants, and contrucrtors, creating forcast and field reports, handled submittals and RFIs.
PHASE 1A PARTIAL MORGUE PLAN 3/32" = 1'-0"
1
PHASE 1 DEMOLITION / NEW CONSTRUCTION 3/32" = 1'-0"
1. 2. 3.
PROVIDE SUPPLEMENTAL TEMPORARY COOLING RELOCATE HISTOLOGY EQUIPMENT TO MORGUE.
4.
2
PHASE 2 DEMOLITION / NEW CONSTRUCTION 3/32" = 1'-0"
1. 2. 3. 4.
CONSTRUCT TEMPORARY PARTITIONS AND DOORS. RELOCATE BLOOD BANK TO AREA SHOWN . OFFICES, STAFF LOUNGE AND TOILET ROOMS TEMPORARILY RELOCATED TO OTHER GROUND FLOOR LOCATION. PROCEED WITH DEMOLITION AS INDICATED.
CONSU
EXTEND TEMPORARY PARTITION AND RELOCATE TEMPORARY DOOR. RELOCATE CHEMISTRY/HEMATOLOGY TO RENOVATED AREA. TEMPORARILY RELOCATE HISTOLOGY TO ...... PROCEED WITH DEMOLITION AS INDICATED.
NEW CONSTRUCTION
REVISIO HISTOLOGY
HISTOLOGY
TEMPORARY DOOR CYTO PREP.
PATHOLOGY
NEW CO NST RU CTIO N
DEM OLIT ION CYTO PREP.
PATHOLOGY
CYTO PREP.
TEMPORARY PARTITION
PATHOLOGY
NO:
D
A B C
09 10 12
STAFF LOUNGE
TEMPORARY DOOR TEMPORARY PARTITION UP
BLOOD BANK
UP
TEMPORARY PARTITION
PROCESSING HEMATOLOGY
UP
BLOOD BANK
HEMATOLOGY
HEMATOLOGY
KEY PL DEMOLITION
3
1. 2. 3. 4.
CHEMISTRY
CHEMISTRY
CHEMISTRY
NEW CONSTRUCTION
PHASE 3 DEMOLITION / NEW CONSTRUCTION 3/32" = 1'-0"
4
REMOVE PORTIONS OF TEMPORARY WALLS AND RELOCATE. CONSTRUCT ADDITIONAL TEMPORARY PARTITIONS AND DOOR AS SHOWN. RELOCATE PATHOLOGY TO RENOVATED AREA. RELOCATE HISTOLOGY TO RENOVATED AREA. PROCEED WITH DEMOLITION AS INDICATED, COORDINATE ITEMS TO BE DEMOLISHED OUTSIDE OF TEMPORARY PARTITIONS WITH OWNER TO ENSURE ADEQUATE ACCESS TO WORK AREAS.
1. 2. 3.
PHASE 4 DEMOLITION / NEW CONSTRUCTION 3/32" = 1'-0"
5
COORDINATE CONSTRUCTION OF NEW ENTRANCE DOOR WITH OWNER TO ENSURE ADEQUATE ACCESS TO WORK AREAS. RELOCATE BLOOD BANK TO RENOVATED AREA. PROCEED WITH DEMOLITION AS INDICATED.
PHASE 5 NEW CONSTRUCTION 3/32" = 1'-0"
1. 2.
REMOVE TEMPORARY PARTITIONS/DOORS RELOCATE STAFF LOUNGE TO RENOVATED SPACE.
DRAWI
PHAS DRAWN BY:
MK CHECKED BY:
RB
GENERAL PHASING NOTES:
SCALE:
1. COORDINATE ALL CONSTRUCTION PHASING WITH STAFF TO ALLOW ADEQUATE ACCESS TO WORK AREAS.
3. THIS PLAN INDICATES THE LIMIT OF ARCHITECTURAL DEMOLITION. REFER TO THE MECHANICAL, ELECTRICAL AND PLUMBING DEMOLITION DRAWINGS FOR THEIR SCOPE OF DEMOLITION WORK.
5. CONTRACTOR WILL BE RESPONSIBLE FOR ANY DAMAGE CAUSED BY CONSTRUCTION INSIDE OR OUTSIDE OF THE BUILDING. CONTRACTOR SHALL REPAIR ANY DAMAGE WITH LIKE MATERIALS.
7. FIRE ALARM DEVICES ARE TO REMAIN OPERATIONAL DURING AND FOLLOWING DEMOLITION.
9. ALL NEW OPENING IN SLABS, WALLS, CEILING AND STRUCTURE ARE TO BE SAW-CUT. WHEN CUTTING NEW OPENING, PROVIDE TEMPORARY SHORING, BRACING, AS NECESSARY TO MAINTAIN STRUCTURAL INTEGRITY
2. DEMOLITION PLANS SHOW APPROXIMATE LAYOUTS OF EXISTING BUILDINGS AND ARE NOT INTENDED TO REPRESENT "AS BUILT" CONDITIONS. CONTRACTORS SHALL NOTIFY THE ARCHITECT AND OWNER'S REPRESENTATIVES OF ANY SIGNIFICANT DEVIATIONS FROM THE WORK SCOPE DESCRIBED, PRIOR TO COMMENCING WORK.
4. ALL EXISTING MECHANICAL & ELECTRICAL WORK IN EXISTING PARTITIONS, EXTERIOR WALLS, FLOOR & CEILINGS THAT INTERFERE WITH WORK SHALL BE RELOCATED, ADJUSTED, OR REPLACED TO SUIT NEW CONDITIONS. COORDINATE WITH APPLICABLE ENGINEERING DRAWINGS.
6. ALL REMOVED ITEMS SUCH AS, BUT NOT LIMITED TO, CABINETS, ACCESSORIES, FIXTURES AND DOORS SHALL REMAIN THE PROPERTY OF THE OWNER UNLESS OTHERWISE INSTRUCTED. CONTRACTOR TO COORDINATE WITH OWNER FOR ITEMS TO BE REINSTALLED.
8. WHERE FINISHES ARE TO BE REMOVED, REMOVE IN A MANNER SO AS NOT TO DESTROY THEIR SUBSTRATE, AS THIS WILL BE USED AS THE SUBSTRATE FOR THE NEW WORK (U.N.O.). SELF-LEVELING FLOOR UNDERLAYMENT MAY BE NEEDED AND ALL DAMAGED SUBSTRATE MUST BE REPAIRED FOR NEW FINISH AS PART OF DEMOLITION WORK.
10. PARTITIONS SHOWN TO BE REMOVED ARE TO BE REMOVED IN THEIR ENTIRETY FROM FLOOR TO STRUCTURE ABOVE. REMOVE OR RELOCATE ALL EQUIPMENT, FIXTURES FURNISHINGS, AND ACCESSORIES ON THE PARTITIONS OR WALL. EDGES OF WALLS TO REMAIN SHALL BE SAW-CUT OR CLEANLY TOOTHED TO ACCEPT NEW CONSTRUCTION. REPAIR AND PATCH EXISTING WALLS AND PARTITIONS TO REMAIN WHERE INTERSECTING PARTITIONS, WINDOWS, DOOR, FRAMES, ETC. ARE TO BE REMOVED AND WHERE EXISTING CONSTRUCTION WILL NOT BE CONCEALED WITH NEW CONSTRUCTION.
As ind PROJECT NO.:
11344
DRAWIN
A-
PROJECT LOCAT
\\dai-cad01\dra Response.rvt
DATE & TIME P
30X48
9C
0" 6' 4" 4' -
- 9" 10'
0"
5 7' -
17' - 7" +/-
- 0" 10'
30X132
6' -
5' - 0"
11"
6
90
3 0x 90
A-600
9
9 2' -
11
1/2 "
+/5' -
/2"
1 5' -
9 3"
2" + /-
124 C
9
FEC 3' 5"
9
ALIG N 6' 2" + /-
3' -
21
1 30x
124 C
1 /2"
REVISION:
CLEAN LAB COATS
STORAGE/ ALCOVE
72
9
11 1/2 "
4' -
123 6' 0
1
A-600 3' 0" CLE AR
DESCRIPTION:
09/17/12 10/23/12 12/21/12 01/21/13 01/28/13
DPH SUBMISSION BID/CONSTRUCTION SET ISSUE FOR PERMIT REVISION 1 MISC. REVISIONS
STAFF TOILET
11"
CHEMISTRY 48x 1 44
DATE:
A B C 1 2
124A
1
1
NO:
123
9
6"
9
121
HOUSEKEEPING
124 A
4 8x 1 44
3' -
1
1
124B
2' -
115
125
5
5
E.ELEC.
A-600
REF
124 D
51
124
5' -
5
5
ALIG N
0"
SIM 30x
6"
6"
UP
1/2
"
/2"
15
LAB COATS
CORRIDOR
A-600
A-701
61
0"
10 1
15
9 6' -
1
7' -
126 4' -
1
5' -
9' -
6' -
1
CONSULTANT:
125
124 B
42x108
9A
9
14
A-600
A-600
1
STAFF TOILET
HAN WIT D WAS H EY H SIN EWA K SH 1
- 11 "
11
STAFF LOUNGE / LAB COATS LOCKERS 1
11 1/2 "
120
CLEAR
36x 60
6" +
HEMATOLOGY
/-
9A
A-600 1C
11"
6"
130
1' - 6 1/2" 4' - 0"
CLEAR
9
484 MAINE AVE., SUITE FARMINGDALE, ME 0434 TEL. 207.582.2400 FAX. 207.582.8320
7' -
11' - 3"
1
126
9A
MAINE
10'
1
9
1
FEC
CONSTRUCTION
RE F.
15
13
127 2
INTERIOR DESIGN
RE F.
2' -
1' - 10 1/2"
- 8"
1
LAB COATS
65 1 2x12 LOC KER S /2"
11
ENGINEERING
12
CYTO TECH.
A-601
A-600
30x 66
118 A
SECRETARY #3 13' - 8 1/2" +/-
118
8' -
1
0"
SWING
10
30x 66
115
132
1 3
3' - 0"
BLOOD BANK SUPERVISOR
132
10'
1C
1B
30X102
CORRIDOR
BLOOD BANK
1
118A
116
CLEAR
A-600
1
117
1
PATH #3
1
5' - 9"
BOSTON
225 FRIEND STREET BOSTON, MA 02114 TEL. 617.723.7100 FAX. 617.723.9113
ARCHITECTURE
9 5' - 0"
117 3
PROCESSING
119
PLANNING
/2"
1
1
1
4
A-600
TRANSACTION WINDOW WITH CORNELL COUNTER FIRE DOOR MODEL: ERC 10.
CLEAR
51
1
SECRETARY # 1
1
30x138
5' - 9" +/-
4' - 6"
SECRETARY #2 1
ELEC. CLOSET
8' -
9
1
4' - 5"
6"
4' -
WATER TREATMENT
2
1
30X72
9A
8' - 0" CLEAR
PATHOLOGY
11' - 2" +/-
FEC
2
1
A-600
HANDWASH SINK WITH EYE WASH
9A 3
1C
128
7' -
SYM.
11 1/2 "
138
1' - 5 1/2"
3' - 5 1/2"
133 14
6' -
CORRIDOR
1
2
1
11' - 3"
1
131
127
ALIGN 5' - 0"
3' - 4 1/2"
131
30X66
CART
DIGIORGIO ASSOCIAT INC.
STAFF TOILET
6' 0" CLE AR
ALIGN 5' - 10 1/2"
1' - 10"
7' - 8 1/2"
3' - 3 1/2"
30X78
1
119
4' - 2"
134
1B
PATH #2
3 A-601
CYTO PREP.
5' - 2 1/2"
11' - 10"
A-600
3
FIRE- LITE GLAZING
18' - 2"
7
A-601
6"
1
1
134
ALIGN 2
3' - 4 1/2"
3
6 5
HANDWASH SINK WITH EYE WASH
1
9' -
130
30X126
1
116 9' - 7 1/2"
9
8
A-601
15
14
A-601
1
3
FIRE SHUTTER ABOVE SLIDING TRANSACTION WINDOW
ALIGN 12
PATH #1
1
1
12' - 10"
A-601 9
129
1A 10' - 9"
8' - 6"
1
9
2' - 6 1/2"
3' - 8 1/2"
30X42
1
A-601
LABORATORY PROJEC
6"
9' -
4 9C
30X60
13
DIRECTOR OF PATHOLOGY
2
36x102
30X42
136
136
7' - 7 1/2"
FLAMMABLE LAB STORAGE
A-701
2
9C
135 2' - 10"
12
/2"
9' -
UC REF
HISTOLOGY
81
133
11
A-601
41 HIGHLAND AVENUE WINCHESTER, M 8' -
9
2' - 11 1/2"
9
9
4' 0" CLE AR
10
WINCHESTER HOSPIT
129
30X78
7' - 7 1/2" 1A
30X60
9B
8
9
1C
1
122
SWING OFFICE KEY PLAN:
1/2 "
122
-1
A-600 8' -
7 0"
9B
9B
AREA OF WORK
GENERAL NOTE: UNLESS NOTED OTHERWISE, ALL NEW PARTITIONS THAT CONNECT TO ADJACENT EXISTING PARTITIONS IN THE SAME PLANE ARE TO HAVE FINISHED FACES ALIGN.
DRAWING TITLE:
PROPOSED FLOOR PLA DRAWN BY:
MK
NEW CONSTRUCTION LEGEND
SEAL:
CHECKED BY:
RB NEW PARTITION TAG
1
XXX
PROPOSED FLOOR PLAN 1/4" = 1'-0"
12'
1
1
NEW DOOR WITH REFERENCE NUMBER NEW PARTITION TYPE
SCALE:
1/4" = 1'-0" PROJECT NO.:
113448.02
DRAWING NO.: EQUIPMENT LAB FURNITURE
A-206
FURNITURE SYSTEMS PROJECT LOCATION:
\\dai-cad01\drawings\113448.02_WH Rapid Response Lab\Revit (2012)\Current\WH Response.rvt DATE & TIME PRINTED: 1/29/2013 12:40:23 PM
2' x 2' ACT 8' - 0" A.F.F.
WINCHEST
3 A-300
41 HIGHLAND AVEN
2' x 2' ACT 8' - 0" A.F.F.
2' x 2' ACT 8' - 0" A.F.F.
LABORATO
2' x 2' ACT 8' - 0" A.F.F.
2' x 2' ACT 8' - 0" A.F.F. 2' x 2' ACT 8' - 0" A.F.F.
2' x 2' ACT 8' - 0" A.F.F.
3
7' - 10"
D A IN
A-300 2' x 2' ACT 8' - 0" A.F.F. 2' x 2' ACT 8' - 0" A.F.F.
2' x 2' ACT 8' - 0" A.F.F.
2' x 2' ACT 8' - 0" A.F.F.
7' - 10"
PLANNING
22 BO TEL FA
ARCHITECTURE ENGINEERING
2 7' - 10"
A-300
INTERIOR DESIGN CONSTRUCTION
2' x 2' ACT 8' - 0" A.F.F.
ETR
48 FA TE FA
2' x 2' ACT 8' - 0" A.F.F. 2' x 2' ACT 8' - 0" A.F.F.
7' - 10"
2' x 2' ACT 8' - 0" A.F.F.
3 2' x 2' ACT 8' - 0" A.F.F.
CONSULTANT:
A-300
2' x 2' ACT 8' - 0" A.F.F.
2' x 2' ACT 8' - 0" A.F.F.
2' x 2' ACT 8' - 0" A.F.F.
REVISION: 2' x 2' ACT 8' - 0" A.F.F.
NO:
First Floor 1 1/4" = 1'-0"
2' x 2' ACT 8' - 0" A.F.F.
DATE:
A B C
DE
09/17/12 10/23/12 12/21/12
DP BID ISS
2' x 2' ACT 8' - 0" A.F.F.
2x2 NEW RECESSED LIGHT FIXTURE 2x4 NEW RECESSED LIGHT FIXTURE FLUORESCENT CHANNEL STRIP LIGHT SUSPENDED, CHAINHUNG FLUORESCENT CHANNEL STRIP LIGHT SUSPENDED,
3. REFER TO ENGINEERING DRAWINGS FOR ELECTRICAL, PLUMBING, FIRE PROTECTION AND HVAC SYSTEM LAYOUTS AND QUANTITIES OF ITEMS. THE REFLECTED CEILING PLAN GOVERNS IN REGARD TO THE LOCATION OF SUCH ITEMS.
LINE OF DECK ABOVE LINE OF DECK ABOVE
4. ENGINEERING ITEMS REQUIRED BUY NOT SHOWN ON THE REFLECTED CEILING PLAN SHALL BE LOCATED AS DESCRIBED HEREIN OR AS DIRECTED BY THE ARCHITECT.
RECESSED DOWN LIGHT
5. IT IS THE INTENT THAT ENGINEERING SYSTEM ITEMS TYPICALLY BE PLACED CENTER OF TILE, IN LINE AND / OR SYMMETRICAL AS APPLICABLE UNLESS SHOWN OTHERWISE.
2x2 EXISTING RECESSED LIGHT FIXTURE
6. REFER TO SPECIFICATIONS AND INTERIOR FINISH SCHEDULE FOR REFLECTED CEILING TYPES AND MANUFACTURERS.
2x4 EXISTING RECESSED LIGHT FIXTURE
KEY PLAN:
METAL STUDS @ 16 O.C. TO UNDERSIDE OF DECK
DIAGONAL BRACING @ 32" O.C.
DIAGONAL BRACING @ 32" O.C.
METAL STUDS @ 16" O.C. TO UNDERSIDE OF DECK
7. PROVIDE UNINSTRUCTED FOR ANY CEILING MOUNTED EQUIPMENT.
VARIES
1'X1' AND 2'X2' SQUARE RETURN REGISTER
VARIES SEE PLAN
1'X1' AND 2'X2' SQUARE SUPPLY REGISTER CEILING MOUNTED MONITOR
AREA OF WORK
SUSPENDED CEILING SYSTEM
5/8" GYPSUM WALL BOARD TYPICAL
6"
CEILING TYPE / HEIGHT TAG
2. COORDINATE WITH ENGINEERING DRAWINGS. NOT ALL REQUIRED ACCESS PANELS, AIR DEVICES, LIGHT FIXTURES, FIRE SPRINKLERS, ETC. MAY BE SHOWN. FINAL QUANTITIES AND PLACEMENT APPROVED IN CONSTRUCTION SUBMITTALS / SHOP DRAWINGS.
SUSPENDED CEILING SYSTEM
VARIES
2x4 ACOUSTICAL CEILING TILE CLG TYPE HEIGHT
1. ALL THE NEW CEILING SCOPE OF WORK SHALL BE COORDINATED AND INSTALLED BASED ON CONSTRUCTION PHASING.
5/8" GYPSUM WALL BOARD TYPICAL
VARIES SEE RCP
2x2 ACOUSTICAL CEILING TILE
GENERAL NOTES
6"
REFLECTED CEILING PLAN LEGEND
5"
GYPSUM WALL BOARD CEILING X'-X"
CORNER BEAD TYPICAL VARIES REFER TO RCP
3 5/8" METAL STUDS @ 16" O.C.
DRAWING TITLE:
REFLECTED DRAWN BY:
Author CHECKED BY:
SOFFIT / HEIGHT TAG
2
SOFFIT DETAIL 1 1 1/2" = 1'-0"
3
SOFFIT DETAIL 2 1 1/2" = 1'-0"
Checker SCALE:
As indicated PROJECT NO.:
113448.02
DRAWING NO.:
A-300 PROJECT LOCATION:
11
10
1
8'-0"
4" VINYL BASE (WB-1)
16
3
ADULT MEDICINE - PATIENT TOILET (252 & (274) - A 3/8" = 1'-0"
7"
1'-0"
1'-0"
30"
30"
1'-0" 2'-0" 1'-9"
8'-0"
3"
A-701
Sim
(PT-13)
1
N
Sim (PT-13)
A-702
P. LAM COUNTER TOP WITH INTEGRAL BACKSPLASH AND WRAPPED EDGES (PL-6) NOTE: USE (PL-7) IN RM # 286 (COUNTERTOPS ONLY)
(PT-13) 4" VINYL BASE (WB-1) METAL ANGLE 4'-0" O.C. MAX
8
24"
P. LAM COUNTER TOP WITH INTEGRAL BACKSPLASH AND WRAPPED EDGES (PL-5)
30"
A-701
1
Sim
30"
A-701
ADULT MEDICINE - SOILED HOLDING (253) - B 3/8" = 1'-0"
BASE CABINETS WITH LOCKING DRAWS AND DOORS (PL-6)
LOCKING WALL CABINETS W/ UNDER CABINET LIGHTING (PL-5)
30"
P. LAM COUNTER TOP WITH INTEGRAL BACKSPLASH AND WRAPPED EDGES (PL-6)
A-701
4" VINYL BASE (WB-1)
23
2
Sim
A-701
ADULT MEDICINE - MEDS (255) - A 3/8" = 1'-0"
A-702
42"
42"
DRAWING TITLE:
INTERIOR ELEVATIONS
(PT-16)
CLOSED DOOR FULL HEIGHT STORAGE CABINETS (PL-5)
DRAWN BY:
MK
SEAL:
CHECKED BY:
MK SCALE:
3/8" = 1'-0" 4' VINYL BASE (WB-1)
UNDER COUNTER FREEZER
Sim
Sim
8
A-702
P. LAM SOFFIT
STAINLESS STEEL DROP IN SINK (REFER TO PLUMBING DRAWINGS)
1
Sim
8
Sim
FRIDGE
SLOPED FRONT SINK BASE (PL-6)
Sim
KEY PLAN:
OPEN WALL CABINETS W/ UNDER CABINET LIGHTING (PL-5)
A-701
STAINLESS STEEL DROP IN SINK (REFER TO PLUMBING DRAWINGS)
2
22
4" VINYL BASE WB-1
Sim
GWB SOFFIT (PT-22)
SOAP AND PAPER TOWEL DISPENSER
2'-0"
BASE CABINETS WITH LOCKING DRAWS AND DOORS (PL-6)
A-701
2
ADULT MEDICINE - GROUP ROOM (250) - C 17 3/8" = 1'-0"
LOCKING WALL CABINETS W/ UNDER CABINET LIGHTS (PL-6)
3" 8'-0"
P. LAM COUNTER TOP WITH INTEGRAL BACKSPLASH AND WRAPPED EDGES (PL-5)
ADULT MEDICINE - PATIENT TOILET (252) & (274) - B ADULT MEDICINE - PATIENT TOILET (252) & (274)- C ADULT MEDICINE - SOILED HOLDING (253) - A 20 21 3/8" = 1'-0" 3/8" = 1'-0" 3/8" = 1'-0"
30"
1'-9"
STAINLESS STEEL DROP IN SINK (REFER TO PLUMBING DRAWINGS)
4" VINYL BASE (WB-1)
19
P. LAM COUNTER TOPS WITH INTEGRAL BACKSPLASH AND WRAPPED EDGES (PL-6) NOTE: USE (PL-7) IN RM # 286 (COUNTERTOPS ONLY)
GWB SOFFIT (PT-22)
2'-8"
2'-0" 8'-0"
1'-5" 3" 4" 3'-11 1/2"
4" VINYL BASE (WB-1)
3'-0"
3'-0"
SOAP DISPENSER
4" 4"
MIRROR
3'-4"
4" VINYL BASE (WB-1)
2'-6"
TOILET PAPER DISPENSER
8'-0"
3'-6"
1'-11 1/2"
4" VINYL BASE (WB-1)
A-701
18
1'-0"
3'-0"
1 - 1/2" GRAB BAR
4"
Sim
GRAB BAR
3'-0"
2'-8"
8'-0"
6"
4"
3'-5"
3'-6"
3'-6"
(PT-13) (PT-13)
8'-0"
PASS THROUGH BOX
LOCKING WALL CABINETS W/ UNDER CABINET LIGHTS (PL-6)
(PT-13)
SOAP DISPENSER
Sim
A-701
4"
MIRROR
4'-0"
(PT-13)
Sim
ADULT MEDICINE - GROUP ROOM (250) - B 3/8" = 1'-0" 8
GWB SOFFIT (PT-22)
5'-0"
EQ
1 A-702
4" VINYL BASE (WB-1)
PASS THROUGH BOX
PAPER TOWEL DISPENSER
Sim
4
METAL ANGLE 4'-0" O.C. MAX
ADULT MEDICINE - GROUP ROOM (250)- A 15 3/8" = 1'-0"
DESCRIPTION: DPH SUBMISSION / DD PRICING DPH PLAN REVIEW PART II SUBMISSION PROGRESS BID/PERMIT SET
ADULT MEDICINE - EXAM #5 (247) - A 3/8" = 1'-0"
10
2'-0"
(PT-13)
02/14/13 05/03/13 06/05/13 08/14/13
A-701
(PT-13)
7'-7"
EQ
12
OPEN WALL CABINETS W/ UNDER CABINET LIGHTING (PL-5)
(PT-13)
Sim 18"
A-701
Sim
END PANEL (P.LAM AT ALL EXPOSED SIDES)
ADULT MEDICINE - EXAM #7 (249) - B 14 NOTE: USE (PL-7) AT ROOMS (283) & (285) 3/8" = 1'-0"
1
A-701
3"
Sim
A-702
A-701
ADULT MEDICINE - EXAM #7 (249) - A 13 NOTE: USE (PL-7) AT ROOMS (283) & (285) 3/8" = 1'-0"
30"
2'-2"
2'-2"
BASE CABINETS WITH LOCKING DRAWS AND DOORS ( PL-5) 4" VINYL BASE (WB-1)
P. LAM COUNTER TOP WITH INTEGRAL BACKSPLASH AND WRAPPED EDGES (PL-6) NOTE: USE (PL-7) IN RM # 286 (COUNTERTOPS ONLY)
DATE:
A B C D
BASE CABINETS WITH LOCKING DRAWS AND DOORS (PL- 5)
4" VINYL BASE (WB-1)
Sim
GWB SOFFIT (PT-22)
2'-3"
1'-0" 2'-0" 3" 8'-0"
3" 8'-0"
1'-9"
1'-9" 2'-8"
4
4" VINYL BASE (WB-1 )
A-701
SLOPED FRONT SINK BASE (PL-5)
18" Sim
OPEN WALL CABINETS W/ UNDER CABINET LIGHTING (PL-5)
6
P. LAM COUNTER TOP WITH INTEGRAL BACKSPLASH AND WRAPPED EDGES (PL-6) NOTE: USE (PL-7) IN EXAM RM# 283, & 285 (COUNTERTOPS ONLY)
4"
Sim
WALL (PT-13)
(PT-13)
GWB SOFFIT (PT-22)
(PT-13)
2'-3"
1'-0"
SLOPED FRONT SINK BASE (PL-5) BASE CABINETS WITH LOCKING DRAWS AND DOORS (PL-5)
LOCKING WALL CABINETS W/ UNDER CABINET LIGHTING (PL-5)
2'-0"
3" 2'-8"
STAINLESS STEEL DROP IN SINK (REFER TO PLUMBING DRAWINGS) P. LAM COUNTER TOP WITH INTEGRAL BACKSPLASH AND WRAPPED EDGES (PL-6) NOTE: USE (PL-7) IN EXAM RM# 283 & 285 (COUNTERTOPS ONLY)
(PT-13)
GWB SOFFIT (PT-22)
4"
1'-0" 2'-0"
LOCKING WALL CABINETS WITH UNDERCOUNTER LIGHTS (PL-5)
4"
8'-0"
GWB SOFFIT (PT-22)
2
A-701
FRAME (PT-9)
18"
Sim
ADULT MEDICINE - EXAM #4 (246) - A 3/8" = 1'-0"
Sim
30"
2
4"
ADULT MEDICINE - EXAM #3 (245) - A 3/8" = 1'-0"
4 A-701
A-701
A-701
A-701
18"
6'-8"
10
Sim
1
REVISION: NO:
SLOPED FRONT SINK BASE (PL-5)
BASE CABINETS WITH LOCKING DRAWS AND DOORS (PL-5)
PROJECT NO.:
4"
ADULT MEDICINE- EXAM ROOM (243) 3/8" = 1'-0"
A-701
30"
Sim
2
2'-2"
8
9
18"Sim
BASE CABINETS WITH LOCKING DRAWS AND DOORS (PL-5)
8'-0"
ADULT MEDICINE - EXAM ROOM (244) (248) (251) 3/8" = 1'-0"
4
SLOPED FRONT SINK BASE (PL-5)
P. LAM COUNTER TOP WITH INTEGRAL BACKSPLASH AND WRAPPED EDGES (PL-6)
4"
Sim
1
STAINLESS STEEL DROP IN SINK (REFER TO PLUMBING DRAWINGS)
(PL-13)
1'-0"
30"
PAPER TOWEL DISPENSER
2'-8"
BASE CABINETS WITH LOCKING DRAWS AND DOORS (PL-5) 4' VINYL BASE (WB-1)
A-701
8
1'-0"
SLOPED FRONT SINK BASE (PL-5)
(PT-13)
SOAP DISPENSER
2'-0"
A-701
2'-0"
2'-0" 3"
P. LAM COUNTER TOP WITH INTEGRAL BACKSPLASH AND WRAPPED EDGES (PL-6) NOTE: USE (PL-7) IN RM# 280 (COUNTERTOPS ONLY)
Sim
LOCKING WALL CABINETS W/ UNDER CABINET LIGHTS (PL-5)
3"
A-701
A-701
2
STAINLESS STEEL DROP IN SINK (REFER TO PLUMBING DRAWINGS) P. LAM COUNTER TOP WITH INTEGRAL BACKSPLASH AND WRAPPED EDGES (PL-6) NOTE: USE (PL-7) IN RM# 281 (COUNTERTOPS ONLY)
8'-0"
Sim
PAPER TOWEL DISPENSER
2'-3"
4"
4
GWB SOFFIT (PT-22)
30"
4"
Sim
4
STAINLESS STEEL DROP IN SINK (REFER TO PLUMBING DRAWINGS)
4"
A-701
18"
4" VINYL BASE (WB-1)
4" VINYL BASE (WB-1)
4"
Sim
WALL (PL-13)
BASE CABINET WITH LOCKING DRAWS AND DOORS (PL-5)
30"
SOAP DISPENSER
PAPER TOWEL DISPENSER
(PT-13)
LOCKING WALL CABINETS W/ UNDERCOUNTER LIGHTS (PL-5)
30"
4'-0"
BASE CABINET WITH LOCKING DRAWS AND DOORS (PL-5)
SOAP DISPENSER
30"
A-701
8'-0"
2'-8"
2'-8"
SLOPED FRONT SINK BASE (PL-5)
30"
Sim
8 GWB SOFFIT (PT-22)
A-701
LOCKING WALL CABINETS W/ UNDER CABINET LIGHTS (PL-5)
2'-8"
OF/ OI
30"
Sim
8 GWB SOFFIT (PT-22)
4"
SLOPED FRONT SINK BASE (PL-5)
8'-0"
8'-0"
P. LAM COUNTER TOP WITH INTEGRAL BACKSPLASH AND WRAPPED EDGES (PL-6) NOTE: USE (PL-7) IN RM# 278 (COUNTERTOPS ONLY)
Sim
8 A-701
3"
SOAP AND PAPER TOWEL DISPENSER (PT-13)
P. LAM COUNTER TOP WITH INTEGRAL BACKSPLASH AND WRAPPED EDGES (PL-6) NOTE: USE (PL-7) IN RM# 279, 284 &287 (COUNTERTOPS ONLY)
Sim
8 A-701
8'-0"
18"
1'-9"
30"
Sim
A-701
ADULT MEDICINE - NURSES STATION (242) - C 3/8" = 1'-0"
7
2'-8"
LOCKING WALL CABINETS W/ UNDER CABINET LIGHTS (PL5) STAINLESS STEEL DROP IN SINK ( REFER TO PLUMBING DRAWINGS)
2'-3"
2'-0" 1'-5" 3"
STAINLESS STEEL DROP IN SINK ( REFER TO PLUMBING DRAWINGS)
2
4
4" VINYL BASE (WB-1)
GWB SOFFIT (PT-22)
Sim
A-701
(PT-13)
4"
8'-0"
7
LOCKING WALL CABINETS W/ UNDER CABINET LIGHTS (PL5) SOAP AND PAPER TOWEL DISPENSER
18"
Sim
4
ADULT MEDICINE - NURSE STATION (242) & (277) - B 3/8" = 1'-0"
1'-0"
GWB SOFFIT (PT-22)
Sim
1'-0"
1'-0"
30"
6
CONSULTANT:
OF/ OI
A-701
1'-9"
7
1'-11"
4'-0"
4" VINYL BASE (WB-1)
A-702
ADULT MEDICINE - NURSE STATION (242) & (277) - A 5 3/8" = 1'-0"
A-701
1 1/2" X 2" TRIM BOARD ( PL-6)
Sim
4
ACROVYN BUMPER GUARDS (WP-3)
4"
A-702
ACROVYN BUMPER GUARDS TO TERMINATE AT END OF CABINET (WP-3)
1'-9"
Sim
ACROVYN BUMPER GUARDS TO TERMINATE AT LOWER WORK SURFACE (WP-3)
(PL-5)
2'-8"
4
2'-6"
4" VINYL BASE (WB-1)
4"
3'-
BUMPER GUARDS (WP-3)
(PL-5)
4"
2'-3"
1'-11 1/2
(PL-5)
123497.00
DRAWING NO.:
4" VINYL BASE (WB-1)
24
ADULT MEDICINE - STAFF PASSAGE (254) - CLEAN STORAGE/ CLEAN LINEN STORAGE 3/8" = 1'-0"
A-601 PROJECT LOCATION: C:\Users\mkronik\Documents\123497.00-Dimock_mkronik(Recovery).rvt
EQUIPMENT LAYOUT
WINCHESTER HOSPITAL 41 HIGHLAND AVENUE WINCHESTER, MA 01890
LABORATORY PROJECT EQ-45
EQO-05 B EQ-77
EQ-14
EQO-05
EQ-85
A
EQO-04
EQ-45
EQO-04
EQ-15
C
EQ-90
EQ-77
EQO-09
EQ-85
EQO-15
EQM-04
EQ-75 EQ-32
EQ-76
HISTOLOGY A
135
EQO-08
EQ-32
EQ-06
DIRECTOR OF PATHOLOGY
A
B
PATH #1
EQ-39
129
E
EQ-45
EQO-04
EQ-79
EQ-74
EQ-85
B EQO-08
EQO-10
136
EQO-09
PREP
EQA-02
EQA-03
EQO-05
EQ-67
A
EQO-04
EQO-01
EQO-04
E
EQO-10
EQO-09
EQA-03 EQO-10
EQO-05
EQ-89
EQ-08
EQA-04
EQA-03
EQO-04
EQO-09
EQO-05B
EQO-09
EQO-10
EQO-04
EQ-01
EQO-04 B
EQ-89
EQ-89
C
A
K
EQ-50
EQ-65
EQO-09
Q
EQO-04
I EQ-11 EQ-44 H
DPH SUBMISSION BID/CONSTRUCTION SET ISSUE FOR PERMIT REVISION 1 MISC. REVISIONS
EQ-14
EQ-25 EQ-25
R
EQ-58
EQ-70
EQ-89 EQO-09
EQO-05
T
EQO-10
EQO-09
EQ-06
EQ-89 EQO-05
EQ-24 EQ-24
124A
EQ-82
EQ-28
EQO-10
STORAGE/ ALCOVE
EQ-18 EQ-28
S
EQ-52
EQ-42
EQO-10 EQ-44
DESCRIPTION:
09/17/12 10/23/12 12/21/12 01/21/13 01/28/13
EQ-67 EQ-58
EQO-05
DATE:
A B C 1 2
EQ-87
EQO-05
EQ-14
REVISION:
EQA-03
N P
EQO-05
EQ-63 SUB GROUP LOCATION WITH ROOM , SEE EQUIPMENTSCHEDULE (TYPICAL)
120
EQ-89 O
EQO-05
UP
NO:
HEMATOLOGY
EQ-45
J
A
EQ-83
EQO-04
C
126
EQA-06
EQO-04
EQO-05
EQ-60
EQ-81 EQ-88
EQO-04
B
EQA-02
M
EQO-05
EQO-05
EQA-01 EQA-03
C
EQ-68
EQ-59
EQ-20
EQ-67 D
EQO-04
B EQ-53
EQ-57
EQ-02
125
EQA-03
EQ-73
EQ-47
EQ-03 EQO-05
CONSULTANT:
RE F.
STAFF LOUNGE / LOCKERS
B
EQO-05
STAFF TOILET
A
118
B
EQ-05 E
EQ-45 EQO-04
EQ-52
EQ-64
EQO-05
BLOOD BANK SUPERVISOR
132
EQM-01
127
124
BLOOD BANK EQ-04
EQ-84
CYTO TECH.
CORRIDOR
L
EQM-01
EQA-03 EQO-05
F
119
PATH #3 A
EQO-04
EQO-05
EQO-04
EQ-08
EQO-01 EQO-10
EQO-05
D
EQO-01
EQO-04
EQ-05
EQO-05
C
EQO-05
EQO-05A
EQA-03
116
118 A EQO-04
EQO-09
C
RE F.
EQO-12
EQO-05
ELEC. CLOSET
EQ-89
G
EQ-06
EQO-04
117
PROCESSING D
118A
EQO-05
F
EQ-22
WATER TREATMENT
EQO-05
B EQ-85 EQO-04
EQO-09
EQO-10 EQO-10
EQ-45
A
B
EQA-03
484 MAINE AVE., SUITE 2B FARMINGDALE, ME 04344 TEL. 207.582.2400 FAX. 207.582.8320
EQO-09
128
EQO-04
EQO-17
E
133
EQO-04
138
138
MAINE
STAFF TOILET
EQA-03
EQO-04
CORRIDOR
CORRIDOR
CONSTRUCTION
EQA-01
PATHOLOGY
A
A
EQA-04
115
EQA-02
EQ-45 EQO-09 EQO-07
EQO-05
CORRIDOR
EQA-06
B
C
134
EQA-03 EQ-78
INTERIOR DESIGN
CYTO PREP.
EQO-05
EQO-11
137
ENGINEERING
131
EQ-33
EQO-08
EQO-09
BOSTON
225 FRIEND STREET BOSTON, MA 02114 TEL. 617.723.7100 FAX. 617.723.9113
ARCHITECTURE
EQO-04
PATH #2
EQ-85
EQO-15
PLANNING
EQO-05
A
130
EQO-09
EQO-05
FLAMMABLE LAB STORAGE
EQO-05
EQO-04
D
DIGIORGIO ASSOCIATES INC.
EQO-04
EQO-05
EQ-30 EQO-08
U
EQA-03
CHEMISTRY
EQA-06
121
EQ-06 EQ-37
EQA-03
EQA-02
V
EQ-89
EQA-01
EQ-14
G
KEY PLAN:
STAFF TOILET
EQO-10
123
EQ-67
EQ-26
EQ-27
1
EQO-04
EQ-38
A
EQO-05
1
EQUIPMENT PLAN 1/4" = 1'-0"
N
SWING OFFICE
2
F SUB GROUP LOCATION WITH ROOM , SEE EQUIPMENTSCHE DULE (TYPICAL)
EQO-04 EQO-05
C
122 EQO-05 EQO-04 AREA OF WORK
B
DRAWING TITLE:
PROPOSED EQUIPMENT PLAN DRAWN BY:
MK
SEAL:
CHECKED BY:
RB SCALE:
1/4" = 1'-0" PROJECT NO.:
113448.02
DRAWING NO.:
A-208 PROJECT LOCATION: \\dai-cad01\drawings\113448.02_WH Rapid Response Lab\Revit (2012)\Current\WH Rapid Response.rvt DATE & TIME PRINTED: 1/29/2013 12:40:28 PM
CORE LAB
RAPID RESPONSE LAB
ABBOTT LINE
EDGERLY HALL - BERTAUX AND IWERKS ARCHITECTS Project: Our firm was selected to renovate a third floor of the Edgerly Hall, a building that hosts the math department for Fitchburg State College. The scope of work consisted of converting three of the four large classrooms into Faculty Offices, spaces for faculty meetings and tutoring, as well additional rest rooms, and service rooms.
WINDOWS TO BE DEMOLISHED (TYPICAL) SASH AND PARTING BD. ONLY, FRAMES TO REMAIN
SEE ELEVATIONS FOR DEMOLITION OF VENTS THROUGH EXT. WALLS
SEE ELEVATIONS FOR DEMOLITION OF VENTS THROUGH EXT. WALLS
SALVAGE DOOR HARDWARE FOR RE-USE
EXISTING FILE SERVER ROOM TO REMAIN OPERATIONAL AT ALL TIMES DURING RENOVATION
5' - 10"
REFER TO PAGE S-120 FOR OPENINGS IN MASONRY WALL 6' - 8"
EXISTING GRILLS TO BE REMOVED (LOCATIONS APPROXIMATE) PATCH NEW HOLES WITH GWB TO MATCH
13' - 2"
EXISTING (5) VENT SHAFT DUCTS TO BE REMOVED
SALVAGE DOOR HARDWARE FOR RE-USE
4' - 8" R.O. IN MASONRY WALL
SALVAGE DOOR HARDWARE FOR RE-USE
300C-1i
9' - 4"
X2R 5
ELEC. CHASE
EXISTING FOUNTAIN TO BE REMOVED
A-301
X2R
X2R 5' - 6"
My task was to layout the new program. I took this project through all stages of the design process using Revit Architecture as a BIM modeling tool. This included documentation of the existing conditions, schematic design and Construction Documents
305 304
303 302
REFER TO PAGE S-120 FOR OPENING IN MASONRY WALL
EXISTING SINK TO BE REMOVED
EXISTING (3) MASONRY AIR DUCT DIVIDER WALLS TO BE DEMOLISHED THIS LEVEL. REFER TO S-120 FOR NEW SUPPORT BEAMS AND DETAILS
306
300JC-1i
4' - 6"
WINDOWS TO BE DEMOLISHED (TYPICAL) SASH AND PARTING BEAD ONLY, FRAMES TO REMAIN
MOLITION
X2R
REFER TO M.E.P. DEMOLITION PLANS FOR DEMOLITION OF ALL ELECTRICAL, PLUMBING, AND HVAC DEMOLITION (TYPICAL)
WINDOWS TO BE DEMOLISHED (TYPICAL) SASH AND PARTING BEAD ONLY, FRAMES TO REMAIN
REFER TO M.E.P. DEMOLITION PLANS FOR DEMOLITION OF ALL ELECTRICAL, PLUMBING, AND HVAC DEMOLITION (TYPICAL)
LDING
My Role:
13' - 7"
SEE ELEVATIONS FOR DEMOLITION OF VENTS THROUGH EXT. WALLS
ON.
300S-1i
REFER TO M.E.P. DEMOLITION PLANS FOR DEMOLITION OF ALL ELECTRICAL, PLUMBING, AND HVAC DEMOLITION (TYPICAL)
DN
300S-2i
UP
307
UP
308i
DN
301
N
REFER TO M.E.P. DEMOLITION PLANS FOR DEMOLITION OF ALL ELECTRICAL, PLUMBING, AND HVAC DEMOLITION (TYPICAL)
WINDOWS TO BE DEMOLISHED (TYPICAL) SASH AND PARTING BEAD ONLY, FRAMES TO REMAIN 1
(2) WINDOWS ABOVE TO BE DEMOLISHED (SASH AND PARTING BEAD ONLY, FRAMES TO REMAIN). SEE ELEVATIONS
Third Floor Demoliton 1/8" = 1'-0"
A
A
A
F2
A
C
C
F2
F2
(2) WINDOWS ABOVE TO BE DEMOLISHED (SASH AND PARTING BEAD ONLY, FRAMES TO REMAIN). SEE ELEVATIONS
ARCH WINDOWS TO REMAIN
C
B
SEE ELEVATIONS FOR DEMOLITION OF VENTS THROUGH EXT. WALLS
WINDOWS TO BE DEMOLISHED (TYPICAL) SASH AND PARTING BD. ONLY, FRAMES TO REMAIN
SEE ELEVATIONS FOR DEMOLITION OF VENTS THROUGH EXT. WALLS
C
F2
C
F2
A
B
C
A
A
WINDOWS TO BE DEMOLISHED (TYPICAL) SASH AND PARTING BEAD ONLY, FRAMES TO REMAIN
A
F2 A
A R1 A F2
A
F1
F1
F1
F1 R1
F1
F1
xI
A
R1 A
F2
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F3
R1
xI
F1
F3
xI
F2 A
A F6
2 A-102
R1
R1
R1
R1 R1
R1
R1
R1
R1
R1
R1
xI
R1
R1 F2 A
A F2
A
A
F1
F1
F1
F1
F1
F1
F1
F1
F1
xI
R1
R1
R1
R1
R1
R1
R1
R1
R1
xI
R1
xI
R1
R1
xI
A
xI
F2
A
F2
R1
A
A
F2
F2
N
F2
F1
A
1
A
A
A
D
D
C
C
C
C
D
D
A
A
A
A
Third Floor Level 1/8" = 1'-0" EXISTING ATTIC FLOOR FRAMING
NEW VENT STACK (CONFIRM LOCATION WITH PLUMBING PLANS)
4 A-201
ALL THIRD FLOOR WINDOWS (LABELED WITH WINDOW LEGEND) TO BE REPLACED SEE PAGE A-503 FOR WINDOW LEGEND AND SCHEDULE
ALL THIRD FLOOR WINDOWS (LABELED WITH WINDOW LEGEND) TO BE REPLACED SEE PAGE A-503 FOR WINDOW LEGEND AND SCHEDULE
VENTS TO BE REMOVED, FILL OPENINGS WITH FACE BRICK TO MATCH EXISTING
VENTS TO BE REMOVED, FILL OPENINGS WITH FACE BRICK TO MATCH EXISTING
7 A-503
A
A
A
B
A
C
C
C
C
C
C
B
A
A
A
ALL THIRD FLOOR WINDOWS (LABELED WITH WINDOW LEGEND) TO BE REPLACED SEE PAGE A-503 FOR WINDOW LEGEND AND SCHEDULE
A
A
A
A
A
A
A
A
VENTS TO BE REMOVED, FILL OPENINGS WITH FACE BRICK TO MATCH EXISTING
A
6 A-503
D A
West 1/8" = 1'-0"
148
A
A
9 A-503
8 A-503
D C
C
C
C
A
A-201
1
North 1/8" = 1'-0"
2
East 1/8" = 1'-0"
ALL THIRD FLOOR WINDOWS (LABELED WITH WINDOW LEGEND) TO BE REPLACED SEE PAGE A-503 FOR WINDOW LEGEND AND SCHEDULE
VENTS TO BE REMOVED, FILL OPENINGS WITH FACE BRICK TO MATCH EXISTING
D
3
3 A-201
1
A
D
A
A
A
A
A
A
A
A
A
A
A
WEST SEE ELEVATIONS FOR FILLING WALL OPENINGS THROUGH EXT. WALLS A
1' - 6"
301E
10' - 0"
2' - 5"
5
REFER TO PAGE S-120 FOR OPENING IN MASONRY WALL 13' - 2"
3
6' - 8"
300WC-2 WOMEN'S 5
4A-4012 3
300-1
5' - 6"
7' - 11 1/2"
4
9' - 1" 1' - 0"
OWNER PROVIDED OFFICE PARTITIONS, N.I.C. (TYP.)
300ME-1 ELEC. PANEL ROOM
5' - 5 3/4"
FINISH O.
4
4
300WC-1 3 MEN'S 1
300-2
3
8A-4016 7
3
301
A
LOCKSET TO BE REPLACED REUSE EXISTING ONLINE LOCKSET FOR NEW DR 316
A
A REFER TO ELECTRICAL DRAWINGS FOR DEMO. & NEW WORK
312 EXISTING IT CENTER
ROOM TO REMAIN OPERATIONAL AT ALL TIMES DURING RENOVATION
A
4
A 300ME
4
3
300-3 J.C.
3 A-301
3
300-3
7' - 4"
(FUTURE ELEVATOR) 3
312
3
4
1A-2
3 4 EXG
8' - 4 1/4"
3' - 7 1/4"
12' - 0 1/8"
9 A-401
7' - 10 3/4"
314a
5' - 0"
11' - 6"
300C-1 LOBBY
10 A-401
EDGE OF DROP CEILING ABOVE
1
A
314
4
3S-1
EDGE OF DROP CLG ABOVE
9' - 1" R.O.
11' - 7 3/4"
2 A-501
301 ADJUNCT FACULTY
3
301C
2
13' - 3 3/4"
310
ELEC. CHASE
4
301D
2
A
15 A-401
4
4
A-301
301C OFFICE 3
310E DEPT. OFFICE/ RECEPTION
3
A
A
310E
3' - 0"
R.O.
15' - 5 1/2"
301D OFFICE 4
2
310D
5
9' - 4"
4' - 6"
1 A-301
310C
4
6
9' - 1" R.O.
EXG
6
310 HALL
REFER TO PAGE S-120 FOR OPENING IN MASONRY WALL 14' - 6" 3' - 2"
310A COPY
6
6 A-301
301Da
1 A-501
316
315
3S-2 1
Sim
DN
EX. LIFT
2
UP
STUDENT RESOURSES
UP
15' - 4 1/4"
5' - 0"
A
314 EXTG. CLASSROOM
315 MATH CLUB
DN A
R.O. 2
301B
10' - 5"
A
9' - 11 1/2"
SOUTH
EXG
3
R.O.
9' - 1" R.O.
EDGE OF DROP CLG ABOVE
REFER TO PAGE S-120 FOR OPENING IN MASONRY WALL
FIN. OPNG.
301Ea 2
R.O. 4' - 0"
15' - 5 1/2"
A-4012
4' - 8"
4
16' - 5 3/4"
A
9' - 1"
3
310B
Sim
2 A-501
R.O.
10' - 0"
9' - 1" R.O.
301E OFFICE 5
R.O.
1 A-501
OWNER PROVIDED OFFICE PARTITIONS, N.I.C. (TYP.)
11' - 7 1/4"
3
ROP OF D EDGE BOVE A CLG
2
A
301 ADJUNCT FACULTY
310D DEPARTMENT HEAD
11' - 2 3/8" 2' - 2"
9' - 1"
3
9' - 1" R.O.
A
301F OFFICE 6
310C OFFICE 10
11' - 0 1/4"
1' - 0"
301F
312a
12' - 8"
5' - 0"
1' - 3"
A
4
A
EXG
310B OFFICE 9
R.O.
301H
4
7' - 7 1/2"
301G
A
B
C
2
2
9' - 1" 10' - 5"
C
4
301H OFFICE 8
2
C
12' - 5 1/2"
301G OFFICE 7
C
3' - 8"
2
4
EQ
C
9' - 6 1/2"
A
9' - 11 1/2"
EQ
C
B
3' - 2"
A
8' - 0"
A
SEE ELEVATIONS FOR FILLING WALL OPENINGS THROUGH EXT. WALLS
SEE ELEVATIONS FOR FILLING WALL OPENINGS THROUGH EXT. WALLS
A-301
DRINKING FOUNTAIN
A
A-201 1
2
301A 301A OFFICE 1
301B OFFICE 2
A
EQ
A
A
SEE ELEVATIONS FOR FILLING WALL OPENINGS THROUGH EXT. WALLS
1
13 TYP 14A-40112 11
2 EQ
Third Floor Level 1/8" = 1'-0"
3
A
300S-1i STAIR 1
D
A
316 COMMONS
D
(2) WINDOWS ABOVE SEE ELEVATIONS
C
C
C 2 A-201
300S-2i STAIR 2
C
D
D
(2) WINDOWS ABOVE SEE ELEVATIONS
A
A
A
A
SEE ELEVATIONS FOR FILLING WALL OPENINGS THROUGH EXT. WALLS
EAST
149
EDGERLY HALL - BERTAUX AND IWERKS ARCHITECTS Roof 35' - 0"
18 A-401
1' - 6 1/4"
20 A-401
16
1" LAMINATE COUNTERTOP
1' - 1 1/4"
9
Men's Room 1/2" = 1'-0"
42" min.
0' - 8"
Mens 1 1/4" = 1'-0"
2
Mens 2 1/4" = 1'-0"
3
Mens 3 1/4" = 1'-0"
4
A-502
7
1/2" = 1'-0"
0' - 7"
2' - 4" UNDER CABINET FIX SEE ELEC. PLANS
Sim
A-502 S
9
9
Sim
Sim
A-502
Sim
A-502 9
1
6 1
Sim
A-502
Sim
9 2
Sim
6
A-502
Sim
A-502
Sim
A-502
A-502
1
Third Floor Level 23' - 0"
0' - 6"
Top Cabinet Section 1/2" = 1'-0"
A-502
9
Sim
Sim
A-502
19
2x4 SINGLE POLE SWITCH IN JAMB @ INTERIOR OFFICE SIDE
40" max.
0' - 9" clear
MIRROR (BY FSC)
34" max.
42" max.
2' - 0" 1' - 6"
8
0' - 11"
1' - 6"
Sim
7
17"-19"
40" max.
abv. fin. flr.
17"-19"
34" max.
abv fin. flr.
1
to controls
42" min.
7" min. - 9" max.
42" min.
ADA COMPLIANT SINK
0' - 6"
42" min.
min. clear
1 4A-4012 3
10' - 0" ceiling height
56" min.
R 2' - 6"
9
7
2 A-102
BY FSC BY FSC
54" min. 12" max. 42" min.
abv fin. flr. 29" min.
17" min. 48" min.
BY FSC
GWB ON MTL STUD
Base Cabinet Section 1/2" = 1'-0"
A-502
1
GWB ON MTL STUD
GWB ON MTL STUD
GWB ON MTL STUD
0' - 4 3/4"
0' - 4"
0' - 0 1/2" A-502
Roof 35' - 0"
30" min.
Sim
7
1' - 6"
60" min.
3/4" EDGE GRAIN "PLYBOO" PLYWOOD AMBER
Copy Room Casework
17
42" min.
1' - 0"
3' - 0"
0' - 4 1/2"
0' - 1 1/2" 3/4" EDGE GRAIN "PLYBOO" PLYWOOD AMBER
21
Section at Copy Room 1/4" = 1'-0"
2' - 0"
RTOP
DGE GRAIN BOO" PLYWOOD ER
Third Floor Level 23' - 0"
0' - 7"
Elevation at Copy Room 15 1/4" = 1'-0"
ADA COMPLIANT SINK
21 A-401
3' - 0 7/8"
4' - 0"
3' - 0 7/8"
7' - 0 3/4"
TO T.O. WALL
2' - 4"
19 A-401
Mens 4 1/4" = 1'-0"
7
Sim
7
Sim
A-502
A-502
1' - 6"
Roof 35' - 0"
Door Schedule Location Door Number
Existing or New
Door and Frame Fire Rating Frame Type
Frame Frame Material
Frame Finish
Door Rough Height
Rough Width
Door Type Door Height Door Width
Thickness
Material
Door Finish
Hardware Set
Card Access
Sign Text
ADA COMPLIANT TOILET
GWB ON MTL STUD
GWB ON MTL STUD
GWB ON MTL STUD
BY FSC
BY FSC BY FSC 54" min.
R 2' - 6"
12" max.
42" min.
30" min.
2 A-102
GWB ON MTL STUD
10' - 0" ceiling height
56" min.
48" min.
17" min.
60" min.
42" min.
0' - 6"
42" min.
MIRROR (BY FSC)
5
Womens 1 1/4" = 1'-0"
6
Womens 2 1/4" = 1'-0"
7
2 A-102
Womens 3 1/4" = 1'-0"
8
3 A-501
Rooff 35' - 0" 300C-1 LOBBY
301 1
150
300WC-2 WOMEN'S
310A COPY
310 HALL H L
OPEN TO BEYOND
310C OFFICE 10
Third Floor Level 23' - 0"
Womens 4 1/4" = 1'-0"
40" max.
0' - 9" clear
29" min.
34" max.
0' - 8"
Women's Room 1/2" = 1'-0"
316 COMMONS
abv fin. flr.
42" max.
to controls
2' - 0" 1' - 6"
abv fin. flr.
33" min. - 36" max.
17"-19"
40" max.
42" min.
10
7"min. - 9"max.
abv. fin. flr.
abv fin. flr.
5 8A-4016 7
34" max.
min. clear
Third Floor Level 23' - 0"
3S-1 3S-2 300-1 300-2 300-3 300ME 301 301A 301B 301C 301D 301Da 301E 301Ea 301F 301G 301H 310 310B 310C 310D 310E 312 312a 314 314a 315 316
NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW EXISTING NEW EXISTING NEW NEW NEW NEW NEW NEW NEW NEW NEW EXISTING NEW EXISTING NEW NEW
B Label-2Hr 3 B Label-2Hr 3 3 3 3 3 3 1 4 1 1 EXISTING 1 EXISTING 1 4 1 2 1 1 1 4 3 EXISTING 3 EXISTING 3 3
Metal Metal Metal Metal Metal Metal Metal Metal Metal Metal Metal EXISTING Metal EXISTING Metal Metal Metal Metal Metal Metal Metal Metal Metal EXISTING Metal EXISTING Metal Metal
P2 P2 P2 P2 P2 P2 P2 P3 P3 P3 P3 P2 P3 P2 P3 P3 P3 P3 P3 P3 P3 P3 P2 P2 P2 P2 P2 P2
7' - 2" 7' - 2" 7' - 2" 7' - 2" 7' - 2" 7' - 2" 7' - 2" 9' - 2" 9' - 2" 9' - 2" 9' - 2" 7' - 2" 9' - 2" 7' - 2" 9' - 2" 9' - 2" 9' - 2" 7' - 2" 9' - 2" 9' - 2" 9' - 2" 9' - 2" 7' - 2" 7' - 2" 7' - 2" 7' - 2" 7' - 2" 7' - 2"
3' - 4" 3' - 4" 3' - 4" 3' - 4" 3' - 4" 3' - 4" 3' - 10" 9' - 1" 3' - 4" 9' - 1" 9' - 1" 2' - 10" 9' - 1" 2' - 10" 9' - 1" 3' - 4" 9' - 1" 5' - 1" 9' - 1" 9' - 1" 9' - 1" 3' - 4" 3' - 4" 3' - 6" 3' - 10" 2' - 10" 3' - 4" 3' - 4"
C C C C C C A B B B B EXTG B EXTG B B B A B B B B C EXTG A EXTG A A
7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0"
3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 6" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 2' - 6" 3' - 0" 2' - 6" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 2" 3' - 6" 2' - 6" 3' - 0" 3' - 0"
0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2"
D1 D1 D1 D1 D1 D1 D1 D2 D2 D2 D2 EXISTING D2 EXISTING D2 D2 D2 D1 D2 D2 D2 D2 D1 EXISTING D1 EXISTING D1 D1
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2
HS-6 HS-6 HS-3 HS-3 HS-4 HS-4 HS-1a HS-2 HS-2 HS-2 HS-2 HS-5 HS-2 HS-5 HS-2 HS-2 HS-2 HS-1a HS-2 HS-2 HS-2 HS-2 HS-1 HS-5 HS-1a HS-5 HS-1 HS-1
STAIR STAIR MEN'S WOMEN'S JANITOR'S ELEC. PANEL OFFLINE LOCKS OFFLINE LOCKS OFFLINE LOCKS OFFLINE LOCKS OFFLINE LOCKS OFFLINE LOCKS OFFLINE LOCKS OFFLINE LOCKS OFFLINE LOCKS OFFLINE LOCKS OFFLINE LOCKS OFFLINE LOCKS OFFLINE LOCKS OFFLINE LOCKS ONLINE LOCKS OFFLINE LOCKS ONLINE LOCKS ONLINE LOCKS
Material Study
Roof 35' - 0"
This drawing shows the relationship between the office spaces and the adjunct faculty offices . I had an opportunity to research and apply the chosen materials to one of the design options. This option was later approved by the owner.
12' - 0"
11' - 0"
10' - 0"
FINISH CEILING HEIGHT
GWB ON MTL STUD AGE S-120 TRUCTURAL DRAWINGS
DOOR AS PER PLAN
4 A-501
Third Floor Level 23' - 0"
Wooden Plank panels over exterior walls.
Section C 1/4" = 1'-0"
3
1
3.
2.
1.
3
Bamboo ceiling panels in the Adjunct Faculty.
Framed 12mm. Tinted Poly carbonate panels between offices and hallways. 1
2
Roof 35' - 0"
10' - 0"
FINISH CEILING HEIGHT
12' - 0"
11' - 0"
(2) LAYERS 5/8" GWB (1 HR FIRE RATED) ON MTL STUD FURRING SEE PAGE S-120 FOR STRUCTURAL DRAWINGS
(1 HR FIRE NG*
Section D 1/4" = 1'-0"
4
12
Third Floor Level 23' - 0" 4a A-301
Sim
A-503
3
3
4
Sim 10
A-503
3
Sim
A-503
Sim
2
3
A-503
A
5
Sim
C
B
D
A-503
1
Sim
A-503
Type Mark
13 A-503
Quantity
A 32 B 2 C 10 D 4 Grand total: 48
Height 7' - 6" 7' - 6" 7' - 6" 4' - 0"
Width 3' - 9" 2' - 8" 3' - 9" 3' - 4"
Window Schedule Frame Type Finish ALUMINUM ALUMINUM ALUMINUM ALUMINUM
P2 P2 P2 P2
Window Type SINGLE HUNG SINGLE HUNG SINGLE HUNG SINGLE HUNG
Screen YES YES YES YES
Glass type 3 3 3 3
Roof 35' - 0"
Rooff 35' - 0" 301D OFFICE 4
301Da
Third Floor Level 23' - 0"
OPEN TO BEYOND
300C-1 LOBBY
301 ADJUNCT FACULTY
300-1
300-2
314 EXTG. CLASSROOM
310 300ME
314a
Third Floor Level 23' - 0"
151
26 Mill Street Construction Documents -Autocad 2007These were rendered in 3ds Studio Max. Site plan - illustrator cs3 Project: Mill Street This 26 was a renovation project for a one family residence,
26 Mill Street
Design Tools: Construction Documents -Autocad 2007 Design Tools: Site plan - illustrator cs3 Design Tools:
Mill Street 26 Mill26Street
Design Tools: Construction Documents -Autocad 2007 Siteconsisted plan - illustrator cs3 located in Newton, MA. The scope of work had of Project: converting attic into aproject finished space with a full This wasthe a renovation forstudio a one family residence, rest located room. Itinalso included a small roomof Newton, MA.installation The scope ofofwork had rest consisted on the first floor. converting the attic into a finished studio space with a full rest room. It also included installation of a small rest room on the first floor. My Role: My tasks had included measuring and documenting the My Role: Existing Conditions, as well as some independent design My tasks measuring and documenting work. I have had usedincluded CAD Architectural Desktop to createthe Existing well as some independent design drawings forConditions, permit sets,asthrough Construction Documents. usedinCAD Thesework. wereI have rendered 3dsArchitectural Studio Max.Desktop to create drawings for permit sets, through Construction Documents. These were rendered in 3ds Studio Max.
Project: Construction Documents -Autocad 2007 Construction Documents -Autocad 2007 This was a renovation project for a one family residence, Site plan - illustrator Design Tools: cs3 Project: Site plan - illustrator cs3 Project: Construction Documents -Autocad 2007 located in Newton, MA.a The scopeproject of work consisted of This was renovation for a had one family residence, This was a renovation project for a one family residence, Site planof - illustrator cs3 located in Newton, MA. The scopespace of workwith had consisted converting attic into finished studio Project: located inthe Newton, MA. Theascope of work had consisted of a full converting the attic into a finished studio space with a full This wasa finished a renovation for one family restconverting room. It the alsoattic included installation of awith small rest roomresidence, into studioproject space aafull rest room. It also included installation of a small rest room rest room. It also included installation of a small rest room Newton, MA. The scope of work had consisted of on the first floor.onlocated the firstinfloor.
26 Mill Street
on the first floor.converting the attic into a finished studio space with a full
restRole: room. It also included installation of a small rest room My My Role: My Role: ontasks the first floor. measuring and documenting the My had included My tasks hadincluded included measuring and documenting the My tasks had measuring andasdocumenting thedesign Existing Conditions, as well some independent Existing Conditions, as well as some independent design Existing Conditions, asI have wellused as some independent work. CAD Architectural Desktopdesign to create MyCAD Role: work. I have used Architectural Desktop to create drawings for permit sets, through Construction Documents. the work. I haveforused Architectural Desktop toandcreate MyCAD tasks had included measuring documenting drawings permit sets, through Construction Documents. These were rendered in 3ds Studio Max. drawings for rendered permit sets, through Construction Existing well as someDocuments. independent design These were in 3dsConditions, Studio Max.as work.inI have used CAD Architectural Desktop to create These were rendered 3ds Studio Max.
drawings for permit sets, through Construction Documents. These were rendered in 3ds Studio Max.
168
dered in 3ds Studio Max.
169
Project: This was a renovation project for a one family residence, located in Newton, MA. The scope of work had consisted of converting the attic into a finished studio space with a full rest room. It also included installation of a small rest room on the first floor.
My Role: My tasks had included measuring and documenting the Existing Conditions, as well as some independent design work. I have used Auto Cad to create drawings for all phases of the project, it included Demolition, Schematic Design, Design Development and Construction Documents. The first floor rest room was one of the most challenging task that involved replacing the grand stair with a smaller stair and a rest room. Through different iterations i have understood how to manipulate the irregular geometry of space between two flights of stairs in order to gain enough clearance for bathroom placement. This rest room had to be comfortable, but also in compliance with code requirements. The attic bathroom had also presented a challenge; it required for a new sewer line. i have designed and correlated this line from third floor through the basement.
PixtonPixton Residence Residence Project: Project: This was a renovation for a one This wasproject a renovation project for a one family residence, located in Newton, family residence, located in Newton, MA. The scopeMA. of work had consisted The scope of work had consisted of converting the attic into athe finished of converting attic into a finished studio space with a full rest room. It rest room. It studio space with a full also included installation of installation a small of a small also included rest room on the floor. restfirst room on the first floor. My Role: My Role: My tasks had included andmeasuring and My tasksmeasuring had included documenting the Existing Conditions, documenting the Existing Conditions, as well as someasindependent well as somedesign independent design work. I have used Architectural work.CAD I have used CAD Architectural Desktop to create drawings for permit Desktop to create drawings for permit sets, through Construction sets, throughDocuments. Construction Documents. These were rendered in 3dsrendered Studio in 3ds Studio These were Max. Max.
ce
one n, d d t
nd ns, n al mit nts.
Design Tools: Design-Tools: Construction Documents Autocad 2003 Documents - Autocadcs3 2003 Presentation - VrayConstruction Plugin for Sketchup 7/ Photoshop Presentation - Vray Plugin for Sketchup 7/ Photoshop cs3 Diagrams - Sketchup 7 Diagrams - Sketchup 7
Pixton Residence Project: This was a renovation project for a one family residence, located in Newton, Design Tools: Design Tools: MA. The scope of work had consisted of converting the-attic into a finished Construction Documents - Autocad 2003 Construction Documents Autocad 2003 space with7/ afor full rest room. cs3 It Photoshop cs3 Presentation -Presentation Vray Pluginstudio for Sketchup Photoshop - Vray Plugin Sketchup 7/ also included installation of a small Diagrams - Sketchup 7 - Sketchup 7 Diagrams rest room on the first floor. My Role: My tasks had included measuring and documenting the Existing Conditions, as well as some independent design work. I have used CAD Architectural Desktop to create drawings for permit sets, through Construction Documents. These were rendered in 3ds Studio Max.