SAMPLES
WORK
HUBBARD HOSPITAL Project Summary: This project is an expansion of the existing Emergency department at Harrington Hospital, at Hubbard. The proposed layout had added 11 exam rooms, trauma, cardiac and secured holding treatment rooms, located at the exterior perimeter and support/ administrative functions located at the center. My Role: SD - Revit Conceptual Energy Analyses modeling tools to create the most energy efficient design option. DD - Reaserched codes, DPH checklists and FGI guidelinsess. Coordination and correspondense between the facilities representaties, vendors and building officials. Worked with lead architects in integrating MEP, structural and civil disciplines for BIM modeling. CD - Lead the project team in creating the drawing set for bid and construction. Staffed drafters to insure seemless production workflow. Assisted drafters by cartooning, redlining and QA reviewing of drawing sets. CA - Was involved in design meetings, field visits and Field repors. Used Procore for correspondense of RFIs, processing submittlals and submiting field reports.
SEPTEMBER 9, 2011
HARRINGTON HEALTHCARE AT HUBBARD FLOOR PLAN AND INTERIOR VIEWS
SCALE: N.T.S.
Design Tools: Revit Arch, Revit MEP, Revit Structure integration Energy Modeling Diagrams - Illustrator cs3 MEP SYSTEMS
STRUCTURAL SYSTEMS
ENVELOPE
7A
8A
6A
9A
5A
H
CC A.I.I.R. TOILET
EXAM
WALLS: PAINTED/ ACCENT PAINT
F
BASE: 4" COVE
F
3A
NOTES: CASEWORK FINISHSEE ELEVATION DETAILS
F
BARIATRIC TOILET
C
RAIL: 4" MAPLE
11A
F FLOOR: SEAMLESS SHT VINYL
FLOOR: VCT. RED MAPLE WOOD GRAIN CEILING: ACT. GYP. SOFFIT PAINTED
WALLS: WASHABLE PAINT BASE: 1'- 0" INTEGRALE
F
BARIATRIC EXAM
RAIL: 6" ACROVYNE
BB
NOTES:
WALLS: PAINTED/ ACCENT PAINT BASE: 4" COVE
NURSE STATION
C
RAIL: 4" MAPLE NOTES:
A
15C
G A
CARDIAC
2A
12A
OFFICE
NOTES:
13A
GL
G
TRIAGE
A
CONSULTANT:
EMERGENCY WAITING
PHYSICIANS
1A 15F
CLEAN UTILITY
K
JANITOR'S CLOSET
G
14A
RECEPT
EE
RECEPT
G
H
STAFF LOUNGE
A
A
GL
C STAFF TOILET
SECURE HOLDING #1
I
SECURE HOLDING #2
I
SECURE HOLDING #3
A
I
F
TOILET/ SHOWER
VESTIBULE
TYP.
WAITING
FINANCE
PES
BASE: INTEGRALE
15I
RAIL: 4" MAPLE
2
2.3
A
KITCHEN
A
T.B.D.
RAIL: 4" MAPLE
C
GL
D C
FLOOR: CARPET W/ ACCENT DESIGN
A
PUBLIC TOILET
BASE: INTEGRATED
CEILING: ACT. GYP. SOFFIT (PAINTED)
AREA OF WORK
GL
WALLS: PAINTED / BASE COLOR & ACCENT PAINT BASE: 4" COVE
VCT
NOTES:
F
PUBLIC TOILET
FAMILY ROOM
3
FLOOR: SEAMLESS SHT VINYL WALLS: PAINTED
DESCRIPTION:
B
NOURISH VCT
NOTES: CUSTOM HEAD WALL
1 2.4
DATE:
D CORRIDOR
NURSE STATION
AREA OF WORK
WALLS: PAINTED
REVISION: NO:
VCT ELEC
FLOOR: SEAMLESS SHT VINYL CEILING: GYP. PAINTED
A
A REG 3
C
A
EXISTING STAIR
C
CEILING: GYP. PAINTED
15D
REG 1
GL
DECONTAM
F
B
B
GL ADMIN
C
I
MAINE
484 MAINE AVE., SUITE 2B FARMINGDALE, ME 04344 TEL. 207.582.2400 FAX. 207.582.8320
RAIL: 4" MAPLE
4
A
TOILET
K
BOSTON
225 FRIEND STREET BOSTON, MA 02114 TEL. 617.723.7100 FAX. 617.723.9113
CONSTRUCTION
BASE: 4" COVE
C
SOILED WORKROOM
MEDS
G
AMBULANCE VESTIBULE
INTERIOR DESIGN
FLAG POLE BRICK PAVERS
CEILING: ACT. GYP. SOFFIT PAINTED
EQUIPMENT ALCOVE
K
A
G FLOOR: VCT
K
E.M.T.
ARCHITECTURE
WALLS: PAINTED/ ACCENT PAINT
TRAUMA
AA
PLANNING
15E
ENGINEERING
H
K
C
DIGIORGIO ASSOCIATES INC.
F
K
CEILING: WASHABLE ACT.
EMERGENCY DEPARTMENT ADDITION AND RENOVATIONS
FLOOR: VCT. RED MAPLE WOOD GRAIN CEILING: ACT. GYP. SOFFIT PAINTED
TYP.
A.I.I.R. EXAM
F
K
340 THOMPSON ROAD WEBSTER, MA 01570
10A
4A
G
RAIL: 4" MAPLE NOTES:
KEY PLAN: C
CORRIDOR
CORRIDOR
FLOOR: C.T.
5
CEILING: ACT WALLS: CT. / CT W/ ACCENT
ADMINISTRATION
6
BASE: CT. COVE RAIL: NONE NOTES:
ELEV.
E FLOOR: VCT./ VCT ACCENT
WAITING
DINING AREA
CEILING: ACT WALLS: PAINTED. / ACCENT PAINT BASE: 4" COVE RAIL: 4" MAPLE NOTES:
DRAWING TITLE:
SCHEDULES SYMBOLS & ABBREVIATIONS DRAWN BY:
Author CHECKED BY:
Checker SCALE:
1/8" = 1'-0" PROJECT NO.:
SEAL:
FIRST FLOOR 0"
REAR CANOPY - TOP 1 1/2" = 1'-0"
13'-4 5/8"
6
1AA
13'-6 1/4"
GFRC INCLOSURE
FIRST FLOOR 0"
8
10
A-508XX
CONSULTA
A-508XX
SECTION AT MAIN VESTIBULE CANOPY 3/4" = 1'-0"
5
A2
A2
9
PRECAST CAP
3 8
A-508XX
1'-7 5/8" EQ
Callout of SECTION AT MAIN VESTIBULE CANOPY 1 1/2" = 1'-0"
A-508XX
3'-0"
Canopy Options
2'-4"
Attached and detached Canopies were proposed for the main Entrance of the hospital and the Ambulance enty.
DIGIORGIO ASSOCIATES INC.
3D View 68 PLANNING
BOSTON
ARCHITECTURE
225 FRIEND STREET BOSTON, MA 02114 TEL. 617.723.7100 FAX. 617.723.9113
ENGINEERING INTERIOR DESIGN
1/2" DRIP (FACE OF7 BRICK BELOW) A-508XX PRECAST CAP
BRICK
SLEEVE FASTNER AIR SPACE
3/8" JOINT
STEEL COLUMN (REFER TO STRUCTURAL DRAWINGS)
3/8" JOINT
1 CONSULTANT:
9
SECTION AT MAIN VESTIBULE CANOPY 3/4" = 1'-0"
A2
REAR CANOPY - BASE 1 1/2" = 1'-0"
10
PLAN DETAIL AT MAIN CANOPY PIER A, B, C - AT BASE 1 1/2" = 1'-0" Callout of SECTION AT MAIN VESTIBULE CANOPY 5 1 1/2" = 1'-0"
STRUCTURAL COLUMN. SEE STRUCTURAL DRAWINGS
REVISION: NO:
DATE:
STEEL COLUMN (REFER TO STRUCTURAL DRAWINGS)
8
PLAN DETAIL AT MAIN CANOPY PIER A, B, C - AT FIBERGLASS 1 1/2" = 1'-0"
A3
A3 A2 1'-7 5/8"
GFRC
C1
FIRST FLOOR 0"
MAINE
484 MAINE AVE., SUITE 2B FARMINGDALE, ME 04344 TEL. 207.582.2400 FAX. 207.582.8320
7
EXPOSED CONCRETE PIER WITH CHAMFERED EDGES. SEE STRUCTURAL FOR DIMENSIONS
GFRC COLUMN SLEEVE
BRICK TIE
FIRST FLOOR 0"
CONSTRUCTION
3
REAR CANOPY BASE SECTION 1 1/2" = 1'-0" BRICKSHELF -1' - 0"
SECTION AT AMBULANCE VESTIBULE CANOPY 3/4" = 1'-0"
7
REAR CANOPY - BASE 1 1/2" = 1'-0"
1'-7 5/8"
BRICK BRICK TIE
REVISION: DATE:
2
A3
Unnamed
2
INTERIOR DESIGN CHECKED BY:
3/8" JOINT
BOLLARD DETAIL 1" = 1'-0"
ENTRY C DETAILS
3'-0"
CONCRETE PIER
DRAWN BY:
CHECKED BY:
RB SCALE:
FIRST FLOOR 0"
WELDED REBAR
As indicate PROJECT NO.:
103384.00
CONSULTANT:
2
PLAN DETAIL AT MAIN CANOPY PIER D - AT BASE 1 1/2" = 1'-0"
CAST SWEEP IN CONCRETE BELOW GRADE
DRAWING N
STEEL COLUMN (REFER TO STRUCTURAL DRAWINGS)
A-209 PROJECT LOCATION:
12
MK
CONCRETE ANCOR
ENCLOSED DOWNSPOUT
DRAWING NO.:
C:\Users\mkronik\Documents\Hubbard ED - Architectural_mkronik.rvt
EXTERIOR GUARD DETAILS 1" = 1'-0"
2" X 2" POLISHED STEEL RAILING POST
3/8" JOINT
484 MAINE AVE., SUITE 2B FARMINGDALE, ME 04344 TEL. 207.582.2400 FAX. 207.582.8320
103384.00
11
COVER
MAINE
1/8" = 1'-0"
PLAN DETAIL AT MAIN CANOPY 1 1/2" = 1'-0"
PRECAST CAP
STEEL COLUMN (REFER TO STRUCTURAL DRAWINGS)
Checker
PROJECT NO.:
14
CANOPY BASE SECTION = 1'-0"
SLEEVE FASTNER
CONSTRUCTION
SCALE:
CONCRETE BELOW GRADE
BRICK TIE
AIR SPACE
225 FRIEND STREET SEAL: BOSTON, MA 02114 TEL. 617.723.7100 FAX. 617.723.9113
Author
3D View 74
STEEL COLUMN (REFER TO REAR STRUCTURAL 8 DRAWINGS) 1 1/2"
FIRST FLOOR 0"
WELDED REBAR
DRAWING T
BOSTON
ARCHITECTURE
CONCRETE ANCOR
1/2" DRIP (FACE OF BRICK BELOW)
PLANNING
DRAWN BY: ENGINEERING
COVER
A3
BRICK
DIGIORGIO ASSOCIATES INC.
DRAWING TITLE: 3D View 68
STRUCTURAL COLUMN. SEE STRUCTURAL DRAWINGS
C1
PLAN DETAIL AT MAIN CANOPY PIER A, B, C - AT FIBERGLASS 1 1/2" = 1'-0" CAST SWEEP IN
PLAN DETAIL AT MAIN CANOPY PIER D - AT BASE 1 1/2" = 1'-0"
1'-7 5/8"
EMERGENCY DEPARTMENT ADDITION AND RENOVATIONS
7
10
PLAN DETAIL AT MAIN CANOPY PIER A, B, C - AT BASE 1 1/2" = 1'-0"
KEY PLAN:
KEY PLAN:
2" X 2" POLISHED STEEL RAILING POST
3/8" JOINT STEEL COLUMN (REFER TO ENCLOSED STRUCTURAL DOWNSPOUT DRAWINGS)
9
CONCRETE PIER
GFRC
3/8" JOINT
STEEL COLUMN 3/8" JOINT (REFER TO STRUCTURAL DRAWINGS)
STEEL COLUMN (REFER TO STRUCTURAL DRAWINGS)
3D View 72
SLEEVE FASTNER
SLEEVE FASTNER AIR SPACE 3/8" JOINT
DESCRIPTION:
AIR SPACE
5
PRECAST CAP
4" MIN TYP.
NO:
EXPOSED CONCRETE PIER WITH CHAMFERED EDGES. SEE STRUCTURAL FOR DIMENSIONS
1/2" DRIP (FACE OF BRICK BELOW)
3'-0"
1'-0 3/8"
1/2" DRIP (FACE OF BRICK BELOW) BRICK PRECAST CAP BRICK TIE GFRC COLUMN SLEEVE
4" MIN TYP.
1AA
EQ
1'-11 5/8"
EQ
1'-11 5/8"
7
1'-0 3/8"
BRICKSHELF -1' - 0"
1AA
EQ
BRICK BASE
EMERGENCY DEPARTMENT ADDITION AND RENOVATIONS
EXPOSED CONCRETE PIER WITH CHAMFERED EDGES. SEE STRUCTURAL FOR DIMENSIONS
SECTION AT AMBULANCE VESTIBULE CANOPY 3/4" = 1'-0" SEE STRUCTURAL
1
GFRC
8"
5 A-508XX
14
PLAN DETAIL AT MAIN CANOPY 1 1/2" = 1'-0"
A-50 11
EXTERIOR GUARD DETAILS 1" = 1'-0"
12
BOLLARD DETAIL 1" = 1'-0" PROJECT LOCATION: K:\103384.00 - Hubbard
REVISION: NO:
5
DATE:
DESCRIPTION:
3D View 72
KEY PLAN:
EMERGENCY DEPARTMENT ADDITION AND RENOVATIONS
DIGIORGIO ASSOCIATES
DRAWING TITLE:
UnnamedINC. PLANNING
BOSTON
ARCHITECTURE
2
DRAWN BY: ENGINEERING
Author
3D View 74
INTERIOR DESIGN CHECKED BY:
225 FRIEND STREET SEAL: BOSTON, MA 02114 TEL. 617.723.7100 FAX. 617.723.9113
CONSTRUCTION
7
Checker
3D View 68
MAINE
SCALE:
1/8" = 1'-0"484 PROJECT NO.:
103384.00
MAINE AVE., SUITE 2B FARMINGDALE, ME 04344 TEL. 207.582.2400 FAX. 207.582.8320
DRAWING NO.:
A-209
CONSULTANT:
PROJECT LOCATION: C:\Users\mkronik\Documents\Hubbard ED - Architectural_mkronik.rvt
REVISION: NO:
5
3D View 72
DATE:
DESCRIPTION:
U.S. COAST GUARD - BOAT HOUSE FACILITY Project: This project was an expansion of the US Coast Guard facility, located near Jones Beach, Long Island, NY. The new addition allowed for storage and maintenance of the MLB , 47 foot boats. My Role: I have lead the project from pre design phases through construction administration. My tasks included coordinating structural, MEP and bridge crane manufacture consultants, developing construction documents and reviewing shop drawings.
4 CONSULTANTS
DIGIORGIO ASSOCIATES INC. BOSTON
PLANNING
225 FRIEND STREET BOSTON, MA 02114 TEL. 617.723.7100 FAX. 617.723.9113
N.Y.
HUD SON RIVER
ARCHITECTURE ENGINEERING
MASS.
MAINE 484 MAINE AVE., SUITE 2B FARMINGDALE, ME 04344 TEL. 207.582.2400 FAX. 207.582.8320
INTERIOR DESIGN CONSTRUCTION
CONN. HARTFORD
R.I. PROVIDENCE
PA. LONG ISLAND SOUND
N.J.
AND LONG ISL
BLOCK ISLAND
C
STATION JONES BEACH
VICINITY MAP NONE
DesignU.Criteria: Roof and the composite panels were S. COASTThe GUARD CIVIL ENGINEERING UNIT 150 mph wind loads. costumized to withstand PROVIDENCE
ACILITY (BMF)
GI EN
NE E R I NG
CIVIL ENGINEERING UNIT PROVIDENCE
LL CE EX
A RD
E NCE
IN
B
T
GU
SCALE:
U.
S.
CO
A
S
USCG. CEU PROVIDENCE 300 METRO CENTER BLVD. WARWICK, RI 02886 ISSUE
A B C
MARK
10/06/2012 12/12/2012 95% Design Submission 02/12/2013 100% Design Submission
DATE
DESCRIPTION
A/E PROJECT NO: CAD FILE NAME: DESIGNED BY: DRAWN BY:
MK
EDITED BY:
CP
CHECKED BY: PLOT SCALE:
SCALE: AS SHOWN SHEET TITLE
A
RAISE ROOF ON THE BOAT MAINTENANCE FACILITY (BMF)
TITLE SHEET
REVIEWED BY:
CP
REVIEWED BY:
REVIEWED BY:
GG
PROJECT ENG.
AJ
BRANCH CHIEF
TECH. DIRECTOR
APPROVING OFFICER PROJECT NUMBER
01-P02123
DRAWING NUMBER
standing seam roof
insulation on metal deck
steel framing
insulated metal panel
translucent window panel
26’ x34’ roll-up door
bridge crane
boat house facility
Maintenance
REQD. TO ACHIEVE FLUSH SUBSTRATE FOR EXT. SHEATHING AND INTERIOR FINISH.
160 Pearl Street Fitchburg, Massachusetts
155 North Street Renovations FSC# C805
39' - 5"
20
20
ADDITION
20
Roof Level 496' - 11"
Roof Level 496' - 11"
Attic 492' - 11"
Attic 492' - 11"
20
20
Project:
20
20
20
20
20
20
Second Floor Level 483' - 4"
bertaux + iwerks architects
Second Floor Level 483' - 4"
105 Beach Street Boston, Massachusetts t: 617.423.6500
107A 20
20
20
20
20
20
20
20
20
20
20
8
MUD SLAB 469' - 11"
GENERAL NOTES:
Dept. Capital Planning & Maintenance
Bttm of Ftg 467' - 11"
1. INFILL EXTG WINDOW AND DOOR OPENINGS W/ WD STUD WALL, SHIM AS REQD. TO ACHIEVE FLUSH SUBSTRATE FOR EXT. SHEATHING AND INTERIOR FINISH.
160 Pearl Street Fitchburg, Massachusetts
Basement Level 464' - 5 3/4"
Elevation 1 East 1/8" = 1'-0"
This was one of the two project on active reuse of an existing building. This two story apartment building was redeveloped as a faculty office building for Fitchburg State College. A small addition was added to accommodate for the faculty lounge room and more offices. 20
First Floor 473' - 10 3/4"
20
20
8
20
20
8
First Floor 473' - 10 3/4"
8
Simpson, Gumperts and Hager 41 Seyon Street Waltham, MA 02453
MUD SLAB 469' - 11"
SAR Engineering Inc.
Bttm of Ftg 467' - 11"
Nitch Enginering inc.
10 Granite Street Quincy, MA 02169
Dept. Capital Planning & Maintenance
186 Lincoln Street Suite 200 Boston, MA 02111
160 Pearl Street Fitchburg, Massachusetts
Basement Level 464' - 5 3/4"
South Elevation 2 155 1/8" =North 1'-0" Street Renovations
My Role:
155 North Street Renovations
FSC# C805
2/23/2009 11:57:20 PM FILE NAME: \\.host\Shared Folders\mikhailkronik On My Mac\Desktop\B\155 North dd Current-3.rvt REFERENCE FILE: 2/23/2009 11:57:20 PM FILE NAME: \\.host\Shared Folders\mikhailkronik On My Mac\Desktop\B\155 North dd Current-3.rvt REFERENCE FILE:
ADDITION
Roof Level 496' - 11"
Attic 492' - 11"
Attic 492' - 11" 20 20 20
First Floor 473' - 10 3/4"
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
8
20
20
8
Bttm of Ftg 467' - 11"
PLOT DATE:
Basement Level 464' - 5 3/4"
Roof Level 496' - 11"
Basement Level 464' - 5 3/4"
Elevation 3 West 1/8" = 1'-0"South Elevation 2 1/8" = 1'-0"Elevation 1 East 1/8" = 1'-0"
20 20 20
20
20
Second Floor Level 483' - 4"
20
20 20
20 20
20 20
20
20
20
20
20
20B
20B
20
20
20
20
8
20
20
Basement Level 464' - 5 3/4"
f: 617.423.6502
02111 20
20
20
20
20
20
20
20
20 20B
20B
20
20
20
20
20
20
20
20
First Floor 473' - 10 3/4"
20
MUD SLAB First 469'Floor - 11" 473' - 10 3/4" Bttm of Ftg MUD 467'SLAB - 11" 469' - 11"
41 Seyon Street Waltham, MA 02453
SAR Engineering Inc.
8
8
10 Granite Street Quincy, MA 02169
8
8
Nitch Enginering inc.
Dept. Capital & 186 LincolnPlanning Street Suite 200 Boston, MA 02111 Maintenance
Bttm of Ftg Basement Level 467' 11" 464' - 5- 3/4"
160 Pearl Street Fitchburg, Massachusetts
Elevation 4 North 1/8" = 1'-0" South Elevation 2 1/8" = 1'-0" 155 North Street Renovations
105 Beach Street Boston, Massachusetts Job No.:
t: 617.423.6500
02111
f: 617.423.6502 FSC# C805
Drawn By:
Author
Checked By: Date: Scale:
Checker Simpson, Gumperts and Hager 41 Seyon Street Waltham, MA 02453 10/30/08 1/8" = 1'-0"
SAR Engineering Inc.
10 Granite Street Quincy, MA 02169
Nitch Enginering inc.
186 Lincoln Street Suite 200 Boston, MA 02111
Basement Level 464' - 5 3/4" Existing Structure and Addition KEY PLAN
Exterior Elevations Design Development
20
10020
20
105 Beach Street Boston, Massachusetts
20
MUD SLAB 469' - 11" Bttm of Ftg 467' - 11"
Revision
FSC# C805
20
20
Author Checker 10/30/08 1/8" = 1'-0"
20B
20
20
20 100
First Floor 473' - 10 3/4" MUD SLAB 469' - 11" Bttm of Ftg 467' - 11"
Job No.:
FSC# C805
Drawn By:
Author
Checked By:
Checker
Date:
10/30/08
Scale:
1/8" = 1'-0"
Basement Level 464' - 5 3/4"
4 North Elevation
1/8" = 1'-0" Existing Structure and Addition KEY PLAN
Exterior Elevations
Existing Structure and Addition KEY PLAN
Exterior Elevations
PLOT DATE:
Design Development
A201 Roof Level 496' - 11"
Attic 492' - 11"
Attic 492' - 11" No.
20
Date
Revision
20
Second Floor Level 483' - 4"
Second Floor Level 483' - 4" 20B 20
20
20
20B
20
20 100
First Floor 473' - 10 3/4" MUD SLAB 469' - 11"
First Floor 473' - 10 3/4" MUD SLAB 469' - 11"
Bttm of Ftg 467' - 11"
Bttm of Ftg 467' - 11"
Basement Level 464' - 5 3/4"
Basement Level 464' - 5 3/4"
155 North Street
Second Floor Level 483' - 4" 20B
Nitch Enginering inc. Basement Level 186 Lincoln Street Suite 200 Basement Level 464' - 5 3/4" 464' - 5 Boston, 3/4" MA 02111
Basement Level 464' - 5 3/4"
Date
20
02111
t: 617.423.6500 f: 617.423.6502 First Floor Job No.: 473' - 10 3/4" First Floor Drawn By: 473' - 10 3/4" MUD SLAB Checked By: Simpson, Gumperts and Hager 469' - 11" MUD SLAB Date: MA 02453 41 Seyon Street Waltham, 469' - 11" Bttm of Ftg Scale: 467' - 11" Bttm ofSAR Ftg Engineering Inc. Granite Street Quincy, MA 02169 467' -1011"
First Floor 473' - 10 3/4"
Elevation 4 North Elevation 1/8" = 1'-0" 3 West South Elevation 1/8" = 1'-0" 2 1/8" = 1'-0"
Attic 492' - 11"
Revision
bertaux + iwerks architects
Second Floor Level 483' - 4" 20
Date
No.
20
8
A201 Roof Level 496' - 11" No.
Job No.:
FSC# C805
Drawn By:
Author
Checked By:
Checker
Date:
10/30/08
Scale:
1/8" = 1'-0"
Elevation 4 North 1/8" = 1'-0" Existing Structure and Addition KEY PLAN
Exterior Elevations
A201
1
Revision
bertaux + iwerks architects
Second Floor Level 483' - 4"
100
Simpson, Gumperts and Hager
Date
Second Floor Level 483' - 4"
Second Floor Level 483' - 4" Floor Level Second 483' - 4"
20
20
Bttm of FtgBasement Level 467' - 11" 464' - 5 3/4"
Roof Level 496' - 11"
t: 617.423.6500
Attic 492' - 11"
20 20
20 20
8
8
20
20
20
Bttm of Ftg 467' - 11"
Basement Level 464' - 5 3/4"
105 Beach Street Boston, Massachusetts
Roof Level 496' - 11" Roof Level 496' - 11" Attic 492' - 11" Attic 492' - 11"
Roof Level 496' - 11"
Second Floor Level 483' - 4"
MUD SLAB 469' - 11"
20 bertaux + iwerks architects
Attic 492' - 11"
20
Design Development
Attic 492' - 11"
MUD SLAB 469' - 11"
20
EXISTING
Attic 492' - 11"
First Floor 473' - 10 3/4"
Attic 492' - 11"
No.
FSC# C805 ADDITION
Roof Level 496' - 11"
First Floor 473' - 10 3/4"
Attic Roof 492'Level - 11" 496' - 11"
First Floor 473' - 10 3/4" First Floor MUD SLAB 473' - 10 3/4" 469' - 11" First Floor 473' - 10 3/4" MUD SLAB Bttm of Ftg 469' - 11" 467' -MUD 11" SLAB 469' - 11" Bttm of Ftg 467' - Basement 11" Bttm of Ftg Level 467' - 11" 464' - 5 3/4"
107A
20
20
8
8
MUD SLAB 469' - 11"
20
20
Roof Level 496' - 11"
Attic 492' -Roof 11" Level 496' - 11"
Second Floor Level 483' - 4" Second Floor Level 483' - 4" Second Floor Level 483' - 4"
20
20 20
20
20
20
I had an opportunity to take this project through all stages of the design process using Revit Architecture as a BIM modeling tool. From documentation of the existing conditions, schematic design of various design options, to production of stamped shop drawings.
Roof Level 496' - 11"
ADDITION
Roof Level 496' - 11"
Second Floor Level 483' - 4"
FSC# C805
Design Development
EXISTING
39' - 5"
02111
f: 617.423.6502
A201
P T i v l f M I o Design Tools: m Construction Documents -Revit Arc t Renderings - Revit Architecture/ Ph d
Project: This was one of the two project on active reuse of an ing building. This two story apartment building was r veloped as a faculty office building for Fitchburg State lege. A small addition was added to accommodate fo faculty lounge room and more offices. My Role: I had an opportunity to take this project through all s of the design process using Revit Architecture as a BIM modeling tool. From documentation of the existing c tions, schematic design of various design options, to p duction of construction documents
Design Tools: Construction Documents -Revit Architecture Renderings - Revit Architecture/ Photoshop cs3Dept. Capital Planning &
3' - 0"
3' - 10 1/2"
3' - 0"
3' - 7 1/2"
3' - 0"
4' - 1 1/2"
3' - 0"
4' - 2 1/2"
20
20
20
20
20
160 Pearl Street Fitchburg, Massachusetts 20
20
FSC# C805
11' - 0 1/2"
2
14' - 11 1/4" 7' - 4"
5' - 1 1/2"
8' - 0"
7
FUTURE WALL 6
3' - 0"
3' - 10 1/2"
3' - 0"
3' - 10 1/2"
3' - 0"
3' - 10 1/2"
3' - 0"
20
3' - 0"
20
2
6
A511
A501
3
Simpson, Gumperts and Hager 41 Seyon Street Waltham, MA 02453
SAR Engineering Inc.
10 Granite Street Quincy, MA 02169
DN
STAIRS
20
9
3 3
117
19' - 8"
186 Lincoln Street Suite 200 Boston, MA 02111
2 A501
4
10
4
4
Simpson, Gumperts and Hager 41 Seyon Street Waltham, MA 02453
11
DN 1
1' - 3 1/4"
10 Granite Street Quincy, MA 02169
40' - 2 3/4"
1 A822
SAR Engineering Inc.
Design Development
15' - 9 3/4"
20
3' - 0"
13' - 1 1/4"
f: 617.423.6502 4
3
VESTIBULE
UP 0' - 9 3/4"
No.
7' - 0"
A303
3
4
20 8
3' - 0 1/4"
17' - 11 3/4"
3' - 0"
A501 100
TEMPORARY WALL UP TO 3'-0" OFF FIN.FL.
Job No.:
17' - 11 3/4"
186 Lincoln Street Suite 200 Boston, MA 02111
Revision
117
8
1
Date
12
3' - 0"
Nitch Enginering inc.
FSC# C805
Drawn By:
Author
Checked By:
Checker
20
3' - 0"
3' - 0"
Date:
20 3' - 0"
20
20 1' - 8"
3' - 0"
20
3' - 0"
Floor 1 First 1/4" = 1'-0"
20
3' - 0"
3' - 9"
PLOT DATE:
10/30/08 1/4" = 1'-0"
Scale:
4' - 0"
3' - 11 3/4"
20
Design Development
1' - 8"
3' - 0"
Existing Structure and Addition KEY PLAN
3' - 2 1/4"
First Floor Plan
3' - 8 3/4"
3' - 2 3/4"
3' - 2 1/4"
33' - 0 1/4"
A102
Revision
A
B
C
D
E
F
G
H
J
K
L
Dept. Capital Planning & Maintenance
1 A210
7
160 Pearl Street Fitchburg, Massachusetts
A401 4' - 1 1/2"
3' - 0"
10' - 4"
3' - 0"
4' - 2 1/2"
3' - 0"
3' - 6 1/2"
3' - 0"
4' - 8 1/2"
1
Checker
Date:
10/30/08
3' - 0"
Author
Checked By:
155 North Street Renovations
4' - 11"
FSC# C805
Drawn By:
10' - 6 1/4"
Job No.:
2
FSC# C805
2' - 8"
1/16" = 1'-0"
SEE A104 FOR ROOF INFORAMITION
3' - 0"
3' - 4"
5 bertaux + iwerks architects
3' - 0"
7
7
105 Beach Street Boston, Massachusetts t: 617.423.6500
Existing Structure and Addition KEY PLAN
FUTURE WALL 7
8
7
02111
f: 617.423.6502
Simpson, Gumperts and Hager 41 Seyon Street Waltham, MA 02453
SAR Engineering Inc.
3' - 0"
8' - 2"
Title Sheet
3' - 5 1/4"
2 A210
3' - 0"
6
4
3' - 0"
3
3' - 5 1/4"
Scale:
10 Granite Street Quincy, MA 02169
24' - 3 3/4"
Nitch Enginering inc. 3' - 0"
3
A511 4 3' - 0"
A001
3
Design Development
3' - 0"
4
10
3
11' - 10 1/2"
4
11 4' - 9"
GLASS OVERHANG, SEE A-102
5' - 0 1/4"
5' - 0 1/2"
DN
12
No.
Date
Revision
3
4
3' - 0"
A501
3' - 0 1/4"
3' - 0"
Job No.:
FSC# C805
Drawn By:
Author
3' - 0"
Checked By:
Checker
Date:
10/30/08 1/4" = 1'-0"
Scale:
4' - 0"
2/23/2009 11:57:05 PM FILE NAME: \\.host\Shared Folders\mikhailkronik On My Mac\Desktop\B\155 North dd Current-3.rvt REFERENCE FILE:
3' - 5 1/4"
200
A210
9
3
STAIRS
4
186 Lincoln Street Suite 200 Boston, MA 02111
3' - 5 1/4"
2
PLOT DATE:
02111
f: 617.423.6502
Nitch Enginering inc.
A210
02111
7
7
5 A501
20
3' - 5 1/4"
3' - 10 1/2"
20
3' - 0"
3' - 0"
20
105 Beach Street Boston, Massachusetts
3' - 5 1/4"
3' - 10 1/2"
20
62' - 1 3/4"
3' - 0"
20
bertaux + iwerks architects t: 617.423.6500
3' - 5 1/4"
20
5' - 4 1/2"
3' - 0"
7
20
20
5
3' - 5 1/4"
0' - 6 1/4"
3' - 0"
16' - 2 1/2"
45' - 2 1/4"
A821
3' - 0"
20
6
ADDITION
3' - 0"
BEAM ABOVE
20
A210
Date
20
4
3' - 0"
25' - 0 1/4"
6
105 Beach Street Boston, Massachusetts
No.
Dept. Capital Planning & Maintenance
4' - 8 1/2"
A210
3
1/16" = 1'-0"
3' - 0"
155 North Street Renovations
bertaux + iwerks architects t: 617.423.6500
7' - 10 3/4"
3' - 6 1/2"
3' - 0"
DN
EET L STR PEAR
TOWNHOUSE LOT
3' - 0"
6
5' - 4 1/2"
T.H. 1
Electrical Legend & General Notes Electrical Siteplan Electrical Basement & First Floor Lighting Plan Electrical Second Floor & Attic Lighting Plan Electrical Basement & First Floor Power & Low Tension Plan Electrical Second Floor & Attic Power & Low Tension Plan Electrical Schedules & Riser Diagrams HVAC Legend & General Notes HVAC Basement & First Floor Plan HVAC Second Floor & Attic Plan HVAC Details HVAC Details HVAC Schedules Plumbing Basement & First Floor Plan Plumbing Second Floor & Attic Plan Plumbing Legend, Schedules & Details Plumbing Details General Notes Sections and Details Sections and Details Foundation Plan First Floor Framing Plan Second Floor Framing Plan Attic Framing Plan Roof Framing Plan Foundation Sections
4' - 2 1/2"
20
8
DN
T.H. 7
3' - 0"
3' - 0"
DN
MILLER LOT
10' - 3 3/4"
B
3' - 0"
15' - 0 1/2"
2
3' - 0"
2' - 7 1/2"
3
A210
L 6' - 11 1/2"
3' - 11 3/4"
TUNNEL
MILLER
E001 E002 E101 E102 E103 E104 E300 H001 H101 H102 H300 H301 H302 P101 P102 P300 P301 S000 S001 S002 S100 S101 S102 S103 S104 S200
4' - 3 1/2"
K 7' - 7 3/4"
107A
FSC# C805
2/23/2009 11:56:35 PM FILE NAME: \\.host\Shared Folders\mikhailkronik On My Mac\Desktop\B\155 North dd Current-3.rvt REFERENCE FILE:
DAMON ST.
ORANGE ST.
CONGRESS ST.
D MON HAM
MYRTLE AVE.
Title Sheet Code Info/ Abbreviations/ Symbols/ General Notes Existing Survey Plan Existing Floor Plans Demolition Plans Site Plan Basement Plan First Floor Plan Second Floor Plan Roof Plan Exterior Elevations Building Sections Wall Sections Wall Sections Wall Sections & Details Exterior Details Exterior Details I - Walls Stairs Elevator Shaft Door Schedule Frames/Types/Elev.& Details Room Finish Schedule, Wall Types Window & Louvers Schedule, Types & Details Enlarged Plans Interior Details Interior Details Signage Plans Types & Schedule
3' - 0"
J
8' - 1"
39' - 6"
NORTH
CLINTON ST.
155 North Street
A001 A002 A010 A020 A090 A100 A101 A102 A103 A104 A201 A210 A301 A302 A303 A401 A402 A501 A511 A701 A710 A711 A801 A821 A822 A901
3' - 5 1/4"
20
RUSSELL
THOMPSON
CLINTON ST.
3' - 0"
H
1
155 North Street Renovations
TOWERS
ST. LO T 2
G 8' - 11" 5' - 1 1/4"
3' - 6 1/2"
AUBUCHON HALL
F 7' - 10"
B
LOT 1
NORTH
5' - 7 1/2"
160 Pearl Street 1 Fitchburg, Massachusetts
~FSC~
STRE ET
E 7' - 10"
2' - 9"
NOR TH
ST.
D 47' - 6 1/2" 7' - 10"
Maintenance
ENUE HILL AV FITCH
ST RE ET
C 7' - 10"
9' - 11 3/4"
PE AR L
~FSC~
NOR TH
NORTH LOT 3
GREEN STREET
stages M condipro-
RECREATION CENTER
STR EET
B 11' - 1"
4' - 11 1/2"
DN
CITY PARK
SOUTH CAMPUS
SNO W
GREEN
ST. LOT
155 North Street
existredee Color the
WOOD ST.
WAVE RLY ST.
GREEN STREET
Project: This was one of the two project on active reuse of an existing building. This two story apartment building was redeveloped as a faculty office building for Fitchburg State College. A small addition was added to accommodate for the faculty lounge room and more offices. My Role: I had an opportunity to take this project through all stages of the design process using Revit Architecture as a BIM Design Tools: modeling From documentation of the existing condiConstruction Documents tool. -Revit Architecture Renderings - Revitschematic Architecture/ Photoshop cs3of various design options, to protions, design Project: duction of construction documents This was one of the two project on active reuse ofMap an exist1 Locus ing building. This two story apartment building was redeveloped as a faculty office building for Fitchburg State College. A small addition was added to accommodate forListthe Drawing Drawing List Sheet Sheet faculty lounge room and more offices. Number Number Sheet Name Sheet Name My Role: I had an opportunity to take this project through all stages of the design process using Revit Architecture as a BIM modeling tool. From documentation of the existing condichitecture tions, design of various design options, to prohotoshopschematic cs3 duction of construction documents
A 0' - 0"
3' - 3 1/2"
155 North Street
Existing Structure and Addition KEY PLAN
Floor 1 Second 1/4" = 1'-0"
1 A402
3' - 0 3/4"
3' - 0"
3' - 0"
3' - 9"
3' - 0"
3' - 0"
1' - 8"
3' - 0"
3' - 1"
Second Floor Plan
3' - 8 3/4" 1' - 8 1/4"
A103
duction of construction documents J
9
K
10
11
9 K
J
9
12
10
Roof Level 496' - 11"
11
12
10
Attic 492' - 11"
9
Roof Level 496' - 11"
V.I.F.
10
11
V.I.F.
V.I.F.
FIXTURE F3
Attic 492' - 11" V.I.F.
FIXTURE F3
11
UP
Second Floor Level 483' - 4"
12
V.I.F.
CAST I
UP
Level Stairs 1 Basement 1/4" = 1'-0" J
Second Floor Level 483' - 4"
12
V.I.F.
7 A501
K Level Stairs 1 Basement 1/4" = 1'-0"
1/2" A
First Floor 473' - 10 3/4" 7 A501
C7X9.
V.I.F.
9 K
J
First Floor 473' - 10 3/4"
3" x 3.
V.I.F.
10
NON-S
9 11
28 GA
Basement Level 464' - 5 3/4"
10
7 Riser/ 1" = 1'-0"
V.I.F.
Section 4 Stair 1/4" = 1'-0"
DN
Basement Level 464' - 5 3/4"
11
UP
V.I.F.
Section 4 Stair 1/4" = 1'-0"
12 DN
12
Floor Stairs 2 First 1/4" = 1'-0"
11 HD HA 6
2/23/2009 11:58:10 PM NAME: \\.host\Shared Folders\mikhailkronik On My Mac\Desktop\B\155 North dd Current-3.rvt ERENCE FILE:
A501
J
4 A501
K Floor Stairs 2 First 1/4" = 1'-0"
J
4
DN
6 A501
1' - 0"
K9
A501
TEMPORARY WALL
1' - 0" DN
10
First Floor 473' - 10 3/4"
1' - 0"
9 11
10
1' - 0"
Ground Level 471' - 2"
Floor Entry Stairs 5 First 1/4" = 1'-0"
Stairs Section 6 Entry 1/4" = 1'-0"
DN
11 DN
12
Level Stairs 3 Second 1/4" = 1'-0"
T DATE:
PLOT DATE:
2/23/2009 11:58:10 PM FILE NAME: \\.host\Shared Folders\mikhailkronik On My Mac\Desktop\B\155 North dd Current-3.rvt REFERENCE FILE:
UP
Level Stairs 3 Second 1/4" = 1'-0"
Floor Entry Stairs 5 First 1/4" = 1'-0"
TEMPORARY WALL
First Floor 473' - 10 3/4" Ground Level 471' - 2"
Stairs Section 6 Entry 1/4" = 1'-0"
10 H 11 12
SHT. MTL. COPING OVER EXTG. DECORATIVE CORNICE TPO MEMBRANE FLASHING, WRAP OVER TOP OF CORNICE
PITCH
SHT. MTL. COPING OVER EXTG. DECORATIVE CORNICE
PROVIDE BLOCKING TO ACHIEVE POSITIVE PITCH
Dept. Capital Planning & Maintenance REMOVE ALL EXTG. PAINT & REFINISH
TPO MEMBRANE ROOFING TAPERED POLYISOCYANURATE INSULATION
160 Pearl Street Fitchburg, Massachusetts
155 North Street Roof Level 496' - 11" Renovations V.I.F.
EXT'G. ROOF DECK
TAPERED POLYISOCYANURATE INSULATION
NEW FASCIA BOARD, MATCH EXTG.
3" RIGID INSULATION POLYISO
Roof Level 496' - V.I.F. 11"
3' - 0 1/2"
2 LAYERS 5/8" EXT. GWB TYPE X
EXTG. SHEATING
1 1/2" S.F. POLYURETHANE
SPUN BONDED POLYOLEFIN AIR BARRIER ATTIC
EXT. NOM. 2 x 4 STUDS @ 16" O.C.
6" BATT INSULATION KRAFT FACED
1 1/2" S.F. POLYURETHANE INSULATION
SPUN BONDED POLYOLEFIN AIR BARRIER ATTIC
EXT. NOM. 2 x 4 STUDS @ 16" O.C.
0' - 0 3/4"
5/8 EXTERIOR GWB
1 1/2" S.F. POLYURETHANE INSULATION 2" BATT INSULATION
6 MIL. POLYETHYLENE VAPOR BARRIER
6 MIL. POLYETHYLENE VAPOR BARRIER
1 LAYER 5/8" INT. GWB TYPE X
2 LAYERS 5/8" INT. GBW TYPE X
Attic
Attic 492' - V.I.F. 11"
492' - 11" bertaux + iwerks architects V.I.F.
C7X9.8
4" TOUNG AND GROVE VERTICAL CLAP BOARD
EXTG. SHEATING
2" BATT INSULATION
1/2" A307 BOLT
1 A401
1/2" BEVEL CEDAR SIDING
1 LAYER 5/8" EXT. GWB TYPE X
0' - 11"
A
EXT'G. ROOF DECK
FSC# C805
6" BATT INSULATION KRAFT FACED
PROVIDE BLOCKING TO ACHIEVE POSITIVE PITCH
REMOVE ALL EXTG. PAINT & REFINISH
1/2" BEVEL CEDAR SIDING
1 1/2" S.F. POLYURETHANE
CAST IN PLACE TREAD
PITCH
TPO MEMBRANE ROOFING
NEW FASCIA BOARD, MATCH EXTG.
3" RIGID INSULATION POLYISO
TPO MEMBRANE FLASHING, WRAP OVER TOP OF CORNICE
EXISTING ATTIC JOISTS 105 Beach Street Boston, Massachusetts 16" O.C. +/t: 617.423.6500 f: 617.423.6502
1X6 BEVEL CEDAR SIDING TPO MEMBRAINE FLASHING
EXISTING ATTIC JOISTS 16" O.C. +/-
02111
TPO ROOF MEMBRAINE TAPERED RIGID INSULATION
3" x 3.5" COLD FORMED ANGLE NON-SLIP ABRASIVE STRIPS
Simpson, Gumperts and Hager
3" POLYISO- CYANURATE RIGID INSULATION
6 MIL POLYETHYLENE VAPOR BARRIER
41 Seyon Street Waltham, MA 02453
6 MIL POLYETHYLENE VAPOR BARRIER
5/8 PLYWOOD DECK
SAR Engineering Inc.
28 GAGE GALV. STEEL PAN
10 Granite Street Quincy, MA 02169
Second Floor Level 483' V.I.F. - 4" Nitch Enginering inc. 1/2" BEVEL CEDAR SIDING
Detail 7 Riser/Tread 1" = 1'-0"
EXTG. 2 x 8 FLOOR JOISTS
186 Lincoln Street Suite 200 1 LAYER 5/8" EXT. MA GWB TYPE X Boston, 02111
EXTG. SHEATING SPUN BONDED POLYOLEFIN AIR BARRIER
EXT. NOM. 2 x 4 STUDS @ 16" O.C.
ACCOUSTIC LAY-IN CEILING
8 8
6" FACED BATT INSUL.
1 1/2" S.F. POLYURETHANE INSUL.
WOOD STOOL EXTENSION
R.O. 5' 9 3/8"
1 1/2" O.D. HDWD HANDRAIL
Design Development
4
2
4
BOLT PARAPET STUDS TO THE FACE OF THE ROOF JOISTS W/ 3-3/8"
2" BATT INSULATION
0' - 1 1/2"
210
2" BATT INSULATION
1 1/2" S.F. POLYURETHANE INSULATION
2" BATT INSULATION 6 MIL. POLYETHYLENE VAPOR BARRIER
NEW WINDOW UNIT
5/8" GWB TYPE X
EXTG. NOM. 2 x 4 STUDS @ 16" O.C.
1 1/2" S.F. POLYURETHANE INSULATION 2 2
6
2
2 LAYERS 5/8" EXT. GWB TYPE X
SPUN BONDED POLYOLEFIN AIR BARRIER
6" FACED BATT INSUL. 3 1/2" Max.
1X6 BEVEL CEDAR SIDING
1/2" BEVEL CEDAR SIDING EXTG. 2 x 8 FLOOR JOISTS
EXTG. SHEATING
1 1/2" S.F. POLYURETHANE INSUL.
2
Second Floor Level 483'V.I.F. - 4"
1/2" GWB CEILING SUSPENDED
6 MIL. POLYETHYLENE VAPOR BARRIER 2
4
1 1/2 " C.C. POLYURETHANE INSULATION SPRAY APLIED 2
2
6 MIL. POLY VAPOR BARRIER
NEW WINDOW UNIT
5/8" GWB TYPE X
10 10 1 LAYER 5/8" GWB TYPE X
WINDOW UNIT
2 LAYERS 5/8" GWB TYPE X
4" RBR. BASE
4" RBR. BASE
EXTG. SUBFLOOR
.11 3/8"
FIN. FLRG.
No.
Date
FIN. FLRG.
Revision
EXTG. SUBFLOOR
First Floor V.I.F. 473' - 10 3/4"
EXTG. 2 x 8 FLOOR JOISTS
EXTG. SILL, REPLACE AS NECESSARY W/ P.T. DIMENSIONAL LUMBER
EXTG. 2 x 8 FLOOR JOISTS
1 1/2" S.F. POLYURETHANE INSUL.
EXTG. STONE FOUNDATION WALL
1 1/2" S.F. POLYURETHANE INSUL.
First Floor V.I.F. 473' - 10 3/4" EXTG. SILL, REPLACE AS NECESSARY W/ P.T. DIMENSIONAL LUMBER
2
6" FACED BATT INSUL.
Job No.: 2" S.F. POLYURETHANE INSUL. OVER STONEDrawn FOUNDATION By: COVER W/ INTUMESCENT PT. Checked By: Date:
FSC# C805
5/8" GWB TYPE X FIN. FLR'G.
6" FACED BATT INSUL. 2" S.F. POLYURETHANE INSUL. OVER STONE FOUNDATION COVER W. INTUMESCENT PT.
Author
3/4 UNDERLAYMENT
Checker
2
10/30/08
Scale: Ground
Level 471'VARIES - 2"
4
EXTG. STONE FOUNDATION WALL
Ground Level 471' - 2"
As indicated
4
2
1.5" S.F. POLYURETHANE
VARIES
6" BATT INSULATION
8 2
6 2" S.F. POLYURETHANE CONC. FOUNDATION
10 Handrail/Guardrail 1 1/2" = 1'-0"
Existing Structure and Addition KEY PLAN
Wall Section - Extg. Bldg. 1 1HR 1" = 1'-0"
3/8 DIA. STL. ANCOR BOLTS
Stairs
Wall Section - Extg. Bldg. 2 2Hr 1" = 1'-0"
A501
Wall at Addition 1 Exterior 1 1/2" = 1'-0"
78 Claybrook rd. Dover MA
144
145
145
147