Skip to main content

Office Handout

Page 1

1


ABOUT LARGE INTEGRATED SCALE DESIGN GROUP PROJECTS

HIGH PERFORMANCE COMPUTING

UNIQUE DESIGN SOLUTIONS

EXPERTISE IN ENERGY LOAD DATA CENTER EFFICIENT DATA ON CONSOLIDATION CENTER DESIGN DEMAND

Harvard University

Designing for Long Duration Utility Outages

Phased Construction

1 2 3 4 5 6 7 1,978,000 SF

LEADING THE WAY IN DATA CENTER DESIGN INTEGRATED DESIGN GROUP, INC. 133 Federal Street, 5th Floor, Boston, MA 02110 | 617.338.1177

325 North St. Paul Street, 18th Floor, Dallas, TX 75201 | 972.717.1818

8000 Towers Crescent Drive, Suite 1350, Vienna, VA 22182 | 703.255.0010 info@idgroupae.com

PARTNERSHIP OFFICES: Edificio Century Plaza Av. Santa Fe 440, Oficina 1002 Piso 10, Col. Santa Fe Del. Cuajimalpa CP 05348 (Mexico City, MX) | 011.52.55.4741.1217

North King Abdul Aziz St.,Pearl Center, Gate 2, 1st Floor, Riyadh, KSA | 966.11.205.78.38

2

www.idgroupae.com

Data Center Campus, Loudoun County, VA

414,000 SF Data Center Building, Loudoun County, VA

160,000 SF Data Center Building, North Bergen, NJ

950,000 SF Data Center Campus, Richardson, TX

The MathWorks University of California at Santa Barbara Novartis

Off-site Constructed Data Centers and Components Design for Low Visibility and High Security Designs Using 400V Power

Working in an Operating Facility

Reduce Carbon Footprint Ultra-low PUE

Master Planned Components Kit of Parts

Economizer Systems Revise Power and Cooling to Support IT Virtualization

Skid-based Components Complete Off Site Construction


3


ABOUT INTEGRATED DESIGN GROUP

1

LEADING THE WAY IN DATA CENTER DESIGN

OUR SERVICES

SCOPE OF SERVICES

OUR STAFF

COMMUNITY

INDUSTRY

PRACTICE

We are a small business focused

We are a full service company that

• Our highly educated staff of over

• Our company is a sponsor and

• 7x24 Exchange: Empire State

• Integrated Design Approach

exclusively on the design of critical

participates in all aspects of building

seventy people have years of

volunteer for two new urban parks:

Chapter, Board President. New

facilities. Our services include:

design from pre-design to construction

experience in designing data

The Rose Kennedy Greenway in

England Chapter, Managing

• Architecture

administration and integrated testing

centers.

Boston and the Klyde Warren Park

Board Member. 7x24 Exchange

• Electrical Engineering

for:

in Dallas.

Washington, DC Chapter, Board

• Plumbing / Fire Protection

• New Buildings

• HVAC Engineering

• Renovations

• Project Management

• Additions

• Interior Design

• Studies

• Strategic Planning

• Audits

• Over 50 percent of our staff are registered professionals. • Many of our employees are LEED accredited.

projects with local universities including “Reducing the Carbon

• Data Center Dynamics

• Site Planning

Worcester Polytechnic Institute in

• 21st Century Data Center Symposium

• Space Planning

Massachusetts.

Telli Foster, Project Manager University of California at Santa Barbara

• Experts In Modular/Scalable Designs • Focus on Energy Efficient and Sustainable Solutions • Seaport-e IDIQ

(creator & host)

PRINCIPAL INVOLVEMENT

KNOWLEDGEABLE TEAM

Integrated Design Group stands out in the industry primarily because they listen carefully to their clients’ requirements and they deliver innovative solutions with Principal-level leadership and engagement in each project. They provide integrated and coordinated architectural solutions internally with a true acumen of data center environments that result in increased value.

Integrated Design Group has become a trusted partner in the planning, design, and implementation of our worldwide data center strategy.

Scot Blessington, CPM,

www.idgroupae.com

Managing Board Member

project done in collaboration with

environment held weekly.

Team

• AFCOM: New England Chapter, • The Green Grid

The North Hall Data Center project was the most complicated project I have ever worked on and thanks to Integrated Design Group, it was also the smoothest to manage. The team expertly addressed issues unique to our facility, giving us a data center that supports the latest in high-performance computing, all while keeping our existing facility operational during construction.

4

Advisor.

Footprint of Data Centers,” a

TEAM PLAYERS WHO ARE RESPONSIVE TO CLIENT NEEDS

• ID University is an in-house learning

• We have sponsored research

• Knowledgeable, Experienced

Senior Project Director Fidelity Real Estate Company

Don Hodges, Vice President - Global Engineering Management State Street Corporation


5


ABOUT INTEGRATED DESIGN GROUP

1

LEADING THE WAY IN DATA CENTER DESIGN

6

www.idgroupae.com

SELECT DATA CENTER CLIENTS Confidential names withheld.


WHERE WE HAVE COMPLETED PROJECTS ID has completed projects in 26 of the 50 states and Mexico, Canada, Kingdom of Saudi Arabia and Bahrain.

BOSTON, MA

TYSONS CORNER, VA

DALLAS, TX

7


LARGE SCALE PROJECTS

2

Digital Ashburn Loudoun County, VA Digital Realty Trust E

• 90 Acre Campus Development • 1,978,000 GSF Over Multiple Buildings • Over 90 MW of UPS Power

H

• Two Substations • Less than 1% Change Orders • 100% of Project Delivery Dates Met • Meet or exceed PUE Goals

C

D

• Includes SCIF Space • LEED Certified

A

B

G

www.idgroupae.com

J

A

• 830,000 SF Raised Floor

LEADING THE WAY IN DATA CENTER DESIGN

8

F

K

B G


Building G Loudoun County, VA Digital Realty Trust • 408,331 GSF Building • 222,024 Raised Floor • 26.4 MW of UPS Power • 22 Independent Data Center POD’s™ • Two Story Building • 1.25 PUE • Less Than 1% Change Orders • LEED Certified

9


LARGE SCALE PROJECTS

2

LEADING THE WAY IN DATA CENTER DESIGN

10

www.idgroupae.com

Digital Dallas Campus Richardson, TX Digital Realty Trust • 69 Acre Campus Development • Over 1.000,000 GSF Over Multiple Buildings • Over 600,000 SF Raised Floor • 65 MW of UPS Power • One Dedicated Substation • Less Than 1% Change Orders • LEED Certified • On Budget and Schedule


NY7 Building North Bergen, NJ Equinix • 160,000 GSF Three Story Building • 90,000 SF Raised Floor • 12 MW of UPS Power • Renovation/Fitout of Existing Office Building • Creative solutions to site restrictions

11


HIGH PERFORMANCE COMPUTING

Harvard University High Performance Research Computing Data Center

The MathWorks Disaster Recovery Data Center

3

LEADING THE WAY IN DATA CENTER DESIGN

Hot aisle containment and in-row cooling units were employed to meet the high density computing requirements.

Passive warm water rear door heat exchangers are mounted to each IT cabinet.

12

www.idgroupae.com


University of California at Santa Barbara High Performance Research Computing Data Center

Novartis Research Computing Data Center

Water cooled cabinets rated for 20 kW each were employed. A dedicated chilled water system for the cabinets was backed up by CRAH units on a separate system fed from different electrical systems.

In-row cooling units employed to meet the high density computing requirements.

13


UNIQUE DESIGN SOLUTIONS

4

DESIGNING FOR LONG UTILITY OUTAGES

The Church of Jesus Christ of Latterday Saints - Active Preservation Facility Thirteen petabytes of data can be preserved for months after a catastrophic event. Photovoltaic cells recharge batteries to run dehumidification and communication systems. Data storage areas are

LEADING THE WAY IN DATA CENTER DESIGN

14

www.idgroupae.com

located under ground where temperature and humidity is naturally regulated by the surrounding earth.


OFF-SITE CONSTRUCTED DATA CENTERS AND EQUIPMENT

Fidelity Investments Centercore

Fifteen units fabricated in a factory and shipped to the site with all power and cooling equipment installed, were assembled on site and made weather tight. Includes 2,400 SF of raised floor space. The 500 kW, Tier IV design is expandable by removing end panels. • Updated design currently being installed in Nebraska. • Winner of the 2013 Innovation in the Medium-Data Center Award Presented by Datacenter Dynamics. • Received the 2013 Global Industry Excellence Award from CoreNet Global.

15


UNIQUE DESIGN SOLUTIONS

4

LEADING THE WAY IN DATA CENTER DESIGN

16

www.idgroupae.com

DESIGN FOR LOW VISIBILITY & HIGH SECURITY

The Church of Jesus Christ of Latterday Saints, Active Preservation Facility

The 60,000 SF facility disappears from view by massing the building underground, using a curved roof and extensive use of landscaping.

State Street Data Center

Embassy guidelines were used to secure this vital facility. Reinforced stone walls provided the required perimeter security.

Fidelity Investments West Data Center

Siting of the building and the extensive use of landscaping allowed for the building to appear like “no one is home.”


DESIGNS USING 400V POWER

The MathWorks

Confidential Financial Client

Fidelity Investments

17


EXPERTISE IN DATA CENTER CONSOLIDATION

5

PHASED PLANNING & CONSTRUCTION Watson Center for Computer Information Technology Upgrades Brown University This project included a new EPO system, the installation of cable trays (in a redundant configuration), new generator backup, a new UPS module, new computer room air conditioners, new offices, finishes and lighting, including new raised floor tiles and acoustical ceiling, all while the data center remained operational.

LEADING THE WAY IN DATA CENTER DESIGN

18

www.idgroupae.com

EXISTING CONDITIONS

CONSTRUCTION PHASE 1B

CONSTRUCTION PHASE 7

CONSTRUCTION PHASE 10


WORKING IN AN OPERATING FACILITY TAB Data Center Renovation Tufts University Renovation and upgrade to an existing data center including complete replacement of raised floor, roof, and power and cooling systems to improve efficiency and increase resiliency. Construction was planned and constructed in phases to maintain data center operation.

Existing Conditions

Solution 19


EXPERTISE IN DATA CENTER CONSOLIDATION

5

REVISE POWER & COOLING TO SUPPORT VIRTUALIZATION State Street Data Center Upgrades

LEADING THE WAY IN DATA CENTER DESIGN

• Tier IV Facility • Embassy Grade Security • ID Engineer of Record in 2003 • ID Partners With State Street for Maintenance and Capacity Planning • Full Operational During Upgrades • Zero Downtime • Under Budget • Significant Rebates from Utility for Energy Savings Design

Before

After

Power density on the floor from

After several studies and CFD analyses,

virtualization had concentrated to one corner causing over-heading.

the solution included adding return air ducts and ceiling plenum solved overheating.

20

www.idgroupae.com


RECONFIGURE POWER AND COOLING IN ACTIVE COMPUTER ROOM Confidential Financial Client Existing Master Plan

New Master Plan

Existing Ductwork

New Ductwork

• General cooling ductwork distribution

• Created hot and cold aisle distribution

• Three levels with graded floors with

• Added separation between floors and

no air separation • Centralized station air handlers • Overhead air distribution over multiple levels with side wall air return intake • Air cooled chillers with glycol cooling

cold aisle • Added in row supplemental cooling units to support 12 kW cabinet rows • Converted cooling system to water cooled chillers using pure water to increase heat transfer efficiencies

21


ENERGY EFFICIENT DATA CENTER DESIGN

6

REDUCE CARBON FOOTPRINT

Fidelity Investments West Data Center An aquifer below the site was tapped to pre-cool supply water in the chilled water loop serving the water-cooled IT equipment. Chillers are used less. • $153,000 Annual Savings • 500 Gallon Per Minute • LEED Certified

LEADING THE WAY IN DATA CENTER DESIGN

22

www.idgroupae.com

• Operates 9 Months Per Year


ULTRA-LOW PUE

Academic Exercise

Assignment: Develop a Design Concept to Meet the Unique Requirements Below: • Project Located in Utah • 30 MW of IT Load • Day One IT Load of 4 MW • Combination of both Racks in Traditional Whitespace and IT Containers • Rack Densities Ranging from 5-40 kW; Design to Accommodate Higher Future Rack Densities • Hot Aisle/Cold Aisle Arrangement • PUE of Less Than 1.2 • Concurrently Maintainable EE/ME Systems • Air and/or Liquid Cooled • 400V Distribution to IT Loads • Generator Systems at N+1 • 100% Free Cooling Year Around • EPA Energy Star Compliant • Capable of Resisting a “100 Year Storm” • Appropriate Seismic Zone Rated

1.

Rooftop air handlers

2.

Supply air shaft

3.

IT racks – hot aisle containment in pods of 24 racks

4.

Return air plenum above ceiling

5.

Exhaust air chimney

Result: A mechanical solution that does

6.

Return air to air handler through roof

not use compressors optimized the

7.

Modular IT containers

8.

Electrical room

9.

Exterior curtain wall

efficiency of the design resulting in a PUE of 1.13.

23


ENERGY EFFICIENT DATA CENTER DESIGN

6

ECONOMIZER SYSTEMS

Air Cooled Chiller with CRAH & Airside Economizer • Received over $1,000,000 from Local utility for Ultra Efficient Design • Uses Both Warm Air and Warm Water Cooling • Delivered on Schedule Within Budget • Five 12,000 SF Data Halls • 1.25 PUE

LEADING THE WAY IN DATA CENTER DESIGN

• LEED Certified • $740,000 Annual Power Savings

EXHAUST SHAFT INTAKE SHAFT

OUTSIDE AIR

RETURN AIR OUTSIDE AIR

COMPUTER ROOM

COMPUTER ROOM

SUPPLY AIR

COMPUTER ROOM

COMPUTER ROOM

GENERATOR ROOM

COMPUTER ROOM

24

www.idgroupae.com


Roof Top Units With Airside Economizers

Pumped Refrigerant Economizers

25


LOAD ON DEMAND

7

LEADING THE WAY IN DATA CENTER DESIGN

26

www.idgroupae.com

Master Planned Components

Kit of Parts


Off Site Constructed Components

Complete Off Site Construction

27


Turn static files into dynamic content formats.

Create a flipbook