FOLLY 2014 / Socrates Sculpture Park


mission statement

Our mission is to raise public awareness about inevitability of sea level rise due to global warming and to encourage re-use and upcycling of materials.

“Our children will ask us why didn’t we do anything about it when we had a chance?” ~ Eugene Delacroix

kronik + arabagi


projected flood plain

Bronx

Manhattan

FOLLY 2014 / Socrates Sculpture Park

Queens


4

Socrates Sculpture Park

C

limate change and increased atmospheric temperatures are predicted to cause a significant rise in sea

level over the next 100-200 years. Scenarios that

take into account rapid melting of the Greenland Ice Sheet

and West Antarctic Ice Shelf warn of an overall sea level rise of greater than 20 ft (6 meters).

We as a human society are facing a global catastrophe that will change the face of our home planet. Yet we are

closing our eyes toward its ramifications instead of taking 4’ flood plain

actions to prevent it. It will take a global reduction of our carbon footprint on the big industry level as well as the individual level to slow down the advance of global warming.

Our proposed folly installation attempts to bring aware-

ness and persuade common people to become more

educated on the issue, reduce their carbon footprint and,

thus, become proactive citizens of planet earth - our home.

8’ flood plain

Figure 1: Mean temperature variation since 1880.

kronik + arabagi


2

the arc A dock and a boat on land, are meant to startle. Their mis-

placement grabs viewer’s attention. A casual observer can deduce that pallets laying on the ground today as a folly, will rise one day with water. The dock will lift up with rising ocean level, allowing one to enter. The arc in turn will be lifted from its base and carried away with the escaping passangers.

This lifeboat is made of upcycled materials, reminding viewers

about simple actions they can take to attempt to reverse our

self-distructive course. Our only hope for escape is flimsy and full of holes but it is better then passive inaction.

FOLLY 2014 / Socrates Sculpture Park


The wooden construction and paddles for pro-

pulsion symbolizes future man’s departure from wood posts

fossil fuels, a return to simplicity and harmony with nature.

plan view

gates vertical sliding posts floating dock water level scale

elevation concrete footing

kronik + arabagi


Symbolic event timeline

8

Year: 2014

At the time of construction the dock rests on the

8 now

FOLLY 2014 / Socrates Sculpture Park

ground and the ARC is supported on vertical posts out of people’s reach.


Year: 2100

Raising water levels will slowly elevate the floating dock over time.

Year: 2200

As the dock meets the height of the ARC, survi-

vors are able to board. Finally, the ARC is raised from its stands and floats away.

200 years from now...

kronik + arabagi


ARC folding gates 38

the arc steel pipe frame wood pallet external walls

38

ARC mounting bracket n g ro u

flotation air

d

tanks ARC wooden support post concrete foundation

floating dock

pallet dock walking surface vertical sliding

Structural Stability: Engineering stability and load bearing will be

provided by the steel pipes that

form the skeleton of the struc-

brackets

ture. The connection joints will

water level scale

place, to prevent public tampering

be threaded and tack welded in with the stability of the structure.

concrete foundation

g ro u

nd

FOLLY 2014 / Socrates Sculpture Park


materials

G

iven that the main goal of the installation is to pro-

name

count

voke action on the individual level against global warming, the materials employed are mostly cheap,

reusable, as well as, even upcycled materials. The purpose

here is to emphasize that everyone can build a construc-

tion similar to ours cheaply in their back yard. Everyone can

steel pipe structural member

take action against global warming, and everyone’s action is important and worthwhile.

wooden pallets

cooler tanks

56

Wooden pallets will be used for the majority of the ARC structure, external walls and the dock. We will use trashed

pallets, commonly found in large dumpsters usually near

major companies. We insist on using trashed materials

reused wooden

here to emphasize and reinforce the idea of reusing and

pallet

bon footprint. Some pallets will have to be modified/cut to

mounting

upcycling wood thus minimizing our consumer and carsize, although most of the construction employs untouched

brackets

pallets.

41 8

steel pipe Off-the-shelf 1 ¼’’ standard steel pipes will be used as the structural subframe of the ARC. Threaded pipe plumbing

joints will be used for pipe connections. Everything is to be

cut and sized to length with minimal machining capabilities on site of the construction.

office cooler water tanks Empty office water cooler tanks will be employed to improve

vertical round wooden posts

concrete footing

4 8

flotation of the ARC and the dock. These will be obtained used as well to emphasize reusability throughout all building materials.

wooden vertical posts Round vertical posts to serve as sliding members for

rowing paddle

8

the floating dock and support legs for the ARC. They are

mounted into a concrete foundation buried in the ground and obstructed from spectator’s views.

kronik + arabagi


FOLLY 2014 / Socrates Sculpture Park


kronik + arabagi


Projected building timeline CH

R MA

L RI AP

Y MA

APRIL

MAY

2014 SEARCH FOR USED MATERIALS ORDER MATERIALS/ FASTNERS SITE PREP WORK/ DEMOLITION POURING FOOTINGS MOUNTING POSTS STRUCTURAL PIPE ASSEMBLY PALLET ASSEMBLY DOCK AND MOUNTS PALLET ASSEMBLY FLOOR PALLET ASSEMBLY SIDES PALLET ASSEMBLY - DOORS INTERIOR FURNISHINGS SANDING/ STAINING PADDLE ASSEMBLY WATER LEVEL MARKER FINISH COAT CLEAN-UP

MARCH

FOLLY 2014 / Socrates Sculpture Park


Projected Costs quantity

approximate cost

120 lf

$200

56

$600

41

$0

8

$320

4

$320

8

$200

8

$100

material cost:

$1740

Mostly from trashed used pallets and used plastic barrels. Steel piping, connectors, and transportation of materials to the site constitute the main cost sink.

kronik + arabagi


TEAM

MIKHAIL KRONIK

PROFESSIONAL

EDUCATION

DiGiorgio Associates Inc., Boston, MA [october 2011 - present] [senior draftsman/ project captain]

boston architectural college boston, ma bachelors of architecture [Jan 2013] dutchess, state university of new york poughkeepsie, ny associates degree in architectural technology [may 2006]

- led project through SD, DD and CD phases - code review, ADA, ANSI/ASHRAE guidelines, LS and DPH checklists - discipline coordination: structural, MEP, medical/lab equipment coordination - LEED project feasibility studies and energy analysis studies - developed cartoon sets, reviewed schedules, assigned worksets and tasks to other team members - RFI procedures, submittals, meeting-minutes and project administration checklists, consultants and vendors correspondence. Western Professional Builders, westwood, MA [february 2009 - 2011] job captain design + build architectural design and construction – assisted principal and lead architect(s) / contractor(s) during all phases of design and construction – generated floor plans, elevations, sections, details and 3d renderings – field verification, as–built conditions and code evaluation – research zoning and code analysis – project schedule, code review and budget analysis. – coordination of sub contractors, vendors, and building inspections – changed construction documents into work orders – hands-on experience in construction and scheduling [pouring foundation, framing, roofing, waterproofing, siding, drywall, finish carpentry] Bertaux and Iwerks Architects, boston, ma [january 2008 - february 2009] intern architect – developed SD, DD and construction documents – documented existing conditions for base drawings – worked on the two active reuse project for Fitchburg State College – BIM modeling [material takeoffs, energy calculation plugins and lighting levels analysis] – website development and print portfolio maintenance Menders, Torrey and Spencer, Inc., boston, ma [september 2006 - may 2007] Intern designer/ draftsman – developed construction documents – schematic design options for a number of historical projects with complex programs – rendered and edited drawings for presentations – assisted in assembling Project Reports.

FOLLY 2014 / Socrates Sculpture Park

DESIGN TOOLS CAD Revit, autoCAD, sketchUp, 3ds Studio Max, CA Procore, timberline BIM timeberline (cot estimating), AGi 32 (lighting analysis) energy modeling adobe photoshop, indesign, acrobat, illustrator microsoft office word, excel, power point web publishing WordPress site building and content management monthly newsletters and business card layout

HONORS BAC Architecture Degree Project Studio Commendation [may 2013] Greene Architecture Degree Project Studio Commendation [may 2013] BAC portfolio award [november 2010] Award for outstanding contributions to campus activities [spring 2005] student advisor for 3d design club [fall 2005]

PROFESSIONAL AFFILIATIONS Autodesk Training Certificate U.S. Green Building Council (assoc.USGBC)

PERSONAL books. documentaries. photography. furniture making. music sampling. drawing.


VEACESLAV ARABAGI PROFESSIONAL

3 Spring Place Cambridge, MA, 02141 +1.916.813.8469 slavamd@gmail.com

ENGINEERING TOOLS

Pediatric Cardiac Bioengineering Lab, boston, ma [september 2011 - present] research engineer

CAD Solidworks, Autocad

-developed microscale flexible soft sensors for surgical applications -manufacturing expert in small scale electro-mechanical laminates and soft lithography micro-molding techniques -designed and co-authored a self growing artificial annulus implant for mitral valve annuloplasty for children -engineered and manufactured a frictionless MRI driven actuator for tissue manipulation -co-lead and authored a robotic implant to simplify and improve the esophageal atresia surgical procedure in infants -

Simulation and Analysis Matlab, Simulink, ANSYS, COMSOL multiphysics

Carnegie Mellon University, pittsburgh, pa [august 2007- august 2011] graduate researcher

SELECTED PUBLICATIONS

-team lead of developing a miniature flapping wing aerial robot -developed an aerodynamic simulation of wing dynamics, used as an optimization and design tool for the flight mechanism -micro-manufactured prototypes using carbon composites layups -performed experimental characterization and analysis of built components and structures -mentored undergraduate and masters students MIGA Motor Company, berkeley, ca [january 2007 -july 2007] reasearch engineer

-

developed small scale actuators based on SMA displacement amplification principle -as the only engineer of the company, led all product development phases: research, mechanical/electrical component design, prototype manufacturing and characterization/testing

Micro-manufacturing Composite laminates, micromolding, soft lithography, micro-assembly Large scale manufacturing Machining CNC/Manual (Mill, Lathe), welding (TIG, MIG, acetylene), vacuum thermoforming, cold/hot metalworking

-P. Codd, V. Arabagi, A. Gosline, P. E. Dupont, "Design and Initial Characterization of a Novel Pressure-Sensing Skin for Detecting Impending Tissue Damage during Neuroendoscopy", Journal of Neurosurgery: Pediatrics, 2013. -V. Arabagi, A. Gosline, R. Wood, P. E. Dupont, "Simultaneous Soft Sensing of Contact Orientation and Force for Millimeterscale Medical Robots", IEEE Int. Conf. Robotics and Automation, pp. 4381-4387, 2013 -V. Arabagi, L. Hines, and M. Sitti, “A Simulation and Design Tool for a Passive Rotation Flapping Wing Mechanism”, Transactions on Mechatronics, vol. 18:2, Apr 2013. -V. Arabagi, and M. Sitti, “A Miniature Controllable Flapping Wing Robot”, PhD Thesis, Carnegie Mellon University, 2011. -V. Arabagi, B. Behkam, and M. Sitti, “Modeling of Stochastic Motion of Bacteria Propelled Spherical Micro-Beads”, Journal of Applied Physics, 109, 114702, 2011.

EDUCATION carnegie mellon university pittsburgh, pa PhD in Mechanical Engineering [Jun 2011] University of California Berkeley berkeley, ca B.S. in Mechanical Engineering with Electrical Engineering Minor [dec 2006] -

kronik + arabagi


HUBBARD HOSPITAL Project Summary: This project is an expansion of the existing Emergency department at Harrington Hospital, at Hubbard. The proposed layout had added 11 exam rooms, trauma, cardiac and secured holding treatment rooms, located at the exterior perimeter and support/ administrative functions located at the center. My Role: SD - Revit Conceptual Energy Analyses modeling tools to create the most energy efficient design option. DD - Reaserched codes, DPH checklists and FGI guidelinsess. Coordination and correspondense between the facilities representaties, vendors and building officials. Worked with lead architects in integrating MEP, structural and civil disciplines for BIM modeling. CD - Lead the project team in creating the drawing set for bid and construction. Staffed drafters to insure seemless production workflow. Assisted drafters by cartooning, redlining and QA reviewing of drawing sets. CA - Was involved in design meetings, field visits and Field repors. Used Procore for correspondense of RFIs, processing submittlals and submiting field reports.

FOLLY 2014 / Socrates Sculpture Park


6

Design Tools: Revit Arch, Revit MEP, Revit Structure integration Energy Modeling Diagrams - Illustrator cs3 MEP SYSTEMS

STRUCTURAL SYSTEMS

ENVELOPE

7A

8A

6A

9A

5A

H

CC A.I.I.R. TOILET

EXAM

A.I.I.R. EXAM

WALLS: PAINTED/ ACCENT PAINT

F

BASE: 4" COVE

F

NOTES: CASEWORK FINISHSEE ELEVATION DETAILS

F

BARIATRIC TOILET

C

RAIL: 4" MAPLE

11A

F

3A

FLOOR: SEAMLESS SHT VINYL

F

K

CEILING: WASHABLE ACT.

FLOOR: VCT. RED MAPLE WOOD GRAIN CEILING: ACT. GYP. SOFFIT PAINTED

WALLS: WASHABLE PAINT BASE: 1'- 0" INTEGRALE

F

BARIATRIC EXAM

RAIL: 6" ACROVYNE

BB

NOTES:

WALLS: PAINTED/ ACCENT PAINT BASE: 4" COVE

NURSE STATION

C

RAIL: 4" MAPLE NOTES:

A

15C

G A

CARDIAC

2A

CONSTRUCTION

RAIL: 4" MAPLE

4

A

TOILET

K

MEDS

BASE: 4" COVE

C

SOILED WORKROOM

K

NOTES:

13A

GL

G

TRIAGE

A

CONSULTANT:

EMERGENCY WAITING

PHYSICIANS

1A 15F

CLEAN UTILITY

K

E.M.T.

INTERIOR DESIGN

BRICK PAVERS

CEILING: ACT. GYP. SOFFIT PAINTED

G

JANITOR'S CLOSET

G

14A

RECEPT

EE

AMBULANCE VESTIBULE

ARCHITECTURE

FLAG POLE

FLOOR: VCT

EQUIPMENT ALCOVE

K

C

G

WALLS: PAINTED/ ACCENT PAINT

TRAUMA

A

PLANNING

15E

ENGINEERING

12A

OFFICE

H

K

AA

EMERGENC DEPARTMEN AND RENOV

FLOOR: VCT. RED MAPLE WOOD GRAIN CEILING: ACT. GYP. SOFFIT PAINTED

TYP.

F

K

340 THOMPSON WEBSTER, MA 0

10A

4A

RECEPT

G

H

STAFF LOUNGE

A

A

GL

B

B

GL

15D

ADMIN

C

C STAFF TOILET

SECURE HOLDING #1

I

SECURE HOLDING #2

I

SECURE HOLDING #3

A

I

EXISTING STAIR REG 3

F

TOILET/ SHOWER

VESTIBULE

TYP.

WAITING

FINANCE

NURSE STATION

AREA OF WORK

BASE: INTEGRALE

15I

1 2.4

2

2.3 KITCHEN

WALLS: PAINTED

3

A

A

T.B.D.

RAIL: 4" MAPLE

C

GL

D C

FLOOR: CARPET W/ ACCENT DESIGN

A

PUBLIC TOILET

BASE: INTEGRATED

CEILING: ACT. GYP. SOFFIT (PAINTED)

AREA OF WORK

GL

WALLS: PAINTED / BASE COLOR & ACCENT PAINT BASE: 4" COVE

VCT

NOTES:

F

PUBLIC TOILET

FAMILY ROOM

FLOOR: SEAMLESS SHT VINYL CEILING: GYP. PAINTED

DES

B

NOURISH VCT

RAIL: 4" MAPLE NOTES: CUSTOM HEAD WALL

F

DATE:

D CORRIDOR

WALLS: PAINTED

REVISION: NO:

VCT ELEC

PES

FLOOR: SEAMLESS SHT VINYL CEILING: GYP. PAINTED

A

A

C C

A

GL

DECONTAM

I

REG 1

G

RAIL: 4" MAPLE NOTES:

KEY PLAN: C

CORRIDOR

CORRIDOR

FLOOR: C.T.

5

CEILING: ACT WALLS: CT. / CT W/ ACCENT

ADMINISTRATION

6

BASE: CT. COVE RAIL: NONE NOTES:

ELEV.

E

WAITING

DINING AREA

FLOOR: VCT./ VCT ACCENT CEILING: ACT WALLS: PAINTED. / ACCENT PAINT BASE: 4" COVE RAIL: 4" MAPLE NOTES:

DRAWING TITLE:

SCHEDULES ABBREVIAT DRAWN BY:

Author CHECKED BY:

Checker SCALE:

1/8" = 1'-0" PROJECT NO.:

103384.00

1

FIRST FLOOR FINISHES 1/8" = 1'-0"

kronik + arabagi

DRAWING NO.:

E-001 PROJECT LOCATION: H:\Hubbard ED -centLl.rvt


FOLLY 2014 / Socrates Sculpture Park


kronik + arabagi


U.S. COAST GUARD - BOAT HOUSE FACILITY Project: This project was an expansion of the US Coast Guard facility, located near Jones Beach, Long Island, NY. The new addition allowed for storage and maintenance of the MLB , 47 foot boats. My Role: I have lead the project from pre design phases through construction administration. My tasks included coordinating structural, MEP and bridge crane manufacture consultants, developing construction documents and reviewing shop drawings.

Design Criteria: The Roof and the composite panels were costumized to withstand 150 mph wind loads.

FOLLY 2014 / Socrates Sculpture Park


standing seam roof

insulation on metal deck

steel framing

insulated metal panel

translucent window panel

26’ x34’ roll-up door

bridge crane

boat house facility

kronik + arabagi


FOLLY 2014 / Socrates Sculpture Park


kronik + arabagi


“The current climate change is an outer mirror of our inner consciousness. It is an outer mirror of our attitude to try to conquer nature, instead of being in harmony with nature, but in the end the part can never conquer the whole.” Swami Dhyan Giten

kronik + arabagi

designers +engineers


Turn static files into dynamic content formats.

Create a flipbook