In this proposal
RISING TIDES THE ARC
MATERIALS
SCHEDULE
TEAM
kronik + arabagi
Rising Tides .
FOLLY 2014 / Socrates Sculpture Park
mission statement
Our mission is to raise public awareness about inevitability of sea level rise due to global warming and to encourage re-use and upcycling of materials.
“Our children will ask us why didn’t we do anything about it when we had a chance?” ~ Eugene Delacroix
kronik + arabagi
projected flood plain
Bronx
Manhattan
FOLLY 2014 / Socrates Sculpture Park
Queens
4
Socrates Sculpture Park
C
limate change and increased atmospheric temperatures are predicted to cause a significant rise in sea
level over the next 100-200 years. Scenarios that
take into account rapid melting of the Greenland Ice Sheet
and West Antarctic Ice Shelf warn of an overall sea level rise of greater than 20 ft (6 meters).
We as a human society are facing a global catastrophe that will change the face of our home planet. Yet we are
closing our eyes toward its ramifications instead of taking 4’ flood plain
actions to prevent it. It will take a global reduction of our carbon footprint on the big industry level as well as the individual level to slow down the advance of global warming.
Our proposed folly installation attempts to bring aware-
ness and persuade common people to become more
educated on the issue, reduce their carbon footprint and,
thus, become proactive citizens of planet earth - our home.
8’ flood plain
Figure 1: Mean temperature variation since 1880.
kronik + arabagi
2
the arc A dock and a boat on land, are meant to startle. Their mis-
placement grabs viewer’s attention. A casual observer can deduce that pallets laying on the ground today as a folly, will rise one day with water. The dock will lift up with rising ocean level, allowing one to enter. The arc in turn will be lifted from its base and carried away with the escaping passangers.
This lifeboat is made of upcycled materials, reminding viewers
about simple actions they can take to attempt to reverse our
self-distructive course. Our only hope for escape is flimsy and full of holes but it is better then passive inaction.
FOLLY 2014 / Socrates Sculpture Park
The wooden construction and paddles for pro-
pulsion symbolizes future man’s departure from wood posts
fossil fuels, a return to simplicity and harmony with nature.
plan view
gates vertical sliding posts floating dock water level scale
elevation concrete footing
kronik + arabagi
Symbolic event timeline
8
Year: 2014
At the time of construction the dock rests on the
8 now
FOLLY 2014 / Socrates Sculpture Park
ground and the ARC is supported on vertical posts out of people’s reach.
Year: 2100
Raising water levels will slowly elevate the floating dock over time.
Year: 2200
As the dock meets the height of the ARC, survi-
vors are able to board. Finally, the ARC is raised from its stands and floats away.
200 years from now...
kronik + arabagi
ARC folding gates 38
the arc steel pipe frame wood pallet external walls
38
ARC mounting bracket n g ro u
flotation air
d
tanks ARC wooden support post concrete foundation
floating dock
pallet dock walking surface vertical sliding
Structural Stability: Engineering stability and load bearing will be
provided by the steel pipes that
form the skeleton of the struc-
brackets
ture. The connection joints will
water level scale
place, to prevent public tampering
be threaded and tack welded in with the stability of the structure.
concrete foundation
g ro u
nd
FOLLY 2014 / Socrates Sculpture Park
materials
G
iven that the main goal of the installation is to pro-
name
count
voke action on the individual level against global warming, the materials employed are mostly cheap,
reusable, as well as, even upcycled materials. The purpose
here is to emphasize that everyone can build a construc-
tion similar to ours cheaply in their back yard. Everyone can
steel pipe structural member
take action against global warming, and everyone’s action is important and worthwhile.
wooden pallets
cooler tanks
56
Wooden pallets will be used for the majority of the ARC structure, external walls and the dock. We will use trashed
pallets, commonly found in large dumpsters usually near
major companies. We insist on using trashed materials
reused wooden
here to emphasize and reinforce the idea of reusing and
pallet
bon footprint. Some pallets will have to be modified/cut to
mounting
upcycling wood thus minimizing our consumer and carsize, although most of the construction employs untouched
brackets
pallets.
41 8
steel pipe Off-the-shelf 1 ¼’’ standard steel pipes will be used as the structural subframe of the ARC. Threaded pipe plumbing
joints will be used for pipe connections. Everything is to be
cut and sized to length with minimal machining capabilities on site of the construction.
office cooler water tanks Empty office water cooler tanks will be employed to improve
vertical round wooden posts
concrete footing
4 8
flotation of the ARC and the dock. These will be obtained used as well to emphasize reusability throughout all building materials.
wooden vertical posts Round vertical posts to serve as sliding members for
rowing paddle
8
the floating dock and support legs for the ARC. They are
mounted into a concrete foundation buried in the ground and obstructed from spectator’s views.
kronik + arabagi
FOLLY 2014 / Socrates Sculpture Park
kronik + arabagi
Projected building timeline CH
R MA
L RI AP
Y MA
APRIL
MAY
2014 SEARCH FOR USED MATERIALS ORDER MATERIALS/ FASTNERS SITE PREP WORK/ DEMOLITION POURING FOOTINGS MOUNTING POSTS STRUCTURAL PIPE ASSEMBLY PALLET ASSEMBLY DOCK AND MOUNTS PALLET ASSEMBLY FLOOR PALLET ASSEMBLY SIDES PALLET ASSEMBLY - DOORS INTERIOR FURNISHINGS SANDING/ STAINING PADDLE ASSEMBLY WATER LEVEL MARKER FINISH COAT CLEAN-UP
MARCH
FOLLY 2014 / Socrates Sculpture Park
Projected Costs quantity
approximate cost
120 lf
$200
56
$600
41
$0
8
$320
4
$320
8
$200
8
$100
material cost:
$1740
Mostly from trashed used pallets and used plastic barrels. Steel piping, connectors, and transportation of materials to the site constitute the main cost sink.
kronik + arabagi
TEAM
MIKHAIL KRONIK
PROFESSIONAL
EDUCATION
DiGiorgio Associates Inc., Boston, MA [october 2011 - present] [senior draftsman/ project captain]
boston architectural college boston, ma bachelors of architecture [Jan 2013] dutchess, state university of new york poughkeepsie, ny associates degree in architectural technology [may 2006]
- led project through SD, DD and CD phases - code review, ADA, ANSI/ASHRAE guidelines, LS and DPH checklists - discipline coordination: structural, MEP, medical/lab equipment coordination - LEED project feasibility studies and energy analysis studies - developed cartoon sets, reviewed schedules, assigned worksets and tasks to other team members - RFI procedures, submittals, meeting-minutes and project administration checklists, consultants and vendors correspondence. Western Professional Builders, westwood, MA [february 2009 - 2011] job captain design + build architectural design and construction – assisted principal and lead architect(s) / contractor(s) during all phases of design and construction – generated floor plans, elevations, sections, details and 3d renderings – field verification, as–built conditions and code evaluation – research zoning and code analysis – project schedule, code review and budget analysis. – coordination of sub contractors, vendors, and building inspections – changed construction documents into work orders – hands-on experience in construction and scheduling [pouring foundation, framing, roofing, waterproofing, siding, drywall, finish carpentry] Bertaux and Iwerks Architects, boston, ma [january 2008 - february 2009] intern architect – developed SD, DD and construction documents – documented existing conditions for base drawings – worked on the two active reuse project for Fitchburg State College – BIM modeling [material takeoffs, energy calculation plugins and lighting levels analysis] – website development and print portfolio maintenance Menders, Torrey and Spencer, Inc., boston, ma [september 2006 - may 2007] Intern designer/ draftsman – developed construction documents – schematic design options for a number of historical projects with complex programs – rendered and edited drawings for presentations – assisted in assembling Project Reports.
FOLLY 2014 / Socrates Sculpture Park
DESIGN TOOLS CAD Revit, autoCAD, sketchUp, 3ds Studio Max, CA Procore, timberline BIM timeberline (cot estimating), AGi 32 (lighting analysis) energy modeling adobe photoshop, indesign, acrobat, illustrator microsoft office word, excel, power point web publishing WordPress site building and content management monthly newsletters and business card layout
HONORS BAC Architecture Degree Project Studio Commendation [may 2013] Greene Architecture Degree Project Studio Commendation [may 2013] BAC portfolio award [november 2010] Award for outstanding contributions to campus activities [spring 2005] student advisor for 3d design club [fall 2005]
PROFESSIONAL AFFILIATIONS Autodesk Training Certificate U.S. Green Building Council (assoc.USGBC)
PERSONAL books. documentaries. photography. furniture making. music sampling. drawing.
VEACESLAV ARABAGI PROFESSIONAL
3 Spring Place Cambridge, MA, 02141 +1.916.813.8469 slavamd@gmail.com
ENGINEERING TOOLS
Pediatric Cardiac Bioengineering Lab, boston, ma [september 2011 - present] research engineer
CAD Solidworks, Autocad
-developed microscale flexible soft sensors for surgical applications -manufacturing expert in small scale electro-mechanical laminates and soft lithography micro-molding techniques -designed and co-authored a self growing artificial annulus implant for mitral valve annuloplasty for children -engineered and manufactured a frictionless MRI driven actuator for tissue manipulation -co-lead and authored a robotic implant to simplify and improve the esophageal atresia surgical procedure in infants -
Simulation and Analysis Matlab, Simulink, ANSYS, COMSOL multiphysics
Carnegie Mellon University, pittsburgh, pa [august 2007- august 2011] graduate researcher
SELECTED PUBLICATIONS
-team lead of developing a miniature flapping wing aerial robot -developed an aerodynamic simulation of wing dynamics, used as an optimization and design tool for the flight mechanism -micro-manufactured prototypes using carbon composites layups -performed experimental characterization and analysis of built components and structures -mentored undergraduate and masters students MIGA Motor Company, berkeley, ca [january 2007 -july 2007] reasearch engineer
-
developed small scale actuators based on SMA displacement amplification principle -as the only engineer of the company, led all product development phases: research, mechanical/electrical component design, prototype manufacturing and characterization/testing
Micro-manufacturing Composite laminates, micromolding, soft lithography, micro-assembly Large scale manufacturing Machining CNC/Manual (Mill, Lathe), welding (TIG, MIG, acetylene), vacuum thermoforming, cold/hot metalworking
-P. Codd, V. Arabagi, A. Gosline, P. E. Dupont, "Design and Initial Characterization of a Novel Pressure-Sensing Skin for Detecting Impending Tissue Damage during Neuroendoscopy", Journal of Neurosurgery: Pediatrics, 2013. -V. Arabagi, A. Gosline, R. Wood, P. E. Dupont, "Simultaneous Soft Sensing of Contact Orientation and Force for Millimeterscale Medical Robots", IEEE Int. Conf. Robotics and Automation, pp. 4381-4387, 2013 -V. Arabagi, L. Hines, and M. Sitti, “A Simulation and Design Tool for a Passive Rotation Flapping Wing Mechanism”, Transactions on Mechatronics, vol. 18:2, Apr 2013. -V. Arabagi, and M. Sitti, “A Miniature Controllable Flapping Wing Robot”, PhD Thesis, Carnegie Mellon University, 2011. -V. Arabagi, B. Behkam, and M. Sitti, “Modeling of Stochastic Motion of Bacteria Propelled Spherical Micro-Beads”, Journal of Applied Physics, 109, 114702, 2011.
EDUCATION carnegie mellon university pittsburgh, pa PhD in Mechanical Engineering [Jun 2011] University of California Berkeley berkeley, ca B.S. in Mechanical Engineering with Electrical Engineering Minor [dec 2006] -
kronik + arabagi
HUBBARD HOSPITAL Project Summary: This project is an expansion of the existing Emergency department at Harrington Hospital, at Hubbard. The proposed layout had added 11 exam rooms, trauma, cardiac and secured holding treatment rooms, located at the exterior perimeter and support/ administrative functions located at the center. My Role: SD - Revit Conceptual Energy Analyses modeling tools to create the most energy efficient design option. DD - Reaserched codes, DPH checklists and FGI guidelinsess. Coordination and correspondense between the facilities representaties, vendors and building officials. Worked with lead architects in integrating MEP, structural and civil disciplines for BIM modeling. CD - Lead the project team in creating the drawing set for bid and construction. Staffed drafters to insure seemless production workflow. Assisted drafters by cartooning, redlining and QA reviewing of drawing sets. CA - Was involved in design meetings, field visits and Field repors. Used Procore for correspondense of RFIs, processing submittlals and submiting field reports.
FOLLY 2014 / Socrates Sculpture Park
6
Design Tools: Revit Arch, Revit MEP, Revit Structure integration Energy Modeling Diagrams - Illustrator cs3 MEP SYSTEMS
STRUCTURAL SYSTEMS
ENVELOPE
7A
8A
6A
9A
5A
H
CC A.I.I.R. TOILET
EXAM
A.I.I.R. EXAM
WALLS: PAINTED/ ACCENT PAINT
F
BASE: 4" COVE
F
NOTES: CASEWORK FINISHSEE ELEVATION DETAILS
F
BARIATRIC TOILET
C
RAIL: 4" MAPLE
11A
F
3A
FLOOR: SEAMLESS SHT VINYL
F
K
CEILING: WASHABLE ACT.
FLOOR: VCT. RED MAPLE WOOD GRAIN CEILING: ACT. GYP. SOFFIT PAINTED
WALLS: WASHABLE PAINT BASE: 1'- 0" INTEGRALE
F
BARIATRIC EXAM
RAIL: 6" ACROVYNE
BB
NOTES:
WALLS: PAINTED/ ACCENT PAINT BASE: 4" COVE
NURSE STATION
C
RAIL: 4" MAPLE NOTES:
A
15C
G A
CARDIAC
2A
CONSTRUCTION
RAIL: 4" MAPLE
4
A
TOILET
K
MEDS
BASE: 4" COVE
C
SOILED WORKROOM
K
NOTES:
13A
GL
G
TRIAGE
A
CONSULTANT:
EMERGENCY WAITING
PHYSICIANS
1A 15F
CLEAN UTILITY
K
E.M.T.
INTERIOR DESIGN
BRICK PAVERS
CEILING: ACT. GYP. SOFFIT PAINTED
G
JANITOR'S CLOSET
G
14A
RECEPT
EE
AMBULANCE VESTIBULE
ARCHITECTURE
FLAG POLE
FLOOR: VCT
EQUIPMENT ALCOVE
K
C
G
WALLS: PAINTED/ ACCENT PAINT
TRAUMA
A
PLANNING
15E
ENGINEERING
12A
OFFICE
H
K
AA
EMERGENC DEPARTMEN AND RENOV
FLOOR: VCT. RED MAPLE WOOD GRAIN CEILING: ACT. GYP. SOFFIT PAINTED
TYP.
F
K
340 THOMPSON WEBSTER, MA 0
10A
4A
RECEPT
G
H
STAFF LOUNGE
A
A
GL
B
B
GL
15D
ADMIN
C
C STAFF TOILET
SECURE HOLDING #1
I
SECURE HOLDING #2
I
SECURE HOLDING #3
A
I
EXISTING STAIR REG 3
F
TOILET/ SHOWER
VESTIBULE
TYP.
WAITING
FINANCE
NURSE STATION
AREA OF WORK
BASE: INTEGRALE
15I
1 2.4
2
2.3 KITCHEN
WALLS: PAINTED
3
A
A
T.B.D.
RAIL: 4" MAPLE
C
GL
D C
FLOOR: CARPET W/ ACCENT DESIGN
A
PUBLIC TOILET
BASE: INTEGRATED
CEILING: ACT. GYP. SOFFIT (PAINTED)
AREA OF WORK
GL
WALLS: PAINTED / BASE COLOR & ACCENT PAINT BASE: 4" COVE
VCT
NOTES:
F
PUBLIC TOILET
FAMILY ROOM
FLOOR: SEAMLESS SHT VINYL CEILING: GYP. PAINTED
DES
B
NOURISH VCT
RAIL: 4" MAPLE NOTES: CUSTOM HEAD WALL
F
DATE:
D CORRIDOR
WALLS: PAINTED
REVISION: NO:
VCT ELEC
PES
FLOOR: SEAMLESS SHT VINYL CEILING: GYP. PAINTED
A
A
C C
A
GL
DECONTAM
I
REG 1
G
RAIL: 4" MAPLE NOTES:
KEY PLAN: C
CORRIDOR
CORRIDOR
FLOOR: C.T.
5
CEILING: ACT WALLS: CT. / CT W/ ACCENT
ADMINISTRATION
6
BASE: CT. COVE RAIL: NONE NOTES:
ELEV.
E
WAITING
DINING AREA
FLOOR: VCT./ VCT ACCENT CEILING: ACT WALLS: PAINTED. / ACCENT PAINT BASE: 4" COVE RAIL: 4" MAPLE NOTES:
DRAWING TITLE:
SCHEDULES ABBREVIAT DRAWN BY:
Author CHECKED BY:
Checker SCALE:
1/8" = 1'-0" PROJECT NO.:
103384.00
1
FIRST FLOOR FINISHES 1/8" = 1'-0"
kronik + arabagi
DRAWING NO.:
E-001 PROJECT LOCATION: H:\Hubbard ED -centLl.rvt
FOLLY 2014 / Socrates Sculpture Park
kronik + arabagi
U.S. COAST GUARD - BOAT HOUSE FACILITY Project: This project was an expansion of the US Coast Guard facility, located near Jones Beach, Long Island, NY. The new addition allowed for storage and maintenance of the MLB , 47 foot boats. My Role: I have lead the project from pre design phases through construction administration. My tasks included coordinating structural, MEP and bridge crane manufacture consultants, developing construction documents and reviewing shop drawings.
Design Criteria: The Roof and the composite panels were costumized to withstand 150 mph wind loads.
FOLLY 2014 / Socrates Sculpture Park
standing seam roof
insulation on metal deck
steel framing
insulated metal panel
translucent window panel
26’ x34’ roll-up door
bridge crane
boat house facility
kronik + arabagi
FOLLY 2014 / Socrates Sculpture Park
kronik + arabagi
“The current climate change is an outer mirror of our inner consciousness. It is an outer mirror of our attitude to try to conquer nature, instead of being in harmony with nature, but in the end the part can never conquer the whole.” Swami Dhyan Giten
kronik + arabagi
designers +engineers