Curriculum Vitae Rakesh Singh Thakur Mail: rakeshsingh.vajora@gmail.com Skype: rakeshsingh.vajora Mobile Qatar: +97450096788 Mobile India: +918688638633 LinkedIn Profile: https://www.linkedin.com/in/thakurrakeshsingh/ Present position
BIM Manager Scan me
Personal data Name Year of birth Nationality Marital Status
Rakesh Singh Thakur 1991 Indian Married For My Work Samples
Education 2008 - 2012
Courses:
Key qualifications
Bachelor of Electrical and Electronics Engineering (EEE) Jawaharlal Nehru Technological University Hyderabad, India • •
Electrical Designing – Taiba Engineering. Autodesk Revit MEP
A career of 11.5 plus years’ Experience in BIM (Building Information Modelling / Management), Engineering & Construction industry, worked with Clients, Main contractor and Consultants in India and Qatar. A Very reliable Engineer and BIM Lead. Works very hard with level of Standard. Provide Management and Technical direction for all BIM, Data and Document Management system and Process to ensure the technologies are compliant and advantageously maximized during Design, Procurement, Construction till inception through asset hand over and operation.
Certificate
Autodesk REVIT MEP – Licence No. 446992
Software’s
Autodesk Revit MEP, Revit Structure, Revit Architecture, Navisworks, AutoCAD, BIM 360, BIM Collaborate Pro, Holo-builder, point cloud, Civil 3D, Cobie, Lumion, Sketch Up Primavera, etc,
Main Area of Professional Experience
BIM Execution Plan, Model production and delivery, Navis work Report & Coordination, BIM 360, Quality check, Coordination Meetings with PMCM, Designers & Clients.
Technical Expertise
BIM Implementation. BIM Execution Plan (BEP). Integrated Project Delivery (IPD) Methodology Plan REVIT Standard Templates. REVIT Parametric Families. BIM and CAD Content Standards. BIM 360 Specialist & BIM Collaborate pro. BIM Progress Report Templates. Holo builder Specialist. CDE Protocol and Standards
linkedin.com/in/thakurrakeshsingh/
Page 1 of 7
Handling of MEP Projects from Start to End. Model Production and delivery table (MPDT) Templates. Coordination and Clash detection using Navisworks. Creating Shop drawings, Builders works, documentation views. Making Report for Monthly Progress Meeting and Weekly Clash reports Updates. Scanning Site Works using Laser Scanning. Handling BIM Team. COBie Scheme and Assets Data Picklist. Main Area of Professional Responsibilities
• • • • • • • • • •
Executing the Project from starting to Completion with Latest BIM Technology, time saving and cost reduction to the projects. Responsible for delivering the BIM Projects and managing the BIM technologies. Develop and finalize scope of work and specification for BIM related deliverables in timely manner in line with Project timeline. Supporting the Latest technologies in BIM to the Client. Managing the Electronic Data Management system (Aconex, BIM 360, BIM collaborate pro) ensuring smooth workflow of operation. Manage, troubleshoot, and resolve issues on BIM, IT (hardware & software) related operations. Model checking, Clash detection and Preparing Clash report. Preparing and checking the BIM Progress tracker for the projects. Extracting and exporting from BIM Model list quantities, technical information relevant to their discipline. Interface coordination between the contractors to ensure smooth alignment of service.
Professional experience March 2023 to Ongoing
PES Work Location: Doha, Qatar Position: BIM Manager Client: PUBLIC WORKS AUTHORITY (PWA) Projects
August 23 – Ongoing
Project: Construction of Medical and Health Sciences at Qatar University Consultant: KEO International Consultants
Project Value: QAR 75 million •
•
•
• • • •
linkedin.com/in/thakurrakeshsingh/
The building is constructed for the two colleges, the College of Medicine, and the College of Sciences and it will accommodate 1,715 students along with the crew of professors. The project comprises a three-story building, plus a basement and ground floor over a built-up area of approximately 36,000 m2 with associated car parking, landscaping, and facilities. The building is divided into three pavilions, and it will accommodate multiple college functions including classrooms, teaching and research laboratories, lecture halls, and administrative areas. Construction of External Underground Services, Internal Road and Bus shelter. BIM – LOD 500. In house team of Architecture, Structure & MEP Team – Close Coordination with all services Exposure but not limited Services – Landscape, Signage, Architecture, Façade, Structure, MEP services etc, and External Underground Services.
Page 2 of 7
Responsibilities: • • • • • • • • • • March 23 – August 23
Supporting to PES for BIM Projects and Implementation of projects. Preparation of BEP, MIDP, etc and relevant documents for the starting of Projects. Preparation of BIM Weekly & Monthly BIM Progress report. Reviewing the Models for the Projects to accomplish the BEP and BIM Standards. Design Coordination with Consultant & Contractor for solving the major coordination issues. Site Visit for the Coordination. Capturing Site As-built Photos with using 360 using Holo builder software Comparing / reviewing the Model in Holo builder software as per site condition. Scanning Site on going work using Laser scan and comparing with the Model. BIM – LOD 500.
Project: Upgrade of Losail International Circuit - Racetrack & Infrastructure
Project Value: QAR 1.3 billion •
•
• • •
The project package includes the development of the Various Buildings & 5.3km racetrack, including repaving and marking works, providing new pavements, and providing screens, lighting systems. Works also include tunnels, constructing a pedestrian tunnel, developing the VIP tunnel, constructing the fans' parking area with a capacity of 5,550 cars, and VIP parking that can accommodate 1,450 cars. The infrastructure works implemented within the project’s third package include the development of the stormwater drainage network over 19km, groundwater drainage network over 14.6km, drainage network over 5.9 km, in addition to the TSE (treated sewage effluent) network over 6km, which will be used in irrigation, and electricity lines over 35.6km, as well as upgrading the communications lines. BIM – LOD 500. In house team of Architecture Structure & MEP Team – Close Coordination with all services Exposure but not limited Services – Landscape, Signage, Architecture, Façade, Structure, MEP services etc, and External Underground Services.
Responsibilities: • •
• • • •
Supporting to PES for BIM Projects and Implementation of projects. Preparation of BEP, MIDP, etc and relevant documents for the starting of Projects. Preparation of BIM Weekly & Monthly BIM Progress report. Reviewing the Models for the Projects to accomplish the BEP and BIM Standards. Site Visit for the Coordination. Capturing Site As-built Photos with using 360 using Holo builder software Comparing / reviewing the Model in Holo builder software as per site condition. BIM – LOD 500.
linkedin.com/in/thakurrakeshsingh/
Page 3 of 7
• •
Oct 2022 to Feb 2023
QPM SECONDEMENT TO ASHGHAL Work Location: Doha, Qatar Position: BIM Coordinator PUBLIC WORKS AUTHORITY (PWA) Projects Responsibilities: • • • • • • •
April 2020 to Sep 2022
Supporting to PWA for BIM Projects and Implementation of projects. Following the BIM Projects & Weekly BIM Trackers to Contractors / BIM Consultants. Reviewing the Models for the Projects to accomplish the BEP and BIM Standards. Preparation of Compliance sheet. Capturing Site As-built Photos. Comparing / reviewing the Model in Holo builder software as per site condition. BIM – LOD 500.
TAISEI CORPORATION Work Location: Doha, Qatar Position: BIM Coordinator Project: Hamad International Airport Expansion Project – Airport Project Client: MATAR – Qatar Airways (Hamad International Airport)
Consultant: Hill International - Dar (HDJV) Project Value: QAR 2.72 billion •
• • •
• •
The Hamad International Airport terminal expansion project will add a 10,000m² indoor tropical garden in a new central concourse and a 268m² water feature, which will be the primary component of the project. An 11,720m² retail, food, and beverages, Al-Murjan area are part of the expansion. BIM – LOD 500. In house team of Architecture Structure & MEP Team – Close Coordination with all services Exposure but not limited Services – Landscape, Signage, Architecture, Façade, Structure, Steel, Metal deck & MEP services include Special Airport System (SAS) services etc, and External Underground Services & Aircraft Services. Exposure of Trees and Planting Coordination special attraction in Airport. Involved in RETAIL SHOPS Coordination in Airport.
Responsibilities: •
• •
Manage Entire BIM department and Coordinate with all other Stakeholders the BIM preparations and Standards. Manage all Relevant to BIM Reports needed by technical team & Subcontractor. Attending PMCM Meeting (Hill International & DAR JV) to discuss the clash resolution and solving issues of Raised RFI. To participate in RFI meeting with the Technical Team & Certain departments. Self-decision making and solving major Coordination issues with discussion with PMCM, Designer & Client. Responsible for Managing Clash detection in Navisworks Software. Responsible for Clashes resolution to coordinate with Technical Team & other disciplines MEP, Architecture, Structure and Produce Smooth Shop-drawing for construction. Responsible for Coordinating Design & Technical Issues that will Impact in BIM and SHD preparation. Conduct BIM QA/QC Check. Involved in CBW Preparation for Wall and Slab Openings for MEP Services.
linkedin.com/in/thakurrakeshsingh/
Page 4 of 7
• • • • • •
•
• • • • • • July 2016 to March 2020
3rd Fix devices coordination for Various Walls types & Façade. Reflected Ceiling Plan (RCP) devices Coordination. Apron Works Coordination External services of Airport. Produce the Transportation planning for the Equipment’s. Produce BOQ & GA drawings from BIM to Various departments. Site Visit for Checking issues.
WCT BERHAD Work Location: Doha, Qatar Position: BIM Coordinator Project: Lusail Commercial Boulevard (Infrastructure Project) Client: Lusail (Lusail Real Estate Development Company).
Project Value: QAR 4.20 billion PMCM / Consultant: Parsons / Dorsch •
•
• • • • • •
Lusail Real Estate Development Company (LREDC), a subsidiary of Qatari Diar Real Estate Investment Company, is responsible for the development, construction, marketing, and management of the city. The total cost of the project is approximately $45bn. The project involves the construction of a commercial boulevard, Commercial Shopping, Wide range of Four-Lane Street, Small Sized Light Transit stations (LRT), 2 storey underground Car parks & related facilities. Lusail Infrastructure Project of long 5km MEP Under Ground Services. BIM – LOD 500 Exposure of Road, Pavement, Signages, Landscape, Traffic Signal, Streetlights, 66kv, 11kv, 415v and Electrical Low voltage Services. Exposure of all Services - Gas, Stormwater, Foul water, Irrigation Water, Potable water, Pneumatic Waste Collection and District cooling Services. Exposure of Planting & shrubs Coordination. Underground Car Park – MEP Services Modelling & Coordination.
Responsibilities: • •
• • • • • • • • • • • Sep 2015 to June 2016
Early Design review and Constructability analysis. Manging Change requests with respect to BIM standards and approaches, ensuring that the Main Works contractors maintain a common data environment. Navis Works Clash report Planning Report for Weekly BIM Updates Planning Report for Monthly BIM Updated to Client & PMCM (Parsons) Coordination issues solving with PMCM & Designers Meetings. Preparing RFI’s and attending RFI Meeting to Solve Issues. Scanning as-built model building and safety regulations Perform QA on Model deliverables to ensure compliance with Owners BIM Standard Responsible for Managing Clash detection in Navisworks Software. Independently determines and develops approach to solutions. Provide oversight of As-built Model development and delivery process. Prepare BOQ for Commercial department.
SIS BIM Work Location: Hyderabad - India Position: Sr. BIM engineer - MEP Project: Nakheel Mall, Palm Jumeirah – Dubai, UAE
linkedin.com/in/thakurrakeshsingh/
Page 5 of 7
Client: Nakheel Mall
Project Value: AED 4.35 billion • •
Project Location is in Dubai – Palm Jumeriah. The project is about Construction of a Mall comprising 3 basement levels, a
•
Promenade Level, Fashion Level, Entertainment Level, Roof Plaza Level and Roof Floor consisting of shopping and entertainment with over (250) specialty shops, food court, coffee shops, two major departmental stores, one supermarket, cinema multiplex and other entertainment facilities. LOD – 400
Responsibilities: • • • • • • • Mar 2015 to Aug 2015
Modelling Of MEP Services Checking all MEP Models review. Coordination with Architecture, Structure & MEP using Navisworks. Preparing builders Works, Prepare Shop drawings. Raising RFI, Planning Project Schedules. Handling technical discussion with Client etc., Quality check and dispatches.
SANVEO INC. India BIM MEP Modeler Project: King Faisal Multi specialty Hospital. (KFSH). Client: Saudi Binladin Group (SBG)
Project Value: $470m • •
•
• •
Project Location is in Saudi – Hospital Project. The KFSH&RC-J Mega Expansion Project was originally conceived as a fundamental enlargement of the Rawdah Campus which entailed Complete Utility Restructuring, Land Acquisition, Agency Interaction and Development of a long-term plan A complete set of medical, administrative, technical, logistic, and housing services. The Medical City of the King Faisal Specialist Hospital & Research Centre-Jeddah is being constructed Master Plan a community of Specialist Hospitals exceeding 2000 Inpatient Beds with the Phase 1 Medical Centre LOD – 400 Huge Exposure of Hospital MEP Services.
Responsibilities: • • • • Nov 2012 to Feb 2015
Modelling MEP Services. Preparing Shop drawings, Sheet Composition Preparing Builders Work Plan. Creating BOQ’s Clash resolving with Architecture, Structure and MEP services using Navisworks. Raising RFI, Handling with Technical discussion with team and Clients.
MAGNASOFT Work Location: Bangalore - India Position: MEP Design Engineer Project: Hilton Hotel Responsibilities: • • •
linkedin.com/in/thakurrakeshsingh/
Modelling of MEP Services. Coordination with other trades. Creating detail shop drawings Page 6 of 7
• • • • •
Creating Builder works plan. Creating Families. Creating Schedules. Creating Viewpoints in Navisworks. Creating Clash reports
Other Trainings
Safety Management, Site Visit Training.
Special Achievements
Appreciated by Technical director by solving Major Coordination in Airport Project. Appreciated by Manager by Completing Given Task by in time schedule. Completing of Projects / Coordination in Time Schedule. Award
Project
Major Coordination Issues solved Behavioural Strengths
Hamad International Airport Expansion Project
Good Communication, Planning, Dedicated towards Work, Problem Solving, Patience, Team Management, Teamwork.
Languages
English, Hindi, Telugu, Kannada Speaking
Reading
Writing
English
2
2
2
Hindi
1
1
1
Telugu
2
2
2
Kannada
3
3
3
Scale: 1. mother tongue | 2. good | 3. working knowledge
linkedin.com/in/thakurrakeshsingh/
Page 7 of 7