The Rail Engineer - Issue 96 - October 2012

Page 1

October 2012

i s s u e

96 A million miles between services PENDOLINO TRAINS ARE GIVEN THEIR THIRD HEAVY OVERHAUL AT LONGSIGHT

Four is better than one

The pressure on performance

Bringing earthworks under control

Bombardier’s new locomotive, the TRAXX DE ME has not one diesel engine, but four.

Network Rail’s Robin Gisby gives us an insight into timetables, delays and costs.

We ask Network Rail how they are getting to grips with drains and earthworks.

written by rail engineers for rail engineers

available online at www.therailengineer.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
The Rail Engineer - Issue 96 - October 2012 by Rail Media - Issuu