by rail engineers for rail engineers
JULY/AUGUST 2020 – ISSUE 185
SLAB TRACK
for HS2 ELECTRIFICATION AND THE ENVIRONMENTAL CHALLENGE
The history and future of electrification, and how it is essential if the railway is to meet its zero-carbon goals. A DOCKLANDS UPDATE
THE TRAIN NOW ARRIVING…
The DLR opened in 1987. Extended several times since, it now needs a major signalling and control upgrade.
HS2’s huge Old Oak Common interchange station will link with the Elizabeth line, Heathrow Express and the Great Western.
www.railengineer.co.uk
INFRASTRUCTURE