Engineer
by rail engineers for rail engineers
DECEMBER 2017 - ISSUE 158
DIDN'T THEY DO WELL? Rail Engineers did well at this year’s RailStaff Awards, scooping eight of the 20 available categories. ALL’S WELL THAT ENDS WELL
ELECTRIFICATION AS IT USED TO BE
A simple repair to the portal of Springs tunnel turned into a nine-day blockade to address major problems.
How the ECML was electrified in the 1980s, written by the project director who did it.
www.railengineer.uk
ELECTRIFICATION/ POWER
LIGHT RAIL/ METRO