The Rail Engineer - Issue 100 - February 2013

Page 1

February 2013

i s s u e

100 High Speed Interest HS2 ROUTE NORTH OF BIRMINGHAM TO MANCHESTER AND LEEDS ANNOUNCED

Holding back the flood

Sorting out Shugborough Tunnel

100th issue past features selection

Cofferdams filled with water hold back the advancing floods.

Relaying of both lines through Shugborough Tunnel over Christmas 2012.

From Thameslink to St. Pancras, Airdrie Bathgate to Crossrail - our selection.

written by rail engineers for rail engineers

available online at www.therailengineer.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.