Witney Factory Tour
£10million in robotics and automated manufacturing continue to take timber homes to another level
P44
LSFA Roundtable
Key voices from the light steel frame supply chain debate technical capabilities and market moves
P66
Volumetric Modular
How healthcare and education continue to make the most of this key manufacturing approach
P71
November/December 2026 Issue 55 / £4.95
Dedicated to offsite design, manufacture and delivery www.offsitemagazine.co.uk
INSIDE STORY THE IMPORTANCE OF SPECIFYING PREFABRICATED WATER SYSTEMS
Build smarter, design better. Design and detailing solutions that work the way you do.
Structural Steel
Light Metal Framing
Precast
Modular Volumetric
© 2026, Trimble Inc. All rights reserved AEC-002
Scan the QR code to learn more
MEP systems
WELCOME NOVEMBER/DECEMBER 2026 Editorial
Gary Ramsay / Consultant Editor T: 01743 290001 E: gary.ramsay@offsitemagazine.co.uk
Turning the Offsite Dials
Advertising and Events
Incredibly ‘that’ time of the year has rolled around again, and we have reached the final Offsite Magazine of 2026. A year that has seen offsite manufacture continue to recover from turbulent sector changes amidst continuing construction and economic flatlines.
Julie Williams / Digital and print sales T: 01743 290042 E: julie.williams@offsitemagazine.co.uk Rhian Morris/ Event enquiries T: 01743 290025 E: rhian.morris@radar-media.co.uk
Production and Finance
Sian Hawkins / Production T: 01743 290006 E: sian.hawkins@radar-media.co.uk
IF THERE IS ONE THING that this magazine
Showcasing innovation and best practice is the
attempts to do, it is to provide a positive view of
driving force behind the event and inside we have
Debra Brooks / Finance T: 01743 290001 E: accounts@offsitemedia.co.uk
offsite manufacture and to champion the benefits
a round-up of all the winners, plus throughout this
of factory-based construction. Something that is
issue, we have a few winner case study features,
still a mystery to many it seems. The awareness
including ‘The Network Building’ that landed the
Publisher
and perceptions of what it can do need to change.
coveted ‘Winner of Winners’. Overall, the Awards
How can the dials be turned so that the arrow is
has built a strong sense of offsite identity and
pointed to normal not ‘alternative’ or ‘specialist’.
shared ambition. This is what can help move that
Offsite Media Ltd Suite E, Hermes House, Oxon Business Park, Shrewsbury SY3 5HJ T: 01743 290001 E: info@offsitemagazine.co.uk W: www.offsitemagazine.co.uk
Subscriptions
W: www.radarbookingsystem.co.uk/ offsite-magazine-subscription/
Printed on FSC Mix paper by Buxton Press Ltd Palace Road, Buxton, Derbyshire, SK17 6AE T: 01298 212000
dial and demonstrate and highlight the wider
Every reader will recognise that the construction industry has historically – and
significance offsite offers the built environment. It
painfully – been fragmented, heavily reliant
is not about isolated examples of offsite success –
on established procurement and delivery
it is about an industry operating at scale.
models and comfortably ‘traditional’. It is not
Finally, if there is anything emblematic of
about replacing traditional construction, the
the move from traditional, site-based building
real opportunities rest in establishing a more
methods towards industrialised factory-led
intelligent, integrated approach in which the
ones, it’s automation and robotics. You can look
right elements are manufactured offsite and
no further than our tour of Donaldsons Timber
assembled efficiently on-site. Why is this still so
Systems Witney facility inside. Massive end of year thanks to everyone that
difficult to achieve?
has supported the magazine in 2026 including all
Challenging conventions is not easy but as
Disclaimer
The content of Offsite Magazine does not necessarily reflect the views of the editor or publishers and are the views of its contributors and advertisers. The digital edition may include hyperlinks to third-party content, advertising, or websites, provided for the sake of convenience and interest. The publishers accept no legal responsibility for loss arising from information in this publication and do not endorse any advertising or products available from external sources. The publisher does not accept any liability of any loss arising from the late appearance or nonpublication of any advertisement. Content including images and illustrations supplied by third parties are accepted in good faith and the publishers expect third parties to have obtained appropriate permissions, consents, licences or otherwise. The publisher does not accept any liability or any loss arising in the absence of these permissions for material used in both physical and digital editions. No part of this publication may be reproduced or stored in a retrieval system without the written consent of the publishers. All rights reserved.
discussed at the recent Explore Offsite event
our knowledgeable and generous contributors,
and displayed in countless projects at the Offsite
advertisers, and industry supporters. Hopefully
Awards 2026 – there is masses to shout about.
see you all on the circuit in 2027.
Gary Ramsay | Consultant Editor Email: gary.ramsay@offsitemagazine.co.uk We are always looking for the latest industry news, people appointments and project case studies using all types of offsite systems and products. For use both in print and online please send them to me at the contact email above.
INFORMING THE UK CONSTRUCTION INDUSTRY
Increase your online profile and drive traffic and enquiries to your website with the following: • Site Takeover & Web Banners • Suppliers Directory Listing • Newsroom Feature & Industry Blog • Digital Newsletter Insertions
DISCOUNTS ON 2027 RATES AVAILABLE WWW.OFFSITEHUB.CO.UK
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Call 01743 290042 or email julie.williams@offsitemagazine.co.uk
Issue 55 November/December 2026
03
04
Issue 55 November/December 2026
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
CONTENTS NOVEMBER/DECEMBER 2026
06
Specify the Stack
Dominic Yeandle, Regional Sales Director (South) and Steve Bamforth, UK Strategic Project Director, at Polypipe Building Services, explain why offsite fabrication of water systems is still rarely specified and why prefabricated water systems should move from ‘option’ to ‘standard’.
Industry News
08
News and developments from across the UK offsite industry and wider construction arena including: a new free to use library of psivalues for timber frame construction, Building Better Community of Practice offers local authorities a temporary accommodation toolkit and ‘proof-of-concept’ for a new digital gateway for construction product information completes.
26 Making Offsite Add Up Demand certainty, manufacturing capability and meaningful evidence of performance were all under discussion at the successful Explore Offsite 2026 conference.
50 Offsite High Points In case you missed out, here is a reminder of the winners at the Offsite Awards 2026, that for the first time saw the industry gather for a bumper gala sit-down dinner celebration.
30 Precast in Practice New technical guidance for non-load-bearing precast concrete façades will soon be available, MPA Precast previews some of its key themes for architects and building designers.
58 A Winning Formula A quick overview of The Network Building, Fitzrovia, the winner of the Best Use of Concrete Technology and judged the overall ‘winner of winners’ at this year’s Offsite Awards.
34 Precision Engineered PBSA Delivery A case study on The Stiles, Ormskirk, where a light steel frame loadbearing superstructure has been key to the phased delivery of a purpose-built student accommodation (PBSA) development.
62 Taking Time Off the Critical Path Paul Cooper, Managing Director at SES Manufacturing, explains why offsite manufacture is the more efficient route to programme delivery and offers better planning and reliable sequencing.
36 Hybrid Working at Height 4 Arbour Street is a prime example of hybrid construction, bringing together the best of precast concrete, mass timber and offsite thinking.
66 LSFA Roundtable Hosted by the Hadley Group, key voices from across the light steel frame supply chain, took part in a Light Steel Frame Association roundtable to discuss the move from technical capability to market confidence.
40 Decarbonising Infrastructure Demands Different Delivery The transition to low-carbon infrastructure is gathering pace, and we need to rethink ‘not just what we build, but how we build it’. NG Bailey show how they approached this at Bristol Airport. 44 Future Homes Start Here Donaldson Timber Systems has invested over £10million in robotics at its Witney facility to automate manufacturing processes and increase capacity. We went along to see the team in action.
71 Volumetric Modular One of our regular special magazine sections highlights important developments from across one of the offsite industry’s central delivery systems. Find out more about the volumetric modular approach from a range of specialists including a lead feature from MTX Contracts plus recent sector news and how education and healthcare projects continue to thrive.
Host a CPD Webinar Amplify Your Expertise: Connect Your Brand with a Targeted Construction Audience
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
BUILDINGLEARNING.CO.UK
Your CPD. Our Audience. Maximum Impact.
05
COVER STORY POLYPIPE BUILDING SERVICES
2
3
Specify the Stack Dominic Yeandle, Regional Sales Director (South) and Steve Bamforth, UK Strategic Project Director, at Polypipe Building Services, explain why offsite fabrication of water systems is still rarely specified and why prefabricated water systems should move from ‘option’ to ‘standard’. WITH SKILLED LABOUR in short supply,
The capability is there. The specification is not. In our
programmes are tight and sustainability expectations
experience, consultants often decline to specify offsite
keep rising. For teams specifying and installing water
fabrication because it is a service rather than a product.
systems, those pressures meet in one place – the
The concern is usually risk.
drainage and supply that have to be installed before
1
Image 1: Steve Bamforth, UK Strategic Project Director, Polypipe Building Services
other trades can follow. Bathroom pods are made in
Why specifying it lowers risk
a factory and delivered ready to connect. In many
The risk argument works the other way. Each system
projects, the stack that serves them is still assembled
from the Advantage Service is designed from the
on-site from loose parts. If the pod can be made
customer’s drawings, signed off by the customer
offsite, it is fair to ask why the stack beside it cannot.
before fabrication, pressure tested at our Aylesford factory and supplied with a test certificate pack. A
A specification gap, not a capability gap
system that is tested before it leaves the factory gives
Offsite fabrication of water systems is not new. We
a project more security than parts assembled on-site. A
have been prefabricating for more than 15 years, before
fabricated system can be specified in the same way as
the service carried the Advantage name. It began with
a product, because what is being specified is a defined
individual fittings, made by hand because a £30,000
result – a stack built to agreed drawings, tested, and
mould made no sense for ten parts a year. It grew into
supplied with its documentation. Our off-the-shelf
full-height, pre-tested stacks built to a project’s exact
stacks are set sizes you can name directly.
dimensions, then into off-the-shelf stacks in the sizes
06
The Building Safety Act’s sign-off process will
our own records showed customers ordered most.
suit a service such as Polypipe Advantage. A tested,
Issue 55 November/December 2026
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
COVER STORY POLYPIPE BUILDING SERVICES
5
4
6
documented system takes some of the burden off the
our colleagues lecture at colleges, where plumbing
specifier, at a time when sign-off already takes long
students often work only with copper and never see
enough. Skilled labour is the other challenge we hear
HDPE before they reach site. We have seen this pattern
most from customers in the South. The Advantage
before. Cast iron gave way to HDPE in drainage over
Service takes ownership of much of the design and
many years, and it took a long time to convince people.
builds the stacks in the
Prefabrication is at an
factory, so fewer skilled
earlier stage of the same
fitters are needed on site.
journey, and specification is
7
where it moves.
Repetition favours prefabrication Housebuilders and offsite producers build the same apartment many times over,
Moving fabrication from niche service to standard specification does not ask the design team to give anything up.
and the pipework sits in the same place each time.
Making it standard Moving fabrication from niche service to standard specification does not ask the design team to give anything up. The system is
That suits a standard stack, delivered complete and
still designed from the customer’s drawings and still
ready to fit. It is the thinking behind our Terrain FUZE
signed off before anything is made. What changes is
Stax range, prefabricated in the most common stack
where the work happens, and how much of it is tested
configurations. Our own analysis found them 65% faster
before it reaches site. We see high-rise residential
to install than loose components, with less waste on-
change first, and other sectors tend to follow, so
site. For MMC producers building standard pods and
repeating apartment layouts are a practical place
apartments, a standard stack can be supplied to the
to start. Talk to us early, while the design can still
line in the same way.
change, and we can show what a prefabricated stack
Images 2-6: Polypipe Building Services has been prefabricating for more than 15 years, before the service carried the Advantage name Image 7: Dominic Yeandle, Regional Sales Director (South), Polypipe Building Services
would look like on your project.
Habit is the real barrier Much of the resistance is habit. A large part of the industry still specifies what it has always specified, because it works and the risk feels low. That is why
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
To discuss specifying the Polypipe Advantage Service on your next project visit: www.polypipebuildingservices.com/ solutions/advantage-prefabrication
Issue 55 November/December 2026
07
INDUSTRY NEWS NOVEMBER/DECEMBER 2026
Timber EnerPHit Retrofit at Historic Worksop
News in Brief NHBC Due to Publish Latest Edition of Technical Standards NHBC will release the latest edition of its Technical Standards in January 2027. Updated annually, NHBC’s Standards are rigorously reviewed to drive incremental improvement and raise build quality. Supporting builders and developers to deliver high-quality new homes, the next edition will deliver updates in multiple areas. New for 2027 is guidance on building near coastal environments.
New Website for Precast Resources
A community centre that has served the Kilton
while addressing thermal bridges – areas of the
neighbourhood of Worksop for more than 50 years
building fabric where heat can otherwise readily
is being given a new lease of life through a major
escape. The TCosy™ system also incorporates
regeneration programme, including a deep-energy
high-performance windows and doors together with
retrofit targeting the rigorous EnerPHit standard.
mechanical ventilation with heat recovery (MVHR),
The regeneration is being delivered in two stages.
creating a complete high-performance building
The first focuses on the building fabric itself, with
envelope designed to work as one integrated system.
Passivhaus specialist Beattie Consult & Build delivering
The project demonstrates the potential to transform
a comprehensive external deep energy retrofit. Once
existing buildings rather than replace them. By taking
these works are complete, the internal refurbishment will
a fabric-first approach to Kilton Forest Community
follow, creating spaces designed in collaboration with
Centre, the existing structure can be retained while
Centre Place around the charity’s operational needs.
its energy performance is brought up to a significantly
Beattie’s retrofit is targeting EnerPHit certification
higher standard.
Elite Precast Concrete has launched a new website bringing together technical and compliance resources, ISO information, BSI certificates, installation guides and CPD-style presentations. Richard Doody, Commercial Director and Co-Owner of Elite Precast Concrete, says customers can also find product information, applications, case studies and learn more about the Elite team.
RICS Marks 50 Years of the Red Book The Royal Institution of Chartered Surveyors (RICS) is celebrating the 50th anniversary of its Global Valuation Standard. First published in 1976, the ‘Red Book’ grew from a UK-focused standard into a globally recognised framework used to support valuations that underpin financial reporting, secured lending, investment decisions and major capital transactions.
– the Passivhaus standard specifically developed
Nathan Beattie, Commercial Director of Beattie,
for the energy-efficient retrofit of existing buildings.
said: “Kilton Forest is a great example of what can be
EnerPHit applies the fundamental principles of
achieved when we look at existing buildings differently.
Dublin Landmark Underway
Passivhaus to existing buildings, including very high
Rather than accepting poor energy performance or
levels of insulation, exceptional airtightness, high-
replacing a building altogether, deep retrofit gives us
performance windows and doors, careful treatment
the opportunity to retain an important community
of thermal bridges and highly efficient mechanical
asset while fundamentally changing how it performs.
ventilation with heat recovery (MVHR).
Our TCosy system will effectively wrap the existing
Work has begun on Parkgate Pointe, Dublin. The 30-storey apartment block will be 102m high, when complete, making it Ireland’s tallest building. Kilsaran Precast will be a key supplier. Derek Duffy, Kilsaran Managing Director said: “Our three precast production facilities will work together to manufacture and deliver approximately 97,000sq m of flooring and wall systems for the project.”
Beattie is using its TCosy™ deep retrofit system to
building in a new high-performance thermal envelope,
transform the performance of the existing community
addressing insulation, airtightness and thermal
centre. TCosy™ is a holistic, fabric-first retrofit
bridging as part of one co-ordinated approach.
solution that creates a new highly insulated thermal
“What makes this project particularly important is
envelope around the existing building. The new
what happens after the construction work is finished.
structure extends from foundation level, around the
By significantly reducing the energy required to operate
existing external walls and across the roof, creating
the centre and creating a much more comfortable
a continuous thermal envelope around the building.
internal environment, the retrofit will help provide
Manufactured offsite and designed specifically
Centre Place with a building that can support its work
around the existing structure, the system can
in the community for many years to come.” Beattie’s
accommodate different building shapes, designs and
external retrofit works at Kilton Forest Community
architectural requirements while enabling relatively
Centre began in late August 2026 and are scheduled or
rapid installation on-site.
completion in early Q1 2027.
At Kilton Forest, the new envelope will substantially improve insulation and airtightness
08
Call for Standardised Designs for NHS Health Centres Wates Group has proposed a programmeled approach to delivering 250 new neighbourhood health centres across England. The recommendations are detailed in its new white paper ‘Partnerships for Progress’ with standardised room layouts, repeatable MEP systems and prefabricated components highlighted as ways to accelerate construction and improve quality.
Source: www.beattie.io
Issue 55 November/December 2026
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
PRECAST OFF-SITE BUILDING SOLUTION:
HOTELS/APARTMENTS BUILD-TO-RENT SPORTS STADIUMS EDUCATION MULTI STOREY CAR PARKS STUDENT RESIDENCE CUSTODIAL BUILDINGS
GREENWICH PENINSULA
HARLOW HOLLYBROOK
LANDSDOWNE BUILDING, BIRMINGHAM
WOODBERRY DOWN, LONDON
SHOREDITCH HIGH STREET, LONDON
Byley 01606 843 500 Grantham 01476 562 277 www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
EBURY BRIDGE, LONDON
Littleport 01353 861 416 Toomebridge 028 7965 0471 Issue 55 November/December 2026
sales@fpmccann.co.uk fpmccann.co.uk/offsite
09
INDUSTRY NEWS NOVEMBER/DECEMBER 2026
STA Launches UK’s First Free to Use Structural Timber Thermal Details Platform The Structural Timber Association (STA) has announced the launch of its Structural Timber Thermal Details platform, the UK’s first free to use library of psi-values for timber frame construction. The platform has over 1,500 details and associated psi values. It covers five generic timber frame wall systems, non-habitable and attic trussed rafter systems and I-Joists and metal web engineered timber floors. Details are presented for single family homes and multi-occupancy apartments. Paul Newman, STA Technical Director, said: “The launch of the STA Structural Timber Thermal Details website represents an important step forward in supporting energy assessors, designers, manufacturers and their wider project teams in delivering high-performance timber buildings. As energy efficiency requirements continue to evolve, the industry needs practical, reliable and easily accessible guidance that helps simplify the specification process and improve consistency across projects.
“Accurate psi-values are critical in achieving compliance in newbuild housing, minimising costs, and optimising designs to maintain competitiveness,” said James
“This platform provides a significant library of independently calculated thermal
Hulbert, Head of Housing & Offsite at Knauf Insulation. “The masonry sector has long
bridge details, together with the information needed to support compliance and design
had access to trade association and manufacturer pattern book values, while the
optimisation. By making these resources freely available, we hope to help the industry
timber frame sector was crying out for its own. The speed with which the STA, Studio
reduce design risk, improve building performance and encourage greater confidence
Partington and Briary Energy have put together over 1,500 details, all with industry
in the use of structural timber systems.”
review, has been mightily impressive. The Thermal Details Platform will prove to be an
The project, which is a collaboration between Timber Development UK, Swedish Wood and Knauf Insulation, using leading industry specialists, Studio Partington
invaluable resource to STA Members, much as the STA Fire In Use Pattern Book has become, and the platform will continue to grow as constructions evolve.”
Architects and Briary Energy, initially focuses on timber frame systems. However,
Colin Davis, Director at Studio Partington, said: “We know how costly and
the website has been designed to accommodate other timber construction
frustrating it can be to produce and source consistent, reliable and accurate
systems, such as SIPS, mass timber and proprietary systems, in the future.
thermal details and calculations. With over 1,500 timber frame details, each with
David Hopkins, CEO of Timber Development UK, said: “This set of details will
a Psi value and temperature factor, this resource lets designers make confident
provide housebuilders and designers with the information they need to do just that. They show the improved performance which can be achieved using timber systems
decisions from day one.” Michael Juckes, Briary Technical Director, also added: “These details will support
and we hope more housebuilders will choose this approach to make new British
SAP assessors in producing compliant calculations, offering improved thermal
homes fit for the future.”
performance over current SAP default values and deliver greater confidence for clients
Thermal performance is a consideration for all forms of construction. All buildings
and developers. Created with the expertise of the STA and designs by architects such
must be designed to comply with the functional requirements of building regulations, as
as Studio Partington, this project provides genuine value to the industry.”
a minimum standard. The STA has invested in this industry leading project, to deliver the UK’s first online free to use generic structural timber thermal details website.
To access the Thermal Details platform visit: https://bit.ly/48vOcOC
SAVE THE DATE... Returning for it’s fifth year, the 2027 MMC Ireland National Conference will take place on
10 & 11 MARCH 2027 Book tickets today!
MMCIRELANDCONFERENCE.COM
10
Issue 55 November/December 2026
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Two Experts. One Coordinated Approach. Frameclad’s Approved Installer Network combines our proven design, engineering and manufacturing capability with experienced installation expertise. This specialist-led model gives clients access to an approved network of competent installation
partners, providing greater geographical coverage, scalability and resilience. It enables the right installation expertise and resource to be matched to each project – wherever it is located.
DESIGN
ENGINEER
MANUFACTURE
INSTALL Digitally Designed
To discover how Frameclad’s Approved Installer Network can help deliver light steel frame projects with greater
consistency, quality control and technical assurance…
DOWNLOAD
Efficiently Manufactured Skilfully Fabricated
A Specialist Approach
Expertly Installed
to LSF Delivery brochure
Quality Assured
Call 01384 401 114
Email enquiries@frameclad.com
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Precision Engineered
Clear Accountability
Issue 55 November/December 2026
www.frameclad.com
11
INDUSTRY NEWS NOVEMBER/DECEMBER 2026
New Cambridge Framework Aims to Transform Construction Productivity A new framework published by the University of Cambridge, aims to help organisations unlock the value of data and use it systematically to understand how projects are delivered and where productivity can be improved. Construction projects generate enormous amounts of data, yet productivity remains variable and poorly understood. The ‘Cambridge Framework for Construction Productivity: Measure · Benchmark · Improve’ has been developed by a research team based at the University of Cambridge Laing O’Rourke Centre, using data from more than 25 projects gathered over the last three years from leading companies in the UK construction sector. This new, unique Framework provides industry with a practical, consistent approach to understanding and improving productivity at project, work-package, and activity levels. By connecting production rates, labour productivity, production flow, variability,
assure and continuously improve productivity. The Cambridge Framework directly
and the factors affecting delivery, the Framework helps construction teams
supports this ambition by providing a consistent approach to measuring key
understand where inefficiencies arise, identify blockers, and determine where
productivity metrics, identifying blockers and turning project data into actionable
intervention can have the greatest impact and outcomes. For construction clients,
insights to measure, benchmark and improve performance.
the Framework can build confidence in project programmes and outcomes by
The research team is developing Camentis, a software tool designed to
providing access to more consistent, evidence-based benchmarks across projects.
operationalise the Framework on live construction projects. The software
The Framework was developed by Dr Danny Murguia, Dr Ashan Asmone, Dr
is currently being piloted on live construction projects, marking the next
Asitha Rathnayake and the late Professor Campbell Middleton, who highlighted
stage of the research and supporting its continued development towards
the potential for a consistent approach to productivity measurement to become
wider implementation. The longer-term vision is for Camentis to support
embedded more widely across industry. Publishing the Cambridge Framework
better project controls, benchmarking and more advanced analytics,
for Construction Productivity marks an important milestone in a fantastic
including AI, helping teams make more evidence-based interventions to
collaboration between academia and industry that began in 2021. The relationships
improve productivity.
and trust established over that time have been exemplary.
The development of the Framework has also received significant
Dr Danny Murguia, Assistant Research Professor at the University of Cambridge
interest and support from the UK Construction Productivity Taskforce and
Laing O’Rourke Centre and lead author of the Framework, said: “The framework
members of the World Construction Leadership Forum, a Cambridge-founded
is about using data when it can make a difference: during project delivery, when
global platform bringing together senior executives from leading construction
teams still have an opportunity to intervene and improve outcomes. But it is also
companies worldwide. The wider ambition is to help construction move from
about learning from every project, building an organisational evidence base so
fragmented, retrospective productivity reporting to a more consistent, evidence-
that the next one can be planned, scheduled, priced and risk-assessed using better
based approach to delivery, creating a stronger foundation for continuous
information than the last.”
improvement across projects and organisations.
The Framework is particularly timely in the context of the upcoming PAS 4010:2026, ‘Improving productivity in infrastructure development and delivery’, which sets out requirements for a productivity management strategy to manage,
The 2027 MMC Ireland National Conference is once again returning to...
The Johnstown Estate, Enfield, Ireland
You can access ‘Cambridge Framework for Construction Productivity: Measure · Benchmark · Improve’ at https://bit.ly/4zgXQ3B
10 & 11 MARCH 2027 THE JOHNSTOWN ESTATE, MEATH
Book tickets today!
MMCIRELANDCONFERENCE.COM
12
Issue 55 November/December 2026
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
INDUSTRY NEWS NOVEMBER/DECEMBER 2026
Algeco UK Achieves Ecovadis Platinum Rating Algeco UK, part of the Modulaire Group
testament to the dedication of our employees,
recently announced that it has been awarded
customers and suppliers who contribute to our
the EcoVadis Platinum rating, the highest level
sustainability journey every day. Sustainability
of recognition available from the world’s largest
is fundamental to our business strategy, and
provider of business sustainability ratings. This
this recognition demonstrates our commitment
achievement places Algeco among the top 1%
to operating responsibly while supporting our
of companies assessed globally by EcoVadis
customers in achieving their own sustainability
in the last 12 months, recognising the Group’s
ambitions.”
strong performance across environmental
With the broadest portfolio of portable
management, labour and human rights, ethics,
and modular buildings in the UK and operating
and sustainable procurement.
nationwide, Algeco UK leads the market with
The platinum rating reflects Algeco UK’s
a robust approach to ESG and Sustainability,
impressive progress and continued commitment
driving circularity through its ‘Loops within
to embedding sustainability into its business
Loops’ business model. As part of Modulaire
strategy and operations. Key initiatives that have
Group, Algeco UK supports the delivery of net
contributed to this include implementing a Supply
zero targets that have been validated by SBTi,
Chain Sustainability Handbook, carbon emission
making Modulaire Group one of nearly 12,000
reduction targets validated by the Science Based
companies worldwide with independently
Targets initiative (SBTi) that provide transparency on the business’s pathway to net zero,
validated science-based targets. The EcoVadis Platinum rating reinforces Algeco’s
and delivering a training programme in partnership with the United Nations Global
ambition to be a leader in sustainable business and supports its broader ESG
Compact to provide education and set clear expectations within its supply chain.
commitments meeting stakeholder commitments.
“We are incredibly proud to have achieved the EcoVadis Platinum rating,” said Henrik Akerson, Algeco UK Managing Director. “This is a significant milestone and a
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Source: www.algeco.co.uk
Issue 55 November/December 2026
13
INDUSTRY NEWS NOVEMBER/DECEMBER 2026
Kier Outline Lessons from Construction Playbook Kier has published a new report examining how Construction Playbook recommendations are translating into real-world industrialised delivery outcomes across major public sector programmes. ‘Lessons from the Construction Playbook: Industrialisation in Action’ explores how principles including longer-term contracting, standardisation, outcome-based specifications and early supply chain involvement are improving productivity, quality and programme certainty. Based on its findings, Kier recommends greater use of standardised outcome measures, stronger alignment between customers and supply chains, and increased focus on programme-level delivery models that enable industrialisation and continuous improvement. The report comes as skills shortages and cost uncertainty continue to challenge project delivery, sharpening the need for more productive and predictable approaches to building public infrastructure. Drawing on evidence from major government programmes, the report demonstrates how industrialised approaches can help address many of the challenges highlighted by the Construction
programmes are delivered. Six years on, the industry is increasingly asking what
Playbook. The findings draw on Kier’s experience supporting programmes including the
evidence exists that those principles work in practice. What we’ve found is that
Ministry of Justice’s New Prison Programme, the NHS New Hospital Programme, the
the greatest benefits come when industrialisation is viewed as more than a
Defence Infrastructure Organisation’s Single Living Accommodation Programme and
construction methodology. It is about creating the conditions for continuous
the Department for Education’s Construction frameworks.
improvement through repeatable requirements, integrated supply chains and
Kier’s analysis shows measurable benefits from industrialised delivery, including
long-term programme thinking. The evidence suggests it can play a critical role in
a 47% improvement in productivity, a 40% improvement in quality and a 15%
helping clients looking at critical infrastructure investments improve productivity,
improvement in delivery certainty. The report also identified improvements across
certainty and value across repeatable programmes of work.”
design, delivery, carbon, waste and quality.
Dapo Obatusin, Deputy Director, Capital Construction Delivery, MoJ Property
Figures also suggest that the New Prison Programme has delivered a 22%
Directorate added: “Industrialised construction is central to our approach to
faster delivery rate compared with traditional, non-systemised approaches, with
delivering the prison estate we need. Kier’s report reinforces the case for this
74% of prison houseblock design and 60% of overall project design standardised.
model, demonstrating how innovation and practical delivery experience can
Embodied carbon in precast concrete has also fallen by 14.9% against the Fosse
improve productivity, quality and certainty. By sharing these insights and lessons,
Way baseline, while digital tracking has supported a 99.3% precast quality rate
Kier is helping advance a way of building that is essential to delivering at the scale
across prison projects. All projects within the New Prison Programme have
required and securing better value for the public.”
reportedly been completed on budget and to schedule. Andrew Dewdney, Head of Industrialisation at Kier, said: “When the Construction Playbook was published in 2020, it set out a clear vision for transforming how public sector projects and
You can download the ‘Lessons from the Construction Playbook: Industrialisation in Action’ at: www.kier.co.uk/what-we-do/industrialisation
TWO DAY SPEAKER PROGRAMME TO INCLUDE DISCUSSIONS AROUND; Housing Delivery, Investment & Scale Public Sector Pipeline, Procurement & Assurance Data Centres, Digital Delivery & Export Growth People, Skills & Lean Operational Excellence European / International MMC Best Practice
14
Issue 55 November/December 2026
10 & 11 MARCH 2027 THE JOHNSTOWN ESTATE, MEATH
10 & 11 MARCH 2027 THE JOHNSTOWN ESTATE, MEATH
Book tickets today!
MMCIRELANDCONFERENCE.COM
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
THE LEADING PRECAST FRAME MANUFACTURER ACROSS THE UK & IRELAND
O’Reilly Precast delivers high-quality full-frame and Architectural Wall Panel (AWP) solutions designed to accelerate construction programmes. Our offsite-manufactured systems enable rapid installation, reduced site labour, and consistent, independently certified factory-controlled quality across projects throughout the UK and Ireland. Designed and manufactured in-house, our approach is built around one dedicated team focused on your project, with the flexibility to adapt as plans change.
OREILLYPRECAST.COM
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Talk to our precast team about accelerating your next build
Issue 55 November/December 2026
0121 630 3472 sales@oreillyprecast.com oreillyprecast
15
INDUSTRY NEWS NOVEMBER/DECEMBER 2026
CITB Report Reveals Construction Apprenticeships Disparity New analysis from the Construction Industry Training Board (CITB) in its latest report ‘Construction Apprenticeships: Opportunities. Challenges. Support’ reveals significant regional differences in construction apprenticeship starts and employer participation across Britain, prompting calls for local skills plans to place greater focus on helping employers recruit and support apprentices. London has by far the fewest construction apprenticeship starts relative to demand. CITB’s report found there are around 30 construction employers for every apprenticeship start in London, compared with fewer than four in Scotland and between six and 20 across other regions. The contrast between Scotland and London remains stark when apprenticeship starts are compared with the size of the construction workforce. Scotland recorded 42.3 starts per 1,000 construction workers in 2024-25, while London recorded the lowest rate at 8.9 starts per 1,000 workers. The findings point to a wider employer participation challenge. London has of the largest concentration of construction businesses in Britain, yet apprenticeship starts are relatively low compared with the number of businesses and the size of the construction workforce. This highlights the scope to support more employers to create apprenticeship opportunities. The findings make a case for devolved and place-based skills interventions that respond to local labour market conditions. At a time when many young people remain outside education, employment or training, increasing the number of employers able to offer apprenticeships could create more routes into skilled work while helping construction develop its future workforce. Across Great Britain, the report shows that around 33,000 people started a construction apprenticeship in 2024-25, but only around 17% of construction businesses are currently employing an apprentice. Additionally, micro businesses – which account for around 95% of the
being in education, employment, or training, apprenticeships can be a fantastic way
industry – are much less likely to participate. Increasing apprenticeship starts will
for them to join the workforce, the sector, the government, and education providers
therefore require practical support to help employers, particularly SMEs, recruit and
need to come to come together. We cannot afford for apprenticeship opportunities
support apprentices, alongside efforts to improve apprenticeship completion rates.
to be lower or to be concentrated in only some parts of the country. By making
Lee Bryer, Insight Manager at CITB, said: “Construction needs skilled people across the whole of Britain, and this report shows striking differences in the scale
apprenticeships easier to offer, we can create more opportunities locally and build a stronger, more resilient construction workforce.”
of opportunity for people to start apprenticeships depending on where they live. Apprenticeships are fundamental to the future of construction, and a hard-working apprenticeship is great to have in any business. With many young people also not
16
Issue 55 November/December 2026
You can find the full Construction Apprenticeships: Opportunities. Challenges. Support. report at: www.citb.co.uk
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
INDUSTRY NEWS NOVEMBER/DECEMBER 2026
Forts Group Unveil New Offsite Company Forts Group, the UK-based construction and
across its divisions and subsidiaries. The new
specialist services group, has announced the launch
company will complement existing operations,
of ‘Build With Steel’, a new subsidiary focused
supplying structural frames that work directly
on the manufacture of bespoke light gauge steel
alongside the Group’s construction, development and
frame (LGSF). Operating from the Group’s Hatfield
specialist services.
headquarters, the new company will manufacture
Commenting on the launch, Jeton Osmani,
made-to-order LGSF for buildings typically up to
Managing Director of Forts Group, said: “The creation
six storeys high, working with specialist structural
of Build With Steel represents a natural progression
engineers, strengthening Forts Group’s ability to
for Forts Group. We have always focused on quality,
deliver comprehensive, end-to-end construction
control, and delivering value to our clients. By bringing
solutions while expanding its in-house structural
bespoke LGSF manufacturing in-house, we are
manufacturing expertise.
strengthening our ability to deliver projects efficiently,
Build With Steel has been created in response
sustainably and to the highest structural standards.
to increasing demand for smarter, faster and more
This investment allows us to support architects,
sustainable structural solutions. By manufacturing
developers and contractors with engineered solutions
steel systems offsite at its Hatfield facility, the
that are precise, reliable and manufactured right here
company can deliver precision-engineered
in Hatfield.”
components that combine strength with efficiency.
The launch of Build With Steel reflects Forts Group’s ongoing commitment to pushing
locally in Hatfield, the company can respond quickly
expansion for Forts Group, strengthening its
construction forward and is set to serve a broad
to client needs, adapt designs on demand and ensure
integrated service offering. By bringing LGSF
range of sectors, from residential and mixed-use
every component
manufacturing within the Group, Forts Group gains
developments to schools and low-rise commercial
greater control over quality, cost and programme
projects. By manufacturing bespoke steel systems
The launch of Build With Steel marks a strategic
vertexcad.com/bd
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
Source: www.buildwithsteel.co.uk
S
Y
S
T
E
M
S
17
INDUSTRY NEWS NOVEMBER/DECEMBER 2026
Frameclad Launch Approved Installer Network Frameclad has announced the launch of a network of approved installation partners, extending its specialist light steel frame capabilities through a coordinated approach to installation. The new delivery model combines specialist design, engineering and manufacturing with expert installation. The initiative brings together two complementary areas of expertise as Nik Teagle, Joint Managing Director, Frameclad, explains: “Rather than treating installation as a separate, downstream activity, Frameclad’s approved partners work alongside our design and engineering specialists together with the wider project team, contributing practical site knowledge before manufacturing begins. Their input can inform installation sequencing, access requirements, tolerances, temporary stability, logistics and resource planning, helping identify potential challenges. “This early collaboration supports our design for manufacture and assembly approach, helping reduce avoidable modifications, late design changes and programme disruption. As construction projects face increasing pressure to demonstrate compliance, manage interfaces and deliver against demanding programmes, our initiative recognises the importance of integrating installation expertise into the process from the outset.” Frameclad’s approach is built around a clear division of responsibilities within one co-ordinated delivery strategy. The company continues to provide dedicated technical design, engineering and manufacturing expertise, supported by controlled production processes and digital traceability in line with golden thread compliance. Installation is undertaken by an approved specialist with the appropriate competence, experience and resources for the project. The network also provides greater geographical coverage and the ability to match installation expertise and capacity to individual project requirements. This offers greater resilience when
through the same installation partner, helping
production information and inspection requirements
planning projects across different locations, scales
reduce the number of interfaces managed by the
also support traceability and the demonstration of
and programmes, without relying solely on a fixed
main contractor and supporting earlier co-ordination
compliance with relevant project requirements. By
in-house installation resource.
between trades.
combining specialist manufacturing capability with
The approved installation partners can also
“Throughout the process, Frameclad remains
installation-led expertise, Frameclad aims to provide
extend beyond light steel frame installation to include
directly accessible to clients and project teams,”
a practical, cost-effective and transparent delivery
complementary packages such as external wall build-
added Joint Managing Director, Martin Jamieson.
model that addresses the challenges of construction
ups, cladding and facade systems, drylining, internal
“Providing specialist support and maintaining
before they reach site.”
partitions, insulation and fire-stopping. Where
control of the engineered system and manufacturing
appropriate, these services can be co-ordinated
information. Our co-ordinated design records,
18
Issue 55 November/December 2026
Source: www.frameclad.com/downloads
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
INDUSTRY NEWS NOVEMBER/DECEMBER 2026
Five Modular Homes Planned for Cambridge Homeless National property consultancy Carter Jonas, acting on behalf of Cambridge Cyrenians, has secured planning permission from Cambridge City Council for five modular homes and a support office for people experiencing homelessness at 23-27 Kings Hedges Road in Cambridge. The permission is for a temporary period of up to five years.
John Mason MRTPI, Associate Partner at Carter Jonas in Cambridge, said: “High
The site is the rear garden land of three semi-detached houses that Cambridge
land and building costs in Cambridge can put single-person homes out of reach
Cyrenians leases and has run as supported housing for 12 residents for more than
for housing providers, so making better use of land already in charitable hands is
15 years. A new 20-year lease includes provision for the modular homes.
important. The case here rested on showing that five more homes could sit behind
The scheme comprises five single-storey modular homes and a sixth unit for support staff, used as an office and for surgeries with the charity’s mental health
existing houses on an established street and be well managed.” Cambridge Cyrenians has provided accommodation and support for people
practitioner. Each home will measure 32sq m, including its front patio, and contain
experiencing homelessness in Cambridge for more than 55 years. It has 100
a bedroom, shower room and open-plan kitchen and living space. With the supplier
supported housing bedspaces and helps more than 200 people each year. James
still to be confirmed, they will be built with a steel frame and structural insulated
Martin, Director at Cambridge Cyrenians, added: “Many of the people we house
panels (SIP), the homes offer thermal performance close to Passivhaus standards.
are ready to leave shared accommodation but have nowhere to go, because social
The development follows a structured pathway that prepares people for
housing is in short supply and private rents are out of reach. These homes give
independent living. Residents, referred through Cambridge City Council’s existing
people a front door of their own and the chance to manage a home independently,
allocation panels, will have a home of their own, with support from the charity’s
with our team on hand when they need it. We look forward to welcoming the first
specialist staff as they prepare to move on. A site management plan, secured by
residents in 2027.”
planning condition, sets out how the site will be run day to day, and new CCTV will Source: www.carterjonas.co.uk www.cambridgecyrenians.org.uk
be installed across the site.
Proud members of
Introducing...
Get creative with space & light Our AluSpace Interior Screening System is designed to divide or delineate both residential and commercial spaces, while at the same time providing an effective acoustic barrier. Choose from hinged single, double doors, pivot or sliding doors to accompany our stylish fixed glazed screen. This flexible and versatile system provides almost limitless design options whilst requiring minimal maintenance. AluSpace will provide many years of assured, reliable and robust performance.
For more information visit smartsystems.co.uk/aluspace E sales@smartsystems.co.uk /SmartArchitecturalAluminium
Hinged
SMA5243 Radar AluSpace 127x190 Ad_AW.indd 1
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Sliding
Pivot
09/11/2022 10:10
Issue 55 November/December 2026
19
INDUSTRY NEWS NOVEMBER/DECEMBER 2026
Measuring Construction Sustainability a Key Challenge Sustainability has moved from a niche consideration to a mainstream expectation
Only around four in ten professionals (42%) name a regular, trusted source of
across the built environment and most professionals agree on what it takes.
sustainability data. That equates to well over half the industry (58%) requiring a
Delivering sustainability consistently, project after project, is proving much harder.
source to rely on. Since the last report, AI search is now referenced in around 14% of
That’s the central finding in the NBS ‘Sustainable Futures Report 2026: The state of
responses. In the previous Sustainable Futures study, AI did not feature at all, which
sustainability across the construction lifecycle’, by NBS (part of Hubexo), a leading
shows how quickly this topic has moved up the agenda. The rising influence of AI
specification and product information platform for the construction industry.
makes it a natural place to look for general information, but this carries the real risk
This is the fifth edition of the NBS report, in association with Royal Institute of
of unverified data reaching specification decisions. Demand for better product data
British Architects (RIBA), which has provided an industry benchmark for evolving
is clear. The majority of respondents (83%) want manufacturers to provide more
views and opinions from those working within the built environment over the
sustainability performance data and 43% look for EPDs when selecting products.
past decade, providing insight into sustainability attitudes and tracking how the industry’s approach is changing.
Dr Lee Jones, Head of Sustainability at Hubexo, said: “The conversation around sustainable construction is evolving. Awareness of embodied carbon,
Specification is the clearest point of agreement with more than eight in
lifecycle assessment and Environmental Product Declarations has grown. But
ten respondents (86%) expressing that a well-written specification matters for
many organisations are still building the skills, processes and data they need to
sustainable outcomes. Three-quarters (75%) say lifecycle assessment is important, a
measure their impacts and track progress, and the gap between ambition and
sign that whole-life thinking is now widely accepted across the industry. However, the
implementation is still clear. Decisions made early on and during design stage
study reveals that practice from day to day is less consistent. Only around half (53%)
have a profound influence on how a building performs, which is why a rigorous
measure and report on sustainability across all or most of their projects, and just
specification is important for sustainable outcomes. But specification is only as
under half (48%) say their intended outcomes are achieved always or frequently.
good as the data behind it. The industry needs to work more closely than ever, to
The barriers are practical ones. Cost tops the list (60%), followed by a lack of
ensure project teams have transparent, verified product information.”
client demand (42%), sustainable products being value-engineered out (32%) and a shortage of people with the right skills (25%). Respondents see clients as the most influential group on a project (68%), yet a lack of client demand is the second biggest barrier to delivering sustainable outcomes.
20
Issue 55 November/December 2026
You can download the NBS Sustainable Futures Report 2026 for the full findings and a guest article from RIBA on measuring how buildings perform in use under the UK Net Zero Building Standard at: https://bit.ly/4iOKzt5
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
TRUST THE EXPERTS Holistic Solutions for a Healthy Building Envelope
A self-adhering, vapour-permeable air barrier that delivers reliable airtightness and improved energy performance. BBA certified and compatible with multiple substrates, it’s suitable for projects from timber frame housing to steel-framed high-rise. contact@proctorgroup.com
+44 01250 872 261
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite Trinity Square, Manchester
Issue 55 November/December 2026
www.proctorgroup.com
21
INDUSTRY NEWS NOVEMBER/DECEMBER 2026
New Toolkit Offers Local Authorities Temporary Accommodation Advice
The Building Better Community of Practice (BB:CoP), with a consortium of
that was never meant to be a home for more than a few weeks, let alone months
experts, has published the Local Authority Toolkit for Relocatable Temporary
or years. None of this replaces the deeper solution, which is building enough
Accommodation (TA) on Meanwhile Use Land. The practical guide will help local
permanent, genuinely affordable homes so that temporary accommodation stops
authorities deliver quality, cost-effective TA by putting relocatable homes on land
being a growth industry in the first place. But while that ambition is being delivered,
that is waiting for future development.
councils need options that improve people’s lives now, at a cost the public purse
The TA system is at breaking point with a record 135,580 households, including
can sustain. This toolkit gives them a practical route to achieve that. We encourage
177,530 children, living in TA in England in March 2026, an increase of 5.2% in a year.
every local authority grappling with these challenges to review the toolkit and seek
Local Authorities (LAs) in England spent £2.93billion on TA in 2025/26, and around
to deploy these proven approaches.”
£4billion on homelessness overall.
The Building Better Community of Practice is asking central government to
The toolkit takes what Bristol City Council, and the London Borough of Havering
support this route in two ways: Policy certainty: for example, fixing lease recovery
have already delivered on the ground and sets out how other LAs can build on
at current Local Housing Allowance rates for leases of more than ten years, so LAs
them: Bristol leased meanwhile sites to MMC Homebuilding for seven years at a
can engage with private finance and commit to leasing structures with confidence.
peppercorn rent. Five modular eco-homes were installed, leased back to the council
Grant for LA-held land: enabling more grant to be deployed into land held by LAs, so
and sub-let to Elim Housing (now Places for People), achieving full Housing Benefit
remediation costs are separated from lease costs and grant stays with the land, to
recovery at minimal capital cost. Havering, through its partnership with Wates
be recycled into affordable housing once the temporary homes are relocated.
and modular supplier Rollalong, bought 18 modular family homes for a phased
The toolkit grew out of a panel discussion in December 2025, hosted by Places
regeneration site at Waterloo and Queen Street. The homes have a 60-year design
for People and was developed with a consortium of experts including 165,000
life and can be moved up to five times.
Reasons, Shared Health Foundation, Akerlof, Trowers & Hamlins, 31Ten, Alternative
The toolkit brings legal, financial, commercial, design and planning guidance
Commercial Finance, Places for People, RCKa, Vestega, MMC Homebuilding, Wates,
together in one place, alongside a viability calculator, an outline business case,
Rollalong, Cornerstone Place, Etopia, ModularWise, Portakabin and Zed Pods, with
supplier solutions and case studies. It helps LAs move towards delivery now, within
review and comments from the Planning Advisory Service (PAS) and HTA.
constrained borrowing capacity. Katie Rudin and Trudi Sully, Co-Chairs of the Building Better Community of Practice Advisory Board, said: “Behind each of these numbers is a family, often with children, whose lives are on hold in a hotel room, a B&B, or accommodation
22
Issue 55 November/December 2026
The toolkit is available for download at: www.buildingbetter.org.uk/ publications/toolkit-for-relocatable-temporary-accommodation-onmeanwhile-use-land/
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
INDUSTRY NEWS NOVEMBER/DECEMBER 2026
Manufacturer’s Information Hub Portal Moves Forward A proof-of-concept for a new digital gateway for construction product information has been completed. Announced earlier this year, the Manufacturer’s Information Hub (MIH) is a manufacturer-led and owned digital platform that will share structured construction product data in a simple and easy to use way. A pan-European solution, it is a not-for-profit initiative and will support environmental and safety compliance and pave the way for digital product passports. The first phase was designed to demonstrate how the MIH would address industry needs and facilitate information sharing between manufacturers and
Director: Growth Mission at UKRI, said: “Reliable, direct access to manufacturers’
information users, such as specifiers, contractors and asset owners. That included
product information is an essential step in creating a more digitally connected
outlining the process for connecting manufacturer databases via a standard API, the
construction sector. It is positive to see manufacturers coming together to solve this
requirements for a standard data dictionary to validate and present information and
issue. At a time of major change in the world of construction products, particularly
how the system would reduce complexity and risk.
when it comes to demonstrating the safety and sustainability criteria of products, this
Alex Small, Founder of the MIH, said: “This is an exciting first step in the journey
will help manufacturers meet the challenge in a simple, effective way.”
towards getting the MIH up and running. At this first stage, we have demonstrated that
As part of the first phase, the MIH team also needed to demonstrate the roadmap for
it is technically feasible to offer this to market. That includes detailing how it will work in
future development. Subject to funding, the next step will be to develop a working prototype
practice, where the complexity sits and what solutions will be needed. The MIH will make
with early adopters by spring 2027. This will be a small-scale working version, linking a handful
it much easier for manufacturers to share product information efficiently and consistently
of manufacturers and users via the API, to demonstrate the core functionality and benefits.
across multiple platforms and systems. By being not-for-profit and manufacturer-led, it
Continued work on the rules around standardised product attributes will also be delivered
means that companies retain full ownership and control of their data and can be part of
during this phase. Once complete, a full-scale prototype will be developed for in-depth testing
this journey from day one, whether an SME or a major manufacturer.”
throughout 2027, before launching some functionality of the platform in 2028.
Supported by UKRI, the project is part of its Industrialising and Digitalising Construction Research and Innovation Challenge. Melissa Zanocco OBE, Challenge
Source: www.themih.org https://bit.ly/4dZQKb9
Glidevale Protect Supports New SIP Housing Development A range of airtightness and breather membranes were supplied by Glidevale Protect for a new residential development in North Yorkshire, built using Structural Insulated Panel (SIP) construction. GRANBY FARM GROVE features seven
up to create a continuous airtight layer and
individually designed homes built with
provide vapour control properties, helping
the goal of significantly exceeding modern
to deliver a U-value of 0.17 W/m²K.
expectations for construction quality,
A co-branded Protect TF200 breather
sustainability and long-term performance
membrane was also used externally as part
by adopting a fabric-first approach, whilst
of the SIP system, providing a temporary
standards for energy efficiency, with the SIP
also paying homage to the agricultural
line of weather protection to the whole of the
construction providing a high performance,
heritage of the site.
external wall during construction and a second
thermally efficient building fabric. Glidevale
line of defence against water penetration after
Protect’s combination of BarriAir and TF200
construction for the project, with Glidevale
construction. The combination of the internal
membranes complemented our systems
Protect’s products including its Protect
airtightness layer and external breather
perfectly, delivering airtightness and
BarriAir airtightness membrane as well as
membrane helped support the performance
condensation control, helping us to ensure
the Protect TF200 external wall breather
requirements of the SIP system and control
overall system performance.”
membrane, forming an integral combination
the risk of interstitial condensation.
SIP Build UK delivered the SIP
of membranes as part of the building
Ian Still, National Sales Director at SIP
envelope. Protect BarriAir was used as an air
Build UK, said: “The homes have been designed
barrier on the internal face of the wall build
to exceed modern building regulation
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
Find out more at: www.glidevaleprotect.com/itt, call +44 (0)161 905 5700, or email: info@glidevaleprotect.com
23
INDUSTRY NEWS NOVEMBER/DECEMBER 2026
Timber Industry Urged to Prepare for Recovery
The timber industry must look beyond another difficult year of trading and prepare
trigger supply shortages and significant price increases. Rising German building
for future growth, delegates heard at Timber Development UK’s (TDUK) Global
permits and the potential for Canadian producers to supply more European
Market Conference. Bringing together 180 delegates from the UK, Europe and Brazil,
markets were also highlighted.
the sold-out event examined weak construction demand, rising production costs, global trade disruption and evolving regulatory pressures. While the outlook for 2027 remains challenging, speakers warned that the
A panel discussion featuring Michelle Buckland, Managing Director of Timber at Haldane Fisher Group, and James Davenport, Managing Director of Metsä Wood UK, explored how businesses could generate growth despite weak demand. Both
eventual recovery could bring its own difficulties, with declining sawmilling
speakers called for greater emphasis on competing with alternative construction
capacity, raw material shortages and skills constraints threatening the industry’s
materials rather than undercutting one another on price. Timber’s environmental
ability to meet renewed demand.
credentials, product innovation and engineered timber applications offer
Opening the conference, TDUK Chief Executive David Hopkins highlighted the impact of geopolitical instability, tariffs, energy costs and subdued UK construction activity. He outlined the organisation’s continued investment in technical support,
opportunities, but businesses must communicate their value more effectively and understand changing customer requirements. Construction Products Association Economics Director Professor Noble Francis
training and education, including the Wood Campus platform, which has attracted
forecast little improvement in UK construction during the first half of 2027. Private
3,000 registrations since its launch. Priorities for 2027 include expanding regional
housebuilding output is expected to fall by 10% in 2026 and a further 3% in 2027,
training, developing further learning resources and engaging with key regulatory
with higher mortgage rates, weak consumer confidence and rising development
developments, including the Building Safety Act, construction products regulation
costs continuing to undermine viability. He also highlighted a construction
and EUDR.
workforce approximately 300,000 workers below 2019 levels, identifying timber
Sampsa Auvinen, Chair of Fordaq and CEI-Bois, warned that falling European softwood consumption – down from approximately 85 million m³ in 2021 to
frame construction as one potential response to labour shortages. The conference concluded that businesses must balance immediate cost
71 million m³ – was masking deeper structural problems. With high raw material
pressures with investment in future opportunities. Greater collaboration, product
costs forcing sawmills to reduce production or close, an estimated nine out of 10
innovation, engineered timber and increased specification will be essential.
Swedish sawmills are operating at a loss.
However, with European supply capacity already under pressure, the industry must
However, shortages of suitable logs, particularly Spruce, are becoming an
prepare now for recovery rather than wait for market conditions to improve.
increasing concern due to bark beetle damage, harvesting restrictions and changing forest conditions. Auvinen cautioned that when construction demand recovers, reduced production capacity and limited raw material availability could
24
Issue 55 November/December 2026
A full account of the day and conference sessions is available at: https://timberdevelopment.uk/tag/global-market-conference
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
FRAMA™ 3200
PRECISION FRAMING STARTS WITH HOWICK
FRAMA™ 4200
FRAMA™ 5600
Built for precision and efficiency, Howick roll-forming machines deliver accurate, high-quality framing automation solutions for modern construction.
FRAMA™ 6800
FRAMA™ 3200 & 5600 Reliable all-rounders for standard framing FRAMA™ 4200 High-efficiency truss systems
FRAMA™ 7600
FRAMA™ 6800 Faster flooring solutions FRAMA™ 7600 Ultimate flexibility for multiple profiles
FRAMA™ 7800
FRAMA™ 7800 Multi-profile floor joist systems X-TENDA™ 3600 Innovative telescopic framing for internal spaces X-TENDA™ 3600
To find out more about setting up construction manufacturing with light gauge steel framing automation, simply scan the QR code to download our Machine Buyer Guide or view it online here. www.howickltd.com www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
25
FEATURE EXPLORE OFFSITE 2026
Making Offsite Add Up 1
Demand certainty, manufacturing capability and meaningful evidence of performance are essential to offsite construction’s next stage of growth. All of this was explored at Explore Offsite 2026, alongside practical examples of how the sector is already delivering change. EXPLORE OFFSITE took place at the National Conference Centre
Midlands Advanced Construction Cluster. The cluster has mapped a
in Birmingham on 15 September, bringing together manufacturers,
development pipeline exceeding £20billion, assessed 13 major projects
contractors, designers and industry specialists. Across five sessions,
and engaged 40 companies. Work is also underway to make regional
the programme covered industry transformation, skills, digital
manufacturing capability easier to identify and to develop shared
platforms, carbon measurement and practical delivery, alongside
assurance arrangements, including multi-manufacturer fire testing.
an exhibition and opportunities for networking. Chaired by Darren
These are comparatively unglamorous interventions, but they address
Richards, Managing Director of offsite industry specialists, Cogent
the difficulties that stop proven systems being selected again.
Consulting, the conference opened with one of the industry’s most
Neither initiative can guarantee future orders, but both could
persistent commercial challenges: how can manufacturers plan
help manufacturers plan investment and give clients greater
investment when future demand remains uncertain?
visibility of available production capacity. The opening panel also brought together Steve Nesbitt of the Manufacturing Technology
Giving manufacturers something to plan for
Centre, Andrew Carpenter of Donaldson Timber, Ron Lang of
Keith Waller from High Value Manufacturing
AtkinsRéalis and Gavin Robinson of Polypipe
Catapult outlined one response via the
to consider the wider barriers to scale and how
Industrialising and Digitalising Construction
to move offsite construction from a collection
Challenge. This Liverpool City Region
of successful projects and technologies to a connected, ‘investable and scalable’ delivery
pathfinder aims to make housing and regeneration demand more visible, align land, planning and procurement, and help businesses develop skills, adopt technology and access finance. For manufacturers, factory investment is harder to justify when orders depend on unrelated tenders and changing specifications. A clearer view of future work could make those decisions less speculative. Jeff Endean of Cast Consultancy described parallel work through the West
26
Offsite manufacture is regularly associated with lower waste, fewer site operations and more efficient material use, but those advantages need to be measured in a consistent way if they are to inform specification and investment.
Issue 55 November/December 2026
model.
Who will do the work? Expanding manufacturing capacity also changes the skills construction needs. Industrialised methods are blurring familiar distinctions between design office, factory and site, creating demand for people who can interpret digital information, understand manufacturing constraints, assure quality and manage assembly.
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
FEATURE EXPLORE OFFSITE 2026
Darren Shaw of Skills England addressed the implications for occupational standards, apprenticeships and employer-led training. The subsequent discussion brought together Polly Wilkinson of BRE Academy, Gaynor Tennant of Offsite Alliance, Robert Illes of Opal Flame and Jim Roach of ARV Solutions, with recruitment and career pathways central to the session. The challenge is as much about recognising these roles as filling vacancies. Without clearer routes into factory, digital and assembly work, potential recruits may overlook opportunities they had never associated with construction.
A more demanding definition of success After lunch, the discussion turned to the evidence behind modern methods of construction (MMC) adoption. Mel Jacobsen Cox, Technical Lead for ProCure and Construction at NHS England, presented findings from 20 NHS capital projects. MMC targets had largely been achieved, yet standardisation scores reached only 40-55%, against an 80% target. Newbuild schemes generally performed better than refurbishments, and uptake of the toolkit’s Category 7 digital measures was around 50%. Mandatory for NHS business cases over £25million since January 2025, the MMC toolkit has proved useful for assurance. Yet Jacobsen Cox’s analysis found that passing an assessment does not necessarily demonstrate performance or value, while high premanufactured value scores need not translate into capital savings. Clients also consistently ranked staff and patient experience ahead of capital cost reduction. In healthcare, the measure of success must include how well a building works for the people using it. Revisions to the toolkit are intended to improve the measurement of standardisation, automate reporting of pre-manufactured value (PMV) and strengthen the evidence behind digital and strategic benefits. The longer-term ambition is to understand the value of MMC investment after buildings enter use. That shift towards post-occupancy assessment could prove valuable in a market where installation
2
speed and pre-manufactured value still dominate many accounts of project success.
and address safety risks before production. Reusing engineering knowledge reduces the need to redesign
Design decisions with factory consequences
familiar elements on each project. Andrew Baker-
Digital design and standardisation were also
Kean of hsbcad extended the discussion to factory
prominent themes in many of the sessions. Paul
automation, robotics, production tracking and AI
Taylor of Mott MacDonald explored configurable
analysis of manufacturing data.
design based on common rules and kits of parts, while James Turner of Laing O’Rourke demonstrated
Carbon evidence before assumptions
the use of automated reinforced-concrete detailing,
The carbon discussion, facilitated by Dirk Vennix
product configurators and manufacturing simulations
of CIRIA, addressed another persistent challenge
at its landmark Explore Manufacturing facility. The
for offsite construction – demonstrating its
simulations typically take two to three weeks per
environmental benefits. Offsite manufacture is
product, allowing teams to test assembly methods
regularly associated with lower waste, fewer site
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
27
FEATURE EXPLORE OFFSITE 2026
3 installation and operational performance all influence the results. Where projects use different boundaries and reporting methods, it is there where carbon figures become difficult to compare and harder for clients to rely on.
What projects actually deliver The closing part of the day saw a range of case studies that brought discussion to connect with what is happening on live sites. Simon Harold of PCE described the hybrid precast concrete, steel and cross laminated timber (CLT) frame at 4 Arbour Street, Brent Cross Town. With BAM as main contractor, the project integrated structural components, façades and service openings on a severely constrained site beside Brent Cross West station and the operational railway.
4
Around 4,800 offsite-manufactured components were delivered through a 54-week structural assembly programme, averaging 11 days per level with a site
operations and more efficient material use, but those
team of 26. The presentation also described a monorail
advantages need to be measured in a consistent way if
façade installation system, moisture-control measures
they are to inform specification and investment.
for exposed CLT and digital records connecting
Andrew Pryke of BAM Design UK & Ireland, Anthony Broome of Hadley Group, Anthony Pearce
28
production, logistics and quality. At Good Hope Hospital, Thomas Boyle of McAvoy
of Apply Structure, Calum Barrett of Transport
explained how modular construction added clinical
for London and David Emery of the Supply Chain
capacity while urgent care continued. Seven
Sustainability School formed a panel charged with
SmartCare modules, around 75% complete on leaving
examining how the industry can substantiate its
the factory, were installed during an eight-hour
environmental claims. The overriding feeling was
weekend operation. Delivered in 14 weeks, the facility
that material choices, factory completion, transport,
provided five consulting rooms, two examination
Issue 55 November/December 2026
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
FEATURE EXPLORE OFFSITE 2026
rooms and a 33-person waiting area while maintaining
interfaces, safe access, logistics and quality records
ambulance access. Hospital Executive Director
that could inform the next job.
Simon Jarvis said the space was designed to provide: “quicker assessment, faster access to treatment, and a
Looking ahead
smoother journey of care.”
The final case studies provided a fitting conclusion to
Andrew Dewdney of Kier examined repeatable
a programme that had examined offsite construction
prison accommodation, including four-storey
through the perspectives of manufacturers, clients,
houseblocks using around 1,750 precast panels, heat
designers and contractors. The practical achievements
pumps and rooftop photovoltaics. At HMP Channings
on display were considerable, although the wider
Wood, differing security zones, escort requirements and
discussions made clear that securing consistent
restrictions on tools illustrated the need for careful site-
demand, developing skills and demonstrating
specific logistics even with standardised components.
performance remain substantial challenges.
Mark Griffin of NG Bailey described how pre-
Images 1-4: Explore Offsite aims to provide a snapshot of the offsite sector and provide an indication of where the industry is heading next
As a successful day that was a precursor to the
engineered and tested mechanical and electrical
Offsite Awards 2026 during the evening, perhaps the
(M&E) assemblies can reduce interfaces and
greatest value of Explore Offsite lies in bringing these
congestion on major airport projects. Phil Cook
perspectives together in one place. The opportunity to
of Reds10 presented the company’s defence
hear directly from those developing new approaches,
accommodation programmes, highlighting its 92%
question the people putting them into practice and
PMV value and the delivery of more than 4,000
make connections across the industry is difficult to
bedspaces across 82 buildings at 15 sites, over four
replicate elsewhere. For those unable to attend this
years through its Net Carbon Accommodation
year’s event, the presentations offer only part of the
Programme. Both demonstrated the advantages of
picture. Much of the value lies in the conversations,
repeatable products and installation processes. Across
connections and exchange of experience that happen
all the projects outlined, the critical details were
throughout the day, which provide a compelling reason
often least visible in finished photographs: agreed
to make sure Explore Offsite is in your diary in 2027.
Find out more at: www.offsitehub.co.uk/ explore-offsite-conference
SCI | Services
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
29
FEATURE PRECAST CONCRETE
1
2
Precast in Practice With new technical guidance for non-load-bearing precast concrete façades soon available, MPA Precast preview some of its key themes, and explain how architects and building designers can benefit from a wide range of expert advice and knowledge. DEVELOPED BY manufacturer members of the MPA Precast
translating established principles into practical considerations for
Architectural and Structural Group in collaboration with Studio
design, specification, procurement and verification.
Partington, the new guidance provides practical tips for façade designers, architects and engineers specifying precast concrete
Start with the building, not the finish
cladding, supporting efficient design, specification and manufacture.
For architects, precast discussions can naturally begin with
There are many excellent examples of robust, beautiful and long-
appearance: colour, texture, aggregate, relief or facing material. The
lasting precast concrete façades. But achieving a positive outcome
guidance encourages an equally early conversation about the underlying
depends on more than the individual precast elements. “A successful
construction strategy.
precast façade is more than a collection of well-made precast
Whether panels are stacked or individually supported affects the
components,” explains Suzanne Davenport of Studio Partington. “Studio
structure, load paths, movement allowances and connections. Panel
Partington is pleased to have been part of this project, working with MPA
dimensions also interact with transport restrictions, crane capacity
Precast to produce easy-to-follow guidance and typical details.”
and installation sequencing. These are not downstream manufacturing
Performance depends on how panels are supported, the accommodation of movement joints and their connections with windows
details – they can influence the architectural arrangement itself. Designers can therefore use the guidance as an early coordination
and adjacent materials. This new guidance brings these interdependent
checklist, bringing the precast specialist, structural engineer and
considerations together, providing key details and narrative for façade
façade consultant into discussions before key geometries become
design, detailing and verification. It will help designers align architectural
fixed. The opportunity is to resolve constraints while options remain
ambition with the performance of the complete building envelope
open, rather than redesign an established elevation around late
and coordinate responsibilities within that process.
technical discoveries. As Mark Shepherd, Director of MPA Precast,
As Suzanne explains: “Based on accumulated knowledge, it provides the
puts it: “How well a precast concrete façade performs depends on
link between precast components and detailed standards and statutory
decisions made long before manufacture begins. This guidance
guidance. It describes interfaces (both physical and organisational)
brings the whole façade together, from support and joints to
between the panels themselves, how panels are supported by the structure,
interfaces and responsibilities.”
how performance-critical elements are integrated and how responsibility for design and testing is agreed and shared.” The guide will be useful for building and façade designers,
Understand the weathering strategy One of the document’s most useful distinctions concerns how the
architectural precast suppliers and other stakeholders. It
façade works. The principal construction described uses precast
supplements existing standards rather than replacing them,
panels and sealed joints to form the building’s air- and watertight
30
Issue 55 November/December 2026
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
FEATURE PRECAST CONCRETE
3
4
envelope. This differs fundamentally from a
ancillary components? Who coordinates testing?
rainscreen arrangement, where a drained cavity and
What evidence must be retained? Thus, resolving
backing construction provide essential aspects of
organisational as well as physical interfaces.
weather protection. That distinction should inform the entire wall
Bring performance assessments together
build-up. Designers cannot simply transfer familiar
Structural behaviour, thermal performance,
assumptions from masonry or lightweight rainscreen
condensation, fire and acoustics also all need to
systems and expect equivalent behaviour. The guidance
be considered as part of any façade design. While
discusses double-sealed panel joints, drainage, sealant
concrete brings many of these inherent benefits,
compatibility and movement accommodation. For
attention to where these different performance
façade designers, the practical message is that joint
requirements interact is still required.
design must reconcile appearance with tolerances,
Thermal assessments, for example, must reflect
installation access and anticipated movement. A narrow
the developed wall construction and connections, not
line on an elevation is also a working construction joint.
simply an idealised panel section. Fire-stopping requires
Maintenance deserves equal attention. Concrete
coordinated product selection, installation sequencing
panels require virtually no maintenance outside of
and evidence. Acoustic performance depends on
cleaning. However, sealants have different service-
junctions and flanking paths as well as concrete’s
life expectations from concrete panels, so access for
mass. This guidance facilitates a more integrated
inspection and replacement should influence detailing
review process: checking that specialist calculations
from the outset. Long-lasting architecture requires
and submissions describe the same building, with
maintainable connections, not merely durable surfaces.
compatible assumptions and clearly defined boundaries.
Design the interfaces and allocate responsibility
Technical credibility with practical application
Perhaps the strongest contribution is the document’s
The document draws on expertise from across the
emphasis on the complete façade rather than
precast and façade sectors, combining manufacturers’
the precast package in isolation. Windows, doors,
technical and supply-chain knowledge with wider
vents, roofs, waterproofing, insulation and internal
industry input, compliance checks and architectural
finishes may come from different specialists. Their
design. As Mark Shepherd, Director of MPA Precast,
junctions determine whether individual components
says: “Written from manufacturers’ practical knowledge
collectively deliver the intended performance. The
and independently peer reviewed, it gives designers a
guidance’s typical arrangements are therefore starting
trusted reference for resolving those decisions early.”
points for coordination, not ready-made construction drawings covering every trade. Design teams can use this distinction to inform
Image 1: Burlington Gate, London has a façade featuring black, mica concrete. Courtesy Cornish Concrete Image 2: Architectural masonryfaced precast cladding panels at Davies Street, London. Courtesy Thorp Precast Image 3: Terracotta-coloured precast concrete panels at Stoke Goods Yard, Stoke-on-Trent. Courtesy Techrete Image 4: V&A Dundee is clad with 2,429 precast concrete ‘planks’ up to 4.4m long and ranging in weight from 0.9 to 2.8 tonnes.
By connecting component expertise with wholebuilding thinking, the guidance can help teams define responsibilities more clearly and develop precast
appointments, specifications and responsibility
façades whose technical resolution supports the
matrices to explore key questions in advance: Who
architectural intent. When published, the new guidance
designs each interface? Who supplies and installs
will be free to download from MPA Precast.
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
To receive notification of the new guidance availability and a digital copy when published, please email: precast@mineralproducts.org
31
FEATURE PRECAST CONCRETE
1
2
Transporting Precast to Another Level FP McCann recently completed another successful partnership build with London-based residential and commercial property developer, Hollybrook, using a structural and architectural precast concrete frame system. CONSTRUCTION has been completed on the London
with other contractors incorporated the bolt on stair
Borough of Barking owned Transport House site in
and balcony fixings and the placing of bathroom,
Dagenham, the former office block home to the Unite
ensuite and utility pods. The accelerated construction
trade union. The building consists of 149 brand new
time typically seen in such offsite precast concrete
sustainably heated residential properties with undercroft
structural frame builds, saw the Transport House
parking which also services a Premier Inn next door.
project completed in just 50 weeks.
The project is Hollybrook’s second collaboration
Commenting on the Transport House residential
between Barking and Dagenham council owned
development, David Langley, Project Quantity
BeFirst, a pioneering urban regeneration company.
Surveyor for Hollybrook said: “Traditional
With full modern methods of construction (MMC)
Images 1-2: MMC has been instrumental in the design of Transport House with the manufacture and installation of a precast concrete structural frame and architectural brick-faced system
construction methods, while tried and tested, are
adopted on the build, FP McCann the Tier 2, BIM
increasingly inadequate to meet the soaring demand
Level 2 certified supplier, has been instrumental in the
for quality, affordable housing. The Transport House
design, manufacture and installation of the precast
residential development demonstrates that offsite
concrete structural frame and architectural brick-
modular precast concrete construction and MMC in
faced system. As on all such contracts undertaken
urban locations, not only help address the current
by FP McCann, BIM Execution Plans (BEP) were
housing challenge but lays the groundwork for a
prepared for the Transport House site development,
more efficient and sustainable homebuilding industry.
demonstrating FP McCann’s proposed approach,
By embracing these methods, we can build faster
capabilities, capacity and competence to meet
with construction times – reduced by up to 60% –
stringent Employer’s Information Requirements (EIR).
minimise our environmental impact and provide safe,
FP McCann’s precast structural frame comprises
affordable living space, delivering quality, sustainable
precast concrete core and party walls, prestressed
living options for a diverse range of residents. The
hollowcore flooring planks and precast stair cores and
building is a great showpiece scheme in a key location,
stair landings. Integral to the structural frame itself,
and we look forward to partnering with FP McCann
are the architectural brick-faced insulated sandwich
on future keynote urban projects.”
panels, offering the attractive external finish to the building. Transfer slab cladding, and ground floor cladding are other key precast concrete elements of the build. Many other MMC features included the supply and fix of galvanised conduits and the fair face finish to internal walls, allowing for followon trades to complete their works in a timely and efficient manner. Co-ordinated works in conjunction
32
Issue 55 November/December 2026
Products Supplied: Precast concrete core and party walls, prestressed hollowcore flooring planks, transfer slab and ground floor cladding; precast stair cores and stair landings and insulated architectural sandwich panels.
Find out more at: www.fpmccann.co.uk
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
ULTIMATE FIRE PROTECTION EUROCLASS A1
Explore our Magply boards tailored for Modular & Offsite construction. Choose from raw or glossy finishes, backed by extensive system testing for compliance in all your offsite and modular building needs.
WALLS | DRY SCREED FLOORING CELINGS | LAMINATED BOARDS
SCAN FOR MORE
FOR MORE INFORMATION VISIT
magply.co.uk
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
� +44 (0) 1621 776 252 � sales@magply.co.uk
33
CASE STUDY THE STILES ORMSKIRK
Precision Engineered PBSA Delivery 1
At The Stiles in Ormskirk, Nolan Group is managing the phased delivery of a purpose-built student accommodation (PBSA) development for Bloom Properties, with Frameclad appointed to design, engineer and manufacture the light steel frame loadbearing superstructure. LOCATED ON CHURCH STREET, the £1.9million development
such as The Stiles demonstrate the value of bringing specialist
comprises the first block of a wider scheme. As Principal Contractor,
engineering expertise into the design process early, enabling
Nolan Group is overseeing the complete delivery process, from
the project team to address technical considerations, coordinate
groundworks through to the external envelope and final fit-out,
interfaces and establish an efficient route from design through to manufacture and installation.”
providing Bloom Properties
For a residential
with a fully integrated
development of this scale,
construction solution.
building safety must
The benefits of early stage collaboration Taking a forward-thinking approach, Nolan Group engaged with Frameclad at an early stage, bringing specialist expertise into the design process from the outset. On behalf of Frameclad,
Frameclad’s advanced Tekla software underpins its detailed design and engineering process. By developing the framing digitally before production, the team can coordinate geometry, interfaces and component requirements, translating the engineered design into precise manufacturing information.
Dale Joy, Regional Specification
be supported by robust engineering, appropriate system performance evidence, and reliable project information. Frameclad’s approach brings together digitally developed design, controlled manufacturing and quality assurance, supporting traceability throughout its part
Manager – North, said: “Our role was to provide a fully engineered
of the delivery process. This aligns with Golden Thread principles –
structural package, developed around the specific requirements of
accurate, accessible building information that helps understanding
the project and the exacting standards of Nolan Group. Projects
of how a building has been designed and constructed.
34
Issue 55 November/December 2026
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
CASE STUDY THE STILES ORMSKIRK
2
“Managing this development places significant
Images 1-3: The Stiles demonstrates how early specialist engineering input, digital design and advanced manufacturing combine to deliver a pre-boarded loadbearing light steel frame solution, meeting the technical, quality and fire safety demands of a complex PBSA development
emphasis on sequencing and programme control,” said Andy Nolan, Managing Director, Nolan Group. “The scheme needs to progress efficiently while maintaining safe working conditions and coordinating activity. Working closely with Frameclad enables us to align offsite manufacturing with the construction programme, creating a streamlined approach from the engineered frame through to installation. By working collaboratively towards a shared objective, we can maintain focus on delivering the quality, safety, performance and overall project outcome that Bloom Properties expect.”
3
Digital design meets advanced manufacturing Frameclad’s advanced Tekla software underpins its detailed design and engineering process. By
performance of complete wall and floor assemblies
developing the framing digitally before production,
depends on their specification, construction and
the team can coordinate geometry, interfaces and
supporting test evidence. This is particularly
component requirements, translating the engineered
important in residential developments such as
design into precise manufacturing information.
purpose-built student accommodation, where
Digital engineering also provides an important
multiple occupants share a building. Fire safety
foundation for quality assurance and traceability.
cannot be assumed – it must be designed into the
Maintaining a clear link between the design
system, properly engineered and supported by robust,
information and manufactured components creates
independently verified performance data.
a more controlled process, helping verify that what
The Stiles demonstrates how digital engineering,
has been specified is accurately translated into
advanced manufacturing and an integrated loadbearing
production.
light steel frame solution can work together to
Fire performance is another critical consideration.
address the technical, quality and fire safety
While light steel itself is non-combustible, the
requirements of a complex PBSA development.
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
Find out more at: www.frameclad.com www.nolan-group.co.uk
35
FEATURE 4 ARBOUR STREET
Hybrid Working at Height 1
Completed this summer at Brent Cross Town, 4 Arbour Street is a prime example of hybrid construction, bringing together the best of precast concrete, mass timber and offsite thinking. PREVIOUSLY KNOWN AS 3 Copper Square during development,
downstands, while CLT provides much of the floor construction and is
the project has been a multi-award winner and landed the Best
also used in walls at upper level.
Use of Hybrid Technology at the Offsite Awards 2026 and Best Use
The structural arrangement required careful definition. The CLT
of Industrialised Systems & Technologies at the Industrialised
floor slabs do not provide the building’s diaphragm action; instead, the
Construction Awards.
beam system was designed to carry the vertical and lateral loads. New
BAM Construction delivered the 239,000sq ft building for Related
connection details were developed between the timber panels, precast
Argent, appointing PCE as its superstructure and facade delivery
beams, composite steel and post-fixed steel angles, allowing the new
specialist. Behind the office floors and exposed timber soffits is a
material to be incorporated without abandoning the wider system
hybrid structural system combining precast concrete, structural
logic. BAM commissioned full-scale fire testing in Poland to validate
steel and cross laminated timber (CLT), assembled using PCE’s
the hybrid solution before delivery.
HybriDfMA approach.
Repeatability from design to assembly Extending the platform
Early design involvement allowed the structural system to be
The significant step at 4 Arbour Street was not simply the use of
coordinated around grid layouts, M&E, facade interfaces, partitions
CLT. It was the integration of timber into an existing industrialised
and core requirements before those decisions reached production.
structural platform. PCE’s HybriDfMA system is based on a
That preparation translated into a defined assembly sequence:
configurable kit-of-parts, using common connection principles
core, columns, stairs, beams and finally floor units. Repeating the
and established assembly methods while allowing different
same logic floor by floor allowed teams to improve the cycle as
structural materials to be selected according
the building rose, rather than continually
to performance, carbon, architectural
resetting the installation process. PCE reports an average installation cycle
and programme requirements. At Brent
of 11-13 days per level, with the structural
Cross Town, that platform was extended to accommodate CLT alongside precast concrete and composite steel. The primary frame uses precast concrete beams and columns, with twin-wall elements forming the stair and lift cores. Structural steel Deltabeams are used where required to support the floor structure without
36
4 Arbour Street shows how an industrialised platform can accommodate material innovation without losing the consistency that makes repeatable delivery possible.
Issue 55 November/December 2026
construction phase completed in 54 weeks. A site team of 26 operatives, including erectors, grouters, steel fixers and carpenters, delivered the works, supported by three apprentices. No external scaffolding was required. Services were also considered within the structural strategy, with pre-
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
High-Performance from the Ground Up
ICF FireBlock (Patent Pending) Integrating A1-rated mineral wool into standard ICF Therm Walls for advanced visible and verifiable fire protection.
Engineered for the future of construction, CastleForms delivers advanced Insulated Concrete Formwork (ICF) walling, insulated foundation and render systems that set new benchmarks in performance. Setting a new standard in integrated fire protection, our NSAI and Kiwa certified solutions combine exceptional structural strength, outstanding thermal efficiency and full regulatory compliance.
ICF Therm Wall Combining structural strength, thermal efficiency, and rapid installation in one high-performance system.
Build with Confidence – Build with CastleForms A comprehensive portfolio of high-performance building systems, all from a single, trusted partner.
Raft Therm Delivering insulated foundations and floors with U-values as low as 0.1W/m²K in one seamless step.
Safer by Design – Engineered to Perform www.castleforms.com info@castleforms.com
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
NSAI Irish Agrément certification covers the Irish market, with KIWA certification covering the UK.
Issue 55 November/December 2026
Soltherm Amalgamating insulation, reinforcement and a durable render finish into one complete external walling solution.
37
FEATURE 4 ARBOUR STREET
formed beam openings and raised floor zones allowing M&E installation to follow the frame. The systemised approach enabled follow-on activity to progress behind the structural works rather than waiting for the entire frame to complete.
Manufacturing across a distributed supply chain The kit-of-parts did not come from a single factory. Specialist manufacturing capability was drawn from across the UK and Europe, with precast, steel and timber components produced by different suppliers and brought together through common design information and connection standards. PCE’s project material identifies 12 manufacturing facilities and 845 product deliveries across the programme. More than 4,800 components were manufactured offsite, including beams, columns, solid and twin walls, stairs, floor units, steelwork and CLT.
2
Quality control was therefore as important as component design. First-off samples established
Images 1-3: Precast concrete and CLT worked together to create an awardwinning hybrid project in a constrained urban site
benchmarks before wider production, while inspections and dimensional records were captured during manufacture. PCE also used quality personnel across the supply chain and independent checks on a proportion of components. Digital co-ordination connected that distributed production process. BIM information fed into manufacture and assembly, while the Ynomia platform developed the model into a connected digital twin. Individual components were assigned unique identifiers, allowing their status and quality information to be tracked through manufacture, delivery and installation and creating an auditable record of the completed structure.
Precision beside a live railway 4 Arbour Street stands immediately beside Brent Cross West station and metres from the live railway. The station remained operational while the building
3
rose alongside it, placing obvious limits on storage, movement and site-based fabrication. The response
concrete and CLT reduced embodied carbon by 22%
was to reduce the amount of work that needed
compared with a traditional in-situ concrete frame,
to happen at the point of assembly. Components
with the structural solution also reported at 13%
arrived through a just-in-time sequence and could
below the relevant LETI target. The introduction of
be lifted from delivery vehicles towards their final
CLT required new connections, testing and quality
positions, limiting double handling and pressure on
controls, but the wider system of manufacture,
an already constrained site. PCE says the approach
logistics and assembly remained structured around
reduced labour, plant, materials and delivery activity
established principles.
around the workface while maintaining predictable
4 Arbour Street shows how an industrialised platform can accommodate material innovation
installation cycles. BAM also identified the hybrid CLT and precast
without losing the consistency that makes repeatable
structure as central to reducing embodied carbon and
delivery possible. The result is a useful demonstration
maintaining an efficient construction programme.
of industrialised construction applied to a constrained
The hybrid solution was also shaped by carbon
commercial project with a clearly thought hybrid
performance. According to PCE, combining precast
material strategy.
38
Issue 55 November/December 2026
Find out more at: www.pceltd.co.uk www.bam.co.uk
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Made for the future. Volume housebuilding is evolving, creating new ways of thinking about how we design and deliver homes.
Proven across modern build systems. Superglass is widely used throughout MMC and off-site construction, providing an ideal insulation solution for: • Modular units • Non-structural pods • Panellised systems • Timber frame construction • Steel frame construction • Floor cassettes
REF: 50813
Thermal Insulation
Acoustic Insulation
Recycled Glass Content
Noncombustible
Contact our Housing Team
All rights are reserved, including those of photomechanical reproduction and storage in electronic media. Commercial use of the processes and work activities presented in this document is not permitted.
www.offsitemagazine.co.uk Issue 55 responsibility or any liability whatever for incorrect information and the consequences thereof. The publisher and editors will be grateful2026 for improvement suggestions and details of errors pointed out. www.linkedin.com/company/exploreoffsite November/December
Extreme caution was observed when putting together the information, texts, and illustrations in this document. Nevertheless, errors cannot quite be ruled out. The publisher and editors cannot assume legal Please check this is the current version by visiting the Superglass website. For archived versions please contact the Technical Services Team.
OSATA001 April 2026
39
superglass.co.uk
FEATURE BRISTOL AIRPORT M&E
Decarbonising Infrastructure Demands Different Delivery 1
The transition to low-carbon infrastructure is gathering pace, but investing in new technology is only part of the challenge. Delivering the scale of transformation required across the built environment needs a rethink, not just on ‘what we build, but how we build it’. NG Bailey explain how they approached this at Bristol Airport. THE LANDMARK PROJECT scheduled for completion in 2027, is
the scheme is expected to deliver annual carbon savings of
being delivered by managing developer Berkeley Group in association
approximately 625 tonnes CO₂e, representing a significant reduction
with key stakeholders Camden Council and Morrisons Supermarket.
in the airport’s operational emissions.
The eight-acre brownfield site next to Camden Market is being
However, the complexity lies beyond the technologies themselves.
transformed into a mixed-use residential neighbourhood alongside
The wider engineering scope included the design and integration
a new flagship 48,000sq ft Morrisons supermarket within the iconic
of mechanical and electrical systems, including heating and
Camden Lock area.
cooling distribution, thermal storage, pumping systems, electrical
Across the industry, organisations are investing in electrification
infrastructure and intelligent building management controls. A
and modern heating systems to reduce their reliance on fossil
four-pipe distribution arrangement enables simultaneous heating
fuels. Yet integrating these technologies within existing buildings
and cooling, while new external distribution mains connect the
and operational estates presents challenges that technology alone
energy centre to the existing terminal infrastructure, supported
cannot resolve. Ageing infrastructure, restricted access, complex
by prefabricated valve skids and pipework gantries. The works also
interfaces and the need to maintain business continuity all place
required careful coordination with the airport’s existing cooling
increasing pressure on traditional construction approaches.
systems to maintain operational continuity during the transition,
The question is no longer simply whether we have the technology to decarbonise our buildings. It is whether we have the delivery models to implement it efficiently, consistently and at the scale required.
ahead of the planned removal of the legacy chillers. Delivering a project of this complexity within a live airport required meticulous planning, programme certainty and minimal
This is where industrialised construction has an increasingly
disruption. Through early collaboration between NG Bailey’s
important role to play. By considering manufacturing, assembly and
Engineering and Offsite Manufacture (OSM) teams, the project
installation much earlier in the design process, we can challenge
adopted a Design for Manufacture and Assembly (DfMA) approach.
conventional delivery methods, reduce complexity and create greater
Engineering led the detailed design and technical development
certainty before work reaches site.
of the energy systems, while OSM translated those requirements into a practical modular solution designed around manufacture,
From design intent to manufacturing reality Bristol Airport’s multi-million-pound terminal decarbonisation
transportation and efficient installation. That distinction is important. Too often, offsite manufacture is
programme provides a practical example of this approach.
considered once a design is substantially developed, limiting its
Supporting its commitment to achieve net zero airport operations
ability to influence the outcome. Its greatest value comes when
by 2030, the project has replaced fossil-fuel heating infrastructure
manufacturing expertise shapes decisions from the outset, allowing
with an electrified energy centre incorporating 22 air source heat
teams to simplify interfaces, improve buildability and remove
pumps and an electric boiler. With the new system now operational,
complexity before construction begins.
40
Issue 55 November/December 2026
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
FEATURE BRISTOL AIRPORT M&E
2
3
At Bristol Airport, this meant developing
greater programme certainty. These advantages
modular plantroom sections around equipment
are particularly relevant as organisations look to
loads, structural requirements, lifting strategies and
decarbonise other complex operational estates,
transportation constraints. Detailed structural models
including hospitals, data centres and major commercial
were integrated into the wider BIM environment, with
facilities, where maintaining continuity is often as
collaborative design reviews and clash detection used
important as the infrastructure being delivered.
Images 1-3: Offsite manufacture was an ideal way to provide a complex energy centre efficiently within a busy airport environment
to resolve interfaces before fabrication drawings were released to the factory floor.
Industrialising the transition As electrification accelerates, the industry faces a
Taking complexity away from site
wider challenge: delivering increasingly complex
At OSM’s offsite manufacturing facility this
energy infrastructure at the scale and pace required
approach was translated into a four-section, single-
to meet decarbonisation targets. Technology alone
storey modular energy centre incorporating a
will not achieve this transition. Success will depend
mechanical pump room and electrical switchroom
on construction methods capable of delivering
within a fully clad, weather-tight enclosure, complete
integrated systems efficiently, reliably and with
with external doors and louvres.
greater repeatability.
The manufacturing scope extended to two large
Bristol Airport demonstrates how manufacturing-
valve skid assemblies incorporating up to 22 heating
led thinking can shift complex building services
and cooling valve sets, alongside two additional
away from traditional, site-intensive construction
prefabricated pipework gantries, incorporating
towards a more industrialised approach. Importantly,
250mm high-level distribution pipework connecting
industrialisation does not mean removing flexibility or
the air source heat pumps. Steelwork, pipework
applying identical solutions to every project. It means
spools and modular assemblies were fabricated and
standardising what can be repeated, engineering
coordinated within a controlled manufacturing
what needs to be different and using manufacturing
environment before delivery to site.
expertise where it adds the greatest value.
For an operationally sensitive environment
This also requires a change in mindset. Rather
such as an airport, the benefits extend well beyond
than treating offsite manufacture as a construction
manufacturing efficiency. Completing substantial
methodology selected towards the end of design, it
elements away from site reduced the volume
needs to become part of the delivery strategy from the
of installation activity required, limiting labour
beginning. Early consideration of how infrastructure
demands, trade interfaces and working-at-height
will be manufactured, transported, installed and
activities while helping minimise disruption to
maintained creates opportunities to improve
ongoing operations.
outcomes across the entire project lifecycle.
Factory-based assembly also enabled consistent
As the built environment moves from
production processes, improved quality assurance and
setting sustainability ambitions to delivering
opportunities to identify issues before installation.
the infrastructure needed to achieve them, the
With manufacturing progressing alongside site
opportunity is not simply to build lower-carbon
preparation, the approach reduced reliance on
systems, but to fundamentally rethink how they are
sequential construction activities and supported
designed, manufactured and delivered.
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
Find out more at: www.ngbailey.com
41
ADVERTORIAL GLIDEVALE PROTECT
1
2
Trust & Transparency Is trust the secret to a successful supplier partnership? The work being carried out by Glidevale Protect and Morro Partnerships at The Innovation Hub would suggest it is.
Images 1-2: Glidevale Protect’s TF200 Thermo reflective external wall membrane plays a key role in maximising the energy efficiency of timber frame structures built by The Innovation Hub
GLIDEVALE PROTECT is proud to support The Innovation Hub in
like The Innovation Hub confidence in its products and their
its goal to deliver sustainable and thermally efficient timber frame
performance. Glidevale Protect’s robust product quality system via
homes for Morro Partnerships. For Dave Thacker, Head of Innovation
batch referencing and availability of digital BIM objects also allows
at The Innovation Hub and an experienced specialist within the
all products to be easily tracked and traceable right through the
timber frame industry, quality products only tell half of the story
golden thread of building information on every project.
– the true value is trust – trust in the data, certification, technical support, with integrity and transparency behind every decision.
For Dave, the real value at The Innovation Hub lies in the honesty and clarity behind the technical data which allows them to make informed decisions and deliver timber frame homes that meet the
Technical expertise
highest standards of thermal performance and build quality.
The purpose of The Innovation Hub, a dedicated 9,000sq ft timber frame manufacturing facility based in Leicester and set up in 2024
Collaboration
for housing developer the Morro Group, is to constantly innovate
After working together for well over two decades, the relationship
and improve its offering for customers. With thermal performance
between Glidevale Protect and Dave Thacker continues to evolve.
high on the agenda following the launch of the new Future Homes
It’s a true collaboration – a partnership defined by co-operation,
Standard, the use of structural timber construction comes sharply
shared goals and mutual respect with the partnership now
into focus. Glidevale Protect’s TF200 Thermo reflective external wall
established with Dave and his team at The Innovation Hub since
membrane plays a key role in maximising the energy efficiency of
the business’ inception. Working with Dave over the years has led
delivered homes and adds value to the final timber frame structures
to Glidevale Protect providing additional support, for example in
built by The Innovation Hub.
supplying a specific colour matched wall membrane, and more
Timber frame manufacturers like The Innovation Hub rely on the
recently, co-branding the Protect TF200 Thermo membrane for The
expertise of key supply chain partners to make sure the most appropriate
Innovation Hub, whilst still retaining the all-important high levels
products are specified and installed correctly to deliver the required
of aged thermal resistance. Commercially, it’s also an ideal way for
performance. “Over the 25 years I have been working with Glidevale
this relatively new timber frame manufacturer brand to boost its
Protect, the technical support has always been there,” says Dave.
visibility on site.
“They have never failed to deliver on the questions that we’ve asked
For Glidevale Protect – quality, honesty, integrity and
and the support that we’ve needed in the field to prove any detail.”
transparency remain at the heart of its business ethos and its positive relationship with The Innovation Hub proves that the most
Certified products
important link in any supply chain is trust.
Declaration of performance via third party certification demonstrates that product test data has been independently verified and is therefore suitable for use in specific applications and can be used within wall U-value calculations with confidence. Glidevale Protect’s main philosophy is to provide these details in a clear and transparent manner which gives timber frame manufacturers
42
Issue 55 November/December 2026
Find out more at: www.glidevaleprotect.com/itt, call +44 (0)161 905 5700, or email: info@glidevaleprotect.com
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
www.glidevaleprotect.com/itt
For more than 25 years, I have partnered with Glidevale Protect. Their honesty, integrity and transparency around data and certification have helped build a strong, collaborative and long-standing relationship that I continue to rely on. Dave Thacker
Head of Innovation, The Innovation Hub
Why Glidevale Protect? By offering a full added value package of technical support and third-party certification for its reflective wall membranes, Glidevale Protect has helped The Innovation Hub deliver sustainable and thermally efficient timber frame homes for Morro Partnerships. Start working with Glidevale Protect today – e-mail: info@glidevaleprotect.com
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
43
FACTORY TOUR DONALDSON TIMBER SYSTEMS
Future Homes Start Here
1
Donaldson Timber Systems (DTS) is the UK’s leading timber system provider and after investing over £10million in robotics at its Witney facility, has made huge strides in automating manufacturing processes, increasing capacity and boosting technical capabilities. Offsite Magazine went along to see the team in action.
A new way of working The installation included four new timber processing centres, a floor panel production line offering customers pre-glued floor cassette solutions, and one of the most advanced automated closed panel wall production lines in Europe. Some of the technology required had never been used in the industry before and was developed specifically for DTS. The development and installation included both robotics
DONALDSON TIMBER SYSTEMS has been designing,
and laser integration. The futuristic robots are the
engineering, manufacturing and installing timber frame
highlight of any tour of the Witney facility. “Robotics
for more than 50 years. In that time, they have delivered
and digital control provide unrivalled precision,” says
more than 150,000 homes, 300 hotels and numerous
Frank O’Reilly, Manufacturing Director at DTS. “They
projects across other sectors. They’ve also seen offsite
ensure consistent quality across every one of our
construction evolve from the earliest manual design and
closed and open panel timber frame systems.”
manufacturing processes through to the latest digital and technology-driven precision manufacturing. With a burgeoning market for low carbon timber
44
This technology also increases the technical capabilities of the DTS team, allowing them to develop more advanced products. One example is the Sigma II
frame housing and looming net zero targets, they
closed panel system, offering high standards of
have been part of a new type of provider seeking to
performance, pre-manufactured value and on-site
revolutionise the manufacturing process. Recognising
programme improvement. The system is widely used
the changing needs of their customers, along with
by housebuilders, particularly with those driven by
the deep skills and labour shortages faced by the
whole life costs and fabric performance, contributing
construction industry, their aim was to tackle those
positively to fuel poverty challenges. The automated
challenges while industrialising the manufacture of
production lines streamline manufacturing, reduce
closed panel timber systems, improving precision
waste, and optimise precision at every stage of the
engineering, speed and capacity.
process. This is significant for a manufacturing facility
Issue 55 November/December 2026
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Don’t fight the system, use a better one.
OFF-SITE P R E - F A B R I C AT I O N
Take a stand against convention and join the Advantage Rebellion, where things get a bit radical. Our complete drainage and water supply systems are designed and prefabricated off-site, reducing costs by up as much as 30%, installation times by up to 60% and waste by as much as 100%. Fully customised systems, quality assured and pre-tested, delivered to site - ready for immediate installation. Join the Advantage Rebellion and change to a better system. Find out more at www.polypipe.com/advantage-page
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
45
FACTORY TOUR DONALDSON TIMBER SYSTEMS
that delivers up to 10,000 units per year, with 30% of those now
Repeatability and building confidence
closed panel solutions.
The introduction of technology such as robotic wall production,
“Our Sigma II closed panels deliver high levels of factory
automated blown-fibre insulation and laser-assisted manufacturing
completion, achieving Future Homes Standard directly from the
allows DTS to repeat the same process accurately, again and again.
factory with minimal additional work required on-site, as well as
Quality becomes less dependent on individual interpretation or
very low levels of embodied carbon,” says DTS Technical Director,
changing site conditions. This is also the case with ensuring building
John Smith. “Added to that, automation enables us to build
performance is delivered. Performance is designed in, manufactured
smarter, safer, and faster, while maintaining the craftsmanship
in and then protected through installation. “Performance is only
and technical excellence that have made us a trusted name in
going to become more important as we look to future homes,” adds
timber construction for over half a century.
John. “For many years, the industry’s focus has been on delivering
“For every plot, we create the manufacturing design for the
more homes, more quickly and at lower cost. Those pressures
walls, floors and roof. From that we generate the information
remain, but increasingly, the long-term performance of homes, their
needed to cut materials, manage stock and drive automated
operational energy use and their ability to support low carbon living
production. We’re moving from architectural and engineering
are becoming equally important.”
information into saw files and instructions to manufacturing
This shift is being accelerated by the Future Homes Standard and
equipment. The quality of product from the production
the wider transition to net zero carbon housing, with the impact
line is directly connected to the quality and coordination of
already starting to show as timber frame continues to increase its
the information that went into it. Digital precision enables
share of new housing, despite a challenging market. According to
manufacturing precision.”
NHBC data, in 2022, timber frame accounted for 10.7% of housing
46
Issue 55 November/December 2026
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
FACTORY TOUR DONALDSON TIMBER SYSTEMS
1
2 starts across England and Wales, which was approximately one in ten new homes. In the first six months of 2026, timber frame reached 20.4% of starts, which equates to one in five new homes. “We have invested in offsite automation to meet the growing market needs for better performance standards and programme certainty,” explains Alex Goodfellow, Chief Executive of Donaldson Offsite. “With cost a key consideration, we can now deliver a Sigma II closed panel system for a comparable cost to an open panel product fitted on-site. With increasing on-site labour costs, materials and time, our offsite closed panel system with better performance and quality at a comparable cost has helped housebuilders, contractors and affordable housing providers to recognise the commercial and operational benefits of offsite construction. When we invested in Witney,
3
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
we created the capacity and technical capabilities customers require to continue building even more
47
FACTORY TOUR DONALDSON TIMBER SYSTEMS
4 advanced and energy-efficient homes and buildings -
possible to compare the impacts of different materials
and we futureproofed our business in the process.”
and products accurately. As John says: “We championed the use of offsite
The future of housebuilding
timber frame for over 50 years as the best way to
So, what next for offsite timber frame manufacture?
achieve sustainable building practices, but a verified
“Embodied carbon will be key,” explains John. “We’ve
EPD proves these claims. When embodied carbon
spent a lot of time as an industry reducing operational
comes into play, offsite timber frame will demonstrate
carbon – and rightly so. Building Regulations have
its value more than ever before, and thanks to the
progressively driven better fabric performance and
investments we made back in 2024, we’re ready to
greater energy efficiency, and the Future Homes
meet that demand at scale.”
Standard takes that further again. But, without
Looking around DTS’s Witney facility, it is clear
measuring and reducing the cradle to grave impact
to see the significant investment in automation and
of a build, there is a very real risk that buildings
industrialised processes, transforming how offsite-
constructed to new standards will never achieve true
based timber technology can help address some of the
zero carbon.”
UK’s biggest housing challenges. By combining digital
Unlike other European countries, the UK does
design, robotics and precision manufacturing, DTS is
not currently have a national Building Regulations
not only boosting capacity, but improving quality and
requirement that sets a whole-life or embodied-carbon
delivering high-performance closed panel systems
limits for a new home. “I believe this is the next major
that are ‘commercially and carbon competitive’. As
performance challenge for our industry,” adds John. “We
housebuilders face mounting pressure to deliver
need to think not only about how a building performs
more homes, meet tougher energy standards and
once it’s occupied, but about the carbon consequence of
tackle skills shortages, these capabilities offer a
the materials and systems we use to create it.”
compelling alternative to traditional site-based
As demonstrated elsewhere in Europe, the way
supported by independently verified environmental
the whole-life carbon of buildings. To drive this
data, strengthens the case for factory-built solutions.
point home, DTS has invested in the environmental
However, the real opportunity lies in bringing these
product declarations (EPD) process for all products
benefits together at scale, giving the industry the
and were the first timber frame manufacturer to
confidence to deliver homes that are not only faster
offer a published EPD for an offsite assembled timber
to build, but more energy-efficient and sustainable
frame wall panel. The availability of EPDs is an
throughout their lifecycle.
performance of a product over its lifetime, making it
48
Issue 55 November/December 2026
Image 4: Timber components will be at the centre of a new Donaldson affordable housing range
construction. Timber’s low-carbon credentials,
to achieve zero carbon is to measure and reduce
important step in communicating the environmental
Images 1-3: The Witney facility has been transformed by its investment into automation to provide exceptional levels of quality and capacity for the timber sector
Find out more at: www.donaldsontimbersystems.com
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
B2B MARKETING as structurally sound as your building systems
Engineered for impact
Powered by Knowledge
No weak foundations
After 17 years immersed in the offsite sector, we understand the issues, the opportunities and most importantly – what works. We turn this insight into specialist marketing campaigns, compelling content and PR that strengthens reputation and drives growth.
Connections that count
Ready to build your reputation and business?
LET’S TALK.
hannah.jones@radar-media.co.uk Building Technology Communication Specialists Strategic Marketing | PR | Content | www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Events | Awards | Magazines Issue 55 November/December 2026
radar-media.co.uk
49
FEATURE OFFSITE AWARDS 2026
Offsite High Points The Offsite Awards 2026 rewarded the many projects, people and products driving forward offsite manufacture across the UK and internationally. In case you missed out, here is a reminder of the evening’s big winners.
With more than 150 entries submitted across 19 categories, the competition once again highlighted the breadth of talent, expertise and innovation driving the offsite industry forward and gave the judging panel the tough task of selecting the winners from a wealth of worthy finalists. With an increased focus
CELEBRATING the significant achievements of the
on better performance, productivity improvements,
industry over the past twelve months, the Offsite
streamlined manufacturing and delivering safer,
Awards 2026 was a much different affair this year.
more energy efficient buildings, offsite is central to
Following feedback from attendees over recent years,
delivering a healthier construction landscape.
it was for the first time a classic, sit-down dinner preceded by a networking drinks reception. Taking place on 15 September at the National Conference Centre, Birmingham, it followed on from the Explore Offsite Conference during the day and provided the perfect opportunity to connect with industry leaders, peers and clients while celebrating the very best the offsite sector has to offer. Over 400 guests gathered to celebrate groundbreaking achievements and pioneers who are developing radical new offsite technologies, innovative product developments and landmark projects. The Offsite Awards has always been known for unearthing projects that may be small in stature but impressive in innovation and imagination and throws a little of the spotlight away from some of the familiar major players and iconic ‘big ticket’ buildings.
50
Issue 55 November/December 2026
2
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
FEATURE OFFSITE AWARDS 2026
1
3 Image 1: All the 2026 Offsite Award winners Images 2-3: For the first time the Awards was a full evening with a sit-down three-course meal Image 4: Much needed funds were raised during the event for the charity Lingen Davies Cancer Support, Shrewsbury
4 Much more than a celebration of achievement, the
Kier Construction’s picked up trophy for its work on
Awards provide a platform for recognising excellence,
the Network Building, the £82million commercial
sharing game-changing ideas, building valuable
development that delivered a nine-storey office and
connections and showcasing the innovations shaping
retail scheme in Fitzrovia using precast concrete
the future of construction. They also offer the perfect
and according to the judges, offsite thinking on an
opportunity to relax and unwind with colleagues
exceptional level.
during the Explore Offsite event while recognising the remarkable accomplishments of the industry. The always upbeat Mark Durden-Smith hosted and ensured that the evening was highly entertaining. The relaxed networking vibe offered the perfect opportunity for everyone to network and discover more about the many inspiring entries. It was a great night for a wide range of businesses or all shapes and sizes. Plus, if you flick to p58 we have an overview of the evening’s Winner of Winners and
OFFSITE AWARDS 2027 & SPONSORSHIP OPPORTUNITIES The Offsite Awards provides one of the most effective platforms for targeting the offsite industry in all its many facets and presents the ideal opportunity to maximise exposure and penetrate what is an economically important and diverse market. The 2027 marketing campaign will launch soon with the Awards entry platform opening in
January 2027. To discuss 2027 promotional opportunities please contact Rhian Morris on 01743 290001 or email: rhian.morris@radar-media.co.uk To keep up to date with developments and find out more about the 2027 Offsite Awards visit: www.offsiteawards.co.uk
winner of the Best Use of Concrete Technology, where
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
51
FEATURE OFFSITE AWARDS 2026 WINNERS Category: Best Use of Concrete Technology Company: Kier Group Project Name: Network Building, Fitzrovia Sponsor: MPA Precast
Category: Best Use of Hybrid Technology Company: PCE, Related Argent, BAM, ShedKM, HTS, Curtins Project Name: 3 Copper Square
Category: Best Use of Timber Technology Company: University of Staffordshire, Willmott Dixon Construction, C W Architects, Ramboll, WIEHAG Project Name: SUSV Village Hub Sponsor: Structural Timber Association
Category: Best Use of MEP & POD Technology
Category: Best Use of Steel Technology
Company: SES and Unipart
Company: Panacea Building Systems
Project Name: HMP Highpoint
Project Name: Downtown Victoria North, Manchester Sponsor: SCI Steel Construction Institute
52
Issue 55 November/December 2026
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Thoughtful design. It’s in our nature.
We design every HLM project with DfMA principles to enable offsite manufacture and delivery. Scan the QR code to learn more:
Offsite-Ad-April 2026.indd 1
14/04/2026 16:26
CERTIFICATE 22/6185
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
53
FEATURE OFFSITE AWARDS 2026 WINNERS Category: Building Performance Pioneer Company: MAKAR Project Name: Paradigm Prototype Home Sponsor: One Click LCA
Category: Best Use of Volumetric Technology Company: Tide, Vision and MJH Project Name: The Castle, Acton Sponsor: MPBA
Category: Architect of the Year Company: P+HS Architects Project Name: Milford Community Diagnostics Centre, Cumberland UTC & Congleton War Memorial Hospital Sponsor: Polypipe
Category: Client of the Year Category: Engineer of the Year
Company: Mid Devon District Council
Company: Adrien Gallet, Unipart
Project Name: Crofts House, St Andrews House and Shapland Place
Project Name: Advanced Digital Design & Optimisation Platform
54
Issue 55 November/December 2026
Sponsor: SES Ltd
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
FEATURE OFFSITE AWARDS 2026 WINNERS Category: Contractor of the Year Company: McAvoy Project Name: Leeds City College
Category: Offsite Pioneer of the Year Company: London Heritage Offsite Project Name: Behind the Façade Sponsor: Saint Gobain
Category: Commercial Project of the Year Company: Engenuiti, AR18 Limited, Fraser Architects, Buckland Timber, Hasslacher and Boxmoor Project Name: AR18 Eco Factory
Category: Healthcare Project of the Year Company: P+HS Architects, MTX Project Name: Cumberland Infirmary Urgent Treatment Centre
Category: Education Project of the Year Company: B&K Hybrid Solutions, Balfour Beatty, Woolgar Hunter, Stora Enso, Peikko Project Name: Fife College, Dunfermline Learning Campus
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
55
FEATURE OFFSITE AWARDS 2026 WINNERS Category: Residential Project of the Year Company: B&K Hybrid Solutions, SDC, Price & Myers, Niall McLaughlin, Engenuiti Project Name: Univ North, University College Oxford
Category: Product Innovation Award Company: The ‘Lift in a Box’ by Vertiq Project Name: A Laing O’Rourke capability: The ‘Lift in a Box’ Sponsor: Combilift
Category: Digital Innovation Award Company: SustainIQ Project Name: Integrated ESG & Carbon Intelligence for Offsite Construction Sponsor: hsbcad
Category: International Project of the Year
Category: Winner of Winners
Company: SUMMARY
Company: Kier Group
Project Name: G - 5 Houses in Arouca, Portugal
Project Name: Network Building, Fitzrovia
56
Issue 55 November/December 2026
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
FEATURE OFFSITE AWARDS 2026 WINNERS HIGHLY COMMENDED
HIGHLY COMMENDED
Category: Building Performance Pioneer
Category: Offsite Pioneer of the Year
Company: OSM, an NG Bailey Group company
Company: HLM Architects Project Name: Think Offsite
Project Name: Manchester Airport T2 Pier 2 Phase 2
HIGHLY COMMENDED
HIGHLY COMMENDED
Category: Education Project of the Year
Category: Healthcare Project of the Year
Company: Stride Treglown
Company: HLM Architects
Project Name: Chilmington Green School
Project Name: Prince Charles Hospital (PCH)
HIGHLY COMMENDED Category: Digital Innovation Award Company: DEPROM Project Name: Peterborough Road – Digital Delivery of Precast Facade
Congratulations to everyone that won in 2026 and huge thanks to everyone that took valuable time to enter. Special thanks to our wonderful sponsors and supporters for helping create such a successful and enjoyable event. See you in 2027!
ENTRY PLATFORM
JANUARY 2027
2027
ENTRY DEADLINE
28 MAY 2027
The OFFSITE CONSTRUCTION AWARDS reward outstanding examples of prefabrication and factory-based construction methods, products, systems and disciplines that increasingly strive to develop a sustainable, streamlined and cost-effective way to deliver a better built environment.
FINALISTS ANNOUNCED
JUNE 2027 AWARDS CEREMONY
15 SEPTEMBER 2027
Why Enter?
OFFSITEAWARDS.CO.UK
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
1
Recognising Dedication
2
Independent Validation
3
Championing Smart Technologies
4
Springboard to Success
5
Join the List of Prestigious Winners
57
FEATURE NETWORK W1
A Winning Formula
1
Winner of the Best Use of Concrete Technology at the Offsite Awards 2026, Kier Construction’s work on the Network Building, Fitzrovia was also judged to be the overall Winner of Winners, demonstrating exceptional levels of offsite manufacture and delivery. THE NETWORK BUILDING (also known as Network
The net zero carbon development by Derwent
W1) is an £82million commercial development
London provides 12,393sq m of Category A office space
delivering a nine-storey office and retail scheme in
across eight floors, with 427sq m of retail at ground
Fitzrovia, at the heart of London’s Knowledge Quarter
level, transforming a dated 1950s building into a future-
and sits on the corner of Tottenham Court Road and
ready commercial asset designed to meet evolving
Howland Street.
occupier demands. The scheme was driven by the need to deliver high-quality, flexible workspace that supports modern patterns of working while providing strong environmental and wellbeing performance. Offsite precast façade systems and modular services improved quality, buildability and programme certainty on a constrained city-centre site. Flexible floorplates allow future adaptation to changing occupier requirements, while full-height glazing, 2.95m floor to ceiling heights, landscaped terraces and highquality end-of-trip facilities enhance the workplace experience. The building supports active travel through cycle storage for up to 270 bicycles, together with showers and changing facilities. Delivery was shaped by the constraints of a tight central London site, requiring a controlled and efficient construction approach. Offsite construction was central to this, including precast concrete façade
2
58
Issue 55 November/December 2026
panels manufactured and glazed offsite before being delivered in sequence.
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
FEATURE NETWORK W1
3
4 “It is a fantastic achievement to have taken home the Awards for Best Use of Concrete Technology and Winner of Winners at this year’s Offsite Awards. Network W1 is the latest example in our growing commercial sector portfolio where sustainable innovation and MMC were at the heart of the build, helping create a standout development in the capital. Over the last ten years, we have built an award-winning reputation across Health, Custodial, Residential, and Commercial Office sectors, earning the prestigious Winner of Winners title on four separate occasions. While these accolades are a source of immense pride, they reflect the talent, determination, and hard work of our teams. From preconstruction to delivery, their commitment to excellence has made every success possible.” Andrew Dewdney, Head of MMC and Industrialisation, Kier Group
performance of 527kgCO2e/m² compared with the Greater London Authority benchmark of 600kgCO2e/m². Carbon reductions were supported using GGBS
5
concrete, recycled structural steel, reclaimed materials and offsite manufacture. The scheme also achieved SmartScore Platinum
Weighing up to 12 tonnes, the panels were installed
certification, recognising its future-readiness, user
from within the building using a bespoke lifting
experience and intelligent building performance.
solution enabling an underslung install., eliminating
Together with improvements to the surrounding public
the need for perimeter scaffolding and improving
realm, including landscaping and enhanced pedestrian
safety, quality and programme control. A similar
space, the completed building delivers a highly sustainable,
approach was applied to building services, with
adaptable and technologically advanced workplace
modular MEP systems used for plant areas and risers.
environment designed for long-term asset value.
Offsite manufacture enabled systems to be tested and
The Network Building offers a compelling example
validated before installation, improving buildability,
of offsite innovation delivering long-term value. By
quality and commissioning performance. Sustainability
combining precast façade systems, modular services
was embedded throughout the design and delivery.
and intelligent design, the project has achieved
The project targeted a BREEAM Outstanding,
Images 1-5: The Network Building is another stunning example of how precast concrete and wider offsite manufacture techniques can work together to provide landmark buildings
greater control over quality, safety and programme,
NABERS 4.5 Star, LEED Platinum, WELL Platinum and
while creating a flexible, future-ready workplace in a
EPC A ratings, while targeting an embodied carbon
challenging urban setting.
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
Find out more at: www.kier.co.uk
59
Shaping the Future of Offsite Construction Join industry leaders, innovators, and specifiers at the UK’s premier offsite event series next year.
60
EDUCATION & HEALTHCARE
HOUSING
May 2027 Birmingham
15 September 2027 NCC, Birmingham
Discover how pre-manufactured and offsite construction solutions are revolutionising public sector building. This targeted event showcases how offsite manufacturing accelerates build programmes, minimises disruption, and delivers high-performance, sustainable spaces for healthcare facilities and modern educational institutions.
Explore how industrialised construction and offsite systems are addressing the national housing demand. This focused conference and exhibition highlights low-carbon housing solutions, factory-built volumetric modules, and panelised systems designed to deliver energy-efficient, high-quality residential developments at scale.
WWW.EXPLOREOFFSITE.CO.UK
Issue 55 November/December 2026
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
SHARE YOUR EXPERTISE:
Call for Papers Now Open Have an innovative case study, groundbreaking MMC technology, or industry insight to share?
Themes of Interest:
We are inviting thought leaders, structural engineers, architects, and offsite specialists to submit paper proposals for presentation at both events next year.
• Net-Zero & Sustainable Building Materials
• Modern Methods of Construction (MMC) Innovation
• Automation, Robotics & DfMA (Design for Manufacture and Assembly) • Digital Twin, BIM & AI in Offsite Manufacturing • Lessons Learned from Major Projects • Case Studies - Delivery at Scale
Submit your proposed presentation description to Rhian Morris, Event Director at rhian.morris@radar-media.co.uk
SHOWCASE YOUR SOLUTIONS:
Exhibitor & Sponsorship Opportunities Position your brand at the forefront of offsite construction by joining us as an exhibitor. Whether you specialize in cutting-edge MMC technologies, sustainable materials, automated manufacturing, or digital twins, our upcoming events provide an unmatched platform to present your innovations directly to key decision-makers, structural engineers, architects, and industry leaders. Beyond speaking on stage, putting your products and services on the exhibition floor lets you generate high-value leads, demonstrate live solutions, and establish your leadership in the evolving offsite ecosystem.
Stand packages and sponsorship opportunities are available – for more information contact Business Development Director, Julie Williams on Julie.williams@radar-media.co.uk www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
61
FEATURE MEP
Taking Time Off the Critical Path
1
As Paul Cooper, Managing Director at SES Manufacturing explains, offsite manufacture is the more efficient route to programme delivery and can transform projects with better planning and sequencing. EVERY PROGRAMME has a critical path, and every project team
Offsite manufacture changes this sequence. Once the design
knows how fragile it is. A late design release, a slipped structural
is agreed, fabrication, assembly, pipework, electrical installation
milestone or a week of bad weather rarely stays contained. It travels
and containment can begin in the factory. This work progresses
down the chain of dependent trades and lands on the completion
in parallel with groundworks, structural work and the building
date. For years the industry has tried to manage that risk with
envelope on site, rather than waiting for those activities to be
better sequencing, tighter co-ordination and more contingency.
completed. A rooftop plant room is a clear example. It can be
Offsite manufacture offers something different: a way to remove the
manufactured before the roof is complete, so by the time the building can receive it, the finished
dependency itself.
unit is ready for delivery rather than
The problem with building in sequence In a traditional approach, plant rooms, risers and other services installations are built in-situ, one trade after another. Each activity depends on the one before it, and on the building being ready to receive
still waiting to be built. A sequence of site-based activities is replaced by a
Repeatable processes, dedicated tooling and a consistent workforce allow production rates to be planned and monitored with confidence, rather than estimated and hoped for.
the work. The structure must be up,
single delivery and installation, with time on site limited to connecting and commissioning. This approach was implemented at One Hanover Street, a listed building at the junction of Regent Street and Hanover Street in London’s West End.
the envelope must be closed, access must be clear and the previous
Refurbishing a listed building in one of London’s busiest commercial
trade must have finished. This creates a programme that is only as
districts presents significant logistical and safety challenges. To help
strong as its weakest link. When any one activity slips, everything
mitigate these risks, SES Manufacturing produced a fully packaged
behind it slips too, and the delay passes straight onto the critical
mechanical plant room offsite under controlled conditions. It was then
path. The more services-heavy the building, the more exposed the
transported to central London, lifted onto the dedicated plant level and
programme becomes.
installed in three sections, removing 2,952 hours from site and reducing
62
Issue 55 November/December 2026
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
on nstructi alised Co Industri ort plus rep nference two 2026 co winners from t the Award bate and marke de days of n tio lisa visua
per
hite Pa
rbon W
Low Ca
ncrete
Co Precast
ark its landm d blishes LSFA pu on circularity an e nt gaug docume of light ble use sustaina me fra steel
d , EPDs an ntal nisation Decarbo arent environme nsp a defining why tra s become data ha tor fac building
De
ww
P70
P50
P32
... is the market-leading publication dedicated to the offsite manufacturing and construction arena.
2027 Copy Deadlines Offsite Issue 56 01/02/2027
ber 2026 ber/Octo / £4.95 Issue 54
Septem
ons Champi e Net Zero evidenc close the e How to accelerat gap and ation through nis n decarbo nstructio offsite co
P26
Offsite Issue 57 12/04/2027 Offsite Issue 58 21/06/2027
Design tivity by n and Produc nstructio
ing co Embedd ing knowledge r tur tte manufac gh to shape be ou early en delivery project
n, site desig d to off ry Dedicate ture and delive manufac .uk azine.co sitemag off w. ww
eel Frame s Light St junction
anding ividual Underst d how ind better an s perform tem wall sys exposure under fire
P75
P42
SE RT HOU CAST O P S N RE TRA URAL P ICK-F T C U R A ST D BR P ETE AN CONCR ÇADE TRIUM A F L E PAN
CAST S EL PRE OMPONENT V E L T C D NEX N G BEYO ONS MOVIN ING SOLUTI LD TO BUI
Offsite Issue 59 31/08/2027
Voices
ric ught eals tho vey rev staff A new sur insights from g dular provokin volumetric mo the g exitin sector housing
Volumet
ric
Volumet
me
eel Fra
Light St
ed its tly open d recen sive Framecla an exclu provide doors to y to see LSF in nit opportu on cti produ
are a Healthc e to continu t y to displa t offsite me
P79
P34
P24
Offsite Issue 60 08/11/2027
Get involved For advertising enquiries for print and digital, contact:
ent Living ing Stud elling Reshap e’s comp concret Precast inty, to certa solution y and long-term nc consiste ce an perform
rks Framewo anding site Underst te for off tial rou public An essen into the . How do providers rketplace sector ma rk? they wo
P54
P32
2026 Awards s. Offsite scorecard ge’s the jud s Hot off this year’ one of Are you products projects, chosen le? or peop
P58
26 gust 20 July / Au / £4.95 Issue 53
n, site desig d to off ry Dedicate ture and delive manufac .co.uk agazine em sit www.off
TRY BO INDUS TRIAL INDUS
Julie Williams T: 01743 290042 E: julie.williams@offsitemagazine.co.uk Retrofit
OFFSITEMAGAZINE.CO.UK www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
ges
Challen
’s ss the UK you addre vity How do h creati issues wit ing retrofit tive build and adap systems?
Issue 55 November/December 2026
P58
63
a
Perform
F BUILDOF sit help off n decarbo producti
P60
FEATURE MEP
2
the risks associated with working at height. Carrying
and more disruptive, and problems tend to surface
out the complex assembly at ground level, rather than
at the worst moment during commissioning and
on roofs or in plant areas, improves safety and speed
handover. Finding them before delivery reduces the
together - a rare combination. The project demonstrates
risk of late-stage snagging and delays at the end of the
how integrated delivery and offsite manufacture can
programme, when time is least forgiving.
support complex refurbishment projects in constrained
Wider benefits
city-centre locations. That is the fundamental shift. Offsite manufacture
The advantages extend beyond the programme
does not simply complete the same work more quickly
itself. Reduced time on-site lowers preliminaries and
– it moves most of the activity out of the programme s
site management costs. It minimises disruption to
most constrained environment and into one where it
neighbouring occupants and the public. These are
can progress independently and safely.
not secondary benefits. For clients, contractors and
Images 1-2: One Hanover Street, a listed building at the junction of Regent Street and Hanover Street in London’s West End where SES Manufacturing produced a fully packaged mechanical plant room offsite under controlled conditions
the communities around a project, fewer hours on
Certainty as well as speed
site mean reduced deliveries and operative numbers,
Speed is only half of the argument. The other half
as well as less noise and less time spent living and
is predictability. A controlled factory environment
working next to a construction site. The industry has
produces predictable output. Repeatable processes,
long accepted that site is where risk concentrates.
dedicated tooling and a consistent workforce allow
Offsite manufacture offers a practical way to reduce
production rates to be planned and monitored with
that concentration: do more of the work where
confidence, rather than estimated and hoped for.
conditions can be controlled and do it at the same
Programme managers can see progress, not just
time as everything else.
forecast it. This predictability is strengthened by
Our 2025 figures show what this means in practice.
reduced weather disruption: production continues
Removing more than 309,000 hours from site
regardless of rain, wind or temperature. Weather is one
represents programme time recovered, risk avoided
of the least controllable threats to a programme, and
and work completed in better conditions, supporting
moving work indoors removes much of that exposure.
a safer, cleaner and more efficient project from start
Quality benefits in the same way. Testing and
to finish. For project teams looking at how to protect
quality checks can be completed before the product
their programme, the question is no longer whether
leaves the factory, allowing defects to be identified
offsite manufacture can deliver. It is how much of the
and resolved early. On-site, rectification is slower
critical path they are prepared to take offsite.
64
Issue 55 November/December 2026
Find out more at: www.ses-ltd.co.uk
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
UNITING EXPERTISE, ACCELERATING ADOPTION As demand for high-performance, sustainable and industrialised construction continues to grow, the Light Steel Frame Association (LSFA) brings together the complete industry ecosystem – connecting manufacturers, architects, designers, consultants, supply chain partners, installers and construction clients to share knowledge, collaborate and create new opportunities.
WHY JOIN THE LSFA? CONNECT Build relationships across a powerful cross-sector network.
EMPOWER Access knowledge and resources to strengthen capability and support business growth.
PROMOTE Showcase your expertise and raise your profile across the wider construction sector.
INFLUENCE Have a voice in the issues, priorities and decisions shaping the future of light steel frame.
JOIN LSFA TODAY Connect with the light steel frame community, strengthen your industry presence and help shape the future of the sector.
To learn more about membership opportunities contact andrew.stephens@lsf-association.co.uk
www.lsf-association.co.uk
LSF-ASSOCIATION.CO.UK
ROUNDTABLE LIGHT STEEL FRAME ASSOCIATION
From Technical Capability To Market Confidence Light steel frame (LSF) meets many construction challenges head-on but how to accelerate it to wider market adoption? Key voices from across the LSF supply chain, took part in the Light Steel Frame Association’s (LSFA) latest roundtable to discuss how.
key questions: how can the sector better demonstrate the technical capability, performance and commercial benefits of proven steel framing systems to clients, designers, insurers, warranty providers, funders and regulators? And how can greater sector collaboration, shared knowledge and stronger industry engagement translate into increased market confidence and wider adoption?
AN ESTABLISHED and increasingly sophisticated
These were the questions at the heart of the LSFA
part of the UK construction landscape, LSF
Stakeholder roundtable, held in Birmingham in
construction is backed by decades of experience
November and sponsored by Hadley Group. Bringing
and investment in digital design, engineering and
together perspectives from LSF manufacturing, legal,
advanced manufacturing. With a growing portfolio
technical assurance, structural warranty, insurance,
of successful projects, the sector has demonstrated
structural and fire engineering, the discussion was
its ability to deliver across residential, student
deliberately designed as an evidence-led conversation
accommodation, hotels, healthcare, education and
rather than an exercise in promoting the technology.
commercial applications. The technical capability is proven, manufacturing
The conclusion was striking. Wider adoption of LSF is now less about demonstrating technical capability
capacity is growing, and the benefits of precision
and more about building on that strength through
engineering, offsite production, safety, speed, quality
consistent, accessible and traceable evidence that
and sustainability are well established. Yet wider
demonstrates performance and provides assurance
market adoption still falls short of the sector’s
across the supply chain.
potential. So, what needs to change?
Fire: evidence exists, but how is it applied?
To find out more about LSFA’s roundtables, visit: lsf-association.co.uk/ events
66
Uniting the industry to accelerate wider adoption
Fire performance inevitably dominated much of the
The discussion explored how the industry can
in fire testing, but one of the recurring frustrations is
accelerate wider adoption, strengthen collaboration
the relationship between the tested system and final
and build market understanding to unlock the full
project-specific construction. A wall may have been
potential behind LSF construction, focusing on some
tested with a particular board, insulation product and
Issue 55 November/December 2026
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
discussion. Manufacturers have invested substantially
ROUNDTABLE LIGHT STEEL FRAME ASSOCIATION
EXPERIENCE IN THE ROOM Darren Richards, Managing Director, Cogent Consulting – Facilitator and Roundtable Chair An offsite manufacturing and industrialised construction specialist, Darren works across the offsite technology supply chain, helping businesses improve productivity and drive operational efficiency. Ben Towe, Chair, LSFA Group Managing Director, Hadley Group, Ben is a strong advocate for raising awareness, improving understanding and accelerating the adoption of LSF construction. Nik Teagle, Steering Group Member, LSFA Joint Managing Director of Frameclad, Nik is an experienced offsite construction specialist, leading strategic development, championing technical innovation and advanced manufacturing. Steve Odunmbaku, Engineering Policy Manager, NHBC An experienced construction and engineering professional, Steve specialises in construction risk, project management and strategic planning. Daniel Leech, CEO, Design4Structures With more than 20 years’ experience in the construction sector, Daniel specialises in digital engineering, construction modelling and developing technical teams. Iziengbe Inerhunwa, Principal Fire Engineer, OFR Consultants A specialist in fire engineering and structural fire safety, Iziengbe has particular expertise in the fire performance of light steel frame construction. Dan Phillips, Director, AHCI A construction insurance specialist, Dan focuses on using carefully structured insurance and surety solutions to manage project risk, unlock development opportunities and support the delivery of complex construction schemes.
configuration. If a contractor later wishes to
it is a credible possibility that needs to be
substitute a different board manufacturer,
considered, particularly in external wall
alter insulation or modify a junction detail,
construction. However, the discussion
the question immediately becomes whether
recognised that full-scale fire testing is
the original fire evidence still applies.
not always the only way to demonstrate
Manufacturers invest extensively
performance. Where sufficient supporting
in testing complete assemblies, but the
evidence exists, validated modelling and
number of possible permutations of
engineering assessments can also be used to
boards, insulation, interfaces, fixings and
establish how a system is likely to perform.
project-specific conditions can become
The principle was clear. Test where
considerable. The roundtable discussion
necessary, model or assess where
repeatedly returned to the value of a more
appropriate, but avoid testing simply for
collective evidence model.
the sake of accumulating certificates.
A Pattern Book approach
Stop treating the frame in isolation
Jonathan Vickers, Legal Director, Browne Jacobson A construction lawyer with more than 12 years’ experience, Jonathan advises on procurement strategy, construction contracts and project risk across the real estate and infrastructure sectors.
Identified as a valuable opportunity,
Perhaps an even more important
enabling industry evidence to be pooled
conclusion was that stakeholders
around standardised, clearly defined and
increasingly need evidence for the complete
controlled configurations, a Pattern Book
system, not simply the steel frame. Cavity
approach could help reduce the need
barriers, fire-stopping, penetrations, linings,
for manufacturers to repeatedly fund
interfaces, junctions and follow-on trades
Andrew Nock Dip CII, Client Director, Arthur J. Gallagher An experienced Client Director specialising in Construction Insurance, with 30 years’ experience advising and managing insurance programmes for main contractors, subcontractors, property developers and construction funders.
similar variations of fire tests. Participants
can all influence the performance of the
suggested that the first step should be
finished building.
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
to map existing fire test evidence across
Is enough attention being placed on
the sector, establish commonly used
complete wall, floor and facade assemblies
configurations and identify genuine gaps
rather than individual components. Much
before commissioning further testing.
of the discussion reinforced this point
Two-sided fire exposure was discussed
with agreement that assurance needs to
in detail. The fire-engineering view was that
extend from design through manufacture
although it is an extremely rare situation,
and finally into installation – this is now
Issue 55 November/December 2026
67
ROUNDTABLE LIGHT STEEL FRAME ASSOCIATION
particularly significant under the current Building
Warranty providers have a different priority. They
Safety Act regime.
need evidence that systems are technically assessed, manufacturing is controlled and crucially, what is built
The changing procurement landscape
on-site matches what was designed and approved.
Participants highlighted wider industry challenges
That point led directly to perhaps the most
around the Building Safety Regulator’s Gateway
important discussion of the day. The better the LSF
2 and Gateway 3 processes but also identified an
industry can demonstrate accreditation, quality
opportunity to address a longstanding procurement
management, traceability and an audit trail, the
issue – the late engagement of specialist
more resilient its position should be if risk appetite
manufacturers and installers.
tightens.
Historically, LSF has frequently been introduced severe – described memorably during the discussion
Overwhelming support for LSF Mark and SiteCheck
as an ‘11:59’ decision. An approach fundamentally at
The LSFA outlined plans to launch LSF Mark, an
odds with industrialised construction. With greater
independent assessment and certification scheme.
design maturity required before Gateway 2, specialist
The proposal received unanimous support around
expertise need to be involved much earlier. Structural
the table. Designed specifically for the LSF sector, the
systems, connections, interfaces, fire performance
scheme aims to establish a recognised benchmark
and manufacturing requirements must be considered
for quality and competence, assessing technical
during the initial design stages.
capability, quality systems, digital information and
at the point when programme pressure is already
The discussion supported earlier manufacturer and
traceability. Warranty representatives welcomed
installer involvement, whilst recognising client desire
the potential for robust independent assessment to
to retain competitive procurement. One potential
simplify acceptance processes, provided the scheme
answer is the development of better generic LSF
delivers genuine assurance rather than simply
design rules and standardised interfaces, allowing
another industry badge.
projects to reach an appropriate level of design
The LSFA also outlined plans for SiteCheck, an
maturity without removing competitive procurement
independent audit process to verify that systems
altogether.
are installed in accordance with approved designs. Together, the LSF Mark and SiteCheck will establish
Insurance is not necessarily the barrier many assume
an end-to-end assurance framework, connecting
The discussion drew a clear distinction between
traceability and installation quality through to
insurance and warranty. Insurers do not view
independent site verification.
LSF as problematic. Its non-combustible nature,
68
manufacturer competence, technical evidence, digital
Particular emphasis will be placed on the digital
controlled manufacture, traceability and engineered
Golden Thread, information flow and system
performance, strengthen its risk profile.
traceability – areas in which light steel frame
Issue 55 November/December 2026
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Building smarter with steel From early design and value engineering through to project completion, our proven MMC systems accelerate programmes, reduce waste, and deliver sustainable, fully warranted results with the flexibility to meet your project’s needs. To transform how you build, contact us at ask.hadleyframe@hadleygroup.com
To find out more about MMC systems, scan the QR
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 55 November/December 2026
69
ROUNDTABLE LIGHT STEEL FRAME ASSOCIATION
10 PRIORITIES AND IMPORTANT TAKEAWAYS 1. Launch and build stakeholder recognition of the LSF Mark. Progress the independent assessment and certification scheme for manufacturers and engage directly with insurers, warranty providers, fire engineers, clients and regulators so its requirements respond to what those stakeholders genuinely need. 2. Develop SiteCheck to underpin LSF Mark. Independently verify that systems have been installed in accordance with the approved design and create a traceable link between manufacture and completed building performance. 3. Create an LSF fire-performance evidence map and explore a Pattern Book approach. Catalogue existing test evidence, identify common system configurations and genuine gaps, and investigate opportunities for collaborative testing and shared evidence without compromising legitimate intellectual property. 4. Develop a Minimum LSF Confidence Dataset. Establish a standard package of information covering structure, fire, durability, manufacturing QA, installation, certification, competence and Golden Thread evidence that can be used consistently by insurers, funders, warranty providers, fire engineers and regulators.
manufacturers are particularly well positioned because of the digital design and manufacturing processes already embedded within most businesses. The ambition is LSF Mark becomes recognisable for quality and competence
5. Strengthen generic LSF design guidance for engineers and designers. Produce worked examples, preliminary design guidance, typical structural solutions and standard interface information so LSF can be considered confidently during earlystage scheme design rather than introduced at the ‘11:59’ stage.
and that a manufacturer has been independently assessed, operates
6. Promote earlier specialist engagement within procurement. Feed the roundtable findings into the LSFA Commercial Procurement Guide and demonstrate how manufacturers, specialist designers, installers and contractors can be engaged early enough to support Gateway 2 while maintaining appropriate competitive tension.
scheme remains genuinely robust and transparent rather than becoming
7. Improve guidance around system interfaces and substitutions. Clarify responsibilities and evidence requirements around boards, insulation, cavity barriers, fire-stopping, penetrations, connections and project-specific changes so tested performance is not unintentionally undermined downstream. 8. Create stronger evidence-led case studies. Move beyond marketing descriptions and demonstrate programme, cost, structural performance, durability, quality, carbon, installation and commercial outcomes on completed LSF projects.
appropriate technical and quality systems and can provide the information and traceability stakeholders require. Warranty representatives indicated that this type of credible independent assessment could materially simplify acceptance processes, provided the merely another badge. This distinction is fundamental to success.
A collective commitment to progress The roundtable reached a clear conclusion: LSF has the technical capability to play a far greater role in UK construction. The priority now is to turn that capability into wider market adoption. Years of investment in structural systems, digital design, advanced manufacturing, testing and certification have established a strong foundation. The next step is to bring these capabilities together through shared evidence, earlier engagement, clearer design guidance, robust independent assurance and greater supply chain collaboration. Above all, the industry needs a connected assurance framework that provides clear, traceable evidence from design and manufacture through to installation and final verification. That makes the unanimous
9. Increase collaboration between manufacturers and the wider supply chain. A unified sector will carry considerably more influence than manufacturers continuing to solve common technical challenges independently. Where appropriate, competitors should jointly fund research or testing of issues affecting the whole sector.
support for the LSF Mark particularly significant. By combining robust
10. Establish a permanent LSFA Stakeholder Advisory Group. Continue the dialogue with representatives from insurance, warranty, fire engineering, structural engineering, legal, funding and other stakeholder groups, potentially meeting quarterly, so future LSFA guidance and assurance programmes remain aligned with changing market expectations.
Light Steel Frame Association The LSFA engages with industry stakeholders, policy and decision makers to ensure the benefits of light steel frame are recognised and its contribution to safer, faster and more sustainable construction, is better understood.
70
Issue 55 November/December 2026
independent assurance with the digital traceability already embedded in LSF manufacturing, it could provide a powerful catalyst for wider adoption. The industrialised technology is ready. The next task is to make the evidence surrounding it is equally industrialised.
If you would like to join and play an active role in shaping the conversations, priorities and opportunities that will influence the future of construction, you can find out more at: www.lsf-association.co.uk
www.offsitemagazine.co.uk www.linkedin.com/company/exploreoffsite
Dedicated to the development and application of volumetric modular systems
NOV/DEC 2026 ISSUE 7
The Castle, Acton
MPBA
Lean Manufacturing
P86
P88
P92
Another towering achievement that proves what can be delivered via perfect offsite planning
With building at scale requiring a different approach how can volumetric modular meet the challenge?
The clear and compelling case for more industrialised construction and its wider productivity gains
ROYAL SURREY COUNTY HOSPITAL MODERN METHODS OF CONSTRUCTION BRING CANCER CENTRE TO LIFE
20-21 APRIL 2027 LONDON
TRANSFORMING CONSTRUCTION DELIVERY THROUGH DESIGN, TECHNOLOGY AND MANUFACTURING
To book your exhibition or sponsorship package contact Julie Williams on 01743 290042 or julie.williams@radar-media.co.uk To submit your interest in speaking at the 2027 Conference contact Tamara Davies on 01743 290022 or tamara.davies@radar-media.co.uk
72
Issue 7 November/December 2026
industrialisedconstruction.co.uk www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
VOLUMETRIC MODULAR CONTENTS
VOLUMETRIC ON THE RISE This issue’s special section highlights the volumetric modular sector and provides a very quick run through some recent projects and developments from its market leaders including winners from the recent Offsite Awards 2026.
Despite negative press and an undeniable battering in recent years, the UK’s volumetric modular sector remains an important part of the wider offsite construction toolbox. As outlined in several of the features over the next few pages, it offers the potential to transform vast swathes of the UK’s built environment. With major investment planned across education and healthcare sectors in particular, volumetric modular can improve productivity, accelerate delivery and address many of the workforce shortages UK plc suffers from. As ever, early collaboration, design standardisation and adopting lean manufacturing techniques can improve the flow of top-quality and adaptable buildings. Reds10 Group’s expansion into the USA is a significant move for the volumetric naysayers and is a real uptick for UK expertise and confidence. Plus, you only need to look at the way Integra Buildings continues to develop to get a flavour of the potential it holds – they are on track to deliver a turnover of over £55million with pretax profits exceeding £6million in 2026 – that is a serious expansion story. While the volumetric modular homes industry has taken a hit, the technology and potential it holds is still vast and as we move into 2027, the number of energy efficient affordable homes required in the UK is huge. Add to that the levels of temporary accommodation and homelessness seen on the streets of the UK being a national shame, it is only via adopting more offsite methods that these problems get anywhere close to being solved. There are many successful volumetric modular projects being delivered at scale, ontime and on-budget to the highest standards. You can read more about some of these success stories inside.
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
OVERLEAF…
74
MTX CONTRACTS
76
NEWS AND VIEWS
86
THE CASTLE, ACTON
88
An overview of the work done at the new £41.5million Cancer and Surgical Innovation Centre (CASIC) for the Royal Surrey NHS Foundation Trust.
A quick catch-up on some recent events, new projects and encouraging business developments in the volumetric modular sector.
The winner of Best Use of Volumetric Technology at the Offsite Awards 2026, saw Tide Construction, Vision Volumetric and MJH Structural Engineers, rewarded for their work at another exceptional high-rise project.
FROM SCALING BACK TO RAMPING UP – THE CASE FOR EFFICIENT DELIVERY
With major public sector investment ahead, construction must find more efficient ways to deliver buildings. Jackie Maginnis, Chief Executive of the MPBA, explores how volumetric modular construction can help meet the challenge.
92
UNLOCKING PRODUCTIVITY POTENTIAL
94
CUMBERLAND INFIRMARY
As more building processes move away from the construction site and into the factory, the case for industrialised construction is a compelling one. But as Darren Richards, Managing Director of Cogent Consulting point outs, there are several caveats to consider.
Faster, safer, and delivering a highquality facility without compromising patients and staff already on-site, the Healthcare Project of the Year winner at the Offsite Awards 2026 showcased why volumetric modular is ideal healthcare solution.
Issue 7 November/December 2026
73
COVER STORY MTX CONTRACTS
MODULAR CONSTRUCTION DELIVERS HEALTHCARE MILESTONE The new £41.5million Cancer and Surgical Innovation Centre (CASIC), designed and built by MTX Contracts for Royal Surrey NHS Foundation Trust, has officially opened to its first patients at Royal Surrey County Hospital in Guildford. THE MAJOR three-storey healthcare development provides six state-ofthe-art operating theatres and 56 patient beds across dedicated recovery and short-stay facilities. Once fully operational, the centre will enable the Trust to undertake an additional 7,000 surgical procedures each year, increasing capacity for specialist cancer treatment and helping to reduce waiting lists for planned operations. The centre has opened in phases, with three operating theatres, a recovery area, post-anaesthetic care unit and 24-bed short-stay ward now operational. Ear, nose and throat, breast and maxillofacial services are the first specialties to benefit from the new facilities, with the remaining three theatres scheduled to open in early 2027. Major facility for local care Royal Surrey is one of the country’s largest cancer centres, providing specialist services to a population of up to three million people across the South East and beyond. With approximately 60% of surgeries performed at the hospital being cancer-related, the new facility represents a significant investment in expanding surgical capacity and meeting growing demand for treatment. Replacing the hospital’s Surgical Short Stay Unit, CASIC has been purpose-designed to support the Trust’s advanced robotic and non-robotic surgical services, providing modern clinical environments that improve patient pathways and support more efficient delivery of care. The first floor accommodates six specialist operating theatres, comprising two orthopaedic
74
1 theatres equipped with ultra-clean air canopies, two theatres designed for laparoscopic procedures with specialist equipment and lighting, and two general operating theatres. Supporting facilities include a 12-bed Post Anaesthetic Care Unit (PACU), a 20-bed second-stage recovery area and a 24-bed short-stay ward, named Shalford Ward, including 12 singleoccupancy rooms, alongside consulting and examination rooms. MTX employed Modern Methods of Construction (MMC) and Design for Manufacture and Assembly (DfMA) principles to deliver the technically complex development, combining precision offsite manufacturing with carefully co-ordinated on-site construction activities. Overcoming complex challenges The building’s structural framework comprises 170 individually designed and factory-manufactured steel
Issue 7 November/December 2026
modules, ranging from six to 15m in length. Manufactured offsite while groundworks progressed simultaneously, the modules were transported to Guildford and installed to create the new three-storey structure. This approach enabled significant programme efficiencies compared with conventional construction methods, while improving quality control and reducing the duration and impact of construction activities within the busy hospital environment. The development presented several complex engineering and logistical challenges, including the constrained hospital site and sloping terrain, which required the incorporation of a partial basement and a partially enclosed rooftop plant area accommodating specialist mechanical and electrical equipment. The facility’s concrete floors were engineered to meet the stringent structural and performance requirements of a modern surgical
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
COVER STORY MTX CONTRACTS
3 2 environment. Specially designed reinforcement pads were incorporated into the first-floor operating theatre areas to achieve the precise floor response and vibration performance required for specialist surgical procedures. A purpose-built first-floor link bridge connects the new centre directly to the existing hospital, providing an integrated route for the movement of patients, staff and equipment. Supported on concrete pillars, the bridge was carefully designed to maintain clearance for larger delivery vehicles beneath, with MTX also undertaking enabling works to create a new access point within the existing hospital building. The project’s mechanical and electrical services were extensively prefabricated to maximise installation efficiency and quality assurance. Specialist equipment, including air handling units, was assembled and factory-tested before being transported to site for reassembly, installation and commissioning. The integration of offsite manufacturing, prefabricated building services and meticulous construction planning enabled MTX to manage the demands of delivering a major new clinical facility alongside an operational hospital, maintaining essential services and minimising disruption to patients, staff and existing healthcare activities.
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
4 Significant offsite achievement MTX Managing Director David Hartley said: “The opening of the Cancer and Surgical Innovation Centre to its first patients is a significant milestone and an achievement that everyone involved in the project can be extremely proud of. Delivering a facility of this scale and technical complexity within a fully operational hospital environment requires specialist expertise, meticulous planning and close collaboration with the Trust and its clinical teams. We are delighted to have worked in partnership with Royal Surrey NHS Foundation Trust to deliver this important development, which will provide additional surgical capacity, enhance patient services and support the Trust in meeting growing demand for treatment for many years to come.” Louise Stead, Group Chief Executive of Royal Surrey NHS Foundation Trust, added: “I am incredibly proud of everyone who has helped bring this
Issue 7 November/December 2026
ambitious project to life. The impact of this centre will be felt by tens of thousands of patients for years to come.” The opening of CASIC represents an important milestone in Royal Surrey NHS Foundation Trust’s continued investment in specialist cancer and surgical services, providing additional capacity and modern clinical facilities to support the delivery of highquality patient care. For MTX, the successful completion and opening of the centre further demonstrates the company’s expertise in delivering complex, purpose-designed healthcare infrastructure through innovative construction methods, helping NHS Trusts bring essential new facilities into operation efficiently and effectively. Find out more at: www.mtx.co.uk Images 1-4: MTX successfully employed MMC and DfMA principles to deliver a technically complex healthcare development
75
VOLUMETRIC MODULAR INDUSTRY NEWS
Reds10 Announces USA Expansion Reds10 Group has announced its expansion into the USA through a strategic investment in MMY US, acquiring a majority stake in the vertically integrated modular housing specialist. The investment brings together two businesses with a shared vision to industrialise construction and deliver high-quality, sustainable and affordable homes for the people and communities that need them most. As well as the cash injection, MMY will also benefit from the Reds10 Group’s support, expertise, technology and capacity to help deliver its secured pipeline and expand its operations across the US. The deal takes Reds10 Group to 14 companies and increases its workforce to over 1,000 people. The Group will now operate manufacturing facilities across the UK and US totalling approximately 640,000sq ft. MMY currently operates from a manufacturing facility in Louisville, Kentucky, and has an approximately USD $100million order book and established partnerships in Kentucky and Cleveland, providing a strong platform for future growth across the Midwest and wider US market. Paul Ruddick, CEO, Reds10 Group said: “This investment marks an important step for Reds10 Group, giving us a presence in the world’s largest economy through a business that shares our values and ambition. The UK is at the forefront
76
of industrialised construction, and we should be exporting that knowledge and capability rather than waiting for other markets to catch up. MMY has built an impressive platform, with a strong order book, established local partnerships and an innovative approach to housing. Combining its US market expertise with our capability across design, manufacturing, construction and technology creates a powerful platform for growth and, most importantly, for delivering more high-quality homes. We also share a commitment to creating lasting value in the communities we serve, investing in local recruitment, apprenticeships and skills as the business grows.” The deal follows the launch of Reds10 Developments in September, Reds10 Group’s UK residential development business, which will unlock land and deliver high quality, affordable homes through industrialised construction in partnership with councils, housing associations, charities and likeminded developers. MMY is a vertically integrated design, manufacturing and construction company specialising in advanced offsite construction. Its product range includes single-family homes and multi-family schemes ranging from four-unit quadplexes to developments of up to 72 homes and up to four storeys. The homes are configured using a catalogue of pre-engineered models, with a choice of sizes,
Issue 7 November/December 2026
layouts and façade options. The business has a projected turnover of $214million by 2030. Through its investment, Reds10 Group will support MMY in developing fully integrated operations across design, manufacturing and construction delivery. MMY will also draw on the Group’s AI platforms, digital technology and wider industrialised construction expertise to strengthen operational performance and increase delivery capacity. MMY was selected by the City of Cleveland and the Site Readiness for Good Jobs Fund as the city’s preferred modular housing manufacturer. Robin Bartram Brown, CEO, MMY US, said: “Joining Reds10 Group marks an important strategic milestone for MMY and the next stage of our development in the US market. We have already established a strong foundation through our manufacturing operations, customer relationships and growing project pipeline. This investment brings together our collective strengths and provides a significant opportunity to accelerate MMY’s growth and expansion across the whole US market.” The partnership also creates opportunities for greater integration across the Group’s supply chain, enabling Reds10 Group companies to export UK-manufactured products and expertise to the US, while bringing MMY’s US-manufactured products and capabilities into the UK market. Source: www.reds10.com
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
INSULATION SOLUTIONS DESIGNED FOR THE DEMANDS OF MODERN MODULAR CONSTRUCTION.
WWW.GRADIENTUK.COM
Twinfix and Offsite We know how important safety is when constructing modular buildings and our canopies are manufactured and installed to the highest possible standards. Over the years Twinfix has designed, manufactured and installed hundreds of school canopies, playground shelters and covered walkways for modular and education projects. As modular buildings can often be quick to install we understand the demand for a fast turnaround. Our process from order to installation is quick and efficient which is the perfect match for your modular building project.
OUR RANGE INCLUDES: Canopies, shelters & walkways Aluminium / steel / timber canopies manufactured and installed Brise Soleil / Solar Shading Polycarbonate roof lights Glass canopies with spider bolt connections Glass (single & double glazed) roof lights Multi-Click polycarbonate vertical glazing systems
Get in touch to find out more
01925 811311 | enquiries@twinfix.co.uk 8230FD_Modular Advert_127x190mm_AW.indd 1
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
17/11/2022 09:47
Issue 7 November/December 2026
77
VOLUMETRIC MODULAR INDUSTRY NEWS
Integra Buildings Set for Record Year
L-R: Integra Technical Director Mike Marriott, Safety, Health, Environment and Quality Director Paul Tansey, Managing Director Chris Turner, CEO Gary Parker and Finance Director Sarah Marshall. Courtesy R&R Studio
Integra Buildings has forecasted record financial performance as it prepares for 2027 and a major programme of investment. Integra is on track to deliver turnover of over £55million and pre-tax profits exceeding £6million in 2026 – both figures the highest in its near 30-year history. Underpinning Integra’s growth is a shift to delivering more complex, turnkey projects, managing every stage from design and planning, through to manufacture and installation, as well as continued investment in the company’s people and in-house capabilities. In the past year, the Yorkshire-based business has gained a host of new industry accreditations, and now holds four ISO certifications, reinforcing its commitment to excellence across all areas of the company. Record performance in 2026 would serve as the perfect curtain-raiser for a landmark year in 2027, when Integra will celebrate its 30th anniversary and embark on a significant investment programme. Integra CEO Gary Parker said: “We’re extremely proud of the strong progress we continue to make as a business. 2026 is on track to be our best year ever and we see further growth into our 30th anniversary and beyond. While market and economic conditions
78
remain challenging, we continue to buck the trend as a business which is growing, both sustainably and at pace. Our success is underpinned by the quality of the projects we deliver and providing our clients with a service which exceeds expectations. Our pipeline of confirmed and potential projects is very strong and the investments we’re making in our people and facilities will ensure we’re well positioned to achieve our ambitions.” Over the last three years, Integra’s workforce has grown from around 180 to 215, partly due to the creation of new departments and specialist teams. Integra recently had plans approved by East Riding of Yorkshire Council for expansion onto neighbouring land, increasing the footprint of its headquarters site in Paull, near Hull, by around a third. The expansion will create additional storage space to accommodate future growth. Over the next three years, Integra plans to invest around £7million throughout the site, including in its existing production facilities and buildings. In the first half of 2026, Integra recorded turnover of £25.5million, with pre-tax profits of £2.5million. The business is now forecasting turnover of £55.6million for the full year, with pre-tax profits of
Issue 7 November/December 2026
£6.35million. Integra’s profit margin is also forecast to increase to over 11% this year, up from 8% in 2025, reflecting a drive for enhanced efficiency across the company’s operations. Integra Managing Director Chris Turner said: “Our site expansion, and associated investment, will put us in a very strong position to continue our upward trajectory over the coming years. We’re entering an exciting new chapter for the business, building on everything we have achieved and pushing new boundaries, both in product design and innovation, and sustainable manufacturing and construction.” Integra has made a multi-million-pound investment in sustainability at its headquarters, focused on both reducing the cost and carbon footprint of its production operations. That investment includes the installation of more than 1,000 solar panels across the site, a move towards electrification of plant and equipment, such as a new fleet of electric forklift trucks, and a comprehensive energy reduction programme which has seen the business cut gas consumption by a quarter since 2022, with a target to eliminate it entirely by 2028. Source: www.integrabuildings.co.uk
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
VOLUMETRIC MODULAR INDUSTRY NEWS
Modulek Completes Macclesfield School Pavilion Project
Modulek has completed a £5million sports pavilion for The King’s School in Macclesfield, adapting an existing traditional-build design to deliver new changing and function facilities. As the school commences its 525-year anniversary celebrations, the two-storey Forster Pavilion provides 1,000sq m of accommodation across 24 modules. It combines four pupil changing rooms and staff facilities on the ground floor with a large first-floor function space, meeting rooms, and a commercial kitchen. The pavilion was the final element of the school’s wider newbuild development. Rising construction costs during the COVID-19 period had left the original scheme beyond the available budget, prompting the school to explore an alternative approach. While the completed Forster Pavilion retains the balcony, brick finishes and much of the layout from the school’s original design, Modulek introduced a new overhanging roof
feature, creating a distinctive appearance while providing 1,000m of accommodation. The ground floor space provides two large and two smaller changing rooms with showers to accommodate up to 200 pupils, plus five individual changing rooms are allocated for match officials and staff. Upstairs, the open-plan function space accommodates approximately 100 people and benefits from an increased ceiling height. Two meeting rooms, a commercial kitchen, servery and washrooms complete the first-floor facilities. Jason Slack, Head of Foundation, at The King’s School, commented: “The School is absolutely delighted with the completed building. It represents a wonderful addition to our new school site. The attention to detail to match the finished design to the existing school buildings was very much appreciated. Features such as the wraparound balcony and the open plan function suite make the pavilion a standout facility that reinforces the reputation for excellent facilities that the school enjoys. The building was much quicker to construct than a traditional build would have been and this helped to keep disruption to normal school operation to a minimum. We’re delighted with the finished product.” Stephen Pester, Commercial Director, Modulek, added: “The school had a clear vision for its pavilion and a fixed budget to deliver it. Our role was to find a way to bring those together, retaining the features that mattered while rethinking how the building could be designed and constructed. The balcony, roof overhang and matching brick finishes give the Forster Building a strong architectural identity. We are proud of the team’s commitment to delivering the new facilities in time for the September term, while working carefully around the day-to-day life of the school.” The project took nine months overall, including five months on-site. Existing changing rooms were demolished during the Easter holidays, and module delivery was also scheduled during a school holiday period. The new pavilion was completed for the start of the September 2026 term. Source: www.modulek.co.uk
Portakabin Delivers The Workdry Group HQ Portakabin has successfully completed the installation of 66 bespoke modular units for The Workdry Group’s new headquarters in Chandler’s Ford, Southampton. The three-storey headquarters is being delivered by Portakabin for The Workdry Group, global specialists in mission-critical water handling, storage and treatment solutions, and represents a significant investment in the company’s future. The 66 bespoke modular buildings were manufactured at the Portakabin manufacturing facility in York, before being transported and installed over a two-week period at the site in Chandler’s Ford. The installation was completed on schedule, marking a major milestone in the development of the new headquarters. Designed to set a new benchmark for offsite, the building will provide a modern, collaborative working environment, with a striking floor-to-ceiling glass atrium and reception area, alongside a mix of agile and flexible working spaces designed to support the Group’s continued growth. The headquarters has been designed to achieve an BREEAM Excellent rating as well as 100% biodiversity gain, with sustainability features including living walls, a planted courtyard, trees to the frontage and bird and bat boxes incorporated into the buildings cladding. Portakabin Chief Executive Dan Ibbetson said: “It’s a real privilege to partner with The Workdry Group on delivering their fantastic new headquarters. I’m enormously grateful to the team for trusting us with the opportunity to demonstrate the incredible spaces that can be delivered using modular building technology.” Dan Lee, Group CEO at The Workdry Group, added: “Seeing work begin on our new headquarters is an incredibly exciting milestone for The Workdry Group and represents a
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
significant investment in our long-term future here in Chandler’s Ford. We’re developing on a prominent site that forms part of people’s everyday journeys through the area, so being a considerate neighbour throughout the construction process is extremely important to us. Working alongside Portakabin, we want to ensure the development is delivered responsibly and leaves a positive legacy for the local area and also provides the foundations to support our ambitious future growth strategy.” The new headquarters is due to be completed in 2027 and will sit alongside Workdry’s existing Selwood operations at the Bournemouth Road site. Source: www.portakabin.com
Issue 7 November/December 2026
79
VOLUMETRIC MODULAR INDUSTRY NEWS
McAvoy Welcome Students to Hospital Redevelopment
L-R Student Jacob Relton, age 20, Duan Kapp, Project Manager at McAvoy at Lynfield Mount Hospital
Four students from Bradford College recently undertook a two-week placement on the Lynfield Mount Hospital site to gain valuable insight into the delivery of a live construction project. The students who are enrolled on the Adult Construction Skills course, were welcomed to the Bradford District Care NHS Foundation Trust site which is currently undergoing a £65million phased investment to improve the facilities for people who use the Trust’s services and colleagues working on-site. Across a fortnight, the students worked alongside McAvoy, to shadow different roles working on the construction of the new ward block and the refurbishment of the current building. They also learned about site operations and project management from the team overseeing the works. Duan Kapp, Project Manager at McAvoy, said: “Supporting local communities is a key part of our commitment to creating social value on every project we deliver. We were delighted to welcome the students and give them the opportunity to experience a live site environment and learn more about our
80
offsite manufacturing and integrated project delivery process. Projects like this rely on a strong pipeline of skilled people entering the industry, so it is vital that we continue to support and inspire the next generation of talent.” As part of the one-year course, students gain an introduction to construction and potential career opportunities within the industry. Louise Rigg, Project Director of the Lynfield Mount Hospital Redevelopment Programme, added: “As well as making a difference to people who use the Trust’s services and staff members, we want the redevelopment to have a positive and lasting impact on the hospital’s local communities. We are pleased that the programme is able to give people the chance to learn new skills and help them think about their future careers.” The Construction Academy Course supports adults aged 19-24, who are not in education, employment or training (NEET), to develop technical skills in areas like bricklaying, joinery, decorating and electrical, as well as contextualised maths, employability and
Issue 7 November/December 2026
soft skills such as problem-solving. As part of the course, students benefit from live work experience placements to help expose them to the world of work and develop skills that are attractive to future employers. John Wells, Project Manager at the Construction Academy, said: “Work experience is an invaluable part of the programme as it gives learners the opportunity to see the trades they have been studying put into practice. It also allows them to see the wide variety of roles that can be involved in a construction project. What made this opportunity particularly incredible was the approach taken by the team working on the Lynfield Mount Hospital redevelopment to provide students with an all-round experience. In addition to spending time on site, they were also given an insight into the site office side of things which usually doesn’t happen on a standard work experience placement.” Source: www.mcavoygroup.com www.bdct.nhs.uk/our-services/mental-healthservices/lynfield-mount-hospital
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
Advanced Roll Forming Enhancing 3D Volumetric Module Design Don’t be restricted by simple 4 mm thick steel profiles. For over 30 years Welser has been supporting the European modular building market with ever more advanced roll forming techniques.
Why would you use Welser? X Up to 8 mm thick steel profiles – stronger, stiffer modules with more internal space X Complex shapes – more design freedom, more functionality from one component X Tighter tolerances – more accurate, more consistent, faster module build and no end splay to manage. X Additional downstream processing so you receive “plug & play” parts for faster build.
Contact:
Scan the QR code to find out more:
Nick Jeal • Welser Profile UK 07515 063209 • n.jeal@welser.com
www.welser.com
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 7 November/December 2026
81
VOLUMETRIC MODULAR INDUSTRY NEWS
New Modular Operating Theatre for Hereford County Hospital Hereford County Hospital has welcomed its first patients following the opening of its new On-Demand® Ultraclean Operating Theatre, providing vital additional capacity to supports a range of procedures, including planned gynaecology/ obstetric procedures and general surgery. Designed and delivered by Darwin Group in partnership with Wye Valley NHS Trust, the new theatre began procedures on 5 October 2026 and caesarean procedures on 20 October 2026. The facility provides a dedicated clinical environment for planned gynaecology/ obstetric procedures and general surgery, strengthening the hospital’s existing maternity and general provision and helping ensure patients can access essential surgical care when they need it. Provided through a hire agreement, the theatre combines the quality, performance and clinical standards expected of a permanent healthcare building with the flexibility of a hireable solution. Alan Dawson, Chief Strategy and Planning officer at Wye Valley Trust, said: “We’re delighted to welcome our first patients to this new operating theatre at Hereford County Hospital. This investment reflects our commitment to providing the highest standards of care for the communities we serve. By increasing our theatre capacity, we will be able to treat more patients locally, reduce waiting times and improve access to important surgical procedures. The new theatre provides a modern, purpose-built environment that has been designed with patient safety, quality and experience at its heart.” James Pearson, Managing Director at Darwin Group added: “This project is a fantastic example of what can be achieved through collaboration, with everyone working
towards the shared goal of improving healthcare facilities for patients and staff. Seeing the theatre become operational is a proud moment for everyone involved. Knowing that the facility has already supported the arrival of its first baby makes this milestone even more special. We’re delighted to have worked alongside Wye Valley NHS Trust to deliver a facility that will provide much-needed additional capacity and make a positive difference to maternity services in Herefordshire over the coming years.” Over 90% of the Theatre was constructed offsite at the Darwin Group manufacturing facility before being transported to the hospital and final installation taking place The project demonstrates how offsite can help the NHS respond to growing demand for healthcare services and support the ambitions of the Government’s 10-Year Health Plan and enabling healthcare providers to expand clinical capacity quickly and cost-effectively. Source: www.darwingroup.co.uk
Mac Zero Targets Further UK Growth with Expansion Plan Mac Zero Modular Buildings has announced a £2million investment in its continued expansion, including a new headquarters in Dungannon and the creation of 15 new jobs. The purpose-built modular headquarters is located adjacent to the company’s second manufacturing facility, bringing its people, manufacturing capability, and project delivery operations together as Mac Zero responds to increasing demand across the UK and Ireland. The investment comes as the company strengthens its presence in the UK market. Mac Zero is now an approved supplier across a range of major public sector procurement frameworks, providing clients with streamlined routes to procure its modular building solutions. The company has also strengthened its business development team with the appointment of Mark Graham as Senior Framework and Business Development Manager, supporting its growth ambitions across Great Britain. Commenting on the investment, Conor McAvoy, Co-Founder of Mac Zero Modular Buildings, said: “Orla and I founded Mac Zero with a clear ambition to build a modular construction business capable of delivering exceptional projects at scale across the UK and Ireland. From the outset, we invested in the systems, people and manufacturing capability needed to support long-term growth. Central to that has been our focus on what matters most to our clients -greater certainty around cost, programme and quality, with sustainability and long-term value built into the way we design and deliver our buildings. This latest investment gives us additional capacity to build on that foundation and pursue the significant opportunities we see ahead.” Orla Corr, Co-Founder and Director of Mac Zero, added: “We have exceeded the ambitions we set for the business in our original five-year plan, so this investment
82
Issue 7 November/December 2026
L-R- Mac Zero’s Stephen Curran, Senior Design & Technical Manager, Eoghan O’Donnell, Commercial Director, Mark Graham, Senior Framework & Business Development Manager, Conor McAvoy, Director and Orla Corr, Director.
represents an important next step for Mac Zero. Our appointment to a growing portfolio of recognised procurement frameworks across the UK and Ireland is creating significant opportunities and making it easier for public sector clients to access our expertise. As we enter our sixth year, our focus is firmly on expanding our client base and presence across GB, including plans to establish a manufacturing facility in England within the next two years.” The company has delivered more than 100 projects across the UK and Ireland in various sectors, including education, health and commercial. Mac Zero specialises in the design, manufacture and delivery of permanent and flexible modular buildings, with a focus on quality, programme certainty, sustainability and creating future-ready environments for its clients. Source: www.maczero.com
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
VOLUMETRIC MODULAR INDUSTRY NEWS
Delivering efficiency and competitive advantage for manufacturers of offsite systems and technology
As specialists in industrialised construction technologies – our objective is to increase productivity and profitability by making offsite manufacturing operations leaner, safer and more efficient.
We offer: Manufacturing logistics Manufacturing controls systems Management systems Manufacturing process improvement Offsite manufacturing audits and gap analysis Marketing support
For more information and advice on setting up new manufacturing facilities or support the upgrading or improvement of existing operations, contact us on:
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
01743 290010 info@cogent-consulting.co.uk
Issue 7 cogent-consulting.co.uk November/December 2026
83
FEATURE SOCIAL BITE VILLAGE
1
HOMES WITH A HIGHER PURPOSE Combining homegrown timber, volumetric modular construction and circular design, the Social Bite Village from EcoSystems Technologies, offers an innovative, scalable and sustainable response to temporary accommodation. THE SOCIAL BITE VILLAGE is a pioneering housing model redefining Scotland’s response to homelessness. Utilising 100% UK-grown mass timber, EcoSystems Technologies delivers high quality, volumetric living modules (NEST Houses) alongside shared ‘HUB’ space – both are 100% relocatable circular assets. These highly sustainable homes provide a therapeutic environment, proving that purpose-driven, industrialised construction can deliver dignified housing at speed and scale. Fresh vision and solutions The Social Bite Village provides a radical shift in how society supports individuals transitioning out of homelessness. Scotland faces a critical
84
shortfall of 300,000 homes, forcing many into hostels or B&Bs that often entrench vulnerability. Working in a mission-aligned partnership with the charity Social Bite, EcoSystems Technologies has developed an industrialised volumetric solution – a scalable village model comprising 10-15 (or more) self-contained ‘NEST’ Houses arranged around a central communal HUB. The project utilises a Product Platform approach, moving construction into a controlled factory environment
to achieve a high degree of premanufactured value (PMV). The living units are constructed as fully furnished, ‘plug and play’ volumetric modules with all mechanical, electrical, and plumbing (MEP) factory-installed and tested. By using a standardised ‘kit of parts’ and manufacturing identical units in sequence, construction timelines were compressed from years to months, allowing for rapid deployment onto ‘meanwhile’ urban land.
“EcoSystems Technologies are the first UK manufacturer to deliver complete volumetric modules using 100% homegrown Scottish Sitka Spruce.”
Issue 7 November/December 2026
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
FEATURE SOCIAL BITE VILLAGE
2 Homegrown timber and circular design EcoSystems Technologies are the first UK manufacturer to deliver complete volumetric modules using 100% homegrown Scottish Sitka Spruce. Compared to ‘quick fix’ solutions like repurposed shipping containers (which often lack internal quality, thermal and acoustic performance) these bespoke timber modules provide a high-performance, net zero carbon environment. By displacing carbonintensive steel and concrete, the hybrid cross laminated timber (CLT)/glulam modular structure reduces embodied carbon by over 74%, sequestering carbon within the fabric to achieve better than net zero status. This domestic supply chain restricts transport emissions to a minimum while supporting the Scottish rural economy. The project defines Design for Manufacture, Assembly and Disassembly (DfMAD). Unlike traditional static builds, these modules are engineered as 100% relocatable assets. This was proven at the Granton Waterfront site near Edinburgh, where all 10 of the homes from the
original village were successfully decommissioned, transported, and redeployed with almost zero abortive material waste. These were augmented on the new site with six additional new NEST homes Beyond the technical metrics, the physical environment is treated as a clinical intervention. The use of exposed mass timber creates a biophilic interior proven to reduce stress levels, while providing every resident with their ‘own front door’ restores the dignity and privacy absent in shared temporary accommodation. With successful villages now operating or planned in Edinburgh, Rutherglen, and Dundee, this model serves as a national blueprint for highquality, sustainable social infrastructure.
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 7 November/December 2026
3 The Social Bite Village demonstrates how innovative, volumetric construction can deliver far more than temporary accommodation. By combining homegrown timber, offsite manufacturing, circular design and demountability, it offers a scalable response to homelessness while supporting the UK supply chain and provides an inspiring blueprint for sustainable, social and environmental value. Find out more at: www.ecosystemstech.com Images 1-3: A volumetric modular approach combined with homegrown UK timber has created a net zero solution for temporary living and homelessness problems
85
FEATURE THE CASTLE
ANOTHER TOWERING ACHIEVEMENT 1
The winner of Best Use of Volumetric Technology at the Offsite Awards 2026, saw Tide Construction, Vision Volumetric and MJH Structural Engineers, rewarded for their work at another exceptional high-rise project. THE CASTLE (also known as Enclave: Acton) is a residential development in the London Borough of Ealing comprised of a single volumetric tower consisting of 27 storeys on a four-storey transfer structure wrapped with a striking glazed terracotta façade. Delivering 462 bespoke apartments, the tower forms a new landmark for the London Borough of Ealing and underpins a wider regeneration effort including a relandscaped town square. The Castle offers a mix of residential accommodation and amenity spaces and is a continuation in the line of tall modular buildings that Tide and Vision Volumetric have delivered over several years.
86
Issue 7 November/December 2026
The tower has significant amenity spaces on the roof, with the building sitting on transfer slabs over a commercial space on the ground floors. This development was delivered on a constrained site in only 18 months from start to finish. Due to the use of volumetric construction, the overall build time is approximately 40% faster than traditional construction. This was possible due to the speed of the volumetric install, which constituted 75% of the total construction area and was completed in just 32 weeks, 25% of the project duration. The volumetric units were manufactured by Vision at their manufacturing facility located in Bedford, just North of London.
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
FEATURE THE CASTLE
The Volumetric units arrived on-site around 90% complete with a premanufactured value of ~75%, at which point they were installed in position by Vision Volumetrics’ dedicated installation team. The floor plan of the tower is broadly triangular on plan with 19 volumetric units per floor up to storey 27, and 13 volumetric units per floor in the upper floors. The volumetric units in the tower surround a central concrete core. The Vision system incorporates a concrete floor slab in each of their volumetric units, which are tied together to form a continuous diaphragm at floor creating a building that is indistinguishable from a traditionally constructed building both internally and externally upon completion. The Castle demonstrates the potential of volumetric construction to deliver high-density housing at scale, combining architectural ambition, manufacturing precision and impressive speed of delivery. As well as bringing 462 new homes to a brownfield site, it will create a new home for The Castle pub, revitalising a social hub that dates to the 1930s but has remained vacant since 2020 and provide convenient access to the North Acton Underground station. With 75% of the building delivered through factorymanufactured modules, the project showcases the benefits of offsite construction in improving efficiency, quality and programme certainty while minimising disruption to the surrounding community. Its striking design, innovative engineering and contribution to Ealing’s wider regeneration made The Castle a compelling award winner. Find out more at: www.tideconstruction.co.uk www.visionvolumetric.co.uk
Images 1-2: The Castle is another prominent example of how volumetric modular construction can deliver amazing results at scale
2
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
Issue 7 November/December 2026
87
FEATURE MPBA
1
FROM SCALING BACK TO RAMPING UP – THE CASE FOR EFFICIENT DELIVERY With major public sector investment ahead, construction must find more efficient ways to deliver buildings. Jackie Maginnis, Chief Executive of the Modular and Portable Building Association (MPBA), explores how volumetric modular construction can help meet the challenge. FOLLOWING A PERIOD of reduced construction output, the UK is facing a substantial programme of building, renewal and modernisation, driven largely by investment in education and healthcare. Delivering these projects will require more than funding alone. Productivity, workforce capacity, programme efficiency and the ability to meet specific operational requirements will all play a part in translating investment into completed buildings. Building at scale requires a different approach In England, almost £20billion is earmarked for the School Rebuilding Programme through to 2034-35, with more than 750 schools and sixth-form colleges set to benefit. The additional £710million Renewal and Retrofit Programme will address urgent condition requirements and improve existing education buildings. Healthcare represents another
88
Issue 7 November/December 2026
2 major area of construction activity, with more than £44billion in NHS capital funding secured for 2026-27 to 2029-30. This investment will support hospital infrastructure, estate maintenance, diagnostics and community facilities.
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
FEATURE MPBA
These programmes span different building types, locations and operational demands. While no single construction method will suit every project, the scale of planned activity makes it important to consider how industrialised approaches can contribute to delivery. Productivity is central to the delivery challenge Construction continues to face pressure to improve productivity while managing skills shortages, costs and competing demands on resources. The Construction Industry Training Board’s (CITB) Construction Workforce Outlook 2026– 3 2030, forecasts UK construction output growth of 1.8% in 2027, rising to 2.8% in 2028, alongside continued demand for additional workers. Against this backdrop, the industry needs to make effective use of its available skills and capacity. Volumetric modular construction offers a significant way to approach this challenge by moving a substantial proportion of building activity into a controlled factory environment. The offsite production of volumetric modules allows manufacturing to progress alongside site preparation, decreasing the amount of work that must be completed sequentially on-site. This parallel approach reduces overall programmes, improves coordination and alleviates disruption around existing facilities. Early design decisions improve delivery Volumetric construction delivers its greatest value when modular technology is considered at the outset, rather than introduced after key design decisions have already been made. Early collaboration between clients, designers, contractors and modular manufacturers allow the building design to respond to the requirements of offsite production, transportation, installation and commissioning. This can help identify opportunities for standardisation, co-ordinate interfaces and reduce avoidable complexity. Repeatable processes and controlled factory conditions can also support consistent quality, while digital design and co-ordinated manufacturing information help align activities across the supply chain. These considerations are particularly relevant to programmes involving multiple buildings or repeatable layouts. Where requirements can be co-ordinated across a portfolio, lessons from one project may inform subsequent developments, support greater consistency and help teams refine approaches. Looking beyond construction cost Programme efficiency is important, but the commercial case for volumetric modular should not rest on speed alone. A meaningful comparison must consider the complete project. Factory based production, co-ordinated design and reduced site activity may influence labour requirements, preliminaries,
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
logistics and overall programme costs. Earlier completion can also bring operational benefits, particularly where additional accommodation is urgently needed, or existing facilities are under pressure. The extent of these benefits will depend on the individual project, making robust whole-project assessment essential. Initial construction costs should be considered alongside programme, quality, maintenance, energy performance and the building’s intended working life. Future adaptability also deserves attention. Changing service requirements, opportunities for expansion and the potential for refurbishment or reuse can all influence the longer-term usefulness of a building. For public sector clients in particular, the objective should be to select a solution that meets immediate operational needs while providing appropriate performance and value over time. From investment to outcomes As investment programmes progress and construction activity is forecast to strengthen, the opportunity is to translate investment into developments that deliver lasting value. Offsite methods of construction have an established role to play. This requires collaboration between clients, designers, contractors, manufacturers and procurement teams, and early consideration of where volumetric modular technology can offer the greatest value. For organisations planning schools, healthcare facilities, public sector projects or commercial buildings, engage with the MPBA and our members early to assess suitability and commercial viability, and identify opportunities to improve programme efficiency, productivity and whole-life Find out more at: www.mpba.biz Image 1: North Middlesex Hospital. Courtesy Portakabin Image 2: Leeds College Printworks Campus. Courtesy Premier Modular Image 3: The Birkbeck Centre for family resilience and high needs services. Courtesy McAvoy Group
Issue 7 November/December 2026
89
The best event in modular construction is back.
The venue
Orlando, Florida April 5-8, 2027
Luxury venue
Rosen Shingle Creek A luxury resort nestled by the headwaters of the Florida Everglades. Four days of education, receptions and business, all under one roof. B O O K E A R LY
The first 200 tickets are $550 off. Register early to lock in the deal. PRESENTED BY
90
Issue 7 November/December 2026
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
Who attends
~1,800 36 4
The best-attended event of its kind
countries represented
Manufacturers, suppliers, contractors, designers, developers and service providers from around the world.
Attendee mix
attendees
days of programming
Expanded exhibit hall
NEW
Every sector in one room
Go big on the show floor
Manufacturers
New extra-large island booths, up to 16’ × 30’, make room for equipment and module displays. Plus 25% more booths and 15 exhibit hours.
27.4%
Suppliers of Materials
22.8%
Developers & Contractors
14.0%
Suppliers of Services
12.1%
Dealers & Fleet Owners
225
Exhibiting companies in ’26
9.3%
Design Professionals
6.0%
Academia, Government & Other
8.5%
Material Suppliers · 113
Service Suppliers · 42
Manufacturers · 44
Contractors · 9
Design Professionals · 14
Academia, Gov. & Other · 7
Networking
Recognition
Education
Four days to connect
MBI’s Awards of Distinction
Top-notch keynotes breakout sessions
The highest honors in modular construction, presented on the final night. Winners are chosen by an independent panel of judges, and attendees vote for Best of Show.
Spanning all four days of the conference, attendees can choose from dozens of educational breakout sessions covering distinct aspects of the modular construction industry.
Opening party Golf tournament Structured roundtables Grand Prize contest VIP reception & awards banquet
Your invitation to Orlando
Register now and save! Includes all sessions, social functions and scheduled meals.
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
MEMBERS
$1,675 $2,225
NON-MEMBERS
$2,275 $2,825
Only 200 member tickets at this rate Issue 7 November/December 2026
PRICES RISE SOON Scan the QR code or visit: modular.org/ 2027-worldof-modular
91
FEATURE LEAN MANUFACTURING
UNLOCKING PRODUCTIVITY POTENTIAL
1
As more building processes move away from the construction site and into the factory, the case for industrialised construction is compelling. But as Darren Richards, Managing Director of offsite construction experts Cogent Consulting highlights, there are many caveats to consider. THERE IS an uncomfortable truth that the offsite sector needs to confront. Putting construction inside a factory does not automatically make it manufacturing and it certainly does not routinely make it productive. An ineffectively organised factory can carry just as much waste, inefficiency and lost time as a poorly organised construction site. In some circumstances, it can be worse because the manufacturer is also carrying the fixed costs associated with the factory, machinery and permanent workforce. The productivity advantage of factory-manufactured construction
92
must be designed, measured and continuously improved. This is why I believe lean manufacturing will become increasingly important to the next stage of development of the offsite and industrialised construction sector. The factory must earn its advantage For years we have promoted the benefits of offsite manufacture around familiar themes: improved quality, speed, safety and reduced waste and site labour. All are valid. But factory manufacture must also be commercially competitive. Traditional construction
Issue 7 November/December 2026
may be inefficient, but it has one significant commercial advantage – much of its resource base is variable. Labour, subcontractors, plant and supply chains can be scaled up or down to meet the demands of individual projects. A manufacturing business operates differently. The moment you invest in a factory, install equipment and establish a permanent workforce, you take on a substantial fixed-cost base. Those costs remain whether the production line is operating at full capacity or standing idle. This makes utilisation critical.
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
FEATURE LEAN MANUFACTURING
In my experience, many offsite manufacturing businesses need to operate consistently above approximately 85% of their realistic productive capacity before the full economic advantages of the manufacturing model begin to emerge. Equally, aiming to operate permanently at 100% of theoretical capacity is neither realistic nor necessarily desirable. A skilfully designed factory operating at 40% utilisation will struggle to compete with conventional construction, regardless of how advanced its manufacturing processes or products may be. Lean before automation There is also a danger that the industry sees automation as the answer to greater productivity. It certainly is not. Automation can be transformational, but automating an inefficient process simply allows you to produce waste more efficiently. Before investing heavily in robotics or sophisticated manufacturing equipment, businesses need to understand their existing production system. Where are the bottlenecks? Where is work waiting? How far are materials travelling? How much time is spent handling or moving? How balanced are the workstations? What proportion of output is right first time? These are classic lean-manufacturing questions. The objective is not simply to make people work faster. It is to remove the obstacles that prevent people and equipment from working effectively. Value-stream mapping, workplace organisation, root-cause analysis, reduced changeover times and quality at source may sound less exciting than robotics, AI and automation. The opportunity is enormous, provided we automate good processes. Manufacturing productivity is not generated on the factory floor alone. It starts with design. Design for Manufacture and Assembly (DfMA) should not simply mean taking a conventionally designed building and finding ways to manufacture parts of it offsite. It means designing for production, assembly, repeatability and standardisation from the outset. Standardisation does not mean identical buildings. It means standardising the
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
2 elements that do not need to change, such as structural grids, interfaces, connections and service zones, whilst retaining architectural variety. Measure what matters Productivity must also be measured, not assumed. Without meaningful measurement, continuous improvement becomes a matter of opinion. The Industrialised Construction Green Paper advocates moving away from fragmented, one-off ‘design–bid–build’ procurement towards aggregated demand and longer-term programmes that support investment in platforms, manufacturing capacity and skills. This is the direction we need. If Government, major clients and framework providers expect manufacturers to invest millions in
Issue 7 November/December 2026
factories, technology, automation and people, then they must create the market conditions to justify that investment. We cannot wait for perfect pipelines. Factories must embrace lean thinking, measure productivity, develop multi-skilled workforces, optimise layouts, reduce rework, adopt digital production control and challenge unnecessary product variation. The future is not simply about building more factories. It is about building better manufacturing businesses. Find out more at: www.cogent-consulting.co.uk Images 1-2: Lean manufacturing is at the core of improving productivity and reaping the best from automation and factory-manufactured construction. Courtesy Vision Volumetric and Modufab
93
FEATURE CUMBERLAND INFIRMARY
MODULAR DELIVERS URGENT CARE FOR CUMBERLAND
1
Faster, safer, and delivering a high-quality facility without compromising patients and staff already on-site, the winner of the Healthcare Project of the Year at the Offsite Awards 2026 showcased why volumetric modular is ideal for this sector. CUMBERLAND INFIRMARY’S new Urgent Treatment Centre (UTC) was built using volumetric modular construction, on a live acute hospital site directly next to the working A&E and ambulance bays. Manufacturing the building offsite allowed the foundations, brick plinths and link corridor to be built in parallel on-site, then the modules craned into place. The result is twelve HTMcompliant consult rooms, delivered without disrupting emergency care to a single patient. The problem faced by the project team was a working A&E, ambulance bays in constant use with the main hospital drop-off a few metres away. This required building a new Urgent Treatment Centre on top of it. Traditional construction was never going to be the answer.
94
Cumberland Infirmary’s new UTC was delivered by P+HS Architects and modular specialist MTX Contracts for North Cumbria Integrated Care NHS Foundation Trust. With the building sitting on the blue-light route, directly alongside the Emergency Department and live clinical areas, keeping disruption to an absolute minimum was non-negotiable. Offsite delivery was the right answer because it meant far less work needed to happen on-site with the volumetric modular approach shaping every decision.
While the modules were taking shape in the factory between April and July 2025 – robust concrete floors, individually fire-rated steelwork, twelve consult/exam rooms built to HTM and HBN tolerances – the site was being prepared to receive them. Foundations, brick plinths, a new road to keep the blue-light route live, and the link corridor into the existing hospital were built in parallel. MTX were engaged early, so the modular grid informed the architecture from concept stage: the curved welcoming frontage,
“Offsite delivery was the right answer because it meant far less work needed to happen on-site with the volumetric modular approach shaping every decision.”
Issue 7 November/December 2026
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
FEATURE CUMBERLAND INFIRMARY
2,400mm trolley width corridors, and a standardised room layout that lets clinicians move between rooms without reorientating themselves all developed within a ‘modular logic’, not despite it. The installation went smoothly and had very little impact on day-today hospital operations. Noise, vehicle movements and general site activity were all kept under tight control, allowing clinical teams to carry on providing care without interruption. MTX’s volumetric modular approach is benchmarked at around 25% faster than traditional construction, and on a site this sensitive, every week saved is a week of reduced operational risk. And this is not a temporary shed dropped on a car park. Buff brickwork ties the building to the adjacent Cancer Centre. Three green cladding tones, hit-and-miss panelling, and a curved frontage give it identity and aid wayfinding. Inside there is IPS-mounted sanitaryware for easy maintenance, daylit clinical spaces, a future expansion zone, and a PVready plant deck. Attaining a BREEAM
2 Excellent rating. This is a permanent NHS asset, which is designed and built to last decades. Cumberland Infirmary’s UTC is an outstanding example of how offsite construction can address some of healthcare’s most complex delivery challenges. By taking the majority of construction activity offsite, the project team created a high-quality, permanent clinical facility while protecting the day-today operation of a busy acute hospital and
ensuring emergency services remained uninterrupted. Early collaboration, intelligent design and ‘parallel working’ enabled speed, safety and quality to move forward hand-in-hand. Find out more at: www.pandhs.co.uk www.mtx.co.uk Images 1-2: Healthcare continues to be a fertile area for the volumetric modular sector
WORK
25
SAFER. STORE MORE. ENHANCE THE SAFETY, STORAGE & EFFICIENCY OF YOUR LOGISTICS WITH COMBILIFT For almost 3 decades, Combilift has been revolutionising how the customers handles materials. Our pioneering range of multidirectional and pedestrian forklifts, straddle carriers, mobile gantries and container loaders allows you to manoeuvre long and out of gauge loads safely, maximise productivity and increase the space available for storage.
CONTACT US TODAY
To find out how Combilift can help you unlock every inch of your storage space.
combilift.com Offsite Magazine 190x127 rev 2.1.indd 1
www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
01/09/2026 12:17:26
Issue 7 November/December 2026
95
DIARY DATES UPCOMING INDUSTRY EVENTS
Dates for your diary MMC IRELAND NATIONAL CONFERENCE 10 & 11 March 2027 The Johnstown Estate, County Meath, Ireland Recognised as Ireland’s leading annual MMC event, the conference will welcome policymakers, developers, contractors, architects, engineers, manufacturers, researchers and industry leaders for two days of content, knowledge sharing and networking, exploring policy, digital construction, industrialised construction, manufacturing innovation, sustainability, skills development and the built environment.
INDUSTRIALISED CONSTRUCTION AWARDS ENTRY DEADLINE 19 March 2027 Online Returning for 2027 the Industrialised Construction Awards will celebrate leaders driving this new era. The Awards will recognise the organisations, technologies and people accelerating the UK’s journey from construction to production – and demonstrating that better ways of designing, manufacturing and assembling buildings are not only possible, but already happening.
INDUSTRIALISED CONSTRUCTION CONFERENCE 20 & 21 April 2027 London The UK’s only industrialised construction conference and exhibition is returning for 2027 and will welcome over 300 construction professionals across the two days. Industrialised solutions transform the building process by leveraging advanced manufacturing techniques, underpinned by automation, robotics, and digital technologies.
EXPLORE OFFSITE EDUCATION & EXPLORE OFFSITE HEALTHCARE May 2027 London Explore Offsite Healthcare & Education brings together industry leaders, public sector clients, and innovators reshaping how hospitals and schools are built. The event demonstrates how offsite construction delivers faster, low-carbon, and high-quality environments with minimal disruption to vital frontline services.
OFFSITE AWARDS ENTRY DEADLINE 18 May 2027 Online The Offsite Awards shine a spotlight on the most pioneering achievements – from forward-thinking designs to cutting-edge technologies, we honour those driving transformation in the built environment. Each year, our platform brings industry leaders, professionals, and innovators together to celebrate success stories and share best practices that define the future of construction.
96
Issue 55 7 November/December 2026
www.offsitemagazine.co.uk www.volumetricmagazine.co.uk www.linkedin.com/company/exploreoffsite
Stone wool insulation for precast wall panels Fabrock® PCP for Precast Sandwich Panels Fabrock® AFP DD for Single Skin Precast Facades Fabrock® FGT DD for Filigree Systems For more information, send us a message at coresolutionsmarketing@rockwool.com.
Perfect partner for the offsite sector James Latham is one of the UK and Ireland’s largest independent distributors of timber, panels and decorative surfaces. With a huge stockholding, solid supply chains and market-leading environmental credentials, we can supply everything you need, from standard construction products to high performing specialist materials. Rapid delivery
Huge stockholding
Great service
Product knowledge
Nationwide depots
Carbon data available
Scan the QR code to find out more
Or visit our website at www.lathamtimber.co.uk
P
R
O
DU
SPOTLIGHT T C
In terms of strength, workability, consistency and certification, WISA-Spruce Special is perfect for an industry that prizes quality, repeatability and accuracy. • Structurally robust • Dimensionally consistent • Also available as a Class-B (B-s1,d0 and Bfl-s1) fire rated variant (WISA Spruce FR) • Fully certified and sustainable