GIS Analysis Project: Towards the Growth of Greater Bendigo
TOWARDS THE GROWTH OF GREATER BENDIGO
A land suitability analysis report for identifying urban growth areas in Greater Bendigo
Subject: GIS in Planning, Design & Development
By Rachana Ravindra Patil 1381810
1. Site Context & History
Located centrally in the heart of Victoria state in Australia (Refer to Fig. 1), Greater Bendigo is known for housing one of the vital gold districts in the world (Stone, 1937) The city of Greater Bendigo is situated approximately 150 km northwest of the city of Melbourne. Due to its gold mining history, Bendigo expanded in the economic and social areas rapidly (Chen, 2016). One of the other significant features of Greater Bendigo is its vast spread of forests and green areas which is up to 40,000 hectares. Based on the Australian Bureau of Statistics (2021) the population of Greater Bendigo has risen from 110,477 (in 2016) to 121,470 residents (as of 2021 ABS data) This rise in density signifies a population projection of up to 200,000 people by the year 2050 as per the City of Greater Bendigo Council (2018).
Recently, amenities of healthcare facilities, sports, and education centers have become key features of Greater Bendigo’s development. Also, due to the city's cross-shaped transit network, it is a prominent transportation hub (Refer to Fig. 1). The Great Bendigo Housing Strategy 2018 (GBHS) has outlined that future housing to be within accessible locations to daily amenities, public transport, quality public open spaces, and sustainably designed (Greater Bendigo Council, 2018). Due to rapid growth, the city is set up for encounters relating to environmental sustainability issues, traffic congestion, and insufficient infrastructure (Greater Bendigo Council, 2018). In coordination with GBHS's strategic objectives and the site’s context, this report aims to find suitable growth areas for 18,000 dwelling units in Greater Bendigo that are resilient to the challenges of rapid urban growth
Fig 1: Basic Map of Greater Bendigo (Created on ArcGIS Pro)
2. Literature Review
In this part of the report, the strategic plans of Greater Bendigo will be critically reviewed based on future urban growth With this information, comparisons will be drawn in conjecture with metropolitan plans such as Plan Melbourne 2017-2050, to understand if Greater Bendigo’s objectives align with the long-term planning goals of Victoria. Finally, the use of GIS-based decision-making in planning will be reviewed in concern with land suitability analysis.
Greater Bendigo strategic plans implementation and relation to federal plans The Council's strategic plans include Integrated Transport and Land Use Strategy (2015), the Greater Bendigo Residential Strategy (2018), Greater Bendigo Council Plan 2021-2025 (2021), A Stronger Greater Bendigo 2030 (2020), Healthy Greater Bendigo 2021-2025 (2021), and Green Bendigo Council Plan 2021-2031 (2021). All these plans have the common criteria of building a sustainable Greater Bendigo that reduces urban sprawl, promotes transit accessibility networks, and enhances interconnectivity Some of the other notable criteria are related to a healthy and well-connected city for citizens. Most of the plans' common focus is to maintain the Urban Growth Boundary (UGB) for future expansion, although several growth towns do not fall under this boundary, for example, Marong, Heathcote, etc. (Profile ID "Estimated Resident Population" , 2024). Such factors affect finding suitable urban growth areas because urban development is usually focused on densifying one central area, hence leading to the centralization of Bendigo itself
Based on Plan Melbourne 2017-2050, Bendigo is stated as one of the integral growth centers of regional Victoria, that signifies future growth prospects for Greater Bendigo. As future population is set to be housed throughout regional Victoria, the state government aims to focus on enhancing regional transport network that will aid this growth (VictoriabGovernment, 2017). In addition to this, Plan Melbourne (2017) outlines shifting of newer population throughout the reginal municipalities of regional Victoria, that endorses the need for Greater Bendigo to be prioritized as a vital urban development region. Keeping planning strategies of both federal and council strategic plans is important to promote development that not only favors already urbanized areas but also prospective urban growth areas in Greater Bendigo.
Use of GIS in Spatial Planning
Since its initial development in 1960s, Geographic Information System (GIS) has evolved quite a lot with its computer-based mapping that analyses and displays information of geographic referenced data (Yeh, 1998). From 1980s, GIS has been a vital part of urban and regional planning departments, especially in developed countries (Yeh, 1998). Since then, use of GIS has been observed in land use mapping for suitability, and its analysis in planning and management is been regarded as highly informative. Using GIS for spatial planning has been proven significantly useful because data management, spatial analysis and visualization are used quite frequently in urban planning (Malczewski, 2004). Malczewski (2004) also suggests that using GIS-based analysis supports in vital decision making of policies. Liu et al., (2014) talks about land-use suitability approach being applied for high density areas in Beijing that aim to find context-based urban planning and strategies for management which provide the best outcomes for proposing development.
As for use of GIS in the Australian context, studies show that GIS is extensively used by research academia and planning government (Duhr et al., 2020). Pineda-Pinto et al. (2021), has used GIS analysis for finding injustice relating to socio-ecological impacts of pollution in the Melbourne Metropolitan region though land use such as waste treatment and fuel dispensation. Such use of GIS has started to appear more in recent years in Australian context, due to its landscape evaluation and planning techniques that make modelling for land-use suitability based on planning goals and decisions (Chen, 2016).
3. Project Objectives
For the accommodation of the projected population of Greater Bendigo, provision of 18,000 dwelling units (DUs) is expected. Such amount of DUs equals to approximately 1800 hectares of developable land. Based on these requirements, this project’s objective is to use ArcGIS Pro in finding suitable urban growth areas through input and analyses of identified data that align with both federal and council strategic plans. Strategic plans of Greater Bendigo Council and Plan Melbourne 2017-2050 are used for determining five different criteria that will support in analyzing data relating to land-use zoning, significant overlays, transit networks and present amenities. To find the most suitable urban growth areas, weighted overlay analysis will be conducted to get the desired results.
3.1 Project Goals
3.1.1. Transit Accessibility
Towns with growth potential, and that are close to transit networks should be promoted for future expansion based on policies of Integrated Transport and Land Use strategy of connecting Greater Bendigo (2015). Also, expanding urban areas near already existing transit infrastructure promotes transit-oriented development.
3.1.2. Proximity to Amenities
Urban areas that are close to health, education, and recreational facilities, make the environment more livable and prosper. Hence, the UGAs should be situated in accessible distance to such amenities.
3.1.3. Mitigating Risks
Bendigo is having a large surface area that comes under Bushfire Management, and some area that comes under flood risks zones. To avoid risks relating to natural disasters it is drastically important to avoid development in or near such areas. This will allow Greater Bendigo to become safer for its residents in a long run.
3.1.4. Environment Sustainability
As forest and green areas are significant features of Greater Bendigo, it is vital to protect these areas from urban sprawl Building away from such areas will not disturb ecological services of both land and natural environment.
3.1.5. Density of Growing Bendigo
As stated in many council plans, reducing sprawl is a noteworthy objective of Greater Bendigo. Therefore, identification of potential growth town will allow densification of appropriate growth areas.
Decision Criteria
Based on the goals the 5 criteria decided were for transit accessibility, proximity to amenities, mitigating risks, environment sustainability and density of Greater Bendigo.
4. Data Collection
Data for input used for analysis was gathered from several Victoria Government Data websites
Basic data such as rail & road network, forest & water areas, and location of towns etc. was provided on LMS by subject instructor. Victoria Government website such as ‘Data Victoria’ provided most of the data relating to planning zones, planning overlays and feature of interests. All this data was acquired with Vic GDA1994 projection, keeping ‘LGA of Greater Bendigo’ as the main data location source Most of the files were downloaded in ESRI shapefile format and also in Geodatabase format as shown in following image obtained from Data VIC website
4.1. Intermediate Process
After Data Collection, base maps based on all criteria were produced in relation to current Greater Bendigo data. Once ArcGIS Pro was opened, for Greater Bendigo’s project file. ‘Environments’ of the project was selected with Output Coordinate System as ‘GDA_1994_VICGRID94’; Processing Extent as ‘Bendigo.shp’ and Raster Analysis: Mask as ‘Bendigo.shp’. These settings are important to be applied throughout the project for right results. The intermediate processing tool chosen for this project was Euclidean Distance tool from Spatial Analyst Tools, with no change in default values.
Once the output raster was formed, it was symbolized to constant color scheme for every Euclidean distance output raster. It was also symbolized by ‘Classify’ with 10 ‘Manual Intervals’, that were rounded up to round values. These output rasters were then input to ‘Reclassify’ tool, with intervals ranging from 1 – 10, with 1 as the most suitable outcome value and 10 being the least suitable outcome value. Although for the process was repeated all other criteria except for BMO, LSIO, SLO, VPO and ESO, ‘Reclassify’ tool was used to assign 1 as restricted value and 10 as unrestricted value. This was done because all these overlays are restricted for urban development. Detailed process of these tools has been provided under every criterion, as well as the final flow chart of Model Builder.
Inputs for Euclidean Distances and Reclassify Values:
This was done for criteria 1, 2 and 4, to get Euclidean distance for transport accessibility, proximity to amenities and density of Greater Bendigo. The reclassified values ranged from intervals of 1 to 10, with 1 being most suitable and 10 being least suitable.
2: Inputs for Euclidean distance and reclassify values
Inputs for all the Planning Overlays of Greater Bendigo:
All overlays LSIO, BMO, SLO, VPO and ESO went through this step to get the reclassified values. The values where 1 and 10, 1 being least suitable and 10 being most suitable.
3: Inputs for planning overlays
Fig
Fig
4.2. Outputs
Criteria 1: Transit Accessibility
Maps for Euclidean distance was formed through Model Builder based on the following Greater Bendigo Transit Network Map. Values of Euclidean distance was rounded of to 500, 1000, so on Based on Euclidean distance, train stations and major roads where reclassified from the value of 1 to 10, where 1 was most suitable and 10 was least suitable. Following map includes forest, urban and growth towns to signify suitability for transit network corridor.
Criteria 2: Proximity to Amenities
Maps for Euclidean distance for all selected amenities were formed through Model Builder based on the following Greater Bendigo Proximity to Amenities Map. Hospitals and education centers were selected as necessity amenities, while parks and sports centers were selected as active health amenities. Based on Euclidean distance, all amenities were reclassified from the value of 1 to 10, where 1 was most suitable and 10 was least suitable. Following map includes forest, urban and growth towns to signify suitability for proximity to amenities
Criteria 3: Mitigating Risks
Greater Bendigo has a significant bushfire management overlay (BMO) and land subject to inundation overlay (LSIO), that makes most of its area vulnerable to be developed. Therefore, maps for Reclassified areas for bushfire and flooding were formed based on the following Greater Bendigo Potential Risk Map. Based on the overlays as shown in following map, LSIO and BMO where reclassified with the value of 1 and 10, where 1 was least suitable and 10 was most suitable. This was opposite to other reclassified map values.
Criteria 4: Density of Growing Bendigo
Maps for Euclidean distance for urban areas and potential growth towns were formed through Model Builder based on the following Greater Bendigo Urban Areas and Potential Growth Towns Map. Potential growth towns where selected based on future growth expansion statistic from Estimated Resident Population (ERP) of the City of Greater Bendigo (2024) . Based on Euclidean distance, both urban areas and potential growth towns were reclassified from the value of 1 to 10, where 1 was most suitable and 10 was least suitable.
Criteria 5: Environment Sustainability
Greater Bendigo has three significant vegetation overlays, which makes most of its area prone to urban sprawl and deforestation. Hence, maps for reclassified areas for Significant Landscape Overlay (SLO), Vegetation Protection Overlay (VPO), and Environmentally Sensitive Overlay (ESO) were formed based on the following Greater Bendigo Sustainability Context Map. Based on the overlays as shown in following map, SLO, VPO and ESO where reclassified together with the value of 1 and 10, where 1 is least suitable and 10 is most suitable. This was opposite to other reclassified map values except Mitigating Risk reclassified maps.
5.
Interpretation of overlay outcome
5.1. Weighted Overlay Analysis
Weighted Overlay as stated by Chen (2016) provides a much better approach for determination of land suitability through individually assigned percentage for each criterion. The percentage for criteria was based on its significance in federal and council strategic plans. For transport accessibility 20% was assigned in consideration with rail & road networks and their alignment with Integrated Transport and Land Use Strategy for Greater Bendigo (2015). For Proximity to Amenities, 20% was assigned with 5% for each amenity that included hospitals, education centers, parks, and sports facilities. This was based on projected population, which is of younger and new families in Greater Bendigo. In addition to this, creating urban areas near such amenities allow quality of life to prosper as well as it provides opportunities for employment.
As Greater Bendigo’s surface area comes under two significant risk overlays of BMO and LSIO areas, 25% was assigned with 15% for bushfire areas and 10% for flood-prone area based on the spread of each overlay. In consideration to environment sustainability, all three VPO, ESO and SLO were assigned 3.3% each with a total of 10% based on geographical location of potential growth towns, which are already not developing in these zones. Lastly, for density of Greater
Bendigo 20% was assigned with 15% for urban areas already present in Bendigo and 10% for potential growth towns. Here, based on compact city goals (Greater Bendigo Residential Strategy 2018) larger percent was assigned for urban areas to densify them and for new growth areas to be identified in potential growth towns.
5.2. Finding the UGAs
After Weighted Overlay was dragged on Model Builder, percentages for all criteria where input with a sum of 100%. Except for BMO, LSIO, SLO, VPO and ESO, all other criteria values were revered from 1 = 10; 2 = 9 and so on. This was to run the weighted overlay process for providing ‘10’ as values closer to most desired areas and ‘1’ as most undesired areas, opposite to the ‘Reclassify’ tool values. For BMO, LSIO, SLO, VPO and ESO weighted overlay, ‘1’ was restricted value, as these areas must be avoided for urban development. After the production of output map, value near to ‘0’ was the least suitable area and value near ‘10’ was the most suitable area for urban growth.
Based on these rankings’ areas nearest to ‘10’ where selected through ‘Selected by Attribute’, where Shape area of polygons greater than 1800 hectares to find areas corresponding to 18,000 dwelling units. After the raster output layer was generated, the data for polygons was exported through ‘Export features’, which allowed selection of final urban growth areas that were greater than or equivalent to 1800 hectares as well as nearest to the value of ‘10’ based on the weighted overlay analysis map (Refer fig. 4).
Input Rasters
Reclass RailwayStations
Reclass MajorRoads
Reclass Hospitals
Reclass Parks
Reclass SportsFacilities
Reclass EducationCenters
Reclass GrowthTowns
Reclass Urban
Reclass LSIO
Reclass BMO
Reclass Sustainability
Fig 4: Input for finding identified UGAs
Urban areas were ‘erased’ from suitable area map to find areas that were new for future development. Two areas of 12.4 sq km and 7.6 sq km (a total of 20.0 sq km) were identified to house 1800 dwelling units (required area was 18.0 sq km) and more (based on future expansion criteria of GBHS, 2015) Suitable urban growth areas can be seen to be identified where all criteria compliment each other. ‘Select by attribute’ was used to select polygons that had areas adding up to greater than 1800 hectares.
6. Concluding Remarks
As outlined in GBHS, Greater Bendigo is set to be planned as a compact, accessible, healthy, and sustainable city, to which the identified suitable areas are in conjunction with Identified UGA is created grom ArcGIS Pro, which allowed accuracy of data in relation to planning overlays and transit network, urban areas, and amenities of Greater Bendigo. Weighted Overlay Analysis has given the best possible outcome for land use suitability that is in alignment with all the criteria significant to future growth of Greater Bendigo.
References
“Australian Bureau of Statistics.” n.d. Accessed November 1, 2023. https://www.abs.gov.au/.
“Estimated Resident Population (ERP) | City of Greater Bendigo | Community Profile.” n.d. Accessed July 19, 2024. https://profile.id.com.au/bendigo/population-estimate?WebID=280.
“Greater Bendigo Council Plan | City of Greater Bendigo.” n.d. Accessed July 19, 2024. https://www.bendigo.vic.gov.au/about-us/our-organisation/greater-bendigo-council-plan.
“Home | City of Greater Bendigo.” n.d. Accessed July 19, 2024. https://www.bendigo.vic.gov.au/.
Malczewski, Jacek. 2004. “GIS-Based Land-Use Suitability Analysis: A Critical Overview.” Progress in Planning 62 (1): 3–65. https://doi.org/10.1016/j.progress.2003.09.002.
Liu R, Zhang K, Zhang Z, Borthwick AGL (2014). Land-use suitability analysis for urban development in Beijing. J. Environ. Manage. 145:170-179
Mellissa Pineda-Pinto et al., 'Mapping Socio-Ecological Injustice in Melbourne, Australia: An Innovative Systematic Methodology for Planning Just Cities'. Land Use Policy 104 (May 2021), http://hdl.handle.net/1959.3/460293
Planning. 2023a. “Plan Melbourne 2017–2050.” Planning. Planning. June 9, 2023.
“Victoria in Future.” Planning. Planning. September 20, 2023. https://www.planning.vic.gov.au/guides-and-resources/data-and-insights/victoria-in-future.
Siqing, Chen. 2016. “Land-Use Suitability Analysis for Urban Development in Regional Victoria: A Case Study of Bendigo.” Journal of Geography and Regional Planning 9 (April):47–58. https://doi.org/10.5897/JGRP2015.0535.
Stone, John B. 1937. “The Structural Environment of the Bendigo Gold Field [Victoria].” Economic Geology 32 (7): 867–95. https://doi.org/10.2113/gsecongeo.32.7.867.
Yeh, A. 1998. “Urban Planning and GIS.” In . https://www.semanticscholar.org/paper/UrbanPlanning-and-GIS-Yeh/a63792b02e8fc5eaf42408912e15668269671c5e.