Skip to main content

Logistics and Operations Practice Exam - 2405 Verified Questions

Page 1


Logistics and Operations Practice Exam

Course Introduction

This course provides an in-depth exploration of logistics and operations management within modern organizations. Students will learn about the strategies and techniques used to efficiently manage the flow of goods, services, and information from suppliers to customers. Key topics include inventory management, supply chain coordination, transportation systems, warehousing, production planning, and the use of technology in operations. Emphasis is placed on optimizing resources, reducing costs, and delivering value to stakeholders while maintaining flexibility and responsiveness in dynamic market environments. Real-world case studies and practical applications are integrated to illustrate best practices and current challenges in the field.

Recommended Textbook Operations Management 11th Edition by William J. Stevenson

Available Study Resources on Quizplus

25 Chapters

2405 Verified Questions

2405 Flashcards

Source URL: https://quizplus.com/study-set/2678 Page 2

Chapter 1: Introduction to Operations Management

Available Study Resources on Quizplus for this Chatper

70 Verified Questions

70 Flashcards

Source URL: https://quizplus.com/quiz/53444

Sample Questions

Q1) The value of outputs is measured by the prices customers are willing to pay for goods or services.

A)True

B)False

Answer: True

Q2) Measurement of productivity in service is more straightforward than in manufacturing since it is not necessary to take into account the cost of materials.

A)True

B)False

Answer: False

Q3) The operations manager has primary responsibility for making operations system design decisions, such as system capacity and location of facilities.

A)True

B)False

Answer: False

To view all questions and flashcards with answers, click on the resource link above. Page 3

Chapter 2: Competitiveness, Strategy, and Productivity

Available Study Resources on Quizplus for this Chatper

73 Verified Questions

73 Flashcards

Source URL: https://quizplus.com/quiz/53443

Sample Questions

Q1) Improving efficiency will guarantee a similar improvement in productivity.

A)True

B)False

Answer: False

Q2) Which of the following is not a factor that affects productivity?

A)computer viruses

B)design of the workspace

C)use of the Internet

D)standardizing processes

E)wireless cellular phones

Answer: E

Q3) ___________ is generally used to facilitate an organization strategy that emphasizes low cost.

A)Speed to market

B)Flexibility

C)Customization

D)Sustainability

E)None of the above

Answer: E

To view all questions and flashcards with answers, click on the resource link above.

Page 4

Chapter 3: Forecasting

Available Study Resources on Quizplus for this Chatper

164 Verified Questions

164 Flashcards

Source URL: https://quizplus.com/quiz/53442

Sample Questions

Q1) A tracking signal focuses on the ratio of cumulative forecast error to the corresponding value of MAD.

A)True

B)False

Answer: True

Q2) Inaccuracies in forecasts along the supply chain lead to:

A)shortages or excesses of materials

B)reduced customer service

C)excess capacity

D)missed deliveries

E)all of the above

Answer: E

Q3) Detecting non-randomness in errors can be done using:

A)MSEs

B)MAPs

C)Control Charts

D)Correlation Coefficients

E)Strategies

Answer: C

To view all questions and flashcards with answers, click on the resource link above.

Page 5

Chapter 4: Product and Service Design

Available Study Resources on Quizplus for this Chatper

77 Verified Questions

77 Flashcards

Source URL: https://quizplus.com/quiz/53441

Sample Questions

Q1) "Concurrent engineering" means that at least two engineers are involved in product design at the same time.

A)True

B)False

Q2) Basic research is done with the expectation that discoveries will have near-term commercial application.

A)True

B)False

Q3) Commonality of components is beneficial for manufacturing but not for services.

A)True B)False

Q4) The process of dismantling and inspecting a competitor's product to discover product improvement is called benchmarking.

A)True

B)False

Q5) Delayed differentiation and modular design are tactics for mass customization. A)True B)False

To view all questions and flashcards with answers, click on the resource link above. Page 6

Chapter 5: Strategic Capacity Planning for Products and Services

Available Study Resources on Quizplus for this Chatper

103 Verified Questions

103 Flashcards

Source URL: https://quizplus.com/quiz/53439

Sample Questions

Q1) Waiting line analysis can be useful for capacity design, especially for service systems.

A)True

B)False

Q2) Production units have an optimal rate of output where:

A)total costs are minimum

B)average unit costs are minimum

C)marginal costs are minimum

D)rate of output is maximum

E)total revenue is maximum

Q3) The utilization of a machine is 50%.The machine has a design capacity of 70 units per hour and an effective capacity of 60 units per hour.Find the efficiency of the machine.

Q4) The ratio of actual output to effective capacity is:

A)design capacity

B)effective capacity

C)actual capacity

D)efficiency

E)utilization

Q5) What quantity would be required for a profit of $2,000?

To view all questions and flashcards with answers, click on the resource link above. Page 7

Chapter 6: Process Selection and Facility Layout

Available Study Resources on Quizplus for this Chatper

151 Verified Questions

151 Flashcards

Source URL: https://quizplus.com/quiz/53437

Sample Questions

Q1) In the use of closeness ratings for process layouts, the code "U" means the closeness between two departments is:

A)(U)nknown

B)(U)nusually important

C)of (U)sual importance

D)(U)nimportant

E)(U)ndesirable

Q2) Flexibility can be used as a competitive strategy.

A)True

B)False

Q3) For output to equal projected demand, what will be the efficiency of the production line that uses the minimum number of workstations?

A)90%

B)95%

C)97%

D)99%

E)100%

Q4) Given the following process layout data for locating six departments in the six areas shown:

To view all questions and flashcards with answers, click on the resource link above. Page 8

Chapter 7: Work Design and Measurement

Available Study Resources on Quizplus for this Chatper

151 Verified Questions

151 Flashcards

Source URL: https://quizplus.com/quiz/53436

Sample Questions

Q1) The standard time for a job can be obtained by multiplying the normal time by an appropriate allowance factor.

A)True

B)False

Q2) How confident can the manager be that the true proportion of time spent mowing is between .45 and .55?

A)90 percent

B)95 percent

C)95.5 percent

D)99 percent

E)99.7 percent

Q3) If the manager wants to be 95.44 percent confident that the true proportion of time spent mowing is within .02 (plus or minus) of the sample proportion, what should be her sample size?

A)400

B)1,000

C)1,600

D)2,000

E)2,500

Q4) What is the observed time for this task?

To view all questions and flashcards with answers, click on the resource link above. Page 9

Chapter 8: Location Planning and Analysis

Available Study Resources on Quizplus for this Chatper

80 Verified Questions

80 Flashcards

Source URL: https://quizplus.com/quiz/53434

Sample Questions

Q1) A location analysis has been narrowed down to two locations, Akron and Boston.The main factors in the decision will be the supply of raw materials, which has a weight of .50, transportation cost, which has a weight of .40, and labor cost, which has a weight of .10.The scores for raw materials, transportation, and labor are for Akron 60, 80, and 70, respectively; for Boston 70, 50, and 90, respectively.Given this information and a minimum acceptable composite score of 75, we can say that the manager should:

A)be indifferent between these locations

B)choose Akron

C)choose Boston

D)reject both locations

E)build a plant in both cities

Q2) If annual demand is estimated to be 20,000 units, which location should the company select?

A)Atlanta

B)Phoenix

C)either Atlanta or Phoenix

D)reject both Atlanta and Phoenix

E)build at both locations

Q3) For what range of output would you prefer site C?

To view all questions and flashcards with answers, click on the resource link above.

Page 10

Chapter 9: Management of Quality

Available Study Resources on Quizplus for this Chatper

102 Verified Questions

102 Flashcards

Source URL: https://quizplus.com/quiz/53432

Sample Questions

Q1) Poor quality has a positive effect on productivity because it usually takes longer to produce a good part.

A)True

B)False

Q2) A chart showing the number of occurrences by category would be used in:

A)Pareto analysis

B)interviewing

C)cause-and-effect diagrams

D)benchmarking

E)none of the above

Q3) The Baldrige award is based on seven categories.Which is not one of those?

A)Relative profitability

B)Strategic planning

C)Human resource focus

D)Information and Analysis

E)Leadership

Q4) Broadly defined, quality refers to the ability of a product or service to occasionally meet or exceed customer expectations.

A)True

B)False

11

To view all questions and flashcards with answers, click on the resource link above.

Chapter 10: Quality Control

Available Study Resources on Quizplus for this Chatper

141 Verified Questions

141 Flashcards

Source URL: https://quizplus.com/quiz/53431

Sample Questions

Q1) "Process capability" compares "process variability" to the "tolerances."

A)True

B)False

Q2) If the process proportion of defectives is unknown, using .10 alpha risk control limits, do any of the sample proportions indicate an out-of-control process proportion of defectives?

Q3) The number of runs with respect to the sample median is:

A)3

B)4

C)5

D)6

E)none of these

Q4) An x-bar control chart can only be valid if the underlying population it measures is a normal distribution.

A)True

B)False

Q5) Processes that are in control eliminate variations.

A)True

B)False

Q6) If the process proportion of defectives is unknown, what is the estimate of it?

To view all questions and flashcards with answers, click on the resource link above. Page 12

Chapter 11: Aggregate Planning and Master Scheduling

Available Study Resources on Quizplus for this Chatper

81 Verified Questions

81 Flashcards

Source URL: https://quizplus.com/quiz/53429

Sample Questions

Q1) The assignment of work to specific machines and people are examples of aggregate planning.

A)True

B)False

Q2) Linear programming to produce an aggregate plan:

A)will produce the best plan if accurate inputs are used

B)is the most widely used technique

C)(a) and (b)

D)will produce a plan that may not be the best plan

E)requires an excel spread sheet

Q3) Accommodating peak demands and effectively using labor resources during periods of low demand would be the goal of aggregate planners in ....

A)Manufacturing

B)Military

C)Archeology

D)Libraries

E)Financial Services

Q4) How should overtime capacity be utilized?

Q5) What are total costs for each period?

Q6) What are total carrying costs?

To view all questions and flashcards with answers, click on the resource link above. Page 13

Chapter 12: MRP and ERP

Available Study Resources on Quizplus for this Chatper

89 Verified Questions

89 Flashcards

Source URL: https://quizplus.com/quiz/53428

Sample Questions

Q1) In an MRP master schedule, the planning horizon is often separated into a series of times periods called:

A)pegging

B)lead times

C)stacked lead times

D)time buckets

E)firm, fixed and frozen

Q2) Initially, a master production schedule - the output from MRP - may not represent a feasible schedule.

A)True

B)False

Q3) Project Management approaches can help in a conversion to an ERP system.

A)True

B)False

Q4) In MRP, EOQ models tend to be less useful for materials at the lowest levels than for upper level assemblies of the bill of materials since higher-level assemblies have larger dollar investments.

A)True B)False

To view all questions and flashcards with answers, click on the resource link above. Page 14

Chapter 13: Inventory Management

Available Study Resources on Quizplus for this Chatper

162 Verified Questions

162 Flashcards

Source URL: https://quizplus.com/quiz/53427

Sample Questions

Q1) What is the economic order quantity for resin?

A)50 kilograms

B)100 kilograms

C)250 kilograms

D)500 kilograms

E)1,000 kilograms

Q2) To provide satisfactory levels of customer service while keeping inventory costs within reasonable bounds, two fundamental decisions must be made about inventory: the timing and size of orders.

A)True

B)False

Q3) Suppose that usage of cooking oil at Harry's Fish Fry is normally distributed with an average of 15 gallons/day and a standard deviation of two gallons/day.Harry has just fired the manager and taken over operating the restaurant himself.Harry has asked you to help him decide how to reorder cooking oil in order to achieve a service level which is seven times the risk of stockout (7/8).Lead time is eight days.Assume that cooking oil can be ordered as needed.

Q4) What is the economic order quantity for this item?

Q5) For the economic order quantity, what is the length of an order cycle?

To view all questions and flashcards with answers, click on the resource link above. Page 15

Chapter 14: Jit and Lean Operations

Available Study Resources on Quizplus for this Chatper

88 Verified Questions

88 Flashcards

Source URL: https://quizplus.com/quiz/53426

Sample Questions

Q1) If a firm's product mix is 60% of product A and 20% each of products B and C, an optimal mix-model production schedule would be successive sequences of AAABC.

A)True

B)False

Q2) In a "pull system," a quantity of inventory in front of a workstation indicates problems at that workstation.

A)True

B)False

Q3) Quality and highly capable production systems are requirements for the successful implementation of lean operations.

A)True

B)False

Q4) The ultimate objective in a lean system is:

A)low to moderate levels of inventory

B)high quality, zero defects

C)minimal waste (less than 6%)

D)balanced and rapid flow

E)all of the above

To view all questions and flashcards with answers, click on the resource link above. Page 16

Chapter 15: Supply Chain Management

Available Study Resources on Quizplus for this Chatper

89 Verified Questions

89 Flashcards

Source URL: https://quizplus.com/quiz/53424

Sample Questions

Q1) One disadvantage to RFID is that they require a 'line of sight' for reading.

A)True

B)False

Q2) Our organization can obtain visibility to potential trading partners on the internet by using:

A)C2C

B)B2C

C)B2B

D)C2B

E)None of the above

Q3) Managing supply chain visibility involves making sure that potential supply chain partners are aware of your organization's needs.

A)True

B)False

Q4) The purchasing cycle ends when the purchasing department is notified that the supplier has shipped the items.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above. Page 17

Chapter 16: Scheduling

Available Study Resources on Quizplus for this Chatper

134 Verified Questions

134 Flashcards

Source URL: https://quizplus.com/quiz/53423

Sample Questions

Q1) If he uses the first come, first served (FCFS) priority rule to schedule these jobs, what will be the average completion time?

A)7.5 hours

B)5 hours

C)3 hours

D)2.5 hours

E)2 hours

Q2) What is the optimum assignment of jobs to machines?

Q3) Scheduling pertains to:

A)hiring workers

B)process selection

C)buying machinery

D)timing the use of specific resources

E)determining the lowest cost

Q4) When does idle time occur at machine B for the optimum schedule?

Q5) Given the following information concerning jobs awaiting processing at a single work center, what processing sequence will result if the critical ratio (CR) rule is used?

Q6) What is the result of the row reduction?

Q7) What is the idle time at machine B for the optimum schedule?

18

To view all questions and flashcards with answers, click on the resource link above.

Chapter 17: Project Management

Available Study Resources on Quizplus for this Chatper

137 Verified Questions

137 Flashcards

Source URL: https://quizplus.com/quiz/53422

Sample Questions

Q1) The latest starting time for an activity is equal to the latest finish time minus the activity time.

A)True

B)False

Q2) What is the estimated standard deviation in the time for activity Z?

A)3 days

B)2 days

C)4 days

D)8 days

E)5 days

Q3) If the expected length of a path is more than 2.5 standard deviations less than a desired project completion time, the path would not be a factor in assessing the probability of finishing the project on time.

A)True

B)False

Q4) Activities not on the critical path have a slack time equal to zero.

A)True

B)False

Q5) What are the estimated slack times (in weeks) for activities A-H?

Q6) In crashing this project, which activity should be the first to be reduced?

To view all questions and flashcards with answers, click on the resource link above. Page 19

Chapter 18: Management of Waiting Lines

Available Study Resources on Quizplus for this Chatper

81 Verified Questions

81 Flashcards

Source URL: https://quizplus.com/quiz/53421

Sample Questions

Q1) Why is there waiting in an infinite source queuing system?

A)poor scheduling of servers

B)slow service

C)low utilization

D)variability in arrival and service rates

E)multiple phase processing

Q2) The queuing models discussed in the text apply only to "steady state" conditions.Steady state exists only when customers arrive at a steady rate; that is, without any variability.

A)True

B)False

Q3) What is the average number of high priority items waiting in line for service?

Q4) What is the average machine downtime with two operators?

A)1.71 minutes

B)3.46 minutes

C)6.25 minutes

D)7.71 minutes

E)9.46 minutes

Q5) What is average time in line for a low priority item?

Q6) What is average time in the system for a high priority item?

To view all questions and flashcards with answers, click on the resource link above. Page 20

Chapter 19: Linear Programming

Available Study Resources on Quizplus for this Chatper

105 Verified Questions

105 Flashcards

Source URL: https://quizplus.com/quiz/53420

Sample Questions

Q1) A change in the value of an objective function coefficient does not change the optimal solution.

A)True

B)False

Q2) The term "range of optimality" refers to a constraint's right-hand side quantity.

A)True

B)False

Q3) In linear programming, sensitivity analysis is associated with: (I) objective function coefficient

(II) right-hand side values of constraints

(III) constraint coefficient

A)I and II

B)II and III

C)I, II and III

D)I and III

E)none of the above

Q4) What are the corner points of the feasible solution space?

Q5) What is the constraint for resource III?

Q6) What is the objective function?

To view all questions and flashcards with answers, click on the resource link above.

Chapter 20: Extension 4: Reliability

Available Study Resources on Quizplus for this Chatper

10 Verified Questions

10 Flashcards

Source URL: https://quizplus.com/quiz/53440

Sample Questions

Q1) Waygate's residential internet modem works well but is sensitive to power-line fluctuations.On average, this product hangs up and needs resetting every 200 hours.On average about 45 minutes is needed to reset this product.What is this product's availability?

A)Not in excess of .75

B)In excess of .75 but not in excess of .8

C)In excess of .8 but not in excess of .9

D)In excess of .9 but not in excess of .95

E)In excess of .95

Q2) Product reliability involves both short-term and long-term perspectives.

A)True

B)False

Q3) If a system depends on two sub-systems functioning when activated, the reliability of that system is equal to the lower reliability of the two sub-systems.

A)True

B)False

Q4) Availability cannot be increased without improving the time between breakdowns.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above. Page 22

Chapter 21: Extension 5: Decision Theory

Available Study Resources on Quizplus for this Chatper

126 Verified Questions

126 Flashcards

Source URL: https://quizplus.com/quiz/53438

Sample Questions

Q1) If you are uncertain which state of nature will occur, and use the maximin criterion, which alternative will you select?

Q2) What would be the total payoff if the heart lab were funded in both the first and second years?

A)$100,000

B)$60,000

C)$50,000

D)$40,000

E)$20,000

Q3) Graphical sensitivity analysis is limited to cases with no more than two alternatives.

A)True

B)False

Q4) The maximax strategy would be:

A)small

B)Medium

C)med.-large

D)large

E)ex-large

To view all questions and flashcards with answers, click on the resource link above.

Page 23

Chapter 22: Extension 7: Learning Curves

Available Study Resources on Quizplus for this Chatper

68 Verified Questions

68 Flashcards

Source URL: https://quizplus.com/quiz/53435

Sample Questions

Q1) The fact that human activities typically improve when they are done on a repetitive basis is described by a/an:

A)normal distribution curve

B)learning curve

C)binomial distribution curve

D)exponential curve

E)fatigue factor allowance

Q2) An 80 percent learning curve means that with each doubling of repetitions there will be a 20 percent decrease in time per unit.

A)True

B)False

Q3) A job is expected to have a 70 percent learning curve.The first unit has been completed in 20 hours.Accordingly, the second unit can be expected to take approximately how many hours?

A)6

B)9.8

C)14

D)20

E)34

To view all questions and flashcards with answers, click on the resource link above.

Page 24

Chapter 23: Extension 8: The Transportation Model

Available Study Resources on Quizplus for this Chatper

20 Verified Questions

20 Flashcards

Source URL: https://quizplus.com/quiz/53433

Sample Questions

Q1) Which of the following is a constraint for the customer (campaign headquarters)?

A)2X<sub>11</sub> + 9X<sub>21</sub> + X<sub>31</sub> = 20

B)5X<sub>12</sub> + 3X<sub>22</sub> + 8X<sub>32</sub> = 70

C)X<sub>11</sub> + X<sub>12</sub> + X<sub>13</sub> = 50

D)X<sub>12</sub> + X<sub>22</sub> + X<sub>32</sub> = 70

E)all of the above

Q2) An automobile manufacturer that has eight assembly plants and thousands of dealers throughout the United States can find the optimal distribution plan by using:

A)linear programming model

B)transportation model

C)weighted factor rating

D)either A or B

E)Global Information Systems

Q3) The transportation model assumes similar, homogeneous goods.

A)True

B)False

Q4) The transportation model is a special type of linear regression model.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above. Page 25

Chapter 24: Extension 10: Acceptance Sampling

Available Study Resources on Quizplus for this Chatper

65 Verified Questions

65 Flashcards

Source URL: https://quizplus.com/quiz/53430

Sample Questions

Q1) A firm uses acceptance sampling to evaluate batches of inputs.Ideally, the defect rate would be no more than 3.5%.The firm knows that on occasion, batches with that defect rate or better might be rejected.However, if the defect rate is less than or equal to 3.5%, the firm would like there to be very little chance of that batch being rejected.This value, 3.5%, is the firm's ______.

Q2) The Lot tolerance percent defective (LTPD) is associated with a consumer's risk.

A)True

B)False

Q3) If this lot were 20% defective, what type error would be possible? For an acceptance sampling plan with c = 2, what would be the risk of this error?

Q4) If he uses an acceptance sampling plan of n = 5 and c = 2, what is the probability that, if this batch is 40% defective, it will be rejected and receive 100% inspection prior to shipment?

A)0.1270

B)0.2730

C)0.3174

D)0.6826

E)0.7270

To view all questions and flashcards with answers, click on the resource link above.

Page 26

Chapter 25: Extension 14: Maintenance

Available Study Resources on Quizplus for this Chatper

38 Verified Questions

38 Flashcards

Source URL: https://quizplus.com/quiz/53425

Sample Questions

Q1) Pareto analysis (using the 80/20 rule) is one method of determining when preventive maintenance activities should be performed.

A)True

B)False

Q2) Ideally, preventive maintenance will be performed before a breakdown or failure.

A)True

B)False

Q3) The major approaches used in plans to deal with breakdowns include all of the following except:

A)standby equipment

B)inventories of spare parts

C)operator repair of minor problems

D)readily available repair personnel

E)All of these are major approaches.

Q4) The optimum amount of preventive maintenance is where:

A)Total breakdown costs are a minimum.

B)Total preventive maintenance costs are a minimum.

C)Each maintenance component cost is a minimum.

D)Total maintenance costs are a maximum.

E)Total maintenance costs are a minimum.

To view all questions and flashcards with answers, click on the resource link above. Page 27

Turn static files into dynamic content formats.

Create a flipbook
Logistics and Operations Practice Exam - 2405 Verified Questions by Quizplus - Issuu