Information Technology Project Management Review Questions - 1066 Verified Questions

Page 1


Information Technology Project Management

Review Questions

Course Introduction

Information Technology Project Management introduces students to the principles, methodologies, and tools essential for effectively managing IT projects. The course covers the entire project life cycle, from initiation and planning through execution, monitoring, controlling, and closing. Topics include project integration, scope, time, cost, quality, human resource, communication, risk, procurement, and stakeholder management in the context of IT environments. Emphasis is placed on practical applications, including project scheduling with Gantt charts, resource allocation, teamwork, and the use of project management software. Students gain hands-on experience through case studies and simulated projects, preparing them to address real-world IT project challenges and deliver solutions on time and within budget.

Recommended Textbook

Information Technology Project Management 9th Edition by Kathy Schwalbe

Available Study Resources on Quizplus

13 Chapters

1066 Verified Questions

1066 Flashcards

Source URL: https://quizplus.com/study-set/264 Page 2

Chapter 1: Introduction to Project Management

Available Study Resources on Quizplus for this Chatper

91 Verified Questions

91 Flashcards

Source URL: https://quizplus.com/quiz/4342

Sample Questions

Q1) Which project management knowledge area is an overarching function that affects and is affected by the different knowledge areas?

A) Project cost management

B) Project stakeholder management

C) Project integration management

D) Project communications management

Answer: C

Q2) High-end tools are generally licensed on a(n) _____ basis.

Answer: per-user

Q3) Which type of tool is usually recommended for small projects and single users?

A) Low-end

B) Midrange

C) High-end

D) Upper range

Answer: A

Q4) Project managers work with the project sponsors to define success for particular projects.

A)True

B)False

Answer: True

Page 3

To view all questions and flashcards with answers, click on the resource link above.

Chapter 2: The Project Management Information

Technology

Context

Available Study Resources on Quizplus for this Chatper

85 Verified Questions

85 Flashcards

Source URL: https://quizplus.com/quiz/4343

Sample Questions

Q1) A(n) _____ refers to a product or service, such as a report, a training session, a piece of hardware, or a segment of software code, produced or provided as part of a project.

Answer: deliverable

Q2) Which perspective of an organization focuses on different groups' roles and responsibilities in order to meet the goals and policies set by top management?

A) Structural frame

B) Human resources frame

C) Political frame

D) Symbolic frame

Answer: A

Q3) According to the symbolic frame, the most important aspect of any event in an organization is not what actually happened, but what it means.

A)True

B)False

Answer: True

Q4) _____ is an organization's acquisition of goods and services from an outside source.

Answer: Outsourcing

To view all questions and flashcards with answers, click on the resource link above. Page 4

Chapter 3: The Project Management Process Groups

Available Study Resources on Quizplus for this Chatper

83 Verified Questions

83 Flashcards

Source URL: https://quizplus.com/quiz/4344

Sample Questions

Q1) The ideal outcome of the _____ process group is to complete a project successfully by delivering the agreed-upon project scope within time, cost, and quality constraints.

Answer: monitoring and controlling

Q2) The project stakeholder management knowledge area maps to which process group by identifying stakeholders?

A) initiating

B) planning

C) executing

D) monitoring and controlling

Answer: A

Q3) The project cost management knowledge area maps to which process group through the activities of estimating costs and budget determination?

A) initiating B) planning

C) executing

D) monitoring and controlling

Answer: B

To view all questions and flashcards with answers, click on the resource link above. Page 5

Chapter 4: Project Integration Management

Available Study Resources on Quizplus for this Chatper

83 Verified Questions

83 Flashcards

Source URL: https://quizplus.com/quiz/4345

Sample Questions

Q1) A(n) _____ is a tool that provides a systematic process for selecting projects based on many criteria.

Q2) A SWOT analysis, being a linear process, cannot be performed using the nonlinear mind mapping technique.

A)True

B)False

Q3) What are new requirements imposed by management, government, or some external influence referred to as?

A) Opportunities

B) Charters

C) Problems

D) Directives

Q4) What is a project charter? Discuss the inputs that can aid the development of a project charter.

Q5) _____ is the result of subtracting the project costs from the benefits and then dividing by the costs.

Q6) _____ project work includes collecting, measuring, and disseminating performance information.

Q7) What is a weighted scoring model? How is it created?

Page 6

To view all questions and flashcards with answers, click on the resource link above.

Chapter 5: Project Scope Management

Available Study Resources on Quizplus for this Chatper

77 Verified Questions

77 Flashcards

Source URL: https://quizplus.com/quiz/4346

Sample Questions

Q1) The main outputs of _____are the project scope statement and updates to project documents.

Q2) What process involves formal acceptance of the completed project scope by the stakeholders?

A) Scope validation

B) Scope planning

C) Scope control

D) Scope baseline

Q3) Some organizations prescribe the form and content for WBSs for particular projects. These are known as _____.

Q4) A(n) _____ is a table that lists requirements, their various attributes, and the status of the requirements to ensure that all are addressed.

Q5) A work package is a task at the _____ level of the WBS.

Q6) Creating the WBS is a subprocess associated with which process in project scope management?

A) planning

B) monitoring and controlling

C) closing

D) executing

To view all questions and flashcards with answers, click on the resource link above. Page 7

Chapter 6: Project Schedule Management

Available Study Resources on Quizplus for this Chatper

99 Verified Questions

99 Flashcards

Source URL: https://quizplus.com/quiz/4347

Sample Questions

Q1) _____ occurs when a resource works on more than one task at a time.

Q2) Where would a draft schedule for a project most likely be found?

A) project buffer

B) project charter

C) resource breakdown structure

D) project's dummy activities list

Q3) Which statement best describes the difference between an activity list and an activity attribute?

A) As opposed to an activity attribute, an activity list provides resource requirements and constraints related to activities.

B) An activity list provides a more concrete list of milestones for a project than an activity attribute.

C) An activity attribute is a tabulation of activities to be included on a project schedule whereas an activity list is not.

D) An activity attribute provides more schedule-related information about each activity than an activity list.

Q4) A(n) _____ for a project is the series of activities that determine the earliest time by which the project can be completed.

To view all questions and flashcards with answers, click on the resource link above.

8

Chapter 7: Project Cost Management

Available Study Resources on Quizplus for this Chatper

98 Verified Questions

98 Flashcards

Source URL: https://quizplus.com/quiz/4348

Sample Questions

Q1) Which statement is true of analogous estimates?

A) Their main disadvantage is that they cost more than other techniques.

B) They are the only technique which do not require expert judgement.

C) They are most reliable when previous projects are similar in fact with current projects.

D) They use project characteristics in a mathematical model to estimate project costs.

Q2) Spreadsheets are a common tool for cost estimating, cost budgeting, and cost control.

A)True

B)False

Q3) Which process results in a cost baseline as a main output?

A) cost controlling

B) cost estimating

C) cost budgeting

D) cost planning

Q4) Estimates should become more accurate as time progresses.

A)True

B)False

Q5) The _____ index is the ratio of earned value to planned value.

To view all questions and flashcards with answers, click on the resource link above. Page 9

Chapter 8: Project Quality Management

Available Study Resources on Quizplus for this Chatper

81 Verified Questions

81 Flashcards

Source URL: https://quizplus.com/quiz/4349

Sample Questions

Q1) Which term is used for a standard of measurement in quality management?

A) milestone

B) metric

C) merge

D) matrix

Q2) Which term is used for the ability of a product to be used as it was intended?

A) conformance to requirements

B) fitness for use

C) critical chain scheduling

D) free slack

Q3) List and briefly describe the three project quality management processes.

Q4) Describe the relationship between Six Sigma and statistics. What statistical concepts are involved in the Six Sigma philosophy?

Q5) Which addresses how well a product or service performs the customer's intended use?

A) reliability

B) performance

C) maintainability

D) functionality

Q6) In the DMAIC process, the letter "C" stands for _____.

Page 10

To view all questions and flashcards with answers, click on the resource link above.

Chapter 9: Project Resource Management

Available Study Resources on Quizplus for this Chatper

85 Verified Questions

85 Flashcards

Source URL: https://quizplus.com/quiz/4350

Sample Questions

Q1) According to Thamhain and Wilemon, what is the legitimate hierarchical right to issue orders?

A) authority

B) achievement

C) expertise

D) self-actualization

Q2) _____ is a relation of harmony, conformity, accord, or affinity and is important for communication.

Q3) _____ is the ability to influence behavior to get people to do things they would not otherwise do.

Q4) A responsibility assignment matrix (RAM) is a matrix that maps the work of the project as described in the OBS to the people responsible for performing the work as described in the WBS.

A)True

B)False

Q5) Which type of power is based on an individual's personal charisma?

A) legitimate

B) coercive

C) reward

D) referent

To view all questions and flashcards with answers, click on the resource link above. Page 11

Chapter 10: Project Communications Management

Available Study Resources on Quizplus for this Chatper

73 Verified Questions

73 Flashcards

Source URL: https://quizplus.com/quiz/4351

Sample Questions

Q1) An important technique for _____ is the status review meeting.

Q2) Geographic location and cultural background have no impact on communications.

A)True

B)False

Q3) _____ communications involves ensuring that stakeholder communication needs are met.

Q4) According to the guidelines provided by Practical Communications, Inc., a(n) _____ is a medium that is "excellent" for encouraging creative thinking.

A) phone call

B) e-mail

C) meeting

D) website

Q5) Communication becomes simpler when you increase the number of team members.

A)True

B)False

Q6) The communications management plan varies with the needs of the project.

A)True

B)False

Q8) What are the guidelines for conducting effective meetings? Page 12

Q7) All meetings must have a(n) _____ and intended outcome.

To view all questions and flashcards with answers, click on the resource link above. Page 13

Chapter 11: Project Risk Management

Available Study Resources on Quizplus for this Chatper

79 Verified Questions

79 Flashcards

Source URL: https://quizplus.com/quiz/4352

Sample Questions

Q1) The main output of qualitative risk analysis is updating the risk register.

A)True

B)False

Q2) Identifying risks is a subprocess of the _____ process of project risk management.

A) planning

B) executing

C) monitoring and controlling

D) closing

Q3) Explain decision trees and expected monetary value.

Q4) Which action involves eliminating a specific threat, usually by eliminating its causes?

A) risk avoidance

B) risk acceptance

C) risk transference

D) risk mitigation

Q5) _____ is the amount of satisfaction or pleasure received from a potential payoff.

Q6) The term _____ is used to describe risks that the project team has identified and analyzed.

To view all questions and flashcards with answers, click on the resource link above. Page 14

Chapter 12: Project Procurement Management

Available Study Resources on Quizplus for this Chatper

82 Verified Questions

82 Flashcards

Source URL: https://quizplus.com/quiz/4353

Sample Questions

Q1) In project procurement management, which process involves completion and settlement of each contract, including resolution of any open items?

A) planning procurement management

B) controlling procurements

C) negotiating procurements

D) conducting procurements

Q2) In project procurement management, which is an output of the planning process?

A) change requests

B) selected sellers

C) resource calendars

D) make-or-buy decisions

Q3) How are RFPs different from RFQs? What are some of the requirements of writing an RFP?

Q4) A single contract can include all three categories of contracts.

A)True

B)False

Q5) Indirect costs are those costs can be traced back to a project in a cost-effective way.

A)True

B)False

Page 15

To view all questions and flashcards with answers, click on the resource link above.

Chapter 13: Project Stakeholder Management

Available Study Resources on Quizplus for this Chatper

50 Verified Questions

50 Flashcards

Source URL: https://quizplus.com/quiz/4354

Sample Questions

Q1) The _____ is a formal or informal document that helps project teams to effectively engage stakeholders and make sure that good decisions are made throughout the life of the project.

Q2) The main output of the identifying stakeholders process is the project charter.

A)True

B)False

Q3) A(n) _____ stakeholder is aware of the project and supportive of change.

Q4) Sensitive information can be included in the stakeholder register as very few people in the organization have access to it.

A)True

B)False

Q5) A(n) _____ is a tool used to document, monitor, and track problems that need resolution.

A) requirements traceability matrix

B) Gantt chart

C) power/interest grid

D) issue log

Q6) The stakeholder management plan is always a formal document.

A)True

B)False

Page 16

To view all questions and flashcards with answers, click on the resource link above.

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Information Technology Project Management Review Questions - 1066 Verified Questions by Quizplus - Issuu