Skip to main content

Forma London

Page 1

FORMA LONDON

REDEFINING SUSTAINABLE CONSTRUCTION

Powered by Inside Sustainability

inside-SUSTAINABILITY.com


FORMA LONDON

I PROFILE

Sustainability is at the heart of Forma London, a specialist fit-out and refurbishment contractor. “We plan to continue to learn about the best ways of tackling the issue of sustainable construction,” explained Paul Delahunty, company co-founder and Chairman, in an interview with Romana Moares.

F

orma London was founded in 2014 by two young enthusiasts with a clear aim – to simplify the overall client

journey. “We believed we could bring some innovative methods to the notoriously conservative construction sector, to make the process more standardised, more systematic and, ultimately, quicker,” said co-founder and Chairman Paul Delahunty, when asked what the main trigger was for setting up the business. He reflected that the process had been a learning curve, marked by several milestones (the completion of a project valued at over £500K, quickly followed by others of over £1 million were big moments for the business) and proof that what Forma was trying to do, and believed in as a business, was resonating with clients.

118 Inside sustainability


What further pushed the business forward

can be daunting for clients, who may be

was the implementation of a Business

unaware of current building regulations

Management System that streamlines work-

and the options available: “What we offer

flow and ensures that all the site teams (as

is a complete end-to-end service.

well as office teams) work from the same

“We support the client throughout the

standard templates and follow the same

process, so at no point are they without

protocols. “Achieving Constructionline and

our assistance in understanding what their

CHAS accreditation were also hugely impor-

options are, what the financial implications

tant milestones as they have given us the

of any decision are, and what the best

opportunity to expand our client base,”

course of action is.

added Mr Delahunty.

“We use several simplified reporting doc-

Forma’s relatively small size is one of

uments for all projects to ensure our team

its advantages. “We can react quickly to

knows the process fully and that every

changes,” he said, “and implement new

report issued to a client is simple and very

ideas or methods of construction faster

clear, yet contains all the details required.

than larger competitors, which means we

Clients don't need, or have the time, to find

can be ahead of the curve.”

regulatory information themselves; this is all on our system and readily available.

End-to-end service

We also externally audit our systems

So how exactly does Forma's approach

to ensure our processes are correct.”

simplify the client's journey? Mr Delahunty

He confirmed that sustainability is a

explained that the construction process

huge factor that has significantly shaped

Inside sustainability 119


FORMA LONDON

I PROFILE

the direction and methods of construction

canvas, according to Mr Delahunty: “For

the company uses. “For existing properties,

new builds, the process is about ensuring

both commercial and residential, the pro-

the longevity of the building by delivering

cess will start in the design phase,”

a high-quality, durable product, ensuring

Mr Delahunty explained. “We look at the

that it meets and exceeds the require-

space and conditions and ensure that we

ments for low-energy buildings.

challenge the design to check that we will

“As before, waste material is reduced

be reusing and reforming something first

and recycled as much as possible, and

and foremost, before adding anything new.”

any new material is appropriately sourced.”

The purpose of this initial review is to look objectively at what is in situ and see how

From warehouse to office space

this can be better employed or reused

Over the years, the company has completed

within the new design, as opposed

over 200 projects for a wide range of clients.

to approaching the project as a blank

One particularly stands out, as it very clearly demonstrates Forma’s approach and capability – a project for allplants, a manufacturer of plant-based frozen meals that approached Forma to design and build allplants’ new multi-purpose office space. The client wanted a creative environment for their employees, and one that would fit with their company ethos of taking care of the planet. Forma was excited to work with a brand that fits with its own vision of

120 Inside sustainability


building ethical and sustainable offices and workspaces. “The building was an empty

With the warehouse an empty shell, there were no heating or cooling facilities already in the building. Forma engaged sustainable

20,000 square foot warehouse shell

air movement company Elta Fans for the

in Walthamstow, said Mr Delahunty. “Along

extraction and used a brand new, state-of-

with the proposed office area, allplants

the-art, energy-efficient solution from iXu

wanted space for a recording studio for

for the ventilation system.

photo shoots and online video content,

Mr Delahunty explained that all the

and a trial kitchen or innovation studio

fixtures and fittings were created using

where new products would be tested.

recycled materials and wood offcuts

The project required a quick turnaround of

from the project on site. For the benches

eight weeks, with our team simultaneously

and desks, Forma opted to use materials

overseeing the design and the build.”

from local suppliers and ethical timber

Inside sustainability 121


FORMA LONDON

I PROFILE

merchants to show its support for local

allplants’ – as well as Forma’s – integral

businesses, as well as keeping down the

values of sustainability. The added bonus is

cost of transportation and the resulting

that when it’s time for allplants to move to

carbon footprint. Any chairs and seating

a bigger space, all of our hard work can be

that were not made by them were sourced

reused and carry on the journey with them.”

from second-hand suppliers. “The project was delivered on a fast-track

Set for growth

programme, and in alignment with the overall

It goes without saying that Forma's

budget,” he continued. “With the limited time

supply chain and partners are key to the

constraints, we managed to stay true to

success of any project: “All our partners

122 Inside sustainability


are vetted before they are approved and

scratch nearly ten years ago, this feels very

added to our contractors list,” said Mr

rewarding for the founders.

Delahunty. “The questions we ask relate

Mr Delahunty concluded that a finished

to all areas of their business to ensure

project is the most exciting aspect of his

they align with our standards, and we

work: “After initially speaking to a client and

routinely ask them about anything new

understanding what they want to achieve,

that might be a more sustainable alterna-

seeing the outcome is so rewarding.”

n

tive to consider. “In this way, we are always looking and learning about alternatives in the construction industry.” Speaking about upcoming projects, Mr Delahunty revealed that Forma is currently gearing up to commence a new-build project in Leigh-on-Sea to deliver several much-needed new homes: “We are looking at different methods of construction to reduce the amount of concrete needed in the foundations, by potentially using a mix of light gauge steel frame and SIPS timber panelling to provide the structure. Hopefully, this will allow us to utilise a screw pile system that we have used on two recent projects, meaning we will require fewer concrete foundations.” The future looks exciting for Forma London: and given the ever-increasing focus on sustainable practices, the company is set for continued growth. Starting basically from

Inside sustainability 123


Turn static files into dynamic content formats.

Create a flipbook
Forma London by ProactivePublications - Issuu