1 minute read

CONSTRUCTION SYSTEM

Axonometric drawing showing the direction of constrcution in the stepwell.

Advertisement

[1] The diameter is assessed depending on importance of stepwell. A cyclinder trench is dug to the height of one man. [2] A wooden wheel with a cross bar is lowered into the excavated well, where the soil is already moist and sluggish. The wheel is of the size of the diamterer of the well at that depth and abuts the excavated sides of the trench. [3] Once the wheel sits horizontally on the soil, layers of brick masonry are piled up on it. [4] Once the stream is flowing within the well and settles to its normal minimum level of water, the length of the stepped corridor is decided. [5] The pavilion part of the stepwells are excavated firat as they structurally bear the exterior load. Columns and beams are added with platforms to make consecutive pavilions. [6] According to the analysis, first retaining walls are built and then pavilions are built.

This article is from: