Jambo Aye Irrigation System, Aceh
Project Cost : IDR 1.09 Trillion
: Q3–Q4 2026



Lhok Guci Irrigation System, Aceh
Project Cost : IDR 3,46 Trillion
: Pre-FS
Jambo Aye Irrigation System, Aceh
Project Cost : IDR 1.09 Trillion
: Q3–Q4 2026
Lhok Guci Irrigation System, Aceh
Project Cost : IDR 3,46 Trillion
: Pre-FS
Lambakan Dam, East Kalimantan
Project Cost : IDR 7.22 Trilion
: Identification
FC : Q1–Q4 2027
Saddang Dam, South Sulawesi
Project Cost : IDR 3.01 Trilion Status : Identification
Project Cost : IDR 2.07 Trillion
: Readiness Criteria
Location: North Aceh and East Aceh, Aceh Province
Status: Preliminary Study
PROJECT DESCRIPTION
Jambo Aye irrigation system is located in the North and East Aceh Regency, Aceh Province. The exact location of the dam is in the Rumoh Rayeuk Village, Langkahan District, North Aceh Regency. The total potential irrigation area of the Jambo Aye irrigation system is 24,360 Ha which is situated on the left and right banks of Arakundo River.
1. Construction of the Jambo Aye Kanan Irrigation System with a service area of 1,080 Ha out of a total area of 3,028 Ha.
2. Rehabilitation of the Jambo Aye Kiri Irrigation System along 56.857 Km out of a total channel length of 63 kilometers.
3. Maintenance of the Jambo Aye Kanan and Jambo Aye Kiri Irrigation System.
PROJECT PROFILE
GCA Minister of Public Works
Partnership scheme Design-Build-Financing-Rehabilitation-Maintenance-Transfer (DBFRMT)
Project Cost IDR 1.09 Trillion/ USD 68.7 Million
Concession Period 15 years: 2 years of Construction/ Rehabilitation and 13 years of Maintenance
Return of Investment Scheme Availability Payment
IRR Project 9.26 %
Desc:
* Indicative according to the current SP – OBC Draft
Region of East Ogan Komering Ulu and Ogan Komering Komering Ilir, South Sumatera Province Region of Way Kanan, Lampung Province
Location:
Rehabilitation of irrigation networks spread across Komering irrigation area of 59,148 Ha and OM of 59,148 Ha + 8,500 Ha (JICA Loan, OM year 2028). The project includes implementation of Smart Irrigation Asset Management System
Location:
Location:
Location:
Merangin Dam is located in Batanghari River Basin. The benefits of the dam are for irrigattion of 12.000 Ha; raw water supply for drinking to 2 m3/s; to reduce flooding to 200 m3/s; Hydropower to 90-107,5 MW; and tourism
The location of the dam project is situated in the Saddang River Basin (DAS Saddang), Enrekang Regency, while the reservoir inundation area is located in Enrekang Regency and Tana Toraja The primary objectives of this project are to support the provision of an additional production of 2 million tons of rice for food security and 1.5 million tons of corn. As well as for tourism and raw water supply. The dam has an average annual flow potential of 566 2 million m³ and an irrigation area potential of 63,000 hectares, while the hydropower potential is 75 MW The Saddang Dam can fulfill up to 2 6 m³/second of raw water demand of the area
Location: Ciamis Regency, West Java
The Project is located on Leuwikeris Dam, Ciamis Regency, West Java The PPP Project of Leuwikeris Minihydro Power Plant (HPP)
Location: South Ogan Komering Ulu, Regency South Sumatera Province
The Project is located on Tiga Dihaji Dam, South Ogan Komering Ulu Regency, South Sumatera Province. The PPP Project of Tiga Dihaji Hydro Power Plant (HPP) is proposed through Unsolicited with Design, Build, Finance, Operate, Maintain and Transfer (DBFOMT) scheme. It is estimated will generate electricity 40 MW
Location: Purworejo Regency, Central Java Province
The Project is located on Bener Dam, Purworejo Regency, Central Java Province The Unsolicited
Project of Bener Minihydro Power Plant (MHPP) is proposed through Design,
Operate, Maintain and
PROFILE * GCA Minister of Public Works Partnership scheme
(DBFOMT)
5,79 MW
Location: West Sumbawa Regency, West Nusa Tenggara Province
The Project is located on Bintang Bano Dam, West Sumbawa Regency, West Nusa Tenggara Province The PPP Project of Bintang Bano Minihydro Power Plant (MHPP) is proposed through Unsolicited with Design, Build, Finance, Operate, Maintain and Transfer (DBFOMT) scheme It is estimated will
6.3 MW for MHPP.
The Project is located on Bulango Ulu Dam, Bone Bolangu Regency, Gorontalo
Floating Photovoltaic and Minihydropower Plant Infrastructure
Delivery on Lau Simeme Dam
Location: Deli Serdang, North Sumatera Province
The Project is located on Lau Simeme Dam, Deli Serdang Regency, North Sumatera Province. The Unsolicited PPP Project of Lau Simeme Floating Photovoltaic (FPV) Minihydro Power Plant (MHPP) is proposed through Design, Build, Finance, Operate, Maintain and Transfer (DBFOMT) scheme It is estimated will generate electricity 7,79 MWp for FPV and 3 MW for MHPP.
Capacity FPV: 7,79 MWp MHPP: 3 MW
Cost
IDR 108,18 Billion
IDR 71, 1 Billion
Photovoltaic and Minihydropower Plant Infrastructure
Delivery on Way Apu Dam
Location: Buru Regency, Maluku Province
The Project is located on Way Apu Dam, Buru Regency, Maluku Province The Unsolicitied PPP Project of Way Apu Floating Photovoltaic (FPV) and Minihydro Power Plant (MHPP) is proposed through Design, Build, Finance, Operate, Maintain and Transfer (DBFOMT) scheme. It is estimated will
Operate-MaintenanceTransfer (DBFOMT) Electricity Capacity FPV: 10 MWp MHPP: 4,05 MW
Project Cost
FPV: IDR 146,66 Billion MHPP: IDR 105,75 Billion
Concession Period 18 Months of Construction and 25 Years of Service Period Return of Investment Scheme User Charge IRR Project
13,13% MHPP: 13,95%
Location: North Aceh Regency, Province of Aceh
The Project is located on Keureuto Dam, North Aceh Regency, Province of Aceh The PPP Project of Keureuto Floating Photovoltaic (FPV) and Minihydro Power Plant (MHPP) is proposed through Unsolicited with Design, Build, Finance, Operate, Maintain and Transfer (DBFOMT) scheme. It is estimated will generate electricity 35 MWp for FPV and 4,8 MW for MHPP
Minihydropower Plant Infrastructure
Delivery on Tapin Dam
Location: Tapin Regency, South Kalimantan Province
Project is located on Tapin Dam, Tapin Regency, South Kalimantan Province. The Unsolicitied PPP Project of Tapin Minihydro Power Plant (MHPP) is proposed through Design, Build, Finance, Operate, Maintain and Transfer (DBFOMT) scheme It is
Location: Pringsewu Regency,
Infrastructure Delivery on Karalloe Dam
Location: Gowa Regency, South Sulawesi
Location: North Jakarta
NCICD project has several benefits, including reducing the flood-affected area in North Jakarta by 112,417,700 square meters, eliminating potential flood-related losses amounting to USD 42.25 billion from 2033 to 2071, and saving travel time, vehicle operational costs, and emission costs
PPP Project Construction and Development of the Estuary Dam in Bintan Bay and the Drinking Water Supply System
Location: Riau Islands
PPP Project Construction and Development of the Estuary Dam in Bintan Bay and the Drinking Water Supply System aims to serve the drinking water needs of the community and industries in the Riau Islands and contribute to the increase in piped drinking water nationally by 0.07% and in the Riau Islands Province by 9 33%
The scope of the project includes:
1. Construction of dam infrastructure (Estuary DAM) and a reservoir integrated with a road on top of the dam.Construction of raw water units, including intake and raw water transmission pipes.
2. The transmission pipes are limited to the area between the intake and the clean water treatment plant (IPA) located near the estuary dam
3. Construction of production units, including water treatment buildings (IPA), clean water reservoirs, main clean water distribution networks, pumps, and other related buildings
14.4 Trillion
Period 56 years: 6 years of Construction and 50 years of Service