Executive Summary

4

Planning Goals and Assumptions

5

Existing Campus Plan - Existing Buildings and Site Features

6

Existing Campus Plan - Site Constraints and Traffic Issues

7

Campus Master Plan

8

Proposed New Facility Program Summary

2

Portledge School

Master Plan


Executive Summary In the spring of 2017 Portledge School engaged Bowie Gridley Architects to continue the School’s earlier Master Planning effort which had culminated in the construction of the new Commons building. Portledge was now ready to initiate a second planning phase to investigate other facilities and campus needs. Bowie Gridley Architects performed observations of all existing buildings and assembled a tabular inventory of academic, athletic, and support spaces. To further strengthen their understanding of current curricula, future needs, and Portledge culture, Bowie Gridley conducted a series of on-site interviews with a broad range of Portledge constituencies including: members of the Board of Trustees; administrators; faculty; staff; students; and parents. Early analysis and discussion identified a range of needs and issues: • • • •

Upper School classroom and support space needs Athletic facilities needs and team scheduling issues Potential for on-campus housing Roadway and traffic safety concerns

While a consensus formed around the above as issues to be addressed in the future, it was determined that the following become the focus of the current phase of Master Planning: • New Athletic Facility. This new facility will double the basketball court capacity, increase the number of practices and competitions possible on campus, and be designed to current standards.

Multiple athletics program configurations were considered including additions to the existing Wellington Gym. However, this proved problematic due to zoning setback requirements. Consensus coalesced around a new and appropriately scaled facility consisting of: a single competition gym with spectator seating; a Wellness Center; and a variety of support spaces. • Several building sites and roadway access options were considered for the new athletics facility. The planning process considered the impact of a new building on existing playing fields, vehicular access, campus -wide pedestrian circulation, and natural topography. Ultimately, the southwest corner of the central campus open space was selected. • Roadway and Traffic Safety Improvements. Beginning with the Lower School, a traffic circle is proposed to eliminate the “bottleneck” created by vehicles entering campus and turning into the Lower School parking lot. From this new traffic circle, an additional roadway running along the south edge of the playing fields directs traffic to the new gymnasium. This same road then runs along the west campus edge to divert visitors and buses away from the academic core to an expanded parking facility to the north of the classroom buildings. Finally, the road separating the Upper School and Science building from Wellington Gym and the Middle School will be eliminated and replaced with a turn-around for busses, deliveries, etc.

The new athletic facility would ideally be situated in a • manner which creates a synergy with playing fields and other outdoor sports activities. Further, the ideal site can relieve vehicular traffic and visitor pressure on the core academic campus. 3

Portledge School

Master Plan


Planning Goals and Assumptions New Athletic and Wellness Facility • “Core Athletics Program” o Regulation basketball court (84’ x 50’) with safe run-off zones o Spectator seating for approximately 200 o Ample and accessible Team, Visitor, Coaches, and Official’s Locker Rooms o Administrative offices o Public area with Athletic Hall of Fame o Ample storage and support facilities • “Special Athletics Program” o Spectator seating for approximately 60 o Can be “locked-off” from balance of facility with separate entrance • Wellness Center o Wellness Classroom and Learning Kitchen • Exterior Spaces o Viewing Terrace overlooks playing field o Entry Plaza with landscape features, seating, chess benches Roadway and Traffic Planning • • • •

Increase traffic safety and convenience at Lower School parking Create a more pedestrian friendly Upper and Middle School campus Plan a new road to the new Athletic Facility and provide perimeter access to the Academic Core Increase parking

4

Portledge School

Master Plan


Existing Campus Plan Existing Buildings and Site Features

Headmaster’s Residence

Maintenance Buildings

Tennis Courts

Playing Fields

d

Upper School

Commons

Parking

Playing Fields

Du

ond ck P

Roa

Lower School

Wellington Gym Middle School

5

Portledge School

Master Plan


Existing Campus Plan Site Constraints and Traffic Issues

Headmaster’s Residence

Maintenance Buildings

“Swale”

Playing Fields

200’ Setback

d

Upper School Limited Parking

Commons

Playing Fields Traffic Conflict Point

Du

ond ck P

Roa

Lower School

Bisecting Roadway Wellington Gym Middle School

Campus Entrance

6

Portledge School

Master Plan


Campus Master Plan

New Athletic/ Wellness Facility

Extensive Pedestrian Network

nd ck Po

Road

Enlarged Parking Lot Âą28 Spaces

Du

New Drop-off and Delivery Spur

Campus Entrance

New Traffic Circle

New Roadway

7

Portledge School

Master Plan

Road Removed Campus Quad Created


Proposed New Facility Program Summary New Athletic & Wellness Facility Gymnasium

9,650 nsf 9,250 nsf

Extended 1 court gym

400 nsf

Equip Storage

3,850 nsf

Team/Locker Rooms

2,600 nsf

US and MS Boys and Girls LR (2 @ 800, 2 @ 500) Visiting Team LR (2 @ 225)

450 nsf

Male and Female Coaches LR (2 @ 225)

450 nsf

Officials LR

100 nsf

Training Room

250 nsf

Athletic Administrative

675 nsf

AD Office

175 nsf

Asst AD Office

150 nsf

Conference Room

150 nsf

PE Office

200 nsf

2,100 nsf

Miscellaneous / Support Showers/Toilets (2 @ 250)

500 nsf

Showers/Toilets (2 @ 100)

200 nsf

Lobby

700 nsf

Public Restroom Male & Female (2 @ 200)

400 nsf

Laundry

250 nsf

Janitorial

50 nsf

1,110 nsf

Miscellaneous Program Areas Health and Wellness Classroom (with Technology)

610 nsf

Health and Wellness Classroom

500 nsf

Total Program Area

17,385 nsf

Net to Gross Multiplier

1.3 nsf

Total Building Area

22,600 gsf 8