District 5 | Parks Master Plan Conceptual Plans 2025

Page 1


Standardize Park Furnishings

- Benches, Waste Receptacles, Light Fixtures, etc.

- Replace Picnic Tables and Grilles

Standardize Park Monumental Signs

Cover Basketball Courts with Shade Cover

Replace Playgrounds with New Surfacing and Shade

Fall Protection Playground Surfacing shall be Poured in Place Rubber

Provide Chilled Drinking Water Fountains with Bottle Fillers

Improve Paved Surfaces

Energy Efficient Lighting and Enhancement to Provide a Safer Environment

Provide Video Surveillance for Security

Dog Waste Bag Dispensers / Disposal Stations

City Wide Park Improvements

Recommendations

New Chilled Drinking Water Fountain with Bottle Filler

New Fence at the East Property Line

New Swing Gates to Close Parking Lot

Coating and Restripe Parking Lot

LIST OF IMPROVEMENTS

1. NEW CITY STANDARD MONUMENTAL PARK SIGN

2. NEW AND ADDITIONAL BENCHES WITH DIVIDERS

3. NEW AND ADDITIONAL WASTE RECEPTACLES.

4. REPLACE EXISTING SITE LIGHTING WITH ENERGY EFFICIENT FIXTURES AND PROVIDE ADDITIONAL FIXTURES FOR SECURITY

5. NEW DOG WASTE BAG AND DISPOSAL STATIONS.

6. NEW PROHIBITED ACTS SIGNS

7. NEW BROWARD COUNTY SHERIFF'S OFFICE PROTECTION SIGNS

8. NEW VIDEO SURVEILLANCE SYSTEM.

9. NEW PLAYGROUND EQUIPMENT AND SHADE STRUCTURE

10. NEW FITNESS EQUIPMENT AND NEW FABRIC AT EXISTING SHADE STRUCTURE

11. RESURFACE BASKETBALL COURT - NO SHADE

12. RESURFACE HANDBALL COURT / PRACTICE WALL

13. REGRADE TENNIS COURT TO PROPERLY DRAIN AND PROVIDE NEW SURFACE AND EQUIPMENT

14. NEW FABRIC ON EXISTING STRUCTURE OVER BENCHES

15. MILL AND RESURFACE PICKLEBALL COURTS AND PROVIDE SHADE STRUCTURE

16. NEW COVERED SEATING AREA AT PICKLEBALL - MODIFY FOOTPRINT AND FENCE

17. DISPLAY PICKLEBALL RULES

18. RAISE GRADE AT SAND VOLLEYBALL COURT AND PROVIDE BORDER

19. REGRADE BOCCE COURTS AND REPLACE WOOD BOARDS AT CURB AND PROVIDE NEW SHADE FABRIC OVER BENCHES AT ENDS

20. NEW SWING SET AT PLAYGROUND - MODIFY FENCE ENCLOSURE

21. MAINTAIN OPEN PLAY AREA

22. NEW CHILLED DRINKING WATER FOUNTAIN WITH BOTTLE FILLER

23. NEW 6 FEET HIGH STEEL PICKET FENCE AT THE EAST PROPERTY LINE

24. NEW SWING GATES AT PARKING LOT ENTRANCES

25. PROVIDE ASPHALT COATING AND RESTRIPE PARKING LOT

Proposed New Park Location

HAMMONDVILLE ROAD

Thank you for your participation.

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
District 5 | Parks Master Plan Conceptual Plans 2025 by pompanobeachparks - Issuu