SCREENING EFFICIENCY

Jef McGee New Business Manager- Aggregate


What is Screen Efficiency? A measure of how much of the feed material should have gone through the hole versus how much really did go through the hole. VSMA Handbook Definition:

Efficiency =

TPH of undersize in feed which actually passes TPH of undersize in feed (should pass)

Undersize

Oversize


Calculating Screen Efficiency Efficiency of the 1” cut on the top deck – The wrong way Most Commonly Made Mistake 41.1% of the deck overs passes 1”, so: 100% - 41.1% = 58.9% of deck overs did pass 1” Top Deck Has a 58.9% Screening Efficiency


Calculating Screen Efficiency Efficiency of the 1” cut on the top deck

How many TPH should go through? 93.8% passes 1”, so:

Feed Gradation

TPH (-1”) = 0.938 x 500 TPH TPH (-1”) = 469 TPH

TPH of Undersize in feed which actually passes Efficiency =

TPH of Undersize in feed (should pass)


Calculating Screen Efficiency Efficiency of the 1” cut on the top deck

How many TPH didn’t go through? 41.1% of the deck overs passes 1”, so: TPH (-1”) Overs = 0.411 x 53 TPH TPH (-1”) Overs = 22 TPH

Deck Overs Gradation

TPH of Undersize in feed which actually passes Efficiency =

TPH of Undersize in feed (should pass)


Calculating Screen Efficiency Efficiency of the 1” cut on the top deck

Feed Gradation

TPH of Undersize in feed which actually passes

Efficiency =

Deck Overs Gradation

= Total 1” minus - 1” minus that didn’t pass = 469 TPH total – 22 TPH that didn’t pass = 447 TPH actually passed

TPH of Undersize in feed which actually passes TPH of Undersize in feed (should pass)

=

447 TPH 469 TPH

=

95.3%


Factors Effecting Screen Efficiency Particle Size

Near sized particles are much harder to pass

1/2” / 1” = 0.50

1/2” Particle

4 holes

3/4” /1” = 0.75

3/4” Particle

18 holes

7/8” /1” = 0.875

7/8” Particle

95 holes


Factors Effecting Screen Efficiency Particle Shape

Flat or elongated material doesn’t pass easily


Factors Effecting Screen Efficiency Plugging and Blinding

Moisture Clays and silts Screen set-up (speed-stroke) Flat and elongated


Factors Effecting Screen Efficiency Feed Rate and Bed Depth

Less than 4:1 ratio of bed depth to aperture size at the discharge end of the deck Too lightly loaded decks reduce efficiency