Pleasant Hill Public Safety Facility 6875 Martha L Miller Drive, Pleasant Hill, Iowa 50327
December 5, 2019
• • • • • • •
Team Members Prime Contractors Current Highlights Safe Hours Project Photos Upcoming Highlights Ryan Companies Contact Information
TEAM MEMBERS CITY REPRESENTATIVES:
RYAN COMPANIES:
DESIGN TEAM:
Sara Kurovski, Mayor Ben Champ, City Manager Madeline Sturms, Community Development Director Al Pizzano, Chief of Police Jamie Xayavong, Fire Chief
Russ Lewton, Regional Vice President Brian Clark, Director of Real Estate Development Terry Coomes, Field Coordinator Matt Hillis, Division Manager Matt Van Loon, Project Executive Jill Boetger, Project Manager Nate Frye, Superintendent Tyler Lange, Project Engineer Intern Beth Bertlshofer, Project Coordinator
Cory Sharp, FEH Design Denny Sharp, FEH Design Don Seymour, FEH Design Chris Martin, FEH Design Brady Daniel, FEH Design Michelle Cramblit, FEH Design James Deeds, KCL Engineering Jake Cunliffe, KCL Engineering Chris Davis, KCL Engineering Lucas Wardenburg, KCL Engineering Scott Hinshaw, KCL Engineering Brandon Chandler, KCL Engineering Gordon Lemmel, Confluence Matt Carlile, Confluence Jason Ledden, Snyder & Associates Eric Cannon, Snyder & Associates Dean Roberts, MWL
Prime Contractors • • • • • • • • • •
Absolute Concrete Brockway Mechanical & Roofing De Vries Electric Inc. Reliable 1 Heating | AC | Plumbing Katelman Steel Fabrication Inc. Lang Construction Inc. Mid-American Glazing Systems Inc. Moen Steel Erection PDM Precast Inc. Pezzetti Erosion Control Inc.
• Sandstone Management Ltd. • TNT Tuckpointing & Building Restoration, LLC
BUILDING 1
BLDG 2
BLDG 3
Overall Project Diagram
CURRENT HIGHLIGHTS
• Structural masonry walls are on-going at the Building 1 elevator shaft, locker rooms, and the future IT room. • The storm sewer installation is nearing completion. The sanitary sewer installation will begin the end of this week. • Footings for Buildings 1, 2, and 3 are complete. • Footings for covered parking areas are being excavated and will be placed by early next week. • The rock for the site parking and staging area is being placed. • The geothermal well field installation is scheduled to begin next week.
2,289 SAFETY HOURS TO DATE
PROJECT PHOTOS
8
Building 3 foundation over-excavation in progress
Building 3 (Storage Garage) completed foundations
Building 1 corridor P113 CMU wall in progress
Completed foundations at Building 2 (Fire Auxiliary)
Rock for temporary staging and parking in progress
Storm sewer installation at SE entry
Storm sewer installation at pond
Storm sewer installation at pond
UPCOMING HIGHLIGHTS
• The underground plumbing installation for Building 2 will commence soon. • Structural masonry walls will be nearing completion. • Pre-cast is scheduled to be delivered 12/16/19. • Mass site grading will be completed. • Sanitary sewer and water main installation are ongoing. • The job trailer will arrive on site.
CONTACT INFORMATION TEAM CONTACT: Jill Boetger
Beth Bertlshofer
Project Manager
Project Coordinator I
Phone: 515-412-5520 jill.boetger@ryancompanies.com
Phone: 515-412-5510 beth.bertlshofer@ryancompanies.com
Tyler Lange
Nate Frye
Project Engineer Intern
Superintendent
Phone: 515-412-5529 tyler.lange@ryancompanies.com
Phone: 515-657-1044 nate.frye@ryancompanies.com