Pleasant Hill Public Safety Facility 6875 Martha L Miller Drive, Pleasant Hill, Iowa 50327
August 21st, 2020
• • • • • • •
Team Members Prime Contractors Current Highlights Safe Hours Project Photos Upcoming Highlights Ryan Companies Contact Information
TEAM MEMBERS CITY REPRESENTATIVES:
RYAN COMPANIES:
DESIGN TEAM:
Sara Kurovski, Mayor Ben Champ, City Manager Madeline Sturms, Community Development Director Al Pizzano, Chief of Police Jamie Xayavong, Fire Chief
Russ Lewton, Regional Vice President Brian Clark, Director of Real Estate Development Terry Coomes, Field Coordinator Matt Hillis, Director of Construction Matt Van Loon, Project Executive Jill Boetger, Project Manager Nate Frye, Superintendent Tyler Lange, Senior Project Engineer Kim Jones, Project Coordinator II Laura Skogman, Project Coordinator
Cory Sharp, FEH Design Denny Sharp, FEH Design Don Seymour, FEH Design Chris Martin, FEH Design Brady Daniel, FEH Design Michelle Cramblit, FEH Design James Deeds, KCL Engineering Jake Cunliffe, KCL Engineering Chris Davis, KCL Engineering Lucas Wardenburg, KCL Engineering Scott Hinshaw, KCL Engineering Brandon Chandler, KCL Engineering Matt Carlile, Confluence Jason Ledden, Snyder & Associates Eric Cannon, Snyder & Associates Dean Roberts, MWL
Prime Contractors • • • • • • • • • •
Absolute Concrete Brockway Mechanical & Roofing De Vries Electric Inc. Reliable 1 Heating | AC | Plumbing Katelman Steel Fabrication Inc. Lang Construction Inc. Mid-American Glazing Systems Inc. Moen Steel Erection PDM Precast Inc. Pezzetti Erosion Control Inc.
• Sandstone Management Ltd. • TNT Tuckpointing & Building Restoration, LLC • Saxton Inc.
MARTHA L MILLER DRIVE
BUILDING 1
BLDG 2
BLDG 3
Overall Project Diagram
MARTHA L MILLER DRIVE
POUR #2
POUR #1
BUILDING 1
BLDG 2
BLDG 3 POUR #1
Exterior Paving Pour Sequence
POUR #4
POUR #3
CURRENT HIGHLIGHTS • The site sidewalks are being placed throughout the campus. • The gypsum board installation at Building 2 (Fire Auxiliary) has commenced. • Re-spreading black dirt throughout the site is ongoing. • Underground wiring for the site light poles has been trenched in. • The south lot and south west drive are being cleaned and sealed. • The wall angle in the detention area ceilings is being installed for the truss deck ceiling panels.
36,607 SAFETY HOURS TO DATE
PROJECT PHOTOS
9
North faรงade of Building 1 (Main Building)
Flagpole base and sidewalk formed
Light pole base awaiting installation
Break room accent wall painted
IT room sheathing completed
The NE faรงade of Building 2 (Fire Auxiliary)
ERV 2 being installed at Building 2 (Fire Auxiliary)
Site sidewalks east of Building 2
The backup generator being installed
Building 2 apparatus bay lighting being installed
UPCOMING HIGHLIGHTS • Gypsum finishing in Building 1 (Main Building) should be completed next week. • Ceiling grid at the upper level of Building 2 (Fire Auxiliary) should be completed next week. • The detention area is being prepped for combo-unit stools. • The panels in all three buildings, Main Building, Fire Auxiliary, and Storage Garage, will have all conductors pulled to them. • The site sidewalks should be completed next week. • The re-spreading of black dirt will be completed.
CONTACT INFORMATION TEAM CONTACT: Jill Boetger
Kim Jones
Project Manager
Project Coordinator II
Phone: 515-412-5520 jill.boetger@ryancompanies.com
Phone: 319-731-2826 kim.jones@ryancompanies.com
Tyler Lange
Laura Skogman
Senior Project Engineer
Project Coordinator
Phone: 515-412-5529 tyler.lange@ryancompanies.com
Phone: 515-309-8500 laura.skogman@ryancompanies.com
Nate Frye Superintendent
Phone: 515-657-1044 nate.frye@ryancompanies.com