RESEARCH, LABORATORY & CONTROLLED ENVIRONMENT EXPERIENCE CONSTRUCTION MANAGEMENT DESIGN BUILD GENERAL CONTRACTING
University of Pittsburgh Crawford Hall Pittsburgh, PA
2
PJ DICK DICK PJ
A BETTER BUILDING EXPERIENCE PJ Dick is the builder of choice for complex research and laboratory facilities. Our experience in the life sciences market and knowledgeable team allow us to deliver high-quality projects tailored to the specific needs of each facility. Through our commitment to good neighbor policies and safety, we work to maintain a safe, comfortable environment for facility staff, visitors, and project personnel while minimizing disruptions to ongoing operations. As a top ranked contractor that has managed over $23 billion in construction activity, PJ Dick has successfully partnered with owners across the Mid-Atlantic region. With offices in Pittsburgh, State College, and Philadelphia, we are able to provide preconstruction and construction management services for both new construction and renovations.
Founded in 1979 Family Owned ENR Top 100 Contractor $2 billion+ in healthcare projects 80% of work from repeat clients
PJ DICK
3
WHAT WE DO Today’s market is continuously changing to meet design trends. To meet your project objectives, entrust your project to a contractor who will build safely, protect your budget, and require quality standards be met during each project phase. Whether you’re looking to ehance your exisisting facilites or build new ones, PJ Dick will provide you with best-inclass services to achieve your project’s vision. Services we provide: • Construction Management at Risk • Design-Build • Developer-Assist • General Contracting • Preconstruction/Estimating • Virtual Construction Coordination We can do it all.
Healthcare
Commercial/Retail
Government
Hospitality
Industrial/Oil & Gas
Multi-family/Senior Living
K-12 Education
Higher Education
Sports/Entertainment
Parking Garages
4
PJ DICK
Special Projects
Viatris / Mylan Pharamcueticals Canonsburg, PA
PJ DICK
5
Penn State Schuylkill Classroom Building Lab Renovations Schuylkill Haven, PA
6
PJ DICK
A SHARED COMPANY FOUNDATION At PJ Dick, our offices are connected by shared internal resources and expertise that supports projects across all locations. From preconstruction and estimating to virtual construction and quality control, our teams collaborate and bring the full strength of our company’s capabilities to every project.
PRECONSTRUCTION & ESTIMATING
VIRTUAL CONSTRUCTION
WEST CHESTER
PITTSBURGH Regional Office
Regional Office
QUALITY CONTROL
SAFETY PJ DICK
7
Johnson Controls Shrewsbury Development Center
Shrewsbury, PA
8
PJ DICK
RESEARCH, DEVELOPMENT & MANUFACTURING + LABORATORY ENVIRONMENTS Marshall University School of Pharmacy
University of Pittsburgh Scaife Hall
PJ Dick has extensive experience building research and laboratory facilities that support innovation and scientific discovery. Across hospitals, college campuses, and commercial settings, our team delivers specialized spaces designed to meet the evolving needs of researchers and their work.
PJ DICK
9
PENN STATE ABINGTON BIOLOGY LAB RENOVATION ABINGTON, PA Penn State University - Abington Biology Lab Renovation $5 million | 7,500 sf
PJ Dick is providing design-build services with Chiang | O’Brien Architects for the 7,500-sf renovation of an existing biology laboratory on the second floor of the Woodland Building on Penn State Abington’s campus. The Woodland Building is one of the two busiest classroom buildings on campus. It also contains the campus library, art gallery, faculty offices, Woodland Cafe, and computer labs.
10
PJ DICK
PJ DICK
11
12
PJ DICK
PENN STATE SCHUYLKILL CLASSROOM BUILDING LAB RENOVATION SCHUYLKILL HAVEN, PA Penn State University - Schuylkill Classroom Building Lab Renovation $2.6 million | 4,000 sf
PJ Dick provided general contracting services for renovations of the physics, organic and general chemistry, and radiological sciences classroom and laboratory spaces. Renovations included finish upgrades along with spatial reconfiguration and include new mechanical, electrical, plumbing and sprinkler systems for the lab spaces. Project scope also included new casework and fume hoods in the chemistry lab renovation.
PJ DICK
13
PRINCETON PLASMA PHYSICS LAB D-SITE HVAC SYSTEM UPGRADES PRINCETON, NJ Princeton Plasma Physics Laboratory D-Site HVAC Systems Upgrade $6.4 million
PJ Dick provided general contracting services for a phased mechanical infrastructure project, including the demolition and replacement of four air handling units and the retrofit of five existing air handling units with new coils, valves, dampers, and variable frequency drives. The project also included replacement of associated ductwork and mechanical controls, as well as installation of a new mechanical chiller and associated piping to increase the capacity of the existing campus system.
14
PJ DICK
PJ DICK
15
16
PJ DICK
MARSHALL UNIVERSITY SCHOOL OF PHARMACY HUNTINGTON, WV Marshall University School of Pharmacy $44 million| 50,000 sf
PJ Dick served as general contractor as part of a public-private partnership delivering Marshall University’s new threestory, 50,000-sf School of Pharmacy academic building. The facility includes active learning classrooms, simulation labs, administrative offices, and research space, including a 4,300-sf pharmaceutical research laboratory supporting pharmacology, immunology, microbiology, toxicology, pharmaceutics, and medicinal chemistry. The open lab includes cell-culture hoods and incubators, chemical-synthesis fume hoods, a cold room, chemical storage, and a 250-L steam-generated autoclave.
PJ DICK
17
PENN STATE UNIVERSITY MORGAN ACADEMIC CENTER AND GREENBERG SWING SPACE STATE COLLEGE, PA Penn State University Greenberg Laboratory Swing Space $16 million | 33,000-sf addition
PJ Dick provided services for a 33,000-sf renovation that included the creation of laboratory swing space to provide temporary research capacity and maintain continuity during laboratory renovations. Phase I involved demolition of an existing ice rink to create swing space for wet and dry laboratory areas on a new second floor, while Phase II included the fit-out of a new academic center. PJ Dick utilized preconstruction expertise to select best-value MEP systems and electrical service, while coordinating construction activities around the university’s class schedule to minimize disruption to ongoing campus operations.
18
PJ DICK
PJ DICK
19
20
PJ DICK
CARNEGIE MELLON UNIVERSITY RICHARD KING MELLON HALL OF SCIENCES PITTSBURGH, PA CMU Richard King Mellon Hall of Sciences $252 million | 345,000 sf
PJ Dick Mascaro, a Joint Venture, is providing construction management at risk services for Carnegie Mellon University’s newest collaboration hub, the 345,000 sf, 11 story Richard King Mellon Hall of Sciences. The building brings together academic, research, and gallery spaces for the Mellon College of Science, School of Computer Science, and Institute of Contemporary Art, with flexible wet and dry laboratories supporting research in Biological Sciences, Chemistry, Computational Biology, and Neuroscience.
PJ DICK
21
JOHNSON CONTROLS SHREWSBURY DEVELOPMENT CENTER SHREWSBURY, PA Johnson Controls Shrewsbury Development Center 180,000-sf office building, 250,000 sf testing and development building
PJ Dick provided design-build and general construction services as part of a joint venture with McCarthy Building Companies for a 107,000-sf, multistory office building and a 250,000-sf testing and development building.
22
PJ DICK
PJ DICK
23
24
PJ DICK
SIEMENS MANUFACTURING & OFFICE SPACE RENOVATION HARLEYSVILLE, PA Siemens Interior Fitout $4 million | 52,500 sf
PJ Dick provided construction services for the 52,500-sf renovation and build-out of legacy manufacturing and office space. The project included the creation of open office areas and the installation and modification of mechanical, electrical, plumbing (MEP), fire alarm, and fire sprinkler systems.
PJ DICK
25
CARNEGIE MELLON UNIVERSITY SCAIFE HALL PITTSBURGH, PA CMU Scaife Hall $53 million | 85,000 sf
PJ Dick provided CM at Risk services for the demolition of the existing Scaife Hall and construction of a new 85,000-sf facility in its place. The building features lab, office, classroom, and cafe space and houses Carnegie Mellon University’s Mechanical Engineering Department while supporting the College of Engineering. Scaife Hall contains a drone arena and 11 wet and dry laboratory spaces supporting research in a variety of subjects, ranging from biology to robotics and rapid prototyping, with below grade laboratory environments.
26
PJ DICK
PJ DICK
27
AIM Academy Global Innovation Hub Consohocken, PA $9 million| 17,000-sf addition PJ Dick provided CM at Risk services for a 17,000-sf, two-story classroom and lab addition featuring chemistry and life-sciences laboratories, physics and engineering labs, and robotics and technology environments, with MEP tieins and critical construction activities coordinated around ongoing campus operations.
John G. Rangos Sr, Research Facility Pittsburgh, PA $1.7 million | 12,000 sf PJ Dick provided construction management at-risk services for a 12,000-sf biomedical research laboratory renovation funded by the National Institutes of Health (NIH). The project required precise environmental controls, cleanair systems, and highly sensitive assay environments. Work was completed on a two-and-a-half-month schedule while coordinating around existing operations.
28
PJ DICK
Ohio State University Stanley J. Aronoff Laboratory Columbus, OH $22 million | 30,000 sf PJ Dick provided general construction services for a five-story, 107,000-sf precast concrete and brick biological science research facility. The facility includes 30,000 sf of laboratories with 48 fume hoods, specialty gases, distilled-water distribution, dedicated laboratory exhaust, cold rooms, and sterilizers.
University of Pittsburgh Benedum Bioengineering + Nanotechnology Laboratories Pittsburgh, PA $2.1 million | 3,200 sf lab space PJ Dick provided CM at Risk services for renovations to the 11th and 12th floors, converting existing space into specialized Bioengineering and nanotechnology research laboratories. The facility supports bioengineering, nanotechnology, and regenerative medicine research and includes specialized laboratory gases, fume hoods, and dedicated cold-room infrastructure.
PJ DICK
29
UNIVERSITY OF PITTSBURGH PJ Dick has worked closely with the University of Pittsburgh over the years, delivering a variety of projects across multiple markets and campus environments. Our experience includes numerous facilities supporting life sciences and research, giving our team a strong understanding of the unique requirements of working within an active university setting.
University of Pittsburgh Crawford Hall Science Lab Renovation Pittsburgh, PA $52.5 million | 87,000 sf PJ Dick provided CM Agency services with DGS for the modernization of this life-science research facility supporting biology and neuroscience environments. The project included a major laboratory and MEP modernization, along with upgrades to building infrastructure, elevators, telecommunications, and exterior elements. Significant interior renovations were completed across all five floors in two phases, allowing portions of the facility to remain occupied during construction.
University of Pittsburgh Chevron Science Center Phase II Pittsburgh, PA $12.3 million | 20,500 sf
PJ Dick provided Construction Management Agency services for the complete demolition and fit-out of the 11th and 12th floors of Chevron Hall. The project transformed the existing space into open, ballroom-style chemistry research laboratories designed to support modern research needs. Work included replacement of mechanical, electrical, plumbing, and fire protection systems, along with new flexible laboratory casework and equipment.
30
PJ DICK
University of Pittsburgh Salk Hall Phase II Pittsburgh, PA $54 million | 270,000 sf PJ Dick provided CM Agency services with DGS for the 270,000-sf renovation of the School of Pharmacy and School of Dental Medicine. The project modernized teaching, research, and clinic spaces, including dental and pharmacy research laboratories supported by laboratory exhaust, airhandling equipment, emergency power, switchgear, and dedicated MEP infrastructure.
University of Pittsburgh Fifth & Halket Research Center Pittsburgh, PA $73 million | 306,000 sf PJ Dick provided CM at Risk services for the construction of a 10-story laboratory and research building for the University of Pittsburgh. The project includes core and shell construction, building infrastructure, and utility-service connections to support wet and dry laboratory environments.
University of Pittsburgh Scaife Hall Pittsburgh, PA $120.4 million | 110,00-sf addition, 42,000-sf renovation PJ Dick is providing CM at Risk services for a new life-science research facility featuring a 3,000-sf gross anatomy lab, 3,500-sf teaching lab, and 1,100-sf high-tech laboratory. Phased construction allows active research to remain operational, with strict vibration monitoring, coordinated testing schedules, and carefully sequenced demolition to protect ongoing experiments.
PJ DICK
31
CONTROLLED & SPECIALIZED ENVIRONMENTS From sterile clinical spaces to highly controlled laboratory environments, PJ Dick understands the precision required to construct specialized facilities. Our team coordinates complex systems and project requirements to deliver spaces that meet stringent performance and operational needs. Astrobotic Headquarters & Clean Room
32
PJ DICK
Maryland State Police Forensics Laboratory
AHN St. Vincent Hospital Community Cancer Center Pittsburgh, PA
PJ DICK
33
34
PJ DICK
ASTROBOTIC HEADQUARTERS AND CLEAN ROOM PHASES I & II PITTSBURGH, PA Astrobotic Headquarters and Clean Up Room $11 million| 53,000 sf
PJ Dick provided CM at Risk services for the 53,000-sf renovation of an existing manufacturing facility and data center into Astrobotic’s global headquarters. The advanced technical facility supports the design, construction, and testing of lunar landers and rovers, with spacecraft integration cleanrooms, laboratories, test facilities, rover testing, payload operations, and mission control all under one roof.
PJ DICK
35
AHN ST. VINCENT HOSPITAL COMMUNITY CANCER CENTER ERIE, PA AHN St. Vincent Hospital Community Cancer Center $16.5 million | 36,500 sf
PJ Dick provided CM at Risk services for a new 36,500-sf, twostory clinical oncology program featuring radiation and medical oncology services, including a linear accelerator with space for a future unit, PET/CT, HDR, exam rooms, infusion therapy, a family lounge, pharmacy, administrative space, and specialized cleanroom-grade negative-pressure isolation rooms.
36
PJ DICK
PJ DICK
37
38
PJ DICK
MARYLAND STATE POLICE FORENSICS LABORATORY PIKESVILLE, MD Maryland State Police Forensics Laboratory $24.4 million| 68,700 sf
PJ Dick provided General Contracting services for a new crime lab for the Maryland State Police. The 68,700-sf facility was constructed on a 10.8-acre site and includes space for evidence storage, laboratory spaces for biology (DNA), chemistry, firearms, latent prints and questioned documents analysis, a complete photography lab, and administrative space. The stateof-the-art labs have sophisticated environmental controls and laboratory utilities, including negative air pressure systems in some of the labs.
PJ DICK
39
UPMC EAST MONROEVILLE, PA UPMC East $134 million| 293,000 sf
PJ Dick provided CM at Risk services for the construction of a 293,000-sf, six-story, 156-bed acute care hospital. The facility includes a dedicated Cancer Center with a Linear Accelerator (LINAC) vault requiring specialized heavy radiation shielding, seven operating rooms, sterile endoscopy suites, 16 ICU beds, 126 medical/surgical beds, and 12 emergency treatment spaces. Additional clinical spaces include cath labs, triage and exam rooms, and isolation rooms.
40
PJ DICK
PJ DICK
41
42
PJ DICK
UPMC JAMESON EMERGENCY & SURGERY ADDITION NEW CASTLE, PA Emergency/Surgery Addition $18 million | 55,000 sf
PJ Dick provided construction management and general contracting services for a 55,000-SF addition to Jameson Hospital, featuring a 30-bay emergency department, six operating rooms, two GI labs, and a relocated MRI. The addition includes substerile rooms, a decontamination room, and sterile surgical environments, with construction completed while maintaining operations at the existing hospital.
PJ DICK
43
UPMC WILLIAMSPORT STERILE PROCESSING RENOVATIONS WILLIAMSPORT, PA UPMC Williamsport Sterile Processing Renovations $1 million| 2,000 sf
PJ Dick provided CM at Risk services for the renovation and equipment replacement of approximately 2,000 SF of the existing sterile processing facility, completed as part of a broader phased hospital renovation program within an occupied facility directly above and below active clinical floors.
44
PJ DICK
PJ DICK
45
www.pjdick.com