SUNIL BHAI FARM HOUSE KOSMADA, SURAT
3 01DESIGN PROCESS
SCOPE OF WORK
I worked on aspects of interior construction andservices, which required me to look over door window, flooring, and kitchen plumbing details. My learning outcome was to include extra resourcesandusethemtomyadvantageinthedesign’scompletion.
5 01DESIGN PROCESS
7 01DESIGN PROCESS DOOR WINDOW DETAIL
9 01DESIGN PROCESS FLOORING DETAIL
KITCHEN DESIGN
11 01DESIGN PROCESS
TWIN HOUSE CITY LIGHT, SURAT
13 01DESIGN PROCESS
SCOPE OF WORK
Twin home was one of the unique projects I worked on for toilet plumbing, and I added dry plumbing to my interior design vocabulary.
15 01DESIGN PROCESS
TOILET
PLUMBING
17 02 TYPICAL DETAILING
YOGESH BHAI, RESIDENCE
19 01DESIGN PROCESS
SCOPE OF WORK
Yogeshbhaihouseprovidedmewithextensive information of the materials available in the market for wardrobes as well as some tricks for achieving good closet design.
21 01DESIGN PROCESS
WARDROBE DETAIL
23 01DESIGN PROCESS
PINKESH BHAI, RESIDENCE HARIHAR
25 01DESIGN PROCESS
SCOPE OF WORK
I conceptualized a step well into a courtyard while keeping the practicality of the space in mind and keeping the same vibe going throughout the space.
27 01DESIGN PROCESS
COURTYARD DESIGN
29 01DESIGN PROCESS
PINKESH BHAI, RESIDENCE HARIHAR
31 01DESIGN PROCESS
SCOPE OF WORK
House of drems enabled me to learn the complexities of electrical layouting as well as a streamlined method of demonstrating switch connection.
33 02 TYPICAL DETAILING
ELECTRICAL LAYOUT GROUND FLOOR
35 02 TYPICAL DETAILING
CEILING RENDERINGWALL LEVELING
COURTYARD (PINKESH BHAI) CEMENT SHEET
STEPS OF EXECUTION ON SITE
37 03 SITE VISIT
CEILING FRAME WORK SHEET GRID SWITCH BOARD 1.SlabPrimerWork 2.Wallpopmarkingandceilinglvl marking 3.HVACmarking 4.ElectricWork 5.WallPOPWork 6.CeilingFrameWork 7.ToiletPlumbing 8.DoorWindowFrameStoneWork 9.ToiletTilesWork 10.FlooringWork 11.FinalWallPOPFinish 12.FurnitureWork 13.Light,SB,Sanitaryware,Mirror,Glass, ACFit 14.ColorWork 15.Curtain-unholsterywork
PLUMBING MARKINGFLUSH TANK FITTING
WARDROBE INNER DESIGNWALL PANELLING
39 03 SITE VISIT
FRAME
PLUMBING
41 01DESIGN PROCESS