P
innacle undertook the modeling, clash coordination and 2D shop drawings for the Metro Headquarters in Martin Luther King BLVD in Las Vegas, which is spread over a project area of 374,400 sq. ft. Our scope of work included the construction of Building 1 and Building 2 with 4 and 5 floors respectively. However, our client executed level 2 of Building no. 2.
BIM Start Date
September, 2010
BIM End Date
November, 2010
Project Area
374,400 Sq.Ft.
General Contractor
The PENTA Building Group.
MEP Contractor
Bombard Mechanical
Scope of Work Pinnacle was responsible for creating 3D model, clash coordination and 2D shop drawing of duct, mechanical pipes, associated fittings, accessories, equipments, diffusers etc in the software platform Cad-Duct (TSI) 2.4.
Pinnacle’s Value Addition
On-site Construction Image
The project was scheduled with weekly milestones which was something hard to achieve. However, we successfully completed this project without failure.
On-site Construction Image
Global Leader in BIM Services www.pinnaclecad.com
Copyright Š 2011 Pinnacle Infotech, Inc.