1 De Haro
an SKS Partners development
Designed by Perkins&Will | Pfau Long, 1 De Haro is located
While developed in Europe over 20 years ago, CLT is becoming
at the intersection of San Francisco’s SOMA, Potrero Hill,
an emerging building material in the United States. The 1 De
and Showplace Square districts and will be a 4-story, 60-ft
Haro project is pioneering the use of CLT, creating an important
tall building when completed. The ground floor will be built
step for the City of San Francisco toward the use of more
from concrete, offering 20-foot tall ceilings and a welcoming
sustainable building materials. 1 De Haro showcases how the
mezzanine space, while the upper floors will be constructed out
development of future building code cycles in 2023 will allow
of mass timber.
the use of CLT and other mass timber materials for structures up to 18 stories.
Mass timber is an engineered wood product involving the lamination and compression of multiple layers to create solid
Construction on 1 De Haro started in 2019 and, once ďŹ nished,
wood columns and beams (known as glulam), and panels (known
this project will be the ďŹ rst mass timber building in San
as cross-laminated timber or CLT). CLT is one of many mass
Francisco to use CLT and the first multi-story building of its
timber framing subsets where layered dimensional lumber
type in California.
boards are set at right angles to one another and laminated to create panels used in floor, roof and wall assemblies. Not only
Mass timber was added to the California Building Code in 2016,
do the resulting panels have a comparable structural capacity
but that code addition limits a mass timber building to just 6
to concrete, the manufacturing process is also quite sustainable
floors or under 85 feet in building height.
and allows for exposed panels with a beautiful, warm, natural wood finish.