Feasibility study presentation staff and community presentation (for website)

Page 1

Pedare Christian College

One College Feasibility Study Introduction Ms Katey Elding Chair of the Pedare Board


Pedare Christian College

Feasibility Study Overview Mr Lindsay Jackson Acting Principal


2 Options OPTION 1 One College Two Campuses i.e we stay as we are and improve the infrastructure and learning environments of both campuses

OPTION 2 One College One Campus i.e. we move the JS campus to the current MS/SS campus on Surrey Farm Drive, and so all 3 schools (Junior, Middle and Senior) would be on one site


Background to Feasibility Study • Early 2015 Strategic Review and Community Consultation (Kathy Carruthers Consulting)

• Second half of 2015 - Review findings transformed into Strategic Direction, Towards 2020 • Term 1 of 2016 - Booklet for community Towards 2020 Pedare Christian College Strategic Direction


5 Areas of Strategic Focus • One College • Quality Teaching and Learning • Beliefs and Wellbeing • Communication and Celebration • Sustainable Future, Place and Space.


Strategic Priority #1: One College Aim: Explore, foster and develop a strong One College culture

1.1 Explore and develop a feasibility and business plan for a “One College One Campus� school 1.2 Explore opportunities and develop a plan for inclusion of an Early Learning Centre at the College 1.3 Articulate and celebrate transition through the College 1.4 Ensure consistency of processes and expectations across the College


Performance Task Develop a new College Master Plan based on either a: • “One College One Campus” or • “One College Two Campuses” scenario. That’s what the College Board and Management has done over the last 12 months! The Feasibility and Master Plan is now complete


“Stars Aligning” 1. First star – Vacant Corner Block sale 2. Second star – Schools Low Interest Loan Scheme • Would enable the One College Two Campus option to be pursued • Substantial improvements on both campuses


One College One Campus Feasibility 3. Third star – potential sale of the JS Campus


One College One Campus Scenario - advantages • Educational • Cultural • Economic • Brand & Marketing • Advantages for Junior Campus


Pedare Christian College

Combined Campus Draft Concept Designs Mr Mark Watson Business Manager


Artists impression of a potential new Junior School Administration and Early Learning building

Pedare Christian College (including Reception Ready, Reception and Year 1 classrooms)


Artists impression of a potential new Middle School STEM building


HEADING TEXT LEGEND TRANSPORTABLE TO BE RELOCATED/REMOVED

NEW TRANSPORTABLE LOCATION

OVAL

TRANSPORTABLE TO REMAIN IN EXISTING LOCATION

CHI L D CARE CENTRE

RELOCATE EXISTING PHYS. ED. STORE TO EASTERN SIDE OF OVAL

CARPARK

Re l o c a t e d Pr o p e r t y & Ma i n t e n a n c e St o r e

5

PL AYI NG FI EL DS

6

Re l o c a t e d Ph y s . Ed . St o r e

DEMOLISH EXISTING PROPERTY & MAINTENANCE STORE

SAL TBUSH

7

SALT BUSH TRANSPORTABLE TO REMAIN IN EXISTING LOCATION. OFFICES TO REMAIN AND EXISTING YR 8 CORE CLASSROOM TO BE RE-USED AS NEW CHINESE

8

5 NEW TRANSPORTABLES

10

CAL ADENI A

MALLEE

9

MALLEE TRANSPORTABLE TO REMAIN IN EXISTING LOCATION. RE-USE AND REFURBISH FOR JUNIOR SCHOOL LIBRARY

CRI CKET NETS

L I NK TO ONE+ RELOCATED TRANSPORTABLES FOR TEMPORARY STUDENT SERVICES

GREVI L L EA

4

PLAYGROUND

7 1 RELOCATED TRANSPORTABLES 1, 2 & 7 + NEW TRANSPORTABLES 10 & 11 FOR TEMPORARY PERFORMING ARTS

10

11

CHAPEL

3

St u d e n t

RELOCATE TO SIDE OF EXISTING PHYS. ED. STORE ON EASTERN SIDE OF OVAL

6

2

Se r v i c es

DEMOLISH REDGUM

11

Pe r f o r mi n g Ar t s

4

ADMI N.

3 1

CARPARK

2

CARPARK

RELOCATE 3 + 4 FOR STUDENT SERVICES RELOCATE 1 + 2 FOR PERFORMING ARTS

CARPARK P & F SHOP TO BE DEMOLISHED. NEW P & F SHOP IN EXISTING RESIDENCE

CARPARK

Re l o c a t e P & F Sh o p i n Ex i s t i n g Bu i l d i n g 44 Currie Street

THE RESI DENCE

Adelaide SA 5000 P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.au

COURTS

W www.hardymilazzo.com.a

PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY

EXISTING SITE PLAN & TRANSPORTABLE RELOCATION PLAN

COMBINED CAMPUS

3 April 2017

6839-1 C Copyright


HEADING TEXT J STAGE 1

A. B.

I

C. D.

E. F. G. H.

OVAL

I.

J. K.

L. M.

CHI L D CARE CENTRE

N.

J UNI OR SCHOOL

H +U

C

Re l o c a t e d Pr o p e r t y & Ma i n t e n a n c e St o r e

C

C

Re l o c a t e d Ed . St o r e

Ph y s . RELOCATED COURTS

F COVERED OUTDOOR L EARNI NG

MALLEE

A

CRI CKET NETS

CAL ADENI A

A Pe r f o r mi n g Ar t s

SENI OR SCHOOL

E

L I BRARY RESOURCE CENTRE

L I NK TO ONE+

T

Q

A

A

St u d e n t Se r v i c e s

CONSTRUCTION OF NEW LIBRARY RESOURCE CENTRE CONSTRUCTION OF CARPARK BELOW NEW MIDDLE SCHOOL BLOCK CONSTRUCTION OF PERMANENT STUDENT SERVICES (2 STOREY) REFURBISH EXISTING LIBRARY IN BORONIA BUILDING - CONVERSION OF FIRST FLOOR LIBRARY TO 3 GLA's - INSTALLATION OF LIFT TO BORONIA U. CONSTRUCTION OF GYM IN PLACE OF RELOCATED COURTS V. REFURBISHMENT OF CHAPEL AND CONSTRUCTION OF FUNCTION CENTRE & PERMANENT GROUNDS WORKSHOP, OFFICES AND STORES BELOW W. REFURBISHMENT OF STUDENT NURSE AND STUDENT RECEPTION IN ADMINISTRATION BUILDING

N

CHAPEL

V

S

OPEN LANDSCAPED COMMUNAL ACTI VI TY

L

A V

RECONFIGURE EXISTING SOUTHERN CARPARK REFURBISHMENT OF EXISTING GROUND FLOOR OF SANDALWOOD BUILDING FOR NEW SCIENCE & FOOD TECHNOLOGY

Q. R. S. T.

PLAYGROUND

A

O. P.

A

FUTURE WORKS

G

A

STAGE 2

SAL TBUSH

GREVI L LEA

A

RELOCATE TRANSPORTABLES (REFER TO 01 EXISTING SITE PLAN & TRANSPORTABLE RELOCATION PLAN) DEMOLISH EXISTING P&F SHOP AND PERMANENTLY RELOCATE INTO EXISTING RESIDENCE CONSTRUCT NEW JUNIOR SCHOOL BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA CONSTRUCT NEW MIDDLE SCHOOL BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA REFURBISH EXISTING MALLEE TRANSPORTABLE FOR JUNIOR SCHOOL LIBRARY RELOCATE CHINESE INTO EXISTING YR 8 CORE ROOM IN SALTBUSH TRANSPORTABLE (OFFICES IN SALTBUSH TO REMAIN) PROVISION OF OHSC INTO GREVILLEA RELOCATE BASKETBALL COURTS CONSTRUCT TEMPORARY NORTHERN CARPARK ON OVAL RECONFIGURE NORTHERN CARPARK RELOCATED CRICKET NETS PROVISION OF OHSC KITCHEN FACILITIES INTO EXISTING KITCHEN TEMPORARILY RELOCATE LEAP AND LEARNING SUPPORT IN EXISTING RESIDENCE PERMANENTLY RELOCATE LEAP AND LEARNING SUPPORT INTO FIRST FLOOR OF BORONIA BUILDING

W V

COVERED OUTDOOR L EARNI NG

W P

ADMI N.

D

P

ADMI N. ENTRY

D

MI DDLE SCHOOL (R BELOW)

O

Re l o c a t e d P & F Sh o p i n Ex i s t i n g Bu i l d i n g

B

M

M

Te mp o r a r y Re l o c a t i o n o f L EAP a n d L e a r n i n g Su p p o r t 44 Currie Street

THE RESI DENCE

Adelaide SA 5000 P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.au W www.hardymilazzo.com.a

PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY

COMBINED CAMPUS

NEW WORKS & STAGING PLAN

3 April 2017

6839-1 C Copyright


HEADING TEXT STAGE 1

RELOCATE TRANSPORTABLES (REFER TO 01 EXISTING SITE PLAN & TRANSPORTABLE RELOCATION PLAN) B. DEMOLISH EXISTING P&F SHOP AND PERMANENTLY RELOCATE INTO EXISTING RESIDENCE C. CONSTRUCT NEW JUNIOR SCHOOL BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA D. CONSTRUCT NEW MIDDLE SCHOOL BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA E. REFURBISH EXISTING MALLEE TRANSPORTABLE FOR JUNIOR SCHOOL LIBRARY F. RELOCATE CHINESE INTO EXISTING YR 8 CORE ROOM IN SALTBUSH TRANSPORTABLE (OFFICES IN SALTBUSH TO REMAIN) G. PROVISION OF OHSC INTO GREVILLEA H. RELOCATE BASKETBALL COURTS I. CONSTRUCT TEMPORARY NORTHERN CARPARK ON OVAL J. RECONFIGURE NORTHERN CARPARK K. RELOCATED CRICKET NETS L. PROVISION OF OHSC KITCHEN FACILITIES INTO EXISTING KITCHEN M. TEMPORARILY RELOCATE LEAP AND LEARNING SUPPORT IN EXISTING RESIDENCE PERMANENTLY RELOCATE LEAP AND LEARNING SUPPORT INTO N. FIRST FLOOR OF BORONIA BUILDING A.

STAGE 2

O. P.

RECONFIGURE EXISTING SOUTHERN CARPARK REFURBISHMENT OF EXISTING GROUND FLOOR OF SANDALWOOD BUILDING FOR NEW SCIENCE & FOOD TECHNOLOGY

FUTURE WORKS

Q. R. S. T. U. V.

CONSTRUCTION OF NEW LIBRARY RESOURCE CENTRE CONSTRUCTION OF CARPARK BELOW NEW MIDDLE SCHOOL BLOCK CONSTRUCTION OF PERMANENT STUDENT SERVICES (2 STOREY) REFURBISH EXISTING LIBRARY IN BORONIA BUILDING - CONVERSION OF FIRST FLOOR LIBRARY TO 3 GLA's - INSTALLATION OF LIFT TO BORONIA CONSTRUCTION OF GYM IN PLACE OF RELOCATED COURTS REFURBISHMENT OF CHAPEL AND CONSTRUCTION OF FUNCTION CENTRE & PERMANENT GROUNDS WORKSHOP, OFFICES AND STORES BELOW

W. REFURBISHMENT OF FIRST AID ROOM AND STUDENT RECEPTION IN ADMINISTRATION BUILDING

44 Currie Street Adelaide SA 5000 P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.au W www.hardymilazzo.com.a

PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY

MASTERPLAN GROUND LEVEL PLAN

COMBINED CAMPUS

4 April 2017

6839-1 C Copyright


HEADING TEXT STAGE 1

RELOCATE TRANSPORTABLES (REFER TO 01 EXISTING SITE PLAN & TRANSPORTABLE RELOCATION PLAN) B. DEMOLISH EXISTING P&F SHOP AND PERMANENTLY RELOCATE INTO EXISTING RESIDENCE C. CONSTRUCT NEW JUNIOR SCHOOL BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA D. CONSTRUCT NEW MIDDLE SCHOOL BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA E. REFURBISH EXISTING MALLEE TRANSPORTABLE FOR JUNIOR SCHOOL LIBRARY F. RELOCATE CHINESE INTO EXISTING YR 8 CORE ROOM IN SALTBUSH TRANSPORTABLE (OFFICES IN SALTBUSH TO REMAIN) G. PROVISION OF OHSC INTO GREVILLEA H. RELOCATE BASKETBALL COURTS I. CONSTRUCT TEMPORARY NORTHERN CARPARK ON OVAL J. RECONFIGURE NORTHERN CARPARK K. RELOCATED CRICKET NETS L. PROVISION OF OHSC KITCHEN FACILITIES INTO EXISTING KITCHEN M. TEMPORARILY RELOCATE LEAP AND LEARNING SUPPORT IN EXISTING RESIDENCE N. PERMANENTLY RELOCATE LEAP AND LEARNING SUPPORT INTO FIRST FLOOR OF BORONIA BUILDING A.

STAGE 2

O. P.

RECONFIGURE EXISTING SOUTHERN CARPARK REFURBISHMENT OF EXISTING GROUND FLOOR OF SANDALWOOD BUILDING FOR NEW SCIENCE & FOOD TECHNOLOGY

FUTURE WORKS

Q. R. S. T. U.

V. W.

CONSTRUCTION OF NEW LIBRARY RESOURCE CENTRE CONSTRUCTION OF CARPARK BELOW NEW MIDDLE SCHOOL BLOCK CONSTRUCTION OF PERMANENT STUDENT SERVICES (2 STOREY) REFURBISH EXISTING LIBRARY IN BORONIA BUILDING - CONVERSION OF FIRST FLOOR LIBRARY TO 3 GLA's - INSTALLATION OF LIFT TO BORONIA CONSTRUCTION OF GYM IN PLACE OF RELOCATED COURTS REFURBISHMENT OF CHAPEL AND CONSTRUCTION OF FUNCTION CENTRE & PERMANENT GROUNDS WORKSHOP, OFFICES AND STORES BELOW REFURBISHMENT OF FIRST AID ROOM AND STUDENT RECEPTION IN ADMINISTRATION BUILDING

44 Currie Street Adelaide SA 5000 P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.au W www.hardymilazzo.com.a

PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY

MASTERPLAN UPPER LEVEL PLAN

COMBINED CAMPUS

4 April 2017

6839-1 C Copyright


GoogleEarth view of proposed Pedare Christian College Junior School access road


Pedare Christian College

Separate Campuses Draft Concept Designs Mr Mark Watson Business Manager


LEGEND

PERFORMING ARTS TO BE DEMOLISHED

L OWER L EVEL OVAL

HEADING TEXT

MUSIC SUITES TO BE DEMOLISHED TRANSPORTABLE TO BE RELOCATED/REMOVED

PERFORMI NG ART S

NEW TRANSPORTABLE LOCATION

GROUNDSKEEPER SHEDS TO BE DEMOLISHED

DI ANEL LA EXISTING DIANELLA RELOCATED SOUTH OF ACACIA

MUSI C SUI TES

BL UE GUM

EXI T

CAR PARK

TEA TREE TOI L ETS TEA TREE TO BE DEMOLISHED

YR 5

CORREA ENTRY

ADMI NI STRATI ON

MI D L EVEL COURTYARD

HARD PL AY

AMPHI THEATRE

BANKSI A

UNDERCOVER ASSEMBL Y AREA

ACACI A J UNI OR PRI MARY PLAYGROUND

MI DDL E PRI MARY PLAYGROUND

TOI L ETS & SPORTS STORE

BASKETBAL L COURTS

DI ANEL LA 44 Currie Street Adelaide SA 5000

TEMPORARY PERFORMI NG ARTS

P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.a W www.hardymilazzo.com.

PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY

EXISTING SITE PLAN AND TRANSPORTABLE RELOCATION PLAN

SEPARATE CAMPUS JUNIOR SCHOOL

15 March 2017

6839-1

01

C Copyright


PROPERTY MAINTENANCE SHED BELOW

HEADING TEXT

12 CARPARKS BELOW

L OWER L EVEL OVAL

MUSI C SUI TES

B

F L I BRARY RESOURCE CENTRE

E

COVERED OUTDOOR L EARNI NG AREA PERFORMI NG ARTS

E

YR 5

B

H

OUTDOOR PL AY AREA

TOI L ETS

BL UE GUM

G

G

CORREA

B A

I

ADMI NI STRATI ON

MI D L EVEL COURTYARD

EARL Y L EARNI NG CENT RE

AMPHI THEATRE

UNDERCOVER ASSEMBL Y AREA

BANKSI A

STAGE 1 A. CONSTRUCT ELC, ADJACENT COVERED OUTDOOR LEARNING AREA AND MINOR REFURBISHMENT OF EXISTING ADMIN ENTRY B. RECONFIGURE CARPARK AND SLIP LANE C. REFURBISH ACACIA AS PER SALT STUDIO PLAN

ACACI A

STAGE 2

MI DDL E PRI MARY PLAYGROUND

J UNI OR PRI MARY PLAYGROUND

J

D. E. F.

G.

C

TOI L ETS & SPORTS STORE

H.

RELOCATE DIANELLA TRANSPORTABLE CONSTRUCT PERFORMING ARTS & MUSIC SUITES (1ST) CONSTRUCT LIBRARY RESOURCE CENTRE, UNDERGROUND CARPARK & PROPERTY MAINTENANCE SHED (2ND) CONSTRUCT NEW OUTDOOR PLAY AREA AND COVERED OUTDOOR LEARNING AREA (3RD) CONSTRUCT EXTENSION TO BLUEGUM (CANTEEN) & REFURBISH EXISTING FOYER/BATHROOMS

FUTURE WORKS

I. J.

BASKETBAL L COURTS

REFURBISH CORREA SIMILAR TO SALT STUDIO PLAN REFURBISH BANKSIA AND CONSTRUCT EXTENSION

DI ANEL LA

D

TEMPORARY PERFORMI NG ARTS

44 Currie Street Adelaide SA 5000 P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.a W www.hardymilazzo.com.

PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY

PROPOSED STAGING PLAN

SEPARATE CAMPUS JUNIOR SCHOOL

15 March 2017

6839-1

02

C Copyright


HEADING TEXT LEGEND TRANSPORTABLE TO BE RELOCATED/REMOVED

NEW TRANSPORTABLE LOCATION

TRANSPORTABLE TO REMAIN IN EXISTING LOCATION

OVAL CHI L D CARE CENTRE

CARPARK

5

Ne w Pr o p e r t y & Ma i n t e n a n c e St o r e Ph y s . Ed. St o r e

PL AYI NG FI EL DS

NEW TRANSPORTABLES

9

EXISTING PROPERTY & MAINTENANCE STORE TO REMAIN

10

SAL TBUSH

6

EXISTING MALLEE TRANSPORTABLES TO REMAIN

TRANSPORTABLE TO REMAIN IN EXISTING LOCATION. TO BE USED AS TEMPORARY SPACE

B

CAL ADENI A

MALLEE

RELOCATED TRANSPORTABLES FOR TEMPORARY STUDENT SERVICES

7 L I NK TO ONE+ CRI CKET NETS

GREVI L L EA

3

PLAYGROUND

CHAPEL

9 1

RELOCATED TRANSPORTABLES 1, 2, 9 & 10 FOR TEMPORARY PERFORMING ARTS

St u d e n t

4

RELOCATE TO SIDE OF EXISTING PHYS. ED. STORE FOR NEW PROPERTY & MAINTENANCE STORE

5

10

Se r v i c es

DEMOLISH REDGUM

2

Pe r f o r mi n g Ar t s

RELOCATE 3 + 4 FOR STUDENT SERVICES

4

ADMI N.

3 1

CARPARK

2

CARPARK

RELOCATE 1 + 2 FOR PERFORMING ARTS

CARPARK P & F SHOP TO BE DEMOLISHED. NEW P & F SHOP IN EXISTING RESIDENCE

CARPARK

Re l o c a t e P & F Sh o p i n Ex i s t i n g Bu i l d i n g 44 Currie Street

THE RESI DENCE

Adelaide SA 5000 P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.au

COURTS

W www.hardymilazzo.com.a

PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY

EXISTING SITE & TRANSPORTABLE PLAN

SEPARATE CAMPUS

6839-1 C Copyright


HEADING TEXT STAGE 1

A. B. C. D.

RELOCATE TRANSPORTABLES (REFER TO 01 EXISTING SITE & TRANSPORTABLE RELOCATION PLAN) DEMOLISH EXISTING P&F SHOP AND PERMANENTLY RELOCATE INTO EXISTING RESIDENCE CONSTRUCT NEW STEM BUILDING BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA RELOCATE CRICKET NETS

STAGE 2

E. F.

OVAL

CHI L D CARE CENTRE

Ne w Pr o p e r t y & Ma i n t e n a n c e St o r e

A

FUTURE WORKS CONSTRUCT NEW MIDDLE SCHOOL BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA H. RELOCATE HOMS, AHOMS, EXTRA CURRICULAR & DIRECTOR OF SPORT TO CALADENIA BUILDING I. INSTALLATION OF LIFT IN THE BORONIA BUILDING J. CONSTRUCTION OF PERMANENT STUDENT SERVICES K. REFURBISHMENT OF CHAPEL AND CONSTRUCTION OF FUNCTION CENTRE WITH PERMANENT GROUNDS WORKSHOP, OFFICE AND STORES BELOW L. REFURBISHMENT OF STUDENT NURSE AND STUDENT RECEPTION IN ADMINISTRATION BUILDING M. CONSTRUCTION OF TECHNOLOGY HUB FOR WOODWORK AND METAL WORKSHOPS G.

Ph y s . Ed. St o r e

PL AYI NG FI EL DS

G

SAL TBUSH

MI DDL E SCHOOL BL OCK MALLEE

H

CAL ADENI A

SENI OR SCHOOL CRI CKET NETS

G

L I NK TO ONE+

D H

GREVI L LEA

I PLAYGROUND

K A A Pe r f o r mi n g Ar t s

CHAPEL

K A

L

L ADMI N. ADMI N. ENTRY

St u d e n t

Se r v i c es

J M

COVERED OUTDOOR L EARNI NG

F

A

A

OPEN LANDSCAPED COMMUNAL ACTI VI TY

A

K

RECONFIGURE EXISTING SOUTHERN CARPARK REFURBISHMENT OF EXISTING GROUND FLOOR OF SANDALWOOD BUILDING FOR NEW SCIENCE ROOM AND FOOD TECHNOLOGY

C

F

C

TECHNOL OGY HUB

NEW STEM BUI L DI NG

E

Re l o c a t e P & F Sh o p i n Ex i s t i n g Bu i l d i n g

B 44 Currie Street

THE RESI DENCE

Adelaide SA 5000 P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.au

COURTS

W www.hardymilazzo.com.a

PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY

SEPARATE CAMPUS

NEW WORKS & STAGING PLAN

6839-1 C Copyright


1 5 M ar ch 2 HEADING TEXT 0 1 7

STAGE 1 A.

B. C. D.

RELOCATE TRANSPORTABLES (REFER TO 01 EXISTING SITE & TRANSPORTABLE RELOCATION PLAN) DEMOLISH EXISTING P&F SHOP AND PERMANENTLY RELOCATE INTO EXISTING RESIDENCE CONSTRUCT NEW STEM BUILDING BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA RELOCATE CRICKET NETS

STAGE 2

E. F.

RECONFIGURE EXISTING SOUTHERN CARPARK REFURBISHMENT OF EXISTING GROUND FLOOR OF SANDALWOOD BUILDING FOR NEW SCIENCE ROOM AND FOOD TECHNOLOGY

G.

CONSTRUCT NEW MIDDLE SCHOOL BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA RELOCATE HOMS, AHOMS, EXTRA CURRICULAR & DIRECTOR OF SPORT TO CALADENIA BUILDING INSTALLATION OF LIFT IN THE BORONIA BUILDING CONSTRUCTION OF PERMANENT STUDENT SERVICES REFURBISHMENT OF CHAPEL AND CONSTRUCTION OF FUNCTION CENTRE WITH PERMANENT GROUNDS WORKSHOP, OFFICE AND STORES BELOW REFURBISHMENT OF STUDENT NURSE AND STUDENT RECEPTION IN ADMINISTRATION BUILDING CONSTRUCTION OF TECHNOLOGY HUB FOR WOODWORK AND METAL WORKSHOPS

FUTURE WORKS

H. I. J. K. L. M.

44 Currie Street Adelaide SA 5000 P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.au W www.hardymilazzo.com.a

PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY

MASTERPLAN GROUND LEVEL PLAN

SEPARATE CAMPUS

6839-1

03

C Copyright


1 5 M ar ch 2 HEADING TEXT 0 1 7

STAGE 1 A.

B. C. D.

RELOCATE TRANSPORTABLES (REFER TO 01 EXISTING SITE & TRANSPORTABLE RELOCATION PLAN) DEMOLISH EXISTING P&F SHOP AND PERMANENTLY RELOCATE INTO EXISTING RESIDENCE CONSTRUCT NEW STEM BUILDING BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA RELOCATE CRICKET NETS

STAGE 2

E. F.

RECONFIGURE EXISTING SOUTHERN CARPARK REFURBISHMENT OF EXISTING GROUND FLOOR OF SANDALWOOD BUILDING FOR NEW SCIENCE ROOM AND FOOD TECHNOLOGY

G.

CONSTRUCT NEW MIDDLE SCHOOL BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA RELOCATE HOMS, AHOMS, EXTRA CURRICULAR & DIRECTOR OF SPORT TO CALADENIA BUILDING INSTALLATION OF LIFT IN THE BORONIA BUILDING CONSTRUCTION OF PERMANENT STUDENT SERVICES REFURBISHMENT OF CHAPEL AND CONSTRUCTION OF FUNCTION CENTRE WITH PERMANENT GROUNDS WORKSHOP, OFFICE AND STORES BELOW REFURBISHMENT OF FIRST AID ROOM AND STUDENT RECEPTION IN ADMINISTRATION BUILDING CONSTRUCTION OF TECHNOLOGY HUB FOR WOODWORK AND METAL WORKSHOPS

FUTURE WORKS

H. I. J. K. L. M.

44 Currie Street Adelaide SA 5000 P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.au W www.hardymilazzo.com.a

PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY

MASTERPLAN UPPER LEVEL PLAN

SEPARATE CAMPUS

6839-1

04

C Copyright


FAQ Q. Will school fees increase as a result of any Capital works? A. Fee increases are expected to be similar to previous years only to cover increases in operational costs such as salaries and wages, utilities, maintenance etc. School fees will not be used to fund any Capital works program under either option. Q. Has the College considered how traffic will be impacted under a Combined Campus option? A. The College has engaged GTA Consultants to undertake work in this area and provide options and recommendations for the best way to accommodate the flows that could occur under this option.

additional traffic


FAQ Q. Under the Combined Campus option, will the Junior Campus site have to be sold? A. Yes. It is central to the Combined Campus option to sell this site. The Combined Campus option cannot be achieved otherwise. Q. Has a decision been made on whether it will be a Combined Campus or Separate Campus outcome? A. Not yet. Both options are now with the Board for consideration. A decision will be made in the coming months by the Board, based on the best interests of the College to ensure a sustainable future and for the best interests of the learning and welfare of the students. It is not yet possible to provide a definitive timeframe.


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.